0% found this document useful (0 votes)
163 views1 page

242023.2314 - Coa - Pt. Galaxy Trading Indonesia Gati - TB - Salamae 03 BG - Latumbi 05

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
163 views1 page

242023.2314 - Coa - Pt. Galaxy Trading Indonesia Gati - TB - Salamae 03 BG - Latumbi 05

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

242023.

2314SA

CERTIFICATE OF ANALYSIS
Description of Goods : Nickel Ore In Bulk
Quantity : 7,553.396 MT
Name of Vessel : TB. SALAMAE 03 / BG. LATUMBI 05
Shipper / Applicant : PT. GALAXY TRADING INDONESIA GATI
Loading Port : Jetty PT. Putra Mekongga Sejahtera, Pomalaa, Kolaka, Sulawesi
Tenggara
Discharging Port : Jetty PT. Huadi Nickel Alloy Indonesia, Pajjukukang, Bantaeng,
Sulawesi Selatan
Sampling Date : June 29th, 2024 up to July 02nd, 2024
THIS IS TO CERTIFY that upon the request of the applicant, the samples was taken at Jetty of
Jetty PT. Huadi Nickel Alloy Indonesia, Pajjukukang, Bantaeng, Sulawesi Selatan with the amount
7,553.396 MT. The samples was analyzed in the laboratory with Fused Method.
The Results are as follows:

Parameter Unit Results Method


Ni Pct 1.30 MWI.01.23.LMIN (XRF-Fusion Method)
Co Pct 0.05 MWI.01.23.LMIN (XRF-Fusion Method)
Fe Pct 19.20 MWI.01.23.LMIN (XRF-Fusion Method)
Al2O3 Pct 3.70 MWI.01.23.LMIN (XRF-Fusion Method)
CaO Pct 0.85 MWI.01.23.LMIN (XRF-Fusion Method)
K2 O Pct <0.01 MWI.01.23.LMIN (XRF-Fusion Method)
MgO Pct 14.89 MWI.01.23.LMIN (XRF-Fusion Method)
MnO Pct 0.50 MWI.01.23.LMIN (XRF-Fusion Method)
Na2O Pct <0.01 MWI.01.23.LMIN (XRF-Fusion Method)
P2 O5 Pct 0.02 MWI.01.23.LMIN (XRF-Fusion Method)
Cr2O3 Pct 1.48 MWI.01.23.LMIN (XRF-Fusion Method)
SO3 Pct 0.01 MWI.01.23.LMIN (XRF-Fusion Method)
SiO2 Pct 40.93 MWI.01.23.LMIN (XRF-Fusion Method)
TiO2 Pct <0.01 MWI.01.23.LMIN (XRF-Fusion Method)
Loss on Ignitation (LOI) Pct 8.68 MWI.01.17.LMIN
Moisture Content (MC) Pct - MWI.01.04.LMIN

This report is made and issued by the Company upon the Principal/Applicant's request and the analysis contained therein reflects the
Company's findings on the sample(s) submitted by Principal/Applicant and/or sample(s) drawn by the Company at the time and place of
performing the inspection/testing only. Due to effects of weather, transport, storage or other factors outside Company's control,
Company shall not be liable for the results herein beyond seven days after pre-shipment inspection or fifteen days after shipment
loading. Furthermore the Company shall not be responsible to any parties on any business and/or any legal consequences for any
transaction by using this report/analysis.

Kendari, July 11th, 2024


PT. CARSURIN Tbk

Ayu Andriana Lestari


Laboratory Manager
For verification of authenticity of certificate or reports, scan the secure QR code using the Validator App or visit verify.carsurin.com

You might also like