0% found this document useful (0 votes)
17 views

SN-6

Uploaded by

esaharyousef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

SN-6

Uploaded by

esaharyousef
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

MEETING ATTENDANCE LIST

Client: PWA Infrastructure Affairs Date: 05/08/2019


Project: C803 South Wakrah PS & Outfall Time: 9:00 - 2:00
Subject: Stakeholder Meeting No 1
Venue: Ashghal Tower 1, Al Wasel Meeting Room, 12th Floor

Name Position Company Phone No. E-mail Signature


,
Mike Hall Senior Design PWA 4492 6439 [email protected]

Tim Kelly
Engineer/Project
Coordinator

Surface & Ground Water PWA 44950816 tkell�@ashghal.gov .ga


VJ4_
Engineer

Kapil Pradeep Devang Design Engineer PWA 40353426 [email protected]

r
Ahmed Zaghmout Design Engineer PWA 77544455 [email protected]

Christupher Lee Design Engineer PWA 33667087 [email protected]

Dharmesh Purohit

Ravikeerti Patil
Design Engineer

Snr. Design Engineer


PWA

PWA
40353438

55719029
d1;[email protected] .ga

r1;[email protected]
I�
/

Dick Steer Snr. Design Engineer PWA


4-'kiZ.,7� G-Stuf/2 C<A�rtW � �.J
� �q;r:, ,�-
�_/',
Jasim Al Sayegh PWA fl
Khalid Khammas Azawi PWA
;0� - ::;:>
<O� f-r
\,
Raymond Malik Senior Engineer PWA r Ma,li6i @cvalv:M. �� Q c �<!� 1\

Waqar Ahmed Khan

Richard Warke
(?""\ • �'(AA:A_.I tt.--() PWA vt'f32b3ii-t tJ k Q- r;L() 1,� 0 ....,,"
L-...AA I G\ {�J
- ,,--
0 \} • :.-

- PWA
,.,

\ V V
n--:x--=.1.-�- F� �-5o :SoZ--::\- ·----r v
f�woo �
r _..... n .... ··� �\,\Ir i:)es '°""' t?"'.,,._
V
f°""� l9<fM G6'.2 'q--3 .L61 .b P��rt<> 9 ...,��1. l-tL{). °""-"�
I . �
(

� MWH. ,;:,w"' {) Stantec PAGE OF