FINAL
Page | 2
Introduction
The UIIDP Project Operations Manual (POM) is in two Volumes. Volume 1 is the main text of
the POM with important Annexes.
Volume 2, which is this one, contains Additional Annexes which are also important but due their
bulky nature are better accommodated in a separate Volume of the POM.
There are also Standalone Annexes to the POM, which are listed in Volume 1, which are mainly
Guidelines and Manuals that provide detailed procedures of some of the thematic areas covered in
the main text of the POM Volume 1.
Additional Annexes
1. TOR for UIIDP 1st and 2nd APA of 61 cities and two regions in
Oromia and SNNPRS
Terms of Reference
For
Consultancy Services for the First (1st) and Second (2nd) Annual Performance Assessment
of 61 Cities and 2 regions in Oromia (38 cities) and SNNPRS (23 cities) participating in the
UIIDP for Allocations for EFY 2012 (2019/20) & EFY 2013 (2020/21)
Page | 3
BACKGROUND
The Ministry of Urban Development and Housing (MUDHo) has introduced the Ethiopian
Cities Sustainable Prosperity Goals (ECSPG) that will lead to the establishment of Green
Growth, Resilient and Well Governed Cities that support Ethiopia’s transformation from a
predominantly agricultural nation to a nation with a rapidly growing industrial sector that
contributes to the economic growth necessary to achieve middle income country status by 2025.
The ECSPG is the Ministry’s contribution to the Government of Ethiopia’s Growth and
Transformation Plan (GTP1) 2010/11-2014/15 and (GTP 2) 2015/16-20/2020.
The ECSPG comprises nine pillars – or dimensions - that will contribute to the achievement of
middle income country status and bring the desired political-economic transformation. Growth is
a key objective of the Ministry’s initiatives and programs for urban development and
construction; the main economic objective. The main elements of the political component of the
nine pillars that make up the ECSPG are good governance, democratization at local level and the
satisfaction of citizens and residents with the delivery of public services and performance of
government – at local, regional and federal levels. Together, the economic and political
interventions of the ECSPG will produce the prosperity that accompanies achievement of middle
income country status.
The ECSPG’s nine strategic pillars will contribute to Ethiopia’s achievement of middle income
country status by producing a transformation in the economic productivity and in the good
governance of cities. Economic transformation will be achieved by increased good urban
governance in general and in the focus of the ECSPG on Job Creation - Micro & Small Enterprise
Development in particular. This focus will be supported by improvements in land use planning,
serviced land delivery, housing development, infrastructure, services and green growth
development. Investments in all these areas and mobilization of resources to meet increasing
operating and investment costs are a main focus of the MUDHo.
The attention given to economic development and governance does not neglect social and
environmental development, nor will the key GTP cross cutting issues be neglected. These
include gender and children’s affairs, youth and sports development, HIV/AIDS prevention and
control, social welfare, labor affairs, population and development, culture and tourism, science
and technology, environment and climate change.
The developmental framework for the ECSPG aims to bring prosperity to Ethiopia’s cities.
The ECSPG programs, sub-programs and projects will be implemented through to 2025 with
GTP, SDG and benchmarked middle income country indicators measured against achievement of
targets in three indexed areas: good governance, economic and social development (growth) and
citizens’ satisfaction.
In terms of achievement of the targets, goals and vision we will continuously ask questions, learn
lessons and fine tune the Ministry’s interventions to answer the following:
Page | 4
transparency and accountability, rule of law and security, and subsidiarity -
administrative and fiscal decentralization.
SUSTAINABLE PROSPERITY
Figure 1.
3. Citizens’ Satisfaction (Public Perceptions) Index (demand side): What are public
perceptions of the development of urban centers and cities? How can we, continuously,
identify public perceptions and attitudes, incorporate them into policies, strategies and
programs and thus effectively mobilize public opinion and public resources for the
achievement of the 2025 Vision,
The Economic and Social Development, Developmental Good Governance and Citizens’
Satisfaction indices will be measured to determine: the current baseline; the GTP2 and III
performance targets; and the benchmarked performance targets to 2025, linked to comparable
middle income country achievements.
Page | 5
This baseline data, GTP2 and 2025 benchmark targets will, in the three areas described, comprise
overall our “Prosperity Index”. The aim is to establish the Cities’ Prosperity Index, containing
the three elements described – growth, governance and citizens’ satisfaction for: a) urban centers
and cities with a population of 20,000+ in the Central Statistical Agency census, and add cities
that achieve this population level; and b) rural development centers that contain basic clustered
education, health and administrative facilities as well as commercial services.
The ECSPG contains ten pillars, 12 programs / sub-programs and 43 projects for urban
development:-
Pillar 1. Urban Transformational Leadership
.
In 2008, a credit in the amount of USD150 million equivalent was made available to the
government of Ethiopia for the ULGDP1, under which 19 1cities who benefitted from the CBDSD
support were able to receive grant funding for infrastructure and services based on their
performance in key areas related to city management.
In 2011 the World Bank approved an additional USD 150 million due to the fact that the program
had performed well, and the funds had been disbursed faster than anticipated. The planned six-
year budget was disbursed in about three years. The additional bank assistance brought the
revised cost of the program to be USD 416 including 20% Regional and 20% ULG contributions
to the performance grant.
1
Bahir Dar, Kombolcha, Gondar and Dessie in Amhara Region; Mekelle, Adigrat, Axum and Shire Endeselassie
in Tigray Region; Adama, Bishoftu, Jimma and Shashemene in Oromia Region; and Hawassa, Arbaminch,
WolaytaSodo and Dilla in SNNPR, Dire Dawa, Harar and Addis Ababa
Page | 6
The additional credit continued financing the costs associated with scaling up the ULGDP1’s
activities to enhance the impact of this well-performing program. Specifically, the additional
funds financed investments to improve the administration of the 19 participating cities and to help
address a large infrastructure backlog. This enabled the administrations of the 19 cities benefiting
from the ULGDP1 to further improve their performance in participatory planning, financial
management, procurement, execution of infrastructure programs, and sustainable delivery of
services. It also assisted 18 additional cities 2 to build capacities in good governance to prepare
them to participate in the ULGDP II that commenced in 2014/15 (EFY 2007).
Second Urban Local Government Development Program 2014/15-2018/19
The ULGDP II is a follow-up to the successful ULGDP1. In preparation for ULGDP II, 18
additional ULGs were selected in 2012 to receive capacity building support to enable them to
participate in the ULGDP II’s performance grant. The ULGDP II has scaled up the ULGDP1
support from 19 to 44 cities – excluding Addis Ababa and adding 26 new cities – by providing
highly needed investment funds to promote the cities as growth engines in the GoE’s urban
development strategy; build institutional capacity of all tiers of governance (federal, regional and
local) in urban development, and enhance the incentives of everyone involved. The 44 ULGs
participating in the ULGDP II are:
The 18 cities that participated in the CBDSD and (excluding Addis Ababa) in the
ULGDP1 – as listed on the previous page;
The 18 cities that participated in the ULGDP1 for CB purposes only3; i.e., did not receive
Performance Grants – as listed on the previous page; and
The 8 cities that are receiving investment funds through the KfW funded Urban
Development Fund and capacity building support from GIZ through the Urban
Governance and Decentralization Programme. These cities are: Adwa (Tigray), Debre
Markos (Amhara), Hosaina (SNNPR), Nekemte (Oromia), Gambella (Gambella), Semara
(Afar), Asosa (Benishangul Gumuz), and Jijiga (Somali). The latter four are located in
the Developing Regional States (DRS) of Ethiopia.
The ULGDP II involves disbursement of funds by the World Bank and allocation of funds to
ULGs, Regional States and MUDHo through a result orientated/performance-based capital
investment fiscal transfer system using the World Bank’s Program for Results (P for R)
methodology, clearly linked to well-defined disbursement-linked indicators (DLIs). The P for R
operation fully utilizes and enhances the key elements of the existing GoE system.
The ULGDP II Development Objective (PDO) is to enhance the institutional and organizational
performance of participating urban local governments in developing and sustaining urban
infrastructure and services. The key results of the performance improvements will be:
enhanced participation of citizens in ULG planning and budgeting;
efficient fiduciary management;
increased amount of own source revenues at the ULG level;
improved infrastructure, service delivery and O&M systems; and
2
Assela, Burayu, Sebeta, Ambo, Robi, and Batu in Oromia Region, DebreBirhan, DebreTabor, Woldya,
Finoteselam, and Mota in Amhara Region; Almata, Humera and Wukro in Tigray Region; and Mizan, Hosaena,
Areka and Butajira in SNNPR
3
TA to New and Existing ULGDP Cities in Amhara, Tigray, Oromia& SNNP Regional States
Page | 7
Strengthened accountability and oversight systems.
The ULGDP II is expected to run for a period of five years – from EFY 2007 (2014/15) to EFY
2011 (2018/19) with the first disbursement year EFY 2007 (2014/15). ULGDP II will fund
performance- based grants for 44 cities - of the total number of larger cities (85), excluding Addis
Ababa, with a total population of 3,312,107 people (2007 figures) and 4,348,853 (2013
estimates). The ULGDP II will cover all nine regions and Dire Dawa City Administration. The
population of the 44 ULGs is about 28% of the total urban population4.
The total Program budget envelope is US$556.55 million and the main expenditure items are:
Performance based grants to 44 ULGs for urban infrastructure and services
investments and capacity building (US$499.55 million);
Regional governments capacity building and oversight/support to constituent ULGs
(US$30.00 million);
MUDHo to administer and coordinate the program, and strengthen its capacity to
support and guide the regions and ULGs (US$27.00 million);
Activities financed under the performance grant are core infrastructure investments in roads,
water supply, sanitation, solid waste, greenery, street lighting, etc. in a well-defined investment
menu, which targets infrastructure investments towards areas under ULG responsibility, and to
maximize gains and minimize the risks. The ULGs prepare their Capital Investment Plans in a
participatory manner and use the planning tools developed under ULGDP1: the assets inventory
and management plan system, capital investment plans, annual plans and budgets. Participatory
approach and proper planning and budgeting are promoted through the APA. Cities and regions
contribute to the investments through a substantial level of matching funding. New cities will be
required, at a minimum, to match 10% of the grants while cities currently part of ULGDP1 and
all regions have a minimum contribution requirement of 20% each (as per current level).
It is expected that the institutional performance improvements and the infrastructure delivered by
cities will result in: -
4
Based on data from WBI 2013 indicators and CSA 2013 estimates extra polated from the 2007 census.
Page | 8
(a) enhanced citizen participation and engagement in ULG planning and budgeting;
(b) increased own source revenue at the ULG level;
(c) improved infrastructure, service delivery, O&M systems;
(d) improved efficiency and effectiveness in fiduciary management;
(e) Improved environmental and social management and safeguards; and
(f) strengthened accountability and oversight systems; and
(g) Strengthened ULG resilience, improved local economic development (LED) and enhanced
gender equity in the ULG operations.
Program Duration
The program with support from the World Bank and AFD, will be implemented over a period of
5 years and 4 months from March 2018 to July 2023, with 4 rounds of performance grants in
EFY 2012 (2019/20), EFY 2013 (2020/21), EFY 2014 (2021/22) and EFY 2015 (2022/23). The
program covers the remaining year of the GTP2 (2015/16-2019/2020) and part of GTP3
(2020/2021-2024/2025) both of which are aligned to the country’s goal of achievement of middle
income status by the year 2025. The program will also contribute in the first year FY 2018/19 to
cover the fiscal gap due to over-the target-performance of ULGs in the ULGDP II.
The UIIDP consists of the provision of performance-based grants to ULGs for eligible
Investments and support to achieve Program results at the regional level on capacity building,
financial audit, procurement audit and environmental and social safeguards audits. The program
will have an additional 73 cities to the existing 44 cities making a total of 117 cities that will
participate in the program. This substantial scale-up to 117 cities will bring about greater impact
in terms of population coverage and size of the Program (increasing beneficiaries from 4.36
million under UGLDP II to an estimated 6.62 million in UIIDP) and result in exponentially larger
positive impact for the country. Ethiopia has a significant number of secondary cities that are
spatially distributed across the country. The government’s current policies of industrial
development and promoting urban-rural linkages present good opportunities for promoting more
5
In the core thematic areas of: Planning and budgeting, assets management, public financial management,
procurement, own source revenues, accountability and transparency, environment and social safeguards, land
management, and strategic urban planning.
Page | 9
balanced regional growth through the creation of a linked system of cities. The scale-up also
allows strengthening of the overall programmatic and performance-based approach to support
sustainable urban development and leverages on economies of scale for program management
and implementation. In addition, the scale-up is built on the solid foundations and tried-and-tested
overall successful experiences of ULGDP I and II. Timely support to improve institutional
performance in the planning, delivery, and sustained provision of urban services and
infrastructure by local governments is critical especially for these rapidly growing cities.
The total IDA funding envelope for the UIIDP is US$600 million (of which USS273 million is
from IDA Grant, US$127 million is from IDA Credit and US$200 million is from the IDA
Scale-Up Funding (SUF)). In addition, AFD will contribute co-financing of euro 9.8 million
(US$10.8 million equivalent). The GoE (from regions and cities) will contribute around
US$248.7 million.6 This brings the total Operation Budget envelope to around US$859.5 million.
Table 1. Program Financing (US$ million)
UIIDP funding to ULGs will be allocated using a simple formula, based on population size
and the performance of the ULGs. An approximate US$16–18 per capita per year (with
phasing in of the new ULGs in the first FY) has been assessed to be the optimal level of funding. 8
As a core principle, the per capita amount would at least maintain the similar level as at the start
of the ULGDP II to ensure minimum level of incentives and meaningful infrastructure and
services investments. The size of this performance grant has been determined considering various
factors such as international good practice (from an expanding number of countries with
performance-based grant allocations), the costs of investments, expenditure needs and current
level of investments, as well as generation of sufficiently strong incentive to drive the
performance. This has been informed by a comprehensive review of ULG fiscal and revenue
positions.
ULGs will use the Program funds to finance urban infrastructure works as well as capacity
building activities, in compliance with the Program’s investment menu and capacity
building manual. Eligible infrastructure investments fall under eight groups including: (a) urban
roads, (b) integrated infrastructure and land services, (c) sanitation (liquid waste), (d) solid waste
management, (e) urban drainage, (f) urban disaster risk management and urban resilience, (g)
built facilities, and (h) urban green infrastructure. Ineligible investments include any World Bank
environment and social impact assessment Category A projects. Compliance with the investment
menu is a minimum condition for receiving funds. In addition, ULGs will be required to prepare
the project in a participatory manner, and consider: (a) social inclusion requirements, including
gender and disability considerations; (b) climate change and disaster adaptation; and (c)
contribution to LED and long-term job creation. 9 ULGs could also spend up to 5 percent of
investment grants and regional/city contributions on capacity building support. For regional
government entities, the grants will mainly be used for capacity building, operations and
management expenses, subject to the eligible capacity building areas, similar to the ULGs.
8
In the first year, the simple average per capita for the new 73 ULGs and the ULGDP II 44 ULGs will be US$14.79
and US$17.68 per capita respectively. From the second year, the per capita allocation uses an average figure similar for
the two groups, which is US$17.68.
9
Details of and procedures for the use of investment project prioritization and selection criteria will be included in
the POM.
Page | 11
Disbursement Linked Indicators, Minimum Conditions, Performance Measures and Verification
Protocols
Almost 96 percent (or around US$576 million) of the Operation’s funds will be disbursed
against disbursement linked indicators (DLIs). The DLIs are structured to provide incentives
to participating ULGs and regional governments for improved management and development of
urban areas. (More details on the DLIs, MCs, PMs, performance assessments, verification
protocols and disbursement arrangements are provided in the UIIDP Annual Performance
Assessment Guideline (APAG) which is a part of this POM and is a standalone Annex of the
POM)
Basic fiduciary, project planning and execution, and environmental and social
management conditions are in place such that local governments can absorb the
Program funding;
ULGs continue to strengthen their institutions of urban management in a social
inclusive manner;
ULGs use program funds effectively in creating sustainable and resilient
infrastructure and delivering services, achieve the targets in infrastructure
delivery, maintenance and development and to promote the GoE’s strategy on
urban development at the city level.
ULGs improve on systematic and foundational aspects to promote long term job
creation, urban resilience and gender empowerment.
The funding proportion against DLIs 1 to 4 have been adjusted to align incentives with emerging
priorities. As compared to ULGDPII, less rewards are given for achieving the MCs (DLI1) and
instead emphasis is placed on achieving the PMs (DLIs 2 to 4) which have higher performance
criteria. In addition, DLI4 focuses on the new thematic areas of local governments’ performance
in LED, resilience and gender and is given a substantial sum to incentivize improvements in these
areas.
The disbursement system for DLI 1, 2, 3, and 4 is scalable based on actual performance of
ULGs. It is particularly important to note that if the ULGs perform better (or poorer) than
expected (as set out in the disbursement related targets in the DLI matrix), disbursements will be
adjusted accordingly. This means that if ULGs perform higher than expected they will receive
higher than expected disbursements. If this continues throughout the Program, additional
financing may be needed.
DLIs 5 to 9 focus on regional government entities to enhance their abilities in fulfilling their
mandates to support ULGs. These DLIs will disburse based on results achieved by regional
government entities in providing support to ULGs (DLI 5) as well as focusing on their
Page | 12
performance in conducting essential audits for ULGs such as on fiduciary and environmental and
social management.
Collectively the DLIs address the PDO and key result areas. The DLIs are designed to address
the challenges of ULGs’ and regional governments’ institutional performance and, in turn, ULGs’
ability to deliver, operate, and manage infrastructure and services, and expand LED. They
provide incentives to address the core issues such as on timely audit, social and environmental
management, own-source revenue generation, and strengthen the system and procedures for
capacity building. In addition, there is enhanced focus to strengthen urban resilience, promote
LED and job creation, and enhance gender equality. The PMs have a direct link to the key result
areas and the GoE’s program intended outcomes.
The expenditure areas are designed to correspond with the structure of the DLIs. These
reflect (a) the performance-based grants to ULGs for urban infrastructure and services
investments and capacity building, and (b) the regional governments’ capacity building and
oversight/support to participating cities. The support to the MUDHo to administer and coordinate
the program and strengthen its capacity to support and guide the regions and ULGs is covered by
the IPF.
An independent Annual Performance Assessment (APA) will be carried out every year to review
the performance of cities and regions against the set of agreed indicators and performance
measures. The independent verification of results to trigger disbursement is key to the Program.
This is the main mechanism to measure the performance and progress of ULGs and regions in
UIIDP. (See the Annual Performance Assessment Guideline (APAG) for the detailed DLIs, the
detailed DLI matrix and verification protocol. The APA results are used to verify the DLIs and
form the basis for disbursements:
For ULGs. Allocations will be determined by: (a) a set of minimum conditions (MCs), and (b) a
further list of performance measures (PMs). Minimum conditions determine if the ULG is
eligible to participate in that year’s program to receive grant support, and the performance
measures track progress of each city in specific areas and determine each city’s score. Key result
areas include: (a) participation of citizens in planning and Budgeting and gender focus, (b)
fiduciary management, (c) generation of own source municipal revenues, (d) delivery as well as
operation and maintenance of new infrastructure and services, and direct job creation, (e)
accountability and oversight systems and (f) environmental and social safeguards, and new areas
such as resilience, LED and gender (see APAG Sections 6-9 for an overview of the minimum
conditions and performance measures).
Page | 13
For regional governments. Key result areas include: (a) capacity building (for various regional
bureaus of urban development (BUDs) and the quality of this, (b) carrying out timely annual
audits of ULGs (for Offices of the Regional Auditor Generals (ORAGs) according to standards,
(c) performing social and environmental audits (for Regional Environmental Protection Agencies
(REPAs)), (d) supporting ULGs’ with respect to urban revenue generation (for Regional Revenue
Authorities (RRAs)) and (e) carrying out the annual procurement audits (for Regional Public
Procurement Agencies (RPPAs) according to defined standards. (See APAG Sections 10 for an
overview of the DLIs and performance measures for regions)
The APA system design built in measures such as independent assessments, quality assurance,
complaint handling system and approval procedures to ensure its robustness. The MUDHo will
recruit an independent firm to conduct the APA in a timely manner. The draft assessment results
will be shared simultaneously with the World Bank and the government (first draft by October
and second draft by January each year). Both the MUDHo (under a technical sub-committee
established) and the Bank will separately undertake rounds of quality assurance review (QAR).
Finally, the UIIDP TC will verify the APA results, and these will be further endorsed by the
UIIDP SC. Based on the final APA results, GoE will send a Results Achievement Notification
(by February each year) summarizing how the Program DLIs have been met. The Bank will retain
the right to make the final decision on whether a DLI has been achieved or not.
OBJECTIVES OF ASSIGNMENT
The Ministry seeks the services of a competent consulting firm or a consortium of firms to
undertake the assignment to assess and score the performance of 61 of the 117 cities in Oromia
(38 cities) and SNNPRS (23 cities) that are participating in the Urban Institutional and
Infrastructure Development Program (UIIDP). The assessment will be done according to the
UIIDP Disbursement Linked Indicators (DLIs) and the associated Performance Measures (PM)
and performance indicators except Quality of Infrastructure which will be done by Office of
Federal Auditor General and results handed over to the APA Consultant. The assessment will be
done as per procedures described in the latest updated Annual Performance Assessment
Guideline (APAG) for UIIDP, so as to identify the achievement of the cities, individually and in
aggregate. This will determine: a) whether UIIDP funds linked to the DLIs described can be
disbursed (by the World Bank); and b) the allocation, or non-allocation of funds, (by GOE) that
may be made to each of the 61 participating cities for EFY 2012 (2019/2020) & EFY 2013
(2020/2021). The new cities which did not participate in ULGDP II will only be assessed in
regard to the Minimum Conditions in the first year. In addition to this, the APA will assess the
DLIs related with the performance at the regional level (DLIs 5, 6, 7, 8 and 9.)
Page | 14
SCOPE OF SERVICE
1 Adama 282,974
2 Bishoftu 128,408
3 Jimma 155,434
4 Shashemane 129,084
5 Nekemte 96,657
6 Assela 86,441
7 Sebeta 63,391
8 Burayu 62,806
9 Ambo 61,900
10 Robe 57,031
Page | 15
New Cities (27)
1 Adola 29,475
2 Agaro 32,714
4 Babile 22,760
5 Bedele 25,080
6 Bedesa 23,371
7 Bokoji 22,797
8 Chiro 43,266
10 Dodola 26,766
11 Fiche 35,329
12 Gimbi 39,811
13 Ginir 21,976
14 Goba 41,152
16 Haromaya 39,486
17 Holeta 29,936
19 Metu 36,985
20 Mojo 37,968
21 Negele 45,314
22 Nejo 24,412
23 Shakiso 29,466
24 Shambu 35,136
25 Suluita 37,492
26 Weliso 48,674
27 Yabelo 22,483
SNNPRS Population
Page | 16
CSA 2013
Estimates
1 Hawassa 225,686
2 Arbaminch 107,542
3 Dilla 84,952
4 Sodo 109,225
5 Areka 45,109
6 Butajira 47,978
7 Hosaena 100,528
8 Mizanaman 48,946
1 Welkite 41,458
2 Durame 35,147
4 Bodite 34,661
5 Jinka 29,108
6 Tapi 35,660
7 Bonga 29,956
8 Sawula 32,608
10 Shone 22,428
11 ShinShicho 20,517
12 Hadero 25,609
14 Worabe 65,199
Page | 17
At the ULG level, the consultants will assess: performance against Minimum Access
Conditions (MACs) and also institutional performance improvements and infrastructure
investment performance. The key results areas include: (a) participation of citizens in planning
and budgeting, (b) fiduciary management, (c) assets management, (d) generation of own source
municipal revenues, (e) land management and urban planning, (f) delivery of new infrastructure
and services, and operation and maintenance of existing infrastructure and services, (g)
accountability and oversight systems, (h) job creation, (i) environmental and social safeguards
and (j) local economic development, urban resilience and gender mainstreaming
At the regional level the consultants will assess: (1) the extent to which the regional ORAGs
have conducted timely audits of the ULGs final accounts (by January 7 of each financial year),
and verify the quality of audit reports; (2) the regional environmental protection agencies have
carried out the safeguards reviews/audits of ULGs in their jurisdictions before the start of the
APA in each year, including the quality of the review; (3) The Regional Revenue Authorities
have supported ULGs’ efforts to generate revenues; (4) the APA will finally check the extent to
which the regions have developed and executed capacity building plan; and 5) the extent to
which Regional Public Procurement Agencies have conducted timely procurement audits of
participating ULGs in their jurisdiction including quality of the procurement audits.
Related to the execution of the Capacity Building plan, the APA will verify that (i) regional
government teams are in place and are operating, and (ii) regional governments have adopted
service delivery standards (as issued by MUDHo) and issued those for the cities, and provided
guidance in implementation (reports).
Scoring Matrix: The Consultant will develop a simple computerized model into which the
Consultant will enter the (draft and final) scoring data resulting from the APA. The model will
calculate the allocations to be made to each of the 61 cities and the aggregated scores for each
DLI to identify whether and how much funds may be released. The computerized model should
facilitate linkage of results to the word documents and also easier consolidation and
analysis of results.
ULGs Signing-off on APAs: Before completing the assessment, the Consultant will be required
to present the draft assessment to executive representatives/officials of each city and region and
obtain their signed certificate of agreement to the assessment, documenting any justifications for
non-agreement.
Strict adherence to the work plan agreed with the Client in the Final Inception Report is
important because the APA is an input to the process of deciding on allocation of funds and it
will have an impact on the ULG planning and budgeting process.
EXPECTED TIMING AND DURATION OF THE ASSIGNMENT
1st APA
It is expected that the contract will be signed not later than August 31, 2018 and the Consultant
will commence services not later than 1 st October 2018. The estimated implementation period for
the assignment is approximately 7 months over the period from 1 st October 2018 to April 2019.
Most of the field work is done during the period from October 1, 2018 to November 30, 2018 (8
weeks) with submission of preliminary draft reports by December 31, 2018 (excluding audit
results/scores) and Final Reports by April 29, 2019 (including audit results/scores).
Page | 18
2nd APA
It is expected that the contract will be signed not later than mid-July 2019 and the Consultant will
commence services not later than 1 st August 2019. The estimated implementation period for the
assignment is approximately 7 months over the period from 1 st August 2019 to February 29,
2020. Most of the field work is done during the period from August 1, 2019 to September 30,
2019 (8 weeks) with submission of preliminary draft reports by October 15, 2019 (excluding
audit results/scores) and Final Draft Reports by January 21, 2020 (including audit results/scores).
Page | 19
MAIN TASKS
Page | 20
u. Other reference and operational documents as specified in the APAG.
2. Inception Report: The Consultant will prepare an Inception Report which presents the
details of the methodology for carrying out the assignment, a detailed work plan and
organization of the Consultant’s Team, amongst others (not more than 15 pages).
The work plan should include the planned schedule of all tasks to be performed and
describe in detail, the planned visit by the Consultant’s teams to each city and regions
including dates of visit, dates for introductory briefing and presentation of the
performance assessment to city executives, date for delivery of the various drafts of the
UIIDP Annual Performance Assessment etc.
The Draft Inception Report should be submitted within ten (10) days after the
commencement of the assignment.
4. ULG notification: Immediately following the approval of the Inception Report, the
Consultant will contact executive officials in each city government and regional RUDBs
officials to inform them of the dates for the APA to be undertaken in each city.
5. Certificate of Agreement Format: The Consultant will draft and submit, in consultation
with the Client, a form of Certificate of Agreement to the UIIDP Annual Performance
Assessment that will be signed by each City’s (and BUDHos) nominated representative
at conclusion of the APA for each City.
6. Mobilization: The Consultant will fully mobilize and train their team and make all
logistical preparations for carrying out the APA in the 61 cities and regions, as
according to the work plan.
1. Introductory Presentation & Briefing with ULGs: Before commencing the APA in
each ULG, the Consultant will meet with the Regional Bureau of Urban Development
Page | 21
and Housing (BUDHo) representative, Mayor, City Manager, ULGDP Coordinator (and
any other city official nominated by the Mayor or City Manager) and:
a. Present the full Consultant’s team;
b. Brief the meeting as to the methodology to be followed;
c. Agree who will be the key informants at the city for each of the Consultant’s team/
performance criteria, what documentary evidence of performance is required and
when they will meet to agree on the assessment of performance.
d. The date, time, place and who will be present for the wrap-up meeting (exit
conference) at which the Consultant will present the final agreed (with the relevant
City officials) preliminary APA (not more than 4 pages) and at which, following any
discussion and amendment of the preliminary APA, the Mayor, City Manager,
ULGDP Coordinator and Regional BUDHo representative will certify (attach
signatures) that they have received, discussed and agreed the preliminary APA and
any areas of disagreement.
e. The Consultant will take minutes of this meeting, including names of all persons
present, and will subsequently obtain the UIIDP Coordinator and BUDHo
representatives confirmation as to the accuracy and completeness of these minutes
2. Annual Performance Assessment:
Field Visits - The respective PATs will visit all 61 participating ULGs in their group of
ULGs and undertake the assessment process as per the APAG dated March 13, 2018. The
teams are expected to visit and spend minimally 4 days (inclusive of travelling time) in
each ULG and approximately 2 days (as required) in each of the 2 participating regional
implementing agencies to carry out the assessment. This will be carried out by the PATs
in the manner as agreed in the Inception Report.
Assessment - The Consultant’s teams will then carry out the APA exercise according to
the detailed procedures in the APAG. Teams will meet the assigned city/regional
officials, securing documents as evidence of performance achieved, carrying out
inspections and investigation through sub-project site visits to verify the authenticity of
the performance as necessary; requesting and documenting reasons or justification for
specific under/over performance; meeting together to check/integrate results and
coordinate activities and preparing the preliminary APA for the city and region.
3. Wrap-Up Meeting: The APA for each city will be completed with a Wrap-Up working
session. The Consultant will take minutes of this meeting and will subsequently obtain
the UIIDP Coordinator and BUDHo representative’s confirmation as to the accuracy and
completeness of these minutes. The Consultant’s team will present the First Draft
Performance Assessment for the City, consisting of:
a. A brief written description of the Performance Assessment for each of the DLIs and
performance criteria described in the APAG – not more than 1 page; describing: a)
any difficulties encountered in determining the assessment; and b) any reasons,
explanations or justifications provided by the City for any over or under
performance;
b. A summary table of the performance assessment;
c. The list of documents that verify the performance assessed; and
Page | 22
d. The Certificate of Agreement to the UIIDP APA.
4. Provision of Documents: The Consultant will provide four copies of First Draft
Performance Assessment and Certificate of Agreement, to the City representatives; 1
copy to the Regional BUDHo representatives and 2 further copies with original
signatures in their full draft APA for submission to the Client with a copy to the World
Bank.
5. Client intervention: The Consultant will inform the Client, by email, when the First
Draft Preliminary APA is agreed and the signed Certificate of Agreement is secured.
Should the Consultant be unable to secure a signed Certificate of Agreement, they will
inform the Client’s representative within 24 hours and agree what follow-up action will
be taken and by whom.
6. The Consultant will submit to MUDHo, within 7 days of completion of the field work
visits for all the 61 cities, a Consolidated Field Work Report showing 61 cities and
regions visited and dates thereof, any challenges and problems encountered and
recommendations for future field work/visits.
Page | 23
Third Draft Preliminary APA Reports will be submitted simultaneously to MUDHo and World
Bank by not later than March 31, 2019 (1 st APA) and not later than December 24, 2019 (2 nd
APA). MUDHo will share the third draft with ULGs and Regions which will have 14 days to
submit complaints, if any. The APA Complaints Resolution Committee (APACRC) will consider
all complaints received and make recommendations on changes to be made by the APA
Consultants.
Final Draft 1st and 2nd APA Reports (including audit results/scores)
The APA Consultants will submit simultaneously to MUDHo and World Bank by not later than
April 29, 2019 (1st APA) and January 21, 2020 (2nd APA), the Final Draft Reports
incorporating changes which they consider justified and provide a report on changes made and
not made (with justification). The UIIDP Federal Technical Subcommittee (FTSC) will verify the
APA results and complaints resolution and submit its recommendations to the UIIDP Federal
Steering Committee (FSC) by not later than May 2, 2019 (1st APA) and not later than
February 5, 2020. The APA results will be formally reviewed and approved by the FSC,
reviewed and endorsed by the World Bank not later than May 15, 2019 (1 st APA) and
February 15, 2020 (2nd APA).
Final 1st and 2nd APA Reports (including audit results/scores)
The APA Consultant will incorporate the final changes and endorsement of the World Bank of
the APA results and allocations and submit the Final ULG and Synthesis APA Reports by not
later than May 22, 2019 (1st APA) and February 22, 2020 (2nd APA).
MUDHo will distribute the Final ULG and Synthesis APA Reports to all regions and will also
officially notify them of the final allocations approved by the World Bank.
Task 4: Workshop
Following distribution to regions of the Final ULG and Synthesis APA Reports and notification
of Allocations/Disbursements by MUDHo, the UREFMFB (MUDHo) will arrange a 1-day
workshop in May 2019 (1st APA) and in February 2020 (2nd APA), at a venue to be determined,
for the presentation of the findings from the final APA.
The Consultant will make the main presentation of their results which should take no more than 3
hours. The format for the workshop will be advised to the Consultant in due course. The
Consultant will not include the workshop costs in their financial proposal. The workshop
participants are not yet identified but are likely to be approximately 300, with representatives
from each UIIDP participating ULG, Regional States, MUDHo, MOFEC and other federal
agencies, as well as the World Bank, other development partners, the press, etc.
The workshop objectives are to discuss the findings and results of the APA with all stakeholders
and to mobilize all stakeholders, UIIDP implementing agencies and interested parties in support
of and in identifying further actions required to successfully implement the UIIDP and improve
performance of the ULGs;
Page | 24
The Consultant will within 5 calendar days of the end of the workshop, prepare a brief workshop
report, containing: any presentations made at the workshop, a list of workshop participants
(name, position, telephone, email), identification of any issues arising at the workshop that
require follow-up or that either affect decision as to UIIDP disbursements, or the conduct of
future APAs.
Format for APA report, and summary sheet for each City: For each round of APA draft reports,
the Consultant will produce an overall synthesis report and individual city reports capturing the
findings of all cities, and with an executive summary. The reports should capture strengths and
weaknesses on each performance measures for each city and regional implementation agency.
The reports need to be of sufficient high quality, as deemed satisfactory by the client. The
Consultant will use the reporting format provided in the APAG. Any suggested changes for
improving the reporting format will need to be cleared by the Client. All reports will be produced
in English.
By March 15, 2019 APA team incorporates QAR comments and submits second draft
Preliminary APA reports and draft preliminary synthesis report (including
audit results for ULGs) simultaneously to MUDHo and World Bank.
By March 31, 2019 Review by MUDHo and Bank, and APA team reconcile comments received,
into the third draft Preliminary report produced by the APA team and
Page | 25
Date (Gregorian Calendar) Activity
submitted simultaneously to World Bank and MUDHo.
By April 1, 2019 MUDHo shares the third draft report with ULGs /Regions which have 14
days for submitting complaints, if any
By April 15, 2019 ULGs/Regions submit their complaints.
By April 22, 2019 Review by the APA Complaints Resolution Committee (APACRC) of
ULG/Regions’ complaints
Reconciliation between complaints and APA findings (APACRC)
Recommendations from the APACRC on changes to be made by the APA
team.
By April 29, 2019 Final draft APA report for each ULG/region and the Final Draft Synthesis
Report as well as report on changes made and not made (with justification)
by APA team, submitted to World Bank and MUDHo
By May 2, 2019 Final Verification of the APA results by the UIIDP Federal Technical
Committee (FTC)
By May 15, 2019 Formal review and approval of results by the FSC; review and endorsement
by World Bank (for the coming FY’s allocations to ULGs)
By May 22, 2019 Final APA report for each ULG/region and the Final Draft Synthesis Report
incorporating changes and endorsement by the World Bank.
By May 31, 2019 Final Results and Allocations announced and workshop with regions and
ULGs held.
In June 2019 ULG budgeting process for 2019/20 continues based on actual allocations.
By June 30, 2019 Submission of CIPs, REPs and AMPs by ULGs to regions for approval
By July 15, 2019 Approval of CIPs, REPs and AMPs by regions
July 15, 2019 Start of implementation of CIPs by ULGs
By June 30, 2019 World Bank disburse to MOFEC the full amount.
In July 2019 50 percent of the allocations disbursed to Regions and ULGs.
In January 2020 50 percent of annual allocation disbursed to Regions and ULGs.
Schedule for 2nd APA of UIIDP: Allocations for DLIs 1-4 and DLIs 5-9 for EFY 2012 (2019/20)
Page | 26
Date Activity
(Gregorian
Calendar)
By mid-July Independent APA consultants engaged and onboard
Early August APA commences – data collection in the field.
By September 30 Complete all field assessments, including minimum conditions and performance
measures (DLIs 1–4), (including value for money audit). The APA also assesses the
result against DLI 5–9.
By October 15 APA consultant completes and submits first draft Preliminary APA reports and draft
Preliminary Synthesis Report (excluding the audit results for the ULGs) to MUDHo as
well as to the World Bank.
October 16- Conduct Quality Assurance Review (World Bank); Quality Assurance Review
November 30 comments and findings to inform APA ready by no later than November 25 and TC
review findings for consistency by November 30.
By December 10 APA team completes and submits second draft Preliminary APA reports and draft
preliminary synthesis report (excluding the audit results) and share with MUDHo and
World Bank.
By December 24 Review by MUDHo and Bank, and APA team reconcile comments received, into the
third draft report produced by the APA team.
By December 25 MUDHo shares the third draft report with ULGs /Regions which have 14 days for
submitting complaints, if any
By January 8 ULGs/Regions submit their complaints
By January 15 APA consultant: Incorporate audit results in the APA.
Review by the APA Complaints Resolution Committee of ULG/Regions’ complaints
Reconciliation between complaints and APA findings (Complaints Committee)
Recommendations from the Complaints Committee on changes to be made.
By January 21 Final draft APA report for each ULG/region and the Final Draft Synthesis Report as
well as report from the Complaints Committee on changes made by APA team,
submitted to World Bank and MUDHo
By February 5 Final Verification of the APA results by the UIIDP Federal Technical Committee
(FTC)
By February 15 Formal review and approval of results by the FSC; review and endorsement by World
Bank (for the coming FY’s allocations to ULGs)
By February 28 Allocations announced and workshop with regions and ULGs held.
In March ULG budgeting process for 2019/20 starts, based on actual allocations
By June 30 Submission of CIPs, REPs and AMPs by ULGs to regions for approval
By July 15 Approval of CIPs, REPs and AMPs by regions
July 15 Start of implementation of CIPs by ULGs
By June 30 World Bank disburse to MoFEC the full amount
In July 50 percent of the allocations disbursed to Regions and ULGs
Page | 27
In January 50 percent of annual allocation disbursed to Regions and ULGs
Page | 28
TEAM COMPOSITION AND QUALIFICATIONS
The description of the Consultant’s team is provided below
It is expected that the Consultant will provide:
An overall team leader/manager and deputy team leader/manager for the entire
assignment, who will be responsible for overall management of the entire assignments
and its four APA teams, logistical arrangements; communication with the Client and key
stakeholders; quality control of team members work; coordination and integration of
Consultant’s inputs and outputs; data analysis using the latest data analysis software
packages and production of the reports and deliverables that are consistent, reliable,
concise, readable and clear in their findings and presentation of APA results.
Four Performance Assessment Teams (PATs). It is estimated that four PATs will be
formed based on the calculation that the APA for each city will require approximately
two day’s work for each team, depending on the size of the ULG and other factors
affecting work rates. On this basis and assuming a 5-day working week, with travel on
Saturday and Sundays, it is expected that, during the 60 calendar days’ assessment
period, each team can carry out the assessment of approximately 15 ULGs. There should
be at least two teams for Oromia Region and two teams for SNNPRS. Each PAT should
have a team leader, responsible for coordination and communication with the overall
team leader/manager for the assignment.
Logistics, Transport, Subsistence Allowances etc. The consultant will be responsible
for all logistical, subsistence allowances for the consultant staff and all transport costs for
both the consultant staff participating in the assessment process.
The arrangements proposed in detail will be included in the Consultant’s Technical Proposal.
Clearly the size and complexity of different ULGs; whether they participated in the ULGDP1
and/or ULGDP II; regional language usages and familiarity with different regions; as well as the
logistical arrangements are among the factors the Consultant will need to take into account in
selecting and directing their APA teams.
Each Performance Assessment Team (PAT) is likely to consist of at least 9 team members as
follows:- Performance Assessment Team Leader (a proven leader chosen from the 9 team
members below and specialist in any of the main disciplines i.e. (i) Financial Management; (ii)
Municipal Finance Specialist; (iii) Procurement Management Specialist; (iv) Environmental
Management Specialist; (v) Social Development Specialist (vi) Municipal
Infrastructure/Engineer/Asset Management Specialist; (vii) Urban Planning/Land Management
Specialist; (viii) Gender Specialist; and (ix) Local Economic Development Specialist.
Page | 30
Position Educational Requirements Experience required
All team members provided should have a solid professional background in the areas to be
addressed, which apart from the specific expertise described in the previous paragraph, would
include performance assessment and evaluation, and program management. It is advisable that
the team should have members or counterpart team members who are conversant with the local
official language, Amharic, since most of the work involves interacting with regional and city
officials.
Page | 32
There should not be former MUDHo, UREFMFB, BUDHo or ULG staff involved in the APA as
part of the Consultant’s team (within the last three years). Personnel involved should be at “arm’s
length” from any previous involvement with related ULGDP II/UIIDP or city activities.
Page | 33
PROPOSAL EVALUATION CRITERIA
PAYMENT SCHEDULE
The payment schedule shall be:
Page | 35
2. TOR for UIIDP 1st and 2nd APA of 56 cities and eight regions in
Other Regions
Terms of Reference
For
Consultancy Services for the First (1st) and Second (2nd) Annual Performance Assessment of
56 Cities and 8 regions in Amhara (32 cities), Tigray (12 cities), Ethiopian Somali (4 cities),
Afar (4 cities), Benishangul Gumuz (1 city), Gambella (1 city), Harari (1 city) & Dire Dawa
City Administration (1 city) participating in the UIIDP for Allocations for EFY 2012
(2019/20) & EFY 2013 (2020/21)
BACKGROUND
The Ministry of Urban Development and Housing (MUDHo) has introduced the Ethiopian
Cities Sustainable Prosperity Goals (ECSPG) that will lead to the establishment of Green
Growth, Resilient and Well Governed Cities that support Ethiopia’s transformation from a
predominantly agricultural nation to a nation with a rapidly growing industrial sector that
contributes to the economic growth necessary to achieve middle income country status by 2025.
Page | 36
The ECSPG is the Ministry’s contribution to the Government of Ethiopia’s Growth and
Transformation Plan (GTP1) 2010/11-2014/15 and (GTP 2) 2015/16-20/2020.
The ECSPG comprises nine pillars – or dimensions - that will contribute to the achievement of
middle income country status and bring the desired political-economic transformation. Growth is
a key objective of the Ministry’s initiatives and programs for urban development and
construction; the main economic objective. The main elements of the political component of the
nine pillars that make up the ECSPG are good governance, democratization at local level and the
satisfaction of citizens and residents with the delivery of public services and performance of
government – at local, regional and federal levels. Together, the economic and political
interventions of the ECSPG will produce the prosperity that accompanies achievement of middle
income country status.
The ECSPG’s nine strategic pillars will contribute to Ethiopia’s achievement of middle income
country status by producing a transformation in the economic productivity and in the good
governance of cities. Economic transformation will be achieved by increased good urban
governance in general and in the focus of the ECSPG on Job Creation - Micro & Small Enterprise
Development in particular. This focus will be supported by improvements in land use planning,
serviced land delivery, housing development, infrastructure, services and green growth
development. Investments in all these areas and mobilization of resources to meet increasing
operating and investment costs are a main focus of the MUDHo.
The attention given to economic development and governance does not neglect social and
environmental development, nor will the key GTP cross cutting issues be neglected. These
include gender and children’s affairs, youth and sports development, HIV/AIDS prevention and
control, social welfare, labor affairs, population and development, culture and tourism, science
and technology, environment and climate change.
The developmental framework for the ECSPG aims to bring prosperity to Ethiopia’s cities.
The ECSPG programs, sub-programs and projects will be implemented through to 2025 with
GTP, SDG and benchmarked middle income country indicators measured against achievement of
targets in three indexed areas: good governance, economic and social development (growth) and
citizens’ satisfaction.
In terms of achievement of the targets, goals and vision we will continuously ask questions, learn
lessons and fine tune the Ministry’s interventions to answer the following:
Page | 37
SUSTAINABLE PROSPERITY
Figure 2.
6. Citizens’ Satisfaction (Public Perceptions) Index (demand side): What are public
perceptions of the development of urban centers and cities? How can we, continuously,
identify public perceptions and attitudes, incorporate them into policies, strategies and
programs and thus effectively mobilize public opinion and public resources for the
achievement of the 2025 Vision,
The Economic and Social Development, Developmental Good Governance and Citizens’
Satisfaction indices will be measured to determine: the current baseline; the GTP2 and III
performance targets; and the benchmarked performance targets to 2025, linked to comparable
middle income country achievements.
This baseline data, GTP2 and 2025 benchmark targets will, in the three areas described, comprise
overall our “Prosperity Index”. The aim is to establish the Cities’ Prosperity Index, containing
the three elements described – growth, governance and citizens’ satisfaction for: a) urban centers
and cities with a population of 20,000+ in the Central Statistical Agency census, and add cities
that achieve this population level; and b) rural development centers that contain basic clustered
education, health and administrative facilities as well as commercial services.
The ECSPG contains ten pillars, 12 programs / sub-programs and 43 projects for urban
development:-
Pillar 1. Urban Transformational Leadership
Page | 38
Pillar 2. Micro & Small Enterprise and Urban Productivity (Economy)
In 2008, a credit in the amount of USD150 million equivalent was made available to the
government of Ethiopia for the ULGDP1, under which 19 10cities who benefitted from the
CBDSD support were able to receive grant funding for infrastructure and services based on their
performance in key areas related to city management.
In 2011 the World Bank approved an additional USD 150 million due to the fact that the program
had performed well, and the funds had been disbursed faster than anticipated. The planned six-
year budget was disbursed in about three years. The additional bank assistance brought the
revised cost of the program to be USD 416 including 20% Regional and 20% ULG contributions
to the performance grant.
The additional credit continued financing the costs associated with scaling up the ULGDP1’s
activities to enhance the impact of this well-performing program. Specifically, the additional
funds financed investments to improve the administration of the 19 participating cities and to help
address a large infrastructure backlog. This enabled the administrations of the 19 cities benefiting
from the ULGDP1 to further improve their performance in participatory planning, financial
management, procurement, execution of infrastructure programs, and sustainable delivery of
services. It also assisted 18 additional cities 11 to build capacities in good governance to prepare
them to participate in the ULGDP II that commenced in 2014/15 (EFY 2007).
Second Urban Local Government Development Program 2014/15-2018/19
The ULGDP II is a follow-up to the successful ULGDP1. In preparation for ULGDP II, 18
additional ULGs were selected in 2012 to receive capacity building support to enable them to
10
Bahir Dar, Kombolcha, Gondar and Dessie in Amhara Region; Mekelle, Adigrat, Axum and Shire Endeselassie
in Tigray Region; Adama, Bishoftu, Jimma and Shashemene in Oromia Region; and Hawassa, Arbaminch,
WolaytaSodo and Dilla in SNNPR, Dire Dawa, Harar and Addis Ababa
11
Assela, Burayu, Sebeta, Ambo, Robi, and Batu in Oromia Region, DebreBirhan, DebreTabor, Woldya,
Finoteselam, and Mota in Amhara Region; Almata, Humera and Wukro in Tigray Region; and Mizan, Hosaena,
Areka and Butajira in SNNPR
Page | 39
participate in the ULGDP II’s performance grant. The ULGDP II has scaled up the ULGDP1
support from 19 to 44 cities – excluding Addis Ababa and adding 26 new cities – by providing
highly needed investment funds to promote the cities as growth engines in the GoE’s urban
development strategy; build institutional capacity of all tiers of governance (federal, regional and
local) in urban development, and enhance the incentives of everyone involved. The 44 ULGs
participating in the ULGDP II are:
The 18 cities that participated in the CBDSD and (excluding Addis Ababa) in the
ULGDP1 – as listed on the previous page;
The 18 cities that participated in the ULGDP1 for CB purposes only12; i.e., did not
receive Performance Grants – as listed on the previous page; and
The 8 cities that are receiving investment funds through the KfW funded Urban
Development Fund and capacity building support from GIZ through the Urban
Governance and Decentralization Programme. These cities are: Adwa (Tigray), Debre
Markos (Amhara), Hosaina (SNNPR), Nekemte (Oromia), Gambella (Gambella), Semara
(Afar), Asosa (Benishangul Gumuz), and Jijiga (Somali). The latter four are located in
the Developing Regional States (DRS) of Ethiopia.
The ULGDP II involves disbursement of funds by the World Bank and allocation of funds to
ULGs, Regional States and MUDHo through a result orientated/performance-based capital
investment fiscal transfer system using the World Bank’s Program for Results (P for R)
methodology, clearly linked to well-defined disbursement-linked indicators (DLIs). The P for R
operation fully utilizes and enhances the key elements of the existing GoE system.
The ULGDP II Development Objective (PDO) is to enhance the institutional and organizational
performance of participating urban local governments in developing and sustaining urban
infrastructure and services. The key results of the performance improvements will be:
enhanced participation of citizens in ULG planning and budgeting;
efficient fiduciary management;
increased amount of own source revenues at the ULG level;
improved infrastructure, service delivery and O&M systems; and
Strengthened accountability and oversight systems.
The ULGDP II is expected to run for a period of five years – from EFY 2007 (2014/15) to EFY
2011 (2018/19) with the first disbursement year EFY 2007 (2014/15). ULGDP II will fund
performance- based grants for 44 cities - of the total number of larger cities (85), excluding Addis
Ababa, with a total population of 3,312,107 people (2007 figures) and 4,348,853 (2013
estimates). The ULGDP II will cover all nine regions and Dire Dawa City Administration. The
population of the 44 ULGs is about 28% of the total urban population13.
The total Program budget envelope is US$556.55 million and the main expenditure items are:
Performance based grants to 44 ULGs for urban infrastructure and services
investments and capacity building (US$499.55 million);
12
TA to New and Existing ULGDP Cities in Amhara, Tigray, Oromia& SNNP Regional States
13
Based on data from WBI 2013 indicators and CSA 2013 estimates extra polated from the 2007 census.
Page | 40
Regional governments capacity building and oversight/support to constituent ULGs
(US$30.00 million);
MUDHo to administer and coordinate the program, and strengthen its capacity to
support and guide the regions and ULGs (US$27.00 million);
Activities financed under the performance grant are core infrastructure investments in roads,
water supply, sanitation, solid waste, greenery, street lighting, etc. in a well-defined investment
menu, which targets infrastructure investments towards areas under ULG responsibility, and to
maximize gains and minimize the risks. The ULGs prepare their Capital Investment Plans in a
participatory manner and use the planning tools developed under ULGDP1: the assets inventory
and management plan system, capital investment plans, annual plans and budgets. Participatory
approach and proper planning and budgeting are promoted through the APA. Cities and regions
contribute to the investments through a substantial level of matching funding. New cities will be
required, at a minimum, to match 10% of the grants while cities currently part of ULGDP1 and
all regions have a minimum contribution requirement of 20% each (as per current level).
It is expected that the institutional performance improvements and the infrastructure delivered by
cities will result in: -
(h) enhanced citizen participation and engagement in ULG planning and budgeting;
(i) increased own source revenue at the ULG level;
(j) improved infrastructure, service delivery, O&M systems;
(k) improved efficiency and effectiveness in fiduciary management;
(l) Improved environmental and social management and safeguards; and
(m) strengthened accountability and oversight systems; and
(n) strengthened ULG resilience, improved local economic development (LED) and enhanced
gender equity in the ULG operations.
Page | 41
(h) Composite institutional performance of participating ULGs, averaged across all cities.14
(i) Composite performance for achievement urban infrastructure and service targets,
maintenance performance and value for money in investments by ULGs, averaged across
all cities.
(j) Composite performance for achievement of LED targets, averaged across all cities
Program Duration
The program with support from the World Bank and AFD, will be implemented over a period of
5 years and 4 months from March 2018 to July 2023, with 4 rounds of performance grants in
EFY 2012 (2019/20), EFY 2013 (2020/21), EFY 2014 (2021/22) and EFY 2015 (2022/23). The
program covers the remaining year of the GTP2 (2015/16-2019/2020) and part of GTP3
(2020/2021-2024/2025) both of which are aligned to the country’s goal of achievement of middle
income status by the year 2025. The program will also contribute in the first year FY 2018/19 to
cover the fiscal gap due to over-the target-performance of ULGs in the ULGDP II.
The UIIDP consists of the provision of performance-based grants to ULGs for eligible
Investments and support to achieve Program results at the regional level on capacity building,
financial audit, procurement audit and environmental and social safeguards audits. The program
will have an additional 73 cities to the existing 44 cities making a total of 117 cities that will
participate in the program. This substantial scale-up to 117 cities will bring about greater impact
in terms of population coverage and size of the Program (increasing beneficiaries from 4.36
million under UGLDP II to an estimated 6.62 million in UIIDP) and result in exponentially larger
positive impact for the country. Ethiopia has a significant number of secondary cities that are
spatially distributed across the country. The government’s current policies of industrial
development and promoting urban-rural linkages present good opportunities for promoting more
balanced regional growth through the creation of a linked system of cities. The scale-up also
allows strengthening of the overall programmatic and performance-based approach to support
sustainable urban development and leverages on economies of scale for program management
and implementation. In addition, the scale-up is built on the solid foundations and tried-and-tested
overall successful experiences of ULGDP I and II. Timely support to improve institutional
performance in the planning, delivery, and sustained provision of urban services and
infrastructure by local governments is critical especially for these rapidly growing cities.
14
In the core thematic areas of: Planning and budgeting, assets management, public financial management,
procurement, own source revenues, accountability and transparency, environment and social safeguards, land
management, and strategic urban planning.
Page | 42
The total IDA funding envelope for the UIIDP is US$600 million (of which USS273 million is
from IDA Grant, US$127 million is from IDA Credit and US$200 million is from the IDA
Scale-Up Funding (SUF)). In addition, AFD will contribute co-financing of euro 9.8 million
(US$10.8 million equivalent). The GoE (from regions and cities) will contribute around
US$248.7 million.15 This brings the total Operation Budget envelope to around US$859.5 million.
Table 2. Program Financing (US$ million)
15
Regions and cities contribute to the performance based transfers in the following manner: Amhara, Oromiya,
SNNPR, and Tigray: 30 percent funding in addition to IDA funded grants; DRS regions: 20 percent; original 16
ULGDP I ULGs: 40 percent; new cities under ULGDP II in the DRS regions 10 percent; and other new (ULGDPII)
cities: 20 percent; Harar and Dire Dawa contribute 50 percent in addition to the IDA funded grants. The new 73 ULGs
under UIIDP will follow the same principles as the ULGDPII newcomers.
16
The regional government and ULGs will be making funding contributions at various levels, as detailed in the
Technical Assessment. The contribution from the ULGs constitutes one of the minimum conditions to be met for each
ULG to qualify to receive funding from the Program.
Page | 43
US$34.57 million (federal level). Enable MUDHo to support and guide the regions
and ULGs and also to administer and coordinate the Operation (US$32.57 from IDA;
and about US$2.0 million from AFD).
UIIDP funding to ULGs will be allocated using a simple formula, based on population size
and the performance of the ULGs. An approximate US$16–18 per capita per year (with
phasing in of the new ULGs in the first FY) has been assessed to be the optimal level of
funding.17 As a core principle, the per capita amount would at least maintain the similar level as at
the start of the ULGDP II to ensure minimum level of incentives and meaningful infrastructure
and services investments. The size of this performance grant has been determined considering
various factors such as international good practice (from an expanding number of countries with
performance-based grant allocations), the costs of investments, expenditure needs and current
level of investments, as well as generation of sufficiently strong incentive to drive the
performance. This has been informed by a comprehensive review of ULG fiscal and revenue
positions.
ULGs will use the Program funds to finance urban infrastructure works as well as capacity
building activities, in compliance with the Program’s investment menu and capacity
building manual. Eligible infrastructure investments fall under eight groups including: (a) urban
roads, (b) integrated infrastructure and land services, (c) sanitation (liquid waste), (d) solid waste
management, (e) urban drainage, (f) urban disaster risk management and urban resilience, (g)
built facilities, and (h) urban green infrastructure. Ineligible investments include any World Bank
environment and social impact assessment Category A projects. Compliance with the investment
menu is a minimum condition for receiving funds. In addition, ULGs will be required to prepare
the project in a participatory manner, and consider: (a) social inclusion requirements, including
gender and disability considerations; (b) climate change and disaster adaptation; and (c)
contribution to LED and long-term job creation. 18 ULGs could also spend up to 5 percent of
investment grants and regional/city contributions on capacity building support. For regional
government entities, the grants will mainly be used for capacity building, operations and
management expenses, subject to the eligible capacity building areas, similar to the ULGs.
Almost 96 percent (or around US$576 million) of the Operation’s funds will be disbursed
against disbursement linked indicators (DLIs). The DLIs are structured to provide incentives
to participating ULGs and regional governments for improved management and development of
urban areas. (More details on the DLIs, MCs, PMs, performance assessments, verification
protocols and disbursement arrangements are provided in the UIIDP Annual Performance
Assessment Guideline (APAG) which is a part of this POM and is a standalone Annex of the
POM)
17
In the first year, the simple average per capita for the new 73 ULGs and the ULGDP II 44 ULGs will be US$14.79
and US$17.68 per capita respectively. From the second year, the per capita allocation uses an average figure similar for
the two groups, which is US$17.68.
18
Details of and procedures for the use of investment project prioritization and selection criteria will be included in
the POM.
Page | 44
DLIs 1 to 4 focus on ULGs to strengthen ULG institutional roles in the delivery of
infrastructure and services and enhance local economic development. Each of these DLIs is a
composite index of defined MCs and PMs. Adjustments to these performance indicators and
scoring may be done throughout Program implementation and particularly following the midterm
review to ensure that the system remains relevant, manageable and robust. These four DLIs build
on ULGDP II performance assessment system and will ensure that:
Basic fiduciary, project planning and execution, and environmental and social
management conditions are in place such that local governments can absorb the
Program funding;
ULGs continue to strengthen their institutions of urban management in a social
inclusive manner;
ULGs use program funds effectively in creating sustainable and resilient
infrastructure and delivering services, achieve the targets in infrastructure
delivery, maintenance and development and to promote the GoE’s strategy on
urban development at the city level.
ULGs improve on systematic and foundational aspects to promote long term job
creation, urban resilience and gender empowerment.
The funding proportion against DLIs 1 to 4 have been adjusted to align incentives with emerging
priorities. As compared to ULGDPII, less rewards are given for achieving the MCs (DLI1) and
instead emphasis is placed on achieving the PMs (DLIs 2 to 4) which have higher performance
criteria. In addition, DLI4 focuses on the new thematic areas of local governments’ performance
in LED, resilience and gender and is given a substantial sum to incentivize improvements in these
areas.
The disbursement system for DLI 1, 2, 3, and 4 is scalable based on actual performance of
ULGs. It is particularly important to note that if the ULGs perform better (or poorer) than
expected (as set out in the disbursement related targets in the DLI matrix), disbursements will be
adjusted accordingly. This means that if ULGs perform higher than expected they will receive
higher than expected disbursements. If this continues throughout the Program, additional
financing may be needed.
DLIs 5 to 9 focus on regional government entities to enhance their abilities in fulfilling their
mandates to support ULGs. These DLIs will disburse based on results achieved by regional
government entities in providing support to ULGs (DLI 5) as well as focusing on their
performance in conducting essential audits for ULGs such as on fiduciary and environmental and
social management.
Collectively the DLIs address the PDO and key result areas. The DLIs are designed to address
the challenges of ULGs’ and regional governments’ institutional performance and, in turn, ULGs’
Page | 45
ability to deliver, operate, and manage infrastructure and services, and expand LED. They
provide incentives to address the core issues such as on timely audit, social and environmental
management, own-source revenue generation, and strengthen the system and procedures for
capacity building. In addition, there is enhanced focus to strengthen urban resilience, promote
LED and job creation, and enhance gender equality. The PMs have a direct link to the key result
areas and the GoE’s program intended outcomes.
The expenditure areas are designed to correspond with the structure of the DLIs. These
reflect (a) the performance-based grants to ULGs for urban infrastructure and services
investments and capacity building, and (b) the regional governments’ capacity building and
oversight/support to participating cities. The support to the MUDHo to administer and coordinate
the program and strengthen its capacity to support and guide the regions and ULGs is covered by
the IPF.
An independent Annual Performance Assessment (APA) will be carried out every year to review
the performance of cities and regions against the set of agreed indicators and performance
measures. The independent verification of results to trigger disbursement is key to the Program.
This is the main mechanism to measure the performance and progress of ULGs and regions in
UIIDP. (See the Annual Performance Assessment Guideline (APAG) for the detailed DLIs, the
detailed DLI matrix and verification protocol. The APA results are used to verify the DLIs and
form the basis for disbursements:
For ULGs. Allocations will be determined by: (a) a set of minimum conditions (MCs), and (b) a
further list of performance measures (PMs). Minimum conditions determine if the ULG is
eligible to participate in that year’s program to receive grant support, and the performance
measures track progress of each city in specific areas and determine each city’s score. Key result
areas include: (a) participation of citizens in planning and Budgeting and gender focus, (b)
fiduciary management, (c) generation of own source municipal revenues, (d) delivery as well as
operation and maintenance of new infrastructure and services, and direct job creation, (e)
accountability and oversight systems and (f) environmental and social safeguards, and new areas
such as resilience, LED and gender (see APAG Sections 6-9 for an overview of the minimum
conditions and performance measures).
For regional governments. Key result areas include: (a) capacity building (for various regional
bureaus of urban development (BUDs) and the quality of this, (b) carrying out timely annual
audits of ULGs (for Offices of the Regional Auditor Generals (ORAGs) according to standards,
(c) performing social and environmental audits (for Regional Environmental Protection Agencies
(REPAs)), (d) supporting ULGs’ with respect to urban revenue generation (for Regional Revenue
Authorities (RRAs)) and (e) carrying out the annual procurement audits (for Regional Public
Procurement Agencies (RPPAs) according to defined standards. (See APAG Sections 10 for an
overview of the DLIs and performance measures for regions)
The APA system design built in measures such as independent assessments, quality assurance,
complaint handling system and approval procedures to ensure its robustness. The MUDHo will
Page | 46
recruit an independent firm to conduct the APA in a timely manner. The draft assessment results
will be shared simultaneously with the World Bank and the government (first draft by October
and second draft by January each year). Both the MUDHo (under a technical sub-committee
established) and the Bank will separately undertake rounds of quality assurance review (QAR).
Finally, the UIIDP TC will verify the APA results, and these will be further endorsed by the
UIIDP SC. Based on the final APA results, GoE will send a Results Achievement Notification
(by February each year) summarizing how the Program DLIs have been met. The Bank will retain
the right to make the final decision on whether a DLI has been achieved or not.
OBJECTIVES OF ASSIGNMENT
The Ministry seeks the services of a competent consulting firm or a consortium of firms to
undertake the assignment to assess and score the performance of 56 of the 117 cities in Amhara
(32 cities), Tigray (12 cities), Ethiopian Somali (4 cities), Afar (4 cities), Benishangul Gumuz
(1 city), Gambella (1 city), Harari (1 city) & Dire Dawa City Administration (1 city) that are
participating in the Urban Institutional and Infrastructure Development Program (UIIDP). The
assessment will be done according to the UIIDP Disbursement Linked Indicators (DLIs) and the
associated Performance Measures (PM) and performance indicators except Quality of
Infrastructure which will be done by Office of Federal Auditor General and results handed over to
the APA Consultant. The assessment will be done as per procedures described in the latest
updated Annual Performance Assessment Guideline (APAG) for UIIDP, so as to identify the
achievement of the cities, individually and in aggregate. This will determine: a) whether UIIDP
funds linked to the DLIs described can be disbursed (by the World Bank); and b) the allocation,
or non-allocation of funds, (by GOE) that may be made to each of the 56 participating cities for
EFY 2012 (2019/2020) & EFY 2013 (2020/2021). The new cities which did not participate in
ULGDP II will only be assessed in regard to the Minimum Conditions in the first year. In
addition to this, the APA will assess the DLIs related with the performance at the regional level
(DLIs 5, 6, 7, 8 and 9.)
Page | 47
SCOPE OF SERVICE
AMHARA REGION
2 Dessie 153,691
3 Gondar 264,964
4 Kombolcha 75,078
9 Mota 33,500
Page | 48
10 Woldiya 59,046
1 Adet 24,532
3 Ayikel 21,105
4 Bati 21,385
5 Bichena 20,739
6 Buri 26,120
7 Chagni 29,731
8 Dangila 31,773
9 Debark 29,068
10 Dejen 27,682
11 Gendawuha 36,403
12 Hayik 49,389
13 Injebara 26,958
14 Kemise 24,852
15 Kobo 31,824
16 Lalibela 22,225
17 Merawi 23,909
18 Mersa 20,632
20 Sekota 28,597
22 Wereta 27,159
TIGRAY REGION
1 Mekelle 286,624
Page | 49
2 Adigrat 76,447
3 Axum 59,269
5 Adwa 53,763
6 Alamata 44,092
7 Humera 28,744
8 Wukro 40,103
2 Korem 22,377
3 Maychew 31,088
4 Shiraro 23,013
SOMALI REGION
1 Degehabur 36,419
2 Kebridehar 35,466
3 Gode 52,438
AFAR REGION
1 Dubti 22,263
2 Asayta 24,286
Page | 50
3 Awash Sebat Kilo 22,513
OTHER REGIONS
At the ULG level, the consultants will assess: performance against Minimum Access
Conditions (MACs) and also institutional performance improvements and infrastructure
investment performance. The key results areas include: (a) participation of citizens in planning
and budgeting, (b) fiduciary management, (c) assets management, (d) generation of own source
municipal revenues, (e) land management and urban planning, (f) delivery of new infrastructure
and services, and operation and maintenance of existing infrastructure and services, (g)
accountability and oversight systems, (h) job creation, (i) environmental and social safeguards
and (j) local economic development, urban resilience and gender mainstreaming.
At the regional level the consultants will assess: (1) the extent to which the regional ORAGs
have conducted timely audits of the ULGs final accounts (by January 7 of each financial year),
and verify the quality of audit reports; (2) the regional environmental protection agencies have
carried out the safeguards reviews/audits of ULGs in their jurisdictions before the start of the
APA in each year, including the quality of the review; (3) The Regional Revenue Authorities
have supported ULGs’ efforts to generate revenues; (4) the APA will finally check the extent to
which the regions have developed and executed capacity building plan; and 5) the extent to
which Regional Public Procurement Agencies have conducted timely procurement audits of
participating ULGs in their jurisdiction including quality of the procurement audits.
Related to the execution of the Capacity Building plan, the APA will verify that (i) regional
government teams are in place and are operating, and (ii) regional governments have adopted
service delivery standards (as issued by MUDHo) and issued those for the cities, and provided
guidance in implementation (reports).
Scoring Matrix: The Consultant will develop a simple computerized model into which the
Consultant will enter the (draft and final) scoring data resulting from the APA. The model will
calculate the allocations to be made to each of the 56 cities and the aggregated scores for each
DLI to identify whether and how much funds may be released. The computerized model should
facilitate linkage of results to the word documents and also easier consolidation and
analysis of results.
ULGs Signing-off on APAs: Before completing the assessment, the Consultant will be required
to present the draft assessment to executive representatives/officials of each city and region and
obtain their signed certificate of agreement to the assessment, documenting any justifications for
non-agreement.
Page | 51
Strict adherence to the work plan agreed with the Client in the Final Inception Report is
important because the APA is an input to the process of deciding on allocation of funds and it
will have an impact on the ULG planning and budgeting process.
EXPECTED TIMING AND DURATION OF THE ASSIGNMENT
1st APA
It is expected that the contract will be signed not later than August 31, 2018 and the Consultant
will commence services not later than 1 st October 2018. The estimated implementation period for
the assignment is approximately 7 months over the period from 1 st October 2018 to April 2019.
Most of the field work is done during the period from October 1, 2018 to November 30, 2018 (8
weeks) with submission of preliminary draft reports by December 31, 2018 (excluding audit
results/scores) and Final Reports by April 29, 2019 (including audit results/scores).
2nd APA
It is expected that the contract will be signed not later than mid-July 2019 and the Consultant will
commence services not later than 1 st August 2019. The estimated implementation period for the
assignment is approximately 7 months over the period from 1 st August 2019 to February 29,
2020. Most of the field work is done during the period from August 1, 2019 to September 30,
2019 (8 weeks) with submission of preliminary draft reports by October 15, 2019 (excluding
audit results/scores) and Final Draft Reports by January 21, 2020 (including audit results/scores).
MAIN TASKS
Page | 52
bb. Capital Investment Plan Manual & Template (April 2018)
cc. Asset Management Manual, AMP Model & Template (June 2016)
dd. Revenue Enhancement Plan Manual & Template (May 2018)
ee. ULGDP II First Annual Performance Assessment for EFY 2007 Allocation to 44
cities. Final Report (September 2014)
ff. ULGDP II Second Annual Performance Assessment for EFY 2008 Allocation to 44
cities. Final Report (June 2015)
gg. ULGDP II Third Annual Performance Assessment for EFY 2009 Allocation to 44
cities. Final Report (June 2016)
hh. ULGDP II Fourth Annual Performance Assessment for EFY 2010 Allocation to 44
cities. Final Report (June 2017)
ii. ULGDP II Fifth Annual Performance Assessment for EFY 2010 Allocation to 44
cities. Final Report (May 2018)
jj. Cities’ annual and quarterly progress reports for EFY 2010 and EFY 2011. As part
of the preparations for the annual assessments, each city will complete and submit
to BWUD by July 31 of each year (and BWUD to MUDHo by August 7), an annual
progress report for the previous fiscal year).
kk. Cities prior year and current year capital investment plans/budgets, annual action
plans and annual procurement plans.
ll. Cities revenue enhancement plans for prior year and current year.
mm. Cities asset inventories and asset management plans of prior year and current
year
nn. Cities external audit reports from previous EFYs (minimum 5 years back). If not
yet issued, cities’ most recent external audit reports, including recommendations for
improved performance.
oo. Cities Annual Procurement Plans and contracts register for the assessment periods.
pp. Other reference and operational documents as specified in the APAG.
8. Inception Report: The Consultant will prepare an Inception Report which presents the
details of the methodology for carrying out the assignment, a detailed work plan and
organization of the Consultant’s Team, amongst others (not more than 15 pages).
The work plan should include the planned schedule of all tasks to be performed and
describe in detail, the planned visit by the Consultant’s teams to each city and regions
including dates of visit, dates for introductory briefing and presentation of the
performance assessment to city executives, date for delivery of the various drafts of the
UIIDP Annual Performance Assessment etc.
The Draft Inception Report should be submitted within ten (10) days after the
commencement of the assignment.
10. ULG notification: Immediately following the approval of the Inception Report, the
Consultant will contact executive officials in each city government and regional BUDHo
officials to inform them of the dates for the APA to be undertaken in each city.
11. Certificate of Agreement Format: The Consultant will draft and submit, in
consultation with the Client, a form of Certificate of Agreement to the UIIDP Annual
Performance Assessment that will be signed by each City’s (and BUDHos) nominated
representative at conclusion of the APA for each City.
12. Mobilization: The Consultant will fully mobilize and train their team and make all
logistical preparations for carrying out the APA in the 56 cities and regions, as
according to the work plan.
7. Introductory Presentation & Briefing with ULGs: Before commencing the APA in
each ULG, the Consultant will meet with the Regional Bureau of Urban Development
and Housing (BUDHo) representative, Mayor, City Manager, ULGDP Coordinator (and
any other city official nominated by the Mayor or City Manager) and:
f. Present the full Consultant’s team;
g. Brief the meeting as to the methodology to be followed;
h. Agree who will be the key informants at the city for each of the Consultant’s team/
performance criteria, what documentary evidence of performance is required and
when they will meet to agree on the assessment of performance.
i. The date, time, place and who will be present for the wrap-up meeting (exit
conference) at which the Consultant will present the final agreed (with the relevant
City officials) preliminary APA (not more than 4 pages) and at which, following any
discussion and amendment of the preliminary APA, the Mayor, City Manager,
ULGDP Coordinator and Regional BUDHo representative will certify (attach
Page | 54
signatures) that they have received, discussed and agreed the preliminary APA and
any areas of disagreement.
j. The Consultant will take minutes of this meeting, including names of all persons
present, and will subsequently obtain the UIIDP Coordinator and BUDHo
representatives confirmation as to the accuracy and completeness of these minutes
8. Annual Performance Assessment:
Field Visits - The respective PATs will visit all 56 participating ULGs in their group of
ULGs and undertake the assessment process as per the APAG dated March 13, 2018. The
teams are expected to visit and spend minimally 4 days (inclusive of travelling time) in
each ULG and approximately 2 days (as required) in each of the 8 participating regional
implementing agencies to carry out the assessment. This will be carried out by the PATs
in the manner as agreed in the Inception Report.
Assessment - The Consultant’s teams will then carry out the APA exercise according to
the detailed procedures in the APAG. Teams will meet the assigned city/regional
officials, securing documents as evidence of performance achieved, carrying out
inspections and investigation through sub-project site visits to verify the authenticity of
the performance as necessary; requesting and documenting reasons or justification for
specific under/over performance; meeting together to check/integrate results and
coordinate activities and preparing the preliminary APA for the city and region.
9. Wrap-Up Meeting: The APA for each city will be completed with a Wrap-Up working
session. The Consultant will take minutes of this meeting and will subsequently obtain
the UIIDP Coordinator and BUDHo representative’s confirmation as to the accuracy and
completeness of these minutes. The Consultant’s team will present the First Draft
Performance Assessment for the City, consisting of:
e. A brief written description of the Performance Assessment for each of the DLIs and
performance criteria described in the APAG – not more than 1 page; describing: a)
any difficulties encountered in determining the assessment; and b) any reasons,
explanations or justifications provided by the City for any over or under
performance;
f. A summary table of the performance assessment;
g. The list of documents that verify the performance assessed; and
h. The Certificate of Agreement to the UIIDP APA.
10. Provision of Documents: The Consultant will provide four copies of First Draft
Performance Assessment and Certificate of Agreement, to the City representatives; 1
copy to the Regional BUDHo representatives and 2 further copies with original
signatures in their full draft APA for submission to the Client with a copy to the World
Bank.
11. Client intervention: The Consultant will inform the Client, by email, when the First
Draft Preliminary APA is agreed and the signed Certificate of Agreement is secured.
Should the Consultant be unable to secure a signed Certificate of Agreement, they will
inform the Client’s representative within 24 hours and agree what follow-up action will
be taken and by whom.
Page | 55
12. The Consultant will submit to MUDHo, within 7 days of completion of the field work
visits for all the 56 cities, a Consolidated Field Work Report showing 56 cities and
regions visited and dates thereof, any challenges and problems encountered and
recommendations for future field work/visits.
Page | 56
APA results and complaints resolution and submit its recommendations to the UIIDP Federal
Steering Committee (FSC) by not later than May 2, 2019 (1st APA) and not later than
February 5, 2020. The APA results will be formally reviewed and approved by the FSC,
reviewed and endorsed by the World Bank not later than May 15, 2019 (1 st APA) and
February 15, 2020 (2nd APA).
Final 1st and 2nd APA Reports (including audit results/scores)
The APA Consultant will incorporate the final changes and endorsement of the World Bank of
the APA results and allocations and submit the Final ULG and Synthesis APA Reports by not
later than May 22, 2019 (1st APA) and February 22, 2020 (2nd APA).
MUDHo will distribute the Final ULG and Synthesis APA Reports to all regions and will also
officially notify them of the final allocations approved by the World Bank.
Task 4: Workshop
Following distribution to regions of the Final ULG and Synthesis APA Reports and notification
of Allocations/Disbursements by MUDHo, the UREFMFB (MUDHo) will arrange a 1-day
workshop in May 2019 (1st APA) and in February 2020 (2nd APA), at a venue to be determined,
for the presentation of the findings from the final APA.
The Consultant will make the main presentation of their results which should take no more than 3
hours. The format for the workshop will be advised to the Consultant in due course. The
Consultant will not include the workshop costs in their financial proposal. The workshop
participants are not yet identified but are likely to be approximately 300, with representatives
from each UIIDP participating ULG, Regional States, MUDHo, MOFEC and other federal
agencies, as well as the World Bank, other development partners, the press, etc.
The workshop objectives are to discuss the findings and results of the APA with all stakeholders
and to mobilize all stakeholders, UIIDP implementing agencies and interested parties in support
of and in identifying further actions required to successfully implement the UIIDP and improve
performance of the ULGs;
The Consultant will within 5 calendar days of the end of the workshop, prepare a brief workshop
report, containing: any presentations made at the workshop, a list of workshop participants
(name, position, telephone, email), identification of any issues arising at the workshop that
require follow-up or that either affect decision as to UIIDP disbursements, or the conduct of
future APAs.
Format for APA report, and summary sheet for each City: For each round of APA draft reports,
the Consultant will produce an overall synthesis report and individual city reports capturing the
findings of all cities, and with an executive summary. The reports should capture strengths and
weaknesses on each performance measures for each city and regional implementation agency.
The reports need to be of sufficient high quality, as deemed satisfactory by the client. The
Consultant will use the reporting format provided in the APAG. Any suggested changes for
Page | 57
improving the reporting format will need to be cleared by the Client. All reports will be produced
in English.
By March 15, 2019 APA team incorporates QAR comments and submits second draft
Preliminary APA reports and draft preliminary synthesis report (including
audit results for ULGs) simultaneously to MUDHo and World Bank.
By March 31, 2019 Review by MUDHo and Bank, and APA team reconcile comments received,
into the third draft Preliminary report produced by the APA team and
submitted simultaneously to World Bank and MUDHo.
By April 1, 2019 MUDHo shares the third draft report with ULGs /Regions which have 14
days for submitting complaints, if any
By April 15, 2019 ULGs/Regions submit their complaints.
By April 22, 2019 Review by the APA Complaints Resolution Committee (APACRC) of
ULG/Regions’ complaints
Reconciliation between complaints and APA findings (APACRC)
Recommendations from the APACRC on changes to be made by the APA
team.
By April 29, 2019 Final draft APA report for each ULG/region and the Final Draft Synthesis
Report as well as report on changes made and not made (with justification)
Page | 58
Date (Gregorian Calendar) Activity
by APA team, submitted to World Bank and MUDHo
By May 2, 2019 Final Verification of the APA results by the UIIDP Federal Technical
Committee (FTC)
By May 15, 2019 Formal review and approval of results by the FSC; review and endorsement
by World Bank (for the coming FY’s allocations to ULGs)
By May 22, 2019 Final APA report for each ULG/region and the Final Draft Synthesis Report
incorporating changes and endorsement by the World Bank.
By May 31, 2019 Final Results and Allocations announced and workshop with regions and
ULGs held.
In June 2019 ULG budgeting process for 2019/20 continues based on actual allocations.
By June 30, 2019 Submission of CIPs, REPs and AMPs by ULGs to regions for approval
By July 15, 2019 Approval of CIPs, REPs and AMPs by regions
July 15, 2019 Start of implementation of CIPs by ULGs
By June 30, 2019 World Bank disburse to MOFEC the full amount.
In July 2019 50 percent of the allocations disbursed to Regions and ULGs.
In January 2020 50 percent of annual allocation disbursed to Regions and ULGs.
Schedule for 2nd APA of UIIDP: Allocations for DLIs 1-4 and DLIs 5-9 for EFY 2012 (2019/20)
Page | 59
Date Activity
(Gregorian
Calendar)
By mid-July Independent APA consultants engaged and onboard
Early August APA commences – data collection in the field.
By September 30 Complete all field assessments, including minimum conditions and performance
measures (DLIs 1–4), (including value for money audit). The APA also assesses the
result against DLI 5–9.
By October 15 APA consultant completes and submits first draft Preliminary APA reports and draft
Preliminary Synthesis Report (excluding the audit results for the ULGs) to MUDHo as
well as to the World Bank.
October 16- Conduct Quality Assurance Review (World Bank); Quality Assurance Review
November 30 comments and findings to inform APA ready by no later than November 25 and TC
review findings for consistency by November 30.
By December 10 APA team completes and submits second draft Preliminary APA reports and draft
preliminary synthesis report (excluding the audit results) and share with MUDHo and
World Bank.
By December 24 Review by MUDHo and Bank, and APA team reconcile comments received, into the
third draft report produced by the APA team.
By December 25 MUDHo shares the third draft report with ULGs /Regions which have 14 days for
submitting complaints, if any
By January 8 ULGs/Regions submit their complaints
By January 15 APA consultant: Incorporate audit results in the APA.
Review by the APA Complaints Resolution Committee of ULG/Regions’ complaints
Reconciliation between complaints and APA findings (Complaints Committee)
Recommendations from the Complaints Committee on changes to be made.
By January 21 Final draft APA report for each ULG/region and the Final Draft Synthesis Report as
well as report from the Complaints Committee on changes made by APA team,
submitted to World Bank and MUDHo
By February 5 Final Verification of the APA results by the UIIDP Federal Technical Committee
(FTC)
By February 15 Formal review and approval of results by the FSC; review and endorsement by World
Bank (for the coming FY’s allocations to ULGs)
By February 28 Allocations announced and workshop with regions and ULGs held.
In March ULG budgeting process for 2019/20 starts, based on actual allocations
By June 30 Submission of CIPs, REPs and AMPs by ULGs to regions for approval
By July 15 Approval of CIPs, REPs and AMPs by regions
July 15 Start of implementation of CIPs by ULGs
By June 30 World Bank disburse to MoFEC the full amount
In July 50 percent of the allocations disbursed to Regions and ULGs
Page | 60
In January 50 percent of annual allocation disbursed to Regions and ULGs
Page | 61
TEAM COMPOSITION AND QUALIFICATIONS
The description of the Consultant’s team is provided below
It is expected that the Consultant will provide:
An overall team leader/manager and deputy team leader/manager for the entire
assignment, who will be responsible for overall management of the entire assignments
and its four APA teams, logistical arrangements; communication with the Client and key
stakeholders; quality control of team members work; coordination and integration of
Consultant’s inputs and outputs; data analysis using the latest data analysis software
packages and production of the reports and deliverables that are consistent, reliable,
concise, readable and clear in their findings and presentation of APA results.
Four Performance Assessment Teams (PATs). It is estimated that four PATs will be
formed based on the calculation that the APA for each city will require approximately
two day’s work for each team, depending on the size of the ULG and other factors
affecting work rates. On this basis and assuming a 5-day working week, with travel on
Saturday and Sundays, it is expected that, during the 60 calendar days’ assessment
period, each team can carry out the assessment of approximately 15 ULGs. There should
be two teams for Amhara ULGs (32), one team for Tigray (12 ULGs). The fourth team
will cover Ethiopian Somali (4 ULGs), Afar (4 ULGs), Assosa, Gambella, Dire Dawa &
Harar. Each PAT should have a team leader, responsible for coordination and
communication with the overall team leader/manager for the assignment.
Logistics, Transport, Subsistence Allowances etc. The consultant will be responsible
for all logistical, subsistence allowances for the consultant staff and all transport costs for
both the consultant staff participating in the assessment process.
The arrangements proposed in detail will be included in the Consultant’s Technical Proposal.
Clearly the size and complexity of different ULGs; whether they participated in the ULGDP1
and/or ULGDP II; regional language usages and familiarity with different regions; as well as the
logistical arrangements are among the factors the Consultant will need to take into account in
selecting and directing their APA teams.
Each Performance Assessment Team (PAT) is likely to consist of at least 9 team members as
follows:- Performance Assessment Team Leader (a proven leader chosen from the 9 team
members below and specialist in any of the main disciplines i.e. (i) Financial Management; (ii)
Municipal Finance Specialist; (iii) Procurement Management Specialist; (iv) Environmental
Management Specialist; (v) Social Development Specialist (vi) Municipal
Infrastructure/Engineer/Asset Management Specialist; (vii) Urban Planning/Land Management
Specialist; (viii) Gender Specialist; and (ix) Local Economic Development Specialist.
Page | 63
Position Educational Requirements Experience required
All team members provided should have a solid professional background in the areas to be
addressed, which apart from the specific expertise described in the previous paragraph, would
include performance assessment and evaluation, and program management. It is advisable that
the team should have members or counterpart team members who are conversant with the local
official language, Amharic, since most of the work involves interacting with regional and city
officials.
Page | 65
There should not be former MUDHo, UREFMFB, BUDHo or ULG staff involved in the APA as
part of the Consultant’s team (within the last three years). Personnel involved should be at “arm’s
length” from any previous involvement with related ULGDP II/UIIDP or city activities.
Page | 66
PROPOSAL EVALUATION CRITERIA
Page | 68
3. TOR for UIIDP Annual Performance Assessment Complaint
Resolution Committee (APACRC)
TERMS OF REFERENCE
FOR
ANNUAL PERFORMANCE ASSESSMENT COMPLAINTS
RESOLUTION COMMITTEE
(APACRC)
Page | 69
1. Introduction and Background
Program Duration
The program with support from the World Bank and AFD, will be implemented over a period of
5 years and 4 months from March 2018 to July 2023, with 4 rounds of performance grants in
EFY 2012 (2019/20), EFY 2013 (2020/21), EFY 2014 (2021/22) and EFY 2015 (2022/23). The
program covers the remaining year of the GTP2 (2015/16-2019/2020) and part of GTP3
(2020/2021-2024/2025) both of which are aligned to the country’s goal of achievement of middle
income status by the year 2025. The program will also contribute in the first year FY 2018/19 to
cover the fiscal gap due to over-the target-performance of ULGs in the ULGDP II.
Program Scope and Coverage of Urban Centres
The UIIDP consists of the provision of performance-based grants to ULGs for eligible
Investments and support to achieve Program results at the regional level on capacity building,
financial audit, procurement audit and environmental and social safeguards audits. The program
will have an additional 73 cities to the existing 44 cities making a total of 117 cities that will
participate in the program. This substantial scale-up to 117 cities will bring about greater impact
19
In the core thematic areas of: Planning and budgeting, assets management, public financial management,
procurement, own source revenues, accountability and transparency, environment and social safeguards, land
management, and strategic urban planning.
Page | 70
in terms of population coverage and size of the Program (increasing beneficiaries from 4.36
million under UGLDP II to an estimated 6.62 million in UIIDP) and result in exponentially larger
positive impact for the country. Ethiopia has a significant number of secondary cities that are
spatially distributed across the country. The government’s current policies of industrial
development and promoting urban-rural linkages present good opportunities for promoting more
balanced regional growth through the creation of a linked system of cities. The scale-up also
allows strengthening of the overall programmatic and performance-based approach to support
sustainable urban development and leverages on economies of scale for program management
and implementation. In addition, the scale-up is built on the solid foundations and tried-and-tested
overall successful experiences of ULGDP I and II. Timely support to improve institutional
performance in the planning, delivery, and sustained provision of urban services and
infrastructure by local governments is critical especially for these rapidly growing cities.
Key Features and Financing Modalities
The total IDA funding envelope for the UIIDP is US$600 million (of which USS273 million is
from IDA Grant, US$127 million is from IDA Credit and US$200 million is from the IDA
Scale-Up Funding (SUF)). In addition, AFD will contribute co-financing of euro 9.8 million
(US$10.8 million equivalent). The GoE (from regions and cities) will contribute around
US$248.7 million.20 This brings the total Operation Budget envelope to around US$859.5 million.
Table 3. Program Financing (US$ million)
UIIDP funding to ULGs will be allocated using a simple formula, based on population size
and the performance of the ULGs. An approximate US$16–18 per capita per year (with
phasing in of the new ULGs in the first FY) has been assessed to be the optimal level of
funding.22 As a core principle, the per capita amount would at least maintain the similar level as at
the start of the ULGDP II to ensure minimum level of incentives and meaningful infrastructure
and services investments. The size of this performance grant has been determined considering
various factors such as international good practice (from an expanding number of countries with
performance-based grant allocations), the costs of investments, expenditure needs and current
level of investments, as well as generation of sufficiently strong incentive to drive the
performance. This has been informed by a comprehensive review of ULG fiscal and revenue
positions.
ULGs will use the Program funds to finance urban infrastructure works as well as capacity
building activities, in compliance with the Program’s investment menu and capacity
building manual. Eligible infrastructure investments fall under eight groups including: (a) urban
roads, (b) integrated infrastructure and land services, (c) sanitation (liquid waste), (d) solid waste
management, (e) urban drainage, (f) urban disaster risk management and urban resilience, (g)
built facilities, and (h) urban green infrastructure. Ineligible investments include any World Bank
environment and social impact assessment Category A projects. Compliance with the investment
menu is a minimum condition for receiving funds. In addition, ULGs will be required to prepare
the project in a participatory manner, and consider: (a) social inclusion requirements, including
gender and disability considerations; (b) climate change and disaster adaptation; and (c)
contribution to LED and long-term job creation. 23 ULGs could also spend up to 5 percent of
investment grants and regional/city contributions on capacity building support. For regional
government entities, the grants will mainly be used for capacity building, operations and
management expenses, subject to the eligible capacity building areas, similar to the ULGs.
22
In the first year, the simple average per capita for the new 73 ULGs and the ULGDP II 44 ULGs will be US$14.79
and US$17.68 per capita respectively. From the second year, the per capita allocation uses an average figure similar for
the two groups, which is US$17.68.
23
Details of and procedures for the use of investment project prioritization and selection criteria will be included in
the POM.
Page | 72
Disbursement Linked Indicators, Minimum Conditions, Performance Measures and Verification
Protocols
Almost 96 percent (or around US$576 million) of the Operation’s funds will be disbursed
against disbursement linked indicators (DLIs). The DLIs are structured to provide incentives
to participating ULGs and regional governments for improved management and development of
urban areas. (More details on the DLIs, MCs, PMs, performance assessments, verification
protocols and disbursement arrangements are provided in the UIIDP Annual Performance
Assessment Guideline (APAG) which is a part of this POM and is a standalone Annex of the
POM)
Basic fiduciary, project planning and execution, and environmental and social
management conditions are in place such that local governments can absorb the
Program funding;
ULGs continue to strengthen their institutions of urban management in a social
inclusive manner;
ULGs use program funds effectively in creating sustainable and resilient
infrastructure and delivering services, achieve the targets in infrastructure
delivery, maintenance and development and to promote the GoE’s strategy on
urban development at the city level.
ULGs improve on systematic and foundational aspects to promote long term job
creation, urban resilience and gender empowerment.
The funding proportion against DLIs 1 to 4 have been adjusted to align incentives with emerging
priorities. As compared to ULGDPII, less rewards are given for achieving the MCs (DLI1) and
instead emphasis is placed on achieving the PMs (DLIs 2 to 4) which have higher performance
criteria. In addition, DLI4 focuses on the new thematic areas of local governments’ performance
in LED, resilience and gender and is given a substantial sum to incentivize improvements in these
areas.
The disbursement system for DLI 1, 2, 3, and 4 is scalable based on actual performance of
ULGs. It is particularly important to note that if the ULGs perform better (or poorer) than
expected (as set out in the disbursement related targets in the DLI matrix), disbursements will be
adjusted accordingly. This means that if ULGs perform higher than expected they will receive
higher than expected disbursements. If this continues throughout the Program, additional
financing may be needed.
DLIs 5 to 9 focus on regional government entities to enhance their abilities in fulfilling their
mandates to support ULGs. These DLIs will disburse based on results achieved by regional
Page | 73
government entities in providing support to ULGs (DLI 5) as well as focusing on their
performance in conducting essential audits for ULGs such as on fiduciary and environmental and
social management.
Collectively the DLIs address the PDO and key result areas. The DLIs are designed to address
the challenges of ULGs’ and regional governments’ institutional performance and, in turn, ULGs’
ability to deliver, operate, and manage infrastructure and services, and expand LED. They
provide incentives to address the core issues such as on timely audit, social and environmental
management, own-source revenue generation, and strengthen the system and procedures for
capacity building. In addition, there is enhanced focus to strengthen urban resilience, promote
LED and job creation, and enhance gender equality. The PMs have a direct link to the key result
areas and the GoE’s program intended outcomes.
The expenditure areas are designed to correspond with the structure of the DLIs. These
reflect (a) the performance-based grants to ULGs for urban infrastructure and services
investments and capacity building, and (b) the regional governments’ capacity building and
oversight/support to participating cities. The support to the MUDHo to administer and coordinate
the program and strengthen its capacity to support and guide the regions and ULGs is covered by
the IPF.
An independent Annual Performance Assessment (APA) will be carried out every year to review
the performance of cities and regions against the set of agreed indicators and performance
measures. The independent verification of results to trigger disbursement is key to the Program.
This is the main mechanism to measure the performance and progress of ULGs and regions in
UIIDP. (See the Annual Performance Assessment Guideline (APAG) for the detailed DLIs, the
detailed DLI matrix and verification protocol. The APA results are used to verify the DLIs and
form the basis for disbursements:
For ULGs. Allocations will be determined by: (a) a set of minimum conditions (MCs), and (b) a
further list of performance measures (PMs). Minimum conditions determine if the ULG is
eligible to participate in that year’s program to receive grant support, and the performance
measures track progress of each city in specific areas and determine each city’s score. Key result
areas include: (a) participation of citizens in planning and Budgeting and gender focus, (b)
fiduciary management, (c) generation of own source municipal revenues, (d) delivery as well as
operation and maintenance of new infrastructure and services, and direct job creation, (e)
accountability and oversight systems and (f) environmental and social safeguards, and new areas
such as resilience, LED and gender (see APAG Sections 6-9 for an overview of the minimum
conditions and performance measures).
Page | 74
For regional governments. Key result areas include: (a) capacity building (for various regional
bureaus of urban development (BUDs) and the quality of this, (b) carrying out timely annual
audits of ULGs (for Offices of the Regional Auditor Generals (ORAGs) according to standards,
(c) performing social and environmental audits (for Regional Environmental Protection Agencies
(REPAs)), (d) supporting ULGs’ with respect to urban revenue generation (for Regional Revenue
Authorities (RRAs)) and (e) carrying out the annual procurement audits (for Regional Public
Procurement Agencies (RPPAs) according to defined standards. (See APAG Sections 10 for an
overview of the DLIs and performance measures for regions)
The APA system design built in measures such as independent assessments, quality assurance,
complaint handling system and approval procedures to ensure its robustness. The MUDHo will
recruit an independent firm to conduct the APA in a timely manner. The draft assessment results
will be shared simultaneously with the World Bank and the government (first draft by October
and second draft by January each year). Both the MUDHo (under a technical sub-committee
established) and the Bank will separately undertake rounds of quality assurance review (QAR).
Finally, the UIIDP TC will verify the APA results, and these will be further endorsed by the
UIIDP SC. Based on the final APA results, GoE will send a Results Achievement Notification
(by February each year) summarizing how the Program DLIs have been met. The Bank will retain
the right to make the final decision on whether a DLI has been achieved or not.
In terms of the Annual Performance Assessment Guideline (APAG), where a ULG or Region is
not satisfied with the outcome of the assessment, a complaint should be submitted to the
UREFMFB, MUDHo not later than two weeks following receipt of notification of official scores.
When submitting the complaint, the ULG/Region must enclose any relevant documentation in
support of the issues in question. A UIIDP APA Complaints Resolution Committee will review
and examine the complaint and recommend action to be taken on the complaints.
Based upon the report from the Complaints Resolution Committee, the APA Consultants will
either incorporate changes which they are convinced are justified and provide reasons on those
changes not accepted . The APA Consultants will submit simultaneously to MUDHo and World
Bank, the Final Draft Reports incorporating changes which they consider justified and provide a
report on changes made and not made (with justification). The UIIDP Federal Technical
Subcommittee (FTSC) will verify the APA results and complaints resolution and submit its
recommendations to the UIIDP Federal Steering Committee (FSC). The APA results will be
formally reviewed and approved by the FSC, reviewed and endorsed by the World Bank. The
APA Consultant will incorporate the final changes and endorsement of the World Bank of the
APA results and allocations and produce the Final ULG and Synthesis APA Reports. MUDHo
will distribute the Final ULG and Synthesis APA Reports to all regions and will also officially
notify them of the final allocations approved by the World Bank.
The examination of the complaint will lead to one of the following results:
1. Correction of errors
2. Re-assessment in case of laxity by the assessment team
Page | 75
3. Rejection of the complaint
(a) Chairman: Bureau Head, Policy and Program Bureau, Ato Mohammedzeyen Kedir
(b) Member: Representative, Ethiopian Cities Association, Ato Sissay Dejene
(c) Member: UIIDP Coordinator, Ministry of Finance & Economic Cooperation, Ato Ababu
Tadesse
(d) Member: Independent Expert in area of concern (as and when required)
(e) Secretary: Program Coordinator, UIIDP
The Secretary will assist the Chairman in convening meetings, circulate Agendas, prepare
Attendance Register and take minutes of meeting. The Technical Advisor, UIIDP will
provide technical support to the Committee.
Functions of the APA Complaints Resolution Committee
(a) Literature review all relevant documents and manuals including:-
i. UIIDP Program Appraisal Document (PAD)
ii. UIIDP Program Operational Manual (POM)
iii. UIIDP Annual Performance Assessment Guideline (APAG)
iv. UIIDP Asset Management Plan (AMP)Manual
v. UIIDP Capital Investment Planning (CIP) Manual
vi. UIIDP Revenue Enhancement Plan (REP) Manual
vii. UIIDP Environmental and Social Management System Guideline (ESMSG)
viii. UIIDP Resettlement System Guideline (RSG)
(b) Receive from the Chairman of the UIIDP Technical Committee the complaints submitted
by ULGs and regions, review and examine the complaint.
(c) The Committee has power to request any additional documents from the ULG, region,
MUDHo, APA Consultants or any other relevant entity that will assist it in its
examination and determination of a complaint and recommend action to be taken on the
complaints.
(d) The Committee has power to instruct any official from the ULG, region, MUDHo, APA
Consultants or any other relevant entity to appear before the Committee (if so required) to
give evidence.
(e) Provide an opportunity to the APA Consultants to reconsider any evidence that may not
have been considered properly or may been missed. The APA Consultants will either
incorporate in revised reports changes which they are convinced are justified and
provide reasons on those changes not accepted.
(f) Based on the evidences submitted by the regions/cities and the responses from the APA
Consultant, make a determination on each complaint and provide the grounds upon which
the determination is made.
Page | 76
(g) Submit a report on the determination, and ground upon which this is based, of all the
complaint cases to the Chairman of the UIIDP Federal Technical Committee (Bureau
Head of Urban Revenue Enhancement, Fund Mobilization and Finance Bureau) not later
than 14 days from the date on which the complaints were submitted to the Committee by
the Chairman of the UIIDP Federal Technical Committee.
Page | 77
4. Organization, Staffing & TORs for Federal Mobile Team
Page | 78
Final Draft after WB review/comments, March 26, 2018
Contents
ORGANIZATION, STAFFING & TORs FOR UIIDP UNIT/FEDERAL MOBILE TEAM..............
STAFFING OF THE FEDERAL MOBILE TEAM..............................................................................
TERMS OF REFERENCE FOR PROGRAM COORDINATOR........................................................
TERMS OF REFERENCE FOR DEPUTY PROGRAM COORDINATOR........................................
TERMS OF REFERENCE FOR PROJECT ENGINEER....................................................................
TERMS OF REFERENCE FOR MUNICIPAL FINANCE SPECIALIST...........................................
TERMS OF REFERENCE FOR FINANCIAL MANAGEMENT SPECIALIST..............................
TERMS OF REFERENCE FOR ENVIRONMENTAL MANAGEMENT SPECIALIST.................
TERMS OF REFERENCE FOR SOCIAL DEVELOPMENT SPECIALIST....................................
TERMS OF REFERENCE FOR INFRASTRUCTURE ASSET MANAGEMENT SPECIALIST
.............................................................................................................................................................
TERMS OF REFERENCE FOR LAND MANAGEMENT SPECIALIST........................................
TERMS OF REFERENCE FOR URBAN PLANNING SPECIALIST..............................................
TERMS OF REFERENCE FOR PLANNING, BUDGETING & PARTICIPATION
SPECIALIST.......................................................................................................................................
TERMS OF REFERENCE FOR MONITORING & EVALUATION SPECIALIST........................
TERMS OF REFERENCE FOR UIIDP PROGRAM ACCOUNTANT (MoFEC)............................
TERMS OF REFERENCE FOR PROCUREMENT MANAGEMENT SPECIALIST.....................
TERMS OF REFERENCE FOR CAPACITY BUILDING SPECIALIST.........................................
TERMS OF REFERENCE FOR LOCAL ECONOMIC DEVELOPMENT (LED) & JOB
CREATION SPECIALIST..................................................................................................................
TERMS OF REFERENCE FOR URBAN RESILIENCE & DISASTER RISK MANAGEMENT
SPECIALIST.......................................................................................................................................
TERMS OF REFERENCE FOR GENDER SPECIALIST.................................................................
TERMS OF REFERENCE FOR INFORMATION TECHNOLOGY (IT) SPECIALIST.................
Page | 79
ORGANIZATION, STAFFING & TORs FOR UIIDP
UNIT/FEDERAL MOBILE TEAM
Page | 80
Total 23 32
Page | 81
The main tasks of the UIIDP Unit/FMT are:
Overall responsibility for day-to-day coordination and management of the Operation.
Capacity building, including direct support to regional and urban local governments,
and issuance of guidelines and standard regulations for matters such as municipal
revenue generation, assets management, service delivery standards, gender, local
economic development and the like.
Program management and implementation of activities under the IPF window,
including the procurement and management of the APAs and the value for money
audits and to ensure the timeliness.
Overall Operation monitoring and evaluation.
Operation reporting, including the semi-annual progress reports.
Ensuring that Operation resources are budgeted for and disbursed within the
expenditure framework.
Accounting for the UIIDP funds to MoFEC.
Evaluating the performance of team members as per the agreement made between
UREFMFB and the FMT team members.
Page | 82
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
Page | 83
c) Supervise and manage the UIIDP staff to ensure that they provide the necessary support
and guidance to regions and ULGs to enable all 117 participating cities to fulfil the UIIDP
Minimum Conditions every year of the program and to achieve satisfactory performance
in the UIIDP Performance Measures and Performance Indicators.
d) Development, publication, dissemination, training, updating of the UIIDP Program
Operations Manual (POM) and oversee the development and updating of other UIIDP
Manuals by the relevant UIIDP Staff and/or consultants;
e) Monitoring and reporting on implementing agencies’ compliance with the POM and other
Manuals.
f) Guide the development of systems and procedures and provide guidance to cities &
regions on all the thematic areas covered by the UIIDP as per the DLIs and performance
indicators including monitoring, evaluation and reporting systems.
g) Draft and secure Memorandum of Understanding with all federal agencies who have
responsibilities for UIIDP implementation activities and ensure that regions and cities
sign the Performance and Participation Agreements for every year of the UIIDP
implementation.
h) Consolidate, integrate, streamline and overall manage the various training programs that
are provided by the UIIDP Unit to federal, regional and ULG staff on various thematic
areas covered by UIIDP.
i) Establishment of administrative, logistical & secretarial services to effectively support the
operations of the UIIDP Federal Steering Committee and Federal Technical Committee.
Ensure that there is proper communication and coordination between the federal and
regional steering and technical committees.
j) Provide secretarial duties for the UIIDP APA Complaints Resolution Committee.
k) Securing and disseminating the World Bank Listing of Ineligible Firms & Individuals to
all implementing agencies undertaking procurement with UIIDP funds every six months
(in June and December).
l) Support for, and participation in, World Bank six monthly implementation support
missions and other missions as well as quality assurance reviews.
m) Undertake regular visits to regions and selected cities, especially in the Developing
Regional States, to get a better understanding of the issues and problems that affect the
implementation of UIIDP.
n) Ensure proper communication and coordination with UREFMFB, other Ministry Bureaus,
federal agencies, regional coordinators, BUDHos, World Bank, AFD and other UIIDP
stakeholders
o) Arrange and conduct quarterly review meetings between the Federal Mobile Team,
Regional Mobile Team and regional coordinators of DRS, Harar & Dire Dawa to enhance
communication, coordination and integration between the federal and regions levels.
p) Secure and keep all correspondences and documentation for the Unit and the UIIDP.
q) Review and submit to UREFMFB, the UIIDP quarterly, semi-annual and annual reports
that are prepared by the Monitoring and Evaluation Specialist.
r) Prepare and submit quarterly, semi-annual and annual summarised reports on UIIDP
performance to UREFMFB, the Ministers and Federal Technical Committee.
Page | 84
s) Carry out annual performance evaluation of all UIIDP Unit staff as per the UIIDP Staff
Performance Evaluation and Incentive Scheme established by UREFMFB.
t) Perform any other duties assigned by the Bureau Head of Urban Revenue Enhancement,
Fund Mobilization and Finance Bureau.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by all the 117 UIIDP participating cities in all
the 9 regions:-
1.DLI 1 - Minimum Conditions
All eight (8) minimum conditions should be achieved by all 117 cities in the 9 regions, inclusive
of Dire Dawa City Administration.
2. Performance Measures, DLI 2, DLI 3, DLI 4
50% responsibility for achievement of the annual expected (average) scoreof all UIIDP
performance measures DLI2, DLI3, and DLI 4 as follows:-
DL Name of DLI Year 1 Year Year Year
I 2 3 4
No.
Assessed Performance Years (EFY) 2010 2011 2012 2013
(Prior) & & & &
2011 2012 2013 2014
(Current
)
Allocation /Implementation Year (EFY) 2012 2013 2014 2015
2 ULGs have strengthened institutional performance. 70 75 80 85
3 ULGs have implemented quality infrastructure and 70 75 80 85
maintenance activities and ensured value for money
Page | 85
He/She shall have a minimum of 15 years general experience of which 10 years specific
experience in leadership, strategic planning and change management, human resource
management, program or project management, project planning, implementation and
management of institutional and infrastructure development projects. . He/She will have excellent
change management skills and strong commitment to sharing expertise and experience in order to
develop others (helping others to achieve goals, resolving conflict successfully). He/she shall also
have excellent writing and communication skills in both Amharic and English with good
knowledge of the urban sector in Ethiopia, World Bank and GoE procurement and safeguard
policies and procedures.
Level of Effort and Timing
It is expected that the assignment will start in May 2018. The consultant will be based at MUDHo
offices in Addis Ababa with regular travel to cities and regions. Contract: one-year contract, with
possible extension upon satisfactory performance of the consultant as per the UIIDP Staff
Performance Evaluation and Incentive Scheme. Remuneration: Negotiable / dependent on
qualifications and experience.
Management Procedures
Contractually, the Consultant will be accountable to the Bureau Head, UREFMFB to whom all
reports and deliverables as per the TOR should be submitted. As agency responsible for the
overall coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables:
Modern management and administrative system for the Unit.
Program Operations Manual;
Memorandum of Understanding with all federal agencies and Performance and
Participation Agreements between regions and cities
Consolidated training program and proposal for training provided by the UIIDP Unit to
federal, regional and ULG staff for various thematic areas.
Agenda, Attendance Sheets& Minutes of Federal Technical Committee and UIIDP APA
Complaints Resolution Committee
Page | 86
Agenda, Attendance Sheets and Minutes of and quarterly review meetings between the
Federal Mobile Team, Regional Mobile Team and regional coordinators of DRS, Harar &
Dire Dawa
Annual performance evaluation reports of all UIIDP Unit staff as per the UIIDP Staff
Performance Evaluation and Incentive Scheme established by UREFMFB
Quarterly, semi-annual and annual summarised reports on UIIDP performance
Properly secured and stored documentation and correspondence for the Unit and for all
aspects of program implementation.
General Deliverables:
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%).This criterion further divided into two:
General Educational Status (10%).–PhD – 10%; Masters – 8%
Relevant Qualification as stated in TOR (25%). - PhD – 25%; Masters – 22%
In addition to PhD or Masters degree, BA or BSc in either of the Engineering
disciplines stated above or Asset Management or Project Management – 5%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 87
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
Page | 89
Qualifications and Skills Required
The position requires a dynamic, energetic and innovative person who is highly qualified with
Masters degree or higher in Management, Business Administration, Public Administration,
Business Management, Urban Management, Civil Engineering, Municipal/Urban Engineering,
Highway Engineering, Water/Hydraulic Engineering, Sanitary Engineering, Structural
Engineering or Building Technology, Construction Technology and Management, Infrastructure
Engineering, Geotechnical Engineering, Finance, Economics, Sociology. Environmental Science,
Natural Resource Management, Land Management, Urban Planning. Additional qualification
such as at least BA or BSc in either Engineering or Asset Management or Project Management
with relevant experience will be an advantage. He/she should have a track record of achievements
in leadership, strategic planning and change management, human resource management,
program/project management, project planning, implementation and management of institutional
and infrastructure development projects.
He/She shall have a minimum of 15 years general experience of which 10 years specific
experience in leadership, strategic planning and change management, human resource
management, program or project management, project planning, implementation and
management of institutional and infrastructure development projects. . He/She will have excellent
change management skills and strong commitment to sharing expertise and experience in order to
develop others (helping others to achieve goals, resolving conflict successfully). He/she shall also
have excellent writing and communication skills with good knowledge of the urban sector in
Ethiopia, World Bank and GoE procurement and safeguard policies and procedures.
Level of Effort and Timing
It is expected that the assignment will start in May 2018. The consultant will be based at MUDHo
offices in Addis Ababa with regular travel to cities and regions. Contract: one-year contract, with
possible extension upon satisfactory performance of the consultant as per the UIIDP Staff
Performance Evaluation and Incentive Scheme. Remuneration: Negotiable / dependent on
qualifications and experience.
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Page | 90
Specific Deliverables:
Updated Annual Performance Assessment Guideline (APAG)
Revised/updated UIIDP Complaint Handling Manual.
Report on support to regions and ULGs in administering the UIIDP Complaint Handling
Manual and other related manuals and guidelines
Report on submission by FEACC to World Bank and MUDHo of the bi-annual
consolidated report on fraud and corruption cases.
Report on whether the quarterly reporting system at ULG (Ethics Officers) and regional
levels (REACCs) is in place and functional.
Report on dissemination and adoption of approved and issued service standards as per the
UIIDP POM.
Report on system put in place a system by ULGs for record keeping and reporting
(quarterly, semi-annual and annual) on the achievements against the service delivery
standards performance indicators.
Annual Work Plan (AWP) for the UIIDP Unit and detailed quarterly and monthly Action
Plans to be used for achievement of the AWPB.
Monitoring report on implementation and achievements of the Annual Work Plan (AWP)
for the UIIDP Unit
UIIDP Annual Work Budget & Plan (AWBP) at federal level.
Monitoring report on implementation and achievements of the UIIDP Annual Work
Budget & Plan (AWBP)
Reports on recruitment of the Annual Performance Assessment Consultant, processing of
results and allocation of funds.
Report on engagement of Consultants for, and progress on, the Annual Value for Money
Audits of the 117 participating cities
Consolidated Strategy and Action Plan for addressing weaknesses/gaps identified in the
APA.
TORs for activities that are planned under the Investment Project Financing (IPF)
component of UIIDP which are not covered by thematic area specialists in the Unit.
General Deliverables:
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Page | 91
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%
Relevant Qualification as stated in TOR (25%). - PhD – 25%; Masters – 22%
In addition to PhD or Masters degree, BA or BSc in either of the Engineering
disciplines stated above or Asset Management or Project Management – 5%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 92
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
TERMS OF REFERENCE FOR PROJECT ENGINEER
Page | 93
f. Assist cities in the construction supervision of contractors and making periodic monthly
progress reports of sites.
g. Support cities in the application of ESMS and RSG and consideration of the
environment and social issues in the contract documents in cooperation with EMS
Management consultants.
h. To keep proper records of all the infrastructure projects being implemented by the
region/ULGs under the UIIDP and review action plans/schedules and resources required
as well as assist towns in maintaining the project management, monitoring and
reporting systems for UIIDP and others.
i. Assist cities in the preparations and consolidating the Capital Investment Plans for the
UIIDP and participate in any other works or meetings related to UIIDP and assist them
in reviewing and appraising project proposals.
j. Assist cities, design and construction supervision consultants and contractors to obtain
the necessary documents and information required for the timely completion of the
projects.
k. Assist in project management and implementation of UIIDP and other programs related
to project management and capacity building. This includes working with the cities
technical team as and when required.
l. Support Resident Engineer in checking works, materials and workmanship to ensure
compliance with the approved designs, drawings and specifications and provide
feedback on the technical performance of the contractor and his consultant to the
contracting authority and UREFMFB.
m. Examine alternative design proposals/variations submitted by the design and
construction supervision consultants and contractor/client for execution and recommend
appropriate solution to UREFMFB and cities to respond to technical and financial
queries.
n. Assist in settling any minor disputes (not litigation and arbitration) between contractor
and municipality, inform relevant authorities at the earliest opportunity of any
problem(s) or potential problem(s) which may arise from construction of the project and
recommend possible solutions.
o. Examine with design and construction supervision consultants and recommend on
settlement of the contractor's claims for extensions of time, payment for extra work etc.
p. Organize meetings and/or consultative forums as required with the cities and other
partners for the successful completion of the projects.
q. Prepare simplified workbook, guidelines, checklist for supervision works for a project
engineer
r. Prepare physical progress report and submit to UIIDP Program Coordinator
s. Participate in, and support the preparation of training manuals, guidelines, seminars and
workshops on infrastructure and related subjects.
t. Support regional cities to plan for the future in developing and planning for operations,
maintenance and an environmental mitigation of infrastructure financed under the
UIIDP such as roads, drainage and management of markets, slaughterhouses, solid and
liquid waste disposals for sustainability of the infrastructure projects.
u. Render technical assistance for technical consultant of the cities to enhance capacity in
the preparation of project proposals, construction and supervision procedures and
current standards as well as in other key project management systems and areas of
expertise as and when required.
Page | 94
v. Review and provide comments on the Annual Performance Assessment (APA) Reports
of assigned ULGs
w. Perform any other duties assigned by the Deputy Program Coordinator and the Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his/her
assigned region (s):-
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Page | 96
Review reports and comments on the projects' progress reports, the project proposals and
designs.
Weekly progress reports.
Draft TORs for design and supervision and draft bidding documents where applicable
Implementation support mission reports
Documentation of all correspondences during implementation of infrastructure projects.
Monthly, Quarterly, Semi-annual and annual physical progress reports of the cities the
engineer is entrusted with and simplified workbooks, workable checklist and training and
project supervision manuals
Summary of progress against UIIDP’s performance indicators semi-annually.
Comments on the Annual Performance Assessment (APA) Reports of assigned ULGs
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 97
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the assignment is to lead the UIIDP’s own revenue generation activities,
including supporting the regional and city financial officers that are responsible for revenue
generation of the City and its accountability and achievement of the UIIDP Disbursement Linked
Indicators and Performance Measures related to municipal finance and own source revenue
enhancement.
Scope of the Assignment
The Municipal Finance Specialist will be responsible for supporting the assigned regions and
ULGs in UIIDP’s own source revenue generation activities. Specific duties and responsibilities
are:
a. Preparing guidelines and plans for ULG revenue mobilization and revenue collection;
b. Providing technical support to the regions and ULGs in identifying alternative sources
of funds for infrastructure;
c. Participating and contributing to the development of the Ministry’s Urban Finance
Strategy
d. Assisting ULGs in updating their annual Revenue Enhancement Plans (REPs) for the
most recent year;
e. Assisting regions and ULGs in developing generic and specific revenue enhancement
strategies that will result in increase in municipal revenues of ULGs;
f. Ensuring ULGs and regions provide counterpart funding for UIIDP as described in the
POM and the PPAs;
Page | 98
g. Monitoring, evaluating and reporting on region/ULG revenue mobilization strategies,
actions and ULG revenue collection;
h. Prepare training plan, training materials and provide training to federal, regional and
ULG staff on municipal finance, revenue enhancement strategies and plans
i. Monitoring compliance by regions and ULGs on municipal finance issues;
j. Review and provide comments on the Annual Performance Assessment (APA) Reports
of assigned ULGs regarding municipal finance and own source revenue enhancement
k. Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his/her
assigned region (s):-
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Guidelines and plans for ULG revenue mobilization and revenue collection.
Periodical municipal finance statements and reports.
Documents and reports on in identification of alternative sources of funds for
infrastructure by regions and ULGs;
Contributions to the Ministry’s Urban Finance Strategy
Reports on generic and specific revenue enhancement strategies
Status Report and recommendations on ULGs and regions counterpart funding for UIIDP
Monitoring and evaluation reports on region/ULG revenue mobilization strategies,
actions and ULG revenue collection;
Training plan, training materials and provide training to federal, regional and ULG staff
on municipal finance, revenue enhancement strategies and plans
Comments on the Annual Performance Assessment (APA) Reports of assigned ULGs
Summary of progress against UIIDP’s performance indicators semi-annually.
General Deliverables
Page | 100
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 101
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
TERMS OF REFERENCE FOR FINANCIAL
MANAGEMENT SPECIALIST
Page | 102
i. Support the Office of the Regional Auditor General (ORAG) in undertaking the annual
financial audits of ULGs. Provide capacity building and training to the ORAGs in conjunction
with the Office of Federal Auditor General (OFAG).
j. Monitor the preparations for and the carrying out of the annual financial audits by
ORAGs and provide them guidance and also provide periodic status reports to the Program
Coordinator and UREFMFB.
k. Review the financial audit reports and provide comments on improving the quality of the
audits to the region and also submit the audits for review by the World Bank. Follow up with
regions and ULGs on implementation of recommendations of the audits and submit status report to
UREFMFB and World Bank on actions taken by the regions and ULGs.
l. Assist regions and ULGs in following up and addressing audit queries.
m. Support the OFAG and its delegate in carrying out the annual Value for Money (VfM)
Audits, ensuring that they have the necessary capacity to carry out the audits.
n. Review the VfM Audit Reports and provide comments to OFAG and its delegate on
improving the quality of the VfM audits.
o. Provide support to the MUDHo Project Financial Management Directorate on financial
accounting, financial management and reporting of the Investment Project Financing (IPF)
component of the UIIDP.
p. Monitor compliance by all implementing agencies with UIIDP POM and Financial
Management Manual in regard to financial management issues;
q. Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
Page | 103
2.3.4. Internal Audit – adherence to procedures with good practices, reflected by:
2.3.4.1. Production of quarterly reports
2.3.4.2. Reports submitted to BoFED/ZOFED and copied to the Mayor
2.3.4.3. Evidence of follow-up of audit findings
2.3.5. ULG level Fixed asset and inventory (stock) management weaknesses are addressed
2.3.5.1. Record keeping- maintain fixed asset register, stock card and bin card
2.3.5.2. Count and Reconciliation
2.3.5.3. Segregation of duties
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
Page | 104
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Suggestions and recommendations for improvements to the UIIDP Financial
Management Manual
Training materials and training reports on financial management
Strategies and action plans for ULGs to move from qualified audits to unqualified (clean)
audits
Summary of progress against UIIDP’s performance indicators semi-annually.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 105
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a qualified and experienced Environmental
Management Specialist who will assist in providing capacity building and mentoring services to
regions and urban local governments (city administrations) in implementation of the UIIDP
Environmental Management System and achievement of disbursement linked indicators and
performance measures related to environmental management.
Scope of the Assignment
The Environmental Management Consultant will have the following duties and responsibilities:
a. Provide overall coordination and assistance in the implementation of the ESMS for the
UIIDP.
b. Establish the system of screening forms and EIA set out in this ESMS, and oversee their
smooth operation including advice to ULGs on the procurement of consultants for any
required EIA studies;
c. Review and assess project screening reports prepared by the respective cities which the
categorized as schedule 1, 2 and 3and follow the approval of the reports by regional
environmental protection institutions.
d. Review the Environmental and Social Impact Assessment (ESIA) of the sub projects
and monitor the implementations of the Environmental Management Plans of the sub-
projects
e. Liaise with the MoEFCC on a regular basis;
Page | 106
f. Site visits during ULG investment project execution and operation to assess how
environmental screening and mitigation measures are succeeding or have succeeded in
minimizing impacts.
g. Provide specific technical advice on mitigation measures for labor intensive projects;
h. Provide technical advice to ULGs on all technical issues related to natural resources and
environmental management. These issues will relate to impacts on surface water,
groundwater, agricultural resources and vegetation, sourcing of materials used in
construction, human health, ecology and protected areas, land and soil degradation;
i. Raise awareness and proactively create demand for this technical advice among ULG
officers;
j. Liaise with the BUDHo, REFAs and ULGs to ensure the project’s compliance with the
ESMS with all aspects of the project;
k. Be responsible for collating information related to the ESMS, occupational health and
safety;
l. Undertake review of EMPs to ensure compliance with the ESMS;
m. Assist in establishing a monitoring and evaluation system for the implementation of the
ESMSG;
n. Lead the delivery of capacity building programs for ULG officers on the ESMS and
produce a training plan.
o. Check and support all cities’ projects that, their CIPs are all screened and approved by
the Regions’ Environmental Protection Authorities.
p. Assist that eligible investments for potential environmental safeguard impacts are
screened against the set of environment criteria in the planning stage and Environmental
and Social Impact Assessments (ESIAs), Environmental Management Plans (EMPs) are
prepared and approved by the Regional Environmental Protection Agency as required;
q. Ensure that EMPs are implemented in a timely manner - prior to commencement of
civil works;
r. Ensure that the ULG has established a functional system for environmental
management;
s. Ensure that the REFAs carry out an environmental performance audit of all CIP projects
on an annual basis as stated in the UIIDP POM; Review the reports for quality,
timeliness and issues that need to be followed up by the cities.
t. Monitor and report on the implementation of landfills and abattoirs as per the MUDHo
manuals ensuring that the necessary safeguard actions are put in place and implemented
as per the ESMSG.
u. Prepared training plan, training materials and provide training to federal, regional and
ULG staff on environmental management, occupational health and safety
v. Perform other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
Page | 107
1. DLI 1 - Minimum Conditions
Safeguards: ULGs have demonstrated that they have established a functional system for environmental and social
management including full time dedicated one environmental and one social safeguards person and updated ESMSG
and RSG endorsed by City Councils
24
Depending on the project phase
Page | 108
Inputs provided by the Client
UREFMFB will provide reasonable and standard office space and office furniture and equipment
required for the duration of the assignment, at its premises for successful discharging of his
assignment. The consultant will be provided, for official business, with internet access, telephone
and fax facilities.
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
System of screening forms and EIA set out in this ESMSG.
Review comments on Environmental and Social Impact Assessment (ESIA) of the sub
projects
Review comments of EMPs to ensure compliance with the ESMS
Report on quality, timeliness and issues that need to be followed up by the cities on
environmental audits.
Training plan, training materials and training reports on environmental management,
occupational health and safety training.
Monitor reports on the implementation of landfills and abattoirs
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Page | 109
Relevant Experience (40%).
Page | 110
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
TERMS OF REFERENCE FOR SOCIAL DEVELOPMENT
SPECIALIST
Page | 111
h. Liaise with the BUDHo and ULGs to ensure the project’s compliance with the RSG and
all resettlement aspects of the project;
i. Be responsible for collating information related to the RSG and resettlement;
j. Undertake review of RAPs to ensure compliance with the RSG;
k. Establish a monitoring and evaluation system for the implementation of the RSG;
l. Lead the delivery of capacity building programs for ULG officers on the RSG and
produce a training plan.
m. Review the procedure being followed to produce Resettlement Action Plan (RAP) to
ensure compliance with the RSG
n. Monitor the implementation of Resettlement action plans and ensure that RAPs are
implemented in a timely manner - prior to commencement of civil works;
o. Review, compile and prepare quarterly reports on social safeguards at national level
p. Review the social aspect of annual environment and social performance audit reports in
line quality, timeliness and social related issues that need to be followed up and addressed
by the cities
q. Ensure that the ULG has established a functional system for social management;
r. Ensure that eligible investments for potential social safeguard impacts are screened
against the set of social criteria in the planning stage and Resettlement Action Plans
(RAPs) are prepared and approved by the Regional Environmental Protection Agency as
required;
s. Perform other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his/her
assigned region (s):-
25
Depending on the project phase
Page | 112
The assignment will require a good understanding and knowledge of social safeguards that are
associated with projects such as the UIIDP and a high level of technical competence in the
implementation of RSGs.
The Consultant should therefore possess the following qualifications:
BA, MA or higher degree in Sociology, Social Work, Social Anthropology, Community
Development or other related fields;
A minimum of 10 years general experience of which 5 years specific experience in
aspects of social safeguards, community development and urban development in general
and sound experience in social safeguards impact screening , resettlement action plans
(RAPs) preparation, implementation ,monitoring and reporting.
Experience in working with local governments and/or knowledge of the urban sector in
Ethiopia will be an added advantage.
Have strong dedication and good understanding of the complexities of
resettlement and willing to work under stress and demanding situation;
The specialist must be well versed with the World Bank guidelines/ Ethiopian environmental
policy and guideline on Environment and Social Safeguards systems and with experience in
drafting documents of similar nature
Excellent writing and communication skills in both Amharic and English.
Proficiency in the usage of computers including use of office word, excel and
PowerPoints
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
Page | 113
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
System of screening forms, RAP set out in the RSG
Reports on Site visits during ULG investment project execution and operation to assess
how social aspects are succeeding or have succeeded in minimizing impacts
Information related to the RSG and resettlement
Review comments on RAPs to ensure compliance with the RSG
Monitoring and evaluation system for the implementation of the RSG;
Training plan, training materials and training reports on social development and
resettlement
Report on technical assistance provided to the regional bureaus and ULGs during site
visits
National level social safeguards performance reports
Functional system for social management in all assigned ULGs
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 114
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of qualified and experienced Infrastructure
Asset Management Specialist who will support assigned regions and ULGs in infrastructure asset
management and planning as per the GIS-based Infrastructure Asset Management Plan Manual
and Model that has been issued to all regions/ULGs. The Consultant will also support regions and
cities in the achievement of UIIDP disbursement linked indicators and performance measures
related to infrastructure asset management and planning.
Scope of the Assignment
The Infrastructure Asset Management Specialist will be responsible for assisting the assigned
region and UIIDP participating cities in all areas involving the management of existing
infrastructure assets and the planning for new infrastructure assets. Specific duties and
responsibilities are:
a. Review and revise the GIS-based Infrastructure Asset Management Manual and Model.
b. Prepare training plan, training materials and provide training to federal, regional and
ULG staff on GIS, GIS -based Infrastructure Asset Management Manual and Model.
c. Review the annual updated GIS-based Asset Inventories and AMPs of all the assigned
ULGs as and when they are submitted by the cities/regions and provide review reports.
d. Provide on the job training and direct assistance to DRS cities and new cities in major
regions on updating of asset inventories, preparation of Asset Management Plans. Provide
implementation plan and status report for this assistance.
Page | 115
e. Review and follow up with MUDHo, regions and cities on the implementation of the
Implementation Strategy and Program of Action for Asset Management. Assist all three levels
(federal, regional, ULG) to take the necessary actions stated in the strategy and program of
actions and produce implementation and status reports.
h. Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
Page | 116
Technology, Construction Technology and Management, , Geodesy, Surveying or GIS or
urban planning or related field.
A minimum of 10 years’ general experience of which 5 years’ experience in
infrastructure asset management and disciplines stated above including at least 3 years’
experience using GIS.
Excellent writing and communication skills in both Amharic and English (all reports,
documents and correspondences shall be in English and/or Amharic).
Knowledge of the urban sector in Ethiopia is an advantage.
Level of Effort and Timing
It is expected that the assignment will start in May 2018. The consultant will be based at MUDHo
offices in Addis Ababa with regular travel to cities and regions. Contract: one-year contract, with
possible extension upon satisfactory performance of the consultant as per the UIIDP Staff
Performance Evaluation and Incentive Scheme. Remuneration: Negotiable / dependent on
qualifications and experience.
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Revised GIS-based Infrastructure Asset Management Manual and Model.
Training plan, training materials and training reports on GIS, GIS -based Infrastructure
Asset Management Manual and Model.
Review comments on the annual updated GIS-based Asset Inventories and AMPs of all
the assigned ULGs
Implementation Plan and Status Report on “On the Job Training” and direct assistance to
DRS cities and new cities in major regions on updating of asset inventories and
preparation of Asset Management Plans
Implementation and status reports on the Implementation Strategy and Program of Action
for Asset Management at all three levels
Page | 117
Contributions to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the performance measures on asset management.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 118
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of qualified and experienced Land
Management Specialist who will provide technical support and assistance to MUDHo, regions
and ULGs on all urban land management issues and the achievement of UIIDP disbursement
linked indicators and performance measures on land management.
Scope of the Assignment
The Land Management Specialist will be responsible for assisting MUDHo, regions and ULGs
on land management issues, especially in regard to land development, land release, land
registration and land inventory. Specific duties and responsibilities are:
a. Assist MUDHO in the revisions and updating of all land management manuals,
guidelines, standards, policies and laws. Provide proposals and recommendations.
b. Advising MUDHo, regions and ULGs on the appropriate instructional and
organizational structure for urban land management
c. Assist MUDHo in the development and implementation of urban land management and
information systems
d. Assist in developing and maintaining a ULGs land registration register;
e. Providing technical guidance to the ULGs regarding matters of land development, land
release, land registration, land inventory and land information systems;
f. Advice in planning towns and trading centers in the ULGs, especially regarding
optimum use of available land and guiding ULGs authorities on balanced development;
g. Inspecting structures in the ULGs to ensure compliance with the land use plan;
Page | 119
h. Monitor and report on ULG adherence to proper and effective land management
practices and policies;
i. Prepare training plan, training materials and provide training to federal, regional and
ULG staff on urban land management.
j. Monitoring compliance with UIIDP POM in regard to urban land management;
l. Review the Annual Performance Assessment Reports of ULGs regarding urban land
management and provide comments
m. Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
2. DLI 2 - Institutional Performance (ULG Performance Measures)
2.1. Land Management and Urban Planning
2.8.2. Effective land management
2.8.2.1. Land released for different uses are as per the laws of land management and have access to basic infrastructure
facilities i.e. road, water, electricity at a radius of 250 meters
2.8.2.2. Proportion of land plots released through competitive auction/ bidding process (and not through direct
allocation)
2.8.2.3. Updated land inventory featuring a tabular and/or spatial database e.g. a map (Yes/No indicator)
Page | 120
Level of Effort and Timing
It is expected that the assignment will start in May 2018. The consultant will be based at MUDHo
offices in Addis Ababa with regular travel to cities and regions. Contract: one-year contract, with
possible extension upon satisfactory performance of the consultant as per the UIIDP Staff
Performance Evaluation and Incentive Scheme. Remuneration: Negotiable / dependent on
qualifications and experience.
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Proposals and recommendations on revisions and updating of all land management
manuals, guidelines, standards, policies and laws.
Proposals on the appropriate instructional and organizational structure for urban land
management at federal, regional and ULGs
Status and Implementation Progress Reports on development and implementation of
urban land management and information systems
Up to date ULGs land registration register
Report on guidance given to ULGs regarding matters of land development, land release,
land registration, land inventory and land information systems;
Report on compliance by assigned ULGs with the land use plan
Monitoring report on ULG adherence to proper and effective land management practices
and policies
Training plan, training materials and provide training to federal, regional and ULG staff
on urban land management
Contributions to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the performance measures on urban land management.
General Deliverables
Page | 121
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 122
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
TERMS OF REFERENCE FOR URBAN PLANNING
SPECIALIST
The Urban Planning Specialist will be responsible for assisting the assigned region (s) and UIIDP
participating cities in areas involving urban planning. Specific duties and responsibilities are:
a. Assist MUDHO in the revisions and updating of all urban planning manuals, guidelines,
standards, policies and laws. Provide proposals and recommendations.
b. Advising MUDHo, regions and ULGs on the appropriate institutional and
organizational structure for urban planning.
c. Assess the feasibility of proposals and identify necessary changes, recommend approval,
denial or conditional approval of proposals.
d. Determine the effects of regulatory limitations on projects.
e. Assist ULGs create, prepare, or requisition graphic and narrative reports on land use data,
including land area maps overlaid with geographic variables such as population density.
f. Advise planning officials on project feasibility, cost-effectiveness, regulatory
conformance, and possible alternatives.
g. Assist ULGs conduct field investigations, surveys and impact studies in order to compile
and analyze data on economic, social, regulatory and physical factors affecting land use.
Page | 123
h. Discuss with planning officials the purpose of land use projects such as transportation,
conservation, residential, commercial, industrial, and community use.
i. Keep informed about economic and legal issues involved in zoning codes, building
codes, and environmental regulations.
j. Mediate community disputes and assist in developing alternative plans and
recommendations for programs or projects.
k. Coordinate work with socio-economy consultants and architects during the formulation
of plans and the design of large pieces of infrastructure.
l. Review and evaluate environmental impact reports pertaining to private and public
planning projects and programs.
m. Monitoring compliance with UIIDP POM in regard to urban planning;
n. Prepare training, plan training materials and provide training to federal, regional and
ULG staff on urban planning.
p. Review the Annual Performance Assessment Reports of ULGs regarding urban planning
and provide comments
q. Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
4 Management Procedures
5 Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Proposals and recommendations on revisions and updating of all urban planning manuals,
guidelines, standards, policies and laws.
Proposals on the appropriate instructional and organizational structure for urban planning
at federal, regional and ULGs
Report on administering government plans and policies affecting land use, zoning, public
utilities, community facilities, housing, and transportation.
Page | 125
Assessment reports on feasibility of proposals and recommendations on necessary
changes/approval/denial or conditional approval of proposals.
Analysis of data on economic, social, regulatory and physical factors affecting land use.
Alternative plans and recommendations for programs or projects.
Review and evaluation comments on environmental impact reports pertaining to private
and public planning projects and programs.
Training plan, training materials and provide training to federal, regional and ULG staff
on urban planning.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 126
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a qualified and experienced Planning,
Budgeting and Participation Specialist who will support all regions and UIIDP participating cities
in planning and budgeting for infrastructure investments in a participatory manner.
Scope of the Assignment
The Planning, Budgeting and Participation Specialist will be responsible for the following
specific duties and responsibilities are:
a. Reviewing, and making contributions to the revision of, the planning, budgeting and
participation manuals being used by ULGs.
b. Supporting regions and cities in formulating and developing ULGs development
strategies, plans and budgets;
c. Support regions and UIIDP participating cities in the preparation of ULG capital
investment plans, capacity building plans, action plans and budgets in participatory
manner.
d. Preparing and disseminating performance standards and indicators for the ULGs to use
on planning, budgeting and participation;
e. Monitoring and evaluating performance of ULGs Development Plans
programs and projects;
f. Collecting, analyzing and storing data into useful information for end users and
maintaining a data bank for planning, budgeting and decision-making purposes;
g. Providing technical advice to MUDHo, regions and ULGs on matters related to
planning, budgeting and participation;
Page | 127
h. Preparation of short, medium and long-range projections based on the GTP and other
Ministry plans and providing these to regions and ULGs to use for planning and
budgeting purposes.
i. Ensures that applicable records, economic, statistical bulletins and miscellaneous data
are maintained in the UIIDP Unit and updated from time to time.
j. Evaluates the effectiveness of public participation, project planning, budgeting and
implementation through monitoring, evaluation and review of projects, post
implementation review and dissemination of project results;
k. Monitoring compliance with UIIDP POM and other manuals in regard to budgeting,
planning and participation;
l. Prepare training plan, training materials and provide training to federal, regional
and ULG staff on planning, budgeting and participation.
o. Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
Page | 128
2.1.2.2. Increase in no. of people involved. Evidence of agenda and issues discussed.
2.1.3. Budget appropriation
2.1.3.1. Budget approved by Council (Yes/No Indicator)
2.1.4. Budget Reliability
2.1.4.1. Variance between overall city budget and actual expenditure (each capital and recurrent) for previous EFY
less than 10%. Yes/No
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
Page | 129
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Contributions to the revision of, the planning, budgeting and participation manuals being
used by ULGs.
Reports on technical support provided to regions/cities in formulating and developing
ULGs development strategies, plans and budgets;
Reports on support given to regions and UIIDP participating cities in the preparation of
ULG capital investment plans, capacity building plans, action plans and budgets.
Monitoring and evaluation reports on performance of ULGs Development Plans,
programs and projects;
Data bank for planning, budgeting and decision-making purposes;
Short, medium and long-range projections based on the GTP and other Ministry plans
Evaluation reports on the effectiveness of public participation, project planning,
budgeting and implementation.
Training plan, training materials and training reports on planning, budgeting and
participation
Contributions to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the performance measures on budgeting, planning and participation.
Review comments on Annual Performance Assessment Reports of ULGs regarding
budgeting, planning and participation.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 130
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
Page | 131
g. Work with UIIDP team members and other project implementing partners to familiarize
them with key performance indicators of the UIIDP.
h. Contributions to revisions to the Annual Performance Assessment
Guideline (APAG).
i. Review comments on Annual Performance Assessment Reports of
ULGs.
j. Perform other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
DLI 2 - Institutional Performance (ULG Performance Measures)
2.6. Accountability and Transparency
2.6.1. Accountability and transparency in city operations and service delivery
2.6.1.2. Public dissemination (in city offices and other public places or web-pages, newspapers) of information
about: (a) Annual budgets; (b) Approved projects; (c) Expenditures; (d) Audited accounts; (e) Procurement
decisions; (f) APA results announced to public
2.6.1.3. Timely submission of quarterly progress reports for UIIDP as per the UIIDP M & E Guidelines (Yes/No
indicator)
Qualifications and Skills Required
The Monitoring and Evaluation Specialist should possess the following qualifications/
competencies:
BA or B.Sc. degree in statistics, Demography, Sociology, Social Work, Economics,
Urban Management or a related field;
A minimum of 10 years’ general of which 5 years specific experience in monitoring and
evaluation systems of programs/projects and capacity building for M&E in a public
sector or urban sector setting.
Excellent writing and communication skills in English, excellent report writing skills.
Excellent command of computer programs and applications with significant capabilities
in computerized database, spreadsheet constructions and statistical software.
Knowledge of the urban sector issues in Ethiopia is an advantage.
Page | 132
UREFMFB will provide reasonable and standard office space and office furniture and equipment
required for the duration of the assignment, at its premises for successful discharging of his
assignment. The consultant will be provided, for official business, with internet access and
telephone facilities.
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
UIIDP Monitoring, Evaluation and Reporting System Guidelines for the federal, regional
and ULG levels
UIIDP M & E system at federal level
Report on assistance given to the UIIDP M&E Officers at Regional and ULG levels in
maintaining UIIDP M & E System at their levels
Consolidated Quarterly Progress Reports, Semi-Annual Report, Annual Report for UIIDP
Training plan, training materials and training reports
Contributions to revisions to the Annual Performance Assessment Guideline (APAG)
Review comments on Annual Performance Assessment Reports of ULGs.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 133
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a UIIDP Program Accountant, based at
MoFEC, who will be responsible for fund flow, financial reporting, and arranging overall project
auditing
Scope of the Assignment
The Program Accountant will have the following specific duties and responsibilities:
a. Prepare and update the UIIDP Financial Management Manual
b. Prepare training plan, training materials and provide training to the UIIDP accountants
at the Regional Bureaus of Finance and Economic Development and ULGs.
c. Facilitate and ensure timely release and flow of resources from IDA to MoFEC and to
MUDHo and regions.
d. Maintain the UIIDP financial accounting and reporting system in IBEX.
e. Ensure timely submission of expenditure documents from MUDHo and regions
(BoFEDs) to MoFEC and consolidated expenditure report to IDA for replenishment of
UIIDP funds;
f. Prepare request for replenishment of funds by IDA with relevant and necessary
documentation and reports /Interim Financial Reports (IFR)
g. Prepare periodic Financial Reports and additional statement as per the UIIDP POM and
UIIDP Financial Management Manual.
h. Ensure that proper financial records are maintained at all UIIDP implementing
Agencies and ensure the quality and consistency of all financial data;
i. Reconcile monthly UIIDP bank accounts at MoFEC with the bank statements.
Page | 134
j. Prepare Semi-Annual Financial Reports for UIIDP and submit to IDA within the
deadline stipulated in the POM and the financing agreement.
k. Prepare annual consolidated financial statements for UIIDP within three months after
the end of the financial year and ensure that these are submitted for audit to the external
auditors;
l. Facilitate the external auditor with all the necessary financial documents in order to
conduct the audit in time and ensure the audit report is submitted to the bank within six
months after the end of the financial year of the program;
m. Copy all financial reports to MUDHo for proper coordination and follow-up of the
implementation and fund utilization;
n. Perform other duties assigned by the UIIDP Coordinator at MoFEC.
Management Procedures
Contractually, the UIIDP Program Accountant will be accountable to the MoFEC UIIDP
Coordinator to whom all reports and deliverables as per the TOR should be submitted. MoFEC
will sign the contract with the UIIDP Program Accountant and will also be responsible for all
Page | 135
payments to the UIIDP Program Accountant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
UIIDP Financial Management Manual
Training plan, training materials and training reports on financial management
UIIDP financial accounting and reporting system in IBEX
Consolidated expenditure report and Replenishment Request to IDA for replenishment of
UIIDP funds
Periodic Financial Reports and additional statement as per the UIIDP POM and UIIDP
Financial Management Manual.
Monthly Bank Reconciliation Statements for UIIDP
Semi-Annual Financial Reports for UIIDP
Annual consolidated financial statements
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the UIIDP
Program Accountant activities/ achievements during the month and plans for the next
month.
Draft Final Report of the UIIDP Program Accountant’s work three weeks before the end
of the assignment; and
Final Report of the UIIDP Program Accountant’s work, one week after receiving
comments from MoFEC.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 136
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a qualified and experienced Procurement
Management Specialist who will provide support to assigned regions and UIIDP participating
cities on procurement planning, implementation and monitoring as well as contract management
including achievement of disbursement linked indicators and performance measures related to
procurement.
The Procurement Management Specialist will be responsible for the following specific duties and
responsibilities:
a. Hold inventory and database of all federal and regional governments procurement laws
including proclamations, regulations, directives, manuals, circulars, standard bidding
documents and templates which govern the procurement process;
b. Keep track of any changes in the procurement laws, procedures and circulars issued by
the Federal and Regional Governments from time to time; analyze their impacts on
value for money and fairness compared to the baseline procurement laws, procedures
and circular and notify MUDHo and the Bank immediately;
c. Review and contribute to the revision/updating of the procurement manuals, guidelines
and procurement formats in line with the Financing Agreement and POM.
d. Supporting assigned regions and cities in the formulation of procurement policies and
strategies in line with the Financing Agreement and POM;
Page | 137
e. Supporting assigned regions and cities in the preparation of the Annual Procurement
Plans for ULGs, reviewing the plans and providing comments or suggestions for
improvement of the quality of the plans;
f. Monitoring the implementation of the Annual Procurement Plans, providing summarized
status report to the Program Coordinator and UREFMFB on quarterly basis. Provide
guidance to the regions and ULGs on speeding up implementation of the procurement
plans/activities.
g. Supporting the assigned Regional Public Procurement and Property Administration
Agencies in undertaking the annual procurement audits of ULGs. Provide capacity
building training to the RPPPAAs in conjunction with the FPPPAA.
h. Monitor the preparations for and the carrying out of the annual procurement audits by
RPPPAAs and provide them guidance and provide periodic status reports to the Program
Coordinator and UREFMFB.
i. Review the procurement audits and provide comments to the RPPPAAs and submit the
audits for review by the World Bank. Follow up with regions and ULGs on
implementation of recommendations of the audits and submit quarterly status report to
UREFMFB and World Bank on actions taken by the regions and ULGs.
j. Provide support to the MUDHo Project Procurement Management Directorate on
preparation of the procurement plan for the Investment Project Financing (IPF)
component of the UIIDP and actively participate in the procurement activities for the IPF
(review of TORs, bidding documents, evaluation reports, contract management etc);
k. Carry out a review to identify constraints and opportunities to the effective and efficient
procurement and administration of works, goods, and consultancy and non-consultancy services
in the ULGs and an implementation capacity assessment to identify gaps;
l. Prepare training plan, training materials and provide training to federal, regional and
ULG staff on procurement management;
m. Monitoring compliance with UIIDP POM and other manuals regarding procurement
management;
r. Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
Page | 138
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s): -
1.2. Functional institutional set-up for procurement system in place according to public
procurement proclamation including:
(a) Procurement function and minimum core staff in place – at least two procurement
specialists within procurement unit in ULG; with first degree and experience in
procurement at least for two years
(b) Functional tender committee/tender award committee (TAC) at ULG level in place;
(c) Participating cities have the copies of their respective region’s procurement law,
directives, manuals and standard procurement documents and staffs are familiar with
these legal documents
(d) Establishment of procurement performance monitoring and measurement using the
Procurement Key Performance Indicators included in the POM and APAG.
(ii) Internal procurement audits are conducted and they are acceptable;
(iii) Follow up and update was done on the action plan for implementation of internal and external audit findings.
(v) Bid openings are conducted immediately after bid submission and minutes are acceptable
(ii) Contract was awarded to the legitimate bidder within bid validity period;
Parameters to be assessed.
(i) Percentage (by no. and value) of procurement items not included in the original annual procurement plan should not
exceed 5%;
(ii) Average deviation between original Planned and Actual Procurement cycle time (procurement initiation-contract
completion) should not exceed 5%;
(iii) deviation between original price in the procurement plan and award price should not exceed 20%;
(iv) deviation between contract price and completion price (turnout cost) should not exceed 25%.
2.4.3.1. Competitiveness, Fairness and Transparency and Controls
Parameters to be assessed.
(i) Percentage (by no. and value) of procurements conducted through open bidding procedure is 85%;
(ii) Complaints resolved within the standard time frame is 100%;
(iii) the percentage of action taken from the previous procurement audit qualifications/ recommendations equals or
exceeds 90%.
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Contributions to the revisions/updates of the procurement manuals, guidelines and
procurement formats.
Reports on technical support provided to assigned regions/cities in formulating
procurement policies and strategies;
Reports on support given to assigned regions and UIIDP participating cities in the
preparation of ULG annual procurement plans
Review comments or suggestions for improvement of the quality of assigned ULG annual
procurement plans
Summarized Quarterly Monitoring & Status Report on implementation of the assigned
ULG Annual Procurement Plans, implementation of audit/review findings and
recommendations, and trainings and guidance provided to the assigned regions and ULGs
on speeding up implementation of the procurement plans/activities.
Report on support provided to the assigned Regional Public Procurement and Property
Administration Agencies in undertaking the annual procurement audits of ULGs.
Training Reports on capacity building training to the RPPPAAs
Monitoring and status report on the preparations for and the carrying out of the annual
procurement audits by RPPPAAs.
Page | 141
Review comments on quality of procurement audits
Status report on implementation by regions and ULGs of recommendations of the
procurement audits.
Report on support provided to the MUDHo Project Procurement Management Directorate
on preparation of the procurement plan for the Investment Project Financing (IPF)
component of the UIIDP and on IPF procurement activities.
Report on constraints and opportunities to the effective and efficient procurement and
administration of works, goods and consultancies in the ULGs.
Procurement implementation capacity assessment report.
Training plan, training materials and training reports on procurement management
Contributions to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the performance measures on procurement management.
Review comments on Annual Performance Assessment Reports of ULGs regarding
procurement management.
Spreadsheet for data collection on procurement performance measurement and
monitoring;
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 142
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a qualified and experienced Capacity
Building Specialist who will be responsible for coordinating all the capacity building activities
under UIIDP and for providing capacity building support to all regions and UIIDP participating
cities.
Scope of the Assignment
The Capacity Building Specialist will be responsible for the following specific duties and
responsibilities:
a. Reviewing, and making contributions to the revision of the UIIDP Capacity Building
Manual and ensuring that the manual is disseminated to all regions and ULGs.
b. Provide support to regions and ULGs in carrying out the capacity self-assessment and
gap analysis using the tools provided in the UIIDP Capacity Building Manual.
c. Supporting regions and cities in formulating and developing their capacity building
strategies, plans and budgets, ensuring that the UIIDP Eligible Capacity Building
Areas are adhered to and that all the four capacity building modalities are used;
d. Using the Checklists in the UIIDP Capacity Building Manual, review and provide
comments on the annual capacity building plans of federal Ministries/Agencies, all
regions and participating ULGs.
e. Monitor and evaluate the performance of regions and ULGs capacity building plans;
f. Preparation of the UIIDP Federal Capacity Building Plan and following up with all
participating federal Ministries and Agencies o the preparation of their capacity
building plans.
Page | 143
g. Evaluate and report on the effectiveness of capacity building activities and training
programs provided under UIIDP by the federal, regional and ULG levels
h. Monitoring compliance by federal, regional and ULG levels with UIIDP II POM and
other manuals in regard to budgeting, planning and participation;
i. Prepare training plan, training materials and provide training to federal, regional and
ULG staff on capacity building.
j. Coordinate and provide assistance to other UIIDP staff in the preparation of training
program and delivery of training by all thematic areas under UIIDP.
k. Coordinate and arrange the provision of supply side capacity building courses/training
by ECSU, Federal/Regional training institutions and private institutions as envisaged in
the POM and UIIDP Capacity Building Manual. Prepare and arrange for of MOUs with
these training institutions for course design and administration.
n. Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
Page | 144
Qualifications and Skills Required
The Capacity Building Specialist should possess the following qualifications/competencies:
BA or B.Sc. Degree or higher in Management, Human Resource Development, Urban
Management, Business Administration, Public Administration or related.
A minimum of 10 years of general experience of which 5 years specific experience in
institutional and human resource development, capacity building and training.
Excellent writing and communication skills in English, excellent report writing skills.
Excellent command of computer programs and applications
Knowledge of the urban sector issues in Ethiopia is an advantage.
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Contributions to the revision of the UIIDP Capacity Building Manual
Report on support to regions and ULGs in carrying out the capacity self-assessment and
gap analysis.
Report on supporting regions and cities in formulating and developing their capacity
building strategies, plans and budgets
Page | 145
Checklists and review comments on the annual capacity building plans of federal
Ministries/Agencies, all regions and participating ULGs.
Monitoring and evaluation reports on performance of regions and ULGs capacity
building plans
UIIDP Federal Capacity Building Plan
Evaluation report on the effectiveness of capacity building activities and training
programs provided under UIIDP by the federal, regional and ULG levels
Training plan, training materials and training reports on capacity building
MOUs with federal and regional training institutions for course design and
administration.
Report on provision of supply side capacity building courses/training by ECSU,
Federal/Regional training institutions and private institutions.
Contributions to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the performance measures on capacity building.
Review comments on Annual Performance Assessment Reports of ULGs regarding
capacity building.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 146
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
Page | 147
g. Monitoring, evaluating and reporting performance of ULGs Local Economic
Development Plans and Job Creation Plans.;
h. Preparing and disseminating performance standards and indicators for the ULGs to use
on local economic development;
i. Collecting, analyzing and storing data into useful information for end users and
maintaining a data bank for local economic development and job creation;
j. Evaluate the effectiveness of local economic development strategies and job creation
strategies;
k. As part of a broader effort that may involve technical assistance and working with
regions, develop comprehensive and harmonized policies, strategies and procedures on incentive
mechanisms and for the registration, monitoring, follow up and graduation of MSEs.
l. Work with regions and ULGs to identify and resolve the challenges that face MSEs and
prevent them from surviving or graduating to the next level. Some of the challenges identified so
far are lack of access to finance, weak backward linkages to access raw materials and weak
forward linkages to buyers and markets, location issues in that MSE business premises are
located far away from potential customers.
m. Work with the regions and ULGs and put in place a mechanism and procedure for the
selection of some MSEs based on open business plan competition.
n. In conjunction with FUJSCA, prepare a capacity building program for MSE offices
and/or MSE one stop centres to equip them with the necessary facilities, equipment, materials and
technical competence to support MSEs.
o. In conjunction with Ministry of Industry, prepare a capacity building program for
Medium Manufacturing Enterprises Development Units in ULGs to equip them with the
necessary facilities, equipment, materials and technical competence to support graduated MSEs.
p. Prepare training plan, training materials and provide training to federal, regional and
ULG staff on local economic development and job creation.
s. Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
Page | 148
Annual procurement plan
The planned use of the performance-based grants from UIIDP follows investment menu (only from
assessment in 2019 of the performance in FY 2018/19).
Note: For the LED & Job Creation Specialist, this will be regarding whether public private dialogue has
informed the CIPs and whether job creation figures are correctly captured in the CIPs
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Contributions to the revision/updating of the UIIDP Local Economic Development Manual
and the UIIDP Job Creation & Measurement Guideline.
Report on supporting regions and cities in formulating and developing ULGs local economic
development strategies.
Report on support to regions and UIIDP participating cities in the preparation of ULG Local
Economic Development Plan and Job Creation Plan as per the manual and guideline.
Report on review of ULG CIPs to ensure that the necessary public private dialogue has taken
place as part of their preparation.
Report on support given to regions and ULGs in ensuring that they arrange at least 2 public
private dialogue/open meetings with city mayor and a wide range of private sector
representatives
Monitoring and evaluation report on performance of ULGs Local Economic Development
Plans and Job Creation Plans.
Performance standards and indicators for the ULGs to use on local economic development;
Data bank for local economic development and job creation.
Evaluation reports on effectiveness of local economic development strategies and job creation
strategies.
Comprehensive and harmonized policies, strategies and procedures on incentive mechanisms
and for the registration, monitoring, follow up and graduation of MSEs.
Mechanism and procedure for the selection of some MSEs based on open business plan
competition
Report on challenges that face MSEs and prevent them from surviving or graduating to the
next level and remedial measures
Page | 150
Capacity building program for MSE offices and/or MSE one stop centres to equip them with
the necessary facilities, equipment, materials and technical competence to support MSEs.
Capacity building program for Medium Manufacturing Enterprises Development Units in
ULGs to equip them with the necessary facilities, equipment, materials and technical
competence to support graduated MSEs.
Contributions to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the performance measures on local economic development and job creation.
Review comments on Annual Performance Assessment Reports of ULGs regarding local
economic development and job creation.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 151
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a qualified and experienced Urban
Resilience and Disaster Risk Management Specialist who will support all regions and UIIDP
participating cities in strengthening urban resilience through (a) a better understanding of risks
of shocks and stresses and incorporating resilience into land use planning/ development; and (b)
undertaking measures to mitigate the risks through disaster and climate risk management, and
improving regulatory decisions and emergency preparedness.
Scope of the Assignment
The Urban Resilience and Disaster Risk Management Specialist will be responsible for the
following specific duties and responsibilities:
a. Reviewing, and making contributions to the revision/updating of the Urban Resilience
and Disaster Risk Management Manual
b. Together with National Disaster Risk Management Commission (NDRMC), identify
needs and develop local DRM and emergency plan (building on woreda risk profile) by
end of year 2 of UIIDP implementation.
c. Together with NDRMC, carry out detailed risk assessment to develop national urban
DRM plan, establish information and warning system and develop training program and
guidance notes by end of year 2 of UIIDP implementation. At the national level, this
information system can be housed in the MUDHo, linked to the NDRMC and other
relevant ministries such as Ministry of Construction. The same information system will
need to be extended at regional and local government levels.
Page | 152
d. Support regions and cities in the establishment of the urban Disaster Risk Management
(DRM) institutional framework at city level (DRM Unit with dedicated staff and budget)
by extending existing national and regional DRM structure to the cities.
e. Support the regions in ensuring that each UIIDP participating city’s DRM unit develops
an Emergency Response Plan and DRM strategy including: (a) securing early warning
on flooding, drought and high winds, and alerts for earthquakes and landslides; (b)
ensuring community disaster preparedness; (c) developing contingency planning and
budgeting; and (d) exploring risk financing and insurance options.
f. Provide support to regions and cities in undertaking an assessment of the fire support
services to identify the specific training and equipment needed to improve response
capacity for densely populated buildings and neighborhoods.
g. Based on the abovementioned assessment of fire support services, support regions and
cities to develop a local plan to provide mobile firefighting units and search and rescue
equipment appropriate for city responses to fire incidents.
h. Prepare and disseminate performance standards and indicators for the ULGs to use on
urban resilience and disaster risk management;
i. Monitor and evaluate performance of ULGs Disaster Risk
Management Strategies/Plans and Emergency Response Plans;
j. Monitoring compliance with UIIDP POM and other manuals in regard to urban
resilience and disaster risk management;
k. Prepare training plan, training materials and provide training to federal, regional and
ULG staff on urban resilience and disaster risk management.
n. Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
Page | 154
assignment. The consultant will be provided, for official business, with internet access and
telephone facilities.
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Contributions to the revision/updating of the Urban Resilience and Disaster Risk
Management Manual
Assessment report on needs and requirements regarding urban resilience and disaster
risk management
Local DRM and emergency plan (building on woreda risk profile) by end of year 2 of
UIIDP implementation.
Detailed risk assessment and national urban DRM plan,
Information and warning system with training program and guidance notes by end of
year 2 of UIIDP implementation.
Establishment of the urban Disaster Risk Management (DRM) institutional framework at
city level (DRM Unit with dedicated staff and budget).
Report on preparation by each of the 117 cities of their ULG Emergency Response Plan
and DRM strategy including: (a) securing early warning on flooding, drought and high
winds, and alerts for earthquakes and landslides; (b) ensuring community disaster
preparedness; (c) developing contingency planning and budgeting; and (d) exploring risk
financing and insurance options.
Report on status of, and support provided to regions and cities in undertaking an,
assessment of the fire support services and specific training and equipment needed to
improve response capacity for densely populated buildings and neighborhoods.
Report on support provided to regions and cities to develop a local plan to provide
mobile firefighting units and search and rescue equipment appropriate for city responses
to fire incidents.
Performance standards and indicators for the ULGs to use on urban resilience and
disaster risk management;
Monitoring and evaluation report on performance of ULGs Disaster Risk
Management Strategies/Plans and Emergency Response Plans;
Training plan, training materials and training reports on urban resilience and disaster
risk management.
Contributions to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the performance measures on urban resilience and disaster risk management.
Review comments on the Annual Performance Assessment Reports of ULGs regarding
urban resilience and disaster risk management.
Page | 155
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 156
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The Gender Specialist will be responsible for the following specific duties and responsibilities:
Reviewing, and making contributions to the revision of, the Gender Development
Manual.
Assist the MUDHo Gender and Youth Mainstreaming Directorate in updating the
Gender Mainstreaming Guideline of Urban Development.
Together with the regions, ensure that there is a gender specialist in place in all UIIDP
participating cities in the WCO and UIIDP focal persons team.
Support regions and cities in preparing the Annual Gender Development Plan and
Budget as per the template and guidelines in the Gender Development Manual.
Prepare and disseminate performance standards and indicators for the ULGs to use on
gender mainstreaming and responsiveness;
Monitoring and evaluating performance of ULGs Annual Gender
Development Plan
Conduct supportive supervision site visits to regions and ULGs to oversee activities and
provide technical support
Develop a reporting format to capture progress and data on Gender related activities
Evaluates the effectiveness of gender mainstreaming and responsiveness on the UIIDP;
Prepare TOR for Gender Audit and supervise the conduct of the audit.
Page | 157
Prepare training plan, training materials and provide training (including TOTs) to
federal, regional and ULG staff on women’s rights in work place and to make staff
more sensitive to gender equality and women empowerment and to be more competent
in preparing the annual gender development plan.
Contribute to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the performance measures on gender mainstreaming and responsiveness.
Review the Annual Performance Assessment Reports of ULGs regarding gender
mainstreaming and responsiveness and provide comments;
Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
Page | 158
Workshop/training on women’s right in workplace (gender-based violence, sexual harassment, and equal payment)
targeting both men and women.
Annual target must be consistent with capacity building plan and gender development plan.
Evidence: Program/workshop attendance sheet (aggregated by gender), capacity building plan and gender development
plan.
4.3.2. Gender Mainstreaming System
4.3.2.1. Gender-balanced employment:(a). Proportion of women public professionals in city municipal service
administration; (b) Proportion of women as a head of office and above in city municipal service administration.
Evidence: ULG HR plan.
4.3.2.2. (a) Gender focal person dedicated for UIIDP; (b) Annual gender and development planning and
budgeting
Evidence:
1. Gender focal person dedicated for UIDP in place in WCO or/and UIIDP coordination team”
2. Annual gender development plan and budget (template/manual in POM): i) approved by the city council, ii)
consistent with ULG annual plan and budget, capacity building plan, and gender mainstreaming guideline*
NB. *Gender mainstreaming guideline is only valid when Gender and Youth Mainstreaming Directorate in MUDHo
developed and disseminated it.
4.3.2.3. (a) Quarterly meeting with gender focal persons from each sector Office; (b) More than 80% of gender
activities in the gender plan successfully completed and more than 80% of the funds budgeted in the gender
plan are utilized.
Evidence:
1.Signed attendance sheet of focal persons (indicating gender, occupation) from each sector Office and meeting notes
(quarterly)
2. Compare annual gender plan to annual gender progress report
4.3.3. Economic Empowerment
4.3.3.1. % of women employed through infrastructure works under UIIDP
*linked to 4.1.1.1 LED indicator
Evidence:
1. No. of people employed in infrastructure works; disaggregated by gender and age
2. Data collected from contractor’s log books, job registration in the M&E system of projects, etc.
4.3.3.2. % of women employed in firms provided with serviced land28 and/or MSE sheds29 under CIP
*linked to 4.1.1.2 LED indicator
Evidence:
1. No. of people employed in firms provided with serviced land and/or MSE sheds in the last year against targets in CIP
2. Data collected from ULG’s records, APA consultants to visit minimum 3 plots of land or MSE sheds to verify firms
are operational, etc
4.3.3.3. % of women-headed MSEs supported to access working premises/sheds and/or serviced land under
UIIDP
Evidence:
1. Records of MSE office
2. Data collected from ULG’s records
4.3.3.4. % of women-headed MSEs awarded with civil contracts under UIIDP
Evidence:
1. Records of MSE office
2. Data collected from ULG’s records
28
This refers to all serviced land allotted to firms engaged in economic activities including agriculture, services and
manufacturing.
29
This refers to working premises / sheds allotted to microenterprises, which should be serviced and provided with
water, electricity and a connective road
Page | 159
Qualifications and Skills Required
The Gender Specialist should possess the following qualifications/competencies:
A minimum of BA degree in Women & Gender Studies, Sociology, Psychology, Social
Work, Social Development, Social Psychology or other gender related fields
A minimum of 10 years of general experience of which 3 years specific experience in
women affairs and gender issues.
Excellent writing and communication skills in English,
Excellent report writing skills.
Knowledge of the urban sector issues in Ethiopia is an advantage.
Level of Effort and Timing
It is expected that the assignment will start in May 2018. The consultant will be based at MUDHo
offices in Addis Ababa with regular travel to cities and regions. Contract: one-year contract, with
possible extension upon satisfactory performance of the consultant as per the UIIDP Staff
Performance Evaluation and Incentive Scheme. Remuneration: Negotiable / dependent on
qualifications and experience.
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Contributions to the revision of the Gender Development Manual.
Updated Gender Mainstreaming Guideline of Urban Development.
Report on staffing situation in all 117 UIIDP participating cities and regions on gender
specialists in place.
Report on support provided to regions and cities in preparing the Annual Gender
Development Plan and Budget.
Performance standards and indicators for the ULGs on gender mainstreaming and
responsiveness.
Page | 160
Monitoring and evaluation report of performance of ULGs Annual Gender
Development Plan.
Evaluation Report on the effectiveness of gender mainstreaming and responsiveness on
the UIIDP;
TOR for Gender Audit.
Training (including TOT) plan, training materials and training/workshop reports on
gender mainstreaming and responsiveness and women’s rights in work place.
Contribution to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the performance measures on gender mainstreaming and responsiveness.
Review comments on the Annual Performance Assessment Reports of ULGs regarding
gender mainstreaming and responsiveness.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 161
MINISTRY OF URBAN DEVELOPMENT & HOUSING
URBAN REVENUE ENHANCEMENT, FUND
MOBILIZATION AND FINANCE BUREAU
(UREFMFB)
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The Information Technology (IT) Specialist will be responsible for the following specific duties
and responsibilities are:
Assess the information technology requirements of the UIIDP Unit, regions and cities
and make recommendations to UREFMFB and the IT Bureau of MUDHo.
Follow up with IT Bureau, regions and ULGs on the implementation of approved
recommendations and information technology requirements.
Together with IT Bureau, manage, monitor and supervise the IT Consultants being
procured by MUDHo that will be responsible for the design, development,
commissioning, operation and maintenance of the UIIDP Management Information
System at federal, regional and ULG levels.
Provide or arrange for support for UIIDP cities, especially the new ones, that may be
having problems or delays in the use of IBEX for all ULG operations except Road Fund
and other specialist projects that are not part of the budget coding system for IBEX.
Provide support to all UIIDP Unit staff on information technology issues and computer
problems that they may experience. Liaise with IT Bureau on those issues that may
require their support.
Provide support on all thematic areas of UIIDP which may have an information
technology requirement regarding systems and information storage (computerized
database)
Page | 162
Evaluate the information technology performance and requirements of the UIIDP on
annual basis and provide report with recommendations to Program Coordinator,
UREFMFB and IT Bureau.
Assist the Procurement Department and IT Bureau regarding specifications for all
computer hardware and software purchased through the UIIDP.
Assess the IT knowledge and experience levels of UIIDP staff, prepare training plan,
training materials and provide training to federal, regional and ULG staff on the UIIDP
MIS and other general information technology aspects. Recommend, manage and
supervise training provided by private suppliers where this cannot be done internally.
Contribute to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the information technology issues.
Review the Annual Performance Assessment Reports of ULGs regarding information
technology issues and provide comments;
Perform any other duties assigned by the Deputy Program Coordinator and Program
Coordinator.
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility for the achievement of the following UIIDP DLIs and
performance indicators by UIIDP participating cities in his assigned region (s):-
Management Procedures
Contractually, the Consultant will be accountable to the Program Coordinator to whom all reports
and deliverables as per the TOR should be submitted. As agency responsible for the overall
coordination and implementation of UIIDP, the UREFMFB will sign the contract with the
Consultant on behalf of Ministry of Urban Development and Housing. The UREFMFB will also
be responsible for all payments to the Consultant once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables
Assessment report and recommendations on the information technology requirements of
the UIIDP Unit, regions and cities.
Report on implementation of approved recommendations and information technology
requirements.
Monitoring and supervision report on IT Consultants responsible for the UIIDP
Management Information System at federal, regional and ULG levels.
Report on support on IBEX, information technology issues and computer problems for
UIIDP staff, on all thematic areas of UIIDP
Annual evaluation report on information technology performance and requirements of
the UIIDP
Training plan, training materials and training reports on the UIIDP MIS and other
general information technology aspects.
Contributions to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the information technology issues.
Review comments on the Annual Performance Assessment Reports of ULGs regarding
information technology issues.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Page | 164
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
UREFMFB.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Contents
ORGANIZATION, STAFFING & TORs FOR REGIONAL MOBILE TEAM................................
DEPLOYMENT OF REGIONAL MOBILE TEAMS (RMTs) UNDER UIIDP................................
STAFFING OF THE REGIONAL MOBILE TEAMS (RMTs) UNDER UIIDP...............................
TERMS OF REFERENCE FOR OVERALL REGIONAL PROGRAM COORDINATOR.............
TERMS OF REFERENCE FOR REGIONAL PROGRAM COORDINATOR.................................
TERMS OF REFERENCE FOR REGIONAL PROGRAM COORDINATOR.................................
Page | 166
TERMS OF REFERENCE FOR PROJECT ENGINEER..................................................................
TERMS OF REFERENCE FOR MUNICIPAL FINANCE SPECIALIST.........................................
TERMS OF REFERENCE FOR FINANCIAL MANAGEMENT SPECIALIST..............................
TERMS OF REFERENCE FOR ENVIRONMENTAL MANAGEMENT SPECIALIST.................
TERMS OF REFERENCE FOR SOCIAL DEVELOPMENT SPECIALIST....................................
TERMS OF REFERENCE FOR INFRASTRUCTURE ASSET MANAGEMENT SPECIALIST
.............................................................................................................................................................
TERMS OF REFERENCE FOR URBAN PLANNING & LAND MANAGEMENT
SPECIALIST.......................................................................................................................................
TERMS OF REFERENCE FOR PLANNING, BUDGETING & PARTICIPATION
SPECIALIST.......................................................................................................................................
TERMS OF REFERENCE FOR MONITORING & EVALUATION SPECIALIST........................
TERMS OF REFERENCE FOR UIIDP PROGRAM ACCOUNTANT (BoFED)............................
TERMS OF REFERENCE FOR PROCUREMENT MANAGEMENT SPECIALIST.....................
TERMS OF REFERENCE FOR CAPACITY BUILDING SPECIALIST.........................................
TERMS OF REFERENCE FOR LOCAL ECONOMIC DEVELOPMENT (LED) & JOB
CREATION SPECIALIST..................................................................................................................
TERMS OF REFERENCE FOR URBAN RESILIENCE & DISASTER RISK MANAGEMENT
SPECIALIST.......................................................................................................................................
TERMS OF REFERENCE FOR GENDER SPECIALIST.................................................................
Page | 167
ORGANIZATION, STAFFING & TORs FOR REGIONAL
MOBILE TEAM
The Regional Mobile Teams will have 16 staff headed by a Program Coordinator with
15 professional in various disciplines.
Page | 168
Page | 169
STAFFING OF THE REGIONAL MOBILE TEAMS (RMTs)
UNDER UIIDP
Number of positions
Specialization Existing UIIDP
ULGDP II
Program Coordinator 1 1
Social Development Specialist 1 1
Budgeting, Planning and Participation Specialist 1 1
Procurement Management Specialist 1 1
Infrastructure Asset Management Specialist 1 1
Environmental Management Specialist 1 1
Project Engineer 1 1
M&E Specialist 1 1
Municipal Finance Revenue Specialist 1
Urban Planning and Land Management Specialist 1
LED & Job Creation Specialist 1
Urban Resilience/Disaster Risk Management Specialist 1
Capacity Building Specialist 1
Gender Specialist 1
Financial Management Specialist 1
Program Accountants. BoFEC 1 1
Total 9 16
The respective regional BUDHos are responsible for daily coordination of the Operation at the
regional level. Specifically, the BUDs are responsible for:
Capacity building support of the ULGs in their jurisdiction.
Preparation of consolidated (ULG and regional government) progress
reports covering all ULGs in their jurisdiction.
Oversight and backstopping support related to aspects of the Operation.
Page | 170
Responsibility for day-to-day management and coordination of the Operation.
Capacity building, including direct support to urban local governments, and training on
guidelines and standard regulations for matters such as municipal revenue generation,
assets management, service delivery standards, and the like.
Overall Operation monitoring and evaluation at regional level.
Operation reporting, including the quarterly and semi-annual progress reports which are
submitted to the federal level.
Ensuring that Operation resources are budgeted for and disbursed within the
expenditure framework.
Accounting for the UIIDP funds to MoFEC.
Evaluating the performance of team members as per the agreement made between
BUDHO and the FMT team members.
Page | 171
BUREAU OF URBAN DEVELOPMENT & HOUSING
Page | 172
Conditions every year of the program and to achieve satisfactory performance in the
UIIDP Performance Measures and Performance Indicators.
y) Dissemination of the UIIDP Program Operations Manual (POM) to all RMTs and
regional Bureaus/Agencies and provide the necessary orientation and training on the
POM to RMT and regional staff;
z) Monitoring and reporting on regional Bureau/Agencies’ compliance with the POM and
other Manuals.
aa) Draft and secure Memorandum of Understanding, for every year of the UIIDP
implementation, between BUDHo and regional Bureaus/Agencies that have
responsibilities for UIIDP implementation activities
bb) Draft and secure Performance and Participation Agreements, for every year of the UIIDP
implementation, between BUDHo and all UIIDP participating ULGs in the region.
cc) Consolidate, integrate, streamline and overall manage the various training programs that
are provided by BUDHo, RMTs to regional and ULG staff on various thematic areas
covered by UIIDP.
dd) Establishment of administrative, logistical & secretarial services to effectively support the
operations of the UIIDP Regional Steering Committee and Regional Technical
Committee. Ensure that there is proper communication and coordination between the
regional technical committee and ULG focal persons group.
ee) Receive from RMTs their Strategy and Action Plan to address weaknesses and gaps
identified in the APAs. Prepare Consolidated Strategy and Action Plan for submission to
the UIIDP Regional Technical Committee.
ff) Receive from MUDHo and disseminate the World Bank Listing of Ineligible Firms &
Individuals to all RMTs and regional implementing agencies undertaking procurement
with UIIDP funds every six months (in June and December).
gg) Support for, and participation in, World Bank and MUDHo six monthly implementation
support missions and other missions as well as quality assurance reviews.
hh) Undertake regular visits to UIIDP participating cities to get a better understanding of the
issues and problems that affect the implementation of UIIDP.
ii) Arrange and conduct quarterly review meetings between the Regional Mobile Team and
the ULGs focal persons group to enhance communication, coordination and integration
between the regional and ULG levels.
jj) Consolidate and submit to the Deputy Bureau Head and Regional Technical Committee,
the UIIDP quarterly, semi-annual and annual reports that are prepared by the RMT
Monitoring and Evaluation Specialists.
kk) Prepare and submit quarterly, semi-annual and annual summarised reports on UIIDP
performance to Bureau Head and Regional Steering Committee.
ll) Carry out annual performance evaluation of all RMT Program Coordinators as per the
UIIDP Staff Performance Evaluation and Incentive Scheme established by BUDHo.
mm) Perform any other duties assigned by the Deputy Bureau Head and Bureau Head of the
Bureau of Urban Development and Housing.
The Overall Regional Program Coordinator will, as per the UIIDP Staff Performance Evaluation
& Incentive Scheme, also have weighted (50%) responsibility, and will be evaluated accordingly,
Page | 173
for the achievement of the following UIIDP DLIs and performance indicators by all the UIIDP
participating cities the region:-
1. DLI 1 - Minimum Conditions
All eight (8) minimum conditions should be achieved by all cities in the region.
2. Performance Measures, DLI 2, DLI 3, DLI 4
50% responsibility for achievement of the annual expected (average) score for all cities in the
region on all UIIDP performance measures DLI2, DLI3, and DLI 4 as follows:-
DLI Name of DLI Year 1 Year 2 Year 3 Year 4
No.
Assessed Performance Years (EFY) 2010 2011 2012 2013
(Prior) & (Prior) & (Prior) & (Prior) &
2011 2012 2013 2014
(Current (Current) (Current (Current)
) )
Allocation /Implementation Year (EFY) 2012 2013 2014 2015
2 ULGs have strengthened institutional performance. 70 75 80 85
3 ULGs have implemented quality infrastructure and 70 75 80 85
maintenance activities and ensured value for money
Page | 174
knowledge of the urban sector in Ethiopia, World Bank and GoE procurement and safeguard
policies and procedures.
Level of Effort and Timing
It is expected that the assignment will start in May 2018. The Overall Regional Program
Coordinator will be based at BUDHo offices in the regional capital with regular travel to cities.
Contract: one-year contract, with possible extension upon satisfactory performance of the
consultant as per the UIIDP Staff Performance Evaluation and Incentive Scheme. Remuneration:
Negotiable / dependent on qualifications and experience.
The BUDHo will also provide the Overall Regional Program Coordinator with administrative
support staff – Secretary/Personal Assistant.
Management Procedures
Contractually, the Overall Regional Program Coordinator will be accountable to the Bureau
Head, BUDHo to whom all reports and deliverables as per the TOR should be submitted. As
agency responsible for the overall coordination and implementation of UIIDP, the BUDHo will
sign the contract with him/her on behalf of the region. The BUDHo will also be responsible for
all payments to the Overall Regional Program Coordinator once the work has been accepted and
cleared for payment.
Expected Deliverables
Specific Deliverables:
Page | 176
BUREAU OF URBAN DEVELOPMENT & HOUSING
Page | 177
e) Monitoring and reporting on ULGs and regional Bureau/Agencies’ compliance with the
POM and other Manuals.
f) Draft and secure Memorandum of Understanding, for every year of the UIIDP
implementation, between BUDHo and regional Bureaus/Agencies that have
responsibilities for UIIDP implementation activities
g) Draft and secure Performance and Participation Agreements, for every year of the UIIDP
implementation, between BUDHo and all UIIDP participating ULGs in the region.
h) Consolidate, integrate, streamline and overall manage the various training programs that
are provided by BUDHo, RMT to regional and ULG staff on various thematic areas
covered by UIIDP.
i) Establishment of administrative, logistical & secretarial services to effectively support the
operations of the UIIDP Regional Steering Committee and Regional Technical
Committee. Ensure that there is proper communication and coordination between the
regional technical committee and ULG focal persons group.
j) Dissemination to, and training of, ULGs on the Annual Performance Assessment
Guideline (APAG) and UIIDP Complaint Handling Manual.
k) Provide support to ULGs in administering the UIIDP Complaint Handling Manual and
other related manuals and guidelines at regional and ULG levels that they use to handle
the various forms of complaints (general, environment and social, procurement), ethics,
fraud and corruption cases. Ensure that the quarterly reporting system at ULG (Ethics
Officers) and regional levels (REACCs) which feeds into the federal reporting system is
in place and functional.
l) Ensure that all UIIDP participating ULGs have put in place a system for record keeping
and reporting (quarterly, semi-annual and annual) on the achievements against the service
delivery standards performance indicators to enable them to provide acceptable reports to
the APA.
m) Preparation of the Annual Work Plan (AWP) for the RMT covering the activities to be
carried out by the RMT during each year. The AWP should further be broken down into
detailed quarterly and monthly Action Plans to be used for achievement of the AWP.
Monitor and report to the BUDHo on implementation and achievements of the Annual
Work Plan (AWP) for the RMT.
n) Coordinate the preparation and submission by regional implementing agencies and
assigned ULGs of their Strategy and Action Plan to address weaknesses and gaps
identified in the APAs. Prepare Consolidated Strategy and Action Plan for submission to
the BUDHo and Regional Steering Committee.
o) Receive from MUDHo and disseminate the World Bank Listing of Ineligible Firms &
Individuals to all RMTs and regional implementing agencies undertaking procurement
with UIIDP funds every six months (in June and December).
p) Support for, and participation in, World Bank and MUDHo six monthly implementation
support missions and other missions as well as quality assurance reviews.
q) Undertake regular visits to UIIDP participating cities to get a better understanding of the
issues and problems that affect the implementation of UIIDP.
Page | 178
r) Arrange and conduct quarterly review meetings between the Regional Mobile Team and
the ULGs focal persons group to enhance communication, coordination and integration
between the regional and ULG levels.
s) Consolidate and submit to the Deputy Bureau Head and Regional Technical Committee,
the UIIDP quarterly, semi-annual and annual reports that are prepared by the RMT
Monitoring and Evaluation Specialists.
t) Prepare and submit quarterly, semi-annual and annual summarised reports on UIIDP
performance to Bureau Head and Regional Steering Committee.
u) Carry out annual performance evaluation of all RMT staff as per the UIIDP Staff
Performance Evaluation and Incentive Scheme established by BUDHo.
v) Perform any other duties assigned by the Deputy Bureau Head and Bureau Head of the
Bureau of Urban Development and Housing.
The Regional Program Coordinator will, as per the UIIDP Staff Performance Evaluation &
Incentive Scheme, also have weighted (50%) responsibility, and will be evaluated accordingly,
for the achievement of the following UIIDP DLIs and performance indicators by all the UIIDP
participating cities in the region:-
1. DLI 1 - Minimum Conditions
All eight (8) minimum conditions should be achieved by all cities in the region.
2. Performance Measures, DLI 2, DLI 3, DLI 4
50% responsibility for achievement of the annual expected (average) score for all cities in the
region on all UIIDP performance measures DLI2, DLI3, and DLI 4 as follows:-
DL Name of DLI Year 1 Year 2 Year 3 Year 4
I
No.
Assessed Performance Years (EFY) 2010 2011 2012 2013
& & & &
2011 2012 2013 2014
Allocation /Implementation Year (EFY) 2012 2013 2014 2015
2 ULGs have strengthened institutional performance. 70 75 80 85
3 ULGs have implemented quality infrastructure and 70 75 80 85
maintenance activities and ensured value for money
Management Procedures
Contractually, the Regional Program Coordinator will be accountable to the Bureau Head,
BUDHo to whom all reports and deliverables as per the TOR should be submitted. As agency
responsible for the overall coordination and implementation of UIIDP, the BUDHo will sign the
contract with him/her on behalf of the region. The BUDHo will also be responsible for all
payments to the Regional Program Coordinator once the work has been accepted and cleared for
payment.
Expected Deliverables
Specific Deliverables:
Page | 181
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
Page | 184
Inputs provided by the Client
BUDHo will provide reasonable and standard office space and office furniture and equipment
required for the duration of the assignment at its premises for successful discharging of his/her
assignment. The Regional Program Coordinator will also be provided, for official business, with
internet access, telephone and fax facilities.
Management Procedures
Operationally, the Regional Program Coordinator will be accountable to the Overall Regional
Program Coordinator. Contractually, the Regional Program Coordinator will be accountable to
the Bureau Head, BUDHo to whom all reports and deliverables as per the TOR should be
submitted. As agency responsible for the overall coordination and implementation of UIIDP, the
BUDHo will sign the contract with him/her on behalf of the region. The BUDHo will also be
responsible for all payments to the Regional Program Coordinator once the work has been
accepted and cleared for payment.
Expected Deliverables
Specific Deliverables:
Performance and Participation Agreements, for every year of the UIIDP implementation,
between BUDHo and assigned UIIDP participating ULGs in the region.
Agenda, Attendance Registers and Minutes of quarterly review meetings between the
Regional Mobile Team and the assigned ULGs focal persons group.
Annual Work Plan (AWP) for the RMT
Consolidated Strategy and Action Plan to address weaknesses and gaps identified in the
APAs
Consolidated UIIDP quarterly, semi-annual and annual reports.
Annual performance evaluation reports for all RMT staff as per the UIIDP Staff
Performance Evaluation and Incentive Scheme.
General Deliverables:
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
consultant activities/ achievements during the month and plans for the next month.
Draft Final Report of the consultant’s work three weeks before the end of the assignment;
and
Final Report of the Consultant’s work, one week after receiving comments from
BUDHO.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the individual
consultant:
Qualification (40%).This criterion further divided into two:
General Educational Status (10%).–PhD – 10%; Masters – 8%
Page | 185
Relevant Qualification as stated in TOR (25%). - PhD – 25%; Masters – 22%
In addition to PhD or Masters degree, BA or BSc in either of the Engineering
disciplines stated above or Asset Management or Project Management – 5%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 186
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
TERMS OF REFERENCE FOR PROJECT ENGINEER
Page | 187
ee. To keep proper records of all the infrastructure projects being implemented by the
ULGs under the UIIDP and review action plans/schedules and resources required as
well as assist towns in maintaining the project management, monitoring and reporting
systems for UIIDP and others.
ff. Assist cities in the preparations and consolidating the Capital Investment Plans for the
UIIDP and participate in any other works or meetings related to UIIDP and assist them
in reviewing and appraising project proposals.
gg. Assist cities, design and construction supervision consultants and contractors to obtain
the necessary documents and information required for the timely completion of the
projects.
hh. Assist in project management and implementation of UIIDP and other programs related
to project management and capacity building. This includes working with the cities
technical team as and when required.
ii. Support Resident Engineer in checking works, materials and workmanship to ensure
compliance with the approved designs, drawings and specifications and provide
feedback on the technical performance of the contractor and his consultant to the
contracting authority and BUDHo.
jj. Examine alternative design proposals/variations submitted by the design and
construction supervision consultants and contractor/client for execution and recommend
appropriate solution to BUDHo and cities to respond to technical and financial queries.
kk. Assist in settling any minor disputes (not litigation and arbitration) between contractor
and municipality, inform relevant authorities at the earliest opportunity of any
problem(s) or potential problem(s) which may arise from construction of the project and
recommend possible solutions.
ll. Examine with design and construction supervision consultants and recommend on
settlement of the contractor's claims for extensions of time, payment for extra work etc.
mm. Organize meetings and/or consultative forums as required with the cities and other
partners for the successful completion of the projects.
nn. Prepare simplified workbook, guidelines, checklist for supervision works for a project
engineer
oo. Prepare physical progress report and submit to UIIDP Regional Program Coordinator
pp. Participate in, and support the preparation of training manuals, guidelines, seminars and
workshops on infrastructure and related subjects.
qq. Support cities to plan for the future in developing and planning for operations,
maintenance and an environmental mitigation of infrastructure financed under the
UIIDP such as roads, drainage and management of markets, slaughterhouses, solid and
liquid waste disposals for sustainability of the infrastructure projects.
rr. Render technical assistance for technical consultant of the cities to enhance capacity in
the preparation of project proposals, construction and supervision procedures and
current standards as well as in other key project management systems and areas of
expertise as and when required.
ss. Review and provide comments on the Annual Performance Assessment (APA) Reports
of assigned ULGs
tt. Perform any other duties assigned by the Regional Program Coordinator.
The Project Engineer will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme,
also have weighted (50%) responsibility, and will be evaluated accordingly, for the achievement
Page | 188
of the following UIIDP DLIs and performance indicators by UIIDP participating cities in his/her
assigned region (s):-
Page | 189
B.Sc. degree or higher in Civil Engineering, Municipal/Urban Engineering, Highway
Engineering, Water/Hydraulic Engineering, Sanitary Engineering, Structural Engineering
or Building Technology, Construction Technology and Management, Infrastructure
Engineering, Geotechnical Engineering or related field of studies with a track record of
achievements in implementation of infrastructure projects.
A minimum of 7 years’ engineering experience of which 3 years is in implementation and
support of projects, design and supervision, contract management as well as appraisal of
projects.
Strong commitment to sharing expertise and experience in order to develop others.
Excellent writing and communication skills in both Amharic and English (all reports,
documents and correspondences shall be in English and/or Amharic).
Knowledge of the urban sector in Ethiopia is an advantage.
Management Procedures
Contractually, the Project Engineer will be accountable to the Regional Program Coordinator to
whom all reports and deliverables as per the TOR should be submitted. As agency responsible for
the overall coordination and implementation of UIIDP, the BUDHo will sign the contract with the
Project Engineer on behalf of the region. The BUDHo will also be responsible for all payments to
the Project Engineer once the work has been accepted and cleared for payment.
Expected Deliverables
Specific Deliverables
Review reports and comments on the projects' progress reports, the project proposals and
designs.
Weekly progress reports.
Draft TORs for design and supervision and draft bidding documents where applicable
Implementation support mission reports
Documentation of all correspondences during implementation of infrastructure projects.
Monthly, Quarterly, Semi-annual and annual physical progress reports of the cities the
engineer is entrusted with and simplified workbooks, workable checklist and training
and project supervision manuals
Page | 190
Summary of progress against UIIDP’s performance indicators semi-annually.
Comments on the Annual Performance Assessment (APA) Reports of assigned ULGs
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Project
Engineer activities/ achievements during the month and plans for the next month.
Draft Final Report of the Project Engineer’s work three weeks before the end of the
assignment; and
Final Report of the Project Engineer’s work, one week after receiving comments from
BUDHo.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Project Engineer:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 191
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the assignment is to obtain the services of a Municipal Finance Specialist who
will support city financial officers that are responsible for revenue generation of the City and its
accountability and achievement of the UIIDP Disbursement Linked Indicators and Performance
Measures related to municipal finance and own source revenue enhancement.
Scope of the Assignment
The Municipal Finance Specialist will be responsible for supporting the assigned ULGs in
UIIDP’s own source revenue generation activities. Specific duties and responsibilities are:
l. Disseminating, and providing training on, guidelines for ULG revenue mobilization and
revenue collection;
m. Providing technical support to the ULGs in identifying alternative sources of funds for
infrastructure;
n. Assisting ULGs in updating their annual Revenue Enhancement Plans (REPs) for the
most recent year;
o. Assisting ULGs in developing generic and specific revenue enhancement strategies that
will result in increase in municipal revenues of ULGs;
p. Ensuring ULGs and the region provide counterpart funding for UIIDP as described in
the POM and the PPAs;
q. Monitoring, evaluating and reporting on ULG revenue mobilization strategies, actions
and ULG revenue collection;
r. Prepare training plan, training materials and provide training to ULG staff on municipal
finance, revenue enhancement strategies and plans
s. Monitoring compliance by ULGs on municipal finance issues;
t. Review and provide comments on the Annual Performance Assessment (APA) Reports
of assigned ULGs regarding municipal finance and own source revenue enhancement
u. Perform any other duties assigned by the Regional Program Coordinator.
The Municipal Finance Specialist will, as per the UIIDP Staff Performance Evaluation &
Incentive Scheme, also have weighted (50%) responsibility, and will be evaluated accordingly,
Page | 192
for the achievement of the following UIIDP DLIs and performance indicators by UIIDP
participating cities in his/her assigned region (s):-
Page | 193
Specialist as per the UIIDP Staff Performance Evaluation and Incentive Scheme. Remuneration:
Negotiable / dependent on qualifications and experience.
Management Procedures
Contractually, the Municipal Finance Specialist will be accountable to the Regional Program
Coordinator to whom all reports and deliverables as per the TOR should be submitted. As agency
responsible for the overall coordination and implementation of UIIDP, the BUDHo will sign the
contract with the Municipal Finance Specialist on behalf of the region. The BUDHo will also be
responsible for all payments to the Municipal Finance Specialist once the work has been accepted
and cleared for payment.
Expected Deliverables
Specific Deliverables
Training report on guidelines for ULG revenue mobilization and revenue collection.
Documents and reports on in identification of alternative sources of funds for
infrastructure by regions and ULGs;
Reports on generic and specific revenue enhancement strategies
Status Report and recommendations on ULGs and region counterpart funding for UIIDP
Monitoring and evaluation reports on ULG revenue mobilization strategies, actions and
ULG revenue collection;
Training plan, training materials and provide training to federal, regional and ULG staff
on municipal finance, revenue enhancement strategies and plans
Comments on the Annual Performance Assessment (APA) Reports of assigned ULGs
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
Municipal Finance Specialist activities/ achievements during the month and plans for the
next month.
Draft Final Report of the Municipal Finance Specialist’s work three weeks before the end
of the assignment; and
Final Report of the Municipal Finance Specialist’s work, one week after receiving
comments from BUDHo.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Municipal Finance
Specialist:
Page | 194
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 195
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
TERMS OF REFERENCE FOR FINANCIAL
MANAGEMENT SPECIALIST
Page | 196
bb. Monitor compliance by all assigned ULGs with UIIDP POM and Financial
Management Manual in regard to financial management issues;
cc. Perform any other duties assigned by the Regional Program Coordinator.
The Financial Management Specialist will, as per the UIIDP Staff Performance Evaluation &
Incentive Scheme, also have weighted (50%) responsibility, and will be evaluated accordingly,
for the achievement of the following UIIDP DLIs and performance indicators by UIIDP
participating cities in his assigned region (s):-
Page | 197
A minimum of 7 years’ general experience of which 3 years’ experience in aspects of
local government finance, accounting, internal audit , external audit (financial audit and
performance audit)
Excellent report writing skills in both Amharic and English.
Excellent command of computer programs and applications with significant capabilities
in computerized database, spreadsheet constructions and preferably knowledge of IBEX
system.
Excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others (helping others to achieve goals), resolving conflict
successfully.
Knowledge of the urban sector issues in Ethiopia is an advantage.
Level of Effort and Timing
It is expected that the assignment will start in May 2018. The Financial Management Specialist
will be based at BUDHo offices in the regional capital with regular travel to cities. Contract: one-
year contract, with possible extension upon satisfactory performance of the Financial
Management Specialist as per the UIIDP Staff Performance Evaluation and Incentive Scheme.
Remuneration: Negotiable / dependent on qualifications and experience.
Management Procedures
Contractually, the Financial Management Specialist will be accountable to the Regional Program
Coordinator to whom all reports and deliverables as per the TOR should be submitted. As agency
responsible for the overall coordination and implementation of UIIDP, the BUDHo will sign the
contract with the Financial Management Specialist on behalf of the region. The BUDHo will also
be responsible for all payments to the Financial Management Specialist once the work has been
accepted and cleared for payment.
Expected Deliverables
Specific Deliverables
Suggestions and recommendations for improvements to the UIIDP Financial
Management Manual
Training materials and training reports on financial management
Strategies and action plans for ULGs to move from qualified audits to unqualified (clean)
audits
Summary of progress against UIIDP’s performance indicators semi-annually.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Page | 198
Monthly Progress Reports within 7 (seven) days of the end of the month on the Financial
Management Specialist activities/ achievements during the month and plans for the next
month.
Draft Final Report of the Financial Management Specialist’s work three weeks before the
end of the assignment; and
Final Report of the Financial Management Specialist’s work, one week after receiving
comments from BUDHo.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Financial
Management Specialist:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 199
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a qualified and experienced Environmental
Management Specialist who will assist in providing capacity building and mentoring services to
urban local governments (city administrations) in implementation of the UIIDP Environmental
Management System and achievement of disbursement linked indicators and performance
measures related to environmental management.
Scope of the Assignment
The Environmental Management Specialist will have the following duties and responsibilities:
w. Provide overall coordination and assistance in the implementation of the ESMS for the
UIIDP.
x. Establish the system of screening forms and EIA set out in this ESMS, and oversee their
smooth operation including advice to ULGs on the procurement of Environmental
Management Specialists for any required EIA studies;
y. Review and assess project screening reports prepared by the respective cities which the
categorized as schedule 1, 2 and 3and follow the approval of the reports by regional
environmental protection institutions.
z. Review the Environmental and Social Impact Assessment (ESIA) of the sub projects
and monitor the implementations of the Environmental Management Plans of the sub-
projects
aa. Site visits during ULG investment project execution and operation to assess how
environmental screening and mitigation measures are succeeding or have succeeded in
minimizing impacts.
bb. Ensure that the REFA carries out an environmental performance audit of all CIP
projects on an annual basis as stated in the UIIDP POM; Review the reports for quality,
timeliness and issues that need to be followed up by the cities.
cc. Provide specific technical advice on mitigation measures for labor intensive projects;
Page | 200
dd. Provide technical advice to ULGs on all technical issues related to natural resources and
environmental management. These issues will relate to impacts on surface water,
groundwater, agricultural resources and vegetation, sourcing of materials used in
construction, human health, ecology and protected areas, land and soil degradation;
ee. Raise awareness and proactively create demand for this technical advice among ULG
officers;
ff. Be responsible for collating information related to the ESMS, occupational health and
safety;
gg. Undertake review of EMPs to ensure compliance with the ESMS;
hh. Assist ULGs in establishing a monitoring and evaluation system for the implementation
of the ESMSG;
ii. Lead the delivery of capacity building programs for ULG officers on the ESMS and
produce a training plan.
jj. Check and support all cities’ projects that, their CIPs are all screened and approved by
the Regions’ Environmental Protection Authorities.
kk. Assist that eligible investments for potential environmental safeguard impacts are
screened against the set of environment criteria in the planning stage and Environmental
and Social Impact Assessments (ESIAs), Environmental Management Plans (EMPs) are
prepared and approved by the Regional Environmental Protection Agency as required;
ll. Ensure that EMPs are implemented in a timely manner - prior to commencement of
civil works;
mm. Ensure that the ULG has established a functional system for environmental
management;
nn. Monitor and report on the implementation of landfills and abattoirs as per the MUDHo
manuals ensuring that the necessary safeguard actions are put in place and
implemented as per the ESMSG.
oo. Prepare training plan, training materials and provide training to federal, regional and
ULG staff on environmental management, occupational health and safety
pp. Perform other duties assigned by the Regional Program Coordinator.
The Environmental Management Specialist will, as per the UIIDP Staff Performance Evaluation
& Incentive Scheme, also have weighted (50%) responsibility, and will be evaluated accordingly,
for the achievement of the following UIIDP DLIs and performance indicators by UIIDP
participating cities in his assigned region (s):-
Page | 201
2.7.1.1. All capital project screened and approved by REFA as per Environmental and Social Management System
Guideline and RSG at planning stage (before construction starts) (Yes/No indicator)
2.7.1.2. ESIAs, ESMPs, RAPs, etc., prepared and approved by regional or regional designated authority as required
(Yes/No indicator)
2.7.2. RAPs are implemented prior to commencement of construction. Environmental and Social Management Plans
are implemented prior to construction and during construction and operation30 (Yes/No indicator). based on a sample
of 3 projects that have ESMPs and/or RAPs and all three must comply
Management Procedures
30
Depending on the project phase
Page | 202
Contractually, the Environmental Management Specialist will be accountable to the Regional
Program Coordinator to whom all reports and deliverables as per the TOR should be submitted.
As agency responsible for the overall coordination and implementation of UIIDP, the BUDHo
will sign the contract with the Environmental Management Specialist on behalf of the region. The
BUDHo will also be responsible for all payments to the Environmental Management Specialist
once the work has been accepted and cleared for payment.
Expected Deliverables
Specific Deliverables
System of screening forms and EIA set out in this ESMSG.
Review comments on Environmental and Social Impact Assessment (ESIA) of the sub
projects
Review comments of EMPs to ensure compliance with the ESMS
Report on quality, timeliness and issues that need to be followed up by the cities on
environmental audits..
Training plan, training materials and training reports on environmental management,
occupational health and safety training.
Monitoring reports on the implementation of landfills and abattoirs
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
Environmental Management Specialist activities/ achievements during the month and
plans for the next month.
Draft Final Report of the Environmental Management Specialist’s work three weeks
before the end of the assignment; and
Final Report of the Environmental Management Specialist’s work, one week after
receiving comments from BUDHo.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Environmental
Management Specialist:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 203
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
TERMS OF REFERENCE FOR SOCIAL DEVELOPMENT
SPECIALIST
The Social Development Specialist will, as per the UIIDP Staff Performance Evaluation &
Incentive Scheme, also have weighted (50%) responsibility, and will be evaluated accordingly,
for the achievement of the following UIIDP DLIs and performance indicators by UIIDP
participating cities in his assigned region (s):-
Management Procedures
Contractually, the Social Development Specialist will be accountable to the Regional Program
Coordinator to whom all reports and deliverables as per the TOR should be submitted. As agency
responsible for the overall coordination and implementation of UIIDP, the BUDHo will sign the
contract with the Social Development Specialist on behalf of the region. The BUDHo will also be
responsible for all payments to the Social Development Specialist once the work has been
accepted and cleared for payment.
Expected Deliverables
Specific Deliverables
System of screening forms, RAP set out in the RSG
Reports on Site visits during ULG investment project execution and operation to assess
how social aspects are succeeding or have succeeded in minimizing impacts
Information related to the RSG and resettlement
Review comments on RAPs to ensure compliance with the RSG
Monitoring and evaluation system for the implementation of the RSG;
Training plan, training materials and training reports social development and resettlement
Functional system for social management in all assigned ULGs
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Social
Development Specialist activities/ achievements during the month and plans for the next
month.
Draft Final Report of the Social Development Specialist’s work three weeks before the
end of the assignment; and
Final Report of the Social Development Specialist’s work, one week after receiving
comments from BUDHO.
Page | 206
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Social Development
Specialist:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
The objective of the TOR is to obtain the services of qualified and experienced Infrastructure
Asset Management Specialist who will support assigned ULGs in infrastructure asset
management and planning as per the GIS-based Infrastructure Asset Management Plan Manual
and Model that has been issued to all regions/ULGs. He/She will also support cities in the
achievement of UIIDP disbursement linked indicators and performance measures related to
infrastructure asset management and planning.
Scope of the Assignment
The Infrastructure Asset Management Specialist will be responsible for assisting the assigned
UIIDP participating cities in all areas involving the management of existing infrastructure assets
and the planning for new infrastructure assets. Specific duties and responsibilities are:
i. Disseminate to all ULGs the GIS-based Infrastructure Asset Management Manual and
Model.
j. Prepare training plan, training materials and provide training to regional and ULG staff
on GIS, GIS -based Infrastructure Asset Management Manual and Model.
Page | 207
k. Review the annual updated GIS-based Asset Inventories and AMPs of all the assigned
ULGs as and when they are submitted by the cities and provide review reports.
l. Review and follow up with BUDHo and cities on the implementation of the
Implementation Strategy and Program of Action for Asset Management. Assist the region and the
ULGs to take the necessary actions stated in the strategy and program of actions and produce
implementation and status reports.
The Infrastructure Asset Management Specialist will, as per the UIIDP Staff Performance
Evaluation & Incentive Scheme, also have weighted (50%) responsibility, and will be evaluated
accordingly, for the achievement of the following UIIDP DLIs and performance indicators by
UIIDP participating cities in his assigned region (s):-
Management Procedures
Contractually, the Infrastructure Asset Management Specialist will be accountable to the
Regional Program Coordinator to whom all reports and deliverables as per the TOR should be
submitted. As agency responsible for the overall coordination and implementation of UIIDP, the
BUDHo will sign the contract with the Infrastructure Asset Management Specialist on behalf of
the region. The BUDHo will also be responsible for all payments to the Infrastructure Asset
Management Specialist once the work has been accepted and cleared for payment.
Expected Deliverables
Specific Deliverables
Training plan, training materials and training reports on GIS, GIS -based Infrastructure
Asset Management Manual and Model.
Review comments on the annual updated GIS-based Asset Inventories and AMPs of all
the assigned ULGs
Implementation Plan and Status Report on “On the Job Training” and direct assistance to
DRS cities and new cities in major regions on updating of asset inventories and
preparation of Asset Management Plans
Implementation and status reports on the Implementation Strategy and Program of Action
for Asset Management at regional and ULG levels
Page | 209
Contributions to revisions to the Annual Performance Assessment Guideline (APAG)
regarding the performance measures on asset management.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
Infrastructure Asset Management Specialist activities/ achievements during the month
and plans for the next month.
Draft Final Report of the Infrastructure Asset Management Specialist ’s work three weeks
before the end of the assignment; and
Final Report of the Infrastructure Asset Management Specialist ’s work, one week after
receiving comments from BUDHO.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Infrastructure Asset
Management Specialist :
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 210
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of qualified and experienced Urban Planning
and Land Management Specialist who will provide technical support and assistance to MUDHo,
regions and ULGs on all urban land management issues and on the use of computerized
geographic information systems (GIS) to map land areas, to overlay maps with geographic
variables such as population density, and to combine or manipulate geographic information to
produce alternative plans for land use or development and the achievement of UIIDP
disbursement linked indicators and performance measures on urban planning and land
management.
Scope of the Assignment
The Urban Planning and Land Management Specialist will be responsible for assisting MUDHo,
regions and ULGs on urban planning issues and land management issues, especially in regard to
land development, land release, land registration and land inventory. Specific duties and
responsibilities are:
n. Design, promote and administer government plans and policies affecting land use,
zoning, public utilities, community facilities, housing, and transportation.
o. Assess the feasibility of proposals and identify necessary changes, recommend
approval, denial or conditional approval of proposals.
p. Determine the effects of regulatory limitations on projects.
q. Create, prepare, or requisition graphic and narrative reports on land use data, including
land area maps overlaid with geographic variables such as population density.
r. Advise planning officials on project feasibility, cost-effectiveness, regulatory
conformance, and possible alternatives.
s. Conduct field investigations, surveys and impact studies in order to compile and
analyze data on economic, social, regulatory and physical factors affecting land use.
t. Discuss with planning officials the purpose of land use projects such as transportation,
conservation, residential, commercial, industrial, and community use.
Page | 211
u. Keep informed about economic and legal issues involved in zoning codes, building
codes, and environmental regulations.
v. Mediate community disputes and assist in developing alternative plans and
recommendations for programs or projects.
w. Coordinate work with economic consultants and architects during the formulation of
plans and the design of large pieces of infrastructure.
x. Review and evaluate environmental impact reports pertaining to private and public
planning projects and programs.
y. Assist the ULGs in the development and implementation of urban land management and
information systems
z. Assist in developing and maintaining a ULGs land registration register;
aa. Providing technical guidance to the ULGs regarding matters of land development, land
release, land registration, land inventory and land information systems;
bb. Advice in planning towns and trading centers in the ULGs, especially regarding
optimum use of available land and guiding ULGs authorities on balanced development;
cc. Inspecting structures in the ULGs to ensure compliance with the land use plan;
dd. Monitor and report on ULG adherence to proper and effective land management
practices and policies;
ee. Prepare training plan, training materials and provide training to ULG staff on urban land
management.
ff. Review the Annual Performance Assessment Reports of ULGs regarding urban planning
and urban land management and provide comments
gg. Perform any other duties assigned by the Regional Program Coordinator.
The Urban Planning and Land Management Specialist will, as per the UIIDP Staff Performance
Evaluation & Incentive Scheme, also have weighted (50%) responsibility, and will be evaluated
accordingly, for the achievement of the following UIIDP DLIs and performance indicators by
UIIDP participating cities in his assigned region (s):-
3. DLI 2 - Institutional Performance (ULG Performance Measures)
2.8. Land Management and Urban Planning
2.8.1. Statutory structure plan and or expansion plan approved/in place
2.8.1.1. Existence of up-to-date approved statutory city-wide (structure) plan and/or expansion plan as at the point of
assessment (Yes/No indicator) Excluding extension of an existing plan
2.8.1.2. CIP is in accordance with city-wide (structure) plan and/or expansion plan at the time of preparation (Yes/No
indicator)
2.8.2. Effective land management
2.8.2.1. Land released for different uses are as per the laws of land management and have access to basic
infrastructure facilities i.e. road, water, electricity at a radius of 250 meters
2.8.2.2. Proportion of land plots released through competitive auction/ bidding process (and not through direct
allocation)
2.8.2.3. Updated land inventory featuring a tabular and/or spatial database e.g. a map (Yes/No indicator)
Page | 212
The Urban Planning and Land Management Specialist should possess the following
qualifications/competencies:
B.Sc. or BA degree in Land Administration, Urban Planning, Regional Planning; or
similar discipline.
A minimum of 7 years ‘general experience of which 3 years specific experience in
urban land management, development and administration.
Excellent writing and communication skills in English, excellent report writing skills.
Excellent change management skills and strong commitment to sharing expertise and
experience in order to develop others (helping others to achieve goals), resolving
conflict successfully.
Knowledge of the urban sector issues in Ethiopia and experience in GIS is an
advantage.
Knowledge of the provisions of the Land Act;
Management Procedures
Contractually, the Urban Planning and Land Management Specialist will be accountable to the
Regional Program Coordinator to whom all reports and deliverables as per the TOR should be
submitted. As agency responsible for the overall coordination and implementation of UIIDP, the
BUDHo will sign the contract with the Urban Planning and Land Management Specialist on
behalf of the region. The BUDHo will also be responsible for all payments to the Urban Planning
and Land Management Specialist once the work has been accepted and cleared for payment.
Expected Deliverables
Specific Deliverables
Assessment reports on feasibility of proposals and recommendations on necessary
changes/ approval/denial or conditional approval of proposals.
Analysis of data on economic, social, regulatory and physical factors affecting land use.
Alternative plans and recommendations for programs or projects.
Page | 213
Review and evaluation comments on environmental impact reports pertaining to private
and public planning projects and programs.
Status and Implementation Progress Reports on development and implementation of
urban land management and information systems in the ULGs
Up to date ULGs land registration register
Report on guidance given to ULGs regarding matters of land development, land release,
land registration, land inventory and land information systems;
Report on compliance by assigned ULGs with the land use plan
Monitoring report on ULG adherence to proper and effective land management practices
and policies
Training plan, training materials and training reports on training provided to ULG staff
on urban planning and urban land management
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Urban
Planning and Land Management Specialist activities/ achievements during the month and
plans for the next month.
Draft Final Report of the Urban Planning and Land Management Specialist’s work three
weeks before the end of the assignment; and
Final Report of the Urban Planning and Land Management Specialist’s work, one week
after receiving comments from BUDHO.
.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Urban Planning and
Land Management Specialist:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 214
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a qualified and experienced Planning,
Budgeting and Participation Specialist who will support all assigned UIIDP participating cities in
planning and budgeting for infrastructure investments in a participatory manner.
Scope of the Assignment
The Planning, Budgeting and Participation Specialist will be responsible for the following
specific duties and responsibilities:
p. Supporting cities in formulating and developing ULGs development strategies, plans
and budgets;
q. Support UIIDP participating cities in the preparation of ULG capital investment plans,
capacity building plans, action plans and budgets in participatory manner.
r. Disseminating performance standards and indicators for the ULGs to use on planning,
budgeting and participation;
s. Monitoring and evaluating performance of ULGs Development Plans,
programs and projects;
t. Collecting, analyzing and storing data into useful information for end users and
maintaining a data bank for planning, budgeting and decision-making purposes;
u. Providing technical advice to ULGs on matters related to planning, budgeting and
participation;
v. Prepare training plan, training materials and provide training to ULG staff on planning,
budgeting and participation.
w. Review the Annual Performance Assessment Reports of ULGs regarding budgeting,
planning and participation and provide comments
x. Perform any other duties assigned by the Regional Program Coordinator.
The Planning, Budgeting and Participation Specialist will, as per the UIIDP Staff Performance
Evaluation & Incentive Scheme, also have weighted (50%) responsibility, and will be evaluated
accordingly, for the achievement of the following UIIDP DLIs and performance indicators by
UIIDP participating cities in his assigned region (s):-
Page | 215
1. DLI 1 - Minimum Conditions
ULG has produced and the council approved a:
Page | 216
Level of Effort and Timing
It is expected that the assignment will start in May 2018. The Planning, Budgeting and
Participation Specialist will be based at BUDHo offices in the regional capital with regular travel
to cities. Contract: one-year contract, with possible extension upon satisfactory performance of
the Planning, Budgeting and Participation Specialist as per the UIIDP Staff Performance
Evaluation and Incentive Scheme. Remuneration: Negotiable / dependent on qualifications and
experience.
Management Procedures
Contractually, the Planning, Budgeting and Participation Specialist will be accountable to the
Regional Program Coordinator to whom all reports and deliverables as per the TOR should be
submitted. As agency responsible for the overall coordination and implementation of UIIDP, the
BUDHo will sign the contract with the Planning, Budgeting and Participation Specialist on behalf
of the region. The BUDHo will also be responsible for all payments to the Project Engineer once
the work has been accepted and cleared for payment.
Expected Deliverables
Specific Deliverables
Reports on technical support provided to cities in formulating and developing ULGs
development strategies, plans and budgets;
Reports on support given to UIIDP participating cities in the preparation of ULG capital
investment plans, capacity building plans, action plans and budgets.
Monitoring and evaluation reports on performance of ULGs Development Plans,
programs and projects;
Data bank for planning, budgeting and decision-making purposes;
Training plan, training materials and training reports on planning, budgeting and
participation
Review comments on Annual Performance Assessment Reports of ULGs regarding
budgeting, planning and participation.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Planning,
Budgeting and Participation Specialist activities/ achievements during the month and
plans for the next month.
Draft Final Report of the Planning, Budgeting and Participation Specialist’s work three
weeks before the end of the assignment; and
Page | 217
Final Report of the Planning, Budgeting and Participation Specialist’s work, one week
after receiving comments from BUDHO.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Planning, Budgeting
and Participation Specialist:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 218
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
Management Procedures
Contractually, the Monitoring & Evaluation Specialist will be accountable to the Regional
Program Coordinator to whom all reports and deliverables as per the TOR should be submitted.
As agency responsible for the overall coordination and implementation of UIIDP, the BUDHo
will sign the contract with the Monitoring & Evaluation Specialist on behalf of the region. The
Page | 220
BUDHo will also be responsible for all payments to the Monitoring & Evaluation Specialist once
the work has been accepted and cleared for payment.
Expected Deliverables
Specific Deliverables
UIIDP M & E system at regional level
Report on assistance given to the UIIDP M&E Officers at ULGs in maintaining UIIDP M
& E System
Consolidated Regional Quarterly Progress Reports, Semi-Annual Report, Annual Report
for UIIDP
Training plan, training materials and training reports
Review comments on Annual Performance Assessment Reports of ULGs.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
Monitoring & Evaluation Specialist activities/ achievements during the month and plans
for the next month.
Draft Final Report of the Monitoring & Evaluation Specialist’s work three weeks before
the end of the assignment; and
Final Report of the Monitoring & Evaluation Specialist’s work, one week after receiving
comments from BUDHO.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Monitoring &
Evaluation Specialist:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 221
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a UIIDP Program Accountant, based at
BoFED, who will be responsible for fund flow, financial management and financial reporting.
Scope of the Assignment
The Program Accountant will have the following specific duties and responsibilities:
o. Prepare training plan, training materials and provide training to the UIIDP accountants
at the ULGs.
p. Facilitate and ensure timely release and flow of resources from MoFEC to BoFED and
from BoFED to ULGs.
q. Maintain the UIIDP financial accounting and reporting system in IBEX.
r. Ensure timely submission of expenditure documents from ULGs to BoFED and from
BoFED to MoFEC and consolidated regional expenditure report to MoFEC;
s. Ensure that proper financial records are maintained at all ULGs and ensure the quality
and consistency of all financial data;
t. Check the monthly UIIDP bank account reconciliations done by all ULGs in the region.
u. Prepare Semi-Annual Financial Reports for UIIDP and submit to MoFEC within the 30
days of the end of the half year.
v. Prepare annual consolidated regional financial statements for UIIDP within 60 days
after the end of the financial year and ensure that these are submitted to MoFEC for
consolidation and audit by the external auditors;
w. Copy all financial reports to BUDHo for proper coordination and follow-up of the
implementation and fund utilization;
x. Perform other duties assigned by the Regional Program Coordinator.
Page | 222
A minimum of BA, B.Sc. Degree in Accounting, Finance, Municipal Finance, Business
Administration, Business Management, Public Financial Management or related
A minimum of 7 years’ general experience of which 3 years specific experience in
aspects of local government finance, public sector financial management, financial audit,
accounting, internal and external audit.
Excellent report writing skills in both Amharic and English.
Excellent command of computer programs and applications with significant capabilities
in computerized database, spreadsheet constructions and preferably knowledge of IBEX
system.
Knowledge of the urban sector issues in Ethiopia is an advantage.
Level of Effort and Timing
It is expected that the assignment will start in May 2018. The UIIDP Program Accountant will be
based at BoFED offices in the regional capital. Contract: one-year contract, with possible
extension upon satisfactory performance. Remuneration: Negotiable / dependent on
qualifications and experience.
Management Procedures
Contractually, the UIIDP Program Accountant will be accountable to the Regional Program
Coordinator to whom all reports and deliverables as per the TOR should be submitted. As agency
responsible for the overall coordination and implementation of UIIDP, the BUDHo will sign the
contract with the UIIDP Program Accountant on behalf of the region. The BUDHo will also be
responsible for all payments to the UIIDP Program Accountant once the work has been accepted
and cleared for payment.
Expected Deliverables
Specific Deliverables
Training plan, training materials and training reports on financial management
UIIDP financial accounting and reporting system in IBEX
Consolidated regional expenditure report
Comments and Report on Review of Monthly ULG Bank Reconciliation Statements for
UIIDP
Regional Semi-Annual Financial Reports for UIIDP
Regional Annual consolidated financial statements
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Page | 223
Monthly Progress Reports within 7 (seven) days of the end of the month on the UIIDP
Program Accountant activities/ achievements during the month and plans for the next
month.
Draft Final Report of the UIIDP Program Accountant’s work three weeks before the end
of the assignment; and
Final Report of the UIIDP Program Accountant’s work, one week after receiving
comments from BUDHo.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the UIIDP Program
Accountant:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 224
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
Page | 225
aa. Review the Annual Performance Assessment Reports of ULGs regarding procurement
management and provide comments
bb. Perform any other duties assigned by the Regional Program Coordinator.
The Procurement Management Specialist will, as per the UIIDP Staff Performance Evaluation &
Incentive Scheme, also have weighted (50%) responsibility, and will be evaluated accordingly,
for the achievement of the following UIIDP DLIs and performance indicators by UIIDP
participating cities in his assigned region (s):-
1.3. Functional institutional set-up for procurement system in place according to public procurement
proclamation including:
(e) Procurement function and minimum core staff in place – at least two procurement specialists within
procurement unit in ULG; with first degree and experience in procurement at least for two years
(f) Functional tender committee/tender award committee (TAC) at ULG level in place;
(g) Participating cities have the copies of their respective region’s procurement law, directives, manuals and
standard procurement documents and staffs are familiar with these legal documents
(h) Establishment of procurement performance monitoring and measurement using Public Procurement Key
Performance Indicators Guideline or equivalent.
(ii) Internal procurement audits are conducted and they are acceptable;
(iii) Follow up and update was done on the action plan for implementation of internal and external audit findings.
(v) Bid openings are conducted immediately after bid submission and minutes are acceptable
(ii) Contract was awarded to the legitimate bidder within bid validity period;
Parameters to be assessed.
(i) Percentage (by no. and value) of procurement items not included in the original annual procurement plan should not
exceed 5%;
(ii) Average deviation between original Planned and Actual Procurement cycle time (procurement initiation-contract
completion) should not exceed 5%;
(iii) deviation between original price in the procurement plan and award price should not exceed 20%;
(iv) deviation between contract price and completion price (turnout cost) should not exceed 25%.
2.4.3.1. Competitiveness, Fairness and Transparency and Controls
Parameters to be assessed.
(i) Percentage (by no. and value) of procurements conducted through open bidding procedure is 85%;
(ii) Complaints resolved within the standard time frame is 100%;
(iii) the percentage of action taken from the previous procurement audit qualifications/ recommendations equals or
exceeds 90%.
Management Procedures
Contractually, the Procurement Management Specialist will be accountable to the Regional
Program Coordinator to whom all reports and deliverables as per the TOR should be submitted.
As agency responsible for the overall coordination and implementation of UIIDP, the BUDHo
will sign the contract with the Procurement Management Specialist on behalf of the region. The
BUDHo will also be responsible for all payments to the Procurement Management Specialist
once the work has been accepted and cleared for payment.
Expected Deliverables
Specific Deliverables
Reports on technical support provided to assigned cities in formulating procurement
strategies;
Reports on support given to assigned UIIDP participating cities in the preparation of ULG
annual procurement plans
Review comments or suggestions for improvement of the quality of assigned ULG annual
procurement plans
Summarized Quarterly Monitoring & Status Report on implementation of the assigned
ULG Annual Procurement Plans and on guidance provided to the assigned ULGs on
speeding up implementation of the procurement plans/activities.
Report on supporting provided to the Regional Public Procurement and Property
Administration Agency in undertaking the annual procurement audits of ULGs.
Monitoring and status report on the preparations for and the carrying out of the annual
procurement audits by RPPPAA.
Review comments on quality of procurement audits
Status report on implementation by regions and ULGs of recommendations of the
procurement audits.
Page | 228
Report on constraints and opportunities to the effective and efficient procurement and
administration of works, goods and consultancies in the ULGs.
Procurement implementation capacity assessment report.
Training plan, training materials and training reports on procurement management
Review comments on Annual Performance Assessment Reports of ULGs regarding
procurement management.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
Procurement Management Specialist activities/ achievements during the month and plans
for the next month.
Draft Final Report of the Procurement Management Specialist’s work three weeks before
the end of the assignment; and
Final Report of the Procurement Management Specialist’s work, one week after receiving
comments from BUDHO.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Procurement
Management Specialist:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 229
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a qualified and experienced Capacity
Building Specialist who will be responsible for coordinating all the capacity building activities
under UIIDP and for providing capacity building support to all UIIDP participating cities in the
region.
Scope of the Assignment
The Capacity Building Specialist will be responsible for the following specific duties and
responsibilities:
o. Dissemination of the UIIDP Capacity Building Manual to all regional implementation
bureaus/agencies and ULGs.
p. Provide support to regional implementing Bureaus/Agencies and ULGs in carrying out
the capacity self-assessment and gap analysis using the tools provided in the UIIDP
Capacity Building Manual.
q. Supporting cities in formulating and developing their capacity building strategies,
plans and budgets, ensuring that the UIIDP Eligible Capacity Building Areas are
adhered to and that all the four capacity building modalities are used;
r. Using the Checklists in the UIIDP Capacity Building Manual, review and provide
comments on the annual capacity building plans of all participating ULGs.
s. Monitor and evaluate the performance of ULGs capacity building plans;
t. Preparation of the UIIDP Regional Capacity Building Plan and following up with all
participating regional Bureaus/ Agencies on the submission of their inputs for the plan.
u. Evaluate and report on the effectiveness of capacity building activities and training
programs provided under UIIDP by the regional and ULG levels
v. Prepare training plan, training materials and provide training to regional and ULG staff
on capacity building.
w. Coordinate and provide assistance to other RMT staff in the preparation of training
program and delivery of training by all thematic areas under UIIDP.
Page | 230
x. Review the Annual Performance Assessment Reports of ULGs regarding capacity
building and provide comments
The Capacity Building Specialist will, as per the UIIDP Staff Performance Evaluation &
Incentive Scheme, also have weighted (50%) responsibility, and be evaluated accordingly, for the
achievement of the following UIIDP DLIs and performance indicators by UIIDP participating
cities in his assigned region (s):-
Page | 231
Performance Evaluation and Incentive Scheme. Remuneration: Negotiable / dependent on
qualifications and experience.
Management Procedures
Contractually, the Capacity Building Specialist will be accountable to the Regional Program
Coordinator to whom all reports and deliverables as per the TOR should be submitted. As agency
responsible for the overall coordination and implementation of UIIDP, the BUDHo will sign the
contract with the Capacity Building Specialist on behalf of the region. The BUDHo will also be
responsible for all payments to the Capacity Building Specialist once the work has been accepted
and cleared for payment.
Expected Deliverables
Specific Deliverables
Report on support to regional implementing Bureaus/Agencies and ULGs in carrying out
the capacity self-assessment and gap analysis.
Report on supporting cities in formulating and developing their capacity building
strategies, plans and budgets
Checklists and review comments on the annual capacity building plans of participating
ULGs.
Monitoring and evaluation reports on performance of region and ULGs capacity building
plans
UIIDP Regional Capacity Building Plan
Evaluation report on the effectiveness of capacity building activities and training
programs provided under UIIDP by the regional and ULG levels
Training plan, training materials and training reports on capacity building
Review comments on Annual Performance Assessment Reports of ULGs regarding
capacity building.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Capacity
Building Specialist activities/ achievements during the month and plans for the next
month.
Draft Final Report of the Capacity Building Specialist’s work three weeks before the end
of the assignment; and
Final Report of the Capacity Building Specialist’s work, one week after receiving
comments from BUDHO.
Page | 232
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Capacity Building
Specialist:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 233
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
ii. Review the Annual Performance Assessment Reports of ULGs regarding local
economic development and job creation and provide comments
jj. Perform any other duties assigned by the Regional Program Coordinator.
The Local Economic Development & Job Creation Specialist will, as per the UIIDP Staff
Performance Evaluation & Incentive Scheme, also have weighted (50%) responsibility, and be
evaluated accordingly, for the achievement of the following UIIDP DLIs and performance
indicators by UIIDP participating cities in his assigned region (s):-
32
This refers to all serviced land allotted to firms engaged in economic activities including agriculture, services and
manufacturing.
33
This refers to working premises / sheds allotted to microenterprises, which should be serviced and provided with
water, electricity and a connective road
Page | 235
4.1.2. Public private dialogue
4.1.2.1. ULG held at least 2 public private dialogue/open meetings with city mayor and a wide range of private sector
representatives -structured meeting, mayor participation, presentation of constraints and economic potentials to
inform the CIP.
4.1.2.2. Implementation of min. 2 agreed actions from each meeting
4.1.3. Micro Small Enterprise
4.1.3.1. No. of MSEs supported through open business plan competitions, against annual target
4.1.3.2. No. of MSE One Stop Center (OSC) supported to be fully functional against annual target
4.1.3.3. No. of graduated MSEs provided with support from the Medium Manufacturing Enterprises Development Unit
in the city administration, against annual target
Management Procedures
Contractually, the Local Economic Development & Job Creation Specialist will be accountable to
the Regional Program Coordinator to whom all reports and deliverables as per the TOR should be
submitted. As agency responsible for the overall coordination and implementation of UIIDP, the
BUDHo will sign the contract with the Local Economic Development & Job Creation Specialist
Page | 236
on behalf of the region. The BUDHo will also be responsible for all payments to the Local
Economic Development & Job Creation Specialist once the work has been accepted and cleared
for payment.
Expected Deliverables
Specific Deliverables
Report on supporting cities in formulating and developing ULGs local economic
development strategies.
Report on support to UIIDP participating cities in the preparation of ULG Local Economic
Development Plan and Job Creation Plan.
Report on review of ULG CIPs to ensure that the necessary public private dialogue has taken
place as part of their preparation.
Report on support given to ULGs in ensuring that they arrange at least 2 public private
dialogue/open meetings with city mayor and a wide range of private sector representatives
Monitoring and evaluation report on performance of ULGs Local Economic Development
Plans and Job Creation Plans.
Performance standards and indicators for the ULGs to use on local economic development;
Data bank for local economic development and job creation.
Evaluation reports on effectiveness of local economic development strategies and job creation
strategies.
Mechanism and procedure for the selection of some MSEs based on open business plan
competition
Report on challenges that face MSEs and prevent them from surviving or graduating to the
next level and remedial measures
Review comments on Annual Performance Assessment Reports of ULGs regarding local
economic development and job creation.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Local
Economic Development & Job Creation Specialist activities/ achievements during the
month and plans for the next month.
Draft Final Report of the Local Economic Development & Job Creation Specialist’s work
three weeks before the end of the assignment; and
Final Report of the Local Economic Development & Job Creation Specialist’s work, one
week after receiving comments from BUDHO.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Local Economic
Development & Job Creation Specialist:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
Page | 237
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 238
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a qualified and experienced Urban
Resilience and Disaster Risk Management Specialist who will support all UIIDP participating
cities in the region in strengthening urban resilience through (a) a better understanding of risks
of shocks and stresses and incorporating resilience into land use planning/ development; and (b)
undertaking measures to mitigate the risks through disaster and climate risk management, and
improving regulatory decisions and emergency preparedness.
Scope of the Assignment
The Urban Resilience and Disaster Risk Management Specialist will have the following specific
duties and responsibilities:
o. Dissemination of the Urban Resilience and Disaster Risk Management Manual
p. Support cities in the establishment of the urban Disaster Risk Management (DRM)
institutional framework at city level (DRM Unit with dedicated staff and budget) by
extending existing national and regional DRM structure to the cities.
q. Support the cities in ensuring that each UIIDP participating city’s DRM unit develops an
Emergency Response Plan and DRM strategy including: (a) securing early warning on
flooding, drought and high winds, and alerts for earthquakes and landslides; (b) ensuring
community disaster preparedness; (c) developing contingency planning and budgeting;
and (d) exploring risk financing and insurance options.
r. Provide support to cities in undertaking an assessment of the fire support services to
identify the specific training and equipment needed to improve response capacity for
densely populated buildings and neighborhoods.
s. Based on the abovementioned assessment of fire support services, support cities to
develop a local plan to provide mobile firefighting units and search and rescue
equipment appropriate for city responses to fire incidents.
t. Prepare and disseminate performance standards and indicators for the ULGs to use on
urban resilience and disaster risk management;
Page | 239
u. Monitor and evaluate performance of ULGs Disaster Risk
Management Strategies/Plans and Emergency Response Plans;
v. Monitoring compliance with UIIDP POM and other manuals in regard to urban
resilience and disaster risk management;
w. Prepare training plan, training materials and provide training to regional and ULG staff
on urban resilience and disaster risk management.
The Urban Resilience and Disaster Risk Management Specialist will, as per the UIIDP Staff
Performance Evaluation & Incentive Scheme, also have weighted (50%) responsibility, and be
evaluated accordingly, for the achievement of the following UIIDP DLIs and performance
indicators by UIIDP participating cities in his assigned region (s):-
Page | 240
Qualifications and Skills Required
The Urban Resilience and Disaster Risk Management Specialist should possess the following
qualifications/competencies:
A minimum of BA or B.Sc. Degree in Environmental Sciences, Natural Resources
Management, Sociology, Social Work, Public Health, Disaster Risk Management,
Climate change or related.
A minimum of 7 years general experience of which 3 years specific experience in
environmental management, climate change, urban resilience and disaster risk
management.
Excellent writing and communication skills in English, excellent report writing skills.
Excellent command of computer programs and applications with significant capabilities
in computerized database, spreadsheet constructions.
Knowledge of the urban sector and climate change issues in Ethiopia is an advantage.
Level of Effort and Timing
It is expected that the assignment will start in May 2018. The consultant will be based at BUDHo
offices in the regional capital with regular travel to cities. Contract: one-year contract, with
possible extension upon satisfactory performance of the Urban Resilience and Disaster Risk
Management Specialist as per the UIIDP Staff Performance Evaluation and Incentive Scheme.
Remuneration: Negotiable / dependent on qualifications and experience.
Management Procedures
Contractually, the Urban Resilience and Disaster Risk Management Specialist will be
accountable to the Regional Program Coordinator to whom all reports and deliverables as per the
TOR should be submitted. As agency responsible for the overall coordination and implementation
of UIIDP, the BUDHo will sign the contract with the Urban Resilience and Disaster Risk
Management Specialist on behalf of the region. The BUDHo will also be responsible for all
payments to the Urban Resilience and Disaster Risk Management Specialist once the work has
been accepted and cleared for payment.
Expected Deliverables
Specific Deliverables
Assessment report on needs and requirements regarding urban resilience and disaster
risk management
Establishment of the urban Disaster Risk Management (DRM) institutional framework at
city level (DRM Unit with dedicated staff and budget).
Page | 241
Report on preparation by each of the participating UIIDP cities in the region of their
ULG Emergency Response Plan and DRM strategy including: (a) securing early warning
on flooding, drought and high winds, and alerts for earthquakes and landslides; (b)
ensuring community disaster preparedness; (c) developing contingency planning and
budgeting; and (d) exploring risk financing and insurance options.
Report on status of, and support provided to cities in undertaking an, assessment of the
fire support services and specific training and equipment needed to improve response
capacity for densely populated buildings and neighborhoods.
Report on support provided to cities to develop a local plan to provide mobile
firefighting units and search and rescue equipment appropriate for city responses to fire
incidents.
Performance standards and indicators for the ULGs to use on urban resilience and
disaster risk management;
Monitoring and evaluation report on performance of ULGs Disaster Risk
Management Strategies/Plans and Emergency Response Plans;
Training plan, training materials and training reports on urban resilience and disaster
risk management.
Review comments on the Annual Performance Assessment Reports of ULGs regarding
urban resilience and disaster risk management.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Urban
Resilience and Disaster Risk Management Specialist activities/ achievements during the
month and plans for the next month.
Draft Final Report of the Urban Resilience and Disaster Risk Management Specialist’s
work three weeks before the end of the assignment; and
Final Report of the Urban Resilience and Disaster Risk Management Specialist’s work,
one week after receiving comments from BUDHO.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Urban Resilience
and Disaster Risk Management Specialist:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Page | 242
BUREAU OF URBAN DEVELOPMENT & HOUSING
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (50%) responsibility, and be evaluated accordingly, for the achievement of the
following UIIDP DLIs and performance indicators by UIIDP participating cities in his assigned
region (s):-
Page | 243
1. DLI 1 - Minimum Conditions
ULG has produced and the council approved a:
Page | 244
4.3.2.3. (a) Quarterly meeting with gender focal persons from each sector Office; (b) More than 80% of gender
activities in the gender plan successfully completed and more than 80% of the funds budgeted in the gender
plan are utilized.
Evidence:
1.Signed attendance sheet of focal persons (indicating gender, occupation) from each sector Office and meeting notes
(quarterly)
2. Compare annual gender plan to annual gender progress report
4.3.3. Economic Empowerment
4.3.3.1. % of women employed through infrastructure works under UIIDP
*linked to 4.1.1.1 LED indicator
Evidence:
3. No. of people employed in infrastructure works; disaggregated by gender and age
4. Data collected from contractor’s log books, job registration in the M&E system of projects, etc.
4.3.3.2. % of women employed in firms provided with serviced land34 and/or MSE sheds35 under CIP
*linked to 4.1.1.2 LED indicator
Evidence:
1. No. of people employed in firms provided with serviced land and/or MSE sheds in the last year against targets in CIP
2. Data collected from ULG’s records, APA consultants to visit minimum 3 plots of land or MSE sheds to verify firms
are operational, etc
4.3.3.3. % of women-headed MSEs supported to access working premises/sheds and/or serviced land under
UIIDP
Evidence:
3. Records of MSE office
4. Data collected from ULG’s records
4.3.3.4. % of women-headed MSEs awarded with civil contracts under UIIDP
Evidence:
3. Records of MSE office
4. Data collected from ULG’s records
Management Procedures
Contractually, the Gender Specialist will be accountable to the Program Coordinator to whom all
reports and deliverables as per the TOR should be submitted. As agency responsible for the
overall coordination and implementation of UIIDP, the BUDHO will sign the contract with the
Gender Specialist on behalf of the region. The BUDHO will also be responsible for all payments
to the Gender Specialist once the work has been accepted and cleared for payment.
Expected Deliverables
Specific Deliverables
Report on staffing situation of Gender focal persons in all UIIDP participating cities in
the region.
Report on support provided to cities in preparing the Annual Gender Development Plan
and Budget.
Performance standards and indicators for the ULGs on gender mainstreaming and
responsiveness.
Monitoring and evaluation report of performance of ULGs Annual Gender Development
Plan.
Evaluation Report on the effectiveness of gender mainstreaming and responsiveness on
the UIIDP;
Training plan, training materials and training/workshop reports on gender
mainstreaming and responsiveness and women’s rights in work place.
Review comments on the Annual Performance Assessment Reports of ULGs regarding
gender mainstreaming and responsiveness.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Gender
Specialist activities/ achievements during the month and plans for the next month.
Draft Final Report of the Gender Specialist’s work three weeks before the end of the
assignment; and
Final Report of the Gender Specialist’s work, one week after receiving comments from
BUDHO.
Evaluation Criteria
The following two technical evaluation criteria will be followed to select the Gender Specialist:
Qualification (40%). This criterion further divided into two:
General Educational Status (10%). – PhD – 10%; Masters – 8%; Bachelors – 6%
Relevant Qualification (30%).
Page | 246
o Required discipline as stated in TOR - PhD – 30%; Masters – 27% ; Bachelors – 25%
o Related discipline- PhD – 27%; Masters – 25%; Bachelors – 23%
Total years of Experience (60%). This criterion further divided into two:
General Experience (20%).
Relevant Experience (40%).
Contents
ORGANIZATION, STAFFING & TORs FOR ULG FOCAL PERSONS.........................................
STAFFING OF THE ULG FOCAL PERSONS UNDER UIIDP.......................................................
TERMS OF REFERENCE FOR ULG PROGRAM COORDINATOR.............................................
TERMS OF REFERENCE FOR PROJECT ENGINEER..................................................................
TERMS OF REFERENCE FOR MUNICIPAL FINANCE FOCAL PERSON.................................
TERMS OF REFERENCE FOR FINANCIAL MANAGEMENT FOCAL PERSON......................
TERMS OF REFERENCE FOR ENVIRONMENTAL MANAGEMENT FOCAL PERSON.........
TERMS OF REFERENCE FOR SOCIAL DEVELOPMENT FOCAL PERSON.............................
TERMS OF REFERENCE FOR INFRASTRUCTURE ASSET MANAGEMENT FOCAL
PERSON..............................................................................................................................................
TERMS OF REFERENCE FOR URBAN PLANNING & LAND MANAGEMENT FOCAL
PERSON..............................................................................................................................................
TERMS OF REFERENCE FOR PLANNING, BUDGETING & PARTICIPATION FOCAL
PERSON..............................................................................................................................................
TERMS OF REFERENCE FOR MONITORING & EVALUATION FOCAL PERSON.................
TERMS OF REFERENCE FOR UIIDP PROGRAM ACCOUNTANT (OFED)..............................
TERMS OF REFERENCE FOR PROCUREMENT MANAGEMENT FOCAL PERSON..............
TERMS OF REFERENCE FOR CAPACITY BUILDING FOCAL PERSON..................................
TERMS OF REFERENCE FOR LOCAL ECONOMIC DEVELOPMENT (LED) & JOB
CREATION FOCAL PERSON...........................................................................................................
Page | 248
TERMS OF REFERENCE FOR URBAN RESILIENCE & DISASTER RISK MANAGEMENT
FOCAL PERSON................................................................................................................................
TERMS OF REFERENCE FOR GENDER FOCAL PERSON..........................................................
Page | 249
ORGANIZATION, STAFFING & TORs FOR ULG FOCAL
PERSONS
The various offices of the city manager will be responsible for implementation of
infrastructure and activities supported through Program Funds. Implementation of
infrastructure, services and activities supported through Program funds are mainstreamed in each
ULG and carried out by the relevant offices in the city administration.
The Offices of Finance and Economic Development (OFEDs) hold overall fiduciary
responsibilities. They will ensure that all Operation funds are included in Integrated Budget and
Expenditure (IBEX) and that financial reports are submitted to ORAG as soon as possible after
the end of the Ethiopian fiscal year.
The ethics liaison unit of the ULG is responsible for dealing with fraud and corruption,
handling related complaints and consolidating reporting of complaints on environment and
social aspect as well as procurement.36
City councils are responsible for reviewing and approving cities’ capital investment plans,
revenue enhancement plans, asset management plans and capacity building plans.
Each ULG will also establish a capacity building unit. This will coordinate the planning and
implementation of capacity building activities, and reporting of these activities.
Federal Urban Job Creation and Food Security Agency is responsible for leading initiatives
relating to supporting micro, small and medium size enterprises.
The Women and Children Affairs Office (WCO) is responsible for leading and coordinating
initiatives identified in the gender action plan and champion gender mainstreaming in planning,
M&E, reporting and management.
36
Note that units with the same mandates have different names in different places.
Page | 250
A disaster risk management (DRM) unit is proposed to be established in each ULG. This
will lead efforts in risk assessment, develop emergency response plans and related capacity
building activities.
Page | 251
STAFFING OF THE ULG FOCAL PERSONS UNDER UIIDP
Number of positions
Specialization Existing UIIDP
ULGDP II
Program Coordinator 1 1
Social Development Focal Person 1 1
Budgeting, Planning and Participation Focal Person 1 1
Procurement Management Focal Person 1 1
Infrastructure Asset Management Focal Person 1 1
Environmental Management Focal Person 1 1
Project Engineer 1 1
M&E Focal Person 1 1
Municipal Finance/ Revenue Focal Person 1
Urban Planning and Land Management Focal Person 1
LED & Job Creation Focal Person 1
Urban Resilience Focal Person 1
Capacity Building Focal Person 1
Gender Focal Person 1
Financial Management Focal Person 1
Accountant – based at OFED 1 1
Total 9 16
Page | 252
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
Page | 253
dd) Put in place a system for record keeping and reporting (quarterly, semi-annual and
annual) on the achievements against the service delivery standards performance
indicators to enable them to provide acceptable reports to the APA.
ee) Preparation of the Annual Work Plan (AWP) for the ULG Focal Persons team covering
the activities to be carried out by the Focal Persons team during each year. The AWP
should further be broken down into detailed quarterly and monthly Action Plans to be
used for achievement of the AWP. Monitor and report to the City Manager and City
Mayor on implementation and achievements of the Annual Work Plan (AWP).
ff) Coordinate the preparation and submission by the ULG Focal Persons team of their
Strategy and Action Plan to address weaknesses and gaps identified in the APAs. Prepare
Consolidated Strategy and Action Plan for the city and submit to the City Manager, City
Mayor and the Regional Coordinator.
gg) Arrange and conduct at least fortnightly meetings of the ULG Focal Persons team to
check on progress on all thematic areas covered by the UIIDP and the AWP, to address
issues and problems encountered by the team members and to replan the team’s activities.
Prepare Agenda, Attendance Register and Minutes of each meeting.
hh) Receive from the Regional Program Coordinator and disseminate the World Bank Listing
of Ineligible Firms & Individuals to the city procurement department every six months
(in June and December).
ii) Support for, and participation in, World Bank and MUDHo six monthly implementation
support missions and other missions as well as quality assurance reviews as and when the
city is selected for such missions/reviews.
jj) Submit to the City Manager, City Mayor and Regional Coordinator, the UIIDP quarterly,
semi-annual and annual reports that are prepared by the Monitoring and Evaluation Focal
Person.
kk) Carry out annual performance evaluation of all ULG Focal Persons as per the UIIDP
Staff Performance Evaluation and Incentive Scheme established by BUDHo.
ll) Perform any other duties assigned by the City Manager and City Mayor.
The ULG Program Coordinator will, as per the UIIDP Staff Performance Evaluation & Incentive
Scheme, also have 100% responsibility, and will be evaluated accordingly, for the achievement of
the following UIIDP DLIs and performance indicators by all the UIIDP participating cities in the
region:-
1. DLI 1 - Minimum Conditions
All eight (8) minimum conditions should be achieved by the city.
2. Performance Measures, DLI 2, DLI 3, DLI 4
100% responsibility for achievement of the annual expected (average) score for the city on all
UIIDP performance measures DLI2, DLI3, and DLI 4 as follows:-
DL Name of DLI Year 1 Year 2 Year 3 Year 4
I
No.
Assessed Performance Years (EFY) 2010 2011 2012 2013
(Prior) & (Prior) & (Prior) & (Prior) &
2011 2012 2013 2014
Page | 254
(Current (Current) (Current (Current)
) )
Allocation /Implementation Year (EFY) 2012 2013 2014 2015
2 ULGs have strengthened institutional performance. 70 75 80 85
3 ULGs have implemented quality infrastructure and 70 75 80 85
maintenance activities and ensured value for money
Management Procedures
Operationally, the ULG Program Coordinator will report to the City Manager to whom all reports
and deliverables as per the TOR should be submitted.
Page | 255
Expected Deliverables
Specific Deliverables:
a) Performance and Participation Agreements, for every year of the UIIDP implementation,
between City Mayor and BUDHo.
b) Annual Work Plan (AWP) for the ULG Focal Persons team.
c) Monitoring report on implementation and achievements of the Annual Work Plan (AWP).
d) System for record keeping and reporting (quarterly, semi-annual and annual) on the
achievements against the service delivery standards performance indicators
e) Agenda, Attendance Registers and Minutes of the fortnightly meetings of the ULGs focal
persons team.
f) UIIDP quarterly, semi-annual and annual reports submitted to City Manager, City Mayor
and Regional Program Coordinator.
g) Annual performance evaluation reports for all RMT staff as per the UIIDP Staff
Performance Evaluation and Incentive Scheme.
General Deliverables:
Inception Report and detailed work plan within three weeks of the commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the ULG
Program Coordinator activities/ achievements during the month and plans for the next
month.
Draft Final Report of the ULG Program Coordinator’s work three weeks before the end
of the assignment; and
Final Report of the ULG Program Coordinator’s work, one week after receiving
comments from City Manager.
Page | 256
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
TERMS OF REFERENCE FOR PROJECT ENGINEER
Page | 257
ccc. Keep proper records of all the infrastructure projects being implemented by the city
under the CIP and review action plans/schedules and resources required as well as
maintaining the project management, monitoring and reporting systems for UIIDP and
others.
ddd. Prepare the Capital Investment Plans for the city
eee. Support Resident Engineer in checking works, materials and workmanship to ensure
compliance with the approved designs, drawings and specifications and provide
feedback on the technical performance of the contractor and his consultant to the ULG
Program Coordinator and City manager.
fff. Examine alternative design proposals/variations submitted by the design and
construction supervision consultants and contractor/client for execution and recommend
appropriate solution.
ggg. Assist in settling any minor disputes (not litigation and arbitration) between contractor
and municipality, inform relevant authorities at the earliest opportunity of any
problem(s) or potential problem(s) which may arise from construction of the project and
recommend possible solutions.
hhh. Examine with design and construction supervision consultants and recommend on
settlement of the contractor's claims for extensions of time, payment for extra work etc.
iii. Participate in, and support the preparation of training manuals, guidelines, seminars and
workshops on infrastructure and related subjects.
jjj. Plan for the future in developing and planning for operations, maintenance and an
environmental mitigation of infrastructure financed under the CIP such as roads,
drainage and management of markets, slaughterhouses, landfills, solid and liquid waste
disposals for sustainability of the infrastructure projects.
kkk. Provide the M & E focal person with all required information as per the M &E
guideline on infrastructure implementation progress, maintenance and contract status on
monthly, quarterly, semi-annual and annual basis;
lll. Review and provide comments to the ULG Program Coordinator on the Annual
Performance Assessment (APA) Reports of the city
mmm. Perform any other duties assigned by the ULG Program Coordinator.
The Project Engineer will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme,
also have weighted (100%) responsibility, and will be evaluated accordingly, for the achievement
of the following UIIDP DLIs and performance indicators by the city:-
Page | 258
2.1.1.1. Quality, consistency and alignment in rolling three 3-year CIP, to ensure effective rolling in the planning
process
2.1.1.2. Capturing infrastructure, operations and maintenance including using the appropriate IBEX code in the
annual budget
2.1.3. Budget appropriation
2.1.3.1. Budget approved by Council (Yes/No Indicator)
2.1.4. Budget Reliability
2.1.4.1. Variance between overall city budget and actual expenditure (each capital and recurrent) for previous EFY
less than 10%. Yes/No
Management Procedures
Page | 259
Operationally, the Project Engineer will be accountable to the ULG Program Coordinator to
whom all reports and deliverables as per the TOR should be submitted.
Expected Deliverables
Specific Deliverables
Capital Investment Plans for the city
Draft bidding documents.
Review comments on designs, bill of quantities and draft bidding documents prepared by
design consultants
Feedback on the technical performance of contractors
Monthly progress reports of construction sites/contracts
Records of all the infrastructure projects being implemented by the city under the CIP
Report to M & E focal person with all required information as per the M &E guideline on
infrastructure implementation progress, maintenance and contract status on monthly,
quarterly, semi-annual and annual basis
Comments on the Annual Performance Assessment (APA) Reports of the city.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Project
Engineer activities/ achievements during the month and plans for the next month.
Draft Final Report of the Project Engineer’s work three weeks before the end of the
assignment; and
Final Report of the Project Engineer’s work, one week after receiving comments from
ULG Program Coordinator.
Page | 260
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The Municipal Finance Focal Person will be responsible for the city’s own source revenue
enhancement and generation activities. Specific duties and responsibilities are:
v. Review and understand the requirements of the Revenue Enhancement Plan (REP)
Manual and Template and attend training on the manual and template which will be
provided by federal and regional levels
w. Identifying alternative sources of funds for infrastructure;
x. Updating the city’s annual Revenue Enhancement Plans (REPs) for the most recent
year;
y. Developing generic and specific revenue enhancement strategies that will result in
increase in municipal revenues of ULGs;
z. Ensuring the city provides counterpart funding for UIIDP as described in the POM and
the PPAs;
aa. Monitoring, evaluating and reporting on the city’s revenue mobilization strategies,
actions and revenue collection;
bb. Ensuring compliance with all laws policies and manuals by the city on municipal
finance issues;
cc. Review and provide comments on the Annual Performance Assessment (APA) Reports
of the city regarding municipal finance and own source revenue enhancement
dd. Provide the M & E focal person with all required information as per the M &E
guideline on municipal finance and revenue enhancement/collection on monthly,
quarterly, semi-annual and annual basis;
ee. Perform any other duties assigned by the ULG Program Coordinator.
The Municipal Finance Focal Person will, as per the UIIDP Staff Performance Evaluation &
Incentive Scheme, also have weighted (100%) responsibility, and will be evaluated accordingly,
for the achievement of the following UIIDP DLIs and performance indicators by the city:-
Page | 261
1. DLI 1 - Minimum Conditions
1.4. Co-funding requirements (defined with various rates of co-funding depending on the type of ULG).
Management Procedures
Page | 262
Operationally, the Municipal Finance Focal Person will be accountable to the ULG Program
Coordinator to whom all reports and deliverables as per the TOR should be submitted.
Expected Deliverables
Specific Deliverables
Report on alternative sources of funds for infrastructure;
Updated city’s annual Revenue Enhancement Plans (REPs) for the most recent year;
Generic and specific revenue enhancement strategies that will result in increase in
municipal revenues of ULGs;
Report on provision of counterpart funding for UIIDP as described in the POM and the
PPAs;
Monitoring and evaluation report on the city’s revenue mobilization strategies, actions
and revenue collection;
Report to M & E focal person on required information as per the M &E guideline on
municipal finance and revenue enhancement/collection on monthly, quarterly, semi-
annual and annual basis
Review comments on the Annual Performance Assessment (APA) Reports of the city
regarding municipal finance and own source revenue enhancement
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
Municipal Finance Focal Person activities/ achievements during the month and plans for
the next month.
Draft Final Report of the Municipal Finance Focal Person’s work three weeks before the
end of the assignment; and
Final Report of the Municipal Finance Focal Person’s work, one week after receiving
comments from ULG Program Coordinator.
Page | 263
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
TERMS OF REFERENCE FOR FINANCIAL
MANAGEMENT FOCAL PERSON
Management Procedures
Operationally, the Financial Management Focal Person will be accountable to the ULG Program
Coordinator to whom all reports and deliverables as per the TOR should be submitted.
Expected Deliverables
Specific Deliverables
Contributions to the production of the ULG Annual Budget, Capital Investment Plan,
Revenue Enhancement Plan, Asset Management Plan and Capacity Building Plan.
Monthly cash & bank reconciliation of the UIIDP account. Reports submitted to
BoFED timely as per regional regulations and manuals
Up to date city’s fixed asset and inventory (stock) i.e. the fixed asset register stock
register and bin card. Report on count and reconciliation of the stocks.
Financial accounts closed on time by not later than October 10
Financial statements handed over to the Office of the Regional Auditor General (ORAG)
for audit before the deadline of October 10 each year.
Report on implementation of recommendations of the audits and status report on actions
taken by the city.
Strategy and action plan for the ULG to move from qualified audits to unqualified
(clean) audits and to maintain this status thereafter. Progress report to the ULG Program
Coordinator on the actions taken.
Progress report to the ULG Program Coordinator on the follow up made and actions
taken on findings and recommendations from the internal audit reports.
Progress report to the ULG Program Coordinator on the follow up made and actions
taken on findings and recommendations from the annual VfM Audit Reports
Report to M & E focal person with all required information as per the M &E guideline
on financial management issues on monthly, quarterly, semi-annual and annual basis.
General Deliverables
Inception report and detailed work plan within three weeks of commencement of the
assignment.
Page | 266
Monthly Progress Reports within 7 (seven) days of the end of the month on the Financial
Management Focal Person activities/ achievements during the month and plans for the
next month.
Draft Final Report of the Financial Management Focal Person’s work three weeks before
the end of the assignment; and
Final Report of the Financial Management Focal Person’s work, one week after receiving
comments from ULG Program Coordinator.
Page | 267
…………………………………….. CITY ADMINISTRATION
The objective of the TOR is to obtain the services of a qualified and experienced Environmental
Management Focal Person who be responsible for screening all CIP projects for environmental
impacts and ensuring that the required mitigation measures are planned and implemented as per
the UIIDP Environmental and Social Management System Guideline (ESMSG). He/She will also
be directly responsible for achievement of disbursement linked indicators and performance
measures related to environmental management.
Scope of the Assignment
The Environmental Management Focal Person will have the following duties and responsibilities:
qq. Review and understand the requirements of the UIIDP Environmental and Social
Management System Guideline (ESMSG) and attend training on the guideline which
will be provided by federal and regional levels
rr. Provide overall coordination in the implementation of the ESMSG and apply the
ESMSG to all CIP projects implemented by the city.
ss. Establish the system of screening forms and EIA set out in the ESMSG, and oversee
their smooth operation including the procurement (if required) of Environmental
Management Consultants for any required EIA studies for catioegory 1 projects;
tt. Screen all CIP projects as per the screening forms in the ESMSG and submit to the
regional environmental protection authority for review and approval.
uu. Prepare Environmental Management Plans of the Category 2 sub-projects and submit
the regional environmental protection authority for review and approval.
vv. Ensure that the environmental requirements are inserted in all infrastructure contracts
and monitor their implementation prior to and during construction.
ww. Ensure that EMPs are implemented in a timely manner - prior to commencement and
during construction of civil works;
Page | 268
xx. Conduct site visits during ULG investment project execution and operation to assess
how environmental screening and mitigation measures are succeeding or have
succeeded in minimizing impacts.
yy. Monitor and report on the implementation of landfills and abattoirs (if any) as per the
MUDHo manuals ensuring that the necessary safeguard actions are put in place and
implemented as per the ESMSG.
zz. Ensure that the REFA carries out an environmental performance audit of all the city’s
CIP projects on an annual basis as stated in the UIIDP POM;
aaa. Review the annual Environmental Performance Audit Reports and follow up on
recommendations and actions to be taken by the city. Provide progress report to the
ULG Program Coordinator on the actions taken
bbb. Provide the M & E focal person with all required information as per the M &E
guideline on environmental management issues on monthly, quarterly, semi-annual and
annual basis.
ccc. Perform other duties assigned by the ULG Program Coordinator.
The Environmental Management Focal Person will, as per the UIIDP Staff Performance
Evaluation & Incentive Scheme, also have weighted (100%) responsibility, and will be evaluated
accordingly, for the achievement of the following UIIDP DLIs and performance indicators by the
city.
37
Depending on the project phase
Page | 269
BA or B.Sc. degree or higher in Environmental Science, Environmental Engineering,
Natural Resources Management or other related degree;
A minimum of 5 years general experience of which 2 years specific experience in all
aspects of urban infrastructure development and environmental safeguard impacts ,
health, and safety issues , screening against environment criteria in the planning stage and
environmental and social impact assessments (ESIAs), environmental management plans
(EMPs)
Experience in working with local governments and/or knowledge of the urban sector in
Ethiopia will be an added advantage.
Excellent writing and communication skills in both Amharic and English.
Management Procedures
Operationally, the Environmental Management Focal Person will be accountable to the ULG
Program Coordinator to whom all reports and deliverables as per the TOR should be submitted.
Expected Deliverables
Specific Deliverables
a. System of screening forms and EIA set out in the ESMSG.
b. Screening Reports of all CIP projects as per the ESMSG and approval of regional
environmental protection authority.
c. Environmental Management Plans of the Category 2 sub-projects and approval of
regional environmental protection authority.
d. Environmental requirements inserted in all infrastructure contracts. Monitoring report
on their implementation prior to and during construction.
e. Site Visit Reports on investment project execution and operation and assessment on
how environmental screening and mitigation measures are succeeding or have
succeeded in minimizing impacts.
f. Monitoring report on the implementation of landfills and abattoirs (if any) as per the
MUDHo manuals
g. Progress report to the ULG Program Coordinator on the follow up made and actions
taken on environmental performance audit findings and recommendations.
h. Report to M & E focal person with all required information as per the M &E guideline
on environmental management issues on monthly, quarterly, semi-annual and annual
basis.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Page | 270
Monthly Progress Reports within 7 (seven) days of the end of the month on the
Environmental Management Focal Person activities/ achievements during the month and
plans for the next month.
Draft Final Report of the Environmental Management Focal Person’s work three weeks
before the end of the assignment; and
Final Report of the Environmental Management Focal Person’s work, one week after
receiving comments from ULG Program Coordinator.
Page | 271
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
TERMS OF REFERENCE FOR SOCIAL DEVELOPMENT
FOCAL PERSON
The Social Development Focal Person will, as per the UIIDP Staff Performance Evaluation &
Incentive Scheme, also have weighted (100%) responsibility, and will be evaluated accordingly,
for the achievement of the following UIIDP DLIs and performance indicators by the city.
Page | 272
1. DLI 1 - Minimum Conditions
Safeguards: ULGs have demonstrated that they have established a functional system for environmental and social
management including full time dedicated one environmental and one social safeguards person and updated ESMSG
and RSG endorsed by City Councils
Management Procedures
Operationally, the Social Development Focal Person will be accountable to the ULG Program
Coordinator to whom all reports and deliverables as per the TOR should be submitted.
Expected Deliverables
Specific Deliverables
38
Depending on the project phase
Page | 273
System of screening forms, RAP set out in the RSG,
Site visit reports to the ULG Program Coordinator and assessment on how social aspects
are succeeding or have succeeded in minimizing impacts..
Monitoring report on the implementation of Resettlement action plans on ensuring that
RAPs are implemented in a timely manner - prior to commencement of civil works;
Reports to the M & E focal person with all required information as per the M &E
guideline on social development and resettlement issues on monthly, quarterly, semi-
annual and annual basis.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Social
Development Focal Person activities/ achievements during the month and plans for the
next month.
Draft Final Report of the Social Development Focal Person’s work three weeks before
the end of the assignment; and
Final Report of the Social Development Focal Person’s work, one week after receiving
comments from ULG Program coordinator.
Page | 274
………………………………….CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of qualified and experienced Infrastructure
Asset Management Focal Person who will be responsible for management of existing
infrastructure assets and the planning for new infrastructure assets using the GIS-based
Infrastructure Asset Management Plan Manual and Model and in the achievement of UIIDP
disbursement linked indicators and performance measures related to infrastructure asset
management and planning.
Scope of the Assignment
The Infrastructure Asset Management Focal Person will be responsible for the management of
existing infrastructure assets and the planning for new infrastructure assets. Specific duties and
responsibilities are:
p. Review and understand the requirements of the GIS-based Infrastructure Asset
Management Plan Manual and AMP Model and attend training on the manual and model
guideline which will be provided by federal and regional levels.
r. Manage the conduct of the assessment of conditions of infrastructure assets of the city.
s. Prepare the city’s Annual Asset Management Plan (AMP) as per the Model AMP and
Manual.
t. Be a member of the CIP Team responsible for preparation of the city’s Capital
Investment Plan (CIP).
u. Review the Annual Performance Assessment Reports of the city regarding asset
management and provide comments
Page | 275
v. Follow up on the implementation of the Implementation Strategy and Program of Action
for Asset Management. Report on the actions taken.
w. As per the AMP Manual Steps, the following are the main responsibilities of the AMP
Focal Person
Step 1: Build the GIS project and manage the GIS system.
Step 2: Take responsibility for the city’s AMP and build linkages with the line
departments having responsibility for the different categories of assets included in
the AMP.
Step 3: Build the spatial database and the database of physical properties for all
assets. Summarize the data and provide an analysis of key information.
Step 4: Responsibility for building a condition indicator for all assets, through the
completion of the condition and maintenance database. Provide summaries of the
condition of all assets.
Step 5: Working with the line departments to obtain a list of all maintenance
activities, for: routine and periodic maintenance; major maintenance associated with
levels 3 and 4 condition; and rehabilitation costs for level 5 condition assets.
Responsibility for maintaining an up-to-date list of maintenance activities for all
databases. Adding unit costs and total costs of all maintenance activities to the
condition and maintenance database. Provide summaries of the cost of all
maintenance activities.
Step 6: Working with the line departments and other relevant organizations, obtain
and maintain an up-to-date list of all asset replacement costs, based upon the asset
feature classes. Build the new works database that provides a list of the replacement
cost and residual value of all assets. Provide summary information on these.
Step 7: Working with the CIP team, build the database for new works projects.
Provide summary outputs of these projects.
Step 8: Using the output from step 5, build the maintenance plan database for all
maintenance activities going forward to implementation.
Step 9: Working with the CIP team, convert the budget for new works projects and
maintenance activities to a 3-year rolling program.
Step 10: Track the progress of all approved new works projects and maintenance
activities, using the databases for these created in steps 7 and 8 respectively. Upon
completion, convert project and activities data across to the relevant databases for
existing assets. Once sufficient historical data is available, track the performance of
new works project starts against plan, and the completion of maintenance activities
and costs against plan.
The Infrastructure Asset Management Focal Person will, as per the UIIDP Staff Performance
Evaluation & Incentive Scheme, also have weighted (100%) responsibility, and will be evaluated
accordingly, for the achievement of the following UIIDP DLIs and performance indicators by the
city.
Page | 276
4. DLI 2 - Institutional Performance (ULG Performance Measures)
2.2. Asset Management
2.2.1. Asset Management Plan prepared and updated
2.2.1.1. Asset inventory updated as per Asset Management Manual featuring a tabular and spatial database of all
infrastructure, with specification and characteristics, for all categories of assets of the cities as listed in the AMM
2.1.1.2.
2.2.1.2. Asset conditions correctly reflected in inventories as per procedures in Asset Management Manual
2.2.1.3. Asset inventory shows an asset value and deficit, which calculates the remaining asset value, maintenance
and rehabilitation deficit based on annual depreciation rates as per procedures in Asset Management Manual.
3.2. Maintenance performance
3.2.1. Maintenance Budgeting and Implementation
3.2.1.1. (a) Maintenance plan derived from the Assets Management Plan
3.2.1.6 (b) Maintenance Budget either 2% of the asset replacement cost or 10% of CIP budget (whichever is less)
3.2.1.2. Maintenance Budget either 2% of the asset replacement cost or 10% of CIP budget (whichever is less)
3.2.2.1. ULGs have developed a clear maintenance budget and actual implementation rate (review overall budget and
utilization rate in final accounts of all maintenance projects to review actual maintenance) is minimum 80%
(financial) of the planned. indicator:
Management Procedures
Operationally, the Infrastructure Asset Management Focal Person will be accountable to the ULG
Program Coordinator to whom all reports and deliverables as per the TOR should be submitted.
Page | 277
Expected Deliverables
Specific Deliverables
c. City’s Annual Asset Management Plan (AMP) as per the Model AMP and Manual.
e. Review comments on the Annual Performance Assessment Reports of the city regarding
asset management.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
Infrastructure Asset Management Focal Person activities/ achievements during the month
and plans for the next month.
Draft Final Report of the Infrastructure Asset Management Focal Person ’s work three
weeks before the end of the assignment; and
Final Report of the Infrastructure Asset Management Focal Person ’s work, one week
after receiving comments from ULG Program Coordinator.
Page | 278
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of qualified and experienced Urban Planning
and Land Management Focal Person who will be responsible for all urban land management
issues and for mapping land areas using GIs, overlaying maps with geographic variables such as
population density, and combining or manipulating geographic information to produce
alternative plans for land use or development and the achievement of UIIDP disbursement linked
indicators and performance measures on urban planning and land management.
Scope of the Assignment
The Urban Planning and Land Management Focal Person will be responsible for all urban
planning issues and land management issues, especially in regard to land development, land
release, land registration and land inventory. Specific duties and responsibilities are:
hh. Assess the feasibility of proposals and identify necessary changes, recommend
approval, denial or conditional approval of proposals.
ii. Conduct field investigations, surveys and impact studies in order to compile and
analyze data on economic, social, regulatory and physical factors affecting land use.
jj. Keep informed about economic and legal issues involved in zoning codes, building
codes, and environmental regulations.
kk. Mediate community disputes and assist in developing alternative plans and
recommendations for programs or projects.
ll. Coordinate work with economic consultants and architects during the formulation of
plans and the design of large pieces of infrastructure.
mm. Review and evaluate environmental impact reports pertaining to private and public
planning projects and programs.
nn. Participate in or manage the preparation of the city’s Structure Plan.
oo. Inspect structures in the city to ensure compliance with the land use plan;
pp. Develop and implement the city’s urban land management and information systems
qq. Develop and maintain the city’s land registration register;
Page | 279
rr. Ensure that land released by the city has been serviced with all required infrastructure
such as water, electricity and roads;
ss. Review the Annual Performance Assessment Reports of the city regarding urban
planning and urban land management and provide comments
tt. Perform any other duties assigned by the ULG Program Coordinator.
The Urban Planning and Land Management Focal Person will, as per the UIIDP Staff
Performance Evaluation & Incentive Scheme, also have weighted (100%) responsibility, and will
be evaluated accordingly, for the achievement of the following UIIDP DLIs and performance
indicators by the city.
DLI 2 - Institutional Performance (ULG Performance Measures)
2.8. Land Management and Urban Planning
2.8.1. Statutory structure plan and or expansion plan approved/in place
2.8.1.1. Existence of up-to-date approved statutory city-wide (structure) plan and/or expansion plan as at the point of
assessment (Yes/No indicator) Excluding extension of an existing plan
2.8.1.2. CIP is in accordance with city-wide (structure) plan and/or expansion plan at the time of preparation (Yes/No
indicator)
2.8.2. Effective land management
2.8.2.1. Land released for different uses are as per the laws of land management and have access to basic
infrastructure facilities i.e. road, water, electricity at a radius of 250 meters
2.8.2.2. Proportion of land plots released through competitive auction/ bidding process (and not through direct
allocation)
2.8.2.3. Updated land inventory featuring a tabular and/or spatial database e.g. a map (Yes/No indicator)
Management Procedures
Page | 280
Operationally, the Urban Planning and Land Management Focal Person will be accountable to the
ULG Program Coordinator to whom all reports and deliverables as per the TOR should be
submitted..
Expected Deliverables
Specific Deliverables
Report on feasibility of proposals and recommendations for approval, denial or
conditional approval of proposals.
Report on field investigations, surveys and impact studies on economic, social,
regulatory and physical factors affecting land use.
Review r comments on evaluation of environmental impact reports pertaining to private
and public planning projects and programs.
City’s Structure Plan.
Inspection report on structures in the city to ensure compliance with the land use plan;
City’s urban land management and information systems
City’s land registration register;
Report on land released by the city and whether it has been serviced with all required
infrastructure such as water, electricity and roads;
Review comments on the Annual Performance Assessment Reports of the city regarding
urban planning and urban land management and provide comments
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Urban
Planning and Land Management Focal Person activities/ achievements during the month
and plans for the next month.
Draft Final Report of the Urban Planning and Land Management Focal Person’s work
three weeks before the end of the assignment; and
Final Report of the Urban Planning and Land Management Focal Person’s work, one
week after receiving comments from ULG Program Coordinator.
.
Page | 281
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
Page | 282
Annual budget;
Annual procurement plan
The planned use of the performance-based grants from UIIDP follows investment menu (only from
assessment in 2019 of the performance in FY 2018/19).
Management Procedures
Operationally, the Planning, Budgeting and Participation Focal Person will be accountable to the
ULG Program Coordinator to whom all reports and deliverables as per the TOR should be
submitted.
Expected Deliverables
Page | 283
Specific Deliverables
City’s development strategies, plans and budgets;
City’s capital investment plans, capacity building plans, action plans and budgets.
Monitoring and evaluation reports on performance of the city’s Development Plans,
programs and projects;
Data bank for planning, budgeting and decision-making purposes;
Review comments on the Annual Performance Assessment Reports of the city
regarding budgeting, planning and participation.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Planning,
Budgeting and Participation Focal Person activities/ achievements during the month and
plans for the next month.
Draft Final Report of the Planning, Budgeting and Participation Focal Person’s work
three weeks before the end of the assignment; and
Final Report of the Planning, Budgeting and Participation Focal Person’s work, one week
after receiving comments from ULG Program Coordinator.
Page | 284
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
Page | 285
DLI 2 - Institutional Performance (ULG Performance Measures)
2.6. Accountability and Transparency
2.6.1. Accountability and transparency in city operations and service delivery
2.6.1.2. Public dissemination (in city offices and other public places or web-pages, newspapers) of information
about: (a) Annual budgets; (b) Approved projects; (c) Expenditures; (d) Audited accounts; (e) Procurement
decisions; (f) APA results announced to public
2.6.1.3. Timely submission of quarterly progress reports for UIIDP as per the UIIDP M & E Guidelines (Yes/No
indicator)
Qualifications and Skills Required
The Monitoring and Evaluation Focal Person should possess the following qualifications/
competencies:
BA or B.Sc. degree in statistics, Demography, Sociology, Social Work, Economics,
Urban Management or a related field;
A minimum of 5 years’ general experience of which 2 years specific experience in
monitoring and evaluation systems of programs/projects.
Excellent writing and communication skills in English, excellent report writing skills.
Excellent command of computer programs and applications with significant capabilities
in computerized database, spreadsheet constructions and statistical software.
Knowledge of the urban sector issues in Ethiopia is an advantage
Level of Effort and Timing
It is expected that the assignment will start in May 2018 and finish in July 2023.
Management Procedures
Operationally, the Monitoring & Evaluation Focal Person will be accountable to the ULG
Program Coordinator to whom all reports and deliverables as per the TOR should be submitted.
Expected Deliverables
Specific Deliverables
UIIDP M & E system at city level.
Quarterly Progress Reports, Semi-Annual Report, Annual Report for UIIDP as per the
M&E Guidelines and other reports as required by City Manager.
Review comments on Annual Performance Assessment Reports of the
city.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
Monitoring & Evaluation Focal Person activities/ achievements during the month and
plans for the next month.
Draft Final Report of the Monitoring & Evaluation Focal Person’s work three weeks
before the end of the assignment; and
Final Report of the Monitoring & Evaluation Focal Person’s work, one week after
receiving comments from ULG Program Coordinator..
Page | 286
Page | 287
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a UIIDP Program Accountant, based at
OoFED, who will be responsible for fund flow, financial management and financial reporting.
Scope of the Assignment
The Program Accountant will have the following specific duties and responsibilities:
y. Review and understand the requirements of the UIIDP Financial Management Manual
and attend training on the manual which will be provided by federal and regional levels.
z. Maintain the UIIDP financial accounting and reporting system in IBEX.
aa. Ensure timely submission of expenditure documents and financial reports from the city
to BoFED;
bb. Maintain proper financial records and ensure the quality and consistency of all financial
data;
cc. Prepare the monthly UIIDP bank account reconciliations and submit to the region as per
the deadline set by the region.
dd. Prepare Semi-Annual Financial Reports for UIIDP and submit to BoFED as per the
deadline set in the UIIDP Financial Management Manual.
ee. Prepare annual financial statements for UIIDP within the deadline set in the UIIDP
Financial Management Manual and submit to BoFED for consolidation.
ff. Perform other duties assigned by the ULG Program Coordinator.
Page | 288
A minimum of 5 years’ general experience of which 2 years specific experience in
aspects of local government finance, public sector financial management, financial audit,
accounting, internal and external audit.
Excellent report writing skills in both Amharic and English.
Excellent command of computer programs and applications with significant capabilities
in computerized database, spreadsheet constructions and preferably knowledge of IBEX
system.
Knowledge of the urban sector issues in Ethiopia is an advantage.
Level of Effort and Timing
It is expected that the assignment will start in May 2018 and finish in July 2023.
Management Procedures
Operationally, the UIIDP Program Accountant will be accountable to the ULG Program
Coordinator to whom all reports and deliverables as per the TOR should be submitted.
Expected Deliverables
Specific Deliverables
UIIDP financial accounting and reporting system in IBEX.
Expenditure documents and financial reports submitted to BoFED;
Proper financial records;
Monthly UIIDP bank account reconciliations.
Semi-Annual Financial Reports for UIIDP.
Annual financial statements for UIIDP.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the UIIDP
Program Accountant activities/ achievements during the month and plans for the next
month.
Draft Final Report of the UIIDP Program Accountant’s work three weeks before the end
of the assignment; and
Final Report of the UIIDP Program Accountant’s work, one week after receiving
comments from ULG Program Coordinator.
Page | 289
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
gg. Follow up and take the necessary action to implement the recommendations of internal
and external audits.
hh. Ensure that procurement complaints are handled timely and properly as per the
procurement complaint regulations and manual
ii. Review the Annual Performance Assessment Reports of the city regarding procurement
management and provide comments
jj. Perform any other duties assigned by the Regional Program Coordinator.
The Procurement Management Focal Person will, as per the UIIDP Staff Performance Evaluation
& Incentive Scheme, also have weighted (100%) responsibility, and will be evaluated
accordingly, for the achievement of the following UIIDP DLIs and performance indicators by the
city.
Page | 290
1. DLI 1 - Minimum Conditions
1.1. ULG has produced and the council approved a:
1.4. Functional institutional set-up for procurement system in place according to public procurement
proclamation including:
(i) Procurement function and minimum core staff in place – at least two procurement Focal Persons within
procurement unit in ULG; with first degree and experience in procurement at least for two years
(j) Functional tender committee/tender award committee (TAC) at ULG level in place;
(k) Participating cities have the copies of their respective region’s procurement law, directives, manuals and
standard procurement documents and staffs are familiar with these legal documents
(l) Establishment of procurement performance monitoring and measurement using Public Procurement Key
Performance Indicators Guideline or equivalent.
(ii) Internal procurement audits are conducted and they are acceptable;
(iii) Follow up and update was done on the action plan for implementation of internal and external audit findings.
(v) Bid openings are conducted immediately after bid submission and minutes are acceptable
(ii) Contract was awarded to the legitimate bidder within bid validity period;
Page | 291
(iii) Availability of adequate auditable procurement records in a secured space.
Parameters to be assessed.
(i) Percentage (by no. and value) of procurement items not included in the original annual procurement plan should not
exceed 5%;
(ii) Average deviation between original Planned and Actual Procurement cycle time (procurement initiation-contract
completion) should not exceed 5%;
(iii) deviation between original price in the procurement plan and award price should not exceed 20%;
(iv) deviation between contract price and completion price (turnout cost) should not exceed 25%.
2.4.3.1. Competitiveness, Fairness and Transparency and Controls
Parameters to be assessed.
(i) Percentage (by no. and value) of procurements conducted through open bidding procedure is 85%;
(ii) Complaints resolved within the standard time frame is 100%;
(iii) the percentage of action taken from the previous procurement audit qualifications/ recommendations equals or
exceeds 90%.
Management Procedures
Operationally, the Procurement Management Focal Person will be accountable to the ULG
Program Coordinator to whom all reports and deliverables as per the TOR should be submitted.
Page | 292
Expected Deliverables
Specific Deliverables
Procurement strategies;
Annual Procurement Plans
Quarterly Monitoring Report on implementation of the Annual Procurement Plans.
Report on follow up and actions taken to implement the recommendations of internal
and external audits.
Review comments on the Annual Performance Assessment Reports of the city
regarding procurement management.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the
Procurement Management Focal Person activities/ achievements during the month and
plans for the next month.
Draft Final Report of the Procurement Management Focal Person’s work three weeks
before the end of the assignment; and
Final Report of the Procurement Management Focal Person’s work, one week after
receiving comments from ULG Program Coordinator.
Page | 293
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The Capacity Building Focal Person will be responsible for the following specific duties and
responsibilities:
z. Review and understand the requirements of the UIIDP Capacity Building Manual and
attend training on the manual which will be provided by federal and regional levels.
aa. Dissemination of the UIIDP Capacity Building Manual to all offices and members of
the focal persons team.
bb. Carry out the capacity self-assessment and gap analysis using the tools provided in the
UIIDP Capacity Building Manual.
cc. Formulate and develop capacity building strategies, plans and budgets, ensuring that
the UIIDP Eligible Capacity Building Areas are adhered to and that all the four
capacity building modalities are used;
dd. Monitor and evaluate the performance of city’s capacity building plan;
ee. Evaluate and report on the effectiveness of capacity building activities and training
programs provided under UIIDP by the city
ff. Review the Annual Performance Assessment Report of the city regarding capacity
building and provide comments
gg. Perform any other duties assigned by the ULG Program Coordinator.
The Capacity Building Focal Person will, as per the UIIDP Staff Performance Evaluation &
Incentive Scheme, also have weighted (100%) responsibility, and will be evaluated accordingly,
for the achievement of the following UIIDP DLIs and performance indicators by the city.
1. DLI 1 - Minimum Conditions
Page | 294
1.1. ULG has produced and the council approved a:
Management Procedures
Operationally, the Capacity Building Focal Person will be accountable to the ULG Program
Coordinator to whom all reports and deliverables as per the TOR should be submitted.
Expected Deliverables
Specific Deliverables
Self-assessment and gap analysis report.
Capacity building strategies, plans and budgets;
Monitoring and evaluation report on the performance of city’s capacity building plan;
Report on the effectiveness of capacity building activities and training programs
provided under UIIDP by the city
Page | 295
Review comments on the Annual Performance Assessment Reports of the city
regarding capacity building.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Capacity
Building Focal Person activities/ achievements during the month and plans for the next
month.
Draft Final Report of the Capacity Building Focal Person’s work three weeks before the
end of the assignment; and
Final Report of the Capacity Building Focal Person’s work, one week after receiving
comments from ULG Program Coordinator.
Page | 296
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
Page | 297
tt. Evaluate the effectiveness of the city’s local economic development strategies and job
creation strategies;
uu. Identify and resolve the challenges that face MSEs and prevent them from surviving or
graduating to the next level. Some of the challenges identified so far are lack of access
to finance, weak backward linkages to access raw materials and weak forward linkages
to buyers and markets, location issues in that MSE business premises are located far
away from potential customers.
vv. Put in place a mechanism/procedure, and arrange, for the selection of some MSEs based
on open business plan competition.
ww. Liaise and follow up with the Medium Manufacturing Enterprises Development Unit in
the city administration to ensure that graduated MSEs continue to receive support from
this Unit.
xx. Review the Annual Performance Assessment Reports of the city regarding local
economic development and job creation and provide comments
yy. Perform any other duties assigned by the ULG Program Coordinator.
The Local Economic Development & Job Creation Focal Person will, as per the UIIDP Staff
Performance Evaluation & Incentive Scheme, also have weighted (100%) responsibility, and will
be evaluated accordingly, for the achievement of the following UIIDP DLIs and performance
indicators by the city.
39
This refers to all serviced land allotted to firms engaged in economic activities including agriculture, services and
manufacturing.
40
This refers to working premises / sheds allotted to microenterprises, which should be serviced and provided with
water, electricity and a connective road
Page | 298
4.1.2.1. ULG held at least 2 public private dialogue/open meetings with city mayor and a wide range of private sector
representatives -structured meeting, mayor participation, presentation of constraints and economic potentials to
inform the CIP.
4.1.2.2. Implementation of min. 2 agreed actions from each meeting
4.1.3. Micro Small Enterprise
4.1.3.1. No. of MSEs supported through open business plan competitions, against annual target
4.1.3.2. No. of MSE One Stop Center (OSC) supported to be fully functional against annual target
4.1.3.3. No. of graduated MSEs provided with support from the Medium Manufacturing Enterprises Development
Unit in the city administration, against annual target
Management Procedures
Operationally, the Local Economic Development & Job Creation Focal Person will be
accountable to the ULG Program Coordinator to whom all reports and deliverables as per the
TOR should be submitted.
Expected Deliverables
Specific Deliverables
City’s local economic development strategies and plans.
ULG Local Economic Development Plan and Job Creation Plan.
Agenda, Attendance Register and Minutes of meetings on public private dialogue has
taken place as part of the preparation of CIPs.
Report on implementation of agreed actions form the public private dialogue..
Monitoring and evaluation report on performance of ULG’s Local Economic
Development Plans and Job Creation Plans.;
Page | 299
Data bank for local economic development and job creation;
Evaluate report on the effectiveness of local economic development strategies and job
creation strategies;
Report on challenges that face MSEs and prevent them from surviving or graduating to
the next level.
Mechanism/procedure, and report, on the selection of some MSEs based on open
business plan competition.
Report on the follow up with the Medium Manufacturing Enterprises Development Unit
in the city administration to ensure that graduated MSEs continue to receive support
from this Unit.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Local
Economic Development & Job Creation Focal Person activities/ achievements during the
month and plans for the next month.
Draft Final Report of the Local Economic Development & Job Creation Focal Person’s
work three weeks before the end of the assignment; and
Final Report of the Local Economic Development & Job Creation Focal Person’s work,
one week after receiving comments from ULG Program Coordinator.
Page | 300
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The objective of the TOR is to obtain the services of a qualified and experienced Urban
Resilience and Disaster Risk Management Focal Person who will be responsible for
strengthening the city’s resilience through (a) a better understanding of risks of shocks and
stresses and incorporating resilience into land use planning/ development; and (b) undertaking
measures to mitigate the risks through disaster and climate risk management, and improving
regulatory decisions and emergency preparedness.
Scope of the Assignment
The Urban Resilience and Disaster Risk Management Focal Person will have the following
specific duties and responsibilities:
z. Review and understand the requirements of the Urban Resilience and Disaster Risk
Management Manual and attend training on the manual which will be provided by
federal and regional levels.
aa. Work with the City Mayor and City Manager to establish the urban Disaster Risk
Management (DRM) institutional framework at city level (i.e. DRM Unit with dedicated
staff and budget).
bb. Ensure that the DRM unit develops an Emergency Response Plan and DRM strategy
including: (a) securing early warning on flooding, drought and high winds, and alerts for
earthquakes and landslides; (b) ensuring community disaster preparedness; (c)
developing contingency planning and budgeting; and (d) exploring risk financing and
insurance options.
cc. Undertake an assessment of the fire support services provided by the city to identify the
specific training and equipment needed to improve response capacity for densely
populated buildings and neighborhoods.
dd. Based on the abovementioned assessment of fire support services, develop a local plan
to provide mobile firefighting units and search and rescue equipment appropriate for
city responses to fire incidents.
ee. Monitor and evaluate performance of ULG’s Disaster Risk
Management Strategies/Plans and Emergency Response Plans;
Page | 301
ff. Monitor compliance with UIIDP POM and other manuals in regard to urban resilience
and disaster risk management;
gg. Review the Annual Performance Assessment Reports of the city regarding urban
resilience and disaster risk management and provide comments
hh. Perform any other duties assigned by the ULG Program Coordinator.
The Urban Resilience and Disaster Risk Management Focal Person will, as per the UIIDP Staff
Performance Evaluation & Incentive Scheme, also have weighted (100%) responsibility, and will
be evaluated accordingly, for the achievement of the following UIIDP DLIs and performance
indicators by the city.
Page | 302
A minimum of BA or B.Sc. Degree in Environmental Sciences, Natural Resources
Management, Sociology, Social Work, Public Health, Disaster Risk Management,
Climate change or related.
A minimum of 5 years general experience of which 2 years specific experience in
environmental management, climate change, urban resilience and disaster risk
management.
Excellent writing and communication skills in English, excellent report writing skills.
Excellent command of computer programs and applications with significant capabilities
in computerized database, spreadsheet constructions.
Knowledge of the urban sector and climate change issues in Ethiopia is an advantage.
Management Procedures
Operationally, the Urban Resilience and Disaster Risk Management Focal Person will be
accountable to the ULG Program Coordinator to whom all reports and deliverables as per the
TOR should be submitted.
Expected Deliverables
Specific Deliverables
DRM Unit established with dedicated staff and budget.
Emergency Response Plan and DRM strategy including: (a) securing early warning on
flooding, drought and high winds, and alerts for earthquakes and landslides; (b) ensuring
community disaster preparedness; (c) developing contingency planning and budgeting;
and (d) exploring risk financing and insurance options.
Assessment report on the fire support services provided by the city.
Local plan to provide mobile firefighting units and search and rescue equipment
appropriate for city responses to fire incidents.
Monitoring and evaluation report on performance of the city’s Disaster Risk
Management Strategies/Plans and Emergency Response Plans;
Review comments on the Annual Performance Assessment Reports of the city
regarding urban resilience and disaster risk management.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Urban
Resilience and Disaster Risk Management Focal Person activities/ achievements during
the month and plans for the next month.
Draft Final Report of the Urban Resilience and Disaster Risk Management Focal
Person’s work three weeks before the end of the assignment; and
Final Report of the Urban Resilience and Disaster Risk Management Focal Person’s
work, one week after receiving comments from the ULG Program Coordinator.
Page | 303
Page | 304
…………………………………….. CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE
DEVELOPMENT PROGRAM
(UIIDP)
The Consultant will, as per the UIIDP Staff Performance Evaluation & Incentive Scheme, also
have weighted (100%) responsibility, and will be evaluated accordingly, for the achievement of
the following UIIDP DLIs and performance indicators by the city.
Page | 305
Rolling three-year capital investment plan (CIP) with
Annual action plan;
Annual budget;
Annual procurement plan
The planned use of the performance-based grants from UIIDP follows investment menu (only from
assessment in 2019 of the performance in FY 2018/19)
Note: The Gender Focal Person will review the gender responsiveness of the CIP, especially regarding the level
of women participation in identification and prioritization of projects and the number of women employed
through infrastructure works under UIIDP. He/she will then provide guidance to regions/ULGs as necessary.
Management Procedures
Operationally, the Gender Focal Person will be accountable to the ULG Program Coordinator to
whom all reports and deliverables as per the TOR should be submitted.
Expected Deliverables
41
This refers to all serviced land allotted to firms engaged in economic activities including agriculture, services and
manufacturing.
42
This refers to working premises / sheds allotted to microenterprises, which should be serviced and provided with
water, electricity and a connective road
Page | 307
Specific Deliverables
Annual Gender Development Plan and Budget.
Agenda, Attendance Register and Minutes of quarterly meeting with gender focal
persons from each sector Office;
Performance standards and indicators for the city to use on gender mainstreaming and
responsiveness;
Monitoring and evaluation report on performance of the city’s Annual Gender
Development Plan
Evaluation report on the effectiveness of the city’s gender mainstreaming and
responsiveness on the UIIDP;
Training plan, training materials and training reports.
Review comments on the Annual Performance Assessment Reports of the city
regarding gender mainstreaming and responsiveness.
General Deliverables
Inception Report and detailed work plan within three weeks of commencement of the
assignment.
Monthly Progress Reports within 7 (seven) days of the end of the month on the Gender
Focal Person activities/ achievements during the month and plans for the next month.
Draft Final Report of the Gender Focal Person’s work three weeks before the end of the
assignment; and
Final Report of the Gender Focal Person’s work, one week after receiving comments
from ULG Program Coordinator
Page | 308
7. TOR for Value for Money Audit for EFY 2010 for 1st APA of
UIIDP
TERMS OF REFERENCE
FOR
Page | 309
Contents
Introduction.....................................................................................................................................3
Additional Annexes.........................................................................................................................3
1. Organization, Staffing & TORs for Federal Mobile Team, Regional Mobile Team &
ULG Focal Persons.........................................................................................................................3
2. TOR for Value for Money Audit for EFY 2010 for 1st APA of UIIDP..............................4
1 INTRODUCTION....................................................................................................................7
1.1 Ethiopian Cities Sustainable Prosperity Goals (ECSPG).................................................7
1.2 Urban Institutional and Infrastructure Development Program.......................................10
2 BACKGROUND TO THE ASSIGNMNET..........................................................................15
2.1 Investment Menu and Capital Investment Plans of ULGs for EFY 2010 (2017/18).....15
2.2 Project Requirements in regard to VfM Audit................................................................20
3 OBJECTIVE OF THE ASSIGNMENT.................................................................................20
4 TASKS....................................................................................................................................20
5 SCHEDULING /TIME TABLE.............................................................................................22
6 EXPECTED OUT PUTS /DELIVERABLES........................................................................23
7 QUALIFICATIONS AND EXPERIENCE OF KEY PERSONNEL.....................................23
8 INPUTS TO BE PROVIDED BY THE CLIENT..................................................................25
9 ACCOUNTABILITY AND REPORTING RELATIONSHIPS............................................25
3. TOR for Annual Independent Procurement Audit for EFY 2010...................................27
10 INTRODUCTION..............................................................................................................28
10.1 Ethiopian Cities Sustainable Prosperity Goals (ECSPG)...............................................28
10.2 Urban Institutional and Infrastructure Development Program.......................................30
11 BACKGROUND TO THE INDEPENDENT PROCUREMENT AUDIT OF ULGS
PARTICIPATING IN UIIDP.........................................................................................................35
12 Objectives of the INDEPENDENT procurement audit......................................................36
13 Scope of the Procurement Audit.........................................................................................37
14 Methodology of the Procurement Audit.............................................................................37
Detailed Steps and Procedures........................................................................................................38
15 Deliverables........................................................................................................................40
16 Duration of the Procurement Audit and assignment of staff for the audit..........................41
17 Team composition and qualifications.................................................................................41
4. TOR for Annual Environmental and Social Audit for EFY 2010....................................57
TOR for Annual Environmental & Social Audit............................................................................57
Page | 310
Ethiopian Cities Sustainable Prosperity Goals (ECSPG)...........................................................57
Urban Institutional and Infrastructure Development Program...................................................60
5. TOR for Financial Audit of UIIDP for EFY 2010............................................................69
TOR for UIIDP financial Audit......................................................................................................69
6. CIP Template........................................................................................................................75
7. REP Template.......................................................................................................................75
8. Procedures of use of SOEs and MSEs including their registration, incentive
mechanisms, monitoring and graduation procedures...............................................................75
List of Tables
Page | 311
1. INTRODUCTION
The Ministry of Urban Development and Housing (MUDHo) has introduced the Ethiopian
Cities Sustainable Prosperity Goals (ECSPG) that will lead to the establishment of Green
Growth, Resilient and Well Governed Cities that support Ethiopia’s transformation from a
predominantly agricultural nation to a nation with a rapidly growing industrial sector that
contributes to the economic growth necessary to achieve middle income country status by
2025. The ECSPG is the Ministry’s contribution to the Government of Ethiopia’s Growth
and Transformation Plan (GTP 1) 2010/11-2014/15; (GTP 2) 2015/16-2019/2020; & (GTP
3) 2020/21-2024/25.
The continuous and substantial movement of people from rural villages and homesteads to
urban villages, small, medium, and large towns, and to the capital city, and the resulting
rapid urbanization, is necessary to support the development of industrial, manufacturing, and
service sectors. The societal change that will accompany the agricultural to industrial
transformation can only be accomplished successfully with careful and meticulous advance
planning that addresses all aspects of the transformation simultaneously. It is for this reason
that the Ministry has developed the Ethiopian Cities Sustainable Prosperity Goals. Its aim is
to build the frameworks and provide the foundations – in our towns and cities and in the
construction industry – to achieve the country’s vision and for the continued advancement of
that vision.
The ECSPG comprises nine pillars – or dimensions - that will contribute to the achievement
of middle income country status and bring the desired political-economic transformation.
Growth is a key objective of the Ministry’s initiatives and programs for urban development
and housing; the main economic objective. The main elements of the political component of
the nine pillars that make up the ECSPG are good governance, democratization at local level
and the satisfaction of citizens and residents with the delivery of public services and
performance of government – at local, regional and federal levels. Together, the economic
and political interventions of the ECSPG will produce the prosperity that accompanies
achievement of middle income country status.
The ECSPG’s nine strategic pillars will contribute to Ethiopia’s achievement of middle
income country status by producing a transformation in the economic productivity and in the
good governance of cities. Economic transformation will be achieved by increased good
urban governance in general and in the focus of the ECSPG on Job Creation - Micro &
Small Enterprise Development in particular. This focus will be supported by improvements
in land use planning, serviced land delivery, housing development, infrastructure, services
and green growth development. Investments in all these areas and mobilization of resources
to meet increasing operating and investment costs are a main focus of the MUDHo.
The attention given to economic development and governance does not neglect social and
environmental development, nor will the key GTP cross cutting issues be neglected. These
include gender and children’s affairs, youth and sports development, HIV/AIDS prevention
Page | 312
and control, social welfare, labor affairs, population and development, culture and tourism,
science and technology, environment and climate change.
The developmental framework for the ECSPG aims to bring prosperity to Ethiopia’s
cities. The ECSPG programs, sub-programs and projects will be implemented through to
2025 with GTP, SDG and benchmarked middle income country indicators measured against
achievement of targets in three indexed areas: good governance, economic and social
development (growth) and citizens’ satisfaction.
In terms of achievement of the targets, goals and vision we will continuously ask questions,
learn lessons and fine tune the Ministry’s interventions to answer the following:
SUSTAINABLE PROSPERITY
8. Growth Index (supply side) What is required in the development of Ethiopia’s urban
centers to create jobs, encourage entrepreneurs, increase investment, develop land,
industry, housing and public utilities and strengthen the framework for job creation (e.g.:
trade, industry, telecommunications, leadership, increase trade and exports); and lastly:
9. Citizens’ Satisfaction (Public Perceptions) Index (demand side): What are public
perceptions of the development of urban centers and cities? How can we, continuously,
identify public perceptions and attitudes, incorporate them into policies, strategies and
programs and thus effectively mobilize public opinion and public resources for the
achievement of the 2025 Vision.
Page | 313
The Economic and Social Development, Developmental Good Governance and Citizens’
Satisfaction indices will be measured to determine: the current baseline; the GTP 2 and GTP
3 performance targets; and the benchmarked performance targets to 2025, linked to
comparable middle income country achievements.
This baseline data, GTP 2, GTP 3 and 2025 benchmark targets will, in the three areas
described, comprise overall our “Prosperity Index”. The aim is to establish the Cities’
Prosperity Index, containing the three elements described – growth, governance and citizens’
satisfaction for: a) urban centers and cities with a population of 20,000+ in the Central
Statistical Agency census, and add cities that achieve this population level; and b) rural
development centers that contain basic clustered education, health and administrative
facilities as well as commercial services.
The ECSPG contains ten pillars, 12 programs / sub-programs and 43 projects for urban
development:-
Pillar 1. Urban Transformational Leadership
Page | 314
1.2. Urban Institutional and Infrastructure Development Program
The Ministry of Urban Development & Housing, Regional Democratic Republic of Ethiopia,
with support from the World Bank and the Agence Francaise de Developpement (AFD is
implementing the Urban Institutional and Infrastructure Development Program (UIIDP) during
the period from March 2018 to December 2023.
The UIIDP will provide Performance Grants (PGs) for investments in infrastructure and services
and in capacity building for 117 urban local governments (ULGs) and capacity building in all
nine Regional Governments (RGs), MUDHo and several Regional Ministries/Agencies.
The UIIDP is being financed through World Bank & AFD Program-for-Results (PforR) financing
instrument at the regional and ULG levels and an Investment Project Financing (IPF) instrument
at the Regional level. The regional governments and urban local governments are expected to
provide matching funds (counterpart contributions) as per the percentages agreed between
MUDHo and the World Bank which are stated in the IIDP Program Operations Manual.
Funding available under the UIIDP will depend on the performance of each city and Regional
Government assessed annually against verifiable results described in the Program Operations
Manual (POM) and in the Annual Performance Assessment Guideline (APAG) which is a
standalone Annex of the POM.
43
In the core thematic areas of: Planning and budgeting, assets management, public financial management,
procurement, own source revenues, accountability and transparency, environment and social safeguards, land
management, and strategic urban planning.
Page | 316
Amhara
32 Cities
BG
Gambella
Oromia
Harari
38 Cities
Dire Dawa
(1 city each)
Total
117
Afar cities SNNPRS
23 cities
4 cities
Tigray
Ethiopian Somali
12 cities
4 cities
44
Regions and cities contribute to the performance based transfers in the following manner: Amhara, Oromia,
SNNPR, and Tigray: 30 percent funding in addition to IDA funded grants; DRS regions: 20 percent; original 16
ULGDP I ULGs: 40 percent; new cities under ULGDP II in the DRS regions 10 percent; and other new (ULGDPII)
cities: 20 percent; Harar and Dire Dawa contribute 50 percent in addition to the IDA funded grants. The new 73 ULGs
under UIIDP will follow the same principles as the ULGDPII newcomers.
Page | 317
ULGs will use the Program funds to finance urban infrastructure works as well as capacity
building activities, in compliance with the Program’s investment menu and capacity building
manual. Eligible infrastructure investments fall under eight groups including: (a) urban roads, (b)
integrated infrastructure and land services, (c) sanitation (liquid waste), (d) solid waste
management, (e) urban drainage, (f) urban disaster risk management and urban resilience, (g)
built facilities, and (h) urban green infrastructure. Ineligible investments include any World Bank
environment and social impact assessment Category A projects. Compliance with the investment
menu is a minimum condition for receiving funds. In addition, ULGs will be required to prepare
the project in a participatory manner, and consider: (a) social inclusion requirements, including
gender and disability considerations; (b) climate change and disaster adaptation; and (c)
contribution to LED and long-term job creation. 45 ULGs could also spend up to 5 percent of
investment grants and regional/city contributions on capacity building support. For regional
government entities, the grants will mainly be used for capacity building, operations and
management expenses, subject to the eligible capacity building areas, similar to the ULGs.
Disbursement Linked Indicators, Minimum Conditions, Performance Measures and Verification
Protocols
Almost 96 percent (or around US$576 million) of the Operation’s funds will be disbursed against
disbursement linked indicators (DLIs). The DLIs are structured to provide incentives to
participating ULGs and regional governments for improved management and development of
urban areas. (More details on the DLIs, MCs, PMs, performance assessments, verification
protocols and disbursement arrangements are provided in the UIIDP Annual Performance
Assessment Guideline (APAG) which is a part of this POM and is a standalone Annex of the
POM
DLIs 5 to 9 focus on regional government entities to enhance their abilities in fulfilling their
mandates to support ULGs. These DLIs will disburse based on results achieved by regional
government entities in providing support to ULGs (DLI 5) as well as focusing on their
performance in conducting essential audits for ULGs such as on fiduciary and environmental and
social management.
DLI 10 is a legacy DLI disbursing against prior results achieved under the ULGDP II that
has arisen due to overachievement of performance results. This DLI will be disbursed upon
verification in FY 2018/19, when the fifth APA of the ULGDP II has been completed in February
2018.
45
Details of and procedures for the use of investment project prioritization and selection criteria will be included in
the POM.
Page | 318
Collectively the DLIs address the PDO and key result areas. The DLIs are designed to address
the challenges of ULGs’ and regional governments’ institutional performance and, in turn, ULGs’
ability to deliver, operate, and manage infrastructure and services, and expand LED. They
provide incentives to address the core issues such as on timely audit, social and environmental
management, own-source revenue generation, and strengthen the system and procedures for
capacity building. In addition, there is enhanced focus to strengthen urban resilience, promote
LED and job creation, and enhance gender equality. The PMs have a direct link to the key result
areas and the GoE’s program intended outcomes.
Page | 319
2. BACKGROUND TO THE ASSIGNMNET
2.1. Investment Menu and Capital Investment Plans of ULGs for EFY 2010 (2017/18)
The menu of investments eligible for funding under the Program are in the Table below.
ULGs are encouraged to focus on projects that will contribute directly to creating jobs
and increasing incomes, including those using labor-intensive techniques.
Table 4. UIIDP performance grant investment menu
Infrastructure/Service Type
Roads Expenditure group 1: Cobblestone, gravel, red ash and earthen
roads. (asphalt roads are not eligible)
Expenditure group 2: Rehabilitation of roads (except asphalt),
bridges, fords and culverts, pedestrian walkways or footpath, cycle
path, paved area, roundabout, street lighting, road signs and traffic
lights, bus terminals, bus stop/station.
Note: Note: Road works outside of existing rights-of-way or require
significant resettlement of people (more than 200 people, project-
specific) will not be eligible for funding under the UIIDP.
Integrated multiple infrastructure and Expenditure group 3: Servicing of land with utilities (water supply,
land services (residential, micro and small electricity, telecommunications, roads and drains (within planned
enterprises, industrial zones, tourism right of way, as per the structural plan/local development plan)),
sites) solid and liquid waste collection and disposal.
Sanitation (liquid waste) Expenditure group 4: Sewer reticulation systems (no large canals46),
wastewater treatment ponds/treatment plants, sludge ponds,
community soak away pit and septic tanks, public and communal
toilets, ventilated improved pit, Ecosan, biogas and vacuum trucks,
vacuum handcart. (in planning and implementation cities must
follow manual and standard from Urban Water Supply and
Sanitation Project.)
Solid waste management Expenditure group 5: Collection trucks and other collection tools,
collection bins, transfer stations, recycling center/sorting facilities,
collection points; skips and skip loaders, hand push carts, landfills47
(of the size of maximum 10 hectares and minimum design criteria as
per the solid waste management manual), biogas and composting
plants; and landfill site equipment including compaction vehicles,
garbage truck, grader, dozer, loader, dump truck and excavator
Urban drainage Expenditure group 6: Drainage systems (follow the guideline
46
Sewer reticulation systems canals (primary canals) shall not exceed in diameter 1,000 millimeters or 10
kilometers.
47
Landfills: To ensure that all landfills activities to be environment friendly and socially acceptable with no or
minimum impacts to the nearby environment, landfills construction and operation activities should not exceed 10
hectares and with provisions as stated in MoUDH standard. These include, among others: all landfills should have 1.
bottom lining system with compact clay soil and covered by geo-membrane (synthetic linings) to separate the trash
and subsequent leachate from groundwater; 2. Leachate collection system to collect rain or other water percolated
through landfill which possibly contains contaminating substances (leachate); 3. Oxidation or other treatment ponds
for further treatment of leachate; 4. Methane collection system/gas management to collect methane gas that is
formed during the breakdown of trash; 5. Runoff water drainage system to prevent rain water flash from the nearby
area; and 6. Composting yard and other facilities within the landfill site and upstream collection and transportation
area. Cities should comply with the national standard and classification set by MoUDH. Also, cities must conduct
landfill feasibility study, ESIA and RAP for review and clearance. All landfills are subject to regional environmental and
social performance review and annual audits.
Page | 320
Infrastructure/Service Type
developed by the MoUDH), flood control systems.
Urban disaster risk management and Expenditure group 7: Fire brigade equipment, trucks, facilities, fire
initiatives to enhance resilience48 stations, non-grid renewable energy supply (e.g. solar, wind),
landslide protection structures
Built facilities Expenditure group 8: Markets for small businesses not exceeding
ground floor with associated services (water supply, drainage,
access roads, sanitation facilities), upgrading the existing markets,
one-stop shops, slaughter houses (abattoirs)49(not exceeding size of
2 ha and the category of level B, C, and D) with by-products and
processing facilities, abattoir trucks, production and premises, sales
and display centers for MSEs, community center, youth center,
cultural centers
Urban green infrastructure Expenditure group 9: Urban parks, public spaces and greenery
development projects.
Consultancy services for design, studies Expenditure group 10: For studies relating to preliminary and
and contract management detailed design, contract documentation and supervision relating to
the above infrastructure and services.
Capacity Building Support Expenditure group 11: Up to 5 percent of investment grants and
regional/city contributions can be utilized on capacity building
support, see menu for capacity building support below.
Notes for investments:
a) Current maintenance and operational costs, including salaries, should not be funded by the
UIIDP grant. Other ULG sources, including OSR should be used for these expenditures. The
performance system will promote planning and actual provision for this to ensure longer-term
sustainability.
b) The investment menu above explicitly excludes possible high-risk activities and Category
“A” types of activities. Investments, which according to the WB Operational Manual for
Environmental Assessment (OP 4.01) are classified in Category A are explicitly excluded from the
Program. These “…are projects which are likely to have significant adverse environmental
impacts that are sensitive, diverse, or unprecedented. These impacts may affect and area broader
than the sites or facilities subject to physical works”. Category A projects are not supported by
PforR operations and ULGs cannot use the UIIDP grants for these types investments.
c) While the scope and scale of works under the Program are not expected to cause significant
adverse environment and social impacts, the current EIA procedures in Ethiopia require
that all investments are screened for negative impacts that are sensitive, diverse, or
unprecedented on the environment and/or affected people.
48
Only cities who have emergency response unit and emergency plan are eligible
49
Slaughterhouse/abattoir: Slaughterhouse construction should follow the MoUDH standards and classification for
environmentally safe implementation of the investment. Slaughterhouse under the program should not exceed 2ha
(level B, C, and D) of the MoUDH classification. The following provisions should be included in the design for
construction and operation phase. These are: 1. liquid waste treatment plant, which is sited at minimum distance of
50 meter from slaughter house; 2. separate closed drainage line for collection of liquid wastes from slaughterhouse to
the septic tank; 3. septic tank bed level shall be below nearby ground water level; 4. slaughter house at metropolitan
cities shall have rendering plant with smell nuisance control; 5. Runoff water drainage system to prevent rain water
flash from the nearby area; and 6. Other facilities like guardhouse and water points. Cities should comply with the
national standard and classification set by MoUDH. Cities must conduct Slaughterhouse feasibility study, ESIA and RAP
for review and clearance. All slaughterhouses are subject to regional environmental and social performance review
and annual audits
Page | 321
d) Siting, design, construction and implementation of all physical infrastructure must consider
risk map/disaster risk management plan and integrate measures to make them resilient to
climate change and disaster impacts.
Siting and construction: Steps should be taken screen location of physical infrastructure to
minimize exposure to disasters (flood, earthquake, drought, fire, landslides)
Design and implementation: Design and operation of infrastructure and services need to
consider climate and disaster impacts. Additionally, sanitation and solid waste management
facility tot consider waste segregation, treatment and reduce contamination of water sources
in the event of flooding or other disasters.
e) In addition to screening for significant negative impacts, the following works will be
ineligible for financing under the UIIDP:
Road works outside of existing rights-of-way;
Infrastructure works that require significant resettlement of people (more than 200 people,
project-specific)
Activities that would significantly convert natural habitats or significantly alter potentially
important biodiversity and/or cultural resource areas.
Canals (Sewer reticulation systems canals (primary canals)) should not exceed in diameter
1,000 millimeters or 10 kilometers
All landfills should comply with minimum design criteria as per the solid waste management
manual, not exceeding 10ha. ULGs, in the design of sanitary landfills, will be required to
demonstrate a system of waste segregation, collection, transportation, treatment, and disposal
of leachates, before they start landfill constructions.
Slaughter houses (abattoirs) should not exceed size of 2 ha, within the category of level B, C, and D.
To provide an indication of the size of investments the cities have planned to make in
EFY 2010, the approved Capital Investment Plans for all the 44 cities are as follows:-
Page | 322
Table 5. CIP Budgets for EFY 2010 (2017/18) for the 44 cities
Page | 324
2.2. Project Requirements in regard to VfM Audit
The UIIDP Financing Agreement signed between Government of Ethiopia and the
World Bank provides that
The UIIDP PAD states that “
The UIIDP Project Operations Manual (POM) states that “
The MUDHo therefore intends to secure the services of OFAG or its delegate to carry out
the Value for Money Audit and answer the questions raised above as well as provide
inputs into the 1st UIIDP Annual Performance Assessment (APA) in regard to DLI 3.4.
Quality of Infrastructure.
3. OBJECTIVE OF THE ASSIGNMENT
The objective of the assignment is to obtain the services of Office of Federal Auditor
General (OFAG) (or its delegate) to carry out a Value for Money (VfM) Audit of
UIIDP investments for EFY 2010 (2017/18) in all the participating 44 ULGs in
Ethiopia. The services will also include carrying out a full technical and financial
review of the various activities/contracts and an assessment of the quality of
infrastructure to provide inputs into, and evidences for, the 1st APA.
3.1. TASKS
(a) review all program documents and interview relevant program staff at
federal, regional and city levels and other stakeholders to get an
understanding of the program objectives, requirements and current status;
(b) visit each of the 44 participating cities to carry out the VfM audit for a
sample of the investments based on but not limited to the criteria of
economy, efficiency and effectiveness of the investments and funds
utilization;
(d) identify the likely Operations and Maintenance costs of the sampled investments
and how these have been taken into account in the planning, project appraisal and
budgeting processes;
(e) assess the appropriateness of the infrastructure delivery approach; quality of
procurement process including: Design documents, Bidding documents,
specifications and bill of quantities for all items procured;
Page | 325
(f) assess whether the contract award prices are within budget and market rates and
that they demonstrate that proper value is achieved in the process;
(g) assess the quality of contracts delivery in terms of their timelines, cost and quality
performance in achieving good value for money;
(h) assess the delivered contracts/projects (outputs) are fit for the purpose and serving
the intended objectives well;
(i) Inspect and record all the evidences (references and dates) to be produced by the
cities which are as follows as per the APAG:-
i. Urban infrastructure physical implementation/ progress report (disaggregated
by categories and locations) under the CIP for the previous FYs since the
beginning of the program;
ii. Urban infrastructure budget expenditure report from IBEX (disaggregated by
categories and locations) under the CIP for the previous FYs since the
beginning of the program;
iii. Design documents, bidding documents, specifications and bill of quantities
for all items procured;
iv. Contract agreement and contract amendments for all items procured;
v. Change orders and payment certificates for all items procured; and
vi. Provisional and final handover (acceptance) for all items procured.
(j) carry out the assessment of quality of infrastructure using the VfM Assessment
Tool in Annex 1 and as per the requirements of the APAG which provides that
“Percentage of projects implemented with a satisfactory level of value for the
money, calibrated in the value for the money assessment tool. The percentage of
projects with a satisfactory level of value for the money will be reflected in the
score multiplied by 0.20 (20 percent which is the weight of this indicator), that is
80 percent satisfactory projects=16 points, 60 percent = 12 points. The score on
this indicator will be rated between 0–20 points. The value for the money of each
project (level of satisfactory value for the money) will be assessed and there will be
a weighting of these to get a total score. The weight of each project will depend on
the size (contract value) of the projects. The input from this will be provided by the
value for the money audits to the APA Consultant to be included in the calibration
and in the final calculation of the size of the allocations.”
Table 6. Calculation example for VfM satisfactory level for each ULG
VfM Weighted
Contract amounts in
Projects Satisfactory contract
Birr
level amounts
This ULG would then get from the APA Consultant 17.2 points i.e. (20*86%) in
the APA for this indicator.
Page | 326
The OFAG is only expected to produce the above table for each of the 44 cities and
provide it to the APA Consultant who will then make the calculation on the points
to be awarded to each city for this indicator.
MUDHo will provide OFAG with an Excel format for entering the scores for all
sampled projects for each of the 44 cities and for the consolidated scores.
(k) based on all the above findings, audit and assessment, prepare a draft VfM Audit
Report and Assessment Report for each of the 44 cities.
(l) prepare a draft Synthesis Report summarizing the findings, conclusions and
recommendations for all the cities which will be presented at a workshop to be
arranged by MUDHo. Produce workshop report.
(m) incorporate comments received from all stakeholders at the workshop and other
written comments from MUDHo and the World Bank and produce the Final VfM
Audit Reports (signed and sealed) and Assessment Reports for each city and the
Final Synthesis Report.
(n) In carrying out the Technical Assessment, the following will be important among
others:
OFAG (or its delegate) is expected to commence services on July 15, 2018 with field work
commencing on August 1, 2018 and complete field work by not later than October 15,
2017. The assignment shall be completed by not later than November 15, 2017 with
submission of Final VfM Audit Reports for all 44 ULGs and Synthesis Report
simultaneously to MUDHo and World Bank.
Page | 327
5. EXPECTED OUT PUTS /DELIVERABLES
The minimum set of deliverables and approximate time schedules are provided in the Table
below. OFAG (or its delegate) may propose additional deliverables and milestones in its
Technical Proposal.
Table 7. Deliverables and Schedule
Page | 329
Financial Management/Audit Experts (4#):
Expert in financial management and audits with professional qualifications in Finance
related fields (first degree) or Masters/equivalent degree in Economics, Public Finance or
Accountancy. A minimum of 10 years working experience with at least 5 years in fields
such as audit, accounting/administration; local revenues; intergovernmental fiscal
relations involving public sector entities and or local government governments within
Ethiopia and/or Sub –Saharan Africa.
Civil/Infrastructure Engineers/ sustainable infrastructure specialists (#4):
Graduate civil engineer with a minimum of 10 years working experience, at least 5 years
of which have involved specific expertise in the area of local infrastructure projects and
development. Practical experience of national and local government procurement systems
and procedures for works and goods and consultancy services in Ethiopia and/or Sub –
Saharan Africa will be an added advantage.
7. INPUTS TO BE PROVIDED BY THE CLIENT
The client will provide to OFAG (or its delegate) at the commencement of the assignment,
the relevant documents required for the assignment and other documents as and when
requested.
The following documents will be provided by MUDHo and the cities:
UIIDP Financing Agreement dated ………………...
UIIDP Program Appraisal Document ( PAD) dated………………
UIIDP Program Operations Manual (POM) Volume 1 and 2 dated ………..
UIIDP Environmental and Social Management System and Guidelines (ESMSG)
dated ……………….. and UIIDP Resettlement System Guidelines (RSG) dated
………………………...
UIIDP Annual Performance Assessment Guideline (APAG) dated ……………… or
latest version.
Capital Investment plans including Annual Procurement Plans for all the 44 cities
for EFY 2010 (2017/18)
Asset Management Plans for the 44 cities for EFY 2010-12
Revenue Enhancement Plans for the 44 cities for EFY 2010-12
Semi-Annual and Annual Reports of the ULGDP II.
8. ACCOUNTABILITY AND REPORTING RELATIONSHIPS
Contractually, OFAG (or its delegate) will be accountable to the Bureau Head, Urban
Revenue Enhancement, Fund Mobilization and Finance Bureau (UREFMFB) to whom all
reports and deliverables as per the TOR should be submitted. As agency responsible for the
overall coordination and implementation ULGDP, the Urban Revenue Enhancement, Fund
Mobilization and Finance Bureau (UREFMFB) will sign the contract (or MOU) with OFAG
(or its delegate) on behalf of Ministry of Urban Development and Housing. The UREFMFB
Page | 330
will also be responsible for all payments to OFAG (or its delegate) once the work has been
accepted and cleared for payment. OFAG (or its delegate) is expected to draft a detailed
work schedule that elaborates the tasks to be performed and the specific dates of deliverables
for UREFMFB 's approval.
1st Draft
January 13, 2018
UREFMFB, MUDHo
Page | 331
Annex 1: VfM Assessment Tool
TERMS OF REFERENCE
FOR
BY
1. INTRODUCTION
The Ministry of Urban Development and Housing (MUDHo) has introduced the Ethiopian
Cities Sustainable Prosperity Goals (ECSPG), EFY 2006 (GC 2013/14) to EFY 2017 (GC
2024/25), which will lead to the establishment of Green Growth, Resilient and Well
Governed Cities that support Ethiopia’s transformation from a predominantly agricultural
nation to a nation with a rapidly growing industrial sector that contributes to the economic
growth necessary to achieve middle income country status by 2025. The ECSPG is the
Ministry’s contribution to the Government of Ethiopia’s Growth and Transformation Plan
(GTP1) 2010/11-2014/15 and (GTP 2) 2015/16-20/2020.
The continuous and substantial movement of people from rural villages and homesteads to
urban villages, small, medium, and large towns, and to the capital city, and the resulting
rapid urbanization, is necessary to support the development of industrial, manufacturing, and
service sectors. The societal change that will accompany the agricultural to industrial
transformation can only be accomplished successfully with careful and meticulous advance
planning that addresses all aspects of the transformation simultaneously. It is for this reason
that the Ministry has developed the ECSPG. Its aim is to build the frameworks and provide
the foundations – in our towns and cities and in the construction industry – to achieve the
country’s vision and for the continued advancement of that vision.
Page | 333
The ECSPG comprises nine pillars – or dimensions - that will contribute to the achievement
of middle income country status and bring the desired political-economic transformation.
Growth is a key objective of the country’s initiatives and programs for urban development
and construction; the main economic objective. The main elements of the political
component of the nine pillars that make up the ECSPG are good governance,
democratization at local level and the satisfaction of citizens and residents with the delivery
of public services and performance of government – at local, regional and federal levels.
Together the economic and political interventions of the ECSPG will produce the prosperity
that accompanies achievement of middle income country status.
The ECSPG’s nine strategic pillars will contribute to Ethiopia’s achievement of middle
income country status by producing a transformation in the economic productivity and in the
good governance of cities. Economic transformation will be achieved by increased good
urban governance in general and in the focus of the ECSPG on job creation - micro & small
enterprise development in particular. This focus will be supported by improvements in
leadership development, land use planning, serviced land delivery, housing development,
construction industry development, infrastructure, services and green growth development.
Investments in all these areas and mobilization of resources to meet increasing operating and
investment costs are a main focus of the MUDHo.
The attention given to economic development and governance does not neglect social and
environmental development, nor will the key GTP cross cutting issues be neglected. These
include gender and children’s affairs, youth and sports development, HIV/AIDS prevention
and control, social welfare, labor affairs, population and development, culture and tourism,
science and technology, environment and climate change.
The ESCPG is being implemented through many programs including through the Second
Urban Local Government Development Program (ULGDP II) under which many of the
investments envisaged under the ECSPG and GTP 2 are being made.
Page | 334
1.2. Urban Institutional and Infrastructure Development Program
The Ministry of Urban Development & Housing, Regional Democratic Republic of Ethiopia,
with support from the World Bank and the Agence Francaise de Developpement (AFD is
implementing the Urban Institutional and Infrastructure Development Program (UIIDP) during
the period from March 2018 to December 2023.
The UIIDP will provide Performance Grants (PGs) for investments in infrastructure and services
and in capacity building for 117 urban local governments (ULGs) and capacity building in all
nine Regional Governments (RGs), MUDHo and several Regional Ministries/Agencies.
The UIIDP is being financed through World Bank & AFD Program-for-Results (PforR) financing
instrument at the regional and ULG levels and an Investment Project Financing (IPF) instrument
at the Regional level. The regional governments and urban local governments are expected to
provide matching funds (counterpart contributions) as per the percentages agreed between
MUDHo and the World Bank which are stated in the IIDP Program Operations Manual.
Funding available under the UIIDP will depend on the performance of each city and Regional
Government assessed annually against verifiable results described in the Program Operations
Manual (POM) and in the Annual Performance Assessment Guideline (APAG) which is a
standalone Annex of the POM.
50
In the core thematic areas of: Planning and budgeting, assets management, public financial management,
procurement, own source revenues, accountability and transparency, environment and social safeguards, land
management, and strategic urban planning.
Page | 336
Amhara
32 Cities
BG
Gambella
Oromia
Harari
38 Cities
Dire Dawa
(1 city each)
Total
117
Afar cities SNNPRS
23 cities
4 cities
Tigray
Ethiopian Somali
12 cities
4 cities
51
Regions and cities contribute to the performance based transfers in the following manner: Amhara, Oromia,
SNNPR, and Tigray: 30 percent funding in addition to IDA funded grants; DRS regions: 20 percent; original 16
ULGDP I ULGs: 40 percent; new cities under ULGDP II in the DRS regions 10 percent; and other new (ULGDPII)
cities: 20 percent; Harar and Dire Dawa contribute 50 percent in addition to the IDA funded grants. The new 73 ULGs
under UIIDP will follow the same principles as the ULGDPII newcomers.
Page | 337
ULGs will use the Program funds to finance urban infrastructure works as well as capacity
building activities, in compliance with the Program’s investment menu and capacity building
manual. Eligible infrastructure investments fall under eight groups including: (a) urban roads, (b)
integrated infrastructure and land services, (c) sanitation (liquid waste), (d) solid waste
management, (e) urban drainage, (f) urban disaster risk management and urban resilience, (g)
built facilities, and (h) urban green infrastructure. Ineligible investments include any World Bank
environment and social impact assessment Category A projects. Compliance with the investment
menu is a minimum condition for receiving funds. In addition, ULGs will be required to prepare
the project in a participatory manner, and consider: (a) social inclusion requirements, including
gender and disability considerations; (b) climate change and disaster adaptation; and (c)
contribution to LED and long-term job creation. 52 ULGs could also spend up to 5 percent of
investment grants and regional/city contributions on capacity building support. For regional
government entities, the grants will mainly be used for capacity building, operations and
management expenses, subject to the eligible capacity building areas, similar to the ULGs.
Disbursement Linked Indicators, Minimum Conditions, Performance Measures and Verification
Protocols
Almost 96 percent (or around US$576 million) of the Operation’s funds will be disbursed against
disbursement linked indicators (DLIs). The DLIs are structured to provide incentives to
participating ULGs and regional governments for improved management and development of
urban areas. (More details on the DLIs, MCs, PMs, performance assessments, verification
protocols and disbursement arrangements are provided in the UIIDP Annual Performance
Assessment Guideline (APAG) which is a part of this POM and is a standalone Annex of the POM
The disbursement system for DLI 1, 2, 3, and 4 is scalable based on actual performance of
ULGs. It is particularly important to note that if the ULGs perform better (or poorer) than
expected (as set out in the disbursement related targets in the DLI matrix), disbursements will
be adjusted accordingly. This means that if ULGs perform higher than expected they will receive
higher than expected disbursements. If this continues throughout the Program, additional
financing may be needed.
DLIs 5 to 9 focus on regional government entities to enhance their abilities in fulfilling their
mandates to support ULGs. These DLIs will disburse based on results achieved by regional
government entities in providing support to ULGs (DLI 5) as well as focusing on their
performance in conducting essential audits for ULGs such as on fiduciary and environmental and
social management.
DLI 10 is a legacy DLI disbursing against prior results achieved under the ULGDP II that has
arisen due to overachievement of performance results. This DLI will be disbursed upon
verification in FY 2018/19, when the fifth APA of the ULGDP II has been completed in February
2018.
52
Details of and procedures for the use of investment project prioritization and selection criteria will be included in
the POM.
Page | 338
Collectively the DLIs address the PDO and key result areas. The DLIs are designed to address
the challenges of ULGs’ and regional governments’ institutional performance and, in turn, ULGs’
ability to deliver, operate, and manage infrastructure and services, and expand LED. They
provide incentives to address the core issues such as on timely audit, social and environmental
management, own-source revenue generation, and strengthen the system and procedures for
capacity building. In addition, there is enhanced focus to strengthen urban resilience, promote
LED and job creation, and enhance gender equality. The PMs have a direct link to the key result
areas and the GoE’s program intended outcomes.
The UIIDP APAG provides that the assessment for DLI 9 will carried out as per Table 1 below.
Page | 339
The Audit was conducted
as schedule without
unnecessary disruptions;
The Audit Report is
completed enough
documenting the auditing
procedures followed,
audits carried out on all the
stages of the procurement
and contract management
process, audit
findings/recommendations,
audit report written in a
clear language and concise
and manner;
Consistency of Audit
Recommendations with
Audit findings;
If 4 out of 6 satisfied, no reduction
for each ULG
Scoring:
If below, reduction for respective
ULGs that are not complied with
25 %
3. Follow up of implementation prior A checklist of audit RPPPAAs’ audit
of Audit Findings and findings/recommendations showing findings/recommendations
Recommendations (25% all audit findings/recommendations follow up checklist.
reduction max) of the previous year (including those
spilled over from previous years, if
not addressed); status of
implementation of each
finding/recommendation, action
taken on offenders
Scoring:
If not complied with 25% reduction
for each ULG there this is not
complied with.
Page | 340
Procurement Audit Training (PAT) consultant was recruited by the World Bank and
FPPPAA and prepared Procurement Audit Manual, PAT manual and provided 1 st round
ToT for 68 participants, June 8-19, 2015
Procurement Audit Training provided by FPPPAA and MUDHo in June 2016 at Bishoftu
The RPPPAAs then conducted the Procurement Audit for EFY 2008 with a few
doing it well and others requiring further improvement regarding the quality of
the audits. It was a good start. The RPPPAAs also conducted the Procurement
Audit for EFY 2009 and this is yet to be reviewed on whether the quality of audits
has improved. The MUDHo and FPPPAA will in conjunction with the World
Bank holding a workshop in May/June 2018 to review the quality of reports, and
to give additional guidance and training to the RPPPAAs to prepare them for the
EFY 2010 Audit which will start in August 2018
(a) To review at the ULG level, the availability, sustainability and operationally
effectiveness of the program procurement systems (legislative, institutional and
operational systems including availability of qualified staff, tender award committees and
complaints handling systems) and overall performance of the system in terms of
procurement planning and implementation;
(b) To review the procurement planning, processing, contracting, and implementation
processes for all the participating cities, to confirm their consistency with the Program
Appraisal Document (PAD), agreed program procurement systems, Project Operational
Manual and the Financing Agreement;
(c) To seek a professional opinion on compliance by the procurement processes with the
general principle of economy and efficiency, equal opportunities, transparency and verify
technical compliance, physical completion and price competitiveness of each contract in
the selected representative sample of contracts;
(g) To recommend actions needed to improve project procurement and contracts delivery
performance in light of deficiencies.
Page | 341
(h) Produce an annual independent procurement audit report to be provided to the audited
ULG, Regional Bureau of Finance and Economic Development, Regional Bureau of
Urban Development (RGs), Regional Offices of Auditor Generals, FPPPAA, MUDHo
and World Bank.
The annual Independent Procurement Audit (IPA) will cover all the cities in the region that are
participating in the UIIDP and review the proper implementation of the program procurement
system, institutional setups, availability of skilled staff and clear procurement decisions and
delegations. Apart from the institutional and legal systems, the IPA will look in to the
procurement planning and effectiveness of the plan implementation. The Regional Public
Procurement and Property Administration Agency (RPPPAA) will sample contracts procured
from each participating city and conduct detailed review of the entire transaction process from
compliance and performance aspects. The Procurement Audit will cover a minimum of 25% of
all completed contracts by each implementing ULG each audit year.
Stage 1 - Inception Planning. This stage will involve reviewing the most recent
Procurement audit reports, if any, and obtaining an original and updated, if any, approved
procurement Plan, list of contracts (contracts register) procured during the audit
period/FY, and agreeing the dates for the cities visits. Inception planning will involve
finalizing the list of contracts to be audited per city; scheduling the visits to the cities; and
obtaining the Client’s consensus of the inception plan. During this period, the auditor is
required to review all the program documents to better understand the implementation
arrangement, program procedures and manuals.
Page | 342
Stage 3 – Final Procurement Audit Report. Preparing the Draft Procurement Audit
Report will involve discussion of the draft report with the ULG and Client in the form of
audit exit meeting; incorporating all new information and comments provided by the
ULG & Client into the draft report including satisfactory Management response as to
how the audit issues will be resolved; and submitting the final audit report to the audited
ULG, Regional Bureau of Finance and Economic Development, Regional Bureau of
Urban Development (RGs), Regional Offices of Auditor Generals, FPPPAA, MUDHo
and World Bank.
Objective. The objective of this stage is to finalize the work plan, scope and program of
the Procurement Audit.
Documents. The RPPPAA should obtain the following documents of the Project to
facilitate the planning of the Procurement audit.
Page | 343
Sampling of Projects/Contracts for Audit. The RPPPAA will select 25% of the
completed contracts awarded by each city administration. If the auditor should find it
necessary, during the conduct of the audit, to introduce variations to the number, nature
and other aspects of contracts to be audited, such changes should be agreed in advance
with the Client.
Output. The RPPPAA will then finalize the work plan, Site Visit arrangements, and
Implementation Schedule for the audit as agreed with the Implementing Agencies. All
the arrangements, list of selected contracts and dates of visits will be compiled into an
Inception Plan report and submitted for the Client’s approval.
Objective. The objective of this stage is to carry out the procurement audit at each city
administration level.
Methodology. The procurement audit is carried out in the presence of and in close
collaboration with the procurement staff of the implementing agency/cities. The
implementing agency will be informed of the audit well in advance and given
opportunity to prepare any required documents in advance of the site/cities visit. Rating
of performance of the various procurement activities will as far as possible be concluded
after discussion with the relevant staff and justification recorded against the final rating.
Compliance with FAs. The RPPPAA will verify whether procurement and contracting
procedures and processes followed by the Implementing Agencies are in compliance
with procedures agreed as program system and other agreed procedures in conformity
with approved city Procurement Plan, the regional proclamations, directives and
manuals as well as Program Financing Agreement, PAD and Program Operational
Manual.
Physical Inspection. The RPPPAA will verify, to the extent possible, whether goods,
works, and consulting and non-consulting services contracted were supplied/completed
according to the required specifications and technical standards and comment on the
reasonableness of prices and physical completion of the contract. In this context, the
Auditor will randomly select 10% of the number of contracts under audit under each
category of goods and works and visit the project sites to carry out the physical
inspections. Depending on the type of goods/works, the following types of inspections
should be performed as appropriate: (a) standard physical inspections of
goods/installations: quality control (conformity with technical specifications stipulated
in the contract) and confirmation that quantities were delivered; (b) site visits to works:
field visits should be undertaken to verify the status of works or to confirm their
completion, documentary checks (certificates of acceptance/completion, defects list,
tests, etc.) should also be made. Where appropriate, and to the extent practical, prices
should also be compared with similar contracts financed by other agencies in the
country and the region and verified against local and international market prices for the
items in question.
Page | 344
Fraud and Corruption. Identify and report on any red flags and possible cases of fraud
and corruption and/or suspected cases of collusive, coercive, or obstructive practices as
defined in the Bank’s fraud and corruption guideline.
Output. The output from this stage of the assignment is the preparation of a brief
summary of findings on each sampled contract which should be completed
immediately after the audit and discussed with the ULG at the exit conference before
the RPPPAA departs from the city. The brief summary of findings and minutes of the
exit conference will be prepared by the RPPPAA and signed by both parties. One copy
of the summary and minutes will be given immediately in the field to the ULG and
copies will be annexed later to the Procurement Audit Report for the city.
Objective. The objective of the third stage is to prepare the Final Annual Independent
Procurement Audit Report.
Methodology. The RPPPAA will prepare the Final Annual Independent Procurement
Audit Report for each city which will be submitted to the audited ULG, Regional
Bureau of Finance and Economic Development, Regional Bureau of Urban
Development (RGs), Regional Offices of Auditor Generals, FPPPAA, MUDHo and
World Bank.
The report will be as per the format in Annex 4.
6. DELIVERABLES
As mentioned above, the conduct of the Procurement Audit will be in three stages with distinct
outputs as follows:
i. Stage 1: The RPPPAA output at this stage will be an Inception Plan detailing: (i)
the work plan, (ii) the list of contracts to be reviewed in each City and (iii) the
implementation schedule of the audit (including site visits and dates) for the
Client’s prior clearance. This stage and output, should not exceed ten (10) days
from the commencement of services,
ii. Stage 2: The output from this stage will be the RPPPAA’s brief summary of
findings on each sampled contract and minutes of the exit conference. These will
be given to the ULG in the field and copies will be annexed later to the Final
Annual Procurement Audit Report.
iii. Stage 3: The output from this stage will be the Final Procurement Audit Report
on the audited City.
Page | 345
iv. All reports and deliverables are to be delivered in English Language in both hard
and electronic copies (7 copies each). One copy each will be submitted to the ULG,
Regional Bureau of Finance and Economic Development and Regional Office of
the Auditor General, and the remaining four copies will be submitted to the
Regional Bureau of Urban Development who will retain one copy and submit three
copies to MUDHo who will retain one copy and submit one copy each to FPPPAA
and the World Bank.
Page | 346
Annex 1 to TOR
1. To assist the RPPPAA in selecting the audit sample, the Client (or ULG) will provide to
the RPPPAA, at the time of contract signature, comprehensive lists of contracts, if available, for
each city and copies of the relevant FAs and, Program Appraisal Document (PAD), and previous
procurement audit reports including a report on the status of implementation of the action plan to
address previous audit findings and recommendations , value for money audit reports and Annual
Performance Assessment Report. On the basis of the information provided by the Client and
other sources, the Auditor will prepare the list of contracts to be audited in each City.
2. The following criteria and considerations should be used in selecting the sample contracts
to be audited:
The Auditor shall verify that all eligible procurements in reference to the financial
expenditure summary were included in the Procurement Plan before sampling. If there
are procurements carried out outside the procurement plan, the sampled contracts for
auditing shall include those.
Critical items: Contracts that are necessary for the success of the project;
Contract awards: contracts awarded to the lowest evaluated bidder which met
the qualification criteria; awarded to higher bids as the lowest bidders failed to
meet the qualification criteria or for other reasons, etc, awards to national or
international firms, awards to single and multiple lots, awards affected by
domestic preference.
Page | 347
3.The RPPPAA shall audit project files with special focus on the following aspects,
documentation and procedures:
Advertising;
Pre/Post Qualification;
Bidding Documents;
Bid Opening
Signed Contracts;
Damages and Penalties for Delays, non-compliance with Functional Guarantees, etc.;
Page | 348
List of deliverables and completion (date, description, quantity, location of goods or
works, inspection and acceptance reports);
Using the documents and information itemized above and other information collected
during the audit, the RPPPAA shall compile a comprehensive history of the procurement process
for each contract audited.
4.Distortions in the procurement process are frequently manifested in one or more of the
following situations:
5. If patterns are identified in a series of contracts, which reflect any of the above
distortions, one or more of the contracts in the series should be selected for more detailed audit in
the audit sample.
Page | 349
Annex 2 to TOR
Checklist of Data and Documents to be Made Available by the Client to the Procurement
Auditor for each City
Financial audits, previous procurèrent audits including a report on the status of implémentation of
the action plan to address previous audit findings , value for money audits.
Relevant Program/ Project Status Reports (PSRs); relevant correspondance files, etc.
In addition, the RPPPAA will be given web references and, as needed, copies of the Government
Guidelines, Standard Bidding Documents and other relevant procurement notes and policy
statements including Regional Guidelines on Standard Bidding Documents, Evaluation Reports,
etc. A list of the Federal and Regional PPAs publications, notes, etc., dealing with procurement
and consultant services will be given to the Auditor so that they can request any additional
publications, notes, etc., which they may consider relevant.
P a g e 350 | 386
Annex 3 to TOR
1. Original and Updated, if any, approved Procurement Plan, including list of all contracts.
4. Consultant Contracts:
v. Bidding documents:
Addenda issued;
N.B.
Additional formats for the collection of data for World Bank Post Procurement Audit are attached in
Annex 10 for Shopping, NCB, QCBS contracts procurement methods)
P a g e 352 | 386
Annex 4 to TOR
Reporting Format for Final Annual Independent Procurement Audit Report
Title Page with information on: Country Name; Region name; City name; Project Name; Name of the
Client/Agency; Name of RPPPAA that conducted the Procurement Audit; Date of Report.
Table of Contents
List of Tables
List of Figures
Acronyms and Abbreviations
Acknowledgements
Executive Summary including the findings on the Audit of the Cities procurement environment
including: status of implementation of previous audit findings and recommendations, if any,
institutional setups, procurement decision matrix and staff availability; Procurement Planning and
monitoring; ongoing procurement processes and implementation issues; signed contracts, assessment
of risk to procurement, complaints handling and resolution issues; internal controls including
procurement audits by internal audit, contract administration issues, results achieved and
recommendations for improvements and proposed actions.
Section 1: Introduction
(Background; Objectives of Assignment; Approach & Methodology, Reference documents,
Audit Scope and Approach, Audit/Assessment Process, Organization of the Assignment Teams.
Logistics, dates of visits, Challenges faced, Team Responses to such challenges.
P a g e 353 | 386
Annex 1: Contract procurement review Data collection samples from World Bank Experience (optional for use):
P a g e 354 | 386
Annex 1.1: Worksheet for Post Review of Procurement Processes and Contract Administration
of Contracts Awarded under Shopping Procedure not subject to Prior Review
Date of Review: Name of Reviewer:
Are evidence of payment (e.g. payment vouchers, receipts) filed separately in the finance unit?
Verification (not evaluation) Names of the suppliers who responded to the solicitation letter are:
of existence of the
quotations. 1) Name, bid amount
Comments if any
53
P a g e 355 | 386
“Delivery Receipt” or Date & Delivery Receipt No.
“Store Receipt
Date resolved:
Indication of possible
Governance Issues
Other matters
Yes or No (explain)
P a g e 356 | 386
Annex 1.2: Worksheet for Post Review of Procurement Processes and
Contract Administration of Goods/Works Contracts not subject to Prior
Review
[To be prepared by the Borrower in advance]
Date of Review: Name of Reviewer:
Are evidence of payment (e.g. payment vouchers, receipts) filed separately in the finance
unit?
Pre/Post qualification
54
.
P a g e 357 | 386
Time allowed for submission of bids Closing date for Advertisement:
If no, how many days should have been given to the bidder:
Date of Publication:
Publication of contract
Where was it published?
award
Contract document (same as for
selected bid ?)
Name of complainant:
Date resolved:
P a g e 358 | 386
Contractual completion date Plan date for end of contract as scheduled:
( extended? amendments, variation
orders acceptable?) Actual:
Actual:
Variation orders::
Indication of possible
Governance Issues?
Other matters
Justification for
direct contract (if
applicable)
Compliance with
key agreed
provisions – Yes
or No (explain)
Physical
inspection for this
contract
P a g e 359 | 386
Annex 1.3: Worksheet for Post Review of Procurement Processes and
Contract Administration of Consultants Contracts not subject to Prior
Review
[To be prepared by the Borrower in advance]
Date of Review: Name of Reviewer:
Are evidence of payment (e.g. payment vouchers, receipts) filed separately in the finance unit?
Closing Date:
55
P a g e 360 | 386
Evaluation Criteria
Technical Evaluation
Signed Contract / Purchase Contract No. (or Purchase Order No).……………….. Date of contract signature:
Order document
Name of complainant:
Date resolved:
Contractual
completion
date
Date of final Report:
Actual
If report was not final or no certification of service delivery, explain why?
completion
date
Output/
reports
Date of invoice:
Timeliness of
Date of payment:
Payments
Number of days to pay invoice:
Indication of possible
Governance Issues
Other
matters
P a g e 361 | 386
Single source
justification
(if applicable)
Compliance
with key
agreed
provisions –
Yes or No
(explain)
6. TOR for Annual Environmental and Social Audit for EFY 2010
1….INTRODUCTION
The Ministry of Urban Development and Housing (MUDHo) has introduced the Ethiopian
Cities Sustainable Prosperity Goals (ECSPG), EFY 2006 (GC 2013/14) to EFY 2017 (GC
2024/25), which will lead to the establishment of Green Growth, Resilient and Well Governed
Cities that support Ethiopia’s transformation from a predominantly agricultural nation to a nation
with a rapidly growing industrial sector that contributes to the economic growth necessary to
achieve middle income country status by 2025. The ECSPG is the Ministry’s contribution to the
Government of Ethiopia’s Growth and Transformation Plan (GTP1) 2010/11-2014/15 and
(GTP 2) 2015/16-20/2020.
P a g e 362 | 386
The continuous and substantial movement of people from rural villages and homesteads to urban
villages, small, medium, and large towns, and to the capital city, and the resulting rapid
urbanization, is necessary to support the development of industrial, manufacturing, and service
sectors. The societal change that will accompany the agricultural to industrial transformation can
only be accomplished successfully with careful and meticulous advance planning that addresses
all aspects of the transformation simultaneously. It is for this reason that the Ministry has
developed the ECSPG. Its aim is to build the frameworks and provide the foundations – in our
towns and cities and in the construction industry – to achieve the country’s vision and for the
continued advancement of that vision.
The ECSPG comprises nine pillars – or dimensions - that will contribute to the achievement of
middle income country status and bring the desired political-economic transformation. Growth is
a key objective of the country’s initiatives and programs for urban development and
construction; the main economic objective. The main elements of the political component of the
nine pillars that make up the ECSPG are good governance, democratization at local level and the
satisfaction of citizens and residents with the delivery of public services and performance of
government – at local, regional and federal levels. Together the economic and political
interventions of the ECSPG will produce the prosperity that accompanies achievement of middle
income country status.
The ECSPG’s nine strategic pillars will contribute to Ethiopia’s achievement of middle income
country status by producing a transformation in the economic productivity and in the good
governance of cities. Economic transformation will be achieved by increased good urban
governance in general and in the focus of the ECSPG on job creation - micro & small enterprise
development in particular. This focus will be supported by improvements in leadership
development, land use planning, serviced land delivery, housing development, construction
industry development, infrastructure, services and green growth development. Investments in all
these areas and mobilization of resources to meet increasing operating and investment costs are a
main focus of the MUDHo.
The attention given to economic development and governance does not neglect social and
environmental development, nor will the key GTP cross cutting issues be neglected. These
include gender and children’s affairs, youth and sports development, HIV/AIDS prevention and
control, social welfare, labor affairs, population and development, culture and tourism, science
and technology, environment and climate change.
P a g e 363 | 386
The ESCPG is being implemented through many programs including through the Second Urban
Local Government Development Program (ULGDP II) under which many of the investments
envisaged under the ECSPG and GTP 2 are being made.
P a g e 364 | 386
Urban Institutional and Infrastructure Development Program
The Ministry of Urban Development & Housing, Regional Democratic Republic of Ethiopia, with
support from the World Bank and the Agence Francaise de Developpement (AFD is implementing the
Urban Institutional and Infrastructure Development Program (UIIDP) during the period from March
2018 to December 2023.
The UIIDP will provide Performance Grants (PGs) for investments in infrastructure and services and
in capacity building for 117 urban local governments (ULGs) and capacity building in all nine
Regional Governments (RGs), MUDHo and several Regional Ministries/Agencies.
The UIIDP is being financed through World Bank & AFD Program-for-Results (PforR) financing
instrument at the regional and ULG levels and an Investment Project Financing (IPF) instrument at
the Regional level. The regional governments and urban local governments are expected to provide
matching funds (counterpart contributions) as per the percentages agreed between MUDHo and the
World Bank which are stated in the IIDP Program Operations Manual.
Funding available under the UIIDP will depend on the performance of each city and Regional
Government assessed annually against verifiable results described in the Program Operations Manual
(POM) and in the Annual Performance Assessment Guideline (APAG) which is a standalone Annex
of the POM.
P a g e 366 | 386
Amhara
32 Cities
BG
Gambella
Oromia
Harari
38 Cities
Dire Dawa
(1 city each)
Total
117
Afar cities SNNPRS
23 cities
4 cities
Tigray
Ethiopian Somali
12 cities
4 cities
ULGs will use the Program funds to finance urban infrastructure works as well as capacity building
activities, in compliance with the Program’s investment menu and capacity building manual. Eligible
infrastructure investments fall under eight groups including: (a) urban roads, (b) integrated
infrastructure and land services, (c) sanitation (liquid waste), (d) solid waste management, (e) urban
57
Regions and cities contribute to the performance based transfers in the following manner: Amhara, Oromia, SNNPR,
and Tigray: 30 percent funding in addition to IDA funded grants; DRS regions: 20 percent; original 16 ULGDP I ULGs: 40
percent; new cities under ULGDP II in the DRS regions 10 percent; and other new (ULGDPII) cities: 20 percent; Harar and
Dire Dawa contribute 50 percent in addition to the IDA funded grants. The new 73 ULGs under UIIDP will follow the same
principles as the ULGDPII newcomers.
P a g e 367 | 386
drainage, (f) urban disaster risk management and urban resilience, (g) built facilities, and (h) urban
green infrastructure. Ineligible investments include any World Bank environment and social impact
assessment Category A projects. Compliance with the investment menu is a minimum condition for
receiving funds. In addition, ULGs will be required to prepare the project in a participatory manner,
and consider: (a) social inclusion requirements, including gender and disability considerations; (b)
climate change and disaster adaptation; and (c) contribution to LED and long-term job creation. 58
ULGs could also spend up to 5 percent of investment grants and regional/city contributions on
capacity building support. For regional government entities, the grants will mainly be used for
capacity building, operations and management expenses, subject to the eligible capacity building
areas, similar to the ULGs.
Disbursement Linked Indicators, Minimum Conditions, Performance Measures and Verification
Protocols
Almost 96 percent (or around US$576 million) of the Operation’s funds will be disbursed against
disbursement linked indicators (DLIs). The DLIs are structured to provide incentives to participating
ULGs and regional governments for improved management and development of urban areas. (More
details on the DLIs, MCs, PMs, performance assessments, verification protocols and disbursement
arrangements are provided in the UIIDP Annual Performance Assessment Guideline (APAG) which is
a part of this POM and is a standalone Annex of the POM
The disbursement system for DLI 1, 2, 3, and 4 is scalable based on actual performance of ULGs . It
is particularly important to note that if the ULGs perform better (or poorer) than expected (as set
out in the disbursement related targets in the DLI matrix), disbursements will be adjusted
accordingly. This means that if ULGs perform higher than expected they will receive higher than
expected disbursements. If this continues throughout the Program, additional financing may be
needed.
DLIs 5 to 9 focus on regional government entities to enhance their abilities in fulfilling their
mandates to support ULGs. These DLIs will disburse based on results achieved by regional
government entities in providing support to ULGs (DLI 5) as well as focusing on their performance in
conducting essential audits for ULGs such as on fiduciary and environmental and social management.
DLI 10 is a legacy DLI disbursing against prior results achieved under the ULGDP II that has arisen
due to overachievement of performance results. This DLI will be disbursed upon verification in FY
2018/19, when the fifth APA of the ULGDP II has been completed in February 2018.
Collectively the DLIs address the PDO and key result areas. The DLIs are designed to address the
challenges of ULGs’ and regional governments’ institutional performance and, in turn, ULGs’ ability
to deliver, operate, and manage infrastructure and services, and expand LED. They provide
incentives to address the core issues such as on timely audit, social and environmental management,
own-source revenue generation, and strengthen the system and procedures for capacity building. In
addition, there is enhanced focus to strengthen urban resilience, promote LED and job creation, and
enhance gender equality. The PMs have a direct link to the key result areas and the GoE’s program
intended outcomes.
58
Details of and procedures for the use of investment project prioritization and selection criteria will be included in the
POM.
P a g e 368 | 386
The UIIDP APAG provides that the assessment for DLI 7 will carried out as per Table 1 below.
As a minimum condition to
access funds for audit of a
ULG: timely environmental
audit (by end of October),
and the calibration as follows:
The Environmental and Social Management System Manual (including the Resettlement System
Guidelines) for Urban Local Governments (ULGs) is produced by the MINISTRY OF URBAN
DEVELOPMENT AND HOUSING for the use of all designated cities and towns. The
Environmental and Social Management System (ESMS) Manual is based on the Environmental and
Social Management Framework and the Resettlement Policy Framework that were introduced in EFY
2001 (GC 2008/09)
This ESMS document is to be used by all ULGs in order to ensure that all environmental and social
safeguards are adequately addressed and that the relevant capacity and training needs are established
P a g e 369 | 386
in order for the recommended measures to be implemented effectively. The main purpose of the
ESMS is to:
Establish clear procedures and methodologies for the environmental and social assessment,
review, approval and implementation of construction works to be financed by ULGs;
Specify appropriate roles and responsibilities, and outline the necessary reporting
procedures, for managing and monitoring environmental and social concerns related to ULG
construction works;
Provide practical information resources for implementing the ESMS.
Resettlement system guidelines (RSG) have also been developed and are presented in this manual.
Short simpler descriptions of the ESMS and RSG and checklists for use by ULGs in identifying and
implementing construction works will be prepared separately.
The objective of assignment described in this is to carry out an Annual Environmental and Social
Management System Performance Audit for EFY [to be inserted] for the cities in the region that are
participating in the UIIDP.
3….SCOPE OF WORK
3.2…Specific Tasks
The specific tasks carried out by the Consultant, include, but are not limited to:
P a g e 371 | 386
22. Assess the implementation of recommendations made in the last ESMS Performance Audit
(this task is excluded for the 1st UIIDP Annual ESMS Performance Audit).
23. Prepare a draft report.
24. On receipt of comments indicating amendments, additions or omissions required by the
MUDHo, prepare final report incorporating comments and suggestions to be made on the
draft report.
It is expected that the consultancy assignment will start in the first week of the month of August each
year and will take approximately 10 weeks .
All reports and deliverables are to be provided, in English, ten (10) hardbound copies and four (4) soft
copies on compact disk (Word and Excel).
5.1…Inception Report
1. A half-day session will be held between the region and the Consultants at the start of the
assignment to discuss and agree the Consultant’s plan to accomplish the task will be held
prior to submitting an Inception Report
2. An Inception Report shall be submitted within 1 week of the commencement of the
assignment, reflecting the agreed methodology (including schedule of visits to cities),
auditing techniques, and an outline of the proposed contents of the UIIDP ESMS Performance
Audit (Draft) Report.
5.2….Draft Final Environmental Performance Audit Report
1. Draft Final UIIDP ESMS Performance Audit Report, with an Executive Summary, a
consolidated section for all ULGs and separate distinct sections for each ULG which
incorporates recommendations and the way forward to effective environmental and social
management of the UIIDP. The report will be submitted within eight weeks of the
commencement of the assignment.
1. Final UIIDP ESMS Performance Audit Report, with an Executive Summary, a consolidated
section for all ULGs and separate distinct sections for each ULG which, with relevant
recommendations and the way forward to effective environmental and social management of
the UIIDP by incorporating comments and suggestions to be made on the Draft Final UIIDP
ESMS Performance Audit Report.
It is envisaged that: the Consultant’s team will include: 1 x Team Leader, ….. Environmental
specialists, ….Urban Infrastructure specialists and … Sociologists/Community Development
specialists.
The Consultant’s team members undertaking this assignment shall have a minimum of Master’s
Degree or equivalent in Environmental Studies, Environmental/Municipal/Civil Engineering and/or
Social Sciences and solid professional background in the areas of environmental resources
P a g e 372 | 386
management and/or community resettlement and familiarity Government of Ethiopia safeguards
policies, laws, regulations and procedures. The team leader shall have adequate experiences at least 10
years of relevance that include practical experience on methodologies and techniques of
environmental or social auditing and basic skills on project coordination and management. The
Consultant’s team members shall have at least 10 years of relevance that include practical experience
on methodologies and techniques of environmental or social auditing and basic skills on project
coordination and management very strong interpersonal, analytic, writing and communication skills
and able to work independently. On an indicative basis it is estimated that the following level of input
is necessary:-
The BUDHo has overall responsibility for implementation of the UIIDP and for the compliance of
implementing agencies with the Environmental and Social Management System Guidelines and
Resettlement System Guidelines. The BUDHo is the client for the Consultant’s assignment:
In terms of performance and deliverables, the Consultant will carry out the assignment under
the direction of and report to the [insert name, position, phone number & email of individual
responsible],
As the agency responsible for the overall coordination of UIIDP, the [insert name, position,
phone number & email of individual responsible], BUDHo will sign the contract with the
consultants and will be responsible for all payments to the Consultant.
Inputs provided By the Client: The BUDHo will provide to the Consultant at the commencement of
the assignment with any key documents deemed relevant to the Consultant’s scope of work. Other
relevant documents will be made available as required by the implementing entities. Documents that
are required for the Consultant’s information and guidance include:
P a g e 373 | 386
auditing will be released to third parties without written approval of the BUDHo. The Consultant firm
will deliver all data and relevant information to the BUDHo.
The Consultant firm shall provide detailed estimates of the budget including staff charges, travel,
equipment, hardware, software, technical meetings, report preparation and other related activities.
1. BACKGROUND
The project books of accounts provide the basis for preparation of the
PFSs by the project implementing agency and are established to reflect
the financial transactions in respect of the project. The implementing
agency maintains adequate internal controls and supporting
documentation for transactions.
P a g e 374 | 386
The responsibility for the preparation of financial statements including
adequate disclosure is that of the implementing agency. The agency is
also responsible for the selection and application of accounting policies.
The agency would prepare the PFSs in accordance with the standards and
procedures mentioned in Government of Ethiopia’s Accounting Manual or
International Financial Reporting Standards (IFRS) or International Public
Sector Accounting Standards (IPSAS).
As stated above, the audit of the project will be carried out in accordance
with International Standards on Auditing (ISA) promulgated by the
International Federation of Accountants (IFAC), and will include such tests
and auditing procedures as the auditor will consider necessary under the
circumstances. Special attention should be paid by the auditor as to
whether the:
(a) World Bank financing (and all external financing where the World
Bank is not the only financier) has been used in accordance with the
conditions of the relevant financing agreement, with due attention to
economy and efficiency, and only for the purposes for which the
financing was provided – please see <state here clearly the relevant
financing agreements>;.
(b) Counterpart funds have been provided and used in accordance with
the relevant financing agreements, with due attention to economy
and efficiency, and only for the purposes for which they were
provided;
P a g e 375 | 386
provisions of the World Bank Procurement Policies and Procedures59
as appropriate;
(f) National laws and regulations have been complied with, and that the
financial and accounting procedures approved for the project (e.g.
operational manual, financial procedures manual, etc.) were followed
and used;
(h) Assets procured from project funds exist and there is verifiable
ownership by the implementing agency or beneficiaries in line with
the financing agreement.
59
Depending on the complexity of procurement activities, the auditor may consider involving technical experts during the
audit engagement. In cases where such experts are involved, the auditor is expected to comply with provisions of
International Standard on Auditing 620: Using the Work of an Expert. Consideration to use of the work of experts should be
brought to the early attention of the borrower and the World Bank for mutual agreement and appropriate guidance.
P a g e 376 | 386
noncompliance by the implementing agency with laws and regulations
may materially affect the financial statements as required by ISA 250:
Consideration of Laws and Regulations in an Audit of Financial
Statements;
The auditor should verify that the project PFSs have been prepared in
accordance with the agreed accounting standards (see paragraph 3
above) and give a true and fair view of the financial position of the project
at the relevant date and of resources and expenditures for the financial
year ended on that date
In addition to the audit of the PFSs, the auditor is required to verify IFRs
and will apply such tests and auditing procedures as considered necessary
under the circumstances.
P a g e 377 | 386
7. DESIGNATED ACCOUNT (only if a designated account is opened)
In conjunction with the audit of the Project PFSs, the auditor is also
required to review the activities of the Designated Account associated with
the project. The Designated Account usually comprises:
The auditor should pay particular attention as to the compliance with the Bank's procedures and the balances of the Designated
Accounts at the end of the fiscal year (or period). The auditor should examine the eligibility of financial transactions during the
period under examination and fund balances at the end of such a period, the operation and use of the DAs in accordance with the
relevant general conditions, relevant financing agreements and disbursement letter, and the adequacy of internal controls for this
type of disbursement mechanism.
For this Project, the Designated Accounts are referred to in the general conditions, the
Financing Agreement (subsection 5.3) and Disbursement Letter (para. I).
The auditor should also examine eligibility and correctness of:
8. AUDIT REPORT
9. MANAGEMENT LETTER
P a g e 378 | 386
(a) Give comments and observations on the accounting records, systems
and controls that were examined during the course of the audit;
11. GENERAL
P a g e 379 | 386
The auditor should submit the report to the recipient’s designated agent
rather than to any staff member of the project entity. The agent should
then promptly forward two copies of the audit report and accompanying
statements to the Bank together with the management letter and
management response.
It is highly desirable that the auditor becomes familiar with the Bank’s
Guidelines on Annual Financial Reporting for World Bank-Financed
Activities. The auditor should be familiar with World Bank Procurement
Guidelines, which can be obtained from the project implementing agency.
The auditor should also be familiar with the Bank’s Disbursement
Handbook for World Bank Clients, Disbursement Guidelines for Projects.
These documents are available on the Bank’s website.
I. TERMS OF REFERENCE FOR FINANCIAL AUDIT
for the IPF
1. BACKGROUND
The project books of accounts provide the basis for preparation of the
PFSs by the project implementing agency and are established to reflect
the financial transactions in respect of the project. The implementing
agency maintains adequate internal controls and supporting
documentation for transactions.
As stated above, the audit of the project will be carried out in accordance
with International Standards on Auditing (ISA) promulgated by the
International Federation of Accountants (IFAC), and will include such tests
and auditing procedures as the auditor will consider necessary under the
circumstances. Special attention should be paid by the auditor as to
whether the:
(j) World Bank financing (and all external financing where the World
Bank is not the only financier) has been used in accordance with the
conditions of the relevant financing agreement, with due attention to
economy and efficiency, and only for the purposes for which the
financing was provided – please see <state here clearly the relevant
financing agreements>;.
(k) Counterpart funds have been provided and used in accordance with
the relevant financing agreements, with due attention to economy
and efficiency, and only for the purposes for which they were
provided;
(o) National laws and regulations have been complied with, and that the
financial and accounting procedures approved for the project (e.g.
operational manual, financial procedures manual, etc.) were followed
and used;
(q) Assets procured from project funds exist and there is verifiable
ownership by the implementing agency or beneficiaries in line with
the financing agreement.
P a g e 382 | 386
g) Governance: Communicate audit matters of governance interest
arising from the audit of financial statements with those charged with
governance of an entity as required by International Standards on
Auditing 260: Communication of Audit Matters with those Charged with
Governance.
The auditor should verify that the project PFSs have been prepared in
accordance with the agreed accounting standards (see paragraph 3
above) and give a true and fair view of the financial position of the project
at the relevant date and of resources and expenditures for the financial
year ended on that date
P a g e 383 | 386
In addition to the audit of the PFSs, the auditor is required to verify all IFRs
used as a basis for the submission of loan withdrawal applications to the
World Bank. The auditor will apply such tests and auditing procedures as
considered necessary under the circumstances. Annexed to the PFSs
should be a schedule listing individual IFR withdrawal applications by
specific reference number and amount.
The total withdrawals under the IFR procedure should be part of the
overall reconciliation of Bank disbursements described in paragraph 5
above
7. DESIGNATED ACCOUNT
In conjunction with the audit of the Project PFSs, the auditor is also
required to review the activities of the Designated Account associated with
the project. The Designated Account usually comprises:
The auditor should pay particular attention as to the compliance with the Bank's procedures and the balances of the Designated
Accounts at the end of the fiscal year (or period). The auditor should examine the eligibility of financial transactions during the
period under examination and fund balances at the end of such a period, the operation and use of the DAs in accordance with the
relevant general conditions, relevant financing agreements and disbursement letter, and the adequacy of internal controls for this
type of disbursement mechanism.
For this Project, the Designated Accounts are referred to in the general conditions, the
Financing Agreement (subsection 5.3) and Disbursement Letter (para. I).
The auditor should also examine eligibility and correctness of:
8. AUDIT REPORT
P a g e 384 | 386
The auditor will issue an opinion on the project financial statements
(PFSs). The annual audit report of the project accounts should include a
separate paragraph highlighting key internal control weaknesses and non-
compliance with the financing agreement terms.
9. MANAGEMENT LETTER
P a g e 385 | 386
11. GENERAL
The auditor should submit the report to the recipient’s designated agent
rather than to any staff member of the project entity. The agent should
then promptly forward two copies of the audit report and accompanying
statements to the Bank together with the management letter and
management response.
It is highly desirable that the auditor becomes familiar with the Bank’s
Guidelines on Annual Financial Reporting for World Bank-Financed
Activities. The auditor should be familiar with World Bank Procurement
Guidelines, which can be obtained from the project implementing agency.
The auditor should also be familiar with the Bank’s Disbursement
Handbook for World Bank Clients, Disbursement Guidelines for Projects.
These documents are available on the Bank’s website.
P a g e 386 | 386