0% found this document useful (0 votes)
30 views79 pages

Oil Photo Tpssd1 DC

Uploaded by

roslan yusof
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views79 pages

Oil Photo Tpssd1 DC

Uploaded by

roslan yusof
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 79

SETIA UTAMA LRT 3 SDN BHD

PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (All panel 750V DC SWGR (+/-) Oxidize busbar panel to be cleaned. Description: Oxidize busbar panel done cleaned for all panel.

Snag/ Outstanding Works No: 0253 Date: 17.01.2023 Snag/ Outstanding Works No: 0253 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: 750V DC SWGR (+/-) Pending cable tagging installation Description: Cable tagging installation done

Snag/ Outstanding Works No: 0254 Date: 17.01.2023 Snag/ Outstanding Works No: 0254 Date: 24.06.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: 750V DC SWGR (+) Spare cable to be tagged (ferrule tagging) Description: Spare cable done tagged (ferrule tagging)

Snag/ Outstanding Works No: 0255 Date: 17.01.2023 Snag/ Outstanding Works No: 0255 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (DP12) To put fire seal / edge protection at hole opening Description: Fire seal / edge protection at hole opening done installed

Snag/ Outstanding Works No: 0256 Date: 17.01.2023 Snag/ Outstanding Works No: 0256 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: 750V DC SWGR (+/-) All opening hole at cable to be fire sealed (after
Description: All opening hole at cable done fire sealed
testing & before energize)
Snag/ Outstanding Works No: 0257 Date: 17.01.2023 Snag/ Outstanding Works No: 0257 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (All panel) Opening cable at gland plate to be fire sealed Description: Opening cable at gland plate done fire sealed

Snag/ Outstanding Works No: 0258 Date: 17.01.2023 Snag/ Outstanding Works No: 0258 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Insulation mat to be cut out (25mm from panel) - General Description: Insulation mat has been cut out (25mm from panel)

Snag/ Outstanding Works No: 0259 Date: 17.01.2023 Snag/ Outstanding Works No: 0259 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To install rubber mat - General Description: Rubber mat installed for all panel

Snag/ Outstanding Works No: 0260 Date: 17.01.2023 Snag/ Outstanding Works No: 0260 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: 750V DC SWGR (+/-) Internal cabling pending for buswire Description: Internal cabling done for buswire

Snag/ Outstanding Works No: 0182 Date: 17.01.2023 Snag/ Outstanding Works No: 0182 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: 750V DC SWGR (+) Pending RJ45 cable termination Description: RJ45 cable done terminate

Snag/ Outstanding Works No: 0183 Date: 17.01.2023 Snag/ Outstanding Works No: 0183 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: 750V DC SWGR (+/-) Pending cable termination Description: Cable termination done

Snag/ Outstanding Works No: 0184 Date: 17.01.2023 Snag/ Outstanding Works No: 0184 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (TD1/ADP02) Missing nameplate for equipment - MCB3, Description: Nameplate for equipment - MCB3, MCB4, MCB5, MCB8 done
MCB4, MCB5, MCB8) installed on site

Snag/ Outstanding Works No: 0261 Date: 17.01.2023 Snag/ Outstanding Works No: 0261 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (TD1/DDP02) Missing nameplate for equipment - MCB1, Description: Nameplate for equipment - MCB1, MCB6 done installed on
MCB6) site

Snag/ Outstanding Works No: 0262 Date: 17.01.2023 Snag/ Outstanding Works No: 0262 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (TD1/ADP02) Damage door knob Description: Door knob rectified on site

Snag/ Outstanding Works No: 0263 Date: 17.01.2023 Snag/ Outstanding Works No: 0263 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (TD1/ADP02 & TD1/ADP03) Pending / Incomplete cable tagging Description: Cable tagging done installed

Snag/ Outstanding Works No: 0254 Date: 17.01.2023 Snag/ Outstanding Works No: 0254 Date: 12.09.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (TD1/ADP02) Opening to be sealed off Description: Opening has been sealed off

Snag/ Outstanding Works No: 0265 Date: 17.01.2023 Snag/ Outstanding Works No: 0265 Date: 24.06.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (TD1/ADP02,TD1/ADP03,TD1/DDP02) Housekeeping & Scratches Description: Housekeeping & rectification done on site

Snag/ Outstanding Works No: 0266 Date: 17.01.2023 Snag/ Outstanding Works No: 0266 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending cable tagging for 33kv cable, LV cable, control cable & earthing Description: Cable tagging for 33kv cable, LV cable, control cable & earthing cable done
cable installed

Snag/ Outstanding Works No: 0216 Date: 17.01.2023 Snag/ Outstanding Works No: 0216 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending fire seal at floor opening Description: Fire seal at floor opening done installed

Snag/ Outstanding Works No: 0217 Date: 17.01.2023 Snag/ Outstanding Works No: 0217 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To add cable cleat at HV Cable Description: Cable cleat at HV Cable done installed

Snag/ Outstanding Works No: 0218 Date: 17.01.2023 Snag/ Outstanding Works No: 0218 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Sleeve protection at control cable Description: Control cable shift to front unistrut

Snag/ Outstanding Works No: 0219 Date: 17.01.2023 Snag/ Outstanding Works No: 0219 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To shift control cable and install cable cleat at unistrut bracket support Description: Control cable shifted to the front and cable tie installed at unistrut bracket
support
Snag/ Outstanding Works No: 0329 Date: 20.01.2023 Snag/ Outstanding Works No: 0329 Date: 28.07.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Housekeeping Description: Housekeeping done

Snag/ Outstanding Works No: 0220 Date: 17.01.2023 Snag/ Outstanding Works No: 0220 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Temperature Box) Unused hole to be sealed off Description: Unused hole has been sealed off

Snag/ Outstanding Works No: 0221 Date: 17.01.2023 Snag/ Outstanding Works No: 0221 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Temperature Box) Pending cable tagging (1nos) Description: Cable tagging (1nos) done installed

Snag/ Outstanding Works No: 0222 Date: 17.01.2023 Snag/ Outstanding Works No: 0222 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Temperature Box) Rod to be cut off at optimum length Description: Rod has been cut off at optimum length

Snag/ Outstanding Works No: 0223 Date: 17.01.2023 Snag/ Outstanding Works No: 0223 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Temperature Box) Pending cable gland earth looping Description: Cable gland earth looping done

Snag/ Outstanding Works No: 0224 Date: 17.01.2023 Snag/ Outstanding Works No: 0224 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Temperature Box) Pending temperature display equipment nameplate Description: Temperature display equipment nameplate installed

Snag/ Outstanding Works No: 0225 Date: 17.01.2023 Snag/ Outstanding Works No: 0225 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Perspex Barrier) Fixed perspex barrier lock to be changed, to use bolt & Description: (Perspex Barrier) Fixed perspex barrier lock has been changed, bolt & nut
nut (8nos) (8nos) installed

Snag/ Outstanding Works No: 0226 Date: 17.01.2023 Snag/ Outstanding Works No: 0226 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending LV cable tagging Description: LV cable tagging done installed

Snag/ Outstanding Works No: 0227 Date: 17.01.2023 Snag/ Outstanding Works No: 0227 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Damaged cable cleat to be replaced Description: Damaged cable cleat has been replaced

Snag/ Outstanding Works No: 0228 Date: 17.01.2023 Snag/ Outstanding Works No: 0228 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending installation fire sealed at floor opening Description: Fire sealed at floor opening has been installed

Snag/ Outstanding Works No: 0229 Date: 17.01.2023 Snag/ Outstanding Works No: 0229 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To protect 33kV cable at sharp edge floor opening Description: The 33kV cable doesn’t touch the sharp edge after being sealed.

Snag/ Outstanding Works No: 0169 Date: 17.01.2023 Snag/ Outstanding Works No: 0169 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Cable lug shroud for earthing cable to be installed Description: Cable lug shroud for earthing cable done installed

Snag/ Outstanding Works No: 0170 Date: 17.01.2023 Snag/ Outstanding Works No: 0170 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Perspex Barrier) Pending installation of magnetic limit switch Description: Magnetic limit switch done installed

Snag/ Outstanding Works No: 0171 Date: 17.01.2023 Snag/ Outstanding Works No: 0171 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending bimetallic plate. To be install after T&C Description: Bimetallic plate installed

Snag/ Outstanding Works No: 0172 Date: 17.01.2023 Snag/ Outstanding Works No: 0172 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (REC01 & REC02) Housekeeping inside and outside panel


Description: Housekeeping done
(overall room & top, inside panel)
Snag/ Outstanding Works No: 0204 Date: 17.01.2023 Snag/ Outstanding Works No: 0204 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (REC01 & REC02) Pending cable tagging (DC Power cable -
Description: Cable tagging installation done
above & below)
Snag/ Outstanding Works No: 0205 Date: 17.01.2023 Snag/ Outstanding Works No: 0205 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (REC01 & REC02) Pending RYB facing colour at cable Description: RYB facing colour at cable done installed

Snag/ Outstanding Works No: 0206 Date: 17.01.2023 Snag/ Outstanding Works No: 0206 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (REC01 & REC02) To put black putty / fire seal foam at hole Description: Black putty / fire seal foam has been installed at hole opening
opening cable cable

Snag/ Outstanding Works No: 0207 Date: 17.01.2023 Snag/ Outstanding Works No: 0207 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending cable tagging installation for earthing cable Description: Cable tagging done installed

Snag/ Outstanding Works No: 0269 Date: 17.01.2023 Snag/ Outstanding Works No: 0269 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Housekeeping Description: Housekeeping done

Snag/ Outstanding Works No: 0186 Date: 17.01.2023 Snag/ Outstanding Works No: 0270 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To do housekeeping / clean up cable Description: Housekeeping done on site

Snag/ Outstanding Works No: 0208 Date: 17.01.2023 Snag/ Outstanding Works No: 0208 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Bracket support to be touched up Description: Bracket support done touched up

Snag/ Outstanding Works No: 0209 Date: 17.01.2023 Snag/ Outstanding Works No: 0209 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To put cable cleat for HV Cable Description: Cable cleat for HV Cable has been installed on site

Snag/ Outstanding Works No: 0210 Date: 17.01.2023 Snag/ Outstanding Works No: 0210 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending installation sharp edge protection Description: *Outstanding

Snag/ Outstanding Works No: 0211 Date: 17.01.2023 Snag/ Outstanding Works No: 0211 Date:
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Extended rod to be cut off at optimum length Description: Extended rod done cut off at optimum length

Snag/ Outstanding Works No: 0212 Date: 17.01.2023 Snag/ Outstanding Works No: 0212 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Cable tray to be cut at optimum length Description: Cable tray done cut at optimum length

Snag/ Outstanding Works No: 0213 Date: 17.01.2023 Snag/ Outstanding Works No: 0213 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To put cable support for cable ladder Description: Cable support for cable ladder installed on site

Snag/ Outstanding Works No: 0214 Date: 17.01.2023 Snag/ Outstanding Works No: 0214 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (REC01 & REC02) To install cable protect (rubber protection )


Description: Cable protect (rubber protection ) at HV Cable done installed
at HV Cable
Snag/ Outstanding Works No: 0168 Date: 17.01.2023 Snag/ Outstanding Works No: 0168 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Housekeeping Description: Housekeeping done

Snag/ Outstanding Works No: 0267 Date: 17.01.2023 Snag/ Outstanding Works No: 0267 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To put permanent seal at top opening Description: Permanent seal at top opening installed

Snag/ Outstanding Works No: 0268 Date: 17.01.2023 Snag/ Outstanding Works No: 0268 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To put fire sealed at hole opening (after complete cable pulling &
Description: Fire sealed at hole opening installed
termination)
Snag/ Outstanding Works No: 0185 Date: 17.01.2023 Snag/ Outstanding Works No: 0185 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending earth cable installation Description: *Outstanding

Snag/ Outstanding Works No: 0205 Date: 17.01.2023 Snag/ Outstanding Works No: 0205 Date:
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending cable laying and termination for external cable Description: Cable laying and termination for external cable done

Snag/ Outstanding Works No: 0270 Date: 17.01.2023 Snag/ Outstanding Works No: 0270 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To put rubber protection at cable that hit sharp edges Description: Cable that hit sharp edges has been rearranged and tie with cable tie.

Snag/ Outstanding Works No: 0230 Date: 17.01.2023 Snag/ Outstanding Works No: 0230 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To reorganise cable using cable tight for vertical cable inside cable trench. Description: Cable has been organised using cable tight

Snag/ Outstanding Works No: 0231 Date: 17.01.2023 Snag/ Outstanding Works No: 0231 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending sticker RYB at rear facing Description: Sticker RYB at rear facing installed

Snag/ Outstanding Works No: 0232 Date: 17.01.2023 Snag/ Outstanding Works No: 0232 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending cable tagging at 33kv cable Description: Cable tagging at 33kv cable installed

Snag/ Outstanding Works No: 0233 Date: 17.01.2023 Snag/ Outstanding Works No: 0233 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending sharp edges protection at cable containment Description: Sharp edges protection at cable containment installed

Snag/ Outstanding Works No: 0234 Date: 17.01.2023 Snag/ Outstanding Works No: 0234 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Washer & nut to be changed at cable lug ITX HV side Description: Washer & nut has been changed at cable lug ITX HV side

Snag/ Outstanding Works No: 0235 Date: 17.01.2023 Snag/ Outstanding Works No: 0235 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending cheque plate installation Description: Cheque plate installed

Snag/ Outstanding Works No: 0236 Date: 17.01.2023 Snag/ Outstanding Works No: 0236 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Temperature Box ITX) Pending cable tagging (1nos) Description: Cable tagging (1nos) installed

Snag/ Outstanding Works No: 0237 Date: 17.01.2023 Snag/ Outstanding Works No: 0237 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Temperature Box ITX) Panel rusted to be touched up Description: Panel rusted has been touched up

Snag/ Outstanding Works No: 0238 Date: 17.01.2023 Snag/ Outstanding Works No: 0238 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Single hole lug has been changed to double hole lug at termination on LV
Description: To change single hole lug to double hole lug at termination on LV side
side

Snag/ Outstanding Works No: 0173 Date: 17.01.2023 Snag/ Outstanding Works No: 0173 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending cable termination Description: Cable termination done

Snag/ Outstanding Works No: 0174 Date: 17.01.2023 Snag/ Outstanding Works No: 0174 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To install bimetallic plate at HV & LV terminal side Description: Bimetallic plate at HV & LV terminal side done installed

Snag/ Outstanding Works No: 0175 Date: 17.01.2023 Snag/ Outstanding Works No: 0175 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Temperature Box ITX) Pending earthing bonding (panel to cable tray) Description: Earthing bonding (panel to cable tray) done

Snag/ Outstanding Works No: 0176 Date: 17.01.2023 Snag/ Outstanding Works No: 0176 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Temperature Box ITX) Copper link pending to be installed at containment Description: Copper link done installed at containment

Snag/ Outstanding Works No: 0177 Date: 17.01.2023 Snag/ Outstanding Works No: 0177 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: (Temperature Box ITX) Pending earth bonding panel door to panel body Description: Earth bonding panel door to panel body done

Snag/ Outstanding Works No: 0178 Date: 17.01.2023 Snag/ Outstanding Works No: 0178 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: To put sticker nameplate tagging Description: *Outstanding P4

Snag/ Outstanding Works No: 0239 Date: 17.01.2023 Snag/ Outstanding Works No: 0239 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending RYB sticker at cable Description: RYB sticker at cable installed

Snag/ Outstanding Works No: 0240 Date: 17.01.2023 Snag/ Outstanding Works No: 0240 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Fire sealed to be installed Description: Fire sealed done installed

Snag/ Outstanding Works No: 0241 Date: 17.01.2023 Snag/ Outstanding Works No: 0241 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending cable tagging for power cable Description: Cable tagging for power cable installed

Snag/ Outstanding Works No: 0242 Date: 17.01.2023 Snag/ Outstanding Works No: 0242 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending panel to be mounted on the floor Description: Panel done mounted on the floor

Snag/ Outstanding Works No: 0243 Date: 17.01.2023 Snag/ Outstanding Works No: 0243 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Cable trench pending Housekeeping Description: Cable trench done housekeeping

Snag/ Outstanding Works No: 0244 Date: 17.01.2023 Snag/ Outstanding Works No: 0244 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Cable DC from DC Switchgear to inverter to be cleated. Description: Cable DC from DC Switchgear to inverter done cleated.

Snag/ Outstanding Works No: 0245 Date: 17.01.2023 Snag/ Outstanding Works No: 0245 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending RJ45 cable dressing & termination Description: RJ45 cable done dressing & termination

Snag/ Outstanding Works No: 0179 Date: 17.01.2023 Snag/ Outstanding Works No: 0179 Date: 09.03.2023
SETIA UTAMA LRT 3 SDN BHD
PROJECT LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM BANDAR UTAMA TO JOHAN SETIA

Description: Pending marking torque Description: Marking torque done

Snag/ Outstanding Works No: 0180 Date: 17.01.2023 Snag/ Outstanding Works No: 0180 Date: 09.03.2023