Needs and Requirements Manual

Uploaded by

ELINE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
768 views

Needs and Requirements Manual

Uploaded by

ELINE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 457

Needs and Requirements Manual

Needs, Requirements, Verification, Validation Across the Lifecycle

May 2022
Needs and Requirements Manual i

COPYRIGHT INFORMATION
This INCOSE Technical Product was prepared by the International Council on Systems
Engineering (INCOSE). It is approved by the INCOSE Technical Operations Leadership for
release as an INCOSE Technical Product.
Copyright (c) 2022 by INCOSE, subject to the following restrictions:
Author Use. Authors have full rights to use their contributions in a totally unfettered way with
credit to the INCOSE Technical source. Abstraction is permitted with credit to the source.
INCOSE Use. Permission to reproduce and use this document or parts thereof by members of
INCOSE and to prepare derivative works from this document for INCOSE use is granted,
with attribution to INCOSE and the original author(s) where practical, provided this
copyright notice is included with all reproductions and derivative works.
External Use. This document may not be shared or distributed to any non-INCOSE third
party. Requests for permission to reproduce this document in whole or part, or to prepare
derivative works of this document for external and commercial use should be addressed to
the INCOSE Central Office, 7670 Opportunity Rd., Suite 220, San Diego, CA 92111-2222.
Electronic Version Use. Any electronic version of this document is to be used for personal,
professional use only and is not to be placed on a non-INCOSE sponsored server for general
use.
Any additional use of these materials must have written approval from INCOSE Central.

Additional Copies/General Information


Copies of the Needs and Requirements Manual, as well as any other INCOSE document can be obtained
from the INCOSE Store. General information on INCOSE, the Requirements Working Group, any other
INCOSE working group, or membership may also be obtained from the INCOSE Central Office at:
International Council on Systems Engineering Telephone: +1 858-541-1725
7670 Opportunity Road, Suite 220 Toll Free Phone (US): 800-366-1164
San Diego, California 92111-2222 | USA Fax: +1 858-541-1728
E-mail: [email protected] Web Site: http://www.incose.org

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements Manual ii

NEEDS AND REQUIREMENTS MANUAL


Document No.: INCOSE-TP-2021-002-01
Version/Revision: Rev 1.1
Date: May 2022
Prepared by:
Requirements Working Group
International Council on Systems Engineering (INCOSE)
7670 Opportunity Road, Suite 220,
San Diego, California 92111-2222 USA

Preface
This Manual has been prepared and produced by a volunteer group of contributors within the
Requirements Working Group (RWG) of the International Council on Systems Engineering
(INCOSE).

Authors
The principal authors of this document are:
Lou Wheatcraft, Wheatland Consulting, LLC, USA
Tami Katz, Ball Aerospace and Technologies Corporation, USA
Michael Ryan, Capability Associates Pty Ltd, AU
Raymond B. Wolfgang, Sandia National Labs, USA

Major Contributors
Those who made a significant contribution to the generation of this document are:
Mark Abernathy, Space Telescope Science Institute, USAS
James R. Armstrong, Stevens Institute of Technology, USA
Brian Berenbach, Georgia Institute of Technology, USA
Simone Bergamo, Thales, FR
Ronald S. Carson, PhD, Seattle Pacific University, USA
Jeremy Dick, Retired, UK
Celeste Drewien, Sandia National Labs, USA
James R van Gaasbeek, Retired, USA
Rick D. Hefner, Caltech US
Henrick Mattfolk, Whirlpool, USA
Lamont McAliley, Veracity Engineering, USA
Donald McNally, Woodward, USA
Kevin E. Orr, Eaton Corporation, USA
Michael E. Pafford, Retired, USA
Susan E. Ronning, ADCOMM Engineering LLC, USA
Gordon Woods, East West Railway Company, UK
Richard Zinni, Harris Corporation, USA

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements Manual iii

Reviewers
In addition to the authors and contributors, below are the names of those who submitted review
comments that were included during the development of this document:
Ben Canty, Ball Aerospace and Technologies Corporation, USA
James B. Burns, Johns Hopkins University, USA
Ken Eastman, Ball Aerospace and Technologies Corporation, USA
Ray Joseph, Odfjell Terminal, Houston, USA
Jenn Molloy, Ball Aerospace and Technologies Corporation, USA
Michele Reed, Shell Products and Technology, USA
Andreas Vollerthun, Dr., KAIAO-Consulting, DE
Beth Wilson, retired, USA

REVISION HISTORY
Revision Revision Date Change Description and Rationale
0 28 Jan 2020 Initial draft for IW2020
0.1 30 June 2020 Post IW2020 draft
0.2 30 September 2020 First integrated draft (V0l 1 and Vol 2 merged)
0.3 27 November 2020 Further maturation of the manual
0.4 December 2020 Further maturation of the manual
0.5 January 2021 Further maturation of the manual - incorporated comments received to date
0.6 April 2021 Further maturation of the manual - incorporated comments received to date post IW2021
0.7 August 2021 Incorporated Comments from May RWG review of the 0.6 version
0.8 December 2021 Incorporated Comments to the 0.7 version
1 January 2022 First release
1.1 May 2022 Editorial and alignment with other RWG products

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements Manual iv

TABLE OF CONTENTS
SECTION 1: INTRODUCTION .............................................................................................................................. 1
1.1 PURPOSE AND SCOPE....................................................................................................................................... 1
1.2 AUDIENCE ..................................................................................................................................................... 1
1.3 APPROACH .................................................................................................................................................... 3
1.4 ONTOLOGY: THE CONTEXT OF TERMS USED IN THIS MANUAL ................................................................................. 4
1.4.1 Stakeholder Expectations, Needs, and Requirements ........................................................................... 4
1.4.2 Stakeholder Requirements Versus System Requirements in the Context of System Verification and
System Validation ................................................................................................................................................ 6
1.4.3 Requirements versus Specifications and Documents versus Specifications .......................................... 7
1.4.4 Needs, Requirements, Design, Verification, and Validation Management ........................................... 8
1.4 NEEDS, REQUIREMENTS, VERIFICATION, AND VALIDATION ACTIVITIES ....................................................................... 9
1.6 THE FIVE NRVV ACTIVITIES DISCUSSED IN THIS MANUAL..................................................................................... 11
1.7 NEEDS AND REQUIREMENTS MANUAL ORGANIZATION ......................................................................................... 13
SECTION 2: DEFINITIONS AND CONCEPTS ....................................................................................................... 15
2.1 DEFINITIONS ................................................................................................................................................ 15
2.2 APPLICABILITY OF LIFECYCLE CONCEPTS, NEEDS, AND REQUIREMENTS ..................................................................... 18
2.3 LEVELS OF LIFECYCLE CONCEPTS, NEEDS, AND REQUIREMENTS .............................................................................. 20
2.3.1 Levels of Organization ......................................................................................................................... 20
2.3.2 System Architecture - a Hierarchical View .......................................................................................... 30
2.3.3 System Architecture - a Holistic View .................................................................................................. 34
2.3.4 Using Both the Hierarchical and Holistic Views................................................................................... 37
2.4 VERIFICATION AND VALIDATION IN CONTEXT ...................................................................................................... 37
2.4.1 Distinctions Between the Concepts of Verification and Validation ..................................................... 40
2.4.2 System Verification and System Validation After Product Release ..................................................... 43
2.5 INTEGRATION, VERIFICATION, AND VALIDATION AND THE SE VEE MODEL ................................................................ 44
2.6 SYSTEM VERIFICATION VERSUS REQUIREMENTS VERIFICATION ............................................................................... 46
2.7 THE INTENT OF SYSTEM VERIFICATION AND SYSTEM VALIDATION ........................................................................... 48
2.7.1 Iterative System Verification and System Validation .......................................................................... 49
2.8 REDUCING RISK BY ADDRESSING SYSTEM VERIFICATION AND SYSTEM VALIDATION EARLY IN THE LIFECYCLE .................... 50
2.9 IMPORTANCE OF AN INTEGRATED, COLLABORATIVE PROJECT TEAM ........................................................................ 53
2.10 IMPORTANCE OF EFFECTIVE COMMUNICATIONS .................................................................................................. 55
2.10.1 A Communications Model .............................................................................................................. 55
2.10.2 One Size Does Not Fit All ................................................................................................................ 57
2.11 GREEN FIELD VERSUS BROWN FIELD SYSTEMS .................................................................................................... 58
2.12 AVOIDING TECHNICAL DEBT ............................................................................................................................ 59
2.12.1 What is Technical Debt? ................................................................................................................. 59
2.12.2 Why Does Technical Debt Accumulate? ......................................................................................... 60
2.12.3 Technical Debt and Risk .................................................................................................................. 61
2.12.4 Avoiding Technical Debt ................................................................................................................. 61
2.13 OVERVIEW OF SE AS DISCUSSED IN THIS MANUAL............................................................................................... 62
SECTION 3: INFORMATION-BASED NEEDS AND REQUIREMENT DEVELOPMENT AND MANAGEMENT ............. 65
3.1 INFORMATION-BASED NEEDS AND REQUIREMENTS DEFINITION AND MANAGEMENT ................................................. 66
3.1.1 Key Characteristics of the I-NRDM Approach ...................................................................................... 69
3.1.2 Implementing the I-NRDM Approach .................................................................................................. 72
3.2 TEXTUAL NEEDS AND REQUIREMENTS VERSUS MODELS AND DIAGRAMS .................................................................. 73
3.2.1 Textual Needs and Requirements........................................................................................................ 73
3.2.2 Models and Diagrams ......................................................................................................................... 75
SECTION 4: LIFECYCLE CONCEPTS AND NEEDS DEFINITION .............................................................................. 78
4.1 INTRODUCTION............................................................................................................................................. 78
4.1.1 Necessary for Acceptance ................................................................................................................... 79

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements Manual v

4.1.2 Change Across the Lifecycle ................................................................................................................ 80


4.1.3 Benefits of Lifecycle Concepts and Needs Definition Activities............................................................ 82
4.2 PREPARE FOR LIFECYCLE CONCEPTS AND NEEDS DEFINITION .................................................................................. 83
4.3 DEFINE INPUTS TO LIFECYCLE CONCEPTS ANALYSIS AND MATURATION .................................................................... 84
4.3.1 Define the Problem, Threat, or Opportunity ....................................................................................... 84
4.3.2 Define Mission, Goals, Objectives, and Measures ............................................................................... 85
4.3.3 Identify External and Internal Stakeholders ........................................................................................ 91
4.3.4 Elicit Stakeholder Needs and Stakeholder-owned Requirements ........................................................ 97
4.3.5 Document Elicitation Outcomes ........................................................................................................ 104
4.3.6 Identify Drivers and Constraints ........................................................................................................ 108
4.3.7 Identify, Assess, and Handle Risk ...................................................................................................... 118
4.4 CAPTURE PRELIMINARY INTEGRATED SET OF LIFECYCLE CONCEPTS ........................................................................ 124
4.4.1 Perspectives ...................................................................................................................................... 126
4.4.2 ConOps versus OpsCon ...................................................................................................................... 127
4.4.3 Get Stakeholder Agreement .............................................................................................................. 127
4.5 LIFECYCLE CONCEPTS ANALYSIS AND MATURATION ........................................................................................... 129
4.5.1 Feasibility .......................................................................................................................................... 130
4.5.2 Design as Part of the Lifecycle Analysis and Maturation Activities ................................................... 131
4.5.3 Use of Diagrams and Models for Analysis ......................................................................................... 131
4.5.4 Levels of Detail and Abstraction ........................................................................................................ 138
4.5.5 Completeness .................................................................................................................................... 139
4.5.6 Risk Assessment ................................................................................................................................ 141
4.5.7 Iteration to Mature Lifecycle Concepts ............................................................................................. 144
4.6 DEFINE AND RECORD THE INTEGRATED SET OF NEEDS ........................................................................................ 152
4.6.1 People and Process Needs ................................................................................................................. 152
4.6.2 Define the Integrated Set of Needs ................................................................................................... 153
4.6.3 Record the Integrated Set of Needs .................................................................................................. 156
4.7 PLAN FOR SYSTEM VALIDATION ..................................................................................................................... 162
4.8 BASELINE AND MANAGE LIFECYCLE CONCEPTS AND NEEDS DEFINITION OUTPUTS ................................................... 163
SECTION 5: NEEDS VERIFICATION AND NEEDS VALIDATION .......................................................................... 165
5.1 NEEDS VERIFICATION ........................................................................................................................................... 166
5.1.1 Prepare for Needs Verification .......................................................................................................... 167
5.1.2 Perform Needs Verification ............................................................................................................... 168
5.1.3 Manage Needs Verification Results .................................................................................................. 169
5.2 NEEDS VALIDATION ..................................................................................................................................... 170
5.2.1 Prepare for Needs Validation ............................................................................................................ 170
5.2.2 Perform Needs Validation ................................................................................................................. 171
5.2.3 Manage Needs Validation Results .................................................................................................... 172
5.3 USE OF ATTRIBUTES TO MANAGE NEEDS VERIFICATION AND NEEDS VALIDATION .................................................... 173
SECTION 6: DESIGN INPUT REQUIREMENTS DEFINITION ............................................................................... 174
6.1 PREPARE FOR DESIGN INPUT REQUIREMENTS DEFINITION ................................................................................... 175
6.2 PERFORM DESIGN INPUT REQUIREMENTS DEFINITION........................................................................................ 176
6.2.1 Transforming Needs into Design Input Requirements....................................................................... 177
6.2.2 Establish Traceability ........................................................................................................................ 196
6.2.3 Defining Interactions and Recording Interface Requirements .......................................................... 203
6.2.4 Use of Attributes to Develop and Manage Design Input Requirements............................................ 222
6.2.5 Plan for System Verification .............................................................................................................. 224
6.2.6 Finalize Design Input Requirements Definition ................................................................................. 225
6.3 BASELINE AND MANAGE DESIGN INPUT REQUIREMENTS..................................................................................... 231
6.4 ARCHITECTURAL LEVELS, FLOW DOWN, ALLOCATION, AND BUDGETING ................................................................. 232
6.4.1 Moving Between Levels of the Physical Architecture ........................................................................ 233
6.4.2 Product Breakdown Structure and Document Tree ........................................................................... 233
6.4.3 Allocation - Flow Down of Requirements .......................................................................................... 236
6.4.4 Defining Child Requirements That Meet the Intent of the Allocated Parents. .................................. 242

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements Manual vi

6.4.5 Budgeting of Performance, Resource, and Quality Requirements .................................................... 243


6.4.6 Budget Management: Margins and Reserves ................................................................................... 247
6.4.7 Use of Traceability and Allocation to Manage Requirements ........................................................... 249
6.5 SUMMARY OF DESIGN INPUT REQUIREMENTS DEFINITION .................................................................................. 250
SECTION 7: DESIGN INPUT REQUIREMENTS VERIFICATION AND VALIDATION ............................................... 251
7.1 DESIGN INPUT REQUIREMENTS VERIFICATION ................................................................................................... 253
7.1.1 Prepare for Design Input Requirements Verification......................................................................... 253
7.1.2 Perform Design Input Requirements Verification .............................................................................. 255
7.1.3 Manage Design Input Requirements Verification Results ................................................................. 257
7.2 DESIGN INPUT REQUIREMENTS VALIDATION ..................................................................................................... 257
7.2.1 Prepare for Design Input Requirements Validation ........................................................................... 258
7.2.2 Perform Design Input Requirements Validation ................................................................................ 259
7.2.3 Manage Design Input Requirements Validation Results ................................................................... 261
7.3 USE OF ATTRIBUTES TO MANAGE REQUIREMENTS VERIFICATION AND VALIDATION .................................................. 261
SECTION 8: DESIGN VERIFICATION AND DESIGN VALIDATION ....................................................................... 262
8.1 DESIGN DEFINITION PROCESS OVERVIEW ........................................................................................................ 263
8.2 EARLY SYSTEM VERIFICATION AND SYSTEM VALIDATION ..................................................................................... 266
8.3 VALIDATION OF THE SYSTEM VERIFICATION AND SYSTEM VALIDATION ARTIFACTS .................................................... 268
8.4 DESIGN VERIFICATION.................................................................................................................................. 269
8.4.1 Prepare for Design Verification ......................................................................................................... 271
8.4.2 Perform Design Verification .............................................................................................................. 271
8.4.3 Manage Design Verification Results ................................................................................................. 272
8.5 DESIGN VALIDATION .................................................................................................................................... 273
8.5.1 Prepare for Design Validation ........................................................................................................... 275
8.5.2 Perform Design Validation ................................................................................................................ 275
8.5.3 Manage Design Validation Results.................................................................................................... 276
8.6 USE OF ATTRIBUTES TO MANAGE DESIGN VERIFICATION AND DESIGN VALIDATION .................................................. 277
SECTION 9: PRODUCTION VERIFICATION....................................................................................................... 278
SECTION 10: SYSTEM VERIFICATION AND SYSTEM VALIDATION COMMON PRINCIPLES ................................ 283
10.1 PLANNING STAGE ....................................................................................................................................... 285
10.1.1 Define the System Verification and System Validation Success Criteria ....................................... 288
10.1.2 Determine the System Verification and System Validation Strategy ............................................ 292
10.1.3 Select a System Verification and System Validation Method ....................................................... 305
10.1.4 System Verification and System Validation Matrices ................................................................... 318
10.1.5 System Verification and System Validation Description Sheets.................................................... 320
10.2 DEFINING STAGE......................................................................................................................................... 322
10.2.1 System Verification and System Validation Activity Definition Sheets ......................................... 322
10.2.2 System Verification and System Validation Procedure Requirements Definition ......................... 325
10.2.3 System Verification or System Validation Procedure Development ............................................. 328
10.3 EXECUTION STAGE: PERFORMING THE SYSTEM VERIFICATION AND SYSTEM VALIDATION PROCEDURES ........................ 330
10.3.1 Formal System Verification or System Validation Event Representative Process ......................... 332
10.3.2 Discrepancies and Non-conformances ......................................................................................... 334
10.3.3 Variances, Concessions, Waivers, and Deviations ........................................................................ 335
10.4 REPORTING STAGE: DOCUMENTING THE RESULTS ............................................................................................. 336
10.4.1 Chain of Evidence Showing Conformance or Compliance............................................................. 338
10.4.2 Use of Compliance Matrices ......................................................................................................... 340
10.5 APPROVING STAGE: SYSTEM APPROVAL .......................................................................................................... 341
10.6 USE OF ATTRIBUTES TO MANAGE SYSTEM VERIFICATION AND SYSTEM VALIDATION ACTIVITIES .................................. 342
10.7 MAINTAINING THE SYSTEM VERIFICATION AND SYSTEM VALIDATION ARTIFACTS ..................................................... 343
SECTION 11: SYSTEM VERIFICATION AND SYSTEM VALIDATION PROCESSES ................................................. 345
11.1 SYSTEM VERIFICATION PROCESS .................................................................................................................... 347

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements Manual vii

11.1.1 Prepare for System Verification - Planning and Defining ............................................................. 349
11.1.2 Perform System Verification Activities - Executing ....................................................................... 349
11.1.3 Manage System Verification results - Reporting and Approving .................................................. 350
11.2 SYSTEM VALIDATION PROCESS....................................................................................................................... 351
11.2.1 Prepare for System Validation - Planning and Defining ............................................................... 353
11.2.2 Perform System Validation Activities - Executing ......................................................................... 354
11.2.3 Manage System Validation Results .............................................................................................. 354
SECTION 12: THE USE OF OTS SYSTEM ELEMENTS ......................................................................................... 356
SECTION 13: SUPPLIER DEVELOPED SOI ........................................................................................................ 361
13.1 CUSTOMER/SUPPLIER RELATIONSHIPS ............................................................................................................ 361
13.2 CUSTOMER/SUPPLIER VERIFICATION VERSUS VALIDATION CONSIDERATIONS .......................................................... 367
13.3 ADDRESSING THE EVOLUTIONARY NATURE OF INTERFACE DEFINITIONS.................................................................. 370
SECTION 14: NEEDS, REQUIREMENTS, VERIFICATION, AND VALIDATION MANAGEMENT.............................. 372
14.1 PREPARE FOR NEEDS, REQUIREMENTS, VERIFICATION, AND VALIDATION MANAGEMENT .......................................... 373
14.1.1 PM and SE Plans ........................................................................................................................... 374
14.1.2 Needs and Requirements Definition and Management Plan ....................................................... 375
14.1.3 System Verification and System Validation Management Plans .................................................. 376
14.1.4 Configuration Management Plan ................................................................................................. 377
14.2 PERFORM NEEDS, REQUIREMENTS, VERIFICATION, AND VALIDATION MANAGEMENT ............................................... 378
14.2.1 Baseline Needs, Requirements, and Specifications....................................................................... 378
14.2.2 Communicate Baselined Needs, Requirements, and Specifications ............................................. 380
14.2.3 Monitoring and Controlling the Baselined Needs, Requirements, and Specifications .................. 381
14.2.4 Managing Unknowns ................................................................................................................... 382
14.2.5 Managing Change ........................................................................................................................ 384
14.2.6 Manage and Control Flow Down, Allocation, and Budgeting ...................................................... 391
14.2.7 Combine Allocation and Traceability to Manage Requirements .................................................. 392
14.2.8 Managing Interfaces .................................................................................................................... 396
14.2.9 Managing System Verification and System Validation................................................................. 400
SECTION 15: ATTRIBUTES FOR NEEDS AND REQUIREMENTS ......................................................................... 402
15.1 ATTRIBUTES TO HELP DEFINE NEEDS AND REQUIREMENT AND THEIR INTENT .......................................................... 403
15.2 ATTRIBUTES ASSOCIATED WITH SYSTEM VERIFICATION AND SYSTEM VALIDATION .................................................... 404
15.3 ATTRIBUTES TO HELP MANAGE THE NEEDS AND REQUIREMENTS ......................................................................... 406
15.4 ATTRIBUTES TO SHOW APPLICABILITY AND ENABLE REUSE .................................................................................. 414
15.5 ATTRIBUTES TO AID IN PRODUCT LINE MANAGEMENT ....................................................................................... 415
15.6 GUIDANCE FOR USING ATTRIBUTES ................................................................................................................ 417
SECTION 16: FEATURES AN SE TOOLSET SHOULD HAVE................................................................................. 419
16.1 CHOOSING AN APPROPRIATE TOOLSET ............................................................................................................ 419
16.2 DESIRABLE FEATURES OF A SE TOOLSET .......................................................................................................... 420
16.3.1 Functionality ................................................................................................................................. 421
16.3.2 Tool Attributes .............................................................................................................................. 423
16.3.3 Management and Reporting ........................................................................................................ 425
16.3.4 General Considerations ................................................................................................................ 427
APPENDIX A: REFERENCES ................................................................................................................................ 428
APPENDIX B: ACRONYMS AND ABBREVIATIONS ............................................................................................... 431
APPENDIX C: GLOSSARY ................................................................................................................................... 434
APPENDIX D: COMMENT FORM ........................................................................................................................ 445

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements Manual viii

LIST OF FIGURES
Figure 1-1: Relationships between INCOSE Requirements Working Group (RWG) products and
the INCOSE SE HB and the SEBOK. ....................................................................................... 3
Figure 1-2: NRVV Activity Relationships to the INCOSE SE HB. ............................................................... 8
Figure 1-3: Relationship of INCOSE SE HB Technical Processes and NRVV Activities Discussed
in this Manual. ......................................................................................................................... 11
Figure 2-1: Entity-Relationship Diagram for Needs and Requirements Terms. [41] .................................... 17
Figure 2-2: Entity-Relationship Diagram for Entities, Concepts, Needs, and Requirements. [41] ............... 19
Figure 2-3: Transformation of Concepts into Needs into Requirements. [39] .............................................. 21
Figure 2-4: Business Operations Level Expanded. ................................................................................... 28
Figure 2-5: Supplier Developed System.................................................................................................... 29
Figure 2-6: Levels of a System - Hierarchical View. .................................................................................. 31
Figure 2-7: Moving Between Levels. ......................................................................................................... 33
Figure 2-8: Interactions and Dependences Internal and External to a System. ........................................ 35
Figure 2-9: Holistic View of the SOI. ......................................................................................................... 36
Figure 2-10: Verification and Validation Confirm that SE Artifacts Generated During
Transformation are Acceptable. [42] ......................................................................................... 38
Figure 2-11: Needs Verification and Validation. ........................................................................................ 38
Figure 2-12: Post-production Verification and Validation. ......................................................................... 43
Figure 2-13: Integration, Verification and Validation in Relation to the SE Vee Model. ............................ 44
Figure 2-14: Integrated, Multidisciplined, Collaborative Project Team. ..................................................... 53
Figure 2-15: Project Team Organization ................................................................................................... 55
Figure 2-16: Communications Model [16], [49]. .............................................................................................. 56
Figure 3-1: I-NRDM + MBD = MBSE. ........................................................................................................ 67
Figure 3-2: Information-based Requirement Development and Management Model. [50] ......................... 68
Figure 4-1a: Lifecycle and Needs Definition Activities Part 1. ................................................................... 81
Figure 4-1b: Lifecycle and Needs Definition Activities Part 2. ................................................................... 81
Figure 4-2: Lifecycle Concepts and Needs Definition IPO Diagram.......................................................... 83
Figure 4-3: Example NASA Mission, Goals, and Objectives (from NASA SE HB [36]). .............................. 88
Figure 4-4: Example Context Diagram, Boundary Diagram, External Interface Diagram. ...................... 112
Figure 4-5: Inputs to the Lifecycle Concepts Analysis and Maturation Activities. ................................... 129
Figure 4-6: Fundamental System Model. ................................................................................................ 135
Figure 4-7: Functional/Activity Analysis using a SIPOC Diagram. .......................................................... 135
Figure 4-8: Generic Functional Flow Block Diagram. .............................................................................. 136
Figure 4-9: System Architecture Diagram. .............................................................................................. 137
Figure 4-10: Input/output Risk Assessment. ........................................................................................... 142
Figure 4-11: Zeroing in on a Set of Feasible Lifecycle Concepts ............................................................ 144
Figure 4-12: Sources of the Integrated Set of Needs. ............................................................................. 153
Figure 4-13: Needs Feasibility/Risk Bucket. ............................................................................................ 159
Figure 5-1: Needs Verification and Needs Validation Overview.............................................................. 165
Figure 5-2: Needs Verification IPO Diagram. .......................................................................................... 166
Figure 5-3: Needs Validation IPO Diagram. ............................................................................................ 170
Figure 6-1: Design Input Requirements Definition IPO Diagram............................................................. 174
Figure 6-2: Design Input Requirement Definition Activities. .................................................................... 176
Figure 6-3: The “Line” Between Design Inputs and Design Outputs. ...................................................... 194
Figure 6-4: The “Line” Within a System Architecture. ............................................................................. 195
Figure 6-5: Example Requirement Parent / Child Trace. ........................................................................ 198
Figure 6-6: Complexity is a Function of the Number of Interactions Among System Elements. ............. 204
Figure 6-7: An Interface is a Boundary, not a Thing................................................................................ 205
Figure 6-8: Example External Interface, Context, or Boundary Diagram. ............................................... 207
Figure 6-9: Example Individual Interface Block Diagram. ....................................................................... 208
Figure 6-10: New System 2 interfacing With an Existing System 1. ....................................................... 211
Figure 6-11: New System 2 and System 3 interfacing With Each Other. ................................................ 212
Figure 6-12: Interface Requirement Traceability. .................................................................................... 217
Figure 6-13: Requirements Feasibility/Risk Bucket. ................................................................................ 228
Figure 6-14: PBS and Associated Sets of Engineering Documentation.................................................. 234
Figure 6-15: Tree Diagram Example for a Coffee Brewing Machine....................................................... 235

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements Manual ix

Figure 6-16: Flow down of Design Input Requirements via Allocation and Budgeting. ........................... 236
Figure 6-17: Flow down of Design Input Requirements via Allocation and Budgeting. ........................... 237
Figure 6-18: Alternate Architecture for Software-intensive Systems. ...................................................... 239
Figure 6-19: Allocation and Budgeting Example. .................................................................................... 244
Figure 6-20: Allocation and Budgeting Dependencies. ........................................................................... 245
Figure 6-21: Allocation and Budgeting Across Interface Boundaries. ..................................................... 246
Figure 7-1: Design Input Requirements Verification and Validation. ....................................................... 251
Figure 7-2: Design Input Requirement Verification IPO Diagram............................................................ 253
Figure 7-3: Design Input Requirement Validation IPO Diagram.............................................................. 258
Figure 8-1: Design Verification and Design Validation. ........................................................................... 262
Figure 8-2: Zeroing in On a Feasible Design and Physical Architecture. ................................................ 263
Figure 8-3: Design Verification IPO Diagram. ......................................................................................... 270
Figure 8-4: Design Validation IPO Diagram. ........................................................................................... 274
Figure 9-1: Production Verification. ......................................................................................................... 278
Figure 9-2: Production Verification IPO Diagram. ................................................................................... 282
Figure 10-1: System Verification and System Validation Process Stages. ............................................. 284
Figure 10-2: System Verification and System Validation Process Artifacts. ........................................... 287
Figure 10-3: Success Criteria Influence on System Verification and System Validation Planning
and Implementation. ............................................................................................................. 290
Figure 10-4: Iterative Relationship Between Success Criteria, Strategy, and Method. ........................... 293
Figure 10-5: Example VaDS or VDS. ...................................................................................................... 321
Figure 10-6: Example ADS. ..................................................................................................................... 323
Figure 10-7: System Verification or System Validation Procedure Development IPO Diagram.............. 329
Figure 10-8: Visualizations of the Project’s System Verification and System Validation Data and
Information. ........................................................................................................................... 344
Figure 11-1: System Verification and System Validation Processes. ...................................................... 345
Figure 11-2: System Verification IPO Diagram. ...................................................................................... 348
Figure 11-3: Holistic view of the SOI. ...................................................................................................... 352
Figure 11-4: System Validation IPO Diagram. ........................................................................................ 353
Figure 12-1: OTS Determination as Part of Architecture and Design. .................................................... 357
Figure 12-2: OTS Evaluation for Usage in the SOI.[26] ............................................................................ 359
Figure 13-1: Contract type and approach ................................................................................................ 362
Figure 14-1: Needs, Requirements, Verification, and Validation Management IPO Diagram. ................ 373
Figure 14-2: Needs, Requirements, Verification, and Validation Management Activities. ...................... 378

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements Manual x

LIST OF TABLES
Table 1-1: NRVV Use Cases. ...................................................................................................................... 2
Table 2-1: Verification and Validation Definitions in Context..................................................................... 42
Table 2-2: Needs, Requirements, Design, System Verification, and System Validation
Comparisons in Terms of Outcomes. ..................................................................................... 43
Table 4-1: Potential Stakeholders Over the System Lifecycle. ................................................................. 93
Table 4-2: Example Stakeholders’ Perspectives and Concerns. .............................................................. 99
Table 4-3: Example Checklist for an Elicitation Session. ........................................................................ 103
Table 4-4: Preliminary Integrated Set of Lifecycle Concepts. ................................................................. 125
Table 6-1: Needs-to-Requirements Transformation Matrix. .................................................................... 178
Table 6-2: Example Trace Matrix. ........................................................................................................... 199
Table 6-3: Interface Requirements Audit Spreadsheet. .......................................................................... 220
Table 6-4: Example Interface Requirements Audit.................................................................................. 221
Table 6-5: Example Allocation Matrix. ..................................................................................................... 241
Table 10-1: Tracking Preliminary and Final System Verification and System Validation Status. ............ 303
Table 10-2: Example System Validation Matrix....................................................................................... 318
Table 10-3: Example System Verification Matrix..................................................................................... 318
Table 10-4: Example System Verification Compliance Matrix (SVCM). .................................................. 340
Table 15-1: Example Implementation Status Recording and Reporting. ................................................ 410

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 1

Section 1: INTRODUCTION

1.1 Purpose and Scope


This Needs and Requirements Manual (NRM) presents systems engineering (SE) lifecycle
concepts from the perspective of needs, requirements, verification, and validation (NRVV)
definition and management across the system lifecycle. Needs, requirements, verification, and
validation are common threads that tie all lifecycle activities and processes together.
For final acceptance, certification, and qualification, the system is verified against design input
requirements and validated against the integrated set of needs. To successfully complete system
verification and system validation, the needs and requirements of the system as well as the
system verification and system validation artifacts must be managed throughout the entire system
lifecycle; this Manual provides practical guidance on the activities required to achieve those
outcomes.
To support Project Management (PM) and SE from a NRVV perspective, this Manual:
• Provides PM and SE practitioners with an understanding of the best practices for effective
NRVV definition and management throughout the system lifecycle.
• Helps organizations understand that NRVV are key elements of SE activities.
• Provides guidance to the successful implementation of NRVV activities as part of PM and
SE, in any domain.
• Reinforces that adequate definition of lifecycle concepts and needs is a necessary
prerequisite to the definition of system requirements
• Provides practical, cross-domain guidance to enable organizations to integrate best
practices and concepts within their PM and SE processes, work instructions, procedures,
and activities.
• Provides a clear description of how the terms verification and validation are applied to the
various lifecycle artifacts.
• Describes the importance of planning early in the system lifecycle for verification and
validation activities across the lifecycle and for the inclusion of verification and validation
artifacts in system models.
• Provides thorough guidance to readers on planning, definition, execution, and reporting of
verification and validation activities across the system lifecycle.
• Presents a data-centric approach to NRVV definition and management.
• Provides guidance for organization and enterprise-wide sharing of data and information
associated with developing and managing an integrated set of needs, the resulting design
input requirements and design output specifications, as well as verification and validation
artifacts throughout the system lifecycle.
1.2 Audience
This Manual is intended for those who perform NRVV activities throughout the system lifecycle
regardless of level of experience. Those new to PM and SE should find the detailed guidance
useful. More experienced practitioners should find new insights concerning NRVV across all
stages of the system lifecycle, particularly in terms of a data-centric perspective, to that which
they may not have been exposed. Major user groups include systems engineers, requirements

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 2

engineers, business analysts, project managers, and product developers. Specific use cases for
various classes of readers are shown in Table 1-1.

Reader Use Cases


Novice Practitioners: • Learn and understand NRVV best practices.
Those new to SE and • Access a structured, unambiguous, and comprehensive source of
NRVV. information and knowledge to help learn NRVV from a data-centric
perspective.
• Learn a consistent and unambiguous ontology (metamodel) for NRVV
Seasoned • Gain more in-depth understanding of NRVV from a data-centric
Practitioners: Those perspective.
experienced in SE and • Reinforce, refresh, build upon, and renew their NRVV knowledge.
NRVV, but not from a • Tailor the concepts in the NRM to their organization’s product line,
data-centric processes, and culture.
perspective. • Adopt NRVV best practices presented in this Manual.
Course Developers/ • Use a structured, unambiguous, and comprehensive source of information
Educators/ Trainers: and knowledge to help teach NRVV from a data-centric perspective.
Individuals or • Suggest relevant NRVV topics to trainers for their course content.
organizations who • Present a consistent and unambiguous ontology for NRVV.
specialize in training • Lead SE curricula development and revision inside their own organizations,
practitioners and other based on best practices and knowledge presented in this Manual.
stakeholders in NRVV
processes and tools.
Tool Suppliers: • Implement recommended features in a toolset to enable practitioners to
Organizations that development and manage NRVV across the system lifecycle from a data-
provide applications centric perspective.
that enable the data- • Align their PM and SE toolset products with a comprehensive set of NRVV
centric practice of SE. activities and artifacts and underlying data and information.
Project Managers: • Understand overall product development lifecycle processes from the
Those who manage perspective of NRVV.
product development • Understand what a data-centric practice of SE means and its advantages
projects. • Understand the value and importance of NRVV activities to project success
- and the importance of budgeting for and scheduling such activities.
• Understand how metrics managed within the SE toolset can help better
manage product development projects.
• Provide an accurate and comprehensive SE reference, for both training and
practitioner use.
• Provide more accurate cost and schedule estimates for complex systems
engineering projects
• Suggest cost and schedule savings to complex systems engineering
projects, even without an engineering background
Non-SE • Understand basic terminologies, scope, best practices, artifacts, and value
Stakeholders: Those associated with NRVV from a data-centric perspective.
involved in non-SE • Understand how various NRVV activities and artifacts relate to other PM
project activities. activities and artifacts.
Customers: Those • Understand overall product development lifecycle processes from the
who request a work perspective of NRVV activities.
product or outsource • Understand the role the customer has in these activities.
the development of a • Understand the importance of clearly defining in the supplier Statement of
SOI to a supplier. Work (SOW) or Supplier Agreement (SA) processes and deliverables and
the relationships of the customer/supplier roles and responsibilities
concerning NRVV.
• Understand why the integrated system must be managed from the
beginning of its development
• Understand why an integrated set of needs must be defined to which the
integrated system will be validated against prior to defining the set of design
input requirements.
• Understand the value of providing suppliers with the underlying analysis
and resulting data and information from which the integrated set of needs
and set of design input requirements were defined
Table 1-1: NRVV Use Cases.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 3

1.3 Approach
As shown in Figure 1-1, this Manual aligns with and complements the INCOSE Systems
Engineering Handbook (SE HB) [17] and the Systems Engineering Body of Knowledge (SEBOK).
In particular, this manual supplements and elaborates the INCOSE SE HB, providing more
detailed guidance on the “what”, “how”, and “why” concerning NRVV across the system
lifecycle. The NRM also addresses ambiguity and inconsistencies in NRVV terminology and
ontology.

INCOSE Systems
Integrated Data as a Foundation of

SEBok
Engineering Handbook
INCOSE RWG Whitepaper:

Systems Engineering

Needs and Requirements Manual

Guide to Guide to Guide to


Other Domain
Needs and Verification and Writing
Specific Guides
Requirements Validation Requirements

Figure 1-1: Relationships between INCOSE Requirements Working Group (RWG) products and the
INCOSE SE HB and the SEBOK.
Figure 1-1 also shows that this Manual is further elaborated by several supporting guides. The
Guide to Needs and Requirements (GtNR) [22] and the Guide to Verification and Validation
(GtVV) [21] further expand on the information in this Manual, focusing further on the ‘what’ and
‘how’ of the specific processes being implemented within an organization. These two guides
define the steps, input and output artifacts, activity flows, roles and responsibilities, approval
process (gate reviews), and configuration management (CM) of the applicable artifacts. The
level of detail is similar in content to an organization’s Work Instructions (WIs) or Standard
Operating Procedures (SOPs). These guides reference this Manual for specific guidance of the
‘why’ and underlying concepts, maintaining consistency in approach and ontology defined in
this Manual.
Although this Manual addresses activities and underlying analysis associated with defining
individual needs and design input requirements and sets of needs and sets of design input
requirements, the actual writing of the needs and requirements statements is covered in the
INCOSE Guide for Writing Requirements (GtWR) [19]. The GtWR includes a list of key
characteristics of well-formed needs and requirements and sets of needs and requirements, as
well as a set of rules that can help achieve those characteristics. However, the underlying
activities and analysis discussed in this Manual have a significant role in achieving these
characteristics. Throughout this Manual, when the activities being discussed address a given
characteristic defined in the GtWR, a trace to that characteristic is included.
As is also shown in Figure 1-1, this Manual and the associated guides advocate a data-centric
approach to PM and SE as defined in the INCOSE RWG Whitepaper Integrated-data as a
Foundation of Systems Engineering [18] and discussed in Section 3 of this Manual.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 4

While this Manual addresses in detail the specific application of the activities and concepts, the
specifics of “how” this information is applied is not prescribed. For example, while the use of
models and a data-centric approach are advocated, the specifics concerning how to do implement
these concepts within the project’s toolset are not addressed; while the use of Requirement
Management Tools (RMTs) is advocated, the specifics concerning any specific RMT is not
discussed. In this regard, the manual is structured to enable other WGs and tool vendors to
develop domain or tool-specific guides that tailor the contents in this Manual to best fit the needs
of the organization.
From an organizational and project team perspective, the concepts and activities presented here
form a general framework for developing systems from the perspective of NRVV. It is not
intended that organizations adopt all the activities presented, but rather use the best practices
presented to tailor their product development activities and processes appropriate to their
domain, product line, workforce, and culture.
Note: The end item being developed can be referred to as either a system or a product-either
term implies the integrated system. The integrated system is made up of subsystems and lower-
level system elements (assemblies, sub-assemblies, components) that are defined within the
system architecture. A “system of interest (SOI)” is the specific entity (system, subsystem, or
system element) that is to be defined, developed, verified, validated, delivered to either internal
or external customers, and then utilized, sustained and retired. The concepts discussed here
apply to any SOI no matter where in the physical architecture it exists.

1.4 Ontology: The Context of Terms Used in This Manual


The different views of NRVV from these authoritative sources can be confusing. Consequently,
a major challenge in developing this Manual concerns ontology, in particular the use of various
terms and their relationships, especially with respect to context.
This Manual therefore provides a specific ontology as applied to NRVV. Still, the reader is
cautioned to be aware of the specific use of terms in context as they read this Manual and the
associated guides, particularly as they may be familiar with the PMI®, CMMI®, or NASA
terminology and processes. Because of this, discussion of the differences and challenges is
appropriate. The following paragraphs provide examples of ontology challenges and how they
are addressed in this Manual. (Section 2 and the Glossary provide definitions of key terms used
in this Manual and its supporting Guides.)
1.4.1 Stakeholder Expectations, Needs, and Requirements
As noted earlier, various guides, textbooks, and standards refer to stakeholder “expectations,
needs, and requirements” as if they are the same. This can result in confusion as to their form, in
terms of what an is “expectation” versus what is a “need” as opposed to what is a “requirement”.
For some practitioners, “stakeholder expectations” are communicated in terms of stakeholder
needs and requirements; ISO/IEC/IEEE 29148 [25] defines “stakeholder requirements” in terms of
“stakeholder needs”. For others, stakeholder needs and expectations are communicated in a use
case, user story, or an operational concept. In some domains, “user needs and requirements” and
“customer needs and requirements” are specifically addressed instead of, or in addition to, the
more generic “stakeholder requirements” designation.
In addition, given that stakeholders exist at all levels of both the organization as well as levels of
architecture, when talking about “requirements” it is often not clear whether the discussion is

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 5

about stakeholder requirements defined at the strategic or business operations level of the
organization or the technical requirements defined at the system, subsystem, or system element
levels.
Another ambiguity is whether “stakeholder requirements” defined at the strategic and business
operations level are really what some refer to as “business requirements” or “customer
requirements” as opposed to technical “product, software, or system requirements”.
As well as stakeholder requirements”, ISO/IEC/IEEE 29148 also includes the phrase
“stakeholder-owned system requirements”, although it is not clear whether what is meant by
“stakeholder requirements” are really “stakeholder-owned system requirements”, i.e.,
stakeholder requirements for a system that result in the stakeholder needs being met. In this
context “customer requirements” could also be interpreted as “customer-owned system
requirements”.
To avoid ambiguity, whenever the phrase “stakeholder or customer requirements” is used in this
Manual, the reader should assume what is meant is “stakeholder-owned or customer-owned
system requirements”. This distinction is important in that “stakeholder, user, or customer
needs” represent a stakeholder, user, or customer perspective of what they need the SOI to do
while the “stakeholder-owned”, “user-owned”, or “customer-owned” system requirements are a
different perspective that communicates what the stakeholders, users, or customers require the
SOI to do to meet their needs. In this context, the stakeholder-owned, user-owned, or customer-
owned system requirements are transformed from the stakeholder needs, user needs, or customer
needs. Often, the requirements from the customer included in a contract with a supplier are
“customer-owned system requirements”.
The focus of this Manual is on the system, subsystems, and system elements that are part of the
integrated system physical architecture. The concepts in this Manual, tailored as appropriate,
apply to any SOI, no matter the level at which the SOI exists within the system architecture. As
such, higher-level lifecycle concepts, needs, and requirements defined at higher levels of the
organization or architecture and allocated to the SOI under development (Refer to Sections 2.1
and 6.4) are considered as constraints and inputs to the lifecycle concepts, needs, and
requirements defined for the SOI, no matter the level at which the SOI exists.
Initial stakeholder needs and stakeholder-owned system requirements obtained during elicitation
are treated as preliminary inputs into the system-level lifecycle concept analysis and maturation
activities. There are often multiple sets of stakeholder needs and stakeholder-owned system
requirements that must be considered. Stakeholder needs and stakeholder-owned system
requirements include internal and external customer needs and customer-owned system
requirements, business operations level stakeholder needs and stakeholder-owned system
requirements, and strategic level business requirements. Higher-level requirements allocated to
the SOI under development, or requirements within a standard or regulation which may or not be
written in the form of a requirement “shall” statement, are also treated as preliminary inputs into
the lifecycle concept analysis and maturation activities for a SOI.
To avoid ambiguity in the use of the terms “needs” and “requirements” as well as “stakeholder-
owned or customer-owned requirements” versus “system requirements”, this Manual follows the
following convention:
• Integrated set of needs represent the integrated and baselined set of needs that were
transformed from the set of lifecycle concepts for the SOI that define its intended use in its
operational environment when operated and supported by the intended users. The need
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 6

statements for a SOI are written in a structured, natural language and have the
characteristics defined in the GtWR for well-formed need statements and sets of needs.
Because needs are not requirements, they do not contain the word “shall”. This set of
needs communicate the stakeholder’s perspective concerning their expectations what they
need the SOI to do as discussed in Section 4 and is what the SOI design input requirements,
design, and the SOI are validated against as discussed in Sections 7, 8, 10, and 11. As
discussed later in the manual a common error is to communicate the stakeholder, user, or
customer needs as “shall” statements, adding confusion as to what are needs as opposed to
what are requirements.
• Design input requirements represent the technical requirements that were transformed from
the baselined integrated set of needs for the SOI and are inputs to the architecture and
design definition processes. The design input requirements are written in a structured,
natural language as textual “shall” statements that have the characteristics defined in the
GtWR for well-formed requirement statements and sets of requirements. The set of design
input requirements communicate the SOI perspective concerning what the SOI must do to
meet the set of needs as discussed in Section 6. They are the focus of both design verification
discussed in Section 8 and system verification discussed in Sections 10 and 11.

“Structured, natural language” refers to the textual form of needs and requirement statements
such that the sentence is not treated as an atomic entity [12] but has a grammatical structure
appropriate for communicating needs and requirements, e.g., “When <condition clause>, the
<subject clause> shall <action verb clause> <object clause> <optional qualifying clause>.” This
allows specific templates and a set of rules to be defined such as those in the INCOSE GtWR
that will result in the needs and requirements having the characteristics of well-formed needs and
requirement statements.
Section 2 contains a detailed set of definitions of the terms associated with needs and
requirements.
1.4.2 Stakeholder Requirements Versus System Requirements in the Context of
System Verification and System Validation
Another area of confusion concerning higher-level ‘stakeholder-owned system requirements’
defined at the business operations level (Refer to Section 2.3) versus ‘design input requirements’
defined at the system, subsystem, and system element levels is in defining system verification as
opposed to system validation. As defined in this Manual, system verification is concerned with
whether the SOI meets the SOI’s design input requirements while system validation is concerned
with whether the SOI can do what is intended when operated in the intended environment by the
intended users and that unintended users cannot prevent the SOI meeting its intended purpose as
defined by the integrated set of needs.
It can be confusing if the word “requirements” is used in both the context of system verification
(meeting the technical requirements) and system validation (meeting the business operations
level stakeholder-owned or customer-owned system requirements). To avoid confusion, this
Manual defines system validation in terms of meeting the set of needs defined for a SOI, which
may include references to the business operations level stakeholder needs and stakeholder-owned
system requirements as appropriate.
In this context, the business operations level stakeholder needs and stakeholder-owned system
requirements are allocated to the SOI as constraints and are integrated with other sets of
stakeholder needs and stakeholder-owned system requirements obtained during elicitation
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 7

activities as discussed in Sections 2.3.2, 4.3, and 6.4. These are then addressed during the SOI
lifecycle concept analysis and maturation activities, transformed via “needs analysis” into the
integrated set of needs which are transformed via “requirements analysis” into the set of design
input requirements.
“Transformed” implies a formal process used when moving from lifecycle concepts to the needs
that communicate what the stakeholders need from the SOI and then when moving to the design
input requirements that communicate what the SOI must do to meet those needs. The set of
design input requirements will contain child requirements that trace to the applicable higher-level
allocated requirements as well as trace to the set of needs from which they had been transformed.
The project team responsible for development of the SOI will verify the SOI meets its design
input requirements and validate that the SOI meets its set of needs as well as validating that the
delivered verified and validated SOI meets the customer and business operations level
stakeholder needs and stakeholder-owned system requirements.
1.4.3 Requirements versus Specifications and Documents versus
Specifications
Another source of confusion is the use of “document” versus “specification” and “requirements”
versus “specifications”. These terms are often used interchangeably: requirement document or
requirement specification, e.g., System Requirements Document (SRD) or Software
Requirements Specification (SRS). In this context the words “document” and “specification”
when used in their singular form represent containers of design input requirements.
The term “specification” in also used in context of the type of information that is contained
within the specification: “requirements” specification, “design” specification, “end-item”
specification, and “as-built’ specification.
In their plural form, some practitioners make a distinction between “requirements” and
“specifications”, where requirements refer to “design inputs” and specifications refer to “design
outputs”, i.e., the SOI is designed to implement the design input requirements and the system is
built according to the design output specifications.
In this Manual, the focus is on practicing SE from a data-centric perspective. With this
perspective the use of the term “document” or “specification” in terms of a collection of sets of
needs and sets of requirements is avoided, rather “set of needs” and “set of design input
requirements” is used in the context that an RMT organizes the needs and requirements in sets
corresponding to a specific system, subsystem, or system element within the physical
architecture as well as the set of needs and set of design input requirements for the integrated
system.
The use of “design input requirements” is appropriate in that they are inputs to the architecture
and design definition processes as opposed to outputs of these processes. A result of the
architecture and design definition processes are design output artifacts which are communicated
to the builders/coders in various forms.
The INCOSE SE HB refers to design outputs as a “set of design characteristics described in a
form suitable for implementation”. NASA’s SE HB refers to the design outputs as “design
descriptions”. Design outputs are also often referred to as “end-item specifications” or the
“Technical Data Package (TDP)”. The end-item specifications or TDP can include parts lists,
drawings, wiring diagrams, plumbing diagrams, labeling diagrams and requirements, logic
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 8

diagrams, algorithms, Computer-aided Design (CAD) files, or STL files (for 3D printing). These
artifacts represent requirements to which the SOI will be manufactured or coded; as such they
can be thought of as the “build-to/code-to” requirements.
To avoid confusion and ambiguity, this Manual refers to these design output artifacts as “design
output specifications” that communicate the design outputs to those that will build or code the
SOI. The resulting physical SOI will be verified to have met the design output specifications
commonly referred to as verifying that the SOI was “built-to spec”. This verification is often
done by the organization’s quality function as part of production verification discussed in
Section 9. A major concept that is advocated in this Manual is that design output specifications
(how) are not to be included within the sets of design input requirements (what).
Figure 1-2 illustrates the concepts of design input requirements versus design output
specifications. This diagram applies to each SOI no matter where in the integrated system
architecture it is.

Problem Space
Design Inputs
Focus on design inputs, preliminary
logical & physical architectures
Integrated Set of Transformation
Needs

Design Input Transformation


Design Output Specifications
Requirements can include requirements,
Design-to specifications, algorithms,
“What” Transformation formulations, drawings, &
Architecture & other design output artifacts
Design

Solution Space Design Output Transformation


Focus on design outputs, maturing the Specifications
logical & physical architectures, design, Build-to/Code-to
design output specifications, realized “How” System of
system of interest Interest

Design Outputs
Figure 1-2: NRVV Activity Relationships to the INCOSE SE HB.
While the figure could be viewed as waterfall with the transformations occurring serially, that is
not the intent. The NRVV activities described in this Manual are intended to be performed
concurrently. Because the system has a physical architecture made up of subsystems and system
elements, needs and requirements are defined iteratively and recursively as the system is
decomposed as discussed in detail in Section 2 and 6. The result is a family of integrated sets of
needs, sets of design input requirements, and sets of design output specifications for the
integrated system as well as each subsystem and system element within the system’s physical
architecture.
1.4.4 Needs, Requirements, Design, Verification, and Validation Management
In this Manual, the management of NRVV activities, resulting artifacts, and data are separated
from the execution of those activities. The actual execution of NRVV activities within a process
area are governed by the appropriate PM or SE plans, procedures, or work instructions for that
process.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 9

The three main management areas concerning needs, requirements, verification, and validation
are as listed below:
• Needs Definition and Management: Defining and overseeing Lifecycle Concepts and Needs
Definition activities and verification and validation of the resulting needs and integrated
sets of needs.
• Design Input Requirements Management: Defining and overseeing Design Input
Requirements Definition activities and verification and validation of the resulting design
input requirements and sets of design input requirements.
• Design and System Verification and Design and System Validation Management: Defining
and overseeing the design verification, design validation, production verification, system
verification, and system validation activities.
NRVV activities involve organizing different sets of data and artifacts: those involved with
needs and design input requirements (#1 and #2 above) and those for the verification and
validation of the design and the SOI (#3 above). Because the artifacts, activities, and data for
each of the areas is tightly coupled and dependent, organizations are encouraged to have a
comprehensive management system that includes each area in a single management process.

1.4 Needs, Requirements, Verification, and Validation Activities


Various PM and SE organizations and standards may name and group the NRVV activities
discussed in this Manual differently, combining several of these activities and assigning various
names to the resulting technical processes.
The Project Management Institute (PMI®), and Carnegie Mellon’s Software Engineering
Institute (SEI®) Capability Maturity Model Integrated (CMMI®) separate requirements
development and management into two separate processes, “Requirements Development” and
“Requirements Management”. Neither PMI nor CMMI include a separate process for lifecycle
concepts nor for needs definition. Verification and validation of the lifecycle concepts and needs
and of the resulting design input requirements are divided between the two main processes:
Needs definition is included as part of Requirements Development and management of those
needs is included as part of Requirements Management.
ISO/IEC/IEEE 15288[24] defines needs and requirements in terms of organizational levels:
organizational (enterprise), strategic, operational, system, and system element. Lifecycle
concepts, needs, and requirements are defined for each level at a level of abstraction appropriate
to the level. The INCOSE SE HB divides requirement development and management into three
technical process areas in accordance with ISO/IEC/IEEE 15288 based on these levels: Business
and Mission Analysis Process for lifecycle concepts, needs, and requirements at the strategic
level, Stakeholder Needs and Requirements Definition Process for lifecycle concepts, needs, and
requirements at the business operations level and Systems Requirements Definition Process for
lifecycle concepts, needs, and requirements at the system level and below. Section 2.3 of this
Manual provides a more detailed discussion of these levels of lifecycle concepts, needs, and
requirements.
In context of the CMMI Requirement Development process; ISO/IEC/IEEE 15288,
ISO/IEC/IEEE 29148[25], and INCOSE SE HB separates Requirements Development into the
above three areas such that the Business and Mission Analysis Process and Stakeholder Needs
and Requirements Process areas correspond to the development of customer requirements and
System Requirements Definition Process area corresponds to the development of the product and
product component requirements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 10

Within ISO/IEC/IEEE 15288, ISO/IEC/IEEE 29148, and the INCOSE SE HB technical


processes, system-level lifecycle concepts, needs, and requirements are combined into the one
process area: Systems Requirements Definition. In addition, in these documents, there is no
separate needs and requirement management process to address the activities associated with
needs and requirements management. Instead, needs and requirements management are included
as part of the Systems Requirements Definitions Process activities, and other technical process
activities including the Architecture Definition Process, Integration Process, Verification
Process, and Validation Process, the crosscutting Interface Management, and technical
management processes such as the Configuration Management Process and the Risk
Management Process.
While ISO/IEC/IEEE 29148 includes the lifecycle processes contained in ISO/IEC/IEEE 15288,
ISO/IEC/IEEE 29148 it also includes clause 6.6 concerning “requirements management” as a
distinct activity.
The US National Aeronautics and Space Administration (NASA) in their NASA Procedural
Requirements (NPR) 7123.1C, NASA SE Processes and Requirements Document [35] and the
companion NASA SE HB NASA/SP-2016-6105 [36] define three process areas that address needs
and requirements: Stakeholder Expectations Definition, Technical Requirements Definition, and
Requirement Management. The Stakeholder Expectations Definition and Requirements
Definition Processes are similar to those defined in ISO/IEC/IEEE 15288, ISO/IEC/IEEE 29148,
and INCOSE SE HB, however as is described by ISO/IEC/IEEE 29148 and CMMI®, NASA
includes a separate cross-cutting Requirement Management process.
Another difference between the NASA SE HB and the INCOSE SE HB is the focus of the
Stakeholder Expectations Definition Process is a combination in the INCOSE SE HB of the
operational and system level lifecycle concepts and stakeholder expectations definition;
however, in the NASA SE HB the form of communicating the stakeholder expectations is not
specifically stated. Stakeholder expectations correspond to stakeholder needs referenced in the
other documents.
All organizations include distinct verification and validation processes.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 11

1.6 The Five NRVV Activities Discussed in this Manual

ISO/IEC/IEEE 15288 and INCOSE SE HB Lifecycle Technical Processes


Business and Mission Analysis Process
Stakeholder Needs and Requirements Definition Process
System Requirements Definition Process
Verification Process
Validation Process
Integration Process

NRVV Activities Discussed in this Manual


Lifecycle Concepts and Needs Definition
Design Input Requirements Definition
System Verification
System Validation
System Needs, Requirements, Verification, and Validation Management

Figure 1-3: Relationship of INCOSE SE HB Technical Processes and NRVV Activities Discussed in
this Manual.
As shown in Figure 1-3, the five NRVV activities defined below trace to, and are an elaboration
of, the Business and Mission Analysis, Stakeholder Needs and Requirements Definition, System
Requirements Definition, Verification, and Validation technical process activities defined in
ISO/IEC/IEEE 15288 and INCOSE SE HB. Note: These activity areas are highly integrated
with and dependent on the other technical processes defined in ISO/IEC/IEEE 15288 and
INCOSE SE HB including the Architectural Definition Process, Design Definition Process, and
Integration Process as well as the crosscutting Interface Management and the technical
management processes.
The focus of this Manual is on the NRVV activities required for a SOI to be developed,
managed, delivered, utilized, sustained, and retired. This Manual divides these activities into the
following five activity areas.
• Lifecycle Concepts and Needs Definition: The focus is on defining a feasible set of
lifecycle concepts and an integrated set of needs that will result in a SOI that will meet the
defined problem or opportunity; mission, goals, and objectives (MGOs), measures, needs,
and requirements defined at the operational and strategic levels of the organization as well
as by an external customer.
o Key activities include eliciting system, subsystem, or system element level stakeholder
needs and stakeholder-owned system requirements; identifying drivers, constraints, and
risk; developing, analyzing, and maturing lifecycle concepts; defining a set of needs;
providing traceability between each need and its source; including attributes as part of
each need expression, and planning for design and system validation.
o Lifecycle Concepts and Needs Definition activities start at the beginning of the
development lifecycle for a SOI and are an elaboration of the activities performed
within the Business and Mission Analysis, Stakeholder Needs and Requirements
Definition, System Requirements Definition technical processes.
o The verified, validated, and baselined set of needs is the basis for requirements, design,
and system validation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 12

o Lifecycle Concepts and Needs Definition is discussed in detail in Section 4.

• Design Input Requirements Definition: The focus is on transforming the baselined


integrated set of needs for a SOI into unique, quantitative, and verifiable design input
requirements expressed as “shall” statements that are inputs for defining the SOI physical
architecture and its realization via a design solution. The design input requirements
address what the system, subsystem, or system element must do to satisfy the set of needs
from which they were transformed without stating how (implementation - design outputs).
o Key activities include transformation of the needs into the requirements; establishment
of traceability between requirements and the need or parent requirement from which it
was transformed; definition of attributes for each design input requirement;
establishment of traceability between dependent peer requirements, planning for design
and system verification, concurrently with the architecture definition process, definition
of a system architecture, and baselining the set of design input requirements. These
requirements are then flowed down (allocated and budgeted) from one level of the
physical architecture to another, establishing traceability between levels of
requirements and dependent requirements, defining interactions across interface
boundaries, and developing interface requirements for each interaction across the
interface boundaries.
o Design Input Requirements Definition activities begin concurrently with the Lifecycle
Concepts and Needs Definition activities as shown in Figure 1-2 and continues until the
SOI has been built or coded and verified against the sets of design input requirements.
o The Design input Requirements Definition activities are an elaboration of the activities
performed within the System Requirements Definition technical process concurrently
with the Architectural Definition technical process.
o The family of sets of verified, validated, and baselined design input requirements for
the SOI is the basis for design and system verification.
o Design Input Requirements Definition is discussed in detail in Section 6.
• System Verification. The focus is on planning for system verification, executing those
plans, and reporting on the results.
o Key activities include defining lifecycle concepts for system verification and plans to
implement those concepts. Defining system verification attributes as the design input
requirements statements are written. These attributes include the verification Success
Criteria, Strategy, Method, level of verification activities, and the responsible
organization. Other activities include defining specific verification Activities,
Procedures, and Events. Following the completion of the verification Procedures, the
results are recorded and included in verification Approval Packages and submitted to
the verification Approving Authorities.
o Planning for system verification begins during Lifecycle Concepts and Needs Definition
and continues through Design Input Requirements Definition, Architectural Definition,
Design, and System Integration.
o System Verification is discussed in detail in Sections 10 and 11.
• System Validation. The focus is on planning for system validation, executing those plans,
and reporting on the results.
o Key activities include defining lifecycle concepts for system validation and plans to
implement those concepts. Defining system validation attributes as the need statements
are defined. These attributes include the validation Success Criteria, Strategy, Method,
level of validation activities, and the responsible organization. Other activities include

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 13

defining specific validation Activities, Procedures, and Events. Following the


completion of the validation Procedures, the results are recorded and included in
validation Approval Packages and submitted to the validation Approving Authorities.
o Planning for the system validation begins during Lifecycle Concepts and Needs
Definition and continues through Design Input Requirements Definition, Architectural
Definition, Design, System Integration and System Verification.
o System Validation is discussed in detail in Sections 10 and 11.

• Needs, Requirements, Verification, and Validation Management. The focus is on managing


the sets of needs and the sets of design input requirements, including managing the needs
and requirement definition activities, managing the flow down (allocation and budgeting)
of requirements from one level to another, validating bidirectional traceability, and
managing the design and system verification and system validation artifacts.
o Key activities include preparing or updating the organization’s processes for needs and
requirements definition and management and selecting appropriate applications to be
included within the project toolset; ensuring project team members are trained in the
organization’s PM and SE processes, use of applications within the project toolset,
allocation and budgeting, and conduct of interface and traceability audits.
o Key activities also include the management of the definition of the design and system
verification and system validation artifacts ensuring they are developed and maintained
in accordance with the organization’s defined process, procedures, and work
instructions.
o CM activities include baselining of the integrated sets of needs and sets of design input
requirements; managing changes to the baselined sets of needs and sets of design input
requirements, sets of design output specifications, system verification, and system
validation artifacts; communicating change information to the stakeholders; and
assessing change impacts to other PM and SE artifacts and activities across the system
lifecycle.
o Needs, Requirements, Verification, and Validation Management is discussed in detail in
Section 14.

1.7 Needs and Requirements Manual Organization


This Manual is organized as follows:
• Section 1 Introduces the manual, discusses key concepts, and key definitions of key terms
used throughout the Guide.
• Section 2 Provides basic definitions and concepts.
• Section 3 Discusses the concept of Information-based Needs and Requirements Definition
and Management (I-NRDM).
• Section 4 Discusses Lifecycle Concepts and Needs Definition activities.
• Section 5 Discusses Needs Verification and Validation activities.
• Section 6 Discusses Design Input Requirements Definition activities.
• Section 7 Discusses Design Input Requirements Verification and Validation activities.
• Section 8 Discusses Design Verification and Design Validation activities.
• Section 9 Discusses Production Verification activities.
• Section 10 Discusses system verification and system validation common principles.
• Section 11 Discusses System Verification and System Validation activities.
• Section 12 Discusses the use of Off-the Shelf (OTS) system elements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 14

• Section 13 Discusses design and system verification and design and system validation
considerations when using supplier-developed system elements.
• Section 14 Discusses Needs, Requirements, Verification, and Validation Management
activities.
• Section 15 Discusses on the use of attributes.
• Section 16 Discusses the desirable features of an SE toolset.
• Appendix A Lists references for sources of information in this Manual.
• Appendix B Lists acronyms and abbreviations used in this Manual.
• Appendix C Provides a glossary defining key terms used in this Manual.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 15

Section 2: DEFINITIONS AND CONCEPTS

The NRVV concepts discussed in this Manual are better understood if based on consistent
definitions of key terms and basic concepts.

2.1 Definitions
This section defines several fundamental terms, based on the preceding discussion in Section 1
and definitions provided by ISO/IEC/IEEE 29148 and ISO/IEC/IEEE 15288, in “An Improved
Taxonomy for Definitions Associated with a Requirement Expression” [41] and other key
references.
Note: In these definitions the term “customer” is used to refer to the organizations or persons
(internal or external) requesting or procuring a work product, and/or will be the recipient of the
work product when delivered. Customers are key stakeholders that exist at multiple levels of an
organization and may be internal or external to the enterprise. As such, there are multiple
customers.

When describing system development, some form of distinction is commonly made between
lifecycle concepts, needs, and requirements.
Needs and requirements apply to an entity, which could exist at any level of the organization or
the system architecture. Since terms such as “product”, “SOI”, “system”, “subsystem”, and
“system element” are level-specific, a term is needed that can apply at any level of the
organization or architecture and to any single item at that level. For this the term “entity” is used
which has lifecycle concepts, needs, and requirements that are to be met by the entity.
An entity is a single item to which a concept, need, or requirement applies: an
organization, business unit, project, supplier, service, procedure, SOI (system,
subsystem, system element), product, process, or stakeholder class (user, operator,
tester, maintainer, etc.)
A concept is a textual or graphic representation that concisely expresses how an entity
can satisfy the problem, threat, or opportunity it was defined to address within specified
constraints with acceptable risk that provides a business capability in terms of people,
process, and products.
A set of lifecycle concepts includes multiple concepts across the lifecycle of how the
organization (and entities within an organization) expect to manage, acquire, define, develop,
build/code, integrate, verify, validate, transition, install, operate, support, maintain, and retire
the system that provides a business capability in terms of people, process, and products.
The information used to define the lifecycle concepts includes a problem statement, a mission
statement, goals, objectives, measures, stakeholder needs and stakeholder-owned system
requirements, use cases, user scenarios, user stories, operational scenarios, drivers and
constraints, and risk. Using this information, through formal lifecycle analysis and maturation, a
set of lifecycle concepts is defined for an entity.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 16

Lifecycle concepts can be communicated in various forms including textual (e.g., OpsCon or
ConOps), graphical representations (e.g., diagrams and models), and/or electronic (data bases).
There are multiple lifecycle concepts that apply to each entity, so it is useful to develop a
necessary and sufficient set of lifecycle concepts which define the needs and requirements for
that entity.
Based on the set of lifecycle concepts, through formal needs analysis, an integrated set of needs
is defined, which will result in the set of lifecycle concepts for the entity to be realized.
Needs are formal textual statements of expectations for an entity stated in a structured, natural
language from the perspective of what the stakeholders need a SOI to do, communicated at a
level of abstraction appropriate to the level at which the entity exists.
A need statement is the result of a formal transformation of one or more lifecycle
concepts into an agreed-to expectation for an entity to perform some function or possess
some quality within specified constraints with acceptable risk.
As with defining needs, defining requirements is an activity which, through formal requirements
analysis, determines specifically what the entity must do to meet the needs they are being
transformed from using a formal transformation process involving decomposition, derivation,
diagrams, and architectural and analytical/behavioral models. A deeper exploration and
elaboration of the lifecycle concepts, including a thorough examination of interactions between
the entity and other entities, are part of the transformation from needs into requirements. As a
result of the requirements analysis, there may be more than one requirement defined for each
need.
Requirements are formal textual “shall” statements that communicate in a structured, natural
language what an entity must do to realize the intent of the needs from which they were
transformed.
A requirement statement is the result of a formal transformation of one or more needs or
parent requirements into an agreed-to obligation for an entity to perform some function
or possess some quality within specified constraints with acceptable risk.
The analysis used to transform lifecycle concepts into needs and to transform needs into
requirements is frequently referred to as business analysis or mission analysis at the enterprise
and strategic levels of the organization and needs analysis and requirements analysis at the
business operations, system, subsystem, and system element levels. Diagrams and models are
important tools used as part of this analysis to help achieve correctness, consistency,
completeness, and feasibility of the transformations.
Lifecycle concepts, needs, and requirements should be developed for entities at all levels.
The reader is urged to be diligent with the lifecycle concepts-needs-requirements (CNR)
approach advocated in this Manual and resist the temptation to jump from the lifecycle concepts
directly to writing requirements or even worse, going directly from lifecycle concepts to
candidate design solutions, skipping needs and requirements definition entirely.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 17

Validation
Attributes

have Included in

Need Included in Need Included in Need


Statement Expression Set

have have
inform have Included in inform

Characteristics Result Rules Characteristics Result Rules


(GtWR) in (GtWR) Attributes (GtWR) in (GtWR)

Stakeholder Needs
Transformed into
Design input Requirements
Verification
Attributes

have Included in

Requirement Included in Requirement Included in Requirement


Statement Expression Set

have have inform


inform have Included in

Characteristics Result Rules Characteristics Result Rules


(GtWR) in (GtWR) Attributes (GtWR) (GtWR)
in

Figure 2-1: Entity-Relationship Diagram for Needs and Requirements Terms. [41]
Both needs and requirements statements are more than the well-formed textual statements which
are written succinctly in a standard format using a structured, natural language having the
characteristics defined in the GtWR. As illustrated in Figure 2-1, the full need or requirement
expression includes associated attributes that aid in the definition and management of a need,
sets of needs, requirements, and sets of requirements. Refer to Section 15 for a more detailed
discussion on attributes as applied to needs and requirements.
An attribute is additional information associated with an entity which is used to aid in its
definition and management.
A need expression includes a need statement and a set of associated attributes.
A requirement expression includes a requirement statement and a set of associated
attributes.
Well-chosen attributes, properly defined and tracked, can make the difference in being able to
manage needs and requirements definition throughout the system lifecycle and adjust accordingly
- or finding out late in the program the needs or requirements were wrong in the first place. When
errors in the needs and requirements are discovered late in the program, they can be expensive and
time consuming to fix.
Although each individual need and requirement expression is important, it is ultimately the set of
needs and resulting set of design input requirements that will describe what the entity must do and

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 18

be, and it is the set of needs and/or set of design input requirements that most often will be agreed-
to as a contractual obligation. See the GtWR for a description of the characteristics of well-formed
sets of needs and sets of requirements and rules that help result in those characteristics.
A need set is a structured set of agreed-to need expressions for the entity
(enterprise/business unit/system/subsystem/system element/process) and its external
interfaces.
A requirement set is a structured set of agreed-to requirement expressions for the entity
(enterprise/business unit/system/subsystem/system element/process) and its external
interfaces.
The integrated set of needs for each system, subsystem, and system element at each level of the
system physical architecture should be defined, verified, validated, and baselined (formally
agreed to by the stakeholders) at a gate review prior to their transformation into the set of design
input requirements. Likewise, the set of design input requirements for each system, subsystem,
and system element at each level of the system physical architecture should be defined, verified,
validated, and baselined (formally agreed to by the stakeholders) at a gate review prior to their
transformation into the design.
The resulting integrated sets of needs and sets of design input requirements defined for an entity
will not be valid (or at least, not useful) until they are verified, validated, formally agreed-to,
baselined, and placed under CM or under contract. This is essential because the needs and
requirements define what is necessary for acceptance. (Refer to Section 4); it is the set of design
input requirements that is the focus of system verification; and it is the set of needs that is the
focus of system validation.
In many cases where there is a customer/supplier relationship, the supplier is often compensated
based on the realized SOI being verified to meet the design input requirements specified in the
contract. Because of this, it is crucial that this set of requirements has the GtWR characteristics
of well-formed sets of requirements as defined in the GtWR before a formal contract is agreed
to.
In some cases, organizations may contract with a supplier stating only the integrated set of needs
for the entity and require that the supplier develop a set of design input requirements based on
those needs as part of the contract tasks defined in a contract. Consequently, it is crucial that this
set of needs has the GtWR characteristics of well-formed sets of needs as defined in the GtWR
before a formal contract is agreed to.
In either case, it must be made clear in the contract who (customer or supplier) is responsible for
the system verification as well as for defining verification Success Criteria, Strategy, and Method
are that must be met for acceptance of the SOI (Refer to Section 10). It should also be made
clear the roles of the customer and supplier for validating that the delivered SOI meets the SOI’s
defined and baselined integrated set of needs.
Customer/supplier relationships are discussed in more detail in Section 13.
2.2 Applicability of Lifecycle Concepts, Needs, and Requirements
It is important to understand the significance of the use of the word “entity” in the above
definitions.
As shown in Figure 2-2, an entity, in response to a problem or opportunity identified by the
customers and stakeholders at the appropriated levels discussed in Section 2.3, fulfills lifecycle

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 19

concepts, an integrated set of needs, and a set of design input requirements that apply to the
entity.

Customers & develop Lifecycle


Stakeholders Concepts
transformed
have into
fulfill

Problem or fulfilled fulfill Integrated


Opportunity by Entities Set of Needs

fulfill
transformed transformed
into into
Design input
Requirements

Figure 2-2: Entity-Relationship Diagram for Entities, Concepts, Needs, and Requirements. [41]
From the lifecycle concepts, the set of needs can be defined for the SOI, project, suppliers,
processes, work instructions, people, and tools. The design input requirements are then
transformed from the set of needs that address what each of those entities must do to meet the
needs for that entity in accordance with the defined lifecycle concepts.
An entity to which a requirement applies could be the object of a need statement (“The
<stakeholders> need the <entity> to ........”) or the subject of a subsequent requirement statement
(“The <entity> shall ......”).
There will be project requirements on a project or organizational elements within the enterprise
that will be recorded in a PM plan, other plans, procedures, and work instructions that may take
the form:
The project shall …….
The [xxxxx team] shall…….
There will be supplier requirements on a supplier, vendor, or contractor that will be recorded in
Statements of Work (SOW) and Supplier Agreements (SA) that may take the form:
The supplier shall …….
The contractor shall …….
As discussed in Section 10, there will be procedural requirements concerning actions the person
or organization responsible for conducting steps within a procedure resulting in those actions,
e.g., a system verification or system validation procedure, such as the following:
The [operator, technician, engineer] shall [stimulate the SOI in some manner].
The [operator, technician, engineer] shall [record the results of the stimulation].
There will be requirements on the SOI that are recorded within the SOI set of design input
requirements or design output specifications as shown in Figure 1-2, which provides
expectations concerning the production of a SOI:

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 20

The SOI shall [perform some function with the desired performance under some operating
condition]. (Design input)
The SOI component shall be manufactured to [the physical dimensions shown in drawing
xyz]. (Design output).
Systems engineers must make clear the applicability of needs and requirements based on the
entity they apply and not mix them together within a single set. Each need and requirement must
be recorded in separate sets for the entity to which they apply. This is important because for
each entity there is an expectation that objective evidence can be obtained which can be used to
prove, with some level of confidence, that the entity has met the requirements (system
verification) or needs (system validation) of that entity.
The approach as to how a project verifies that a SOI meets its design input requirements is
different from the approach used by a customer to verify that a supplier meets its SOW
requirements. A more formal approach is applied concerning how the project or supplier will
verify a SOI meets both its design input requirements and design output specifications.
Separating requirements based on the entity to which they apply allows the verification
approaches and resulting activities and artifacts to be recorded and implemented separately based
on the entity to which the requirement applies.
Unfortunately, it is common to see non-technical SOW/SA supplier requirements mixed in with
the technical design input requirements for the SOI the supplier is developing in the same
document, many of which are written in a passive voice such that it is not clear whether the
requirement is a non-technical requirement that applies to the supplier or a technical design input
requirement that applies to the SOI.
In cases, such as a SA that is a combination of a contract, SOW, and technical requirements all in
one document, it is important to separate the requirements based on the entity to which they
apply (different sections or appendices) as well as ensure the requirements, no matter the
applicability, are well-formed as defined in the GtWR.
It is also common to see design input requirements (what) and design output specifications (how)
included in the same set of requirements without being clearly marked. For successful projects,
this mixing must be avoided.

2.3 Levels of Lifecycle Concepts, Needs, and Requirements


2.3.1 Levels of Organization
As illustrated in Figure 2-3 lifecycle concepts, needs, and requirements exist at several levels and
from different points of view [39].
As shown in Figure 2-3, at each level there are real-world stakeholder expectations which are
addressed by the lifecycle concepts, needs, and requirements. “Real-world” makes a distinction
as contrasted with “as communicated” or “as understood” expectations. In the end it is the real-
world expectations that must be realized throughout the operational life of the system.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 21

Concept of Operations
Organizational Enterprise
Level View (ConOps) or Strategic Strategies
Business Plan (SBP) Business
Analysis

Stakeholder Preliminary Lifecycle Concepts:


Strategic Development, Production, Business Business
Level View real-world
expectations Acquisition, Deployment, Mission Needs Mission Requirements
Lifecycle Operations, Support, Retirement Needs Requirements
Analysis & Analysis Analysis
Maturation

Business Lifecycle Concepts: Business Business


Operations Stakeholder Development, Production,
real-world Operations Operations
Level View expectations
Acquisition, Deployment,
Needs Needs Requirements Requirements
Lifecycle Operations, Support, Retirement
Analysis & Analysis Analysis
Maturation

System Stakeholder System Lifecycle Concepts:


Level View real-world Development, Production, System System
expectations Acquisition, Deployment, Needs Requirements
Lifecycle Operations, Support, Retirement Needs Requirements
Analysis & Analysis Analysis
Maturation

Stakeholder Subsystem Lifecycle Concepts:


Subsystem Development, Production,
Level View real-world Subsystem Subsystem
expectations Acquisition, Deployment,
Lifecycle Operations, Support, Retirement Needs Requirements
Requirements
Analysis & Needs
Analysis Analysis
Maturation

System Stakeholder
System Element Lifecycle
Element Concepts: Development, Systems System
real-world Production, Acquisition, Element Element
Level View expectations Deployment, Operations, Support,
Lifecycle
Needs Needs Requirements Requirements
Analysis & Retirement Analysis
Maturation Analysis

Levels and Lifecycle Concept Needs Requirements


Views View View View

Figure 2-3: Transformation of Concepts into Needs into Requirements. [39]


The stakeholders have a viewpoint appropriate to the level they exist. Each level elaborates on
the lifecycle concepts, needs, and requirements defined at the previous level. There is an
• Organizational level view in which the enterprise leadership sets the organizational strategies in the
form of an enterprise level Concept of Operations (ConOps) for the organization or a Strategic
Business Plan (SBP).,
• Strategic level view in which business management level stakeholders derive business
lifecycle concepts, needs, and resulting business requirements,
• Business operations level view in which business operations level stakeholders define the
operational lifecycle concepts, needs, and resulting business operations requirements,
• System level view in which the system to be developed is defined by the system level
stakeholders in terms of system lifecycle concepts, needs, and system requirements,
• Subsystem level view in which the subsystems to be developed is defined by the subsystem
level stakeholders in terms of subsystem lifecycle concepts, needs, and subsystem
requirements, and
• System element level view in which the system elements to be developed is defined by the
system element level stakeholders in terms of system element lifecycle concepts, needs,
and system element requirements.
The lifecycle concepts, needs, and requirements at one level flow down and constrain the next
level until a build, buy, code, or reuse decision is made. At this next level, the lifecycle
concepts, needs, and requirements must be consistent with and compliant with the higher-level
lifecycle concepts, needs, and requirements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 22

Defining and recording lifecycle concepts, needs, and requirements for an entity is more than just
an exercise in writing; it is an engineering activity which, through formal analysis, determines
specifically what the customers, users, and other real-world stakeholders expect the entity to do
to satisfy a specific problem or opportunity. This formal analysis starts at the organizational and
strategic levels of the enterprise and is elaborated by engaging the customers, users, and other
stakeholders to formalize a number of lifecycle concepts, needs, and requirements which provide
an implementation-independent understanding of what is expected of the entity (design inputs)
without addressing how (design outputs) to satisfy a specific problem or opportunity within
defined constraints with acceptable risk.
2.3.1.1 Organizational Level
At the Organizational level, the organization has several strategies that will guide its future. A
system has its genesis in the enterprise level ConOps or SBP which communicates the
leadership’s intentions regarding the management and operation of the organization—in terms of
existing systems, systems to be developed or procured, services, domain, and product line(s). At
this level, the ConOps or SBP, defines the organization in terms of ‘brand’ (distinctive identity)
and establishes a vision or mission statement and corresponding goals and objectives which
clearly state the reason for the enterprise, its strategy for moving forward, and expected
outcomes. The focus of the enterprise level ConOps or SBP is how the organization will operate
within the domain, market, industry, and regulatory environment in which it exists.
2.3.1.2 Strategic Level
At the Strategic level, business management stakeholders using the guidance in the enterprise
level ConOps or SBP to define a set of strategic level lifecycle concepts which capture the
business management stakeholder concepts for management, acquisition, product definition,
development, quality, safety, security, human resources, marketing, operations, procurement,
deployment, sales, support, maintenance, and retirement. These lifecycle concepts are captured
as preliminary concepts whose focus is on defining the lifecycle concepts at the business
strategic level in terms of internal capabilities, performance, activities, standards, and processes
for the enterprise which will be used to realize the vision or mission statement for the enterprise
and corresponding goals and objectives. The preliminary lifecycle concepts are elaborated and
formalized into a set of business level stakeholder needs which are transformed into a set of
business requirements. The business level stakeholder needs are extracted from the preliminary
lifecycle concepts and transformed into business requirements using mission or business analysis
activities. The lifecycle concepts, needs, and requirements at this level are about strategic level
organizational capabilities provided by the people, processes, and products within the
organization.
Strategic level lifecycle concepts, needs, and requirements often focus on governance of
organization’s business management and operations. Examples include business goals and
objectives, principal capabilities and product line(s), branding, quality, safety, security, human
resources, data governance, regulations and standards compliance, and high-level processes, for
example, PM and SE. At this level, the lifecycle concepts, needs and requirements can apply to
various entities including the organization, programs, projects, processes, and people responsible
for supplying servicers or developing systems (products) as well as the systems the enterprise
procures, delivers, or develops. Once the business management stakeholders at the strategic
level are satisfied that their lifecycle concepts, needs, and requirements are complete at the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 23

appropriate level of abstraction, they are passed down to the business operations level for
implementation.
At the strategic level, the focus is on “classes” of potential solutions, rather than on a specific
service, product, or system within a class.
2.3.1.3 Business Operations Level
At the Business Operations level, lifecycle concepts, needs, and requirements are defined at a
lower, tactical level of abstraction using the organizational level ConOps and strategic level
preliminary lifecycle concepts and business level needs and requirements as guidance. The
business operations level stakeholders use a structured analysis process to elicit operational level
stakeholder needs and develop lifecycle concepts appropriate to the business operations level,
which are recorded in the business operations set of lifecycle concepts.
Lifecycle concepts are defined to address the business operations capabilities needed by the
business to conduct operations. These concepts include information technology (IT), data and
information management, PM, SE, product development, budgeting, scheduling, inventory
control, configuration management, quality, safety, security, logistics, marketing, sales, etc.
Needs analysis processes are used to extract business operations level stakeholder needs from the
operational level lifecycle concepts and transform them into a formal set of business operations
level stakeholder-owned requirements for the organizational entities responsible for developing
systems or services.
The business operations level lifecycle concepts, needs, and requirements are recorded in the
organization’s toolset for storing the organization’s data and information. Hereafter, this will be
called the organization’s “integrated dataset”.
Business units, programs, and projects exist at the business operations level. At this level, a key
area of focus is on the infrastructure: specific programs/projects, people, processes, and
applications used within the organization that will be involved in operations and in supplying
services or developing systems (products) for both internal and external customers.
The business operations level stakeholder needs and stakeholder-owned system requirements
concerning the people, processes, and tools are implemented via the organization’s Plans, SOPs,
WIs, Process Definition Documents (PDDs), etc. A key point is that the focus of these concepts,
needs, and requirements is on the organization, programs/projects, and people involved in
business operations activities.
A second focus at the business operations level is on the lifecycle concepts, business operations
level stakeholder needs, and stakeholder-owned requirements concerning the services provided
by the enterprise and systems (products) the enterprise develops or procures, to satisfy the needs
of both internal as well as external customers.
Included within the business operations level needs for a service or systems is a mission
statement, goals, objectives, measures, and constraints that clearly communicate the business
operations level stakeholder real-world expectations for that service or system. Together, the
business operations level lifecycle concepts, needs, and requirements are constraints on the
system level.
At the business operations level, lifecycle concepts for the services supplied and systems and
product lines supplied by the organization units are developed at a more detailed level of

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 24

abstraction. Business operations level stakeholder needs are extracted from the business
operations level lifecycle concepts and transformed into business operations level stakeholder-
owned requirements at a level of abstraction appropriate to the business operations level. The
resulting lifecycle concepts, needs and requirements are recorded in the organization’s integrated
dataset. The transformation is guided by formal lifecycle analysis and maturation, needs
analysis, and requirements analysis.
A key point is that this second set of business operations lifecycle concepts, needs, and
requirements is on the services supplied or products being developed or procured, rather than on
the organizational units supplying the service or developing or procuring the product. These sets
of business operations lifecycle concepts, needs, and requirements flow down and constrain the
system level lifecycle concepts, needs, and requirements which must be consistent with and
compliant with the business operations level lifecycle concepts, needs, and requirements. The
projects are responsible for verification that the business operations level stakeholder-owned
requirements for a product or service have been met and validating that the business operations
level stakeholder needs have been met.
2.3.1.4 System Level
At the System level, the focus is on a specific service being supplied or a specific system or
product to be procured for an internal customer or developed for both internal and external
customers.
At this level, a system is first defined as a solution to business operations level needs and
requirements. A major advantage of postponing consideration of a specific solution to the
system level of activities, is that the organizational, strategic, and business operations level
lifecycle concepts, needs, and requirements can be considered when assessing candidate
solutions. With this “big picture” in mind, the higher-level lifecycle concepts, needs, and
requirements are considered when defining the lifecycle concepts, needs and requirements for
the system.
Proposing a solution without understanding the higher-level organizational lifecycle concepts,
needs, and requirements is a major reason for project failure. This approach adds risk that a
candidate solution will gain momentum within the organization and that once higher-level needs
and requirements are discovered, there will be a temptation to fit those needs and requirements to
the proposed solution (instead of the other way around). This approach often leads to either a
failed project or higher-level needs and requirements that are not met and a failure of the realized
system to be successfully verified against its design input requirements and successfully
validated against its set of needs.
Using the approach discussed in this Manual, the business operations level lifecycle concepts,
stakeholder needs, and requirements constraint the specific system being procured or developed
or service to be supplied. The project team uses a structured engineering process to work with
the various system level stakeholders associated with the product or service, both internal and
external, to elicit system level stakeholder needs and stakeholder-owned system requirements
and identify risk specific to the SOI or service being developed.
With this information, the project team defines and matures a feasible set of system level
lifecycle concepts for the system that will result in the needs and requirements defined at the
business operations level to be met with risk acceptable for this lifecycle stage.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 25

Based on this set of lifecycle concepts, the project defines an integrated set of needs for the
system, which is transformed into the set of system level design input requirements. The system
level lifecycle concepts, set of needs and set of design input requirements are recorded in the
SOI’s integrated data set. The system will be verified against the system level design input
requirements and validated against the system level set of needs.
As part of the lifecycle concepts analysis and maturation activities a physical architecture for the
system is defined consisting of subsystems and systems elements. If the organization decides
the system needs further elaboration, this set of design input requirements will be allocated to the
subsystems at the next level of the architecture.
2.1.3.5 Subsystem Level
At the Subsystem level, the focus is on specific subsystems that are part of the system physical
architecture.
Included within the system level needs allocated to each subsystem are MGOs, measures, and
constraints that clearly communicate the system level stakeholder real-world expectations for
each subsystem. Together, the system level lifecycle concepts, needs, and requirements
allocated to the subsystems constraint the specific subsystems being procured or developed.
The project team works with the various subsystem level stakeholders, both internal and
external, to elicit subsystem level stakeholder needs and stakeholder-owned subsystem
requirements; and to identify risk and constraints specific to each subsystem. With this
information, the project team defines and matures a feasible set of subsystem level lifecycle
concepts for each subsystem that will result in the in the allocated needs and requirements
defined at the system level to be met with risk acceptable for this lifecycle stage.
Based on this set of subsystem level lifecycle concepts an integrated set of subsystem level needs
is defined for each subsystem which are transformed into subsystem design input requirements.
The subsystem level lifecycle concepts, set of needs, and the set of design input requirements are
recorded in the SOI’s integrated dataset. Each of the subsystems will be verified against their
design input requirements and validated against their set of needs.
If the organization decides a subsystem needs further elaboration, this set of design input
requirements will be allocated to the system elements that make up that subsystem at the next
level of the architecture.
2.1.3.6 System Element Level
At the System Element level, the focus is on specific system elements that are part of their parent
subsystem.
Included within the subsystem level needs allocated to each system element are MGOs,
measures, and constraints that clearly communicate the system level stakeholder real-world
expectations for each subsystem. Together, the subsystem level lifecycle concepts, needs, and
requirements allocated to the system elements constraint the specific system elements being
procured or developed.
The project team works with the various system element level stakeholders, both internal and
external, to elicit system element level stakeholder needs and stakeholder-owned system element
requirements; and identify risk, and drivers and constraints specific to each system element. With

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 26

this information the project team defines and matures a feasible set of system element level
lifecycle concepts for each system element that will result in the in the allocated needs and
requirements defined at the subsystem level to be met with risk acceptable for this lifecycle
stage.
Based on this set of system element level lifecycle concepts, the project defines an integrated set
of needs for each system element which are transformed into the system element design input
requirements. The system element level lifecycle concepts, set of needs, and the set of design
input requirements are recorded in the SOI’s integrated dataset. Each of the system elements
will be verified against their design input requirements and validated against their set of needs.
2.3.1.7 SOI in Context of the Macro System of Which It is a Part
A common issue is when systems engineers focus on the specific SOI, they are responsible to
develop, verify, validate, and deliver without considering higher level organizational and
architectural lifecycle concepts, needs, and requirements both internal to their organization as
well an external customer’s organization. Failure to recognize this top-down process is a
common cause of project failure.
When a project team is responsible for developing a SOI, it needs to use systems thinking to
address the macro system in which the SOI under development is a part and within which it must
operate. This macro system includes both systems external to the SOI which the SOI interacts as
well as organizational units above the project or program level that is developing a specific
system, processes, and other systems or organizations with which the SOI or project team must
interact.
If the SOI is a subsystem or system element, both the customer and developing organizations
must never lose sight of the higher-level system it is a part and interactions between their
subsystem and other subsystems or interactions of their system element with other system
elements. They also must acknowledge that the SOI they are responsible to develop must
respond to the higher-level allocated lifecycle concepts, needs, and requirements to ensure the
integrated system or macro system is optimized, even if it means that the SOI is not optimized.
2.1.3.8 Example of Organizational Levels of Lifecycle Concepts, Needs, and
Requirements.
Consideration of the organizational, strategic, and business operations levels are necessary
because they represent three significantly different points of view that must be defined and
implemented in a top-down manner.
The following is an example of why organizations must address the levels of lifecycle concepts,
needs, and requirements above the system level:
Consider a wood-felling company whose management have just returned from a 1930s-trade
show where they witnessed a demonstration of the revolutionary wood-felling technological
device called a “chainsaw” that was introduced to the market by Andreas Stihl’s new
company. Although the ability to cut down trees at a greater rate is extremely attractive, the
company cannot simply nominate one of the stakeholders to define as set of requirements for
the procurement of chainsaws. From a systems view, how will this new, transforming
technology be phased into operations?

Further, management cannot even ask stakeholders at the business operations level to
describe what they want from the introduction of the new chainsaw capability in the form of

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 27

needs and requirements. The current business operations managers are experienced in
managing axe men who are not able (and probably not willing since they are going to be re-
trained at best and, at worst, let go) to describe in any manner how the new device is to be
operated, since they have no familiarity with the operating procedures, training, safety, or the
maintenance necessary for the new device.

Similarly, the logistics and procurement staff at the business operations level will know, in
considerable detail, current logistic information such as the number of axe handles broken
per linear meter of hardwood cut in support of current operations, but will know nothing of the
support for a device that will need a different maintenance methodology, significantly different
support materials such as fuel and lubrication, different storage, and many more parts of
much greater variety (such as starter ropes, chains, sparkplugs, and pistons).

Before the business operations level stakeholders can begin to define their needs and
requirements, therefore, the stakeholders at the strategic level above them must define
lifecycle concepts for how the new capability is to be introduced into the organization. Is the
reason to procure chainsaws to fell trees faster, or to cut down the same amount of wood
more efficiently (with fewer operators, for example)? In either case, will the current
tradesmen be retained and retrained, or will new operators be required? With axes, the
tradesmen own their own axes and are responsible for maintaining the axes (keeping them
sharp and replacing broken handles supplied by the company.) With the company procuring
the more expensive chainsaws, what new logistics and procurement support will be required
and how will it be acquired? How will the company transport and store materials—such as
fuel, lubrication, and spare parts—that are not currently supported? How will the new devices
be maintained (engine and chains), and by whom? How will the organizational structure
need to be changed? How will these new devices be deployed—across all operators at
once, or team by team, or region by region? If wood is to be produced faster, will additional
transport vehicles be required to extract the product, and will additional sawmill capacity be
required? Ultimately, of course, business management must also consider whether they
want to produce more wood at the risk of flooding their own market resulting in a falling price
and reduced profits or will the new chainsaws result in lower production costs allowing the
enterprise to offer products to the market cheaper, thus making them more profitable? If the
company simply buys 200+ of these new chainsaws, before thinking through at least some of
these questions, they could cause a lot of churn in the supply chain at best, or seriously injure
or kill someone at worst.

Before an acquisition can be considered, therefore, the stakeholders at the strategic level
must draft the initial versions of the acquisition concept, deployment concept, operating
concept, maintenance concept, and retirement concept. Those concepts can then be fleshed
out by the selected stakeholders from the business operations level. Once at least one
feasible set of lifecycle concepts have been defined, system level lifecycle concepts and
stakeholder needs for the chainsaws, supporting infrastructure, and materials can be
recorded and transformed into a set of system level design input requirements. These can
then be passed on to systems designers and procurement to develop the design output
artifacts and statements of work. At the very least, this will help the company buy the “right”
chainsaws and supporting parts, equipment and enabling systems. In addition, procurement
plans, maintenance plans including lubrication and sharpening schedules, operating
instructions, safety plans, training, etc. can be developed.

Looking at the system development top-down then, the need for the three distinct levels
views above the system level is evident; and it is easier to understand why the lack of
attention to the strategic and business operations levels lifecycle concepts, needs, and
requirements is a principal reason for project failure - especially for systems with custom-built
hardware and/or software. Buying chainsaws is one endeavor, building a sophisticated
military system is quite another.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 28

This same systems-thinking mindset is needed when an organization wants to adopt any new
technology, methodology, or process. To successfully adopt concepts such as Agile, Lean, Six-
Sigma, Model-based System Engineering (MBSE), etc., these levels need to first be considered.
For example, it could be an expensive mistake, to invest heavily in a new MBSE tool without
considering how it will be used, by whom, the supporting infrastructure, the value, return on
investment (ROI), and how such a tool will be used and maintained.
2.1.3.9 Portfolio Management Within the Business Operations Level
In the discussion above, the point was made at the strategic and business operations levels there
are distinct lifecycle concepts, needs, and requirements. The strategic level addresses the
organizational units, the business operations level addresses the products and services provided
by the organizational units. The stakeholders at each level will identify problems, opportunities,
and threats and potential solutions in the form of products and services to address the problems,
opportunities, and threats.
This could yield a solution set of multiple products and services; resulting in the need to develop
individual business operations level lifecycle concepts, needs, and requirements for each product
and service. Together the organization manages the set of projects which realize products or
services as a portfolio, as shown in Figure 2-4.

Business Operations
Lifecycle Concepts: Business Business
Stakeholder Development, Production,
real-world Acquisition, Deployment, Operations Operations
expectations Lifecycle Operations, Support, Retirement Needs Needs Requirements Requirements
Analysis & Analysis Analysis
Maturation

System/Product/Service
System/Product/Service
System Lifecycle Concepts:
Stakeholder
real-world Development, Production,
System/Product/Service System System
Stakeholder
expectations System Lifecycle
Acquisition, Concepts:
Deployment, Needs Requirements
Lifecycle Development,
Operations, Support, Production,
Retirement Needs System Requirements System
real-world Analysis & System Lifecycle
Acquisition,
System/Product/Service
Concepts:
Deployment,
Analysis Analysis
Stakeholder Maturation
expectations Needs
Needs Requirements
real-world
Lifecycle Development,
Operations, Support,Production,
Retirement
System/Product/Service System Requirements System
Analysis & Analysis Analysis
Stakeholder Maturation
expectations System Lifecycle
Acquisition, Concepts:
Deployment, Needs Requirements
Lifecycle Development,
Operations, Support,Production,
Retirement Needs System Requirements System
real-world Analysis & Analysis Analysis
Stakeholder Maturation
expectations System Lifecycle
Acquisition, Concepts:
Deployment, Needs Requirements
Lifecycle Development, Production,
Operations, Support, Retirement Needs System Requirements System
real-world Analysis & Analysis Analysis
expectations Acquisition, Deployment, Needs Requirements
Maturation
Lifecycle Operations, Support, Retirement Needs Requirements
Analysis & Analysis Analysis
Maturation

Figure 2-4: Business Operations Level Expanded.


For each product or service in the portfolio, the stakeholders at the strategic or business
operations level of the organization define lifecycle concepts, needs, and requirements for both
the project teams as well as the products to be produced or the service being supplied by each
project team.
Each product or service can be in various stages of planning and maturity. Some may be at the
idea stage, while some will have progressed to the concept stage where key technologies are
identified, the maturity of key technologies assessed, and business operations level lifecycle
concepts, needs, and requirements defined. Value to the organization is assessed in terms of how
the potential products fit within the strategic level business lifecycle concepts, needs, and
requirements and ROI. These activities would form the basis of managing the portfolio of
products and services.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 29

2.3.1.10 Organizational Levels When There is a Customer/Supplier Relationship


for a System or Service.
Based on maturity, feasibility, value, ROI, budget, and resource availability, projects are formed
to produce a product or provide a service. In some cases, the product will be produced, or
service supplied in-house and in other cases the product or service will be acquired from an
outside supplier. In this case the organization is a customer of the product or service.
As shown Figure 2-5, for the cases where there is a customer/supplier relationship, the supplier
project team must consider both the lifecycle concepts, needs, and requirements from their
organization as well as the customer’s organization as defined in the SOW or SA.

Customer Organization Supplier Organization


Concept of Operations Concept of Operations
Organizational (ConOps) or Strategic Enterprise Organizational (ConOps) or Strategic Enterprise
Level View Strategies Level View Business Plan (SBP) Strategies
Business Plan (SBP) Business Business
Analysis Analysis

Preliminary Lifecycle Concepts: Stakeholder Preliminary Lifecycle Concepts:


Strategic Stakeholder Strategic Development, Production, Business Business
Development, Production, Business Business Level View real-world
Level View real-world Acquisition, Deployment, Mission Needs Requirements
expectations Acquisition, Deployment, Mission Needs Mission Requirements expectations Lifecycle Operations, Support, Retirement
Mission
Lifecycle Operations, Support, Retirement Needs Needs Requirements
Requirements Analysis & Analysis
Analysis & Analysis Analysis Analysis
Maturation Maturation

Business Business Lifecycle Concepts: Business Business


Stakeholder Lifecycle Concepts: Business Business Operations Stakeholder Development, Production,
Operations real-world
Development, Production,
Operations Operations real-world Operations Operations
Level View Acquisition, Deployment, Level View expectations
Acquisition, Deployment,
Needs Needs Requirements Requirements
expectations Lifecycle Operations, Support, Retirement Needs Needs Requirements Requirements Lifecycle Operations, Support, Retirement
Analysis Analysis
Analysis Analysis Analysis &
Analysis &
Business Operations or System Level?
Maturation
Maturation

System Stakeholder System Lifecycle Concepts:


Level View real-world Development, Production, System System
expectations Acquisition, Deployment, Needs Requirements
Lifecycle Operations, Support, Retirement Needs Requirements
Analysis & Analysis Analysis
Maturation

Stakeholder System Lifecycle Concepts:


System real-world Development, Production, System System
Level View expectations Acquisition, Deployment, Needs Requirements
Lifecycle Operations, Support, Retirement Needs Requirements
Analysis & Analysis Analysis
Maturation

Stakeholder Subsystem Lifecycle Concepts:


Subsystem real-world Development, Production, Subsystem Subsystem
Level View expectations Lifecycle
Acquisition, Deployment,
Needs Requirements
Operations, Support, Retirement Needs Requirements
Analysis & Analysis
Maturation Analysis

System Element Lifecycle


System Stakeholder Concepts: Development, Systems System
Element real-world Production, Acquisition, Element Element
Level View expectations Lifecycle Deployment, Operations, Support, Needs Requirements Requirements
Analysis & Retirement Needs Analysis
Analysis
Maturation

Supplier Developed System

Figure 2-5: Supplier Developed System.


The customer will have a project team within their business operations level responsible to their
strategic and business operations levels’ stakeholders to develop a system or provide a service
consistent with the strategic and business operations levels’ lifecycle concepts, needs,
requirements for the product or service. Before issuing a Request for Proposal (RFP), the
customer will determine which level of needs and requirements they will include in a contract to
the supplier: the business operations level or the system level.
If at the system level, the customer’s project team will define the system level lifecycle concepts,
system level stakeholder needs, and transform those needs into a set of system level technical
design input requirements that will result in the business operations level lifecycle concepts,
needs, and requirements to be met.
It is this set of customer-owned design input requirements for the system to be provided by the
supplier that will be included in the RFP - and any supplier developed system that can be verified
to meet these requirements will be acceptable. The customer’s project team will communicate
their expectations for the supplier in the RFP that consists of a SOW or SA with requirements on
the supplier (activities, processes, deliverables) as well as technical design input requirements for
the product or service for which they are contracting.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 30

However, if at the business operations level, the customer’s project team will include their
organization’s business operations level lifecycle concepts, stakeholder needs and stakeholder-
owned system requirements in the contract.
In this case, the supplier’s project team will be responsible for developing system level lifecycle
concepts, an integrated set of needs, and a set of design input requirements consistent with both
the customer-owned system requirements in the contract as well as the supplier organization’s
operational level lifecycle concepts, stakeholder needs, and requirements defined for systems
being developed for an outside customer.
From the supplier perspective, their organization provides the product or service for the
customer. Based on the supplier operational lifecycle concepts, needs, and requirements
concerning supplying products and services to an external customer, the supplier will form a
project team to respond to the customer’s RFP for a product or service.
Addressing system verification and system validation within the contract is extremely critical so
it is clear for both the customer and supplier which set of requirements will be the focus of
system verification and which set of needs will be the focus of system validation. Refer to
Section 13 for a more detailed discussion concerning system verification and system validation
considerations when using supplier developed system elements.
2.3.2 System Architecture - a Hierarchical View
2.3.2.1 Use of the Term “Level”
When describing the organizational level model depicted in Figures 2-3, 2-4, and 2-5 the term
“level” was used. Caution should be used to understand the context in which the word “level” is
used and intent: levels of organization, levels of architecture, levels of detail, and levels of
abstraction.
It is common to hear statements concerning high-level requirements and low-level requirements.
What is really meant by “high-level” or “low-level”? For some “high-level” or “low-level” refer
to levels of abstraction or levels of detail - strategic and business operations level lifecycle
concepts, needs and requirements are communicated at a higher level of abstraction than system
level lifecycle concepts, needs, and requirements. Likewise, system level lifecycle concepts,
needs and requirements are communicated at a higher level of abstraction than system element
level lifecycle concepts, needs and requirements. For others, high-level requirements may refer
to “what” or “design-to” design input requirements, while low-level refers to “how” or “build-to”
design out specifications.
In Figures 2-3, 2-4, and 2-5 the focus is on organizational levels of lifecycle concepts, needs, and
requirements and how they flow down and constrain the next lower-level lifecycle concepts,
needs, and requirements being developed.
Levels can also refer to different tiers or layers within the system physical architecture. In SE, it
is common to decompose the system via the ISO/IEEE/IEC Architecture Definition Process
described in the INCOSE SE HB into lower-level subsystems and system elements. Each of
these, in turn can be further decomposed. The result is a hierarchy of multiple levels of
subsystems and system elements as shown in Figure 2-6. This decomposition process is what is
referred to by “moving down the left side of the SE Vee” as discussed later in Section 2.5.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 31

Each system, subsystem, and system element are defined by its own set of lifecycle concepts, set
of needs, and set of design input requirements and each system element is realized
(manufactured or coded) via its corresponding set of design output specifications. The result is a
hierarchical “document tree” of lifecycle concepts, integrated sets of needs, sets of design input
requirements, and sets of design output specifications.

System
C|N|R C|N|R: Concepts | Needs | Rqmts
L1
Analysis

Subsystem Subsystem Subsystem


C|N|R C|N|R C|N|R

Analysis Analysis Analysis L2


Decomp Decomp Decomp

System System System System System System System


System Element
Element Element Element Element Element Element Element
C|N|R
C|N|R
C|N|R
C|N|R C|N|R C|N|R
Analysis
C|N|R C|N|R
L3
Analysis Design Analysis Design Design Design Design
Decomp Spec Decomp Spec Spec Decomp Spec Spec

System System System System System System


Element Element Element Element Element Element
C|N|R C|N|R C|N|R C|N|R C|N|R
C|N|R
L4
Analysis 11
Design Design Design Analysis Design
Spec Decomp Spec Spec Decomp Spec

System System System System System


Element Element Element Element Element L5
C|N|R C|N|R C|N|R C|N|R C|N|R
Design Design Design Design Design
Spec Spec Spec Spec Spec

Figure 2-6: Levels of a System - Hierarchical View.


In terms of levels of architecture, this Manual refers to entities within the system physical
architecture as “subsystems” or “system elements” where system elements could be assemblies,
sub-assemblies, parts, and components. In this context, a system is an entity that can be
decomposed through elaboration (decomposition and derivation) that involves analysis,
allocation, and budgeting into lower-level subsystems. The subsystems can be further elaborated
into system elements. Some system elements may require further elaboration and for others no
further elaboration is necessary for successful system element design and realization.
The SOI could therefore be either a system, subsystem, or system element depending on context.
For each entity within the system architecture, the project team determines if it needs further
elaboration or if it is sufficiently defined by the design input requirements that no further
elaboration is needed for the project team to make a build, buy, code, or reuse decision.
As the project team moves down the levels of the physical architecture, for each entity at the next
level, the project team determines whether the entity requires further elaboration or not.
If a system element needs no further elaboration, they make a buy, build, code, or reuse decision.
“Buy” could mean the project team will procure a “system element” off-the-shelf (OTS) that has
already been manufactured or coded. “Buy” could also mean the project team will contract out
the further elaboration and development to a supplier. From the supplier’s perspective that

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 32

“system element” is their SOI. “Build” or “code” refers to the case the system element will be
developed (designed and manufactured or coded) in-house. “Reuse” refers to cases where a
system element already exists within the organization and can either be used “as is” OTS or
modified OTS (MOTS) to meet the lifecycle concepts, needs, and requirements defined for that
system element. Section 12 provides more detail concerning the use of OTS or MOTS system
elements.
If the system element is to be developed in-house, using the Design Definition Process, the set of
design input requirements is transformed into a design which will result in a physical realization
of the system element. For the design team, the system element is now their SOI. As part of the
Design Definition Process, the design team will decompose the system element into physical
entities referred to as assemblies, sub-assemblies, parts, components, and software. The design
of these physical entities is communicated via a set of design output specifications that are used
to manufacture or code the physical entities that when integrated together, will result in the
physical realization of the system element which can then be integrated with other realized
system elements into the next higher-level system element or subsystem in the SOI architecture.
The hierarchical, reductionist view is the basis for the SE Vee model shown in Figure 2-13
where the left side of the SE Vee represents a movement down the system hierarchy, from one
level to another to define the system, subsystems, and system elements and the right side of the
SE Vee represents a movement up the system hierarchy to integrate the system elements and
subsystems to form the integrated system.
2.3.2.2 Lifecycle Concepts, Needs, and Requirements Flow Down and
Traceability
As was discussed for organizational levels, the subsystems and systems elements at each level of
the physical architecture are defined by a set of lifecycle concepts, set of needs, and set of design
input requirements appropriate to the level they exist. Through various means of systems
analysis, a system architecture is defined and as shown in Figure 2-6, the system level design
input requirements “flow down” to the subsystems or systems elements that exist at the next
(lower) level of the architecture.
In this context, the lifecycle concepts, needs, and requirements at one level are constraints for the
lifecycle concepts, set of needs, and set of design input requirements for the subsystems or
system elements at the next (lower) level of the system architecture to which they are allocated.
As such, the lower-level lifecycle concepts, needs, and requirements are elaborations of the
previous level lifecycle concepts, needs, and requirements.
For subsystems or system elements that will be decomposed further, the responsible project team
will define lifecycle concepts, a set of needs, and a set of design input requirements. These
activities are repeated until no further elaboration of the system elements is needed.
As shown in Figure 2-7, for each level of the SOI physical architecture, the set of design input
requirements for a system, subsystem, or system element can be traced back to the needs from
which they were transformed as well as the allocated requirements from the previous level from
which they were either decomposed or derived. The needs, in turn, can be traced back to their
source - higher-level lifecycle concepts, needs, and requirements. This approach of tracing the
needs throughout the architecture, as well as the requirements - and to have intra-level linking
between the two - may be new to some readers.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 33

Organization’s Strategic Level


Traceability Traceability
Lifecycle Concepts:
Stakeholder Traceability Development, Production, Business Business Level 0
real-world Acquisition, Deployment, Needs Business Requirements
Operations, Support, Business
expectations Lifecycle Retirement Needs Requirements

Trace
Analysis & Analysis Analysis
Maturation

Constrain Trace to

Trace
Parent

Business Operations Level


Lifecycle Concepts: Traceability Traceability
Stakeholder Traceability Development, Production, Business Business
real-world
Acquisition, Deployment, Needs Operations Requirements Operations Level 1
Operations, Support, Analysis Needs Requirements
expectations Retirement Analysis
Lifecycle
Analysis &
Maturation

Trac
Tra
Trace to

ce
Parent

e
Constrain
Product/System
MGOs, measures, Use Traceability Traceability
Cases, Operational
System Traceability
Lifecycle System
Stakeholder Traceability Scenarios, Stakeholder System Design Input
real-world needs & Requirements Lifecycle
Analysis &
Concepts and
Architecture Needs
Needs Requirements
Analysis Requirements Level 2
expectations Drivers & Constraints, Risks Analysis
Lifecycle Maturation
Analysis & Section 6 Design
Maturation Section 4 Lifecycle Concepts & Needs Definition Input Requirements
Definition

Flow down Trace to


(Allocation & Budgeting)
Trace

Trace
Constrain Parent
Subsystems
MGOs, measures, Use Traceability Traceability Subsystem
Cases, Operational Subsystem Traceability Design Input
Stakeholder Traceability Scenarios, Stakeholder Lifecycle Subsystem Requirements Requirements
real-world
needs & Requirements
Drivers & Constraints, Risks
Lifecycle
Analysis & Concepts and Needs Needs Analysis Level 3

Flow down
expectations Maturation Architecture Analysis

Constrain
Lifecycle

Trace
Analysis & Section 6 Design

Trace
Trace
Constrain

Maturation Section 4 Lifecycle Concepts & Needs Definition Input Requirements


Definition

Lower-Level System Elements Level 4

Figure 2-7: Moving Between Levels.


Figure 2-7 is an elaboration of Figure 2-3 showing the flow down (allocation and budgeting) that
occurs from one level of the system architecture to another. To aid in the discussion concerning
levels, level numbers are used as shown in the figure.
Level 0 is the strategic level of the organization where the stakeholders at this level define the
problem, threat, or opportunity which the system is to address along with strategic level lifecycle
concepts, business needs, and business requirements that drive and constrain all activities,
projects, and programs within the organization.
Level 1 is the business operations level of the organization where the stakeholders at this level
define a business operations level of abstraction set of lifecycle concepts, needs, and
requirements that elaborate on the Strategic Level lifecycle concepts, needs, and requirements for
a product/SOI. These requirements can apply to the system to be developed, the project team or
supplier that will be developing the system, as well as processes used to manage and engineer the
system. These requirements will trace to their parent business requirements at Level 0.
For cases where the development of a system will be outsourced to a supplier or the organization
is a supplier that is developing a system for a customer, there are often two sets of Level 1
lifecycle concepts, needs, and requirements - one set for each organization as shown in Figure 2-
5.
The Level 1 business operations level stakeholder-owned system requirements constrain the
solution space for the system to be developed. The business operations level stakeholders (both

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 34

customer and supplier) expect that their requirements will be implemented and complied with.
In addition to the set of business operations level stakeholder-owned system requirements there
is often a project formulation authorization process that includes stakeholder needs in the form of
MGOs and measures along with a preliminary budget and schedule to communicate a clear
vision for what is expected of the project team responsible for developing and delivering the
system.
The project team, working at the Level 2 System Level, will perform the Lifecycle Concepts and
Needs Definition activities discussed in Section 4 of this Manual to work with system level
stakeholders to elicit their needs and requirements, define use cases, operational scenarios,
drivers and constraints (including the operational-level set(s) of stakeholder-owned system
requirements), and risk. The resulting information is often documented in a preliminary set of
lifecycle concepts in the form of a preliminary Operational Concept (OpsCon).
Using this information as inputs to the project’s lifecycle analysis and maturation activities, one
or more feasible sets of lifecycle concepts are defined. These concepts are an elaboration of the
set of business operations Level 1 lifecycle concepts. As part of the lifecycle concept analysis
and maturation activities, a candidate physical architecture is defined. Through needs analysis
the project team defines an integrated set of needs for the system which are verified and
validated as discussed in Section 5 and baselined.
Performing the Design Input Requirement Definition activities defined in Section 6, the project
team does requirements analysis to transform the baselined Level 2 set of needs into a set of
Level 2 design input requirements. The resulting set of design input requirements are verified
and validated as discussed in Section 7 and baselined. Each of the design input requirements
will trace to their source needs they were transformed from as well as trace to the Level 1
business operations level parent stakeholder-owned system requirements they apply to and have
been allocated to, the system.
As part of the Level 2 lifecycle concept analysis and maturation activities, the Level 3
architecture for the system will be defined using the Architecture Definition Process defined in
the INCOSE SE HB and the Level 3 subsystems will be identified. The project team will then
flow down the set of Level 2 design input requirements via allocation and budgeting to the Level
3 subsystems. Project team members responsible for each subsystem at Level 3 will repeat the
above activities.
For subsystems that will be further decomposed into system elements at Level 4, the Level 3
requirements will be allocated, and the above activities will continue until all the system
elements have been defined via their individual set of lifecycle concepts, set of needs, and set of
design input requirements.
Refer to Section 6.4 for a more detailed discussion on moving between levels of the system
architecture, requirements flow down, allocation, and budgeting.
2.3.3 System Architecture - a Holistic View
The hierarchical view (also referred to as a reductionist view since we are decomposing the
system to its fundamental subsystems and system elements) shown in Figure 2-6 is one of the
greatest strengths of SE AND one of its greatest weaknesses.
The strength is that it enables complex systems to be decomposed into less complex subsystems
and system elements whose development can be assigned to internal or external organizational
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 35

units with focused expertise (subject matter experts) based on the functionality and engineering
discipline. The intent is to make the definition, design, and build of a large system easier by
breaking it into manageable parts.
Using this approach, it is assumed after each subsystem and system element has been built,
coded, or procured, it will be integrated into the system and that the resulting integrated system
will be able to achieve its intended purpose in its operational environment when operated by its
intended users and does not enable unintended users to negatively impact the intended use of the
system.
A major weakness with the hierarchical, reductionist view is that the resulting subsystems and
system elements tend to be developed in silos. One result of this is that the focus is the
optimizations of the systems and systems elements within the system physical architecture rather
than the optimization of the integrated system.
Another weakness in this approach is that the hierarchical, reductionist view fails to show the
interactions (interfaces and dependencies) between the individual subsystems and system
elements within the physical architecture and system elements internal to the system or its
interactions with systems and the operational environment external to the system.
As shown in Figure 2-8, a system comprises internal subsystems and system elements with
interconnections, interactions, and dependencies between those parts. The system is constrained
within a boundary with interconnections, interactions, and dependencies across that boundary to
external systems that exist in an operating environment that exists in a wider environment.

Wider Environment

Operating Environment
System

System
Elements

Subsystems

Figure 2-8: Interactions and Dependences Internal and External to a System.


In this context, interconnections and interactions refer to what is commonly referred to as an
interface boundary across which two systems, subsystems, or system elements interact. These
interactions can be in the form of induced environments (acoustics, vibrations, electro-magnetic,
thermal, etc.).
The interactions can also be in the form of systems, subsystems or system elements competing
for the use of common resources (bandwidth, CPU time, memory, power, weight, or mass (for
space systems), etc.). Dependencies can be in the form of a system, subsystem, or system

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 36

element that provides something as an enabling system to another system, subsystem, or system
element or in cases where subsystems or system elements share an allocated or budgeted
resource or performance measure (mass, power, time, total allowable error, precision, accuracy,
jitter, quality characteristic, etc.)
Operating
Environment

System of Interest
System
Element
C|N|R System
m System
ste System
Sy Element Element
C|N|R C|N|R
System ∂
System System System
C|N|R Element Element
C|N|R
C|N|R C|N|R

System System
Element Element
C|N|R C|N|R

System System
Element Element
C|N|R C|N|R

System System
Element Element tem tem
Sys Sys
C|N|R C|N|R
Sys S
System tem ystem System
Element
C|N|R
C|N|R
System
C|N|R

C|N|R: Concepts | Needs | Rqmts

Figure 2-9: Holistic View of the SOI.


Because the interconnections, interactions, and dependencies are related to the behavior of the
system elements, the subsystem they are a part, and the system they are a part, a more holistic
view of the system such as shown in Figure 2-9 is needed. (Figure 2-9 contains the same system
elements as shown in Figure 2-6, only arranged in a more holistic view with an emphasis on
interconnections, interactions, and dependencies between the subsystems and system elements
within the system as well as with external systems in the operating environment.)
While the hierarchical, reductionist view is useful when defining a system, subsystem, and
system elements in terms of lifecycle concepts, needs, and requirements, the project team must
also have a holistic view of the system architecture and resulting behavior throughout the system
lifecycle. This holistic view requires the project team to understand the basic tenets of systems
thinking.

• A system is more than a sum of its parts.


• A system’s behavior is a function of the interaction of its parts as well as the interactions of
the integrated system with the external systems and environment of which it is a part.
• A system’s parts are often interdependent.
• A system will have emergent behaviors (good and bad) beyond what was defined within
the needs, requirements, and specifications.
• Optimizing a system’s performance may mean that some parts that make up the system
may have to be sub-optimized.
The approach described in this Manual is meant to drive the project team to be systems thinkers
and have a holistic view of system development across all aspects of the system lifecycle.
Viewing the system holistically, the focus is on the behavior of the integrated system as a
function of the interaction of the subsystems and system elements that make up the system as
well as the behavior of the system in the context of its interaction with the systems that make up
the macro system, the operating environment, users, operators, and maintainers.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 37

2.3.4 Using Both the Hierarchical and Holistic Views


Both the hierarchical and holistic views are useful in the practice of SE. To be successful, the
project team must use the holistic view to manage the integrated system from the beginning of
the project rather than working in siloes and only focusing on managing the individual
subsystems and system elements that make up the integrated system.
In the past, using a document-centric approach to SE, the focus was more on the hierarchical
view and on the individual subsystems and system elements that are part of the integrated
system. While this hierarchical view was useful in defining lifecycle concepts, needs, and
requirements for individual subsystems and system elements that are part of the system physical
architecture prior to design, it frequently results in issues during system integration, system
verification, and system validation of those subsystems, system elements, and the integrated
system.
During system integration, system verification, and system validation, a primary concern is the
behavior and interactions between subsystems and system elements and between the integrated
system and external systems; emerging properties; optimization of the integrated system; and
interactions between the integrated system and its operating environment. In this context, the
holistic view shown in Figure 2-9 is more useful.
For today’s increasingly complex, software-intensive systems, a data-centric approach to SE
should be adopted as discussed in Section 3. The data-centric approach advocates that both
hierarchical and holistic views are represented by a common integrated data and information
model of both the system under development as well as the PM and SE processes and resulting
work products and artifacts.
Using the approach described in this section, blending considerations of both the hierarchical
and holistic views as well as the organizational/system/element model shown in Figure 2-1, the
reader will be able to define a complete sets of lifecycle concepts, integrated sets of needs, and a
sets of design input requirements for subsystems and system elements as well as for the
integrated system that, when designed and built/coded, will yield an integrated system that can
be verified to meet its set of design input requirements and validated to meet its set of needs.
The result is an integrated system that can be integrated into the customer’s technical
environment as well as their strategic and organizational ones. This is the ultimate goal of SE.

2.4 Verification and Validation in Context


The concepts associated with the terms verification and validation are distinctly different
depending on the context. The intended meaning of the concepts represented by each term are
often misunderstood and the terms are often used interchangeably without making clear the
context in which they are used, resulting in ambiguity and a failure to communicate.
To avoid this ambiguity, each of these terms should be preceded by a modifier (i.e., the subject)
which clearly denotes the proper intended context in which the term is being used as shown in
Figure 2-10:
• Needs verification or needs validation for verification and validation of the needs,
• Requirement verification or requirement validation for verification and validation of the
design input requirements,
• Design verification or design validation for verification and validation of the design and
associated design output specifications, or

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 38

• System verification, system validation, or production verification for verification and


validation of the realized SOI.
System Validation
“Did we build the
right thing?”
Design Validation
Design “Do we have the
right design?”
Design
Inputs Rqmts Validation Outputs
“Are we building the
right thing?”

Integrated Set Transformation Transformation Transformation Realized


Design Input Design Output
Lifecycle Concepts of Needs Design Input Requirements Architecture & Specifications System System of
and Needs Requirements Design Implementation, Interest
Definition Definition Definition Integration

Design Production
Verification Verification

Drive
Drive
“Did we build it

Drive
System “Did we design
right?”
Verification it right?”
“Did we build
it right?”

Organizational Requirements
Organizational
Architecture & Design Organizational Production
Requirement Verification Design
Definition Verification System Verification
Requirements
“Are the requirements
defined correctly?”
Definition “Did we design it Realization “Did we build it
Requirements correctly?” Requirements correctly?”

Derived from Ryan, M. J.; Wheatcraft, L.S., “On the Use of the Terms Verification and Validation”, February 2017

Figure 2-10: Verification and Validation Confirm that SE Artifacts Generated During Transformation
are Acceptable. [42]
Not shown in Figure 2-10 are the development of lifecycle concepts and the transformation of
those concepts into the integrated set of needs. Figure 2-11 expands on the box on the left of
Figure 2-10, “Integrated Set of Needs”, illustrating the information that feeds into the lifecycle
concept analysis and maturation activities and the resulting transformation of the approved
lifecycle concepts into the integrated set of needs. Figure 2-11 also shows verification and
validation in context of the integrated set of needs.
Do the lifecycle concepts and integrated
set of needs represent a system of interest
Needs that can accomplish its intended use in its
Validation operational environment when operated
“Do the needs communicate the
• Problem or opportunity intent of the stakeholders?” by its intended users?
• MGOs
• Measures Concept Needs
• Stakeholder real-world Validation Validation
expectations “Do the lifecycle concepts “Do the needs communicate
reflect the intent of the
• Use cases, user stories, stakeholders?”
the intent of the lifecycle
concepts?”
system concepts, OpsCon,
ConOps Implemented by Lifecycle Transformation
Integrated Set
• Higher-level Needs Concepts Needs Analysis of Needs
Lifecycle Concept Design Input
• Higher-level Requirements Analysis Requirements
• Higher-level lifecycle concepts Maturation Definition
• Drivers & constraints,
• External systems
• Standards Concept Needs
Drive

• Regulations Verification Verification


Drive

“Are the needs written


• Technology “Are the lifecycle
correctly?”
concepts defined
• Operating Environment correctly?”
• Risks
Organizational
Business & Mission Analysis and Organizational
Requirements for
Stakeholder Needs and defining Requirements for
Requirements Definition Processes
lifecycle concepts defining needs
INCOSE SE Handbook

Figure 2-11: Needs Verification and Validation.


Figures 2-10 and 2-11 illustrate the importance of making it clear as to the context in which the
terms verification and validation are being used. The development activities are represented as

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 39

the successive transformation of lifecycle concepts into an integrated set of needs, which are
transformed into a set of design input requirements, which are transformed into design output
specifications, which are transformed into the SOI itself. This is represented in the main
horizontal logic path across the center of both figures.
The verification and validation arrows in each figure show that verification and validation of an
entity is against a reference item (e.g., a requirement, design characteristic, or standard) - that is,
the adjective used is important since not all verification and validation are against the same
reference. The performance of a system verification or system validation action onto the entity
provides an outcome which is compared with the expected outcome as defined by Success
Criteria. The comparison enables the determination of the acceptable conformance of the entity
to the reference item with some degree of confidence.
The organizational requirements and standards governing how each artifact is to be developed is
on the lower part of each figure - and represents the organization’s requirements, policies, best
practices, and formal guidance on how lifecycle concepts, needs, requirements, the design should
be defined, and how the system should be realized. The U. S. Food and Drug Administration
(FDA) refers to these requirements and standards as “design controls” as they are used by the
organization to control, oversee, and manage the development of a system.
In this Manual the terms verification and validation are applied to the needs and requirements
and then to the entities that result from these needs and requirements:
• Verification of the needs and requirements. The GtWR defines characteristics and rules
that help to achieve those characteristics for forming needs and requirements statements
and sets of needs and requirements. In this context, verification involves verifying that
the statements and sets of statements have the characteristics of well-formed needs and
requirements statements resulting from following the rules such as those in the INCOSE
GtWR or similar organizational guide or standard. Verification of needs and
requirements is what is commonly referred to as assessing the quality of the need and
requirement statements and sets of needs and requirements. Refer to Section 5 for a more
detailed discussion on needs verification and Section 7 for a more detailed discussion on
requirements verification.
• Validation of the needs and requirements. Validation of a need statement determines
whether a need statement clearly communicates the intent of the lifecycle concepts or
source from which it was derived or transformed. Validation of a requirement statement
determines whether the requirement statement clearly communicates the intent of the
need, or parent requirement from which it was derived or transformed. A need or
requirement statement can be well-formed in accordance with the GtWR rules (that is, the
statement can be verified in terms of its quality) - but can speak to the wrong need or
requirement or it may not communicate the true intent of the concept, need, or parent
requirement from which it was derived or transformed. Again, the focus is on the quality
of the needs and requirements statements and sets of needs and requirements. Refer to
Section 5 for a more detailed discussion on needs validation and Section 7 for a more
detailed discussion on requirements validation.
• Verification of the entity. Verification of the entity (design, design output specifications,
subsystem, system element, or the integrated system) against the verified and validated
set of design input requirements. In this context, verification is a formal process that
results in collected evidence that can be used to provide evidence that the entity is
being/has been “formed” in the right way as defined by the set of design input

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 40

requirements with the required level of confidence. Refer to Section 8 for a more
detailed discussion on design verification, Section 9 for a more detailed discussion on
production verification, and Sections 10 and 11 for a more detailed discussion on system
verification.
• Validation of the entity. Validation of the entity (design, design output specifications,
subsystem, system element, or the integrated system) against the verified and validated
set of needs. In this context, validation is a formal process that results in collected
evidence to be used for the acceptance, certification, and qualification of the SOI that
proves the right “entity” is being/has been “formed” as defined by the set of needs with
the required level of confidence. Refer to Section 8 for a more detailed discussion on
design validation and Sections 10 and 11 for a more detailed discussion on system
validation.
2.4.1 Distinctions Between the Concepts of Verification and Validation
While there is overlap between these concepts, it is important to understand where the concepts
of verification and validation differ is in the questions that are being addressed by the each of the
two activities.
Verification addresses the question, “Are we designing and building the entity in the right way?”,
and thus verifies two things at each stage of development:
• An entity is verified against its success criteria, e.g., needs and requirements against the
organizational best practice for developing needs and requirements, design and design
output specifications against the design input requirements, and the manufactured/coded
SOI against both its design output specifications (production verification) and its design
input requirements (system verification).
• An entity is verified against the organization’s requirements for development, design,
manufacturing, system integration, system verification, and system validation as
communicated in the organizations coding best practices, standards, procedures, and work
instructions.
Note that verification covers both the what (meeting design input requirements) and the how
(compliance to established organizational requirements on performing engineering work).
Validation addresses the question “Are we asking for, designing, and building the right entity?”
and as such validates two things at each stage of development:
• The set of design input requirements, design, and subsystems, system elements, and
integrated system are validated against their respective set of needs as shown in Figure 2-
10.
• The set of needs is validated against lifecycle concepts from which the set of needs was
transformed as shown in Figure 2-11.
In EIA-632, there is guidance in a note that states, “Validation in a system lifecycle context is the
set of actions ensuring and gaining confidence that a system is able to accomplish its intended
use, goals, and objectives”. [13]. This note supports the view of not waiting until the final
integrated system is released for use to determine whether it is acceptable, but rather the intent is
to determine the conditions for acceptance at the beginning of the project. In this way the
project’s modelling and simulation tools can be used during development to detect flaws and
missed needs and requirements prior to production and system integration, system verification,
and system validation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 41

Validation is critical because it addresses the risk that the final system will not satisfy the
customers, users, and operational and system level stakeholder real-world expectations
concerning its intended use in the operational environment when operated by the intended users
and does not enable unintended users to negatively impact the intended use of the system. One
could argue that this is the ultimate purpose of engineering as a discipline and specifically of the
discipline of SE. [2]
Other perspectives concerning the distinction between the concepts of verification and validation
are that:
• The focus of verification is more on structure. Do the sets of needs and sets of design input
requirements have the characteristics as defined in the GtWR? Does the design realize the
set of design input requirements? Is the SOI constructed correctly in accordance with its
set of design output specifications? Are the internal relationships (e.g., traceability,
dependencies, etc.) within the subsystems, system elements, and integrated system
recorded properly? Are the interactions between the entity and external entities recorded
properly?
• The focus of validation is more on content and intent concerning what is being
communicated. Do the set of needs or set of design input requirements communicate the
right thing? Do the needs or requirements statements clearly communicate the correct
intent of the parent or source from which it was derived? Is the set of needs or set of
design input requirements correct, complete, consistent, and feasible? Will the resulting
SOI correctly represent its intended use in the operational environment when operated by
the intended users and does not enable unintended users to negatively impact the intended
use of the system?
To better understand how the terms “verification” and “validation” are used within this Manual
the following definitions are included in Table 2-1.
Needs Verification: Confirmation that the need Needs Validation: Confirmation that the needs clearly
statements and set of needs meet the rules and communicate the intent of the agreed-to lifecycle
characteristics defined for writing well-formed needs concepts, constraints, and stakeholder real-world
and sets of needs in accordance with the expectations from which they were transformed in a
organization’s standards, guidelines, rules, and language understood by the requirement writers. A
checklists. confirmation that the set of needs correctly and
completely capture what the stakeholders need and
expect the system to do in context of its intended use
in the operational environment when operated by its
intended users.
Requirements Verification: Confirmation that the Requirements Validation: Confirmation that the
requirement statements and sets of requirements requirements clearly communicate the intent of the
meet the rules and characteristics defined for writing needs and parent requirements from which they were
well-formed requirements and sets of requirements transformed, in a language understandable by the
in accordance with the organization’s standards, design and manufacturing/coding teams.
guidelines, rules, and checklists.
Design Verification: Confirmation that: Design Validation: Confirmation that the design, as
1) the design meets the rules and characteristics communicated in the set of design output
defined for the organization’s processes, guidelines, specifications will result in a system that meets its
and requirements for design, intended purpose in its operational environment when
2) the design reflects the set of design input operated by the intended users as defined by the set of
requirements, and needs and does not enable unintended users to
3) the set of design output specifications clearly negatively impact the intended use of the system.
implement the intent of the design as communicated
by the set of design input requirements.
System Verification: Confirmation that the designed System Validation: Confirmation that the designed,
and built or coded SOI: built, and verified SOI will result or has resulted in a SOI

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 42

a) has been produced by an acceptable that meets its intended purpose in its operational
transformation of design inputs into design outputs, environment when operated by its intended users and
b) meets its set of design input requirements and does not enable unintended users to negatively impact
set of design output specifications. the intended use of the system as defined by its set of
c) No error/defect/fault has been introduced at the needs.
time of any transformation, and
d) meets the requirements, rules, and characteristics
defined by the organization’s best practices and
guidelines.
Table 2-1: Verification and Validation Definitions in Context.

Table 2-2 expands on the definitions in Table 2-1 providing a comparison showing the
differences of the various kinds of verification and validation in terms of expected outcomes.
Note: the list of outcomes includes examples and is not intended to be exhaustive.
Needs Verification: The focus is on the wording and Needs Validation: The focus is on the integrated set
structure of the need statements and sets of needs. of needs and the message they communicate.
• Are individual need statements worded or structured • Has an acceptable elicitation process been
correctly in accordance with the organization’s followed?
requirements, rules, and checklists? • Have all stakeholders been consulted?
o Are the needs written correctly? • Are the needs the right needs, i.e., do they
o Do they have the characteristics of well-formed accurately represent the agreed-to lifecycle
needs and sets of needs? concepts from which they were transformed?
• Is the set of needs complete, containing needs • Do the needs correctly and completely capture
dealing with form, fit, function, quality, and what the stakeholders need the SOI to do in the
compliance? operational environment in terms of form, fit,
• Does each need statement trace to a source? function, compliance, and quality?
• Does each source have a corresponding need • Would the set of needs, if met, solve the problem?
statement?
Requirements Verification: The focus is on the wording Requirements Validation: The focus is on the set of
and structure of the requirement statements and set of requirements as transformed from the needs and the
requirements. message they communicate.
• Are individual requirement statements worded and • Are the requirements and sets of requirements the
structured correctly in accordance with the right requirements, i.e., do they accurately
organization’s requirements, guidelines, rules, and represent the intent of the needs, parent
checklists? requirements, or source from which they were
o Are the requirements written correctly? transformed?
o Do they have the characteristics of well-formed • Do they address the right need?
requirements and sets of requirements? • Do the resulting child requirements represent a
• Do the requirements trace to the need(s), parent necessary and sufficient set to meet the intent of
requirement(s) or source requirement(s)? the parent need or requirement?
• Have the requirements been allocated to the next • Are the requirements communicating the right
level of the architecture? Are there any gaps? things?
Design Verification: The focus is on the design. Design Validation: The focus is on the message the
• Has an acceptable transformation of the set of design is communicating.
design input requirements into design output • Will implementing the agreed-to design output
specifications been applied? specifications result in a SOI that will meet the
• Does the design satisfy the set of design input operational and needs such that the SOI can be
requirement set that drove the design? used as intended in the operational environment?
• Do the design output specifications clearly and • Do we have the right design [as defined by the
accurately communicate the agreed-to design to the design output specifications]]?
suppliers/builders/coders?
• Can the system be built to the design output specs?
• Has traceability been established between the
design input requirements and the design artifacts?
• Did the design team follow the organization’s
requirements for the design activities?
• Did we design the thing right?
System Verification: The focus is on the built or coded System Validation: The focus is on the completed SOI
SOI and how well it meets the agreed-to design input and how well it meets the agreed to integrated set of
requirements and design output specifications. needs.
• Did we correctly follow our organization’s • Did we correctly address the problem or
requirements for manufacturing or coding? opportunity?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 43

• Is there objective evidence the SOI satisfies the • Does the SOI satisfy the needs for its intended use
design input requirements and design output when operated by the operators/users in the
specifications? operational environment?
• Did we detect all errors/defects/faults that may • Does the SOI protect against unintended users
have been introduced at the time of any negatively impacting the intended use of the
transformation? system?
• Did we build the thing right? • Did we build the right thing?
Table 2-2: Needs, Requirements, Design, System Verification, and System Validation
Comparisons in Terms of Outcomes.

Further details for each of these activity areas are included in:
• Section 5: Needs Verification and Validation.
• Section 7: Design Input Requirements Verification and Validation.
• Section 8: Design Verification and Validation.
• Section 9: Production Verification.
• Sections 10 and 11: System Verification and Validation.
2.4.2 System Verification and System Validation After Product Release
Verification and validation do not end with production and release of a SOI for use. As shown in
Figure 2-12 there is post-development system verification and system validation that must take
place.

System Validation
“Did we build the
right thing?” Post Development
Validation
Design Design Validation
“Do we have the
Design “Do we still have the
right system?”
Inputs right design?” Outputs
Needs Validation Rqmts Validation
“Are we building the “Are we building the
right thing?” right thing?”
Operational
Stakeholder Integrated Transformation System;
Design Input Transformation Design Output Transformation Realized
Real-World Set of Maintained
Lifecycle Concepts Needs Design Input Requirements Architecture & Specifications System System of Transition, System;
Expectations and Needs Requirements Design Implementation, Interest Operation, Disposed
Definition Definition Definition Integration Maintenance, &
Disposal System
Design Production
Verification Verification

Drive
Drive

Drive

“Did we build it
Drive

System “Did we design


Drive

it right?” right?” Post


Verification Development
“Did we build
it right?” Verification
“Is the system still right?”

Organizational Requirements Organizational Organizational


Lifecycle Concept Needs Organizational Architecture &
Design Organizational Production
Verification Requirement Verification Verification System Operations, Operations,
& Needs “Are the requirements Design “Did we design it
Verification Maintenance, Maintenance, &
Definition
“Are the needs Definition defined correctly?” Definition Realization “Did we build it
defined correctly?”
Requirements
correctly?”
Requirements correctly?” & Disposal Disposal
Requirements Requirements Requirements Verification
“Are we operating,
maintaining, and
Derived from Ryan, M. J.; Wheatcraft, L.S., “On the Use of the Terms Verification and Validation”, February 2017 disposing it correctly?”

Figure 2-12: Post-production Verification and Validation.


For some products, there may be system verification and system validation performed on
“returned items” or items in the field that are being used beyond their design life to gather data
about operational performance over time. Such efforts can identify defects in the initial system
that was missed during initial system verification and system validation activities - or can detect
aging (degradation over time) and end-of-life (EOL) defects before a catastrophic failure occurs.
This information can also be used when a new version of the SOI is being developed, enabling
the project to take advantage of the lessons learned from the current system and incorporating
them in the new version.
These are the two edges of the “bathtub curve” of a system’s life; the curve is a plot of defects
found over time, with the leading lip starting high early in the system’s use, then curving down
like the edge of a bathtub in profile. As time progresses to the right, at some point the number of
defects slopes up sharply, representing the other side of the tub - and a warning the system is
nearing EOL and merits close observation and possible replacement. This is especially

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 44

important for systems that are still operational long after their design lifetime. For some
systems, based on lessons learned, maintenance history, recalls, and warranty work (all are part
of system verification and system validation), upgrades, modifications, or expanded preventative
maintenance procedures are developed to address these issues as well as extend the system’s
operational lifetime. For systems that are upgraded (planned periodic updated versions), this
information is used to enhance and improve the next version of the system.
Post-production verification addresses the question: “Do we still have the right system?” and
post-production verification addresses the question: “Is the system still right?”

2.5 Integration, Verification, and Validation and the SE Vee Model


The SE Vee model shown in Figure 2-13 is commonly used to show the iterative and recursive
nature of SE as a system is decomposed into a hierarchical architecture of individual subsystems
and system elements, realized by design, built and coded, and integrated into the system. It is
also used to show what subsystems and system elements are part of the system physical
architecture as well what system elements, subsystems, and the integrated system are validated
and verified against.
R&D/Life-cycle Concept Analysis & Maturation
Operations,
Needs Analysis & Definition Sustaining Engineering ,&
Functional & Physical Architecture Maturation Disposal
Behavioral Model Maturation
Procurement/Production
Requirements Analysis &Definition System Verification
Design and Design Verification & Validation
System Verification & System Validation Planning
System Validation
System Integration

Problem/ Integrated Set of Validates against Acceptance, Qualification,


Opportunity System Needs Certification, System Operational PRODUCT
Ne Evaluation and Validation
e
Ve ds,
rif Re
ica qu
tio ire
n, m e
l i d n,
n

& n
io
Va tio

Va t &
at
& ra

lid D
n, eg

at es
tio Int

System io ig Verifies against Realized


ica m
Ar

n n
rif ste
ch

Requirements System
Ne ture
i

Ve Sy
te

ed D
c

s & e fi
Re itio
qu n,
n

Subsystem
ire D

Verifies & Validates against Realized


m eco

Needs &
en m

Requirements Subsystems
t D po
ef sit
in io
iti n
on , A
,, llo

System Element
In ca

Verifies & Realized


te ti

Needs &
g r on

Requirements Validates System Elements


at
io & D

against Verification Methods:


n,

- Test
- Demonstration
es

Design,
ig
n

- Inspection/Observation
Design Output Specifications,
Build, Buy, Code, Reuse - Analysis (includes models,
simulations, similarity)

Design Inputs Design Outputs


Adapted from Ryan, M. J.; Wheatcraft, L.S., “On the Use of the Terms Verification and Validation”, February 2017 and INCOSE SE HB, Version 4, Figures 4.15 & 4.19

Figure 2-13: Integration, Verification and Validation in Relation to the SE Vee Model.
The SE Vee model is one of several visualizations to help understand the SE processes where the
definition of lifecycle concepts, integrated sets of needs, sets of design input requirements,
architecture, and design take place on the left side of the SE Vee. The Vee “shape” is useful to
communicate the point that on the right side of the SE Vee the physical system elements and
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 45

subsystems that make up the system physical architecture are verified against their respective
requirements and validated against their respective needs that were defined during the SE
activities on the left side of the SE Vee. Thus, the processes of system integration of the physical
parts, system verification, and system validation on the right side of the SE Vee are distinctly
separate activities from the activities concerned with needs definition, requirements definition,
architecting, design, and production of the parts that occurs on the left side of the SE Vee.
This distinction is especially important in terms of budgeting and scheduling. A common issue
with many projects is a failure to appreciate the time and effort associated with system
integration, system validation, and system verification activities associated with the right side of
the SE Vee. Consequently, it is common for projects to not include sufficient budget and
schedule to successfully complete the system integration, system verification, and system
validation activities - especially when issues are discovered that can lead to expensive and time-
consuming rework.
Because of this, it is important for projects to understand that the success of the system
integration, system validation, and system verification activities on the right-side of the SE Vee
is highly dependent on the time spent and quality of the SE activities and resulting artifacts
developed on the left-side of the SE Vee.
Concurrent Integration, Verification, and Validation
A major issue many have with the SE Vee model is there is sometimes a misconception
concerning when integration, verification, and validation activities occur. As shown in the SE
Vee, some feel that integration, verification, and validation only occur on the right side of the SE
Vee as it is commonly shown. This is false. As shown on the top of Figure 2-13, integration,
verification, and validation are three distinct activities that occur concurrently with the other SE
technical processes across all lifecycle stages.
Integration is an activity that must start at the beginning of the project. It is important that the
project team manages the development of any system as an integrated system using both the
hierarchical and holistic views discussed previously. Similarly, verification and validation are
concurrent activities that occur across all lifecycle stages as discussed in the previous section.
The integrated sets of needs and sets of design input requirements go through their own
verification and validation prior to baseline as discussed in Sections 5 and 7. The design goes
through its own verification and validation activities to help ensure the needs and requirements
will be met by the realized system that is built or coded in accordance with the design as
communicated via the sets of design output specifications.
With the increased use of prototypes, modeling, and simulations as part of the lifecycle concept
analysis and maturation, needs definition, requirements definition, architecture definition, and
design definition, and the ability to model the operational environment, early system verification
and early system validation can be conducted during design verification and design validation
activities prior to system production and system integration, system verification and system
validation as discussed in Section 8.
Doing so can reduce the risk of issues and anomalies being discovered during system integration,
system validation, and system verification activities and the associated costly and time-
consuming rework. In addition, modeling and simulations prior to production, allows not only
expectation management but also early feedback from the customers, users, and other

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 46

stakeholders on the final system architecture and design. It will be much less expensive and time
consuming to resolve issues before the realization of the actual physical hardware and software
and system integration, system validation, and system verification.
In some organizations, design verification is referred to as a Functional Configuration Audit
(FCA) where the design for the integrated system is verified to meet its functional baseline
approved at the Preliminary Design Review (PDR) and Critical Design Review (CDR) as
communicated in the sets of design input requirements.

2.6 System Verification versus Requirements Verification


System elements, subsystems, and the integrated system are verified (assess compliance of)
against predefined and agreed to verification Success Criteria defined for each requirement using
an agreed to verification Strategy and Method as part of system verification. In terms of a
contract, most often it is the design input requirements that the project will verify the SOI against
by providing evidence that the agreed to verification Success Criteria defined when the
requirements were defined were met. (Refer to Section 10 for a more detailed discussion
concerning Success Criteria, Strategy, and Method.)
Unfortunately, it has become customary practice that rather than defining system verification in
terms of the verification of a system, subsystem, system element against its design input
requirements, the shorter phrase “requirement verification” has been adopted. This, in turn, led
to “requirement verification matrices”, “requirement verification events”, rather than “system
verification matrices” and “system verification events”. However, it is important to understand
that verification of a system, subsystem, system element against its requirements is not
requirement verification; it is system verification as discussed previously when defining
verification and validation in context and shown in Figure 2-10.
Another issue with the focus on “requirement verification” in this context, is that often what is
referred to as “requirements” are the design input requirements. Consequently, verifying the
system was successfully produced via the design output specifications is often not included as
part of “requirement (system) verification”. (In many organizations verifying the built system
meets the design output specifications [built per spec] is a quality function, sometimes referred
to as a Physical Configuration Audit (PCA), performed as part of production verification
discussed in Section 9 that occurs during manufacturing or coding, and not as part of the system
verification activities.)
Using the phrase “requirement verification” rather than “system verification”, means that the
focus is on the design input requirements rather than verification that the system elements,
subsystems, and the integrated system meet their design input requirements. As a result, many
system engineers believe that there is a relationship between the satisfaction relationship between
parent/child requirements and the choice of system verification activities against the different
levels of requirements as they move up the system physical architecture during system
integration. They believe that system verification consists of the verification activities directly
associated with a given requirement as well as verification activities concerning the lower-level
child requirements that trace directly to it. In this context, they believe that the successful
verification of the child requirements at one level is a prerequisite to system verification of the
parent requirements at the next higher level. These systems engineers feel that this is in the spirit
of the bottom-up approach to system integration, system verification, and system validation and
takes advantage of the greater specificity of the lower-level requirements. Some systems
engineers also believe that satisfaction of the child requirements may be sufficient evidence that

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 47

the parent requirements have been met. Others believe that, in some cases, the satisfaction of a
parent requirement can be used as evidence the child requirements have been met.
However, there is a major flaw in this line of reasoning when applying this approach to system
verification and system validation. This flaw is a result of not understanding the differences
between needs verification, needs validation, design input requirements verification,
requirements validation, design verification, and design validation that occur during development
and system verification and system validation that occur during system integration.
System verification and system validation are not exercises in verifying design input
requirements or validating needs. They are exercises in verifying the realized physical
subsystems, system elements, and integrated system meets their design input requirements
(system verification) and needs (system validation) defined during development.
As discussed in Section 6.4 parent/child relationships are very important concepts during design
input requirements definition as they deal with the flow down (allocation) of design input
requirements from systems at one level of the physical architecture to subsystems and system
elements at the next lower level of the physical architecture as well as the budgeting of
resources, quality, and performance to ensure the integrated physical system meets the design
input requirements and needs when all of the subsystems and system elements that make up the
SOI are integrated together.
However, the determination of the proper parent/child relationships and whether the child design
input requirements are both necessary and sufficient are part of requirements verification,
requirements validation, design verification, and design validation activities during development
- not system verification and system validation activities during integration of the physical
subsystems and system elements into the integrated system.
As such, parent/child requirement relationships should not be the focus of system verification
during system integration of the subsystems and system elements that make up the system
physical architecture. However, these relationships are important to help determine what system
verification evidence is needed to help verify parent requirements have been met. While
verifying child requirements have been met does not inherently verify the parent requirements
have been met, as is stated earlier, evidence that the child requirements have been met by the
system, subsystem, or system element they apply may be used to help ensure the intent of the
parent requirement(s) have been met by the system element, subsystem, or integrated system
they apply. This is especially true when addressing budgeted quantities.
Consider when the parent requirement has a quantity (e.g., performance, physical characteristic,
quality attribute) that was budgeted to the subsystems and system elements at the next lower
level of architecture (Refer to Section 6.4). Because the requirements associated with a budgeted
quantity, there is a dependency between each child requirement as well as with the parent. Such
that a budgeted child requirement not being met, could result in one of the other dependent child
requirements not being met or the parent requirement not being met.
For example, if the parent system has a weight constraint and that weight was apportioned
(budgeted) to the subsystems and system elements that are part of its physical architecture, and
one or more of these lower-level subsystems or system elements exceed their budgeted weight,
the possibility exists that the parent system, subsystem, or system element will fail to meet its
weight requirement during its verification activities.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 48

Because of the possibility of confusion, when this Manual refers to “needs or requirements
verification and requirements validation”, what is really meant is verification and validation of
the needs and requirements themselves and not verification and validation of the realized system,
subsystem, or system element that the needs and requirements apply. When the guide refers to
“system verification and system validation” what is meant is verification and validation of a
realized system, subsystem, system element against their respective sets of needs and
requirements. The same is true for design verification and design validation.
To help correct the misuse of requirements verification and requirements validation when system
verification and system validation is the real subject, throughout this Manual, the incorrect use of
“requirement” versus “system” when referring to system verification and system validation
common artifacts have been renamed. For example, rather than a Requirements Verification
Matrix (RVM) or Requirements Verification Compliance Matrix (RVCM), the names have been
changed to System Verification Matrix (SVM) and System Verification Compliance Matrix
(SVCM). In addition to the verification matrices, there are similar validation matrices: System
Validation Matrix (SVaM) and System Validation Compliance Matrix (SVaCM).

2.7 The Intent of System Verification and System Validation


A key outcome of system verification and system validation is to verify and validate that the
physical realized subsystems and system elements at the lower levels of the architecture meet
their needs, design input requirements, and design output specifications prior to being accepted
and approved for integration into the next higher level of the physical architecture.
However, the larger system verification question for these subsystems and system elements is
determining if the architecting, allocation, flow down, and budgeting were done properly,
resulting in the physical subsystems and system elements, that when integrated into their parent
system will result in the integrated parent physical system being able meet its design input
requirements and meet its set of needs.
During system integration, system verification, and system validation we are restricted to the
realized, as-built physical components (hardware and software) at the various levels of the
physical architecture. Once the system elements and subsystems are integrated, they represent a
higher-level system element, subsystem, or the integrated system whose behavior is a function of
the interactions of each of the physical parts as well as interactions between the integrated
system and the macro system it is a part.
As discussed earlier, a system is more than just a sum of its parts and may have emergent
properties (good or bad) not explicitly represented by one of more of the requirements - or even
anticipated by the developers. At this next higher level, the system has its own set of needs and
set of design input requirements that are the subject of their own verification and validation
activities. This is true for all subsystems and system elements in the physical architecture that
make up the integrated system, no matter the level.
Below the top level of the SOI architecture, “validation” of subsystems and system elements
takes on a slightly different meaning than validation of the integrated system. First, for physical
subsystems and system elements that make up the system, “operational environment” includes
the interactions between these physical subsystems and system elements across interface
boundaries (internal and external) and the associated induced environments (vibrations,
acoustics, thermal dynamics, EMI/EMC, etc.), which may or may not be well-defined and
modeled).

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 49

A subsystem or system element that is part of the physical architecture may meet all its design
input requirements and design output specifications, however, after being integrated into the next
higher level of the architecture, the resulting system may not be aligned with the needs defined at
that level, i.e., the integrated system could still fail system validation, in spite of all individual
subsystems and system elements meeting their needs and requirements.
Because the behavior of a system is a function of the interaction of its parts, a major goal of
systems validation is assessing the behavior of the integrated physical system and identifying
emergent properties not specifically addressed by the needs or requirements nor discovered
during modeling and simulations. Emerging properties may be positive or negative. For
example, cascading failures across multiple interface boundaries between the system elements
that are part of the system’s architecture. Relying on models and simulations of the system and
its operational environment may not uncover all the emerging properties and issues that occur in
the physical realm.
While system validation using models and simulations allows a theoretical determination that the
modeled SOI will meet its needs in the operational environment by the intended users once
realized, the assessment of the actual behavior (system validation) must be done, whenever
possible, in the physical realm with the actual hardware and software integrated into the SOI in
the actual operational environment by the intended users.
In some cases, such a failure of the integrated system to pass system verification and system
validation could be the result of an interface or operating environment definition issue or a
failure to develop a well-formed and complete set of design input requirements to verify the
system against or develop a well-formed and complete set of needs to validate the system against
in the first place. Another common cause is the failure to understand one of the basic systems-
thinking tenets - that to optimize the integrated system behavior and performance, the
performance of subsystems and system elements that make up the integrated system may have to
purposely not be optimized.
There are cases when it may not be practical in terms of the intended use and actual operational
environment to conduct system validation of the physical subsystems, system elements, or the
integrated system. However, the reader is cautioned to not substitute validation of the actual
hardware and software with the design and early system validation results using models and
simulations, unless necessary. Doing so adds risk to the project and reduces the confidence level
(as compared to system validation against the actual integrated physical system in its actual
operational environment when operated by the intended users) and adds risk of the realized
physical system failing system validation. As long as the physical system is not completely
integrated and/or has not been validated to operate in the actual operational environment by the
intended users, no result must be regarded as definitive until the acceptable degree of confidence
is realized.
2.7.1 Iterative System Verification and System Validation
Some software development approaches (such as Agile methods) advocate iterative system
verification and system validation over the different builds versus “sprints”. Using this
approach, it is not clear where the line is between design verification and design validation
versus system verification and system validation. Some question whether the traditional SE
concepts of system integration, system verification, and system validation apply to standalone
software application development, especially when the focus during software development is

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 50

often more on incremental and repeated increases in functionality and features, then a more
traditional hierarchical architecture and delivery of the complete, integrated system.
The good news is that the iterative system verification and system validation activities over the
different builds can be considered part of design verification and design validation as well as
early system verification and early system validation as discussed in Section 8. In the end,
before delivery and acceptance, the project will need to complete system verification and system
validation on the integrated system as defined in Section 11.
Some Agile practitioners validate against use cases or user stories and verify against stakeholder
needs, but often do not develop a set of technical system design input requirements typical of a
traditional SE approach to product development a described in this Manual. A problem with this
approach is that use cases or user stories only represent a subset of all the needs that the system
must be validated to meet. In addition, with this approach, a complete set of design input
requirements is not developed against which the system elements, subsystems, and the integrated
system can be verified against. While the application of the concepts in this Manual will need to
be tailored to an Agile development project - these concepts still apply when developing systems
that contain embedded software. Even within Agile development, there are top-level
organizational, strategic, operational and needs and requirements that would affect the
development of the user stories and sprints.

2.8 Reducing Risk by Addressing System Verification and System


Validation Early in the Lifecycle
At the end of a project, all project teams want to be able to say they have built the right system
and that the delivered system meets the business operations level and system level needs and
requirements while accomplishing its intended purpose in its operational environment when
operated by the intended users and does not enable unintended users to negatively impact the
intended use of the system.
Doing so results in “making the customers happy” by delivering a winning system that delivers
what is needed, within budget and schedule, and with the desired quality. In this context, all
project teams should focus on risk that could result in a failure to deliver a winning product and
failing to satisfy customers. A simple and practical definition of risk is: “Anything that can
prevent the project from delivering a winning product.”
A major risk is failing to ensure the set of needs and resulting set of design input requirements
are well-formed. This includes needs and requirements dealing with all lifecycle stages, not just
during operations. For example, needs and requirements concerning deployment, installation,
maintenance, and retirement must be included in the requirement set such that they will be
included not only in the system verification and system validation planning but also in the
acquisition or design of support equipment and enabling systems needed for system verification
and system validation.
Another risk to the project is failing to plan for system verification and system validation from
the beginning of the project. SE best practices include planning for system verification and
system validation activities from the beginning of the project and continuing to mature the
planning artifacts for system verification and system validation activities throughout the
lifecycle. Failing to do so can result in massive cost overruns and schedule slips as well as a
system that does not meet its requirements and fails to meet its needs. Given these impacts, all

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 51

project managers need to mitigate this risk from the beginning of their project. Recognizing the
need to mitigate this risk is critical to being able to deliver a winning product.
There are several reasons why system verification and system validation should be planned
early:
• Helps improve the quality of the sets of needs and sets of design input requirements by
ensuring they are well-formed, unambiguous, correct, complete, consistent, verifiable, and
able to be validated. Asking “How will we verify the system to meet this requirement or
validate the system to meet this need?” is an effective approach to identify ambiguous needs
and requirements.
• Enables the system to be designed to enable system verification and system validation
activities and to gather the data required to provide evidence that that the system has met a
need or requirement as defined by the Success Criteria. If two design options are equally
viable, why not choose the one that makes it easier to obtain the data?
• Ensures the additional resources and enabling systems needed to conduct the system
verification and system validation activities are available when needed (e.g., construction of
facilities, test stands, support equipment, other enabling systems, etc.). These facilities and
equipment cost money and may have to be reserved months in advance (if existing) or, if not
existing or need modifications, will take time to define, develop, build, and pass their own
system verification and system validation activities. Project planning for these resources is
key to making sure they are available when needed.
• Helps to ensure all needed resources are included in the project master schedule, budget, and
work breakdown structure (WBS). When contracting out the development of the system, it is
important to include system verification and system validation activities in the supplier’s
contract. If this is not planned early, it can be expensive to add later.
Planning for system verification and system validation can be considered a type of risk
mitigation plan, for a system not meeting its sets of design input requirements or sets of needs.
The amount (budget, resources, time) allocated to system verification and system validation
activities should be proportional to the project risk associated with the system not meeting a
particular requirement or need.
A minimal amount of system verification and system validation activity is appropriate when the
developer is working with a known system for a known customer in a known operational
environment with known users. In this case, the likelihood of the design and system itself not
meeting its needs or requirements are low. However, when developing a new system for a new
customer in a unique environment for a newly defined intended use using a new technology, the
probability of not meeting a need or requirement and system non-acceptance could be high.
For products in highly regulated industries, the likelihood of not meeting a need or requirement
may be low, but the consequence may be high - rejection for use. In this case, additional
resources for system verification and system validation, regardless of need or requirement type
or complexity. A new product that is heavily regulated may need to provide additional objective
evidence that proves compliance with standards and regulations or there is a risk that it may not
be approved for use.
Risk has two parts: the probability of occurrence and consequence of failure. In assessing risk,
the likelihood and consequences of failure must also be considered in terms of project size,
complexity, and visibility. A large production project is more likely to need more attention than
a small, one-time task. Large projects involve more resources, bigger budgets, and more time;

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 52

thus, the consequences of failure are higher based (in part) on the size of the investment. More
complex projects can increase the likelihood of failure - especially when the development is
stretched over longer periods of time. The consequences of failure of highly visible projects
could be greater than smaller, less visible projects. For example, a major system that is highly
visible to the public such as a launch vehicle or spacecraft, especially when humans are on-
board, a medical diagnostic device whose results can be trusted, or a vaccine that needs to be
effective without long-term negative effects on the health of the recipients - all may require
additional system verification and system validation to buy down the overall risk.
Needs and requirements change, so needs and requirements creep can also be a risk. A project
based on needs and with little or no underlying analysis, may lead to needs and requirements
subject to change; will need more attention than a project with well-formed integrated sets of
needs and sets of design input requirements developed as defined in this Manual. Poorly formed
sets of needs and requirements are often very volatile due to lack of consistency, correctness,
completeness, feasibility, and ambiguity. This volatility can result in costly and time-consuming
rework and an elevated risk the system will fail system validation. A higher risk is if the poorly
formed needs and requirements do not evolve properly and form an adequate basis for the
design. The needs and requirement interpretation in this case would be “left to the designer”
which carries technical risk and increases the chance of poor customer satisfaction with the
delivered system (failed system validation).
The organization’s reputation is also at stake. The number of failures after release, the amount of
warranty work, recalls, and returns are also a form of system validation. In today’s social media
driven world, the organization’s reputation can be negatively or positively impacted by the
comments and discussions concerning their products. Some consider social media the final form
of system validation. While this Manual is not intended to engineer a social media reaction, a
poor product in the commercial or government space can lead to negative comments - right or
wrong - about a company that would be difficult, if not impossible, to manage in the digital
space.
Having considered these risks, organizations can take action to collaborate with the customers,
regulatory agencies, and other stakeholders to reduce the probability or magnitude of their
potential dissatisfaction (failed system validation), even though the system meets the design
input requirements and design output specifications (system verification) as well as needs
(system validation). Even if every requirement in the contract is met, if the customer is receiving
negative comments or reviews online, that can also be a problem for the developing organization.
Early system verification and system validation activities as discussed in Section 8, should be
done during design to reduce risk of failing system verification and system validation during
system integration.
This means, each verification and validation activity across the system lifecycle should consider
the reduction of risk associated with learning early (not waiting until something is fully built or
coded before checking that it has the capability to meet a requirement or need). However, there
is always a risk of invalidating the early system verification and system validation due to
changes that are made to the design due to finding and correcting issues found during system
integration, system verification, and system validation.
In summary, for today’s increasingly complex, software-intensive systems, it is imperative that
projects address needs verification, needs validation, requirements verification, requirements
validation, design verification, and design validation as defined in this Manual during

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 53

development, before doing system verification and system validation during system integration
of the physical subsystems and system elements that are part of the physical architecture. The
risk-reduction payoff could be substantial.

2.9 Importance of an Integrated, Collaborative Project Team


The concepts discussed in this Manual are enabled with adoption of a multi-disciplined,
collaborative project team - minimizing the “silos”. Project success is achieved when the various
project disciplines work together, collaboratively to define lifecycle concepts, needs,
requirements, and design and recording the results of their activities within an
integrated/federated set of data. This is one of the key advantages of practicing SE from a data-
centric perspective as discussed in Section 3.
As shown in Figure 2-14, this team includes stakeholders from all lifecycle stages and associated
subject matter experts (SMEs) that have a role in developing and maturing lifecycle concepts,
developing both functional architectural and analytical/behavioral models used for analysis,
defining and managing the integrated set of needs, transforming those needs into design input
requirements, , and transforming the models into the physical architecture, realizing that
architecture via design, defining the design output specifications, producing the system elements
via coding or manufacturing, integrating, verifying, validating, operating, maintaining, and
disposing/retiring the SOI.
The multi-disciplined, collaborative project team also includes stakeholders responsible for:
defining the WBS and Product Breakdown Structures (PBS), planning, budgeting, scheduling,
procurement, contracting, risk management, quality control, monitoring, controlling, and other
activities associated with both project and SE management.

Needs &
Requirements
Project Engineering
Management Disciplines

SE Analysis
Management Modeling
Integrated,
Procurement Multidiscipline, Architecture &
& Contracting Collaborative, Design
Project Team
Maintenance Manufacturing
& Upgrades & Coding

System System
Validation integration
System
Verification

Figure 2-14: Integrated, Multidisciplined, Collaborative Project Team.


The SE processes, activities, work products and artifacts are highly interdependent and together
form a “system” that represents the project team members, activities, work products, and
artifacts, and interactions between team members. For the project to be successful, it is critical
that team members have a systems thinking perspective. The interactions between project team
members involve the communications and flow of data and information in many forms and

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 54

media types as well as between external organizations that make up the macrosystem the project
team is a part.
A major advantage of cultivating a collaborative work environment, combined with practicing
SE from a MBSE, data-centric perspective is that the project team can introduce more modern
systems development strategies such as Agile development. While Agile development is outside
the scope of this Manual, the agile approach - for some but not all projects - may allow the team
to produce and qualify a system faster and less-expensively than is possible using traditional,
serial waterfall approaches. The savings increases when compared to siloed projects with a
document-centric distributed set of ‘ground truth’ data. Project activities can be managed in
“sprints” that the project team defines and uses to monitor progress and communications can be
less formal between the project and customer as well as between members of the project team.
Success requires a collaborative, cross-functional team with smooth internal interactions as well
as a robust data and CM infrastructure.
Another advantage of strong collaboration (aka “removing siloes”) and practicing PM and SE
from a data-centric perspective is that it allows the system under development to be managed
from the top as an integrated system, as opposed to a siloed approach where each of the parts are
managed independently, each trying to optimize their individual performance and use of
resources.
For today’s increasingly complex, software-intensive systems, the most effective way to manage
the overall behavior of the integrated system is to also manage the development of those systems
top-down from a single integrated data and information model of the SOI. Managing allocation
and budgeting of performance and resources from the top enables the project team to optimize
system performance and use of resources, which may require sub-optimization of some of the
subsystems and system elements that make up the integrated system. Managing from the top
also help to ensure consistency across all lifecycles and associated artifacts.
Having an integrated, collaborative, multidisciplinary project team responsible for the integrated
system development enables different activities (lifecycle concept analysis and maturation, needs
definition, developing candidate architectures, defining requirements, design, etc.) to take place
concurrently as shown in Figure 2-13.
This approach is preferred for its “back and forth” feedback flow between project team members.
Specifically, the architecture and design teams are key in assessing feasibility of the lifecycle
concepts, sets of needs, and sets of design input requirements in context of the mission, goals,
objectives, measures, drivers and constraints, stakeholder expectations, and risk.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 55

Core
Team
PM SE

PM&I WG SE&I WG

Subject Matter
Experts

Lifecycle Stage
Support Personnel

Figure 2-15: Project Team Organization


Figure 2-15 presents one example of how a project team structure may look in the organization.
In this example, the project team would be organized based on roles, levels of responsibility, and
expertise. There would be a “core” team responsible for the overall project and SE management,
planning, monitoring, and controlling. The core team is supported by a PM and Integration
Working Group (PM&I WG) whose focus is on the day-to-day PM activities and SE and
Integration Working Group (SE&I WG) whose focus is on the day-to-day SE activities.
While the day-to-day focus of each WG is different, they would have frequent joint status and
planning meetings co-chaired by the leads of each WG. The leads of each WG would also be
members of the core team. The WGs would be supported by SMEs and discipline experts
assigned specific technical or management roles and activities, supported by other stakeholders
as needed depending on the lifecycle stage. Representatives of each subject matter area of
expertise would be a member of the applicable WG.
While team formation may not seem related to needs and requirements definition and
verification and validation activities - the nature of how teams interact, organizational culture,
and where and how to access SME expertise will determine how easily and effectively PM and
SE take place throughout the development lifecycle.

2.10 Importance of Effective Communications


2.10.1 A Communications Model
Communication theory is outside the scope of this Manual; however, a brief mention is merited
since miscommunication between team members and stakeholders can be disastrous to even
small projects. Specifically, this section emphasizes 1) that communication is only successful,
when the received message or content is the same as what the originator intended to
communicate, 2) just because communication appears to have taken place, does not mean it was
successful and effective, and 3) there are different forms and media in which communications
takes place - to be effective the sender must use the form and media most appropriate for what is
being communicated and the audience to which the message is intended.
When communicating lifecycle concepts, needs, and requirements, increasingly, the debate is
about which means (form and media) of communications is best. The debate is usually between
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 56

those that practice traditional SE, those that are adopting the use of language-based models, and
those that are following Agile principles. Depending on the specific information item or concept
being communicated and the domain, culture, people, and processes within a specific enterprise,
one means of communications is often advocated (with a lot of passion in many cases) over the
others.
To address the debate concerning the best means of effective communications of lifecycle
concepts, needs, requirements, architecture, and design it is helpful to understand the basic
communication model shown in Figure 2-16.

Problem
Communication Model Message
(as understood)
Statement,
Mission, Goals, Feedback
Filters Filters
Objectives,
MOSs, Needs, Filters
Expectations, Filters
Requirements
Lifecycle Message Filters
Concepts, Filters (as intended)
Drivers, Sender:
Constraints, Past & Receivers:
Risks, Needs, Present Present &
Requirements, Future
Architecture, Forms:
Deign, Design • Verbal
Output • Text
Specifications • Diagrams
• Models Receivers
• Designers/Developers/Coders
Senders: Media: • Testers (Verification/Validation)
• Customer • Face-to-face • Customers
• Managers • Phone • Users/Operators
• Requirements Engineer • Email • Managers
• Business Analyst • Printed Document • Quality Organization
• Business Management • Electronic Document • Regulators
• Architects, Designers • Electronic Tool(s) • Standards Organization
• Regulators database/models • Procurement; Contracts; Lawyers
• Standards Organizations • Maintainers; Sustaining Engineers
• Procurement
• Contracts; Lawyers

Figure 2-16: Communications Model [16], [49].


As shown in the model, there are lifecycle concepts, needs, or requirements that are to be
communicated in the form of a message; there is a sender of the message, the message sent (as
intended), the form of the message and the media used to communicate the message, the message
sent, filters, the receiver(s) of the message, feedback, and the message received (as understood).
It is very instructive when we apply this communication model to the communication of the
information shown on the left of Figure 2-16. Although this information comes from many
sources, the sender receives this information from the various sources through the senders’
personal filters. Then using these filters, the sender encodes the information into a message
which is transmitted via some means (form and media) to the intended receiver(s) who, in turn,
decode the message via their own personal filter(s). The encoding of the message by the sender
and the decoding of the message by the receiver(s) is based on their understanding of language,
but also training in product development methodologies, processes, tools, culture, domain,
education, biases, and work environment of the organization they are employed. Note that the
responsibility for ensuring that communication has taken place and that the message was
transmitted effectively rests with the sender, as only the sender knows the original message and
intent.
People often have built-in biases based on their past experiences. An individual may have
worked in a given domain (e.g., consumer products, government procured systems, standalone

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 57

software applications) all of their career and may therefore assume that everyone does product
development the same way and uses key basic terms in the same way with the same meaning. If
an individual has only worked in a SE environment that is formal, document-based and uses the
traditional waterfall-based processes, that individual may have a built-in bias to follow that
approach to encode and decode the messages. If an individual’s experience base is solely related
to standalone software application development, they may have a built-in bias to use the
approaches and terminology based on that experience. If an individual is used to developing
products using CMMI or PMI lifecycle models, they might assume everyone else develops
products using those same product development models and associated terminology.
In an organization that is implementing SE from a data-centric perspective, including the use of
language-based models, and project team is trained in one or more of the modeling languages
(e.g., UML/SysML), then they are likely to encode and decode needs and requirements via
various diagrams and visualizations that make up an overall model of the system of interest. In
an Agile software environment, the project team is likely to communicate needs and
requirements using a mix of both formal and informal communications. The point is that for
effective SOI development, some thought should be given to how different types of information
will be communicated - not just to the project team but throughout the organization. Often a
project communications plan can address and codify this content.
The challenge in communicating SE data and information is whether the message received,
interpreted, and understood by the receiver reflects what was intended by the sender. In Figure
2-16, the goal is for the two boxes labeled “message as intended” and “message as understood”,
to represent the same message. If there is an intended action associated with the message, the
resulting action should also match. When the messages differ, problems are going to exist such
that the system under development may fail either, or both, system verification (not meeting
requirements) and fail system validation (not meeting the needs of the stakeholders in the
operational environment). The reason for failure is often a “failure to communicate”.
2.10.2 One Size Does Not Fit All
In truth, successful SE development approaches must include multiple forms and media to
completely develop and effectively communicate the data and information from which a system
is designed, coded/built, verified, validated, and delivered. All the various types and categories
of information cannot be communicated effectively using a single form or media.
These forms include functional flow block diagrams (FFBD), context diagrams, boundary
diagrams, external interface diagrams, internal interface diagrams, architecture diagrams, data
flow diagrams, use case diagrams, textual needs and requirements, tables, reports, electronic
documents, language-based models, etc. The specific form of visualization can be used that best
supports a specific lifecycle activity from whatever perspective is best for what is being
communicated and to whom. Communicating needs and requirements in an office application, a
RMT, a model, or design drawings in a CAD-generated pdf file, are different forms, however
each can be appropriate depending on the intent of the sender and the intended audience
receiving the information.
To effectively communicate data and information, wise project managers, business analysts and
systems engineers need to recognize the need to use whichever form and media is the most
appropriate based on both what they are communicating and the audience they are
communicating - it is important to know the audience.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 58

It is the responsibility of the sender that the message being communicated is in a form that will
be understood as intended by the receiver(s). To communicate project information effectively,
the sender must acknowledge the various filters and biases used to encode and decode the
message that is being sent such that the sender’s meaning is interpreted and understood as
intended, no matter the form or media used.
If the message is needs and requirements that need to be captured and communicated for features
and functions that will supply those features, then an FFBD may be the most effective form of
communication. If the customer can meet face-to-face frequently with the project team, then
user stories, use cases, and agreed to success, evaluation, acceptance criteria can be used to
communicate the information; however, once the communication takes place, the content needs
to be recorded and archived so there is a record of the communication that is retrievable and
understandable. If a regulator is formally communicating standards and regulations to present
and future developers, a textual set of requirements in a printed or electronic document may be
the most effective means of communication. If a customer is developing an RFP to be released
to multiple, geographically separated potential bidders, then both the technical requirements for
the system as well as the SOW or SA requirements on the suppliers need to be communicated
formally as textual “shall” statements with the characteristics of well-written requirements.
The key is that not one single form and media type will be best for all the types and categories of
data and information that must be communicated, recorded, and archived. Referring to Figure 2-
16, identify the content to be communicated (the input), pick one type of sender, formulate the
message, decide who the recipient(s) is/are, whether current or future recipient(s) are who is
being communicated to, and then pick the means of communication that is the most effective to
communicate the content and will meet the needs of the recipient(s). Following this process, will
yield different approaches for different types of the inputs listed, the specific message and intent,
and the intended recipients.

2.11 Green Field versus Brown Field Systems


Key concepts to understand when developing a system are the concepts of “green field” and
“brown field” systems.
• Green field system development is when a new system is being developed where there is
not an adequate predecessor system. There may be other similar systems, but the
organization or customer has decided to start with a “blank piece of paper”. For example,
an organization is building a new medical diagnostic device. There may be other similar
devices in the market or not, but the organization is implementing an innovative approach
or technology in this new device.
• Brown field systems, on the other hand, are legacy or heritage systems where there is an
existing predecessor system, which can be evolved or transformed into the desired
system. This is often the case in consumer products where the organization periodically
produces revisions or updates to existing products or new product models for the
upcoming year.
There can also be a combination. A medical device company may have a general-purpose
diagnostic instrument that support multiple types of inputs and analysis. In this case the
instrument is existing (brown field), but the biological sample, assay, and analysis software are
new (green field) projects. Or a new medical device may have the same hardware and
functionality but use different software to improve performance and quality.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 59

The development of a new entity (green field system), or an upgrade or modification of an


existing entity (brown field system), can be performed internally to the organization or through
various types of customer-supplier relationships. Development can be performed pursuant to a
formal contract between two enterprises, or under a formal contract between two separate parts
within the organization, or less formally between the end-user and the developer within a given
organizational element of an enterprise. Regardless of the formality of the customer-supplier
relationship, formal documentation of the end-user and acquirer's business operations level and
system level needs and requirements will lead to a smoother development project, resulting in a
product fit-for-use and satisfying the customer expectations.
One of the major advantages of adopting a data-centric approach to SE as described in Section 3,
is that there will be a data and information model of the current “as-is” brown field system. With
this data and information model, the organization can identify what changes need to be made to
the existing data and information model that will result in the desired “future state/to be” system.
Changes to the needs will result in an updated set of needs. Changes to this set of needs will
identify which of the system technical design input requirements will need to be changed.
Traces from these requirements to the design artifacts will indicate what design changes will
need to be made. This information will also help to develop a more accurate budget and
schedule as well as decide what needs to be verified and validated and what does not (existing
data may be sufficient). This capability can result in an organization being able to release an
updated system is a much shorter time at a reduced development cost.

2.12 Avoiding Technical Debt


Failing to spend time at the beginning of the project to understand business strategic level,
operations level, and system level needs and requirements, define and mature the lifecycle
concepts, and establish completeness, consistency, correctness, and feasibility leads to an
accumulation of technical debt. Projects must manage risk, but unfortunately both cost and
schedule are often fixed too early in the development lifecycle before feasibility is assessed -
setting projects up for failure from the beginning.
The point of this section is to urge both engineering and management teams to consider program
decisions from a risk-based, technical debt avoidance perspective - especially those that are
tempted to “cut corners” or implement temporary “band-aid fixes”. Management should always
be aware of the old saying: "Pay now or pay me later, if later you will be paying a lot more!"
2.12.1 What is Technical Debt?
Technical debt is a metaphor made up by Ward Cunningham, one of the authors of the Agile
Manifesto, to describe what occurs when a project team uses a quick short-term solution that will
require additional development work later to meet the needs of the stakeholders. From a project
perspective, technical debt refers to the eventual consequences of poor project management and
system engineering practices. The debt can be thought of as work that needs to be done before a
particular product development project can be considered complete and successful.
Technical debt is closely related to project and technical risk - not performing key activities early
in the development lifecycle adds risk to the project due to the consequences of not doing those
activities when they should have been done and addressing the consequences later - “kicking the
can down the road”.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 60

By not doing or postponing key lifecycle development activities or making “band-aid” type fixes
which will eventually need a more effective and permanent fix anyway, it is like taking out a
high interest loan resulting in debt for the project. Like all loans, the debt collector is persistent
in demanding the loan be repaid along with the interest. Until the debt is repaid, it will keep on
accumulating interest, making it harder to deliver a winning product. Unaddressed technical
debt increases system development disorder and risk- in short, too much of any kind of debt
often leads to a failed project.
A key part of the concept of technical debt is that, like financial debt, it must be repaid at some
point in the future along with the accumulated interest. Moreover, like financial debt, technical
debt accumulates interest on top of interest. From a risk perspective, if risk is accumulated -
even for seemingly valid reasons - the probability of the risk becoming an “issue” and cascading
into worse issues becomes high. This makes it less likely to deliver a winning product. This
interest represents the increased cost and time along with cost and time associated with rework
that could have been avoided if the work were done at an earlier point in the program when the
cost and schedule impacts of change are less before hardware is built and software coded.
2.12.2 Why Does Technical Debt Accumulate?
The main reason for technical debt accumulation is that the project team does not always have a
complete understanding of the “big picture” and what is necessary for acceptance at the outset of
the project. Obtaining the knowledge needed to see the big picture and understand what is
necessary for acceptance may seem to be costly and time consuming at the beginning of a
project, especially on large complex projects. Customers (internal and external) need to
understand the need for the upfront activities and artifacts as discussed in this Manual, such that
the project team has a good understanding of the “big picture” and what is necessary of
acceptance, before proceeding with development. Consider these early activities as an
investment that has a huge return in terms of a more accurate budget and shortened time to
market.
Another key issue is that leadership for projects that are cost-constrained or schedule-constrained
may be tempted to reduce verification and validation activities across the lifecycle, which can
make up a sizable portion of the overall development budget, without clearly understanding the
big picture and what is necessary for acceptance before beginning design. Reducing verification
and validation activities across the lifecycle can result in a realized system that will fail system
validation and not be acceptable for its intended use in the intended operational environment by
the intended users.
In some cases, developers are made aware of a real or perceived problem, situation, opportunity,
or “need” that requires immediate remediation. All too often this is followed by a proposed
solution (design) without first clearly understanding the problem, stakeholders’ needs and
requirements, mission, goals, objectives, drivers and constraints, risk, defining and maturing
lifecycle concepts, establishing feasibility, and defining an integrated set of needs and
transforming them into a set of well-formed design input requirements. The time pressure can be
high, and the temptation to “jump to a solution” may be great. However, without doing these
activities, the developers may not understand enough of the larger picture to develop a design
solution that will result in a SOI that will pass final system validation and be accepted by the
customer or approved for use.
In other cases, the project team may be provided with, or go directly to defining, a set of
requirements without first defining and maturing lifecycle concepts, establishing feasibility, and

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 61

defining an integrated set of needs. While this approach is better than jumping directly to a
design solution, it also adds risk of failure. This definition of set of design input requirements is
often rushed, and thereby defective. The set of requirements may also include a solution (a mix
of both design input requirements and references to design output specifications) without
adequate underlying analysis from which they were formed. Consequently correctness,
completeness, consistency, and feasibility may not have been addressed. Again, without doing
the activities that come before defining the set of needs and set of design input requirements, the
project team may not be clear on what is necessary for acceptance. Again, a proposed “quick
and dirty” solution may seem to be adequate to address the problem but may also add to the set
of problems by creating new unintended ones.
In each case, the result is a large amount of technical debt. Failing to understand the problem
and what is necessary for acceptance prior to developing the integrated set of needs and resulting
design input requirements and design, often leads to failed system verification and system
validation, resulting in cost and schedule overruns, and project failure.
2.12.3 Technical Debt and Risk
The project team needs to take steps to prevent the technical debt and avoid the high interest
consequences later in the project. Technical debt represents risk to the project - risk that the
project will not be able to deliver a winning product.
For customers that will outsource the development of a SOI to a supplier, failing to complete the
work necessary to develop contracts, SOWs, and SAs accumulates technical debt in the form of
expensive contract changes.
Towards the end of the project, a high amount of technical debt puts a project at risk of failure of
system verification and system validation and exposes the project to the risk of potential costly
rework to meet the needs and requirements.
After seeing the work discussed in this Manual some readers will feel the number of activities is
overwhelming. However, they need to understand that failing to do these activities will result in
the accumulation of technical debt that unfortunately is all too often repaid in the form of a failed
project and associated consequences to both the enterprise and the project team.
2.12.4 Avoiding Technical Debt
Activities undertaken by the project team early in the project to understand the big picture and
avoid accumulating technical debt include:
• Clearly define and understand the problem or opportunity the project is to address.
• Define and get agreement on a mission statement, goals, objectives, and a project charter.
• Define a set of measures the stakeholders will use to assess success.
• Understand the both the business operations level and system level needs and requirements from
the beginning.
• Identify and document drivers and constraints.
• Identify and assess risk and determine how they will be managed.
• Define lifecycle concepts and do the analysis needed to mature the lifecycle concepts and
establish feasibility before defining the integrated set of needs.
• Define a set of needs before defining the set of design input requirements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 62

• Develop a well-formed set of design input requirements based on the underlying analysis done
to mature the lifecycle concepts and resulting set of needs.
• Define what is necessary for the system to be accepted at the beginning of the project.
• Provide the project team the time, budget, and resources needed to deliver a winning SOI.
• Define the Success Criteria, Strategy, and Method for system verification and system validation
as the needs and requirements are being defined.
• Practice continuous integration, verification, and validation across all lifecycle activities.

2.13 Overview of SE as Discussed in This Manual


At the strategic and business operations levels shown in Figure 2-3, a problem/opportunity is
identified that the project team is to address along with the definition of lifecycle concepts,
stakeholder needs, and stakeholder-owned system requirements appropriate to those levels of the
organization.
At the system level, the project team responsible for the development of the system, identifies
the relevant stakeholders, elicits needs and stakeholder-owned system requirements, identifies
drivers and constraints, and risk. This information is used to define, analyze, and mature a set of
lifecycle concepts that will address the problem or opportunity, and elicited stakeholder needs
and stakeholder-owned system requirements within the defined drivers and constraints. The goal
is to identify at least one set of feasible concepts (with acceptable risk) before defining an
integrated set of needs.
From this set of lifecycle concepts an integrated set of needs for the system is derived as
discussed in Section 4. This set of needs is verified and validated as discussed in Section 5 and
baselined as part of a gate review, e.g., Scope Review (SR) or Concept Review (CR) as
discussed in Section 14.
The baselined set of needs are transformed into the set of design input requirements for the
system as discussed in Section 6 and go through requirements verification and requirements
validation as discussed in Section 7 and are baselined as part of a gate review, e.g., Systems
Requirements Review (SRR) as discussed in Section 14. The resulting design input
requirements represent the system “functional” baseline.
At this point, the organization makes a build/code, buy, or reuse decision. If build/code, they
will proceed with defining subsystems and system elements at the next level of the system
physical architecture. If they make a buy decision (i.e., contract out the development of the
system), the supplier will proceed with defining the subsystems and system elements at the next
level of the system physical architecture.
For the system, subsystem, and system elements that are contracted to a supplier, a key issue is
that unless the customer provides the supplier with the dataset and associated models that
represent the underlying lifecycle analysis and maturation, needs analysis, the integrated set of
needs, and requirements analysis; the supplier will need to do redo that analysis as part of their
own SE efforts.
In either case, based on the analytical/behavioral and functional architecture models and
preliminary physical architecture developed concurrently with the lifecycle concepts analysis and
maturation activities, needs analysis, and requirements analysis, the system level design input
requirements are allocated to subsystems and system elements at the next lower level of the
physical architecture as shown in Figure 2-7. These allocated requirements represent constraints

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 63

to the subsystems and system elements at the next level of the architecture. For each system,
subsystem, and system element, the lifecycle concept analysis and maturation, needs analysis
and definition, design input requirements analysis and definition, and allocation cycle is repeated
as the developing organization moves down the levels of the architecture.
These activities repeat until the developing organization makes a buy, build, code, or reuse
decision for each subsystem and system element. This not a serial, one-way process. SE is
interactive and recursive. As more detailed knowledge is gained as the developing organization
moves down the levels of the architecture, there is often a need to refine the lifecycle concepts,
set of needs, and set of design input requirements defined for the previous level. Using a model-
based approach, these refinements are made automatically as the models are refined as the
developing organization moves down the levels of the architecture.
As advocated in this Manual, using an integrated, collaborative, and multidisciplinary project
team, the preliminary functional and physical architecture definition and design takes place
concurrently with lifecycle concept analysis maturation, needs analysis and definition, and
design input requirements analysis and definition as shown at the top of Figure 2-13. This
approach is preferred in that the physical architecture is key in assessing feasibility (cost,
schedule, and technology) and risk. (This approach assumes the SOI is developed holistically
with all the subsystems and system elements contained within an integrated model of the system.
Frequently, this is not the case when different subsystems and system elements are developed in
silos either within the organization or externally by the various suppliers.)
The challenge for the project team is being able distinguish between the design input
requirements versus the design output specifications. The approach defined in this Manual is to
focus on the design input requirements as ‘inputs’ to the architecture and Design Definition
Process and the design output specifications as ‘outputs’ of the Design Definition Process. At
some point there is a transition between design input requirement and architecture definition and
the realization of the design input requirements and architecture via the INCOSE SE HB Design
Definition Process. Some organizations consider this transition to occur when design input
requirements for a system element are realized by actual physical parts, components, and
software via the Design Definition Process.
As part of this realization, the design team creates a design for the system element and
communicates the design to those that will build or code the system element via a set of design
output specifications. Realizing the design output specifications during manufacturing or coding
results in the creation of the subsystems and system elements that make up integrated system
physical architecture (hardware, mechanical, software).
The design and resulting design output specifications go through design verification and design
validation as discussed in Section 8 and are baselined as part of one or more gate reviews, e.g.,
SDR, PDR and CDR as discussed in Section 14.
As shown in Figure 2-10, once the subsystems and system elements that make up the SOI
architecture are developed (procured, manufactured, or coded), they undergo production
verification to verify they meet their design output specifications as discussed in Section 9.
Production verification evaluates whether a yielded product (hardware or software) meets
requirements - the design output specifications in this case. In some domains, performance of
production verification for larger and more complex system elements is sometimes called
product acceptance.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 64

Upon completion of production verification and acceptance, the subsystems and system elements
undergo system verification and system validation to verify they meet their set of design input
requirements (system verification) and to validate they meet their set of needs (system
validation) as discussed in Sections 10 and 11. Upon successful system verification and system
validation, the system elements are integrated into their respective systems which then go
through their own system verification and system validation against their set of design input
requirements and set of needs. Once their system verification and system validation activities
are complete, they are integrated into the SOI and then system verification and system validation
activities are performed on the integrated system.
Note in Figure 2-13 system verification and system validation of a realized system, subsystem,
system element, or SOI is “against” their respective set of needs and set of design input
requirements that were defined, verified, validated, and baselined as design inputs for each
system, subsystem, and system element at each level of the SOI physical architecture.
For each system, subsystem, and system element, at each level of the SOI physical architecture,
system verification and system validation activities take place. For systems, subsystems, and
system elements developed by a supplier, the system verification and system validation activities
for each are completed as part of their acceptance as defined in their contract.
It is important that the customer organization (or regulatory agency) clearly define both their role
and the developer’s role in system verification and system validation activities for the system as
well as all subsystems and system elements in the system’s physical architecture as discussed in
Section 13.
In the end, objective evidence of compliance will be documented that can be evaluated by the
Approving Authorities (customers or regulatory agencies) to determine whether the system
integration, system verification, and system validation activities have been completed
successfully.
For medical and other safety critical systems, system verification and system validation may be
required to be certified prior to a governmental regulatory agency authorizing the system to be
released to and used by the public. Following the customer or regulatory agency evaluation,
qualification, and certification, the system can be accepted, and ownership transferred to the
customer or released into the marketplace.
We have almost finished laying the foundation for the concepts and activities to be presented in
the rest of this Manual. After a discussion of information-based requirements development in
the next section, we will have completed our foundation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 65

Section 3: INFORMATION-BASED NEEDS AND REQUIREMENT


DEVELOPMENT AND MANAGEMENT

Today’s system development environment presents many key challenges because of increases in:
• Complexity.
• The role software has in the system architecture (software-intensive systems are the norm).
• Dependencies and number of interactions among parts of the system.
• The interactions between a system and the macro system it is a part.
• The number of threats across interface boundaries and vulnerabilities to those threats.
• Dependencies between PM and SE.
• Dependencies between SE lifecycle process activities and artifacts.
• Oversight.
• Competition.
• The pressure (and need) to reduce development time and time to market.
• Risks (program/project, development, manufacturing, integration, system verification,
system validation, and operational.
• The number of projects that are over budget and experiencing schedule slippage.
To address these challenges and successfully develop increasingly complex, software-intensive
systems, project managers and systems engineers must move to a data-centric approach for
system development using a combination of textual as well as diagram and model-based
communications, depending on what is being communicated and to whom.
Using a data-centric approach as discussed within the INCOSE RWG whitepaper Integrated
Data as a Foundation of Systems Engineering[16[[48]], system engineering is practiced from the
perspective that business operations level system level needs and requirements, along with all SE
artifacts (models, designs, design output specifications, documents, diagrams, drawings, etc.)
generated during the performance of system lifecycle process activities, are visualizations of the
underlying integrated data and information model of the SE.
Similarly, PM should be practiced from a data-centric perspective that recognizes the work
products developed (plans, budgets, schedules, WBS, PBS, contracts, etc.) generated in the
performance of all PM phases are also visualizations represented by underlying sets of data and
information.
Project managers and systems engineers need to recognize that both the PM and SE activities
and resulting work products and artifacts are interrelated and highly dependent. There are risk,
costs, schedules, activities, and resources associated with each SE artifact generated across all
system lifecycle stages that must be planned for, monitored, and controlled.
Because of this, both the PM and SE sets of data and information need to be integrated,
accessible, and shareable between the members of the project team and external organizations
involved in developing the system. This sharing will help to ensure consistency, correctness, and
completeness of work products and artifacts developed across all system lifecycle stages.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 66

As a result, the trend is to use toolsets that support the development of all work products and
artifacts within a common Product Lifecycle Management (PLM) or Application Lifecycle
Management (ALM) tool or a set of tools. The applications within the toolset should support
interoperability standards allowing work products and artifacts to be represented as shareable
data and information. Instead of developing work products and artifacts using standard office
applications and managing the printed, hardcopy documents, the project team develops and
manages work products and artifacts electronically from data developed and managed with the
tool datasets. (Refer to Section 16 for a detailed discussion on the desirable features the project
toolset.)
Various views of the shareable datasets can be generated within a common PM and SE tool or
applications within a toolset. These visualizations can be in several forms including tables,
spreadsheets, diagrams, documents, and reports which can be generated, distributed, and viewed
electronically or printed as a hardcopy document. As such, these visualizations are outputs of
the project toolset, whose contents can be specified by the schema that defines the data and
information contained within the toolset(s) datasets.
In a document-centric approach to SE, it is difficult to identify a “Single Source of Truth
(SSoT)”. As the project progresses through the SOI lifecycles and change happens, the various
PM and SE documents often become out of date and not in synchronization. In a data-centric
approach to SE, with the SSoT maintained within the SOI’s integrated dataset, changes will
automatically be reflected across all artifacts across all lifecycle stages minimizing this risk.

3.1 Information-Based Needs and Requirements Definition and


Management
The intent of MBSE is moving from a document-centric practice of SE to a data-centric practice
of SE. This enables an increased use of diagrams and models as a means of analysis to better
understand the problem, elicit stakeholder needs and stakeholder-owned system requirements,
define and mature feasible lifecycle concepts that will realize those needs and requirements,
define an integrated set of needs, and transform those needs into a set of design input
requirements for the system. The results include functional and physical architectures,
analytical/behavioral models as well as functional diagrams of the activities to be used by the
project team to develop or procure the system. These artifacts are all part of the SOI’s integrated
and shareable data and information model.
For some organizations, the practice of MBSE is model-based design (MBD) where the focus is
on the solution space and transforming design inputs into design outputs. In this context, the
MBD activities often begins with a baselined set of design input requirements. This is common,
especially for cases when a customer outsources the design, manufacturing, and coding of the
SOI to a supplier.
The MBD team develops diagrams and models to analyze the “customer-owned” set of design
input requirements. As part of this analysis, the MBD team iteratively and recursively develops
functional architecture and analytical/behavioral models of the SOI. Based on this analysis, the
MBD team addresses and corrects any defects that may exist within the requirements set. These
corrections can result in expensive contract changes. With approval of the customer, the MBD
team then transforms the resulting functional architecture and analytical/behavioral models into a
physical architecture which the Design Definition Process transforms into a set of design output
specifications. The design output specifications are provided to the organization (internal or
external) responsible for manufacturing/coding of the physical SOI.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 67

A major issue with the MBD approach is that the MBD team often works in a silo separate from
the development of the integrated set of needs and set of design input requirements for the SOI
they are responsible for designing. As a result, they may lack the knowledge of, or access to, the
underlying analysis from which the set of design input requirements were derived, as well as a
clear understanding of the system level lifecycle concepts and set of needs from which the set of
design input requirements were transformed. Without this knowledge the MBD team is at risk of
delivering a system that can be verified to meet the set of design input “customer-owned”
requirements but fails system validation (fails to meet the integrated set of needs) and is not
accepted for use by the customer.
The approach described in this Manual is referred to as Information-based Needs and
Requirements Definition and Management (I-NRDM) [50][51]. Using the I-NRDM approach, the
focus of NRDM activities is on the problem space (design inputs) as shown in Figure 3-1,
defining the system level integrated set of needs, and transforming these needs into a well-
formed set of design input requirements which are linked to the functional and logical/behavioral
models and physical architecture as well as to the project’s budget and master schedule.

Problem Space
Design Inputs
Focus on design inputs, preliminary
logical & physical architectures
Integrated Set of Transformation
Needs

Design Input Transformation


Requirements
Design Output Specifications
Design-to can include requirements,
“What” Transformation specifications, algorithms,
Architecture &
formulations, drawings, &
Design
other design output artifacts

Design Output Transformation


Solution Space Specifications
Focus on design outputs, maturing the
Build-to/Code-to
logical & physical architectures, design, &
“How” System of
design output specifications
Interest

Design Outputs

Figure 3-1: I-NRDM + MBD = MBSE.


The quality of the set of design input requirements is high because they are based on mature,
feasible lifecycle concepts and the integrated set of needs that is consistent with those concepts.
The confidence in the project’s budget and schedule are also high for the same reason. To help
establish feasibility, preliminary physical design related activities occur concurrently, maturing
the system lifecycle concepts to the point that feasibility in the physical realm has been
established, within identified drivers and constraints with an acceptable level of risk.
As shown in Figure 3-1, if the concept of I-NRDM (design inputs) is combined with the concept
of MBD (design outputs), the result shows the real intent of MBSE. Thus MBSE = I-NRDM +
MBD. Adopting this perspective will help organizations move closer to INCOSE’s Vision 2025
[18].

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 68

The I-NRDM approach defined in this Manual is a practical implementation of PM and SE from
a data-centric perspective as defined in the INCOSE RWG whitepaper Integrated Data as a
Foundation of Systems Engineering:
“SE, from a data-centric perspective, involves the formalized application of
shareable sets of data to represent the SE work products and underlying data and
information generated to support concept maturation, needs and requirements
development, design, analysis, integration, system verification and system validation
activities throughout the system lifecycle, from conceptual design to retirement.”

Information-based Needs Validated by Engineered Product


rmed Baseline
and Requirement Definition System
Validated by
Transfo
into Design
System
Pro
& Management Validation
Artifacts
Physical
Architecture
Analysis
per
t
of ies
Iterate

Ve
Attributes

rif
Lifecycle Concepts & Needs Definition

y
Tr
Valid

an int
ated Verif

sfo o
by Architecture y
Problem/

rm
identify Analysis System

ed
Stakeholders Opportunity
date

Fulfill Functional Iterate Verification


Artifacts
Vali

Architecture
Addressed

De Attributes Pr
op
Express

d to
fin e
By

e Pro of rtie

Allocated to
cate
pe s
r
of ties

Allo
Iterate Needs, Iterate Mission, Validate Attributes
Requirements, Goals, Functions

A ll
Expectations Objectives Iterate

oc
ate

by
Iterate

d
In

Verified
fo

to
Dri of Interfaces Sp
rm
Inform

ec
is
ve
lized

ifi
s

Risks Allocated
Ba

Mitig ed
ated Sp by
By
Rea

b of ec Baseline

Pr
Infor y s is ifie

op of
m Needs Ba db

er
Analysis

tie
Regulations Lifecycle y
Integrated

s
Constrain med
& Concepts Transfor set of Needs Attributes
Standards into Transformed into
Iterate Analysis &
Maturation Con Requirements Iterate
stra Requirements Validated to represent Expressions
train in
Higher Cons Co
ns Analysis
Level tra Technology

In d
in

e
in

Inc In
Con

lud
Needs
tra

in

lud
stra
ns

Inc
stra

ed
Co

Con

Cost &
in

Higher Requirements Properties


Schedule Statements Attributes
Level Higher of
Concepts Level Existing
Rqmts Systems Traceability is critical to
document relationships Requirements Definition

Figure 3-2: Information-based Requirement Development and Management Model. [50]


The result of developing and managing needs and requirements using the I-NRDM approach is
the ability to create a data and information model that represents the NRVV activities that define,
establish, and document the work product and artifacts as well as relationships between these
artifacts as shown in Figure 3-2. Included are the system verification and system validation
artifacts that are defined concurrently with the definition of the lifecycle concepts, set of needs,
and set of design input requirements.
Ideally, this data and information model is developed collaboratively such that the needs, design
input requirements, functional architectural and logical/behavioral models, preliminary physical
architecture, and PM work products are developed concurrently.
The I-NRDM approach applies whether the design team is internal to the organization or external
to the organization. If external, the I-NRDM approach will result in a much more mature and
higher-quality set of design input requirements, underlying data and information model AND
cost and schedule estimates being provided to the implementing organization.
For cases when the design and manufacturing is contracted out to an external organization,
applicable parts of the data and information model developed by the customer as part the needs

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 69

and requirements definition activities can be shared with the external organization’s design team.
If the toolset used by both the customer and external organization is designed to allow the
sharing of data, the external organization responsible for design can import the needs,
requirements, functional architectural and logical/ behavioral models, and the preliminary
physical architecture directly into their toolset. (Refer to Section 16 for a detailed discussion on
features the project SE toolset should have.)
In either case, the organization responsible for the final design and definition of the design output
specifications does not have to start the design activities from scratch. Instead, they can focus
their efforts on maturing and finalizing the functional architectural and logical/behavioral models
and preliminary physical architecture that were defined during the needs and design input
requirement definition activities, significantly reducing the time and cost of the final design
activities.
The advantage of practicing PM and SE based on the I-NRDM approach is that PM and SE work
products and artifacts developed across all SE lifecycle stages will be more consistent, complete,
and correct. With this concurrent approach, the time to define feasible system lifecycle concepts,
baseline an integrated set of needs representing those concepts, and transform these needs into an
agreed-to set of design input requirements will be reduced.
Because feasibility will have been addressed prior to issuing the contract along with correctness,
consistency, and completeness, the risk of expensive contract changes and schedule slips will be
reduced. This will help project managers and systems engineers develop winning products that
deliver what is needed, within cost and schedule, with the desired level of quality.
Section 4, Lifecycle Concepts and Needs Definition and Section 6, Design Input Requirements
Definition are both based on the I-NRDM approach.
3.1.1 Key Characteristics of the I-NRDM Approach
The I-NRDM approach has several key characteristics as described in the following sections.
3.1.1.1 Implementing SE Lifecycle Phase Activities Concurrently Rather Than
Serially
The system lifecycle concepts are matured, and needs and requirements are developed and
managed concurrently, iteratively, and recursively as an integral part of the functional and
analytical/behavioral modeling and preliminary physical architecture definition efforts. The
result is a shareable data and information model that represents both the system under
development as well as the PM and SE process work products and artifacts. As more mature
knowledge become available, updates to preliminary stakeholder needs and stakeholder-owned
system requirements, lifecycle concepts, set of needs, set of design input requirements, system
integration, system verification, and system validation planning artifacts, functional and
analytical/behavioral models, and the physical architecture can be defined helping ensure
consistency.
Design input requirements analysis by the project team members responsible for design is a
continuation of the analysis performed as part of the needs and design input requirement
definition activities. All design input requirements are traced to the needs from which they were
transformed; thus, requirement validation is an integral part of the process.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 70

At the end of the design input stage, what is baselined is not just an integrated set of needs and
set of design input requirements but a shareable data and information model that contains the sets
of needs and sets of design input requirements for all parts of the system architecture as well as
other PM and SE work products and artifacts developed during concurrent I-NRDM activities
including functional and analytical/behavioral models, the SOI preliminary physical architecture,
and budgets and schedules. This shareable data and information model represents a SSoT for the
project.
3.1.1.2 Using a Holistic Versus Siloed Organization Structure
The I-NRDM approach advocates that it would be more productive if a more holistic
organizational approach were adopted, establishing a collaborative environment with a
multidiscipline team consisting of both project managers and systems engineers focused on
needs and design input requirements definition, architecture definition, modeling, budgeting,
scheduling, design, coding, manufacturing, integration, system verification, and system
validation, operations, maintenance, and retirement/disposal. This team would work together to
develop, analyze, and mature the various work products and artifacts concurrently across the SOI
lifecycle.
This holistic approach recognizes that PM and SE are systems in their own right, and the
processes that make up each are parts of those systems. Thus, the overall behavior of these
systems is a function of the interaction of those process areas. With this perspective, the practice
of PM and SE should focus on these interactions and not put each lifecycle process into its own
separate silo.
3.1.1.3 Focusing on the Integrated System Optimization Versus Subsystem
Optimization
Using the I-NRDM approach, subsystems and system elements that are part of the integrated
system physical architecture may be assigned to separate internal or external teams, however,
each of the project teams (internal and external) needed to develop a shareable data and
information model of their SOI within, or based on, the shareable data and information model
that represents the integrated system of which they are a part. Thus, the system level design
input requirements allocated to each SOI will contain values that optimize the system
performance even if this results in sub-optimal SOI performance. [40] This optimization also
includes the budget and schedule.
3.1.1.4 Using SE Tools Having the Capability to Share Data and Information
Using the I-NRDM approach, the collaborative, multidiscipline team will use PM and SE
toolsets to define and manage the underlying sets of data and information representing the
various work products and artifacts developed as part of the development lifecycle processes.
These toolsets will support various visualizations (tables, diagrams, models, and text) of the
resulting data and information. Team members would use the tool capabilities and visualizations
most appropriate to the SE lifecycle stage activities they are working, what they are trying to
communicate, and to whom they are communicating.
The applications within the toolset will use a schema that is consistent with the project’s master
schema for organizing and storing data and information complying with interoperability
standards. This will allow the data and information model that results from these activities to be
shared with other tools and to be integrated into a common data and information model for the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 71

SOI and the system of which it is a part. If using a tool that uses a compatible schema and
conforms to interoperability standards, those responsible for architecture and design will be able
to import the data and information generated during the I-NRDM activities, no matter the tool
used.
Using this approach, changes made to the data and information in one tool can be propagated to
other tools whose data is in the integrated, shareable dataset, helping ensure consistency,
correctness, and completeness across all lifecycle activity artifacts and work products and
maintain a SSoT. This would allow the project team to have a toolset that would support both
the traditional capabilities of existing PM and requirement management tools as well as support
language-based system models allowing artifacts generated within special purpose tools to be
linked together. (Refer to Section 16 for a detailed discussion of the desirable features the
project SE toolset.)
3.1.1.5 Baselining Well-Formed Sets of Needs and Design Input Requirements
with an Underlying Data and Information Model
Using the I-NRDM approach, an underlying integrated data and information model will be
developed from the beginning of the project. The lifecycle concepts will mature through a series
of iterations resulting in a set of lifecycle concepts that are feasible. The project team is
concurrently assessing the needs and requirements against the maturity of available technologies,
cost, and schedule. This results in architectural and analytical/behavioral models and a physical
architecture that are feasible, with risk acceptable for that lifecycle stage.
Because all artifacts are represented by a sharable data and information model, correctness,
completeness, and consistency should not be an issue. The design input requirements resulting
from this approach will have the characteristics of a well-formed set of requirements as defined
in the GtWR, avoiding time consuming and expensive rework to discover and correct a defective
set of needs or set of design input requirements by those responsible for architecture and design
definition.
3.1.1.6 Defining a Project Ontology and Master Database Schema at The
Beginning of the Project
Using the I-NRDM approach, an ontology and master schema is developed from the beginning
of the project resulting in both consistent use of terms [28][38] within the needs and
requirements sets as well as all other artifacts represented by the data and information model.
Having a defined ontology and master schema is critical to the sharing of data between SE tools -
assuming the tool supplier schemas are consistent with the project’s ontology and master schema
and the tool supplier fully supports interoperability standards. (Refer to Section 16 for a detailed
discussion of the desirable features of the project SE toolset.)
3.1.1.7 Capturing Dependencies and Relationships
Using the I-NRDM approach, dependencies, and relationships not only just among design input
requirements at all levels of the functional and physical architectures but all the other artifacts
generated by the various development lifecycle activities are captured as part of the integrated
data and information model.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 72

3.1.1.8 Using RMTs and Modeling Tools That Allow Requirements Statements
to Be Decomposed Such That Individual Terms Within The Requirements
Statements Can Be Referenced And Modeled
Within the needs and design input requirement statements, meaningful terms and entities may be
referenced, such as parts of the system architectural components, states, conditions, functions,
data elements, interfaces and other entities drawn from an integrated system data and information
model. These entities typically appear in other modeling contexts, such as functional block
diagrams, context diagrams, boundary diagrams, external interface diagrams, state-transition
diagrams, to name a few. [12] With this capability, completeness, consistency, and correctness are
much easier to assess and manage. From an NRVV perspective this gives the project team a
powerful capability. In addition, change impact assessment is a built-in capability no matter
where in the development lifecycle a change occurs.
3.1.1.9 Using RMT and Modeling Tools That Help Ensure Needs and
Requirements Statements Are Well-Formed
Using the I-NRDM approach, the SE tools will have the capability to define and maintain the
project ontology as well as include the structured, natural language processing (NLP) capability
[38]
to aid the authors in writing needs and requirements statements that have the characteristics
defined in the GtWR and to assess the overall quality of the set of needs and set of design input
requirements. NLP tools can also be used to ensure consistency in the use of terms across all
lifecycle artifacts based on the project’s official ontology.
These capabilities not only improve the quality of the needs and design input requirements
statements but the quality of all the artifacts represented by the data and information model.
With this capability, needs and requirements verification - verification that the needs and
requirements statements have the characteristics of well-formed needs and requirements and
follows the organizations rules for writing textual needs and requirements is automatic, enabling
the definition of high-quality needs and design input requirements statements within the model.
3.1.1.10 PM Work Products Are Developed Concurrently with The Development
Of The SE Artifacts
Using the I-NRDM approach, PM work products will be consistent with the SE artifacts,
resulting in budgets and schedules that have a higher degree of confidence. Another benefit is
that concurrent PM and SE processes can be integrated such as CM, risk management, problem
definition, definition of the project mission, goals, and objects, identifying drivers and
constraints and lifecycle definition, analysis, and maturation.
3.1.2 Implementing the I-NRDM Approach
To successfully implement the proposed I-NRDM approach, the following actions must have
been completed prior to the start of the project. [50]
● Senior management has agreed to implement SE from a data-centric perspective, and there
is an enterprise level “champion”.
● Data governance and information management policies have been defined and are enforced.
● The level of data-centric SE capability consistent with the needs of the project has been
agreed to.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 73

● An IT infrastructure has been put into place that meets the needs of the enterprise and
project.
● An PM and SE toolset consistent with the needs of the project has been procured and
licenses put in place that support both I-NRDM and MBD. (Refer to Section 16 for a
detailed discussion of the desirable features of the project SE toolset.)
● The project has a defined ontology and master schema for the SOI’s integrated dataset.
● An integrated, collaborative, multi-discipline PM and SE team has been formed.
● The project team members are trained in practicing PM and SE from a data-centric
perspective, using the proposed I-NRDM approach, the PM and SE tools, sharing of data
and information between tools, defined schema, plans, processes, procedures, and work
instructions.
Organizations that have achieved SE Capability Level (SCL) 3 as defined in the INCOSE RWG
whitepaper “Integrated-data as a Foundation of Systems Engineering” will have addressed the
above actions as part of their normal practice of SE from a data-centric perspective.
Refer to Section 14, Needs, Requirements, Verification, and Validation Management for a more
detailed discussion on implementing the I-NRDM approach.

3.2 Textual Needs and Requirements versus Models and Diagrams


The I-NRDM approach is based on the concept of “duality” [52] as applied to “needs and
requirements” and “models and diagrams”. Depending on what is being done and what is being
communicated, textual “needs and requirements” and “diagrams and models” are two sides of
the same SE coin. Neither is solely sufficient - both are needed.

3.2.1 Textual Needs and Requirements


For many ideas and concepts that need to be communicated; well-formed, textual needs and
requirements statements have been proven to be the most effective form of communication. A
major critique of textual needs and requirement statements is the inherent ambiguity in the use of
an unstructured, natural language. To help avoid this ambiguity, the language advocated in the
GtWR is a structured, natural language with a set of rules to reduce ambiguity. In this Manual,
when the phrase “well-formed” is applied to textual need and requirement statements, it refers to
needs and requirement statements that are written using a structured, natural language following
the rules stated in the GtWR. The advantages of using well-formed textual needs and
requirements are described in the following sections.
3.2.1.1 Communication
There is still (arguably, there will always be) a sizable audience who cannot interpret, do not
understand, or who are not willing to work with, diagrammatic or other non-textual
representations of needs or requirements statements, especially when the words used (technical
jargon) are not intuitively obvious to the reader. These people, particularly management,
customers, and users of the system or other non-technical personnel, may not have been trained
in language-based models or find the terminology used in some diagrams and models not to be
intuitive and confusing.
When that is the case, effective communication as discussed in Section 2.10 has not taken place
since the receiver of the message may not interpret and understand the message as intended by
the sender and may well lose interest in the needs and requirements definition activities. On the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 74

other hand, text is universal. Of course, the textual statements must be well-written in such a
way as to be clear, correct, and unambiguous; but then diagrams and models have even more
potential to be unclear, incorrect, and ambiguous if they are poorly formed, defective, or the
wrong meaning is assigned to them. Diagrammatic or model representation will have to be
supported by well-written, detailed textual statements and descriptions for the representations to
be understood unambiguously by all stakeholders. This capability supports the GtWR
characteristics: C3 - Unambiguous, C7 - Verifiable, C13 - Comprehensible, C14 - Able to be
Validated.
3.2.1.2 Power of Expression
There is a wide variety of types of needs and requirements that must be expressed. Use cases,
user stories, scenarios, diagrams, and models tend to focus on the functional architecture and
may be capable of expressing functional, performance, and interface needs and requirements, but
are not presently well suited to expressing non-functional needs and requirements that deal with
the physical system elements associated with quality (-ilities), regulations, standards, and
physical characteristics. Textual forms carry the universal power of expression using a
structured, natural language for all types of needs and requirements. This capability supports the
characteristics defined in the GtWR: C3 - Unambiguous, C4 - Complete, C7 - Verifiable, C13 -
Comprehensible, C14 - Able to be Validated.
3.2.1.3 Managing Sets of Needs and Requirements
There is a significant barrier to defining and managing needs and requirements as part of
language-based models: they do not lend themselves to the presentation of large numbers of
needs and requirements. SysML requirement diagrams can present individual requirement
expressions but are not well suited to representing multiple or large sets of requirements. This
limitation of the SysML requirement diagram as a visualization of the sets of requirements
contained in the system model requires alternate, textual visualizations of requirements
expressions as well as sets of requirements. Note: currently SysML does not include an entity
type “needs”, nor corresponding needs diagrams. This capability supports the GtWR
characteristics: C4 - Complete, C13 - Comprehensible.
3.2.1.4 Accessibility
Even when stakeholders are willing to spend the time to learn modeling languages such as UML
and SysML or other language-based modeling tools, the SE tools (including RMTs) and
modeling tools used to create and view the data and information represented by the model's
dataset are not readily available and assessable to all stakeholders. In many cases, access is
restricted by the number of "seats" or "licenses" purchased. Being able to provide needs and
requirements in an electronic document format (pdf, or common office application formats)
allows the stakeholders to view the needs and requirements in applications that have been
installed on their computers. In addition, there are still managers who still prefer, and demand,
printed, text-based documents, and will continue to do so for the foreseeable future.
3.2.1.5 Attributes
Both the needs and requirements expressions include attributes that can be used to manage them
as well as the system under development across all lifecycle process activities. While modeling
languages allow users to define an entity having the name "attribute" and link that entity to a
need or requirement statements, few practitioners do so, especially when there are multiple

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 75

attributes that the project team has decided to use. Operational scenarios, use cases, user stories,
and other diagrams used to represent needs or requirements are not conducive to appending a
large set of attributes nor using those attributes to produce meaningful reports and dashboards for
use by management stakeholders. Refer to Section 15 for a more detailed discussion concerning
the use of attributes. This capability supports the GtWR characteristics: C1 - Necessary and
C13 - Comprehensible.

3.2.1.6 Formal, Binding Agreement


Textual needs and requirement statements are more easily understood in a formal agreement or
contract-based system development effort by a wider, and often, non-technical set of
stakeholders including business management, PM, CM, contract administrators, and legal
support. Use of “shall” in requirements statements or another term defined to have the same
meaning, makes it clear that what is being communicated is formal, the requirement statement is
binding, and the system will be verified to meet the requirements or validated to have met the
needs. To be part of a binding agreement, especially in a legal contract, the sets of needs and
requirements must be expressed formally, and configuration managed in a form that 1) makes it
clear the statements are binding and 2) have the characteristics of well-formed needs and
requirements statements and sets of needs and requirements as defined in standards and guides
such as the GtWR. This capability supports the GtWR characteristics: C1 - Necessary, C3 -
Unambiguous, C4 - Complete, C6 - Feasible, C7 - Verifiable, C13 -Comprehensible, C14 - Able
to be Validated.
3.2.1.7 System Verification and System Validation
Most formal agreement (contract-based) product development and management processes as
well as highly regulated products include system verification and system validation as formal
processes that must occur prior to product acceptance, qualification, certification, and approval
for use. In highly regulated, safety critical industries such as the medical device industry and
consumer products, formal evidence that the design outputs, including the product, meet the
design inputs (needs and design input requirements) is needed prior to the product being
approved for release into the market. Currently, no other form, other than textual requirements,
has been able to meet these characteristics. This capability supports the GtWR characteristics:
C7 - Verifiable, C14 - Able to be Validated.
3.2.2 Models and Diagrams
On the other side of the SE coin, for many ideas and concepts that need to be communicated,
models and diagrams have been proven to be an effective form of communications. Advantages
[52]
of models and diagrams are described in the following sections.
3.2.2.1 Analysis from Which Needs and Requirements are Derived
Models and diagrams are excellent analysis tools for defining and maturing feasible lifecycle
concepts by providing a context for needs and requirements and are key to help ensure
correctness, completeness, and consistency of both individual needs and requirements and sets of
needs and requirements. As part of lifecycle concept maturation, functions are defined and
relationships between those functions (interactions and interfaces) are identified. From this
knowledge, functional flow block diagrams can be developed as well as context diagrams,
boundary diagrams, and external interface diagrams.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 76

These can then be transformed into a functional architecture and analytical/behavioral models
which can, in turn, be transformed into a physical architecture. These models are excellent
sources of needs and requirements dealing with functions, performance, and interactions between
the subsystems and system elements within the system physical architecture as well as between
the system and external systems in its operational environment. (Refer to Section 6.2.3 for a
more detailed discussion concerning assessing interactions and defining interface requirements.)
This capability supports the GtWR characteristics: C1 - Necessary, C6 - Feasible, C8 - Correct,
C10 - Complete, C11 - Consistent, C12 – Feasible, C13 -Comprehensible, C14 - Able to be
Validated.
3.2.2.2 Completeness
A key issue when defining needs and requirements is completeness. Models and diagrams
provide the capability to address completeness in terms of functions, inputs to those functions,
sources of those inputs, outputs, and customers (destinations/users) for those outputs. When
developing these models or diagrams, missing sources for inputs or missing customers for the
outputs become apparent and enable the project team to address these issues. In the model,
functions can be decomposed revealing subfunctions that must be addressed, along with their
inputs, sources of inputs, outputs, and customers for those outputs. This capability supports the
GtWR characteristic: C10 – Complete, C13 -Comprehensible, C14 - Able to be Validated.
3.2.2.3 Consistency
Another key issue when defining needs and requirements is consistency. As the number of needs
and requirements grows for today’s increasingly complex systems and the number of subsystems
and system elements within the system architecture grows, it becomes increasingly difficult to
comprehend and manage all the associated data and information as well as the artifacts
represented by the data and information. With each subsystem and system element within the
system physical architecture defined by their own lifecycle concepts and resulting sets of needs
and requirements, consistency can be a big issue, not only in the use and definition of terms
(ontology), but what the needs and requirements are communicating. Models and diagrams
provide the capability to address consistency not only within sets of needs and requirements, but
also between needs and requirements in other sets associated with other subsystems and system
elements within the system physical architecture as well as external systems which the system
interacts. This capability supports the GtWR characteristic: C11 – Consistent, C13 -
Comprehensible, C14 - Able to be Validated.
3.2.2.4 Identify and Manage Interdependencies
A key tenant of SE is that the behavior of a system is a function of the interactions between the
parts of the system as well as interactions with the external systems and the operational
environment of which it is a part. A key area where there are dependencies is the budgeting of
performance, quality, and physical attribute values contained in design input requirement for
systems at from one level of the physical architecture to subsystems and system elements at the
next lower level of the physical architecture.
When this is done, the budgeted values allocated to the subsystems and system elements are
interdependent - a change in one will affect the others. Tying these interdependencies together
can result in an equation of dependent variables. Managing these interdependencies within a
model is much easier than in document-based approaches to SE where these interdependencies
are often not managed as dependent variables. Refer to Section 6.4 for a more detailed

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 77

discussion on allocation and budgeting. This capability supports the GtWR characteristics: C8 -
Correct, C10 - Complete, C11 – Consistent, C13 -Comprehensible, C14 - Able to be Validated.
3.2.2.5 Support Simulations
Language-based analytical/ behavioral models developed as part of architecture and design can
be used to develop higher fidelity models that allow simulations of the integrated system. These
simulations can be a significant part of design verification and design validation. With a
simulation capability, design issues for the integrated system can be identified and corrected
before baselining the design output specifications and building, coding, and integrating the
realized parts that make up the system - saving both time and money by avoiding expensive and
time-consuming rework that often occurs during system verification and system validation.
(Refer to Section 8 for a more detailed discussion of using models and simulations as part of
design and early system verification and system validation.) This capability supports the GtWR
characteristics: C7 - Verifiable, C13 -Comprehensible, C14 - Able to be Validated.
3.2.2.6 Key to Understanding
In many cases, models and diagrams help facilitate communication by making complex systems
and processes easier to understand. As the old saying goes: “A picture is worth a thousand
words……” This capability supports the GtWR characteristic: C13 -Comprehensible, C14 -
Able to be Validated.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 78

Section 4: LIFECYCLE CONCEPTS AND NEEDS DEFINITION

Note: The Stakeholder Needs and Requirements Definition Process as defined in the current
INCOSE SE HB [17] applies to the business operations level lifecycle concepts, needs, and
requirements for a system as discussed in Section 2.3. These needs and requirements represent
the sets of business and stakeholder needs and stakeholder-owned system requirements on the
SOI to be developed. However, much of what is currently described in the Stakeholder Needs
and Requirements Definition Process can be applied to the development of system, subsystem,
and system element level lifecycle concepts and needs as well - no matter the level of the SOI
exists within the physical architecture.
As such, the focus of this section is an elaboration of the INCOSE SE HB Stakeholder Needs and
Requirements Definition Process applied to the definition of system, subsystem, and system
element level lifecycle concepts and needs that will meet the intent of the higher-level parent
lifecycle concepts, stakeholder needs, and stakeholder-owned system requirements.
Because there are multiple stakeholders involved, each having their own sets of needs and
stakeholder owned requirements, the results of the activities in this section are referred to as an
“integrated set of needs” which will be transformed into a set of “design input requirements”
for the SOI. When the term “needs” is used by itself, it applies to stakeholder needs no matter
the architectural level of the SOI for which they are defined.
4.1 Introduction
For the SOI under development, project success depends on the project team understanding the
source of concern, problem/opportunity, higher-level lifecycle concepts, higher-level needs, and
higher-level requirements that constitute acceptability or desirability of a solution (what?),
measures (how well?), and the conditions in which the SOI must operate (in what operating
environment?) as defined at the previous organizational or architectural level. No matter the
level of the system architecture, the project team responsible for the SOI must understand and be
compliant with the higher-level lifecycle concepts, needs, and requirements when defining the
SOI level of lifecycle concepts, integrated set of needs, and resulting set of design input
requirements.
For when there is a customer/supplier relationship, the supplier project team must address both
the customer’s needs and requirements as well as their organization’s needs and requirements
allocated to them as well as was discussed in Section 2.3 and shown in Figure 2-5.
This knowledge allows lifecycle concepts for the SOI to be defined, analyzed, and matured and a
formal integrated set of needs defined, agree-to, and baselined. These activities enable the
definition of well-formed need and design input requirement statements having the
characteristics defined in the GtWR with the basic formulas “The stakeholders need the [entity]
to do [what], [how well], [in what operational environment.]” when formulating the set of needs
and “The [entity] shall do [what], [how well], [in what operational environment].” when
formulating the SOI’s set of design input requirements.
Included within the integrated set of needs are the MGOs, measures, and constraints as discussed
in Section 2. It is this integrated set of the needs that communicate agreed-to functions,

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 79

performance, interactions with external systems, quality, and compliance the stakeholders expect
from the SOI to address the stated problem or opportunity. This set of needs and resulting set of
design input requirements also are the form of communication used to inform those responsible
for designing, building/coding, integrating, verifying, validating, and delivering the SOI.

4.1.1 Necessary for Acceptance


The focus of Lifecycle Concepts and Needs Definition activities addressed in this section and
Design Input Requirement Definition activities addressed in Section 6 is to clearly define what is
“necessary for acceptance” early in the SOI lifecycle.
The goal of all development projects is that their product is accepted by the customer(s) or
approved by some regulatory agency.
Both system verification and system validation are key to addressing questions concerning what
is necessary for acceptance. Therefore, it is critical that system verification and system
validation Success Criteria and Method (Refer to Section 10) are stated that defines what is
necessary for acceptance for each need and design input requirement statement. It is the Success
Criteria and Method that determines what is necessary for acceptance.
The recorded results of the system verification and system validation activities are combined into
Approval Packages (Refer to Section 10) which are submitted to one or more Approving
Authorities for approval (qualification, certification, acceptance, or approval for use). The
contents of the Approval Packages are based on the Success Criteria and Method defined and
approved and the outcomes associated with the completion of the system verification and system
validation Activities that result in the evidence that the Success Criteria was met using the
approved Method with the required level of confidence.
In the end, it is the Approving Authorities that (a) decide what constitutes necessary for
acceptance, and (b) determines what is necessary for acceptance. While the Approving
Authorities have the last vote, other stakeholders can be ranked as to their say in what is
necessary for the system to be acceptable. When there is an inconsistency or a disagreement, the
rank of a given stakeholder will be taken into consideration when weighing the options.
A failure to address the stakeholder needs and stakeholder-owned requirements at the beginning
of the project can result in a failure of the SOI to pass system validation (if the system is
determined to be unacceptable by an Approving Authority).
During all lifecycle stages, the project team must be continuously focused on what is necessary
for acceptance to ensure they are defining, designing, building, and coding a SOI that will meet
these criteria. Failure to do so will result in system validation failure and a failed project.
Successfully completing the Lifecycle Concepts and Needs Definition activities and Design Input
Requirements Definition activities defined in this Manual ensures the Success Criteria that
represents what is necessary for acceptance have been clearly defined and recorded early in the
project. Doing so helps ensure the customers have defined success for the developers and the
developers understand what they must deliver for the SOI to be accepted by the customer and
approved for its intended use by its intended users in its intended operating environment (system
validation).
Acceptance can be done in stages. Where there is an acquirer/supplier relationship (See Section
13), a SOI may be first accepted contractually as a result of passing system verification and then

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 80

accepted for use in its operational environment when operated by its intended users through
customer managed system validation. In this case, for each stage of acceptance there is different
criteria that defines what is necessary for acceptance. As an example, for U.S. government
funded systems, USC Title 9 requires system verification, referred to as Developmental Test and
Evaluation (DT&E), and system validation, referred to as Operational Test and Evaluation
(OT&E), to be done by different organizations; each stage having different acceptance criteria.
For many highly regulated systems, acceptance is based on the SOI passing system validation –
is the system able to be used as intended, in its intended operational environment, when operated
by its intended users.
4.1.2 Change Across the Lifecycle
While the integrated set of needs for each SOI will be baselined as part of a gate review (Concept
or Scope Review), that does not mean the lifecycle concepts and needs will not change. Changes
to the lifecycle concepts and resulting integrated sets of needs will have a domino effect on
design input requirements, architecture, design, design output specifications, the realized system,
system verification, and system validation.
During Design Input Requirement Definition, it is common to discover issues with the lifecycle
concepts and integrated sets of needs, requiring them to be updated when the set of design input
requirements is baselined at a gate review (SRR or similar type of gate review.).
During maturation of the physical architecture, design verification, design validation, early
system verification, early system validation, and development of the design output specifications,
it is also common to discover issues with the lifecycle concepts and integrated sets of needs (and
resulting design input requirements), requiring them to be updated when the physical
architecture, design, and design output specifications are baselined at their gate review(s), e.g.,
Preliminary and Critical Design Reviews (PDR, CDR), or similar type of gate review.
The ability to assess and manage change (See Section 14) is dependent on traceability between
SE and PM artifacts and work products across the lifecycle. This traceability is made possible
by practicing SE from a data-centric perspective as discussed in Section 3.
Lifecycle Concepts and Needs Definition involves a number of activities as shown in Figures 4-
1a and 4-1b. Each activity results in data and information that will be used to define the
integrated set of needs for the integrated system as well as each subsystem and system element
within the system physical architecture.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 81

Traceability and Feedback


b

Document
Elicitation
Outcomes

Section 4.3.5

Prepare for Define Elicit


Lifecycle Define the Mission, Identify Stakeholder
Problem, External & Needs, & Identify
Concepts & Threat, or Goals,
Objectives, Internal Stakeholder-
Drivers & a
Needs Opportunity Stakeholders Constraints
Definition & Measures owned
Requirements
Section 4.2 Section 4.3.1 Section 4.3.2 Section 4.3.3 Section 4.3.4 Section 4.3.6

Pre Project-Formulation Activities


Identify,
performed at the business Assess, &
strategic and operational levels Handle
shown in Figure 2-1 Risk

Section 4.3.7
Define Inputs to System Lifecycle Concept Analysis & Maturation
Section 4.3
Figure 4-1a: Lifecycle and Needs Definition Activities Part 1.

Traceability and Feedback


b
People
People Requirements
Needs Project Plans
SOWs *

Section 4.6.1
Capture Process
Preliminary Lifecycle Processes Requirements Design Input
Integrated Concepts Requirements
a Set of Analysis &
(Procedures)
Needs
Procedures,
Work Definition
Lifecycle Maturation instructions*
Concepts
Section 4.6.1 Section 6.0
Section Section 4.5 * Not included in this manual
4.4
Alternate non I-NRDM Path
Baseline and
Manage Needs,
Define and Plan for Verify & Lifecycle Requirements,
Record the System Validate the Concepts &
Integrated Set Integrated Set Verification, and
of Needs Validation of Needs Needs Validation
Definition Management
Outputs
Section 4.6.2 Section 4.7 Section 5.0 Section 14.0
Section 4.8
System Lifecycle Needs Definition Section 14.0
Concept Definition Section 4.6

Figure 4-1b: Lifecycle and Needs Definition Activities Part 2.


Figures 4-1a and 4-1b show the specific section number for each activity and the flow of one
activity to the next resulting in the integrated set of needs. Traceability is extremely important
to capture the source of each need in the integrated set and other information captured and
artifacts developed during Lifecycle Concepts and Needs Definition. This traceability is key to
using the data-centric approach to SE discussed in Section 3.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 82

Historically, in a 20th Century document-based requirements development approach to SE, many


organizations would develop an OpsCon document that contains preliminary set of lifecycle concepts for
the integrated system discussed in this Manual. They would do a limited analysis to the point the OpsCon
and other “scope definition” information could be baselined via a gate review often referred to as a
Scope Review or Mission Concept Review.
Rather than defining and doing detailed analysis and maturation of the lifecycle concepts and defining
and documenting an integrated set of needs as advocated in this Manual, often the OpsCon was used as
the source of system level stakeholder needs. Lacking the modeling knowledge and tools available today,
often the analysis needed was not done to help ensure feasibility, completeness, consistency, and
correctness of the lifecycle concepts described in the OpsCon. The transformation of the OpsCon into
the system technical requirements would be performed as part of “requirements analysis” activities.
Because the needed analysis and maturation of the lifecycle concepts was not done adequately, the
completeness, consistency, correctness, and feasibility of the resulting set of technical system level
requirements was not always established.
This old 20th Century approach often resulted in a significant amount of technical debt, especially when
the development of the SOI based on those requirements was contracted out to a supplier.
The 21st Century data-centric approach presented in this Manual, advocates using models and diagrams
to perform the system-level lifecycle concepts analysis and maturation activities before defining an
integrated set of needs and transforming them into a set of design input requirements. This approach is
preferred because completeness, consistency, correctness, and feasibility are established early before
baselining the integrated set of needs and the resulting set of design input requirements, avoiding or at
least minimizing technical debt.

Note: While theoretically lifecycle concepts and an integrated set of needs should be defined for
subsystems and system elements at all architectural levels for the integrated system, some
organizations may not do so. Some may only formally define a set of needs at the system level,
but not for subsystems and system elements at the lower levels of the architecture. The authors
recommend lifecycle concepts and an integrated set of needs be defined for not only the
integrated system, but for each subsystem and system element within the system physical
architecture. Without doing so there is an issue concerning what to validate the subsystems and
system elements against. The result is a family of sets of needs for all parts of the architecture.
4.1.3 Benefits of Lifecycle Concepts and Needs Definition Activities
Focusing on defining lifecycle concepts and a feasible set of needs for the integrated system as
well as for each subsystem and system element within its physical architecture before
transforming them into design input requirements has many benefits:
• Clearly defines what is necessary for acceptance at the beginning of the project.
• Ensures what the customers and business operations level stakeholders expect and need
from the SOI is defined and recorded.
• Clearly sets the boundaries for the SOI - makes clear what is in scope and what is not.
• Helps avoid scope battles later in the development lifecycle.
• Helps to identify and resolve issues early in the development lifecycle.
• Helps prevent poorly formed design input requirements in terms of completeness,
correctness, consistency, and feasibility.
• Reduces the time to define and baseline the sets of design input requirements.
• Reduces costly rework.
• Helps to manage change.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 83

• Results in an integrated set of needs which are the focus of design input requirements
definition, design, and system validation.
The following sections describe each of areas of focus shown in Figures 4-1a and 4-1b that are
part of Lifecycle Concepts and Needs Definition activities:
Section 4.2: Prepare for Lifecycle Concepts and Needs Definition.
Section 4.3: Define Inputs to Lifecycle Concepts Analysis and Maturation.
Section 4.4: Document Preliminary, Integrated Set of Lifecycle Concepts.
Section 4.5: Lifecycle Concept Analysis and Maturation.
Section 4.6: Define and Record the Integrated Set of Needs.
Section 4.7: Plan for System Validation.
Section 4.8: Baseline and Manage Lifecycle Concepts and Needs Definition Outputs.

4.2 Prepare for Lifecycle Concepts and Needs Definition


A prerequisite to successful lifecycle concepts and needs definition are the enablers shown in
Figure 4-2. These enablers are part of NRVVM activities discussed in Section 14. Enablers
include an enterprise tailored Guide to Writing Needs and Requirements and processes and work
instructions for the development and management of needs and requirements.

Lifecycle Concepts & Needs Outputs


Inputs Definition Activities
• Draft Integrated Set of Needs
• Problem or opportunity • Risks, Risk Management Plan
• MGOs and measures • Prepare for Lifecycle and Needs Definition • Set of feasible lifecycle concepts.
• Stakeholders • Define Inputs to Lifecycle Concepts Analysis • Functional architectural and
⁃ Customer (internal and external) and Maturation analytical/behavior models
⁃ Business Operations • Document Preliminary, Integrated Set of • Preliminary physical architecture
⁃ Users Lifecycle Concepts • Technology Readiness Assessment
⁃ Regulatory agencies • Lifecycle Concept Analysis and Maturation and Technology Maturation Plan
⁃ Approving Authorities • Define and Record the Integrated Set of • Design and system validation
⁃ Other internal stakeholders Needs planning artifacts
⁃ Other external stakeholders • Plan for System Validation • Draft PM & SE management plans,
⁃ Needs & requirements • Baseline and Manage Needs Definition WBS, PBS, budget, schedules
• Drivers & constraints outputs • For each need:
⁃ External systems ⁃ Traceability to each source
⁃ Enabling systems ⁃ Traceability to system validation
⁃ Standards & regulations planning artifacts
⁃ Higher level requirements Enablers
⁃ Operating environment • Enterprise tailored Guide for Writing Needs
⁃ Technology maturity & Requirements
⁃ Budget & schedule • Enterprise tailored process for developing &
• Risks managing needs & design input
requirements
• Enterprise tailored Guide for system
verification and system validation
• Enterprise product development process
• Trained systems engineers
• Project toolset
• Stakeholder representation

Figure 4-2: Lifecycle Concepts and Needs Definition IPO Diagram.


The project’s plans, guides, processes, and work instructions should be consistent and in
compliance with enterprise, strategic, and business operations levels product development
concepts and processes, including processes for verification and validation across all lifecycle
activities. Project team members involved in the development of the integrated set of needs
should be trained in and knowledgeable of what is in the guides and work instructions and how
to perform Lifecycle Concepts and Needs Definition activities.
This section assumes the project will be recording and managing the inputs to the Lifecycle
Concepts and Needs Definition activities as well as all the output artifacts using a project toolset
that supports the data-centric I-NRDM approach discussed in Section 3. Provisions must be

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 84

made for project team members to have access to tools that meet their needs, including the
RMTs, modeling/diagraming tools used to produce the input artifacts from which the needs were
transformed and resulting output artifacts, along with the ability to link and share information
between tools.
Preparing for the lifecycle concepts and needs definition activities consists of gathering or
obtaining access to the required input artifacts shown in Figure 4-2. Ideally, standards,
regulations, higher level concepts, needs, and requirements will already be managed within the
organization’s PM and SE toolsets such that the applicable information can be imported into the
project’s toolset. This enables traceability to this information.
A key preparation activity is the creation of a Needs Inspection Checklist tailored to the project,
domain, and product line, if one does not already exist. If the organization has a generic
checklist, the project can tailor the checklist to the SOI being developed and the project’s
specific processes. This checklist serves as a standard to guide the project team’s lifecycle
concepts and needs definition activities as well as provides a standard which will be the basis of
the needs verification activities defined in Section 5.1 and needs validation activities defined in
Section 5.2. Addressing the areas and questions within the checklist will aid in the successful
completion of the needs definition activities defined in this section. (An example needs
verification checklist is contained in the GtNR Appendix C.)

4.3 Define Inputs to Lifecycle Concepts Analysis and Maturation


The focus of this section is defining the inputs that feed into the lifecycle concepts analysis and
maturation activities. Some organizations may classify these activities under the heading
“requirements elicitation”. Rather than calling these activities “requirements elicitation”, a
broader approach “elicit stakeholder needs and stakeholder-owned system requirements” is used.
The result of the activities in this section is the data and information needed to define a
preliminary integrated set of lifecycle concepts that would historically be recorded in a
ConOps/OpsCon no matter the form (database or document).
Note: The activities in Section 4.3.1, Define the problem, threat, or opportunity, and 4.3.2,
Define mission, goals, objectives, and measures are activities that occur at the organization’s
strategic and business operations levels prior to project formulation. These two sections are
elaborations of the INCOSE SE HB “Business and Mission Analysis”. For lower-level systems
and systems elements within the system physical architecture, the project team responsible for
the parent system will defined the problem or opportunity, MGOs, and measures for the lower-
level subsystems and system elements.
4.3.1 Define the Problem, Threat, or Opportunity
“One of the most dangerous forms of human error is forgetting what one is trying to achieve.” -
Paul Nitze (1907-2006)
As part of project formulation, a project champion and business analyst work with key
stakeholders at the organization’s strategic and business operations levels to clearly define the
problem or opportunity for which the project team is to address. Identifying the specific problem
or opportunity will enable the project team to understand why the project is worth doing, the
system is needed, and the capabilities, functions, performance, and features that are important to
the customers, users, and operators of the system.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 85

The steps to defining the problem or opportunity include:


1. Identify the organization’s strategic and business operations level stakeholders that are
impacted by the problem or threat or those who will benefit by pursuing the opportunity.
2. Work with of these stakeholders to understand how they are impacted by the problem or
threat or those that will benefit by pursuing the opportunity.
3. Clearly define a statement of the problem, threat, or opportunity.
4. Get stakeholder agreement for the problem, threat, or opportunity statement.
4.3.2 Define Mission, Goals, Objectives, and Measures
Once the problem, threat, or opportunity has been defined, recorded, and agreed to, the project
champion and business analyst will collaborate with the stakeholders that participated in
identifying and defining the problem or opportunity to better understand what they would view
as an acceptable outcome.
• How do they define success?
• What measures would the stakeholders use to define success?
• What is the intended use of the SOI in what operating environment?
• What capabilities, features, functions, and performance do they need?
• What are their expectations for quality and compliance (with standards and regulations)?
• What specific outcome(s) do they expect once the SOI is delivered?
For cases where there is no existing system or product (green field projects), a common approach
is to characterize the “as is” or “present state “of the organization in terms of the problem, threat,
or opportunity and then characterize the “to be” or “future state” of the organization in terms of
the resolution of the problem or the ability to pursue the opportunity.
For existing systems that need to be updated (brown field projects), a common approach is to list
the problems or issues with the existing “as-is” SOI and the reasons the SOI needs to be updated.
Key information includes what they think needs to be changed and why, and what value will
result from the update. What can the existing SOI no longer do, what performance needs to be
improved, what changes need to be made concerning interactions with external systems. For the
business level stakeholders, a key concern is the ROI if the proposed changes are made and the
consequences if not made.
Key drivers for updates to brown field systems include the need for new features driven by the
market and competitors, new technologies, old technologies that are out of date or no longer
supported, new or changed operating environments, changes to external systems the SOI must
interact, changes in the supply chain (key parts of the existing system are no longer available),
changes to regulations, and changing needs of the customers, users, or consumers.
Assuming the organization has been doing the post-development verification and validation of
the existing system as discussed earlier, most of the answers to these questions will have already
been determined. Using this information, the project champion and business analyst will
collaborate with the stakeholders concerning their vision for the updated version or new model of
the SOI, defining the “to be” or “future state” real-world expectations of the stakeholders.
For either of the above cases, the project champion or business analyst will do a “gap” analysis
comparing the “as-is” current state to the “to be” or “future state”. The result is the identification

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 86

of the changes that need to be made to the existing “as-is” state that will result in the “to be” or
“future state”, the value of these changes, and the expected ROI.
With this knowledge, the project champion and business analyst will work with the
organization’s strategic and business operations level stakeholders to elicit their needs and
stakeholder-owned requirements, define preliminary lifecycle concepts, and define an integrated
set of business operations level needs and requirements for the SOI. As part of the needs
elicitation activities at the business operations level, a mission statement, goals, and objectives
(MGOs) and measures that address the stakeholder expectations for the project and SOI to be
developed or service to be supplied that clearly communicates the expected outcome(s).
This information is captured within the organization’s toolset such that subsequent artifacts
developed at lower levels can trace back to this information.
Note: Stakeholder needs are expressed at different levels of abstraction. The MGOs and
measures are the top of the hierarchy of the set of needs. For some organizations, rather than
defining a “mission” statement, they define a top level “Need” statement (with a capital “N” to
distinguish this statement from lower-level needs). With this approach, rather than MGOs, the
NGOs are at the top of the hierarchy. The MGOs/NGOs and measures defined by the
stakeholders at the previous level of the organizations are further elaborated during the SOI
lifecycle concepts analysis and maturation activities and are reflected within the SOI’s
integrated set of needs. Within this Manual the phrase “Mission Statement” is used.
4.3.2.1 Mission
The mission statement is the top tier of the needs hierarchy based on the above analysis of a
problem, threat, or opportunity that the project was formed to address. The mission statement
defines the “why” - why does the project exist? What does the organization’s strategic and
business operations level stakeholders or the customer need to be accomplished? “What is the
expected outcome?”
The mission statement should not be to obtain the SOI, rather what expected outcome is expected
that will result from obtaining or developing the SOI. For example, what a customer’s primary
need is not a new coffee maker, but to be able to make a “great” cup of coffee. What “great”
means to them will be part of the goals and objectives defined for the SOI.
The mission statement is communicated in a single thought sentence that encapsulates the
integrated set of needs, from which the elements of the set can be elaborated (decomposed and
derived).
Multiple sentence or multiple part mission statements often indicate the organization is not able
to agree on a single mission statement. There have been cases when a project has multiple
sponsors or funding sources. Unfortunately, each of the sponsors or funding sources may have a
different “mission” in mind. Multiple mission statements or multiple part mission statements
will often result in failure when the different mission statements are in conflict.
A rationale should be defined for the mission statement that clearly communicates the intent and
expectations for the outcome. Why is it worded the way it is and how does it address the
problem, threat, or opportunity from which it was derived?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 87

Once a mission statement has been formulated and agreed to, the project champion or business
analyst collaborates with the stakeholders to further elaborate the mission statement in terms of
goals and objectives.
4.3.2.2 Goals
Goals are upper-level needs that form the second level of the hierarchy of the integrated set of
needs. Goals are elaborated from the mission statement communicating those things that need to
be achieved that will result in achieving the mission.
Goals describe future outcomes that will result in the mission to be achieved. Goals allow the
organization to divide the mission statement into manageable pieces and promote a shared
understanding between the project team and the organization’s strategic and business operations
level stakeholders or customers of what will be done to achieve the mission.
Some general rules for writing goal statements include:
• Goals are often initially written as list of phrases each beginning with an action verb.
• Goals should be written as single thought statements, are clear, positive, concise, and
grammatically correct.
• Goals are more qualitative, then quantitative. (a goal could be to “reduce processing time”,
while the associated objective would address the actual change in processing time either as
a percentage or actual value.)
• Focus on what is most important, limit the number of goals to 7 +/- 2.
• Goals should address a critical outcome, chart a clear course, reflect primary activities and
approach of the project, and address mandates from management or parent organization.
• Goals must be congruent with the mission statement and not conflict with each other.
• As a set, meeting each of the goals, should result in the mission being achieved.
• As was recommended for the mission statement, include rationale for each goal.
4.3.2.3 Objectives
Objectives are upper-level needs that form the third level of the hierarchy of the integrated set of
needs. Objectives are elaborated from the goals providing more details concerning what must be
done to meet the goals that will result in the mission to be achieved i.e., what the project team
and the system to be developed need to achieve so the system can fulfill its intended purpose
(mission) in its operational environment when operated by its intended users.
Some general rules for writing objective statements include:
• Objectives are often initially written as list of phrases each beginning with an action verb.
• Objectives should be written as single thought statements, are clear, positive, concise, and
grammatically correct.
• Objectives are more quantitative in that the statements that can be validated to, i.e., the
completed SOI should be able to be validated to have met each of the objectives. (While
the goal could be to “reduce processing time”, the associated objective would address the
actual change in processing time either as a percentage or actual value.)
• Focus on what is most important, limit number of objectives to 7±2, the objectives are not a
list of requirements (however they will be implemented via need and requirement
statements that will trace back to the objectives as their source).
• Objectives must be able to be decomposed/derived from goals—they are children of goals
and aggregate to be the goals.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 88

• Objectives address a critical need and address mandates from the customers, management,
or parent organization that resulting SOI will be validated against.
• From a project perspective, objectives could include key deliverables.
• Achievement of the sum of the objectives should result in achievement of the parent goal
such that the achievement of the sum of all objectives should result in the achievement of
the sum of all goals which should result in the achievement of the mission (that is,
achievement of the set of needs).
• As for the mission and goal statements, include rationale for each objective.
As a set, the MGOs need a time frame and budget defined in which they will be met. The budget
and schedule are drivers and constraints for the project team and are discussed in more detail in
Section 4.3.6.5.
Some organizations will include priorities when defining the objectives, referring to the high
priority objectives as “primary” and lower priority objectives as “secondary’, e.g., a NASA
science mission may define primary science objectives and secondary science objectives. The
project can claim project success when all the primary science objectives have been met and
claim additional credit when any of the secondary objectives are met.
From a planning perspective, within budget, schedule, and risk constraints the project can plan to
initially meet both the primary and secondary objectives; however as determined by the lifecycle
concepts analysis and maturation activities discussed later, doing so may not be feasible and
some of the primary objectives may need to be changed and some or all of the secondary
objectives may need to be removed from the list of objectives. If initially deemed feasible at this
lifecycle stage, when issues occur later in the lifecycle that require the project to descope, it is
the secondary objectives that would be removed from the list first. In doing so, any downstream
artifacts linked to those objectives would also need to be assessed for removal as well.
Figure 4-3 shows an example from NASA concerning defining mission goals and objectives
addressed at the business operations level for a given project.

Mission Mission Operational Success Design


Goals Objectives Objectives Criteria Drivers

• Agency Strategic • Science Objectives Operational Drivers Measurements Mission Drivers


Plans • Exploration • Integration & Test • What • Launch Date
• Announcements Objectives • Launch measurements? • Mission Duration
of Opportunity • Technology • On-Orbit • How well? • Orbit
• Road Maps Demonstration • Transfer • Cost Constraints
• Directed Missions Objectives • Surface • Etc.
• Technology • Science Data
Distribution Explorations
Development
• Maintenance • What
Objectives
explorations?
• Programmatic • Logistics
• Etc. • What goals?
Objectives

Figure 4-3: Example NASA Mission, Goals, and Objectives (from NASA SE HB [36]).

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 89

4.3.2.4 Measures
It is important that the project champion and business analyst define and get agreement on key
measures that will be used to both validate the objectives against as well as to manage system
development across the lifecycle. As discussed later for the integrated set of needs, when
defining objectives, the project team must define what measures the objectives will be validated
against.
Measures are referred to by various terms: Measures of Suitability (MOS), Measures of
Effectiveness (MOEs), Measures of Performance (MOPs), Key Performance Parameters (KPPs),
Technical Performance Measures (TPMs), Leading Indicators, mission success criteria, primary
science objectives, secondary science objectives, acceptance criteria, etc.
Note: This Manual does not attempt to define the various measures. There are multiple
documents in the INCOSE Store concerning measures that go into detail concerning the need to
define measures and how they can be used to better manage a project.
Achievement of the MGOs and measures should result from the achievement of the set of needs
defined for the SOI.
4.3.2.5 Special Considerations
Business versus Consumer Perspective
It is important to understand different perspectives. The problem/threat/opportunity, MGOs, and
measures from a business perspective (developing organization or customer organization) may
be different, thus both must be addressed as discussed in Section 2.3.1.
In addition, for consumer products, the consumer’s perspective concerning
problem/threat/opportunity, MGOs, and measures will also be quite different. The consumer
does not care about the developing organization’s profits, time to market, market share, reuse of
resources, etc. The consumer cares about how the resulting product meets their specific needs.
Thus, there will two sets of MGOs and measures that need to be defined and met by the project
team from both a business perspective and a consumer product perspective.
Project MGOs focus on the project from a business perspective while the focus of the system or
product MGOs is on the SOI being developed from a user/consumer/operator perspective. In
general, the verbs used to define project goals and objectives apply to what the project must do
while verbs used to define SOI goals and objectives apply to what the SOI must do. This may
lead to conflicts which the project team must address, e.g., product price versus profitability and
market share.
It is important that the two sets of MGOs and measures are defined at this time as each will have
its own set of lifecycle concepts, resulting set of needs, and set of requirements. Each set will
have different verification and validation activities. Refer to Section 4.6.1 for a more detailed
discussion concerning needs and requirements for organizations and processes vs needs and
requirements being developed.
Dealing with Uncertainty
Initial values stated within the objectives and measures are often questionable in terms of
feasibility (cost, schedule, technology, legal, ethical, environmental, etc.). The actual feasibility

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 90

may not be known until several iterations by the project team of the system lifecycle concepts
analysis and maturation activities to the point the feasibility likelihood is established with risk
acceptable for this lifecycle stage. The system lifecycle concept maturation activities will inform
(feedback) the definition of the MGOs and measures which may need to be updated based on the
knowledge gained during the life concepts analysis and maturation activities.
A best practice is to enclose numbers contained in objectives and measures within brackets […]
with “to be determined” (TBD) or “to be resolved” (TBR) to indicate they are preliminary and
will be finalized once the lifecycle concepts have matured and needs defined, recorded, and
baselined. Also refer to Section 4.6.3.1 for a more detailed discussion on managing unknowns
and the use of TBDs and TBRs.
Goals versus Objectives
Definitions of goals and objectives are often interchanged. To avoid confusion, some
organizations will combine the list of goals and objectives. When this is done, once the list has
been formed, often a goal/objective hierarchy is often apparent.
Getting Stakeholder Agreement
Getting the organization’s strategic and business operations level stakeholders to agree on the
wording of the MGOs and measures can be challenging and may take multiple iterations to reach
a set of project and SOI MGOs and measures that the stakeholders will agree to. Even though
defining the MGOs can be time consuming, the effort is well worth it as it ensures everyone is on
the same page, sharing a common vision, when it comes to what outcomes are expected for the
project to be successful.
Many project failures can be traced back to the fact that either the organization’s strategic and
business operations level stakeholders or an external customer either did not define a set of
MGOs and measures for the project and SOI or the project or SOI did not meet the defined and
agreed to MGOs and measures. Without a common vision, each stakeholder will define needs
and requirements based on their vision for the SOI which may conflict with other stakeholders
vision resulting in conflicts and inconsistencies.
Assessing Feasibility before Baselining the MGOs and Measures
There have been cases where the project champion or business analyst did define the MGOs and
measures for the project and the SOI. However, the feasibility was not adequately assessed
before baselining the business operations level lifecycle concepts, needs, and requirements the
project and SOI were expected to meet. In these cases, as the project moves through the SE and
PM lifecycle process activities, it becomes apparent that the MGOs and measures cannot be met
as defined. When this happens, the organization can either go back and update the MGOs and
measures based on what is feasible or cancel the project. Failing to act often results in a failed
project. For a SOI that will be acquired from a supplier, the failure to establish feasibility within
the needs and requirements is a major cause for expensive and time-consuming contract changes.
4.3.2.6 Recording and Managing the MGOs and Measures
The MGOs and measures are recorded within the organization and SOI integrated dataset and
linked to the problem/opportunity statement. It is important both the organization and the project
manage the MGOs and measures such that implementing system level lifecycle concepts, needs,
and design input requirements can be traced to the MGOs and measures they apply.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 91

Once the project champion or business analyst has obtained agreement on the problem or
opportunity statement, business operations level lifecycle concepts, needs, requirements, and
resulting MGOs and measures for both the project and SOI; a project is formally formed to
develop a SOI that will result in the MGOs and measures to be achieved and problem resolved or
the capability to pursue the opportunity to be realized. The business operations level lifecycle
concepts, needs, and requirements are considered constraints which the project team must
comply.
At the top of the integrated set of needs hierarchy, the agreed-to MGOs and measures are a major
focus of the SOI lifecycle concept analysis and maturation activities, lower-level needs
definition, design input requirements definition, architecture, design, and system validation.
Ultimately, meeting the MGOs and measures are key to delivering a winning product and
making the customers happy. In the end, successfully meeting the MGOs and measures are a
major factor in passing system validation.
4.3.3 Identify External and Internal Stakeholders
Once the project has been formed, a critical first step to defining, analyzing, and maturing the
lifecycle concepts and transforming them into an integrated set of needs is to identify the
stakeholders, both internal and external, who are relevant to these activities at this level and with
whom the project team will interact.
Stakeholders are the primary source of needs and requirements, therefore for the project to be
successful, all relevant stakeholders must be identified and included at the beginning of the
project both internal and external to the project team and their organization. Leaving out a
relevant stakeholder often results in missing needs and requirements and a failure to pass system
validation. These stakeholders not only are important in defining the needs and requirements,
but they must be involved in the validation of all SE artifacts across all lifecycle activities.
The choice of a relevant set of stakeholders is critical for being able to determine the
completeness (GtWR Characteristic C10 - Complete) of the integrated set of needs and resulting
design input requirements. A different set of stakeholders would lead to a different set of needs
and requirements based on different perspectives on their unique problems, opportunities, needs,
requirements, MGOs, and measures [9].
Stakeholders are any individual or organization with a personal stake in the SOI, who may be
affected by the SOI, who will participate in the development of the SOI, are able to influence the
definition and development of the SOI, or with whom the project team will interact across the
SOI lifecycle.
As such, some organizations classify stakeholders as VIPs: anyone who has a Vested interest or
“stake” (“interest or concern” in the Oxford dictionary) in the SOI, has Influence concerning the
funding, development, procurement, approval, or acceptance of the SOI, or will Participate in
any of the SOI’s lifecycle phase activities.
Stakeholders can include, but are not limited to customers, sponsors, organization decision
makers, regulatory organizations, developing organizations, integrators, testers, users, operators,
maintainers, support organizations, the public at large (within the context of the business and
proposed solution), and those involved in the disposal or retirement of the SOI. Stakeholders can
be both internal and external to the organization.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 92

A key part of stakeholder identification is to determine who the Approving Authorities are within
the group of stakeholders. It cannot be assumed that the only stakeholder that has this authority
is the “customer” (the one paying for the SOI or development of the SOI, requesting the SOI, or
procuring the SOI).
The Approving Authorities include stakeholder(s) that are responsible for formally certifying,
qualifying, and approving the system for use in its operational environment by its intended users.
It is critical these stakeholders be included in the needs definition activities and in the definition
of what constitutes necessary for acceptance. They must agree that the set of needs and resulting
set of design input requirements will result in a SOI that can be verified to meet those
requirements and validated to meet the baselined set of needs in the operational environment as
defined by the Success Criteria.
There can be various levels of Approving Authority. During development, the approving
authority could be a stakeholder internal to the developing organization. Once the system
integration, system verification, and system validation activities have been completed, the
Approving Authority could be an external stakeholder, either the customer to whom the SOI is
being delivered or, for highly regulated systems, a regulatory agency.
For a developer-funded effort (in house product development), determining the Approving
Authorities is up to the developer. In this case, the developing organization will determine who
the Approving Authorities are both internal and external to the organization. Of particular
interest are consumer regulatory agencies, e.g., for medical devices the USA Food and Drug
Administration (FDA) and for aircraft the USA Federal Aviation Administration (FAA). For
consumer products, customers and users in the marketplace will determine the ultimate
acceptability of the solution based on sales and social media feedback.
From a customer/acquirer-funded effort (organization procures the SOI or contracts out the
development of the SOI with an external supplier), the task of defining the Success Criteria that
constitutes “necessary for acceptance” and identifying the Approving Authorities becomes a
negotiation among the customer/acquirer, supplier/developer, users/operators, and possibly other
stakeholders as determined by the customer/acquirer (the one supplying the funding). The
results of these negotiations must be reflected in the contract. However, it is still the
supplier/developer’s responsibility to alert the customer/acquirer regarding risk of ignoring
stakeholders and any concerns or characteristics deemed necessary for acceptance by these
stakeholders.
There can be many stakeholders for a SOI over its lifecycle; therefore, considering the lifecycle
concepts across the lifecycle provides a thorough source for stakeholder identification. Table 4-1
contains the lifecycle stages and examples of potential stakeholders by lifecycle stage.
For products being developed where there is a significant user/operator interaction with the
product, e.g., medical devices and consumer products, special attention is given to these
interactions.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 93

Lifecycle Stage Potential Stakeholders


Define Paying customer, sponsor, project team, project manager, procurement,
research and development, suppliers, regulating authorities, public,
marketing, end users, operators, compliance office, regulators, owners of
enabling systems, owners of external systems, Approving Authorities
Develop Project team, subject matter experts (SMEs), system architects, design
engineers, suppliers, procurement, etc.
Produce Production organization, process engineers, quality control, production
verification, product acceptance, supply chain
Integrate, Verify, Test engineers, system integration engineers, system verification engineers,
and Validate system validation engineers, operators/users, owners of enabling systems,
facility personnel, contracting, Approving Authorities, regulators, safety
personnel, security personnel
Operate Transporters, installers, users, operators, safety engineers, security engineers,
owners of external systems, IT, regulators, quality, mission assurance
Sustain/Maintain Customer/technical support, replacement part providers, service technicians,
trainers, IT, quality engineer, inspectors, CM, those conducting post
development system verification and system validation activities.
Dismantle/Dispose Operators, waste management, regulators, public
Table 4-1: Potential Stakeholders Over the System Lifecycle.

To help ensure all relevant stakeholders have been identified, the following questions should be
addressed:
• Who pays?
• Who profits?
• Who produces?
• Who tests (Is involved in design and system verification and system validation activities)?
• Who uses or operates?
• Who maintains?
• Who regulates?
• Who accepts, approves, certifies, or qualifies the SOI?
• Who owns or controls external systems the SOI interacts with?
• Who owns or controls enabling systems the SOI interacts with?
• Who participates in, or who may be impacted by, the disposal of the SOI at end-of-life?
• Who else cares?
4.3.3.1 Creating a Stakeholder Register
The project must identify and manage the stakeholders or classes of stakeholders who will
participate with the project team to develop the SOI. One approach that can be used to record
the list of stakeholders is to develop a stakeholder register that includes key information for each
stakeholder involved in some way with the SOI. This register is often be included is the PMP
and/or SEMP or a project’s Communication Plan.
Key information for each stakeholder includes:
• Stakeholder’s name, location, mailing address, email, phone, fax, etc.
• Stakeholder’s organization and job title.
• Whether or not the stakeholder is internal or external to the organization.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 94

• Stakeholder’s project or SE role: How are they involved? What is their “stake”? Are they
an Approving Authority? Are they decision makers, end users, controller of assets or
resources, influencer, interested party, procurement, legal, compliance?
• Which part of the system are then primarily involved? In what way?
• What lifecycle(s) are they primarily concerned with or involved in? In what way?
• Which engineering discipline do they represent?
• Classification of the stakeholder in terms of “V.I.P” as discussed earlier
• What information the project needs from the stakeholder.
• What information the stakeholder needs from the project.
The stakeholder register can be useful because often there is a large set of stakeholders and
stakeholders often change over the SOI’s lifecycle. This means that elicitation activities may
need to be revisited if stakeholders change during development. It is recommended that the
project team re-evaluate the stakeholder community periodically to ensure successful
engagement with stakeholders, keeping them engaged, and managing changes in stakeholders
and their needs and requirements. (Refer to the GtNR for an example stakeholder register.)
4.3.3.2 Stakeholder Considerations
Rank
Not all stakeholders are equal. Based on their position and role, some stakeholders have more
“power” and influence than others. For example, customers and the Approving Authorities. In
this case, higher ranked stakeholder’s needs and stakeholder-owned requirements will have more
importance (higher priority) than lower ranked stakeholders. Higher ranked stakeholders often
have a broader perspective and think at a higher level of abstraction than other stakeholders.
The rank of stakeholders is used to resolve any needs or requirements that are conflicting or
cannot be met by the proposed solution within the defined constraints. Higher ranking
stakeholders are often paying customers, sponsoring agencies, acquirers, and the Approving
Authorities who will have the authority to accept, qualify, certify, or approve for use the SOI.
A discussion or negotiation between the acquirer(s), developer(s)/project team, and any
stakeholders that supply resources or interact with the SOI over its lifecycle should occur to
determine roles and relative ranking of the stakeholders.
Stakeholder Communication
The project team’s communication approach with the stakeholders is heavily influenced by
stakeholder rank, whether the stakeholder is internal or external to their organization, stakeholder
availability, and stakeholder accessibility.
The communication approach with stakeholders should be decided and recorded as part of the
communication plan. Communicating with internal stakeholders can vary in form and timing as
compared to communicating with external stakeholders. Forms may be written documents,
electronic communication, verbal communication including in a review, or a variety of forms as
appropriate. A project team point of contact (POC) should be assigned for communication with
various stakeholders and to develop a communication plan for when and how things will be
communicated, so that communication channels are understood, and messaging is consistent.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 95

Interaction with stakeholders is not limited to just the elicitation activities at the beginning of the
project. The project team must establish and maintain frequent communications with the
stakeholders throughout the lifecycle activities. These communications should not be limited to
just formal “gate reviews”, but rather enable frequent informal participation and feedback. A
fundamental premise of Agile development methods is frequent communications between the
project team and key stakeholders. Frequent engagement with the stakeholders enables
continuous validation of the various artifacts generated throughout the development lifecycle.
Priority/Criticality
It is common for a specific stakeholder to consider some aspects of the SOI more important than
others. During elicitation activities, it is important to ask the stakeholders to prioritize what they
are asking for. Some things will be especially important to the stakeholder, while other things
may be “nice-to-haves” or “desires”, but not critical to the system being able to achieve the
agreed to mission, goals, and objectives. There will be some things that the stakeholder may be
able to “live without” given budget or schedule constraints or conflicting stakeholder needs and
stakeholder-owned requirements.
Stakeholders need to make clear which things are critical for the system to able to meet its
intended purpose in the operating environment. When there is a difference in opinion as to
priority or criticality, the ranking of the stakeholder must be considered. In some cases, the
difference in opinion is a communication issue, where one party does not have the knowledge or
insight of the other party. When recording stakeholder inputs, it is important to record within the
SOI’s integrated dataset the priority or critically of their needs and requirements and rationale
concerning the designation.
Availability/Accessibility
For the project to proceed on schedule, it is important for the stakeholders to be available and
accessible when needed, especially for projects using Agile methodologies. The project will
need to consult each stakeholder to make sure they are available when needed or have an
individual designated to take their place with the authority to represent the specific stakeholder.
There are cases where a stakeholder becomes involved late in the development lifecycle with
major needs and requirements that were not communicated when the project started. Depending
on the “rank” or importance of the stakeholder, this could result in significate rework and
resulting cost and schedule issues. The higher in the organization a stakeholder is or if the
stakeholder is external, accessibility can be an issue. If a key stakeholder’s accessibility is in
question, it may be necessary for them to name a spokesperson who can represent their views to
the project team.
There are cases where a stakeholder is not directly available, and a surrogate is necessary. The
surrogate needs to be representative of the missing stakeholder with a current and relevant
perspective.
Personas/User Classes
For products that have a significant user interaction it is not always safe to consider all users to
be equal in terms of key characteristics associated with demographics, anthropometrics,
education, skills, language, needs, training, job function, lifecycle stage involvement, etc. In
these cases, it is common to do group classes of users with similar characterizes in terms of a
specific product in to a “user class”. Each user class is clearly defined in terms of the
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 96

characterizes listed above. Often each user class is given a person’s name; this named user class
is referred to as a “persona”. When used in needs and requirements, the persona represents the
characteristics defined for that user class.
Changing Stakeholders
An issue similar to availability, is when a key stakeholder is replaced with another stakeholder
during development. This often happens for projects with longer development times. When this
happens, the replacement stakeholder may not agree with the perspective of their predecessor,
have different priorities, and have needs and requirements that are different than what was
communicated when the project was formed. Depending on the “rank” or importance of the
stakeholder, this could result in significant rework and resulting cost and schedule issues. Highly
visible, long-term projects are especially vulnerable to changing stakeholders, especially when
the stakeholder is high rank, controls the funding, and is politically motivated.
Changing Stakeholder Needs and Stakeholder-owned System Requirements
During a project, stakeholder needs and stakeholder-owned system requirements often change.
There are several reasons for this. One reason is that the operating environment (physical as well
as cultural) may change overtime due to changes in external systems the SOI must interact,
changes to stakeholders as discussed above, changes in the drivers and constraints, or changes in
the problem or opportunity. Again, these changes are more common for projects with longer
development times. There have been cases where a system is developed and delivered five years
after the project started, only to find that the original problem or opportunity no longer exists or
has significantly changed.
Another reason for change is the fact that SE is a knowledge-based practice. As stakeholders
become more informed, their needs will frequently change. As an example, in the chemical
processing industry, when addressing needs from process operators for the implementation of
automated control systems, various scenarios were explored to define a complete and consistent
set of needs. After 6 months of lifecycle concept maturation activities, a review of the lifecycle
concepts and resulting needs and requirements with the operators found that the operators had
learned significantly new concepts that radically altered their original needs and requirements.
Just by discussing the issues and exploring alternative concepts, their viewpoints changed, and
they begin to think more critically.
When changing stakeholder needs and stakeholder-owned system requirements are a possibility,
they represent risk to the project’s success. Part of the elicitation activities is to ask stakeholders
about possible changes and their likelihood. These threats will be evaluated, and the risk
quantified. The project can then determine how they plan to manage these risks. (Refer to
Section 4.3.7 Identify, Assess and Handle Risk.)
The risk of changing stakeholder needs and stakeholder-owned system requirements can also be
mitigated by involving the key stakeholders, like the operators in the example above, in the
lifecycle concept analysis and maturation activities. They are often best to define value and
feasibility when selecting concepts from the alternatives. Once a set of feasible lifecycle
concepts have been selected, the resulting integrated set of needs will reflect this concept, and
the possibility of changes in the set of needs is reduced.
For needs that have a degree of uncertainty and thus are likely to change, the attribute A26 -
Stability, can be used. Also, if a stakeholder states a number or quantity but is not certain if that

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 97

number is correct or is likely to change, a common practice is to but “[….]” around the number
and assign a "To Be Determined (TBD)" or “To Be Resolved (TBR)” to that value. For a more
detailed discussion on TBDs and TBRs, Refer to Section 4.6.3.1, Managing Unknowns.
Groups of Stakeholders
Often there will be multiple members of a stakeholder group, e.g., users, operators, marketing,
sales, safety, regulators, customers, the “public” who will be buying, using, operating, or
maintaining a product or may be affected by the product in some way. It may not be practical to
collaborate with every member of the group to elicit their needs and requirements. In this case a
means must be implemented to name a representative of the group concerning their needs and
requirements. For safety, a representative from the safety office; for users, a representative from
a user group. For consumers who will be buying a commercial product, a member from the
marketing organization or a consumer/user group. For standards and regulations, a member of
the organization’s compliance group. For the public, a representative from the applicable
regulatory agency or consumer safety organization. (See also personas/user classes.)
4.3.4 Elicit Stakeholder Needs and Stakeholder-owned Requirements
Once the MGOs and measures have been defined for the project, the project team will further
elaborate these higher-level needs as discussed in the rest of this section. It is the role of the
project team to define at least one set of feasible set of lifecycle concepts and respective
integrated set of needs that will result in the MGOs being achieved within the defined constraints
with a level of risk appropriate for this lifecycle. These activities include elicitation of the
stakeholder needs and stakeholder-owned requirements for the SOI which include identifying
drivers and constrains and assessing risk discussed in later sections.
The project team engages the stakeholders associated with the SOI to understand their needs and
technical requirements not only just during operations but for all lifecycle stages. Standard
elicitation techniques and methods (Refer to Section 4.3.4.3) are employed as defined in the
organization’s SEMP and PMP. Needs and requirements come from multiple sources, thus
eliciting and capturing the stakeholder needs and stakeholder-owned system requirements
represents a significant effort for the project team and adequate resources must be included in the
project budget and schedule to enable these activities.
Stakeholder needs and stakeholder-owned system requirements for the SOI originate from
concerns, problems, challenges, issues, risk, opportunities, experience, failures, and successes.
During elicitation, the project team should collaborate with the stakeholders to understand the
source and context of their stated needs and requirements.
The elicitation activities allow the project team to discover and understand what is needed, what
processes exist, how stakeholders interact with SOI, what happens over the SOI’s lifecycle -
good and bad, what states and transitions the SOI might undergo or experience during use,
nominal, alternate-nominal, and off-nominal operations, and other considerations.
To help ensure nothing has been left out during an elicitation session, towards the end of each
session with a stakeholder, the project team should ask “What should we have asked that we
didn’t?” and “Is there anything else you would like to add?”
Note: Many organizations limit needs definition to the elicitation of user or customer-owned
“requirements”. As discussed in Section 4.3.1, there are other stakeholders directly associated
with the SOI, both internal and external to the organization, that must be included in the
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 98

elicitation activities. Failing to include all stakeholders can result in issues concerning
completeness, consistency, correctness, and feasibility of the resulting integrated set of needs
and set of design input requirements. The scope of needs definition is much broader than just the
customers or users. Rather than focusing on only the Voice of the Customer (VOC), the voices of
all stakeholders (VOX) must be considered.
As shown in Table 4-2, each stakeholder has a unique perspective concerning the SOI being
developed.

Stakeholders Example Perspectives/Concerns


Customer/Sponsors Cost, schedule, resources to develop
(those providing Cost and resources to operate and maintain - lifecycle costs
resources or have Whether the system will meet their needs
requested the system) Quality
Risks
ROI
Customers (those that Features/capabilities (functions)
will buy and use a Cost/schedule
consumer product) User interface / user experience
Whether the system will meet their real-world expectations
Performance: speed, accuracy, precision
Safety, Security
Quality: reliability, maintainability, updateability, lifecycle costs
Users/operators (those Features/capabilities, functionality
using or interacting with Whether the system will meet their real-world expectations
the operational system) User interface, user experience, usability, operability
Performance: speed, accuracy, precision
Quality: availability, reliability, robustness
Safety, Security
Operating environment
Marketing Capabilities, features, performance, and quality better than their
competitors
Providing a product that consumers need, want, and will buy
Making customers happy, increasing market share
Project management Understanding the stakeholder needs and stakeholder-owned system
requirements
Feasibility of what is being asked for
Drivers and constraints
Enabling systems (hardware, SE tools, networks)
Schedule/budget
Available resources and personnel
Risks
Compliance with standards and regulations
Contractors, Suppliers, Understanding what the customer real-world expectations are
Vendors Understanding what the deliverables are
Understanding what the customers measures are
Understanding what is necessary for acceptance
Schedule and budget
Profits
Keeping their customers happy
Developers/Engineering Understanding the stakeholder needs and stakeholder-owned system
requirements
Feasibility of what is being asked for
Drivers and constraints
External system interactions
Enabling systems (hardware, SE tools, networks)

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 99

Schedule/budget
Operating Environment
measures (what will make customers happy and accept the SOI)
Production Engineers Timeliness and quality of the design output specifications
Ability to produce quality products - repeatably, at the needed rate and
yield
Changes/updates needed to the existing manufacturing capability
Feasibility in what they are being asked to do
Cost and Schedule
Integrators, verifiers, Quality of the built or coded system (built/coded) in accordance with the
validators design output specifications
A realized, integrated system that can be verified to meet the design
input requirements and validated to meet the set of needs
Testability of the system
Infrastructure to enable integration, system verification, and system
validation (hardware/software)
Access to test points to get needed data
Maintainers/Technical Installation and setup
support Maintainability
Tools needed to maintain and repair
Logistics of spare parts
Shipping and storage
Reliability, failure rate, time to repair
Configuration management
Facility personnel Operating environment
Support services
Enabling systems
Safety, Security
Regulators and Compliance with standards and regulations
government Consumer safety
Information Technology IT hardware (Networks, servers, workstations)
(IT) Application support software
Security
Disposers Use of hazardous materials
Safety
Environmental impacts
Reusability of parts and materials
The public at large Safety and security
Environmental impacts

Table 4-2: Example Stakeholders’ Perspectives and Concerns.

4.3.4.1 Plan for Elicitation


Before conducting elicitation activities, the project team must plan for each stakeholder
elicitation session or activity. Key things to determine include:
• The SOI level stakeholders who will be involved, how frequently (once or multiple times)
and when.
• The types of information that is needed from the stakeholder(s) (Refer to Section 4.3.4.2).
• The elicitation techniques that will be used. (Refer to Section 4.3.4.3)
• Existing documentation that should be available—existing requirements, specifications,
interface definitions, or user documents for a similar product, regulations and standards,
customer survey info, problem logs, consumer complaints, etc.
• How information will be captured during the elicitation sessions.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 100

• The form and media that will be used to document and manage the captured information.
4.3.4.2 Information to be Elicited from Stakeholders
For each stakeholder, there is a common set of information that should be the focus of the
elicitation interactions.
Problem or opportunity statement. At the beginning of the elicitation activities, present the
problem, threat, or opportunity statement defined at the business operations level to the SOI level
stakeholders and ask if they agree? Also ask:
• Why does the stakeholder think the new SOI is needed? Why?
• What problems, if any, is the stakeholder aware concerning the existing SOI?
o Are there needed changes to inputs? Outputs? Functionality? Performance?
o What changes would they like to see to address these problems?
MGOs and measures. Present the MGOs and measures to the stakeholders. Questions to ask:
• Are there any other changes they think need to be made to the Mission statement?
• Are there changes they think need to be made to the goals or objectives?
• Are there other measures that need to be defined? Measures changed?
• Do they think the values stated in the MGOs and Measures are feasible? If not, why?
Note: These first two items have a dual purpose. First it is important to align the stakeholders to
a common vision for the project and SOI to be developed. This information will help define the
context in which the stakeholders are addressing a specific problem, threat, or opportunity as
well as ensure everyone is “on the same page.” Without this understanding, it is common to get
conflicting information from the stakeholders based on their individual understanding of the
problem, threat, or opportunity and their unique vision of the reason for the SOI and outcomes
as a result of developing the SOI.
It is critical to get all stakeholders aligned to a common vision. Failing to do so will result in
conflicting and inconsistent lifecycle concepts, needs, and requirements.
Second, there may have been things overlooked by the organization’s strategic and business
operations level stakeholders during the formulation of the problem statement and MGOs and
measures that other SOI level stakeholder(s) can help fill in the gaps.
This activity is a validation of the high-level needs that are communicated by the MGOs and
measures. Any issues must be resolved prior to proceeding with stakeholder elicitation, lifecycle
concept analysis and maturation, and definition of the integrated set of needs.
Lifecycle stages. Identify the SOI lifecycle stages the stakeholder represents or is involved in.
Lifecycle stages could be procurement, development, test, verification, validation,
manufacturing, transportation, deployment, installation, transition, training, operations, logistics,
maintenance, upgrades, or disposal. Often there is a distinct set of stakeholders and interfaces
associated with each lifecycle stage. Each having unique needs and requirements. Not
addressing a lifecycle stage could result in missing needs and requirements.
Use cases or scenarios. For each lifecycle stage, ask the stakeholder to describe a “day-in-the-
life” of the SOI. This could include multiple use cases or scenarios. Address both nominal and
alternate nominal cases. For use cases, capture the initial conditions and state of the SOI at the
end of the use case.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 101

Note: for when users or operators are defined in terms of “personas” discussed earlier, the
project team will develop use cases or scenarios for each defined persona. When doing so, it is
important to base the use cases and scenarios on actual users or operators. This information
can be obtained using the elicitation techniques and methods listed in Section 4.3.4.3. Actual
observations of actual users and operators in the actual operational environment is highly
recommended.
Off-nominal scenarios. In addition to the nominal and alternate nominal scenarios, also ask the
stakeholder about off-nominal scenarios- what could go wrong, or currently what often goes
wrong? (The off-nominal scenarios will be a major source of risk discussed later as well as
Failure Modes and Effects Analysis (FMEA.))
The resulting use cases or scenarios provide key insights into the stakeholder needs and
stakeholder-owned system requirements concerning features, capabilities, functionality,
performance, interaction with other systems, standards, regulations, physical attributes, etc.
Capabilities, functionality, performance. Different users/operators often have different
functionality or performance needs and requirements. What capabilities, functionality, and
performance do they need from the new system? Why?
• How many users/operators?
• What capabilities and functionality do the users need? For each function, what is the expected
performance? Is there a specific trigger for a given function?
• Under what condition or state of the SOI does a given function apply or need to occur?
• What operational environment does the function occur?
• Does the function occur repeatably or continuously?
• How should the SOI respond to or behave when an off-nominal condition occurs?
Interactions/interfaces with external systems. During the stakeholder’s description of the
activities during each lifecycle stage, pay particular attention to any interactions of the SOI with
external systems. These interactions could represent interfaces or could be the result of induced
environments, or the competition of resources. Refer to Section 4.3.6.3 for more information
concerning what the project team needs to consider during elicitation activities concerning
interfaces.
Relative priority of each stakeholder need and stakeholder-owned requirement. What is most
important, which are nice to haves? Just wishes? What can be traded off? Establishing
priorities is important when having to make tradeoffs as well as when a project is de-scoped due
to budget or schedule issues. This information is used to define the priority attribute discussed in
Section 15.
Criticality of each need and requirement concerning the system’s ability to realize the MGOs and
measures. While priority reflects relative importance of something to a stakeholder, criticality
establishes the importance of the need and requirement to meeting the MGOs and measures.
Critical items are “essential” for the system to full its primary purpose in the operational
environment when operated by its intended users. Establishing criticality is important when
tradeoffs are being made or the project is de-scoped. Critical items should never be deleted from
the set of needs and set of design input requirements. Criticality is also important to understand
when mitigating risk as well as when accessing and managing changes. This information is used
to define the criticality attribute discussed in Section 15.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 102

The benefits of establishing priority and critically include enabling the project team to better plan
and manage the development effort, provide trade space, help improve communications, and
often results in fewer needs and design input requirements. (Priority and criticality are key
attributes of both needs and requirements expressions as discussed in Section 15.) As discussed
in Section 10, organizations may use priority and criticality as criteria to focus system
verification and system validation activities to reduce costs and shorten delivery times. From a
safety perspective, regulatory agencies tend to focus more on changes to critical needs and
requirements.
Quality. The stakeholder’s needs and stakeholder-owned requirements concerning quality (-
ilities).
• Usability - with or without training?
• Reliability - to what level? Over what length of time? Mean time to failure?
• Safety and Security - what are the threats? Hazards? What needs to be protected? Etc.
• Serviceability/Sustainability - through user updates, system upgrades, etc. Mean time to
repair?
• Scalability - how many users? How much data and information?
• Testability/inspectability - built-in capability? With provided tooling and/or equipment?
• Agility/adaptability/resiliency - how well and how fast can the system to respond or adapt
to changes to the mission, threats, and operating environment?
• Availability - to how many? For how long? Over what time?
Note: There are many “-ilities”. Which apply depends on the SOI and needs of the stakeholders.
A search for “non-functional requirements”, “quality requirements”, or “-ilities” on the
internet will result in a much larger list with definitions and examples.
Issues/Risks. Ask the stakeholders what issues/risk they think could impact the ability to
successfully develop and deliver a winning product. (All issues must be recorded in the SOI’s
integrated dataset. They will be a major source of risk discussed later.) Also ask about
issues/risk associated with user/operator interactions with the SOI. What are the hazards?
Which need to be mitigated? In what way? What is the likelihood? The impact? (See Section
4.3.7 for a more detailed discussion on risk identification, assessment, and handling.)
Assumptions. Ask the stakeholders what they are assuming to be true for what they have said to
be valid. Assumptions are a proposition that is taken for granted as if it was known to be true,
whether it is true. Assumptions can relate to the business or mission, technology (maturity,
feasibility, performance), resource availability (people, facilities, enabling systems, etc.), cost,
schedule, expected outcomes, and stakeholder needs. If a need or design input requirement is
based on an assumption that later turns out to be false, that need or requirement may not be valid.
All assumptions must be recorded in the SOI’s integrated dataset.
Rationale. For each need and requirement elicited from the stakeholders, it is important to
capture the rational concerning “why”. Rationale helps understand intent. To understand the
real need, stakeholders may have to be asked “why?” multiple times. If the need or requirement
is based on an assumption, that assumption should be included in the rationale attribute. If the
need or requirement includes a number, the rationale should also include a description from
which that number was derived. If a stakeholder cannot provide rationale, why include the need
or requirement in the set? This information will be used to document the rationale for the
resulting needs and design input requirements in the rationale attribute defined in Section 15.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 103

The goal of elicitation is to provide an implementation-free understanding of the stakeholders’


needs and stakeholder-owned requirements by defining what is expected (design inputs) without
addressing how (design outputs) to satisfy the set of needs.
It is important to always remember that final acceptance of a SOI is based on the system passing
system validation. If any of the above information is not well understood and reflected in the
lifecycle concepts and set of needs, there is a good chance the SOI will fail system validation.
Use of checklists. As part of planning for an elicitation session, it is useful to develop a checklist
tailored to the specific stakeholder. Table 4-3 shows and example checklist.
Purpose/Function of SOI Operational environments Priority and criticality
Performance levels Storage Interfaces
Safety and Security Transportation Assumptions
Issues and Risks Process improvement Constraints
Maintenance or upgrade Reporting Assembly/disassembly
User interfaces Compliance Training
Access control Documentation Cost/Schedule
Table 4-3: Example Checklist for an Elicitation Session.

4.3.4.3 Elicitation Techniques and Methods


There are various techniques and methods used for elicitation. Which is used depends on the
specific stakeholders and information to be obtained. Below is a summary of the more popular
methods. These methods are quite common and well recorded, so this Manual only provides a
brief description.
• Brainstorming. Large collections of inputs from a group that must be distilled. Best if
structured to consider all lifecycle stages.
• Workshops or Focus Groups. Gain more clarification of and detail concerning specific
topics, lifecycle stages, stakeholder needs, or design input requirements.
• Interviews. One on one discussions that can explain a concept, bound a problem, and/or
identify specific stakeholder’s needs or stakeholder-owned requirements.
• Feedback and Document Analysis. Information on existing or similar products can remind
the project team of what types of needs or requirements may exist and inform them of
problems or improvements desired in a new product.
• Interface Analysis. Paper study or observation to identify interactions of the SOI with
external systems and types of interactions the SOI must be compatible with—form
(physical and mechanical characteristics) and functional (input and output of signals and
communication, for example). Includes human interactions with the SOI.
• Observation of comparable products. Stakeholders can point to features that are desired,
need to be changed, or added.
• Prototyping. Provide a prototype based on initial understanding of stakeholder’s needs or
stakeholder-owned requirements to allow stakeholders to explain how the prototype meets
or misses their needs or requirements. Provides an opportunity for stakeholders to point
out what they like and do not like; what they would like to be changed or added.
• Surveys/Questionnaires. Used to obtain a general feel for stakeholder’s needs or
stakeholder-owned requirements; however, it can be challenging to develop a useful survey
or set of questions that provides clear information without the need for follow-on
discussions.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 104

• Site visits. The value of site visits cannot be overstated. Site visits give the project team
first-hand knowledge of the operating environments (Refer to Section 4.3.6.6) and
document the operations from the perspective of the actual users/operators in the actual
operating environment. Site visits allow the project team to make observations concerning
not only the operating environment but also specific actions and human factor
considerations that may be overlooked on not communicated in other elicitation settings.
This is an extremely important consideration when the customer may send a procurement
representative to the elicitation meetings rather than actual users/operators. This often
results in missing needs and the resulting requirements. A system can be delivered and
accepted that passed system verification and system validation against the design input
requirements (system verification) but when put into operations, the system fails to meet its
set of needs in the actual operational environment when operated by the intended users and
does not enable unintended users to negatively impact the intended use of the system
(system validation).
• Models and Diagrams: The old saying “a picture is worth a thousand words” applies.
Sometimes the stakeholders will gain new insights when seeing a model or a diagram.
Upon viewing a model or diagram the stakeholders may identify missing information or
incorrect information. Inconsistency may be more apparent enabling the project team to
collaborate with the stakeholders to resolve those inconsistencies. Refer to Section 4.5.3
for a detailed discussion concerning models and diagrams.
4.3.5 Document Elicitation Outcomes
It is critical that all the information obtained from the elicitation activities be recorded in the
SOI’s integrated dataset. There are various forms and media that can be used to document the
information gained from the elicitation activities. In some cases, e.g., use cases and models,
there is a predefined format defined within the SE tools. In other cases, the information is
captured as text. Below are common forms used.
• Operational scenarios.
• User stories.
• Use cases.
• Diagrams/drawings.
• Models.
• Lists.
• Tables.
• Text.
The medium used is also important. From a data-centric approach to SE as described earlier, this
information must be recorded in the SOI’s integrated dataset such that it can be accessed quickly.
Another important consideration is traceability. The form and medium must support traceability
such that subsequent artifacts can be traced back to this information.
When defining personas/user classes, it is important to record the personas/user classes within
the integrated dataset such that the personas/user classes can be referred to within needs and
requirement statements. One approach is to use include the personas/user classes in the project
data dictionary.
A major benefit of practicing SE from a data-centric perspective is the increased use of models
as analysis tools to both establish traceability between artifacts as well as enable the ability to

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 105

view the information within the SOI’s integrated dataset from different perspectives depending
on the needs of the project team members.
The individual outcomes from the elicitation activities represent the unique perspective of a
stakeholder or group of stakeholders. These perspectives will be analyzed and integrated into an
integrated set of needs. The form used for recording the elicitation outcomes is dependent on the
organization, culture, processes, toolset, and domain.
4.3.5.1 Considerations Concerning the Elicitation Outcomes
There are several key challenges that must be considered when evaluating the information
resulting from the elicitation activities.
• The elicited needs and requirements will frequently include ambiguous terms and phrases
like user friendly, robust, easy to use, works fast, safe, affordable, pleasant, easy to test, cost
effective manufacturing, works just like the last one only better, etc. It is common for
stakeholders to state their needs at a high level of abstraction resulting in ambiguity as to
their exact intent as it applies to the SOI.
For example, the need for the SOI to be “safe” is ambiguous. The project team cannot meet
this need without more detailed information because there are no measures from which to
design or verify or validate against. Therefore, further analysis must occur to define “safe”
in terms the system can be verified and validated against. What hazards and associated
threats could exist that make the system not safe? What level of safety is needed? Which
safety standards and regulations need to be imposed on the SOI, which will result in a “safe”
system?
During elicitation activities, the project team must collaborate with the stakeholders to
remove these ambiguities. What does the stakeholder mean by user friendly, robust, easy to
use, pleasant? With clarification, the project team may be able to meet the intent of each
stakeholder, just not as was originally stated. To remove the ambiguity, the project team may
need multiple cycles of elicitation with the stakeholders to resolve ambiguous statements.
When there is ambiguity, ask “What do you mean by xxxxx” “Please elaborate on what you
mean by xxxxx” “What do you need the SOI to do such that the system is xxxxx?’
Below is a classic example of a need that is not appropriate:
“The marketing stakeholders need the product to perform [in some manner] 10 % better than
the competition, three years from now”. Unless the developers can see into the future, there
is no way they could meet the intent of this need statement. They would have to work with
the marketing department to define needs that are attainable in the present based on an
assessment of the maturity of technologies needed to attain the required level of performance.
• Often stakeholders do not always know what they need nor the specific problem, threat, or
opportunity the project and resulting SOI is intended to address. Therefore, it is critical that
his information is clearly defined and communicated to the stakeholders prior to the
elicitation activities (Refer to Section 4.3.2 and 4.3.3) and then present this information to the
stakeholders at the beginning of the elicitation sessions.
• It is often the case that the stakeholder needs may first be annunciated as “requirements”,
even if not substantiated (lack the necessary analysis) nor having the characteristics of well-
formed requirements as defined in the GtWR. These must be treated as other “needs” and be
subject to the same reconciliation and prioritization as other needs communicated during
elicitation sessions. Failure to reconcile and prioritize all these “needs” incurs technical debt

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 106

and ongoing risk for system development, because any inherent conflict among the needs
will eventually be manifested during lifecycle concept analysis and maturation, recording the
set of needs, or while transforming these needs into a set of design input requirements.
• Stakeholders often state their needs as implementation statements or solutions rather than
address the problem and needs concerning a solution to the problem. The focus should be on
the "what" not "how”. When a stakeholder states a specific implementation or solution, ask
“Why?” and “What does that implementation or solution allow you to do?” A common
approach is to ask “why” multiple times. The answers to the questions will help uncover the
real needs. In addition, avoiding implementation allows the project team to be more
innovative in defining an effective design solution.
• Stakeholders will often address needs and requirements for lower-level system elements that
make up the SOI, rather than focusing on the integrated system. For some it is hard to
address higher levels of abstraction. It is common for engineers to jump to an architectural
and design solution, rather than spend the time to understand the problem. For any given
SOI, have the stakeholders focus on what would be observable externally, rather than diving
into the internal architecture and design of the SOI.
• Stakeholders will often have both explicit AND implicit needs and requirements.
Stakeholders will often focus on functionality, performance, and user interfaces, assuming
everything else will be addressed by the developing project team. The stakeholders assume
the project team knows what they are assuming. The stakeholder’s expectations for their
implicit needs and requirements are often the same as for what they have explicitly stated. If
the implicit needs and requirements are not met, the system may fail system validation, even
though those needs and requirements where not explicitly stated. To avoid this issue, the
project team must ask questions concerning areas of interest not explicitly stated by the
stakeholders. For example, what quality attributes do they need the SOI to have? What
standards or regulations need to be adhered to? What are the drivers and constraints?
• Stories, scenarios, use cases, system concepts, ops concepts, concepts of operation, etc. often
focus on functionality, performance, and interactions with other systems, but are often
incomplete, not addressing other “non-functional” needs and requirements such as
operational needs and requirements, quality (-ilities), design and construction standards,
regulations, and physical characteristics. These other needs and requirements must also be
included - otherwise the integrated set of needs and resulting set of design input requirements
will be incomplete.
• Individual stakeholders often have “blinders on” and only focus on their specific interests
rather than considering the needs of other stakeholders. Their needs and requirements may
unknowingly be inconsistent or conflict with other stakeholders. The conflicts make it
difficult for the project team to satisfy the conflicting needs and requirements without further
clarification and understanding of the rational for each of the conflicting needs and
requirements.
The project team must ask questions to get the stakeholders to consider a system view and
how what one stakeholder thinks could affect other stakeholders. For example, a stakeholder
may demand a need and requirement be met no matter the cost or impact on the system’s
schedule or ability to meet other stakeholder’s needs or requirements. The project team may
have to help the stakeholder rethink and update their needs and requirements.
A key role of the project team is to identify and resolve these inconsistencies and conflicts.
During elicitation, the project team can collaborate with the stakeholders to point out these

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 107

problems and seek a resolution. In Section 4.4, when the preliminary integrated set of
lifecycle concepts are defined, these problems can be flagged and addressed during lifecycle
analysis and maturation activities.
In some cases, the conflicts are mutually exclusive such that the project team will have to
decide on which stakeholder set of needs and requirements to implement. The reason for the
conflict could be that one stakeholder did not understand the MGOs and measures defined by
management or the needs of one of the stakeholders were based upon false assumptions. In
either case, the project team will collaborate with the stakeholders to resolve and get
agreement on how to go forward. Depending on stakeholder rank, one of the stakeholders
may have to rethink and reset their expectations.
Another issue is that the initial stakeholder needs and stakeholder-owned system
requirements may not be realistic nor feasible. Because of this, stakeholder perceptions of
their needs and requirements, no matter the form, should be considered as tentative or
preliminary statements subject to further analysis, refinement, prioritization, and
reconciliation during concept definition and maturation. In these cases, some stakeholder
expectations will have to be changed to what is realistic and feasible given the drivers,
constraints, and risk. Again, depending on rank, some stakeholders may have to rethink and
reset their expectations to what is feasible.
• What defines the SOI is the integrated “set “of needs and resulting “set” of design input
requirements. While individual needs and requirements may be feasible, the combined set of
needs may not be feasible in terms of cost, schedule, technology, and risk. Every stakeholder
need and stakeholder-owned requirement as initially stated may not be able to be satisfied.
In addition, one of the parameters of the triad “faster, better, cheaper” may be out prioritized
by one of the other parameters of the same triad. Because of this, it is important to decide at
the beginning of the project which of the stakeholders has the authority to decide on the
necessity and prioritization of the business operations level and system level stakeholder
needs and stakeholder-owned system requirements. Most often the evaluation will require
analysis of a system in operation or while being maintained, so that the developer, acquirer,
and user can understand the trade-offs available among competing sets of stakeholder needs
and stakeholder-owned system requirements. The project team will use the feasibility,
priority, and criticality assessments to prioritize functions, features, and capabilities to help
ensure that they are truly “required” and necessary for acceptance rather than simply
preferences or “desirements”. The decision authority can then use this information to make
an informed decision. (Refer to Section 4.6.3.4 for a more detailed discussion on needs
feasibility and risk.)
The project team will have to address these challenges and issues. This will involve several
iterations with the stakeholders to resolve the issues and reach agreement. Collaborating with
stakeholders often involves “soft skills” in addition to the “hard skills” used for SE.
4.3.5.3 Elicitation Completeness Checklist
Following the elicitation activities, the project team should ensure:
• All relevant stakeholders have been involved in the elicitation activities.
• Al lifecycle stages have been addressed
• All elicitation outcomes have been accounted for and captured.
• The elicitation outcomes are communicated at the right level of abstraction. Are they an
implementation-free understanding of the needs and requirements by defining what is

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 108

expected (design inputs) without addressing how (design outputs) to satisfy the MGOs and
achieve the defined measures?
• Issues and risk have been recorded and a plan for mitigation has been established.
• Rationale has been captured for each need.
• The priorities and critically of the stakeholder needs and stakeholder-owned requirements
have been established and recorded.
• Any conflicts and inconsistencies have been captured and a plan for resolution developed.
• Ambiguous terms such as user-friendly, easy-to-use, fast, high quality, good tasting,
affordable, robust, etc. have been resolved.
• The feasibility of the recorded outcomes has been assessed and those that are questionable
have been identified for further analysis during lifecycle analysis and maturation activities.
• All interactions with external systems identified during elicitation has been recorded.
• Drivers and constrains from the elicitation activities have been recorded.
4.3.6 Identify Drivers and Constraints
Completeness is a major consideration during Lifecycle Concepts and Needs Definition. During
the elicitation activities, the project team should have recorded drivers and constraints within the
SOI’s integrated dataset. To help ensure completeness, it is helpful for the project team to focus
on identifying drivers and constraints as an additional concurrent activity as described in this
section. In doing so, drivers and constraints not communicated by the stakeholders during
elicitation will be identified, along with identifying the stakeholders associated with those drivers
and constraints that may not have been included previously. Because of this, the elicitation
activities and identification of drivers and constraints activities are complementary.
Drivers and constraints are things outside the project’s control that constrain or drive the solution
space. Compliance is mandatory - failing to show compliance, will result in the system failing
system validation, certification, acceptance, and approval for use. Drivers and constraints
represent a major source of needs and requirements that drive and constrain the lifecycle
concepts analysis and maturation activities as well as the solution space available to the design
team.
Drivers and Constraints can include:
• Design constraints (parts, materials, organizational design best practices, etc.).
• Design standards (industry, domain, business management, business operations).
• Production constraints (existing technology, facilities, equipment, cost, throughput, etc.).
• Human factors (human/machine interface - HMI).
• Regulations (law).
• Operating environment (natural, induced).
• Operating environment (social, cultural).
• Existing systems: (interactions, interfaces, dependencies).
• Technology Maturity.
• Cost.
• Schedule.
• Mission drivers - examples for space missions include launch date, launch vehicle
performance, orbit, destination, duration, logistics, crewed/un-crewed, orbital Mechanics,
etc.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 109

• Higher-level requirements allocated to the SOI. At the system level, these will be business
operations level stakeholder needs and stakeholder-owned system requirements. At lower
levels of the architecture, these will be requirements allocated to the SOI from the level
above.
Concurrently with the stakeholder elicitation activities, drivers and constraints need to be
identified and be recorded within the SOI’s integrated dataset, which could be an exceptionally
large and time-consuming task.
Once a set of feasible system lifecycle concepts have been defined, traceability between the
lifecycle concepts and the drivers and constraints will be established and included within the
integrated set of needs. Once the set of needs has been transformed into the design input
requirements, traceability between the requirements, needs, and drivers and constraints will be
established within the project toolset.
The following sections expand on several key drivers and constraints.
4.3.6.1 Standards and Regulations
Standards and regulations often represent a major source of needs and requirements on a project
the SOI being developed. Because of this, they represent a significant part of the development
cost and schedule. Showing compliance can represent a substantial portion of system
verification and system validation activities, cost, and schedule because the SOI must be verified
to show compliance with the requirements within the standards and regulations and validated to
show the SOI is in compliance with the needs and requirements that invoke the standards and
regulations.
Identifying Relevant Standards and Regulations

Standards and regulations are documents that contain requirements related to:
• regulatory compliance (e.g., medical devices, pharmaceuticals, aviation, consumer
products);
• production processes and workmanship (e.g., soldering, crimping, coding);
• development and management processes (e.g., medical devices, pharmaceuticals, space
systems);
• design approaches of certain types of systems (e.g.., mechanisms, windows, batteries,
petroleum extrication, distribution, and processing, medical devices); or
• specified methods for test, verification, validation, acceptance, certification, and
qualification of certain types of systems (e.g., medical devices, pharmaceuticals safety
critical systems, automotive, human crewed space systems).
Standards and regulations can apply to all levels of the system architecture and lifecycle stages.
In some cases, the standards and regulations are written at the design input level of abstraction,
stating what needs to be done and why, but not how. The how is left up to the design, test, and
manufacturing organizations.
In other cases, the standards and regulations address specific design “how” implementation type
requirements for the design, testing, or manufacturing. There are standards and regulations
governing specific parts and materials used within a system. Compliance with these
requirements will be communicated in the design output specifications. In the medical device
and pharmaceutical world, regulations concerning system validation are of critical importance

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 110

for approval for release for public use (e.g., animal versus human testing, staged approach to
human testing)
Projects must make sure they include all “relevant” industry standards and standards and
regulations mandated by the customer and government regulatory agencies. “Relevant” is
highlighted, in that it is important that the project only address standards and regulations and
portions of those standards and regulations that apply to the SOI under development and to
which the project must comply. A key mistake is invoking a generic list of standards and
regulations on a project without specifically identifying which apply. The project will have to
show compliance through system verification and system validation activities with each
requirement invoked by a standard and regulation - thus only those requirements within
standards and regulations that are relevant to the specific SOI should be invoked by the project to
reduce development time and cost.
Consequences of Failing to Show Compliance
Failing to identify relevant standards and regulations early in the development lifecycle can
result in missing needs and requirements and result in subsequent costly changes. How can the
SOI be expected to meet security or safety needs and requirements if they were not identified and
included in the SOI’s integrated sets of needs and sets of design input requirements? Failing to
show compliance (failed system verification and system validation), will result in the system
failing qualification, certification, and approval for use and being rejected by the customer or
regulatory agency. If this happens, the result will be expensive rework and schedule slips.
In some cases, failing to meet all relevant standards and regulations could lead to bankruptcy.
For example, a concept for a new medical device is defined and the principal project
stakeholders are able to get investors and form a company to mature that concept and build that
device. In this case they must follow the USA’s Food and Drug Administration’s (FDA)
processes for developing and qualifying the device for its intended use as defined in the FDA’s
set of regulations (USA CFR Title 21). Also, assume the intent is to market the medical device
worldwide. This company must identify all the standards and regulations for not only the USA,
but for each country in which they wish to market the device. If they fail to comply with all the
relevant standards and regulations, they will not be allowed to sell their device in the intended
market(s). In many cases, millions of dollars will have been spent getting to the point where all
the paperwork can be submitted to the regulatory agencies. If these agencies fail to approve the
device for use, those millions of dollars could be a jeopardy. Either the company will have to
seek more funding from investors or go bankrupt!
If a project is developing a SOI for an external customer, that customer will frequently specify
which standards and regulations apply, from their perspective. The project will have to include
specific needs and requirements that invoke the requirements in these documents AND will have
to prove, thru system verification and system validation, their SOI is compliant with those
standards and regulations. This compliance will be part of the project’s customer’s or regulatory
qualification and acceptance activities.
Even if not explicitly stated by the customer or other stakeholders, awareness of, researching,
showing compliance the relevant standards and regulations is crucial.
For design and construction standards invoked by a customer or regulatory agency, organizations
may be able to do an “equivalency check”. Rather than meeting the specific customer or
regulatory standard, the supplier may be able to show that their internal design and construction

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 111

standards meet the intent of the customer or regulatory agency and are thus equivalent. This
approach is based on whether the customer or regulatory agency allows an equivalency
assessment - in some cases they may accept a supplier's existing methodology to reduce cost or
schedule. An example of this is use of a European soldering standard on a contract that specifies
a standard released in the United States or the other way around.
For projects responding to a customer contract, specific project requirements for documentation
and contract deliverables concerning compliance with standards and regulations need to be
included in the contract, making these deliverables contractually binding. The SOW should also
make it clear what role the customer will have in the system verification and system validation
activities. In some cases, the supplier is responsible for the verification that the SOI meets the
design input requirements and the associated acceptance artifacts and in other cases the customer
assumes responsibility for validating the SOI meets their needs and the associated the validation
artifacts.
(Refer to Section 6.2.1, Compliance, for a more detailed discussion concerning strategies
concerning implementing requirements contained in standards and regulations.)
Compliance Stakeholders
Often the organization will have an internal “compliance” or “quality” group responsible for
ensuring the relevant standards and regulations are clearly identified and recorded within the
SOI’s integrated dataset. This group will work with the project team throughout the
development lifecycles to help ensure compliance. This compliance group will also interact with
the external regulatory agencies to make sure the intent of the standards and regulations are
being met as well as to ensure the objective evidence needed to show compliance (system
verification and system validation) and obtain certification or qualification and acceptance is
properly recorded in the Approval Packages and submitted to the regulatory agency’s Approving
Authority in accordance with the requirements defined by the agency.
4.3.6.2 Technology Maturity
Technical maturity is a key driver and constraint. The maturity of a technology relates directly
to feasibility. If a need or requirement is dependent upon the maturity of a critical technology,
yet that technology has a low maturity, the feasibility of that need and resulting requirements
represents a project risk.
A common tool used to address technology maturity and associated risk is Technology
Readiness Assessment (TRA) as defined by the US Government Accountability Office (GAO)
[15]
and Technology Readiness Levels (TRLs) which are expressed on a scale of 1 - 9. The lower
the number the less mature the technology is for that specific use and operating environment and
the higher the risk to the project. If a requirement is not feasible, then the risk of failure of the
system to meet that requirement is more likely, and the risk of failing system verification and
system validation is high.
Many technology-dependent projects fail because they did not understand the concept of
technology maturity as it relates to risk and did not understand and plan for the advancement of
the technology maturity in their budget and schedule.
To meet the MGOs and measures, especially a high priority objective or measures, a TRA of the
current maturity level of all critical technology development needs for the project is necessary.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 112

Out of these activities a TRL can be assigned for each critical technology and the project can
develop concepts for maturing the technologies.
Of particular concern are the resources, budget, and time that will be needed to mature the
critical technologies - referred to as the advancement degree of difficulty (AD2). The concept of
AD2 is closely related to the concept of TRLs, with a focus on doing an assessment as to the
degree of difficulty in terms of resources, cost, and time it will take to advance from one TRL to
another. The result of this assessment is communicated in a Technology Maturation Plan (TMP)
which is often a subplan to the project’s SEMP.
Doing the AD2 assessment and developing the TMP is important from a technical risk standpoint
in terms of not only meeting critical performance, quality, safety, and security requirements,
MGOs and measures as well as project risk in terms of cost and schedule. In cases where there
may be more than one candidate effort to mature a technology, the project will need to assess the
AD2 (resources, cost, time, and risk) associated with advancing each candidate technology to the
needed TRL. The result of this assessment may constrain which technology can be considered
for inclusion in the SOI.
Addressing the TRL and AD2 help to ensure that need statements and resulting requirements
have the characteristic C6 - Feasible, and integrated sets of needs and resulting requirements
have the characteristic, C12 - Feasible.
(Refer to Section 4.5.1 for a more detailed discussion on technology maturity and feasibility.)
4.3.6.3 Existing Systems
Another source of drivers and constraints are interfaces with existing external systems. An
interface is a boundary at or across which systems interact. The external systems could be
engineered systems, human systems, or natural systems. Identifying these interactions facilitate
the definition of the SOI’s boundaries and clarifies the dependencies the SOI has on other
systems (enabling systems) and dependencies other systems have on the SOI. Identifying
interactions and interface boundaries also help ensure compatibility between the SOI and those
external systems in which it interacts. Integrating legacy components into new systems is often
overlooked. It forces discussions which lead to understanding the operational needs for new and
existing (if applicable) systems, including System of Systems (if applicable).
Interface Interface
Boundary Boundary

Inputs Inputs
External External
Outputs Outputs
System System

External
Inputs
SOI Inputs
Outputs
External
Outputs
System System

Inputs Inputs
External Users
Outputs
System
Outputs Operators
Interface
Boundary

Outputs

Operating Environment

Figure 4-4: Example Context Diagram, Boundary Diagram, External Interface Diagram.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 113

During elicitation activities the project team begins the identification of external interfaces. To
get a complete understanding of all the interactions between the SOI and external systems, the
project team can develop context diagrams, boundary diagrams, or external interface diagrams as
part of their elicitation activities. An example context/boundary/external interface diagram is
shown in Figure 4-4. Also refer to Section 4.5.3.3 and Section 6.2.3 for additional discussions
concerning the identification of interface boundaries and interactions across those boundaries.
It is helpful to develop these diagrams during the elicitation activities and the development of the
preliminary lifecycle concepts to help establish completeness and to better understand how the
SOI interacts with the other systems that make up the macro system of which it is a part.
Failure to identify all interface boundaries and interactions across those boundaries is a
significant risk to the project, especially during system integration, system verification, system
validation, and operations.
Enabling Systems
An important source of interfaces which must be identified, defined, and managed includes
interactions with enabling systems. Enabling systems are systems external to the SOI needed to
“enable” certain lifecycle activities or enable the SOI to operate. Enabling systems include
lifecycle support systems and services across the SOI lifecycle, e.g., development, production,
integration, system verification, system validation, deployment, training, operations,
maintenance, and disposal. This could consist of laboratories, test equipment, test fixtures,
power supplies, clean rooms, transportation, storage, integration facilities, to name a few.
Other systems internal to a system could also be enabling systems for a given SOI. If someone is
responsible to develop an imaging system for a diagnostic instrument, the structure, power,
cooling, sampling handling mechanism, data collection system are all enabling systems for the
imaging system. If someone is assigned to develop the diagnostic analysis software application,
then the imaging system, microprocessors, operator display and keyboard, and data
communications systems are enabling systems for the software application.
Project responsibility extends to the acquisition of services from the relevant enabling systems in
each lifecycle phase. Because enabling systems are often supplied by other parts of the
organization or external organizations, their use must be included in the project’s budget and
schedule. Acquiring services from enabling systems or having to modify an existing enabling
system can be large budget and schedule drivers. In some cases, the enabling systems may need
to be modified. These changes must be identified early in the project such that the modification
is completed, verified, and validated in time to support the project’s schedule.
The stakeholders that represent the enabling systems must be included in the list of stakeholders
the project elicits needs and requirements from.
Defining Interfaces
Once the interface boundaries have been identified, all the interactions across the interface
boundaries must be defined. In a document-centric practice of SE, these definitions are
commonly recorded in some type of interface definition artifact, e.g., Interface Control
Document (ICD), Data Dictionary, Interface Definition Document (IDD), or Interface
Agreement Document (IAD), or within the SOI’s integrated dataset from which the associated
report may be generated. In a data-centric practice of SE these are often captured in databases
and models.
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 114

All interactions with external systems must be identified in the set of needs and transformed into
functional/performance or operational interface requirements for each interaction and trace to
where that interaction is defined.
A major source of anomalies found during system integration involve interfaces. Failing to
identify interfaces, define interactions across the interface boundary, and failing to include all the
interface requirements in the set of design input requirements and set of design output
specifications represents key risk to successful system integration, system verification, and
system validation activities. (Refer to Section 6.2.3 for a more detailed discussion on interface
definition and defining interface requirements.)
Because of the critically of interactions across interface boundaries, it is extremely important that
the project defines lifecycle concepts for how it will make sure the system will work safely and
securely with all the external systems with which it must interact in the intended operational
environment AND is protected from outside threats across those interfaces.
External Interface Analysis
The project must not only identify and document interface boundaries but assess each interaction
across those boundaries in terms of stability, documentation, threats, and risk. Serious problems
can, and all too often do, arise at the interface boundaries. These problems represent risk to the
project during both development and operations. The SOI is particularly vulnerable when
interacting with external systems over which they may have little or no control. Because of this,
the SOI is at vulnerable to bad things happening at or across the interface boundaries, therefore
identifying interface boundaries and interactions across those boundaries is key to exposing
potential risk.
For each external interface boundary, the following questions should be asked. The resulting
information needs to be assessed concerning each interaction between the SOI and external
systems for each lifecycle stage. Failure to do so adds risk to the project.
• Which external systems are existing versus which are being developed concurrently with
the SOI?
• Who are the stakeholders for the external systems, and have they been involved in the
elicitation activities?
• Have all the specific interactions (inputs and outputs) between the SOI and each external
system been defined?
• From a threat perspective, has risk been assessed concerning bad things that could happen
across this interface in either direction? (Refer to Section 4.5.6)
• Is an existing external system likely to change how it interacts with the SOI across the
interface boundary during the development or after the SOI is in use? How will the project
team know if it does change? How will the proposed changes impact the SOI?
• For existing systems, is the documentation (e.g., Interface Control Documents (ICDs)) that
defines the interface boundary and interactions across that boundary available and current?
If not, how will this information be obtained?
• For new systems being developed concurrently, what is the process to be followed to
document and agree on the specific interactions. Who is responsible for recording the
interactions and getting approval? Who will have configuration control of those
definitions? What is the schedule for doing so?
• For software systems, what standard, application programmer’s interface (API), etc. apply
to the interactions?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 115

For new systems being developed concurrently with the SOI, the definitions concerning the
interactions evolve as the design evolves. At the beginning of the project, the project team will
need to define what is crossing the interface boundary (inputs and outputs) and the characteristics
of what is crossing the boundary. Later, the design team will determine the specific media that
will be involved and the communications protocols and physical characteristics of each system at
the interface boundary.
When this information has not yet been defined, needs and requirements may have To-Be-
Determined (TBDs) as place holders until the information has been defined. As this information
in known, the interface definition documents (ICDs or similar definition document) will need to
be updated.
The evolutionary nature of defining the interactions across interface boundaries must be
addressed in the SOW or SA for systems that are outsourced to a supplier - failure to do so often
results in costly contract changes and issues during integration. Failure to address this issue
adds significant development risk to the project.
See also Section 14.2.8 concerning interface management across the system lifecycle.
4.3.6.4 Higher-Level Lifecycle Concepts, Needs, and Requirements
A major constraint on the project team, as well as the SOI to be developed, are the lifecycle
concepts, needs, and requirements that were defined at the previous level and allocated to the
SOI. During elicitation, the stakeholders representing these higher-level lifecycle concepts,
needs, and requirements will make them known.
When there is a customer/supplier relationship there will be higher-level lifecycle concepts,
needs, and requirements developed by the developing organization as well as those developed by
the customer organization that are allocated to the SOI and shown in Figure 2-5.
As discussed in Section 2.3, both the customer and supplier sets of lifecycle concepts, needs, and
requirements must be assessed for consistency and applicability to the SOI under development.
Some of these lifecycle concepts, needs, and requirements could be on the project team
developing the SOI (e.g., policies, processes, work instructions); lifecycle concepts, needs, and
requirements concerning the SOI; and lifecycle concepts, needs, and requirements dealing with
system verification and system validation.
As part of the stakeholder elicitation activities, stakeholders could have sets of stakeholder-
owned requirements for the SOI in the form of requirement statements “The SOI shall …”.
These stakeholders could be internal to the developing organization, an external customer, or
regulatory agencies. From a user perspective, some requirements may be communicated in
different forms - user stories, use cases, or operational scenarios for example.
For SOIs that are lower in the system architecture there will be requirements allocated from
higher levels of the architecture to the SOI for implementation. Some of these allocations
include budgets for performance and quality. The lower level SOI’s will derive child
requirements from their set of needs and trace to their allocated parents at the previous level.
(Refer to Section 6.4 for a more detailed discussion concerning levels, allocation, and
budgeting.)

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 116

Even though, these higher-level requirements may be written as “shall” statements, they should
only be considered as inputs to the Lifecycle Concepts and Needs Definition activities for that
lower-level SOI. Along with all the other stakeholder needs and stakeholder-owned system
requirements obtained during elicitation, these inputs will have to be assessed in terms of
conflicts, ambiguity, correctness, completeness, and consistency during the lifecycle concept
definition and maturation activities.
Lifecycle concepts concerning the SOI at the previous level, will be elaborated when defining
the lifecycle concepts. The SOI lifecycle concepts must be consistent with the context of the
higher-level lifecycle concepts. For lower level SOIs developed as part of a subcontract with
provided requirements, it important to still ensure the system level elicitation activities occur to
ensure the resultant SOI meets the needs of the stakeholders for its intended use when operated
by the intended users (system validation), and not just meet the requirement statements in the
contract (system verification).
No matter the level the SOI exists, traceability will need to be established to show compliance
with the lifecycle concepts, needs, and requirements that exist at the previous level.
4.3.6.5 Budget and Schedule
Like the old question: “Which came first, the chicken or the egg?”; budgets and schedule are
problematic. It is common for the customer (internal or external) to specify the budget and
schedule at the beginning of the project without sufficient knowledge as to whether their specific
needs and requirements can be met (are feasible) or worse yet, without knowing what the needs
and requirements are. This is often the case for both outsourced systems and internally
developed consumer products. Even though this approach is the most common, it is also a high-
risk approach and a source of many project failures.
Key cost and schedule drivers are system integration, system verification, and system validation.
System verification and system validation costs are a function of the number of needs and
resulting design input requirements as well as the defined system verification and system
validation Strategy and resulting system verification and system validation Method discussed in
Section 10. When the budget and schedule are specified before the customer or operational
stakeholders have the knowledge of how many design input requirements the SOI will be
verified against and needs the SOI will be validated against, there is significant development risk
to the project.
Another cost driver, discussed previously, is the technology maturity of the key technologies
needed to meet the needs and requirements. Specifying a fixed budget and schedule too early,
can constrain the solution space limiting the technologies that can be considered.
Maturing a technology takes time and money. A common complaint made by developers is
when management sets a launch date for a product before feasibility has been determined. When
the budget and schedule are determined prior to establishing feasibility, the development risk is
high.
In other cases, like in some government managed projects, the initial budget and schedule is
notional (ballpark estimate) and the final budget and schedule is set in the time frame of a key
decision point usually in the time frame of the preliminary design review (PDR). At PDR, the
project will have a more mature knowledge of both the number of requirements the system will
be verified against, the number of needs it will be validated against, and the maturity of key

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 117

technologies. With this knowledge, theoretically, the project should be able to estimate
remaining technology maturation, development costs, system integration, and System
verification and system validation costs more accurately.
In either case, budget and schedule will be key measures concerning feasibly during lifecycle
concept analysis and maturation.
4.3.6.6 Operating Environment
System validation helps to ensure that the designed, built, and verified realized system meets its
“intended purpose” in its “operational environment” when operated by the “intended users” and
does not enable unintended users to negatively impact the intended use of the system as defined
by the integrated set of needs.
“Intended purpose” includes the concept of “used as intended” by the intended users.
“Operational environment” includes the concept of “conditions for use”. “Used as intended”
implies the use and operations are understood as well as the operating procedures or instructions
for use (IFU) provided to the users/operators are developed based on this understanding.
Thus, in addition to defining the lifecycle concepts, needs, and requirements; the used as
intended, conditions for use, “personas/user classes” of the intended users, operating procedures,
IFU, and the human/machine interface must clearly be understood and defined.
For example, when developing a semi-truck, when defining the operational environment, the
conditions for use must be made clear. Is the intended purpose to operate the truck in artic
conditions (sub-zero temperatures, snow, and ice)? Or in tropical conditions (high temperatures,
high humidity, and road conditions (dirt or muddy roads))? What skills are needed for the
intended users? What anthropometrics are assumed so the truck can be used as intended by the
intended drivers?
Operational environment involves not only the other parts of the system the SOI must interact
with across the interface boundaries, but also the natural environment (temperature, humidity,
pollutants, etc.) as well as induced environments (temperature, vibrations, mechanical loads,
electrical emissions, acoustics, etc.) from these other systems.
Often overlooked, induced environments also include outputs of the system to the natural
environment which could include pollutants and waste. Pollutants include light, thermal,
chemical, electromagnetic, hazardous materials, biological, or radiation. Requirements
concerning pollutants and waste are usually addressed when defining what the SOI can output
into the natural environment as constraints. These include constraints across all lifecycle stages
including manufacturing and disposal. Often these constraints are included in a standard or
regulation. If a system includes hazardous materials, this could result in the system being
considered hazardous waste when disposed of. For spacecraft landing on a planet, there
planetary protection requirements concerning the contamination of the natural environment by
the spacecraft itself or during operations.
The operating environment may impose constraints that may increase complexity and constrain
the type of components that can be used. For example, additional supervisory systems may need
to be added to constrain a simple system to operate within a set of state boundaries. An extreme
radiation environment will result in the need for the use of “hardened” components as well as
additional shielding resulting in increased mass, extreme operating pressures will result in more
robust physical designs, again adding mass to the SOI.
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 118

The operating environment also has a human element as well. The human element includes
social, cultural, and political considerations as well as the abilities and knowledge of the intended
users/operators. That is a major reason for defining “personas/user classes” so that the intended
users are understood and defined, and the system designed to be used and operated by the people
represented by these personas/user classes.
Human factors concerning the human/machine interfaces as well as the induced environments
caused by the SOI and their impacts on the users and operators must be taken into consideration.
To address these factors, it is common for one of the stakeholders to be a human factors expert
trained and knowledgeable in Human Systems Engineering (HSE) and Human Systems
Integration (HSI). They will be a key stakeholder during elicitation as well as be key
participants in the maturation of the lifecycle concepts and design activities to realize those
concepts. They will also be involved in the system verification and system validation activities
associated with any needs and design input requirements associated with human factors.
An especially important part of the operating environment are the threats that could result in
unintended users negatively impacting the intended use of the system. This includes security
issues that are increasingly of concern in today’s software-intensive systems. These threats
represent significant operational risk to the SOI.
From a needs and design input requirements definition perspective, the operating environment
defines the “under what conditions” part that should be included within needs and requirements
expressions.
4.3.7 Identify, Assess, and Handle Risk
During the elicitation activities discussed earlier, the project team should be recording issues and
risk within the SOI’s integrated dataset. To help ensure completeness, it is helpful for the project
team to focus on issues and risk as an additional activity as described in this section. In doing so,
issues and risk not communicated during elicitation will be identified.
Risks are anything that could prevent the delivery of a winning SOI where “winning” can be
defined as a SOI that delivers what is needed, within budget and schedule, with the needed
quality. Once delivered, risk is anything that could impact the intended use of the SOI in its
intended environment, by its intended users, or anything that would allow unintended users to
prevent the intended use of the SOI or allow unintended users to use the SOI in an unintended
manner, e.g., hack into an aircraft and use the aircraft as a weapon.
As part of the elicitation activities, issues and risk must be identified and assessed. Stakeholders
should be asked specifically about any issues and risk they think could prevent the SOI to be
developed and delivered within budget, schedule, or risk during operations. Failing to address
risk will result in an incomplete set of needs and resulting design input requirements resulting in
a SOI that will fail system validation.
4.3.7.1 Classes of Risk
Classes of risk to be addressed are described briefly in the following sections.
Management Risk
There is project risk that includes risk concerning budget, schedule, resources, and upper-level
management support throughout the system lifecycle. A key risk to projects is a failure to

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 119

include sufficient budget, schedule, and resources needed to support all lifecycle stage activities.
Failure to do so puts the project at risk of cost overruns, schedule delays, and unavailability of
people, facilities, and required resources. To help mitigate these types of risk, it is important for
the project to include sufficient margins and reserves for cost and schedule to address the
unknown, unknowns. To help maintain upper-level management support, the project team must
continue to communicate the value of the project and ROI to upper-level management and
customers throughout the lifecycle.
Development Risk
There is development risk concerning problems that can occur due to a failure to follow PM and
SE lifecycle process activities resulting in work products and artifacts that are not complete,
correct, consistent, and feasible.
Development risk also applies to performance and quality based on the maturity of critical
technologies. If the TRL associated with the technologies needed to meet critical or high priority
requirements is low, those requirements are high risk and must be managed closely as discussed
in Section 4.3.6.2.
Performing TRAs [15], establishing the TRLs, doing AD2 assessments, and developing TMPs are
key tools to identify and manage technology maturation risk. Basing the success of a project on
low TRL technologies results in lifecycle concepts, needs, and requirements that are not feasible.
Consequently, the SOI may fail system validation.
Defective integrated sets of needs and the resulting design input requirements are also
development risk factors. [45] To help reduce development risk, the project must avoid technical
debt and focus on establishing consistency, correctness, completeness, and feasibly early in the
development lifecycle.
The lifecycle concepts analysis and maturation activities will inform (feedback) the identification
of additional development risk based on the knowledge gained during the lifecycle concept
analysis and maturation activities.
A lack of traceability across the lifecycle is a major risk in that a failure to do so results in
inconsistencies in work products and a lack of capability to do effective change assessment cross
the lifecycle.
Assessing development risks helps to ensure that need statements and resulting requirements
have the characteristic C6 - Feasible, and integrated sets of needs and resulting requirements
have the characteristic, C12 - Feasible.
Production Risk
A common problem is for the project team to fail to consider the needs and requirements for
production. To address this problem, representatives from the production organization must be
included as part of the project team from the beginning of the project.
The role of production is to transform the design output specifications into the physical SOI.
There are production risk concerning the technologies needed to produce the SOI, facilities, and
equipment. While it is lower risk when the SOI can be produced using the existing production
capabilities, there is higher risk when new technologies are needed, and modifications need to be
made to the existing production capabilities in terms of cost, schedule, and resources.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 120

In addition, there is risk concerning problems that may occur during the actual build/coding of
the system. Scalability is often an issue. Building one copy of a system in a lab is a lot different
than when manufacturing is turning out hundreds or thousands of copies.
Addressing quality and production verification during production presents unique issues that
may drive the need for requirements concerning test points or inspection points for components,
subassemblies, assemblies, and subsystems that are only used during production, system
verification, and system validation but not used, nor accessible, once the SOI has been integrated
into the macro system it is a part or during operations. These test points are used by quality
personnel during production verification to help ensure the system was “built to spec” (meets the
design output specifications) and the expected yield is achieved, where “yield” is defined as the
percent of copies of a SOI that pass production verification.
The data from the test points may also be used as part of design testing and maturation, during
design verification and design validation, and maintenance activities during operations.
System Integration, System Verification, and System Validation Risk
A major risk faced by many programs and projects is a failure to address or to underestimate
what it will take (resources, cost, and schedule) to successfully complete system integration,
system verification, and system validation activities with the required level of confidence.
The authors have seen many cases where a project will allocate only 20%-30% of their budget
and schedule to system integration, system verification, and system validation activities.
Experience has shown that these projects are most likely going to fail to deliver a winning
product.
Assuming an organization follows good SE practices, such as those defined in this Manual, and
develops well-formed integrated sets of needs, sets of design input requirements, and sets of
design output specifications; lessons learned have shown that at least 50% of the project’s
development budget and schedule need to be allocated to system integration, system verification,
and system validation activities. If the organization fails to follow good SE practices and if the
quality of the integrated sets of needs, sets of design input requirements, and sets of design
output specifications is poor, this percentage could be even greater - primarily due to rework.
Approaches to mitigate risk for these activities include developing concepts for system
integration, system verification, and system validation early in the development lifecycle,
implementing these concepts in the project’s system integration, system verification, and system
validation plans, documenting well-formed sets of needs and sets of design input requirements,
defining system verification and system validation attributes for each need and design input
requirement, performing design verification and design validation prior to production, and then
performing production verification on each system, subsystem, and system element prior to
integration into the next higher level of the physical architecture.
Given a key part of integration across the system lifecycle involves interface boundaries and
interactions across those boundaries, special attention must be made to identifying all interface
boundaries (external and internal), defining the interactions across the interface boundaries, and
ensuring the design input requirements include interface requirements addressing all interactions
across the SOI interface boundaries.
As advocated in this Manual, system integration, system verification, and system validation
should be practices continuously across the lifecycle. With the increased use of language-based
models and the ability to run simulations of the modeled system projects have the capability to

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 121

do early system verification and system validation activities before the system is built or coded.
As a result, issues are identified and corrected before the system is built or coded, significantly
reducing the risk of issues found during system integration, system verification, and system
validation.
Compliance Risk
As discussed previously, failing to show compliance with standards and regulations is a major
source of risk for a project.
For example, the FDA publishes findings concerning their audits. Unfortunately, it is common
for organizations to fail to receive approval to market their medical devices due to
noncompliance. For example, in 2017, The Most Common FDA Audit Findings From 2017 [14]
“Last year FDA conducted 17,487 audits worldwide, and issued 5045 FDA 483s (letter of non-
compliance with FDA regulatory requirements), meaning that about 30% of the audits lead to
non-compliance in more than one regulated area. There were 498 Warning Letters issued during
the same time showing that 1 in 10 audits found repeat violations that required more serious
enforcement action by FDA. SOP and documentation deficiencies were the dominant findings in
FDA audits for almost all areas of compliance. Poor Corrective and Preventive Action (CAPA)
practices and inadequate complaint handling was found at more than half of the non-compliant
medical device manufacturing facilities. Overall, the medical device manufacturing facilities
had almost double the number of 483s issued compared to drug manufacturing sites, while
biologics had the least number of 483s. More than half of the non-complaint clinical trial sites
had Principal Investigators who did not follow the written protocol, followed by poor patient
records and source documents”.
What if an organization is developing a space system that will include humans? What are the
licensing requirements for commercial space vehicles? US Department of Defense (DOD)
controlled space systems? US National Aerospace and Aeronautics Administration (NASA)
controlled space systems? What requirements will NASA place on the system to be human
rated? What extra testing and reviews will be required before humans are allowed to fly in, live
in, work in, and interact with the space system? What US Department of Energy (DOE)
requirements will the project have to meet if the space system includes radioactive materials? As
for medical devices, there are standards and regulations for both the process and the project as
well as standards and regulations for the space system itself. All the requirements in these
standards and regulations relevant to the project and system must be complied with before the
system will be approved for use.
What if an organization is developing a space system that will land on the surface of a planet,
asteroid, or moon? If a NASA project, the project will have planetary protection requirements
they must meet and be in compliance. Both NASA and commercial projects also need to address
requirements in the International Space Treaty.
Some systems/systems may require outside experts for certification. Does the system require an
Underwriters’ Laboratories (UL) certification? Or the system includes a pressure vessel that
requires an American Society of Mechanical Engineers (ASME) Class 1 Certification?
To avoid risk associated with non-compliance, even if not explicitly stated by the customers or
other stakeholders, be aware of and research all the possible relevant standards and regulations in
the domain of the SOI. Compliance is expected and failure to address relevant standards and
regulations can result in failure during system verification and system validation and system

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 122

rejection by the customers or regulating agencies even if they did not explicitly identify the
relevant standards and regulations to which the project must comply.
Operational Risk
There are operational risks involved in the performance of the system for its intended use by the
intended users/operators in its operational environment. A failure to address operational risk
during need definition activities can result in failures during system validation. When doing
system validation, it is important to focus on the intended use in the operational environment by
the intended users/operators as defined in use cases, user stories, operational concepts, and site
visits.
Off-nominal performance, inputs, outputs, failures, and unexpected changes in the operating
environment represent significant risk during operations. Is the system agile, robust, or resilient
enough to cope with unexpected changes to inputs or the environment? Is the system robust
enough to still function when anomalies occur?
Of particular concern during operation are the threats that could result in unintended users to
negatively impact the intended use of the system. This includes security issues that are
increasingly of concern in today’s software-intensive systems. Is the system resilient enough to
detect, protect, and recover from outside attacks?
These are all issues the stakeholders will have expectations for - even if not explicitly stated.
The challenge is to address these off-nominal inputs, outputs, failures, threats, and unexpected
changes in the operating environment during lifecycle concept and needs definition.
Again, sufficient performance margins, especially safety margins, need to be included in the both
the values in the design input requirements as well as the implementing design. Failure to do so
could result in the system failing system validation, qualification, certification, acceptance for
use, or fail during operations. (Refer to Section 6.4 for a more detailed discussion margins and
reserves to mitigate risk.)
For highly regulated systems like medical devices, risk management is a major design control
process that is key to a medical device being approved for use. This process is defined in ISO
14971:2019 Application of Risk Management for Medical Devices. The standard emphasizes the
need to practice risk management across the system lifecycle. Of particular concern is risk
associated with operations once a medical device is approved for use, by the intended users, in
the operational environment and the prevention of unintended use of the medical device or
untended users using a medical device in unintended ways or preventing the intended use of the
medical device. While the focus is on medical devices, the guidance within this standard can be
applied to all systems and products.
4.3.7.2 Risk Assessment and Handling
The project must do a risk assessment of each of the classes of risk discussed above. For eacb
class of risk, the identified risks need to be recorded within the SOI’s integrated dataset and
handled (accepted, monitored, researched, or mitigated) during the system lifecycle concepts
analysis and maturation activities.
Even though the INCOSE SE HB has a separate Risk Management Process for risk management,
risk assessment and handling are critical crosscutting activities that occur concurrently with the
Lifecycle Concepts and Needs Definition activities as well as across all other lifecycle activities.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 123

Risk Assessment

Risk assessment involves the evaluation, analysis, and estimation or quantification (likelihood
versus consequence) for each identified risk. Key questions that should be addressed as part of
risk analysis. These include:
• What is the likelihood of this risk occurring?
• What are the consequences if this risk does occur?
• How soon do we need to act on this risk?
• How does this risk compare with other similar risk?
• Do we know enough to quantify the risk and determine the urgency to act?
Combining the likelihood with the consequence results in a quantification of each risk.
Assessing the timeframe for action helps establish a degree of urgency for handling the risk and
effective communication of the risk and how the risk is to be handled.
Risk assessment may also be objectively addressed by defining the cost liability of the risk. A
failure which is determined to occur at a probabilistic rate and have a probabilistic severity in
cost may be viewed as that risk having a cost rate. The design result should have an acceptable
risk cost rate. With this perspective, a major issue is who determines what is “acceptable”.
Some stakeholder is going to pay the cost when the risk in realized. Ultimately the system owner
will be liable for the direct cost and may choose to purchase a third parties commitment to cover
the cost liability (warranty or insurance). For some systems, the severity, no matter the cost rate,
will be unacceptable to the stakeholders and the design will need to reduce the severity, no
matter the likelihood, to a cost rate that is acceptable to the stakeholders. This is especially true
when the cost is measured in terms of human life or destruction of the ecosystem.
Risk Handling
Risk handling includes planning, tracking, and controlling across the lifecycle. The first thing
that should be considered is the project’s response to a risk: accept, research, monitor, or
mitigate. Credible rationale and criteria used to make the decision for a given response must be
clearly defined.
Due to a variety of reasons such as low likelihood, marginal or negligible consequence, politics,
culture, or cost, the project may choose to accept the risk, i.e., do nothing. In other cases, the
risk is not well understood, and urgency has not been established so the project may want to do
more research and analysis and collect additional data before deciding on a response. Or the
project may choose to accept yet monitor a given risk. In this case, they recognize there is a risk,
understand the risk, but there is no urgency in a response. Because they do recognize the risk,
they will track, survey, or monitor trends and behavior of risk indicators over time. Based on
this information, they reserve the right to change their response to the risk.
4.3.7.3 Risk Mitigation
For a risk with higher likelihood and more severe consequences where a degree of urgency has
been established, the project will choose to mitigate the risk. Key considerations for mitigation
include how a hazard or associated threat could be eliminated, the likelihood reduced, and/or the
severity of the impacts/consequences be reduced.
The result is a set of mitigation actions that will be determined, evaluated, approved, and
implemented. Implementation includes developing plans and policies and assigning

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 124

responsibility for managing implementation of those plans and policies and expectations for
those that must implement and follow those plans and policies.
When the risk mitigation involves the SOI under development, how the project team plans to
mitigate the risk must be included in the lifecycle concepts analysis and maturation activities and
reflected in the resulting set of needs and set of design input requirements. It is also critical that
complete traceability is established for all artifacts associated with mitigating the risk: the risk,
lifecycle concepts to mitigate the risk, resulting need statements, design input requirements,
design, design output specifications, system verification, and system validation. This traceability
is needed not only for tracking but also as part of managing changes throughout the development
lifecycle. Needs and requirements whose focus is on risk mitigation will normally have both the
priority and critically attributes defined as well as the attribute that addresses the fact that the
need or requirement is associated with risk mitigation. (Refer to Section 15 for a more detailed
discussion on the use of attributes.
When risk mitigation involves the user/operators, the risk mitigation activities are often
addressed in both the training and certification of the users/operators as well as the “instructions
for use” or operating procedures and checklists.
4.3.7.4 Use of Margins and Reserves to Mitigate Risk
For management risk, development risk, and operations risk, margins and reserves are common
approaches to mitigating the risk. [53] When the ability to meet performance requirements that
are based on new or developing technologies (low TRL) there is a risk that the required
performance will not be able to be achieved. Rather than to communicate needs and design input
requirements based on theoretical projections of performance of unproven technologies (low
TRL), include sufficient margins in the budget, schedule, needs, requirements, and design to
address these types of risk and the unknown, unknowns. Failure to do so could result in the
system failing system verification and system validation, qualification, and acceptance for use.
(Refer to Section 6.4 for a more detailed discussion on the use of margins and reserves to
manage risk.)
For example, if the theoretical or overly optimistic conversion of sunlight to electricity efficiency
is zz%, write the needs and design input requirements for a lower value that is more likely to be
achieved given the maturity of the needed technologies at that time.
Note: Risk identification, assessment, and handling are continuous activities that occur over the
life of the SOI. Known risks are periodically re-assessed in terms of likelihood, consequences,
and urgency. If a project is doing risk management properly, project team members should be
able to list the top ten risks being mitigated from memory. If not, risk mitigation may not be
happening within the project.

4.4 Capture Preliminary Integrated Set of Lifecycle Concepts


The results of the proceeding activities are integrated into a set of preliminary set of lifecycle
concepts and supporting data. The set of lifecycle concepts can include concepts for acquisition,
development, design, verification, validation, operations, deployment, support, and retirement
concepts. These preliminary set of lifecycle concepts and supporting data and information are
inputs into the lifecycle concept analysis and maturation activities. These are preliminary in the
sense the detailed analysis concerning feasibility, completeness, consistency, and correctness has

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 125

not yet been completed. The specific lifecycle concepts used depend on the organization, its
product lines, processes, and culture.

Stakeholder (S)/ L1 L2 L3 L4 L5
Lifecycle (L)
S1 X X X
S2 X X
S3 X X X
S4 X X X
S5 X X X
Combined XXX XXX XXX XXX XXX

Table 4-4: Preliminary Integrated Set of Lifecycle Concepts.

As shown in Table 4-4, out of the elicitation effort will be a preliminary integrated set of
lifecycle concepts which will drive the lifecycle concepts analysis and maturation activities
discussed in Section 4.5. Each column of the table represents an SOI lifecycle stage. Each row
represents an operational scenario, concept, or use case for a specific stakeholder (or group of
stakeholders) for the lifecycle stages that stakeholder has a stake or involvement.
The task of the project team is to combine the various operational scenarios, concepts, and use
cases into an integrated set of operational scenarios, concepts, or use cases for each lifecycle
stage. This task can be challenging in that each stakeholder or stakeholder group may have a
different perspective based on their role, unique needs, experience, and political environments
both internal and external to the organization.
The project team will need to validate stakeholder assumptions, as well as make tradeoffs to
prioritize, deconflict, and ensure the integrated set of stakeholder inputs (needs and stakeholder-
owned requirements) are truly “required” and necessary for acceptance rather than simply
preferences or desirability. There will be conflicts and inconsistencies that may have not yet
been resolved as part of the elicitation activities. These issues must either be resolved or at least
identified for future work “To be Resolved (TBR)” during the lifecycle concepts analysis and
maturation activities.
An analysis of the various sets of stakeholder needs and stakeholder-owned system requirements
for a given lifecycle stage along with the MGOs and measures allows the project team to identify
the features, capabilities, functions, performance, quality, and compliance needed and expected
by the stakeholders as well as interactions (interfaces) between the SOI and external systems.
This information will be used to help analyze and mature the preliminary set of lifecycle
concepts.
The knowledge gained from this information will be used by those on the project team who
participate in developing functional architectural and analytical/behavioral models. This
modeling effort will be a major activity of the lifecycle concepts analysis and maturation
activities discussed in Section 4.5.
A major part of recording the preliminary lifecycle concepts is for the project team to identify
processes, process activities, enabling systems, enabling organizations, facilities, and resources
needed as part of the SOI development effort across all lifecycle stages.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 126

The following sections include several topics and activities that should be considered when
defining the preliminary set of lifecycle concepts.
4.4.1 Perspectives
Lifecycle concepts can and are developed from several perspectives. This information is often
recorded in various documents and plans. It is important that the project team addresses each of
these perspectives rather than just focusing on a single perspective.
There is a management perspective addressing how the project will conduct PM and SE to
develop the SOI across all lifecycles. The focus in on PM concepts, needs, and requirements.
Of particular importance is the project’s concepts for development, manufacturing, system
integration, system verification, and system validation; what will be done in-house and what will
be contracted out to a supplier. The project team will need to decide who will be responsible for
system integration, system verification, and system validation. This information is needed to
plan the project, define a WBS and PBS, develop schedules and budgets, and develop contracts.
The management perspective is commonly documented in a PMP, SEMP, and other supporting
plans. If the parts of the development of the SOI will be contracted out to an external
organization, the customer will reflect this information in a SOW or SA in accordance with their
acquisition concepts and plans.
Higher level business operations concepts, needs and requirements are documented at the
business operations layer shown in Figure 2-1. Their focus often concerns branding, market
share, business level standards, costs, and schedules. For example, how a product relates to the
completion, cost per unit to manufacture, and other products developed by the enterprise e.g., the
business operations stakeholders need the SOI to have a production cost of less than $xx and a
yield of xx%. Applicable business operations concepts, needs, and requirements will be
allocated to the SOI and the project team.
The project team therefore needs to work with the business operations stakeholders to understand
their lifecycle concepts, needs, and requirements and how each will be complied with.
There is an operational perspective addressing how the stakeholders view the SOI in terms of
how they will interact (interface) with the SOI during the various SOI lifecycle activities. The
operational perspective also addresses how the SOI will interact within its operational
environment during operations as well as interact with the external systems that makeup the
macrosystem of which the SOI is a part. The operation perspective is historically recorded in an
Operations Concept (OpsCon) or similar form.
SOI operational lifecycle concepts and needs are communicated at a lower level of abstraction
needed to address the higher-level business operations concepts, needs, and requirements. The
SOI integrated set of needs is from this operational perspective. Once the SOI is built or coded
the OpsCon is a source of operations procedures, instructions for use, system validation
procedures, and work instructions.
There is a system perspective that addresses the SOI’s expected capabilities, functionality,
performance, quality, interfaces, compliance with standards and regulations, architecture, and
physical characteristics. This is a technical view of the SOI whose lifecycle concepts are
historically recorded in a ConOps or similar form. Once the SOI lifecycle concepts have been
matured, they are then implemented via the design input requirements. The system perspective
is used as part of the transformation of the integrated set of needs into the set of design input
requirements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 127

SOI lifecycle concepts, needs, and design input requirements for the system, subsystems, and
system elements are recorded at the system, subsystem, and system element layers shown in
Figure 2-1: The focus is on the SOI and how the SOI will support the operational concepts,
needs, and requirements recorded in the business operations level OpsCon.
Each of the above perspectives are equally important as each is a source of needs and the
resulting design input requirements. Assuming all the relevant stakeholders were identified and
involved in the elicitation activities, each of these perspectives will have been addressed. To
help ensure consistency, correctness, and completeness all three perspectives must be considered
as part of the lifecycle concept analysis and maturation activities.
Gathering this information helps ensure the project team has the knowledge to define a
preliminary set of lifecycle concepts on which they will the perform the necessary analysis to
mature the lifecycle concepts to a level of maturity such that a complete, consistent, correct, and
feasible integrated set of needs can be defined.
4.4.2 ConOps versus OpsCon
Historically, many projects document the preliminary lifecycle concepts in a ConOps or OpsCon
type document as discussed above. Unfortunately, the terms ConOps and OpsCon are often used
interchangeability, even though each of their perspectives is different. This can result in
confusion.
To avoid this confusion, one approach is to avoid these terms and develop a set of lifecycle
concepts that represents all perspectives and document them in a “Systems Concepts” (SysCon)
type of document or electronic equivalent. When doing this, it is advisable to separate each
perspective in separate parts of the SysCon.
Standards concerning the development of ConOps and OpsCon documents include IEEE Std
1362-1998 “IEEE Guide for Information Technology—System Definition—Concept of
Operations (ConOps) Document”, ISO/IEC/IEEE 29148 “Systems and software engineering.
Lifecycle processes. Requirements engineering”, and ANSI/AIAA G-043A-2012 “Guide to the
Preparation of Operational Concept Documents”. NASA’s Procedural Requirements document,
NPR 7123.1B, "NASA Systems Engineering Processes and Requirements" includes a discussion
and definitions of ConOps and OpsCon are closely aligned with G-043A.
The INCOSE SE HB provides specific definitions of ConOps versus OpsCon based on
ISO/IEC/IEEE 29148.
Note: These standards were developed from a document-centric perspective rather than a data-
centric perspective. For a data-centric perspective, the information in the ConOps, OpsCon, or
SysCon should be recorded within the SOI’s integrated dataset in a form that allows traceability
to specific data and information items. Once feasible lifecycle concepts have been defined,
traceability between the lifecycle concepts and the resulting integrated set of needs can be
established.
4.4.3 Get Stakeholder Agreement
At this stage of Lifecycle Concepts and Needs Definition, the preliminary lifecycle concepts and
supporting information representing each of the above perspectives must be presented to the
stakeholders in a form suitable for review and feedback.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 128

After the elicitation activities and the integration of the results, it is common to revisit the
original problem statement, higher-level lifecycle concepts, needs, and requirements and make
modifications as needed based on the latest information and knowledge gained up to this point.
After the lifecycle concept analysis and maturation activities defined in Section 4.5, the higher-
level lifecycle concepts, needs, and requirements may need to be revised again especially from a
feasibility standpoint.
Defining a set of lifecycle concepts requires the integration of several disparate views, which
may not necessarily be harmonious. It is critical that the project team has confirmation from the
stakeholders that they understand and agree with the problem statement, MGOs, measures,
higher-level lifecycle concepts, needs, requirements, and risk as currently recorded within the
SOI’s integrated dataset. This is especially true concerning how the project team dealt with, and
resolved inconsistencies, disagreements, ambiguity, and feasibility issues during stakeholder
elicitation result integration activities shown in Table 4-4.
To get this confirmation and agreement, the project team must provide this information to the
higher-level organization stakeholders and SOI level stakeholders for their review and comment
before proceeding with the lifecycle concepts analysis and maturation activities defined in the
Section 4.5.
This activity is critical to ensuring the resulting individual needs have the GtWR characteristics
C1 – Necessary, C3 – Unambiguous, C4 – Complete, and C8 – Correct and sets of needs have
the GtWR characteristics C10 – Complete, C11 – Consistent, C13 – Comprehensible, and C14
Able to be Validated.
Note: In the past using a document-based approach, it was common for organizations to
baseline the set of lifecycle concepts in a OpsCon/ConOps type document as part of defining the
“scope” of the project and then develop a set of design input requirements directly from the
preliminary lifecycle concepts as shown by the red lines in Figure 4-2b.
Lifecycle concept analysis and maturation as defined in the next section was then performed
under the heading “requirements analysis” used to define the set of design input requirements or
in the case where the customer provided a set of design input requirements to a supplier,
“requirements analysis” was a supplier activity to ensure they understand the customer-owned
system requirements as well as part of the architectural definition and Design Definition
Processes..
This approach is common for SOIs that will be outsourced to a supplier where the supplier is
given the set of design input requirements as part of the contract without the underlying analysis
from which the requirements were derived.
Using this approach, the set of needs may or may not be recorded within the SOI’s integrated
dataset, and thus system validation would be loosely defined if at all. Also, with this approach,
feasibility of the preliminary lifecycle concepts and resulting design input requirements may not
have been established resulting in increased technical debt and risk for the project.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 129

4.5 Lifecycle Concepts Analysis and Maturation


The activities in the previous sections resulted in a preliminary set of lifecycle concepts and
inputs to those concepts shown in Figure 4-5. These preliminary lifecycle concepts have
provided a broad description of system behavior which is a starting point for lifecycle concept
analysis and maturation activities.

y Problem/ Initial Set of Stakeholder’s Needs


identif Opportunity
Stakeholders Feed Into the Lifecycle Concept
Analysis & Maturation Activities

Addressed
Express

De

By
fin
e

Iterate Stakeholder Iterate Mission Traceability is


real-world Goals,
expectations Objectives critical to managing
relationships
In
fo
Dri
By ed
rm
Inform

ve
aliz
Risks Miti
Re

gate
Infor d by Needs
m
Lifecycle Analysis
Regulations Constrain Concepts Transformed Integrated set of
& Standards Analysis & into Needs
Iterate Maturation Co
nst
rai
train Co n
Higher Cons ns
Level tra Technology
in

in
Con
tra

Needs
n
strai
ns

stra
Co

Con

Cost &
in

Higher Schedule
Level Higher
Concepts Level Existing
Rqmts Systems

Figure 4-5: Inputs to the Lifecycle Concepts Analysis and Maturation Activities.
As a result of lifecycle concept analysis and maturation activities discussed in this section,
functional architectural and analytical/behavioral models are developed or expanded, and a
preliminary physical architecture defined. Based on the resulting information, the preliminary
set of lifecycle concepts are transformed into a mature set of lifecycle concepts that are
consistent, correct, complete, and feasible. These concepts are then transformed via analysis into
the integrated set of needs.
Note: The use of “logical” can be confusing: “logical model” or “logical architecture”? To
avoid ambiguity, at this stage of development and level of abstraction, this Manual uses
“analytical/behavioral model” when referring to language-based models that contain logic
(XOR, AND, OR, IF, WHEN) to show the flow of information, triggers for functions, and assess
behavior common to language-based model development. When referring to diagrams showing
functions, and basic inputs/outputs for those functions, “functional model” is used. When
referring architecture views of the SOI, “functional architecture”, “functional architecture
model”, or “physical architecture” are used. Models are analysis tools used to help develop
and define the set of needs, set of design input requirements, and physical architecture, which is
communicated to the builders/coders via a set of design output specifications. The result is the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 130

actual SOI which goes through system integration, system verification, system validation and is
accepted and delivered to the customer.
This activity is critical to ensuring the resulting needs and sets of needs have the GtWR
characteristics C1 - Necessary, C4 - Complete, C6 - Feasible, C8 – Correct, and C11 -
Consistent.
The following sections include topics and activities that should be considered during lifecycle
concepts analysis and maturation.
4.5.1 Feasibility
As discussed in the GtWR, well-formed need statements and resulting requirements have the
characteristic C6 - Feasible, and integrated sets of needs and resulting requirements have the
characteristic, C12 - Feasible. A set of feasible lifecycle concepts are key to having an
integrated set of needs that are feasible.
Addressing feasibility during lifecycle analysis and maturation activities is critical to being able
to ensure the individual need statements and integrated set of needs are feasible. A key
expectation at the gate review to baseline the integrated set of needs for a SOI and resulting set
of design input requirements is that there is at least one feasible design concept and physical
architecture defined from which the integrated set of needs were defined. Failing to establish
feasibility before defining an integrated set of needs and transforming them into a set of design
input requirements for a SOI result in a significant amount of technical debt.
Feasibility takes into consideration key drivers and constraints including cost, schedule,
technical, legal, ethical, and safety with acceptable risk for this lifecycle stage. An SOI may not
be feasible [5] if, to meet the MGOs and measures
• it needs to break the laws of physics (cannot be done);
• its existence or use violates laws or regulations in an applicable jurisdiction;
• it leads to excessive program risk because of technical immaturity or inadequate margin
with respect to program cost and schedule as a function of lifecycle phase;
• its existence or use violates social norms in terms of harm to humanity or the environment;
and
• its use represents an unacceptable safety risk to the users, operators, or public at large.
Because technology is related to subsystems and system elements that make up system physical
architecture (rather than the functional architecture or analytical/behavioral model of the
integrated system), the project team responsible for design will need to be involved in the TRA
and assign TRLs to parts of the system physical architecture associated with a critical technology
needed to achieve a specific capability and associated performance. To do this, the functional
architecture model will need to be mapped to the physical architecture prior to defining the
integrated set of needs. This mapping must be done as part of the lifecycle concept analysis and
maturation activities. Without this knowledge, the feasibility of the resulting needs and
requirements will be uncertain, adding technical risk to the project.
To establish feasibility, the project team must do the analysis and activities needed that will
result in defining a feasible set of lifecycle concepts and a preliminary physical architecture that
will meet the MGOs and measures that represent the higher-level stakeholder needs and
stakeholder-owned system requirements within the defined drivers and constraints with
acceptable risk. Maturing the lifecycle concepts and defining a preliminary physical

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 131

architecture helps ensure the project team has addressed completeness, correctness, consistency,
and feasibility prior to baselining the integrated set of needs.
Note: In this Manual “physical architecture” refers to the physical subsystems and system
elements included within the physical integrated system architecture including electrical,
hardware, chemical, mechanical, firmware, and software elements. It is the physical subsystems
and system elements that will be procured, built, coded, integrated, verified, validated, delivered.
4.5.2 Design as Part of the Lifecycle Analysis and Maturation Activities
It is a myth that design activities do not start until after the integrated set of needs and set of
design input requirements are baselined. Feasibility is an attribute of the physical architecture
dependent on the maturity of key technologies. To establish feasibility the project team must
define and mature a design concept and physical architecture concurrently with the maturation of
the lifecycle concepts and associated artifacts.
Lessons learned indicate that preliminary design work during lifecycle analysis and maturation
activities can identify critical issues that are difficult to determine until a physical design concept
and architecture is of sufficient maturity to evaluate a more complete set of development,
verification, validation, operations, sustaining engineering, and disposal considerations. It is
well known that the costs to fix errors increase exponentially as the project matures, therefore
addressing physical design and architecture considerations early is a best practice to mitigate the
risk of expensive and time-consuming rework costs and accumulating excessive amounts of
technical debt.
As shown in Figure 2-13, lifecycle concept analysis and maturation, needs definition, functional
and physical architecture maturation, analytical/behavioral model maturation, design input
requirements definition, and design verification and design validation occur concurrently during
the concept, design, and development phases of the system lifecycle. Conducting these
activities concurrently are critical to ensure the mature set of lifecycle concepts and resulting
integrated set of needs is consistent, correct, complete, and feasible.
Using the knowledge gained from prototypes, models, and trade studies, a feasible design
concept and preliminary physical architecture can be developed to allow a more complete
understanding of both the programmatic and SE implications, development challenges, costs,
schedules, and risk.
The preliminary design work at this stage enables validation of the preliminary integrated set of
needs and set of design input requirements, providing analysis to determine whether something is
missing or not needed. This validation is a key part in assessing completeness, correctness,
consistency, and feasibility of the preliminary physical architecture and lifecycle concepts.
From a PM perspective, the development of a preliminary physical architecture enables the
project team to define a PBS which, in turn, results more credible cost and schedule estimates
and the ability to track and manage development or acquisition of the subsystems and system
elements reflected within the PBS.
4.5.3 Use of Diagrams and Models for Analysis
A key part of the analysis needed to mature the lifecycle concepts is the use of diagrams and
models that are developed within project toolset.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 132

Models and diagrams are visualizations of the underlying data and information model of the SOI
and the SE processes. As such they represent the underlying analysis from which the set of
needs is derived. Further elaboration of these models and diagrams are then used for the analysis
needed to transform the set of needs into the set of design input requirements.
These models can be refined as the physical architecture is defined and used to help define
lifecycle concepts, needs, and requirements for the subsystems and system elements that are
included within the system physical architecture. In doing so, the models are key to establishing
traceability and supporting allocation and budgeting. These models are also key in identifying
interactions (interfaces) between parts of the physical architecture as well as interactions between
the SOI and external systems and the operational environment.
Analysis using models and diagrams enables the project team to demonstrate the set of needs, set
of design input requirements, and the set of design output specifications are necessary, sufficient,
and feasible [5] to satisfy the lifecycle concepts, needs and requirements prior to baselining.
Without this underlying analysis, needs elicitation is “open-loop”, with limited methods to
validate that the proposed integrated set of needs will satisfy the lifecycle concepts, needs and
requirements.
Without this underlying analysis from which the integrated set of needs are derived, all too often
actual “validation” of the needs will only happen late in the development lifecycle during system
verification and system validation, even if the stakeholders said they were satisfied with the
baselined set of needs, set of design input requirements, and set of design output specifications.
As a result, the delivered SOI will often fail to meet its intended use when operated in the actual
operational environment by the intended users (fail system validation.)
From a holistic, integrated view discussed in Section 2, the project team must develop an
integrated system model from the beginning of the project. This integrated model can then be
used during early system verification and system validation activities as well as during design
verification and design validation using simulations to uncover issues before the SOI is built or
coded as discussed in Section 8.
As a minimum, the project team will need to use diagrams and models that clearly identify the
functions and their inputs and outputs and interactions between the SOI and external systems and
environment. As the models mature, functions are decomposed, lower-level architectures are
defined, and subfunctions, performance, quality, physical attributes are allocated to the lower-
level system elements.
Analytical/behavioral models are developed to help assess behavior, interactions between parts
of the architecture, and determine the “how well” performance characteristics of the functions.
It is risky to attempt to address all characteristics in a single model because the model will either
not address specific elements with enough definition and accuracy, and/or a “complete” model
will become too complicated to complete, view, and comprehend as well as to define and
execute simulations. [3] [7]
There are a variety of diagrams, models [29], and simulations that can be used to help with the
analysis and maturation activities based on the needs of the project team and the type of analysis
being performed. These are often domain-specific depending on the type of system being
developed, the degree of data-centricity practiced by the project team, the specific analysis being
performed, as well as the capabilities of the project team, their toolset, and culture.
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 133

When using models and simulations it is important that they go through a verification process to
ensure they are formed correctly as well as a validation process to ensure they correctly represent
the entity they are modeling.
Some examples of diagrams are shown below: (Note that this is not an exhaustive list.)
• Functional Flow Block Diagrams (FFBD).
• Activity Diagrams.
• System Architecture Diagrams (SAD).
• Use Case Diagrams.
• Context Diagrams (external interface diagram).
• Activity Diagrams.
• Workflow Diagrams.
• Swim-lane Diagrams.
• Sequence Diagrams.
• States/Mode Diagrams/charts.
• Data Flow Diagrams (DFD).
• Entity Relationship Diagrams (ERD).
• N2 Diagrams.
• IPO (input/process/0utput) Diagrams.
• SIPOC (source, input, process, output, customer) Diagrams.
Examples of several types of models include: (Note that this is not an exhaustive list.)
• Physical Models.
• Structural Models.
• Behavior Models.
• Functional Models.
• Temporal Models.
• Mass Models.
• Cost Models.
• Probabilistic Models.
• Parametric Models.
• Layout Models, Network Models.
• Visualizations.
• Simulations.
• Mathematical Models.
• Prototypes.

A detailed discussion of each is beyond the scope of this Manual, however each is well known
and described on the internet and in the literature.
A key feature when selecting the project toolset is the capability of the toolset to support the
types of diagrams and models needed by the project team. The choice of a toolset will depend
on which of the methods the project teams need to use as part of their analysis and maturation
activities. (Refer to Section 16 for a more detailed discussion on the features a toolset should
have.)
As discussed earlier, diagrams and models can be developed from the project perspective
(activities) and customer/user operations perspective (activities) as well as the SOI perspective
(functions). While the form of the diagrams and models are similar, the “actor” is different. If
the actor is an organization (project or supplier), then diagrams of the activities can be developed
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 134

focusing on the activities used to develop the SOI as well as the inputs and outputs of each
activity.
If the actor is a user/operator, the diagram would focus on the activities performed by the
user/operator in the process of using or interacting with the SOI. If the actor is the SOI, the
diagram would focus on the functions performed by the SOI, inputs and outputs for the
functions, and sources of those inputs and outputs. To avoid confusion, it is important to make
clear which perspective the diagram/model is communicating.
Each perspective is necessary to mature the set of lifecycle concepts and to ensure a complete
integrated set of needs and set of design input requirements. The project perspective is needed to
clearly understand the activities, work products, deliverables, costs, and schedules. The
user/operator perspective is needed to clearly understand and define the human/system
interactions, interfaces, use cases, and operational scenarios. The SOI perspective is needed to
clearly understand the capabilities, functionality, performance, behavior, and interactions both
within the SOI and with external systems.
If contracting out the development of the SOI to an external organization, a diagram of the
development activities and associated artifacts and deliverables can be created that can be used to
inform the writing of a contract and associated SOW or SAs.
The use of models and diagrams help establish that individual needs and requirements have the
GtWR characteristics C1 - Necessary and C8 - Correct; and the sets of needs and requirements
have the GtWR characteristics C10 - Complete and C11 - Consistent.
The following sections provide generic examples concerning the use of basic diagrams and
models. While these diagrams were produced using standard office applications, in practice the
project team would develop these diagrams within the project toolset, enabling the underlying
data to be managed within a sharable integrated data and information model. In this context,
each of the diagrams or models would be a visualization of that data and information model.
Which visualization selected would depend on the analyst’s purpose and need.
4.5.3.1 Functional/Activity Analysis
A common approach to using diagrams and models is to begin with a basic overview diagram or
model shown in Figure 4-6.
At a fundamental level, there are external inputs, functions, or activities to receive and process
those inputs, functions to transform those inputs into outputs, the outputs, and the functions to
export those outputs to some destination. Each input has a source, and each output has a
destination. The source or destination could be another function, a person, or another system,
subsystem, or system element. The functions and associated inputs and outputs exist in an
external operating environment which contain other systems.
For the SOI, inputs and outputs consist of data, commands, messages, measurements, power, etc.
For an organization (project team or supplier) the inputs and outputs consist of work products,
artifacts, and deliverables. For operations, the inputs, and outputs involve the user/operator
interactions across the human/machine interfaces.
The basic model shown in Figure 4-6 is “The Receive Inputs”, “Transform Inputs to Outputs”,
and “Export Outputs”. These functions or activities are decomposed as needed to capture the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 135

specific functionality, activities, and performance needed or organization to accomplish its


intended purpose/use in the operating environment.

E
E
x
x Receive Export
Source Input Output Destination t
t Input Output
e
e
r
r
n
n Transform
Receive Export a
a Source Input Inputs Output Destination l
Input Output
l into
Outputs
S
S
y
y
s
s Receive Export
t Source Input Output Destination t
Input Output e
e
m
m
s
s System of Interest

Operating Environment

Figure 4-6: Fundamental System Model.


Given the fundamental system model, it is common to start analysis activities by reviewing the
preliminary set of lifecycle concepts, needs, and stakeholder-owned requirements that resulted
from the stakeholder elicitation activities. During this review, the functions referred to
explicitly, implied, or that are enabling are identified. A function is a task, action, or activity
that must be performed to achieve a desired outcome. One method is to identify the verbs used
to describe use cases, user stories, or operational scenarios and determine which apply to the
project or user/operator (activities) and which apply to the SOI (functions).
The result is a list of functions to be implemented by the SOI and activities to be implemented by
the users/ operators, or the project team. Each of these verbs will result in needs statements in
the integrated set of needs and transformed into SOI functional/performance or operational
requirements.

E E
x Function/ x
t Source Input Activity Output Customer t
e F(1) e
r r
n n
a Function/ a
Source Input Activity Output Customer
l l
F(2)

S S
y y
s Function/ s
t Source Input Activity Output Customer t
e F(n) e
m m
s s
Operating Environment
Figure 4-7: Functional/Activity Analysis using a SIPOC Diagram.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 136

For the list of functions and activities, a common diagram used for analysis is referred to as a
SIPOC diagram shown in Figure 4-7. Where SIPOC stands for Source-Input-Process
(function/activity)-Output-Customer. For each function or activity, its inputs and outputs are
identified. For each input, the source is listed and for each output the customer or destination of
the output is listed. In the function/activity blocks, the functions/activities are stated as verbs.
From each of the perspectives discussed previously, the project team can use SIPOC diagrams to
better understand the SOI as well as understand the functions, activities, input, and outputs.
Given that all functions and activities need at least one input and at least one output and the fact
that all inputs need a source, and all outputs need a destination or customer, part of the analysis is
focused on “completeness”, i.e., discovering what is missing and correcting these deficiencies.
4.5.3.2 Functional/Activity Flow Block Diagram.
With the knowledge gained from developing the SIPOC diagrams and resulting analysis, the
functions or activities can be combined to form a FFBD, or an Activity Diagram shown in Figure
4-8.

E E
x x
t t
Input Function/ Function/
e Outputs/ Outputs/ e
r Activity Inputs
Activity Inputs r
n Input F(x) F(x) n
A
a Function/ a
l Outputs/ l
Activity ??
Inputs
F(x) S
S
B y
y Function/ Function/
s Outputs/ Outputs/ s
Input Activity Inputs Activity Inputs Function/
t t
F(x) F(x) Activity Output
e e
F(x) m
m System of Interest
s s
Operating Environment

Figure 4-8: Generic Functional Flow Block Diagram.


Given the source of an input could be another function or activity, and the customer or
destination for each output could be another function or activity, developing a functional flow
block diagram is like “connecting the dots”. Many of the graphical modeling tools allow this to
be done by drag and drop, connecting inputs to their source and outputs to their destination.
These tools will create the initial FFBD or activity diagram and enable the user to “clean it up”.
The FFBD is a representation of SOI functions or user/organizational activities where the blocks
represent the inputs, outputs, and functions/activities and the lines illustrate how they are
connected. The focus is on what the user/organization/SOI does, not how they/it do the function
or activity.
The FFBD can be used to show functional flows internal to the SOI, user/operator interactions
with the SOI, interactions of the SOI with external systems, as well as manufacturing processes
and workflows.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 137

Activity flow diagrams are useful for developing the project’s WBS and allocating groups of
activities to internal or external organizations (customers or suppliers). Activity diagrams can
also be used to develop operating procedures or instructions for use (IFR). Again, each
perspective is needed, but it is best to use separate diagrams for each.

4.5.3.3 System Architecture Diagram


A function or activity may be accomplished by one or more subsystems or system elements
comprising equipment (hardware), software, firmware, facilities, and personnel. The objective
of creating system architecture diagrams to provide the foundation for defining the physical
architecture through the allocation of functions and subfunctions first to logical architectural
entities and then to hardware/software, facilities, and personnel.

System
Subsystem Subsystem
External Interface
Function Function
Interface
System boundary
F(x) boundary F(x)
External Interface
Interface Interface
System boundary boundary boundary

External Interface Function Interface Function


System boundary F(x) boundary
F(x)

Interface
boundary
Subsystem Interface
boundary
Function
F(x)
Interface
boundary

Function Interface External


F(x) boundary System

Operating Environment

Figure 4-9: System Architecture Diagram.


The FFBD shown in Figure 4-8 can be transformed into a System Architecture Diagram (SAD)
as shown in Figure 4-9. The input/output blocks shown in the Figure 4-8 represent interactions
across the interface boundaries shown in Figure 4-9. There could be one or more interactions
between external systems and the system as well as internal interactions between subsystems and
system elements across an interface boundary which must be defined as discussed in Section
4.3.6.3 and Section 6.2.3.
Initially the SAD can represent a functional architectural model. Like functions are grouped
together into functional system elements referred to as “logical elements”. The functional
architectural model can be transformed into more detailed analytical/behavioral models to help
show and understand internal and external behaviors and interactions.
A later allocation of logical elements to physical subsystems and system elements results in a
physical architecture.
A key tenet of systems thinking is that the behavior of a system is a function of the interactions
between the parts that make up the system as well as interactions between the system and
external systems. A major advantage of using models is that the analytical/behavioral models
can be transformed into mathematical models that can be used to run simulations to assess the
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 138

behavior and performance of the integrated system. Having a simulation capability enables the
project team to do design verification and design validation using simulations as discussed in
Section 8 to discover issues within the analytical/behavioral model rather than waiting to
discover these issues during system integration, system verification, and system validation of the
physical SOI.
For greenfield SOI development projects, the physical architecture will be based on the project
teams experience in developing similar systems, “top down”. For brownfield SOI development
projects, the physical architecture may already be defined, in which case the functional
architecture and analytical/behavioral models would be created “bottom up” (if they do not exist)
and would be used for analysis of the modified system.
After any issues with the analytical/behavioral model have been resolved, the functions,
performance, interactions, and quality can be allocated to the physical architecture, which will be
realized by design, and communicated to the builders/coders via the design output specifications.
4.5.4 Levels of Detail and Abstraction
An important consideration when developing functional architectural and analytical/behavioral
models and the resulting physical architecture is the concept of “levels”. As discussed in Section
2, levels can refer to levels of architecture, levels of detail (high or low), levels of decomposition,
or levels of abstraction.
At this lifecycle stage, the focus is on levels of abstraction and decomposition. Initially, high
level functions are defined, e.g., “Process Inputs”. Then that function is decomposed into
subfunctions, that together result in the parent function being realized, e.g., “Receive inputs”.
“Store Raw Inputs”, “Transform Inputs”, “Store Transformed Inputs”, “Display Transformed
Inputs”, “Export Transformed Inputs”.
When addressing architecture, these levels of abstraction will be the basis for defining the levels
of the architecture - first functional, then physical. From a design input perspective, the
challenge is determining the level of decomposition and detail most appropriate for what is
needed for a given SOI lifecycle stage. It is important to understand where the “line” is between
design inputs (what), and the actual design (how). The goal of decomposition at this stage of
development is to decompose functions such that a function can be allocated to a single physical
subsystem or system element.
As a rule of thumb, keep drilling down to provide a level of detail that will allow the project
team to have a common understanding such that the functional architectural and logical/behavior
models can be validated to show that the lifecycle concepts will result in the MGOs, measures,
and higher-level stakeholder needs and stakeholder-owned system requirements to be met within
the drivers and constraints with acceptable risk - then STOP.
At this point, the focus should be to model what the SOI does only if it is externally observable.
Functions, performance, quality, and interactions with external systems are externally observable
from an operations perspective. It is what is externally observable (what) that represents the set
of needs which will be transformed into the set of design input requirements. Because of this,
the initial modeling effort focus should be the development of functional architectural models,
context diagrams, boundary diagrams, and external interface diagrams. The functional
architectural models will be a major source of needs and the resulting design input requirements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 139

At this stage of development, the focus in on the stakeholder’s external view of the SOI to
establish completeness, correctness, and consistency of the lifecycle concepts and implementing
set of needs. If it is not externally observable, it is the responsibility of the project team
members responsible for modeling, architecture, and design to concurrently define the
analytical/behavioral models and resulting physical architecture, to address (how).
Logical/behavioral interactions within the SOI are more aligned with architecture and design
activities diving down to a more detailed logical understanding of the flow of information and
interactions within the SOI. Using this detailed information allows the architects and designers
to assess functionality, performance, interactions, and behaviors.
From a holistic perspective, a rule of thumb is that for whichever level the project team is
addressing, they should have a working knowledge of the entities at the level above and the
entities at the level below, as well as any system, subsystems, or system elements to which they
interact at the current level (internal to the SOI or external).
It is important that when defining the integrated set of needs, the project team returns to the
stakeholder external perspective of the SOI. A common error when defining the integrated set of
needs and resulting design input requirements for a SOI is including needs and requirements
dealing with internal aspects of the SOI resulting in requirements “level” issues where the
requirements are communicated at the wrong level such that the system cannot be verified to
meet the requirement at the level stated.
This activity helps establish the GtWR characteristic C2 – Appropriate.
4.5.5 Completeness
As stated in the GtWR, well-formed sets of needs and resulting design input requirements have
the characteristic C10 - Complete. A complete set of lifecycle concepts are key to having a
complete integrated set of needs and resulting set of design input requirements. How does the
project team know when the lifecycle analysis and maturation is complete? If not complete, the
integrated sets of needs and resulting design input requirements will not be complete.
There may be missing needs. There may be conditions that were not anticipated by the
stakeholders that lead to conditions for which NO need was defined.[3]. The integrated set of
needs cannot be considered “complete” unless they address ALL possible states of inputs and
outputs. Therefore, the lifecycle analysis and maturation process must address more than the
nominal or alternate nominal “go path” or “green light path” of desired behavior by considering
all other likely conditions, especially off nominal and failure conditions. Failure to address off-
nominal inputs and outputs, errors, or faults [4] will result in an incomplete set of needs and
resulting set of design input requirements.
Nominal, alternate nominal, and off-nominal user/operator interactions with the system as well
as all interactions across an interface must all be considered.
FFBDs, context diagrams, boundary diagrams, external interface diagrams, and internal interface
diagrams are effective diagrams to help ensure there are no missing functions, inputs, or outputs.
Initially, many of the functions identified came from the stakeholder elicitation activities and
development of the preliminary set of lifecycle concepts. Once the project team does the
functional analysis using diagrams and models, often they may find there are other functions,
inputs, and outputs needed.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 140

A major advantage of the move towards data-centric PM and SE and the use of models as a key
part of lifecycle concept analysis and maturation, is completeness as well as correctness and
consistency. For example, when doing functional analysis using the SIPOC diagrams, every
input must have a source and every output must have a customer (destination). In addition,
every input and output must be associated with a function. The subsequent functional flow
diagrams will not be complete unless the missing sources, destinations, and functions are
identified.
While it may be impractical to address ALL possible conditions of inputs or outputs (especially
combinations of conditions), the systems analyst should consider which combinations of input
conditions and failure conditions should be addressed to help ensure that an acceptable response
(output) to each of these addressed during the lifecycle concept analysis and maturation activities
are reflected in the set of needs and resulting set of design input requirements.
A key tool to aid in this analysis is the ability to use models to run simulations. With the
capability to run simulations, the project team can assess the correctness and completeness of the
models to address the MGOs, measures, and lifecycle concepts. The ability to conduct
simulations also aids in identifying combinations of inputs, outputs, and operating conditions that
can lead to failures as well as approaches to address those failures or error conditions. The result
of this analysis can lead to additional needs and resulting design input requirements.
Other factors affecting completeness of the lifecycle concepts and resulting integrated set of
needs include ensuring that:
• There is a concept defined for each lifecycle stage including nominal, alternate nominal,
and off-nominal operations.
• Relevant stakeholders from each lifecycle stage participated in the elicitation activities.
• For all lifecycle stages, interface boundaries and interactions across those boundaries
between the SOI and external systems during each lifecycle stage have been included,
especially interactions across interface boundaries that could prevent the intended use of
the SOI by the intended users or allow an unintended user to prevent the intended use of the
SOI by the intended users.
• For each function, required performance has been defined.
• Higher-level stakeholder needs and stakeholder-owned system requirements for quality (-
ilities) have been addressed.
• All applicable standards and regulations (or analogs) have been identified and concepts for
compliance have been defined.
Considerations for SOIs being developed to Customer Requirements
When a customer has supplied a set of SOI requirements to a supplier, it is critical the supplier
clearly understands the intended use of the SOI in its intended operational environment by its
intended users as well as understand the SOI across its lifecycle.
To get this understanding, the supplier should consider the customer’s set of requirements as
inputs to the lifecycle analysis and maturation activities. As part of these activities, gaps could
be identified that the customer may not have realized that needed to be addressed when defining,
analyzing, and maturing the lifecycle concepts, defining the integrated set of needs, and
transforming them into the set of design input requirements. Failing to address those gaps will
result in an incomplete set of needs and resulting design input requirements. Resolution of those
gaps can be addressed during the lifecycle concepts analysis and maturation activities using data

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 141

and information gathered from the other stakeholders during elicitation activities. By only
providing a SOI that addresses the customer supplied requirements, the SOI may pass system
verification (it meets the customer-owned requirements) but fails system validation.
For suppliers developing a product to a customer provided set of requirements, it is tempting to
look at that set of requirements as the only set of requirements. In reality, there are other
stakeholder needs and stakeholder-owned requirements that must also be considered to ensure
the SOI is able to be developed, integrated into the macro system it is a part, and enable system
validation. For example:
• The production team needs the product to be manufacturable.
• The test team needs the product to be testable (able to be verified to meet the requirements
and validated to meet the set of needs).
• The customer and public needs the product to be safe and secure from a cyber perspective.
• The users need the product to be easy and safe to interface with from a human factors
perspective.
• The supplier organization may need this product to conform to a strategic development
effort aligning with technology maturation.
• The product may need to address regulatory compliance not considered by the customer.
• There is the potential that the customer may have missed a use case related to some
compatibility with existing infrastructure within the operating environment in their
development of their requirements.
• There is the potential that the customer may have missed an external system or enabling
system with which the SOI may interact.
• There is the potential that the customer may not have completely communicated their
expectations for quality.
These considerations are not always specified in the contract and customer set of requirements.
Any of these considerations could lead to additional derived needs that must be captured in some
fashion to develop a set of design input requirements that is complete, correct, consistent, and
feasible.
If the suppliers only follow their contractual requirements they are likely to generate a SOI that
may not work as needed when integrated into the macro system it is a part, or reduce ability for
validation of the integrated system in its operational environment In some ways the resulting
requirements may compete with the customer requirements, which is when a reconciliation effort
will occur to assess if a customer requirements take priority, or the supplier's (in which case the
negotiation of waivers and contract changes occur).
4.5.6 Risk Assessment
Another approach to establishing completeness (as well as robustness and resiliency), is an
assessment of the operational risk as discussed in Section 4.3.7.1. The set of needs and resulting
set of design input requirements will not be complete until operational risk assessments are
complete, and all identified risks are managed in some way.
A common tool to use in assessing operational risk is Failure Models and Effects Analysis
(FMEA). A FMEA is a common activity for risk assessment. FMEAs can be done for each of
perspectives discussed in Section 4.4.1. For systems with user interaction, in addition to a
system FMEA to discover risks internal to the system or product, the FMEA may focus on the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 142

user’s interaction during operations; identifying each activity and what hazards and threats may
exist as part of the user/operator interaction. This type of FMEA is often referred to as a “Use”
or “User” FMEA (UFMEA).
Operational risk can also result from something unexpected in the operating environment. There
could be cases when the natural environment (temperature, humidity, particulates, air flow, etc.)
could exceed what is “nominal” or the induced environment (temperature, vibrations, acoustics,
EMI, EMC, etc.) that were not defined or not well defined and thus not considered or exceeds
what is defined as “nominal”.
For example, an engine is produced for a general use truck to be marketed around the world.
When manufactured, nominal conditions of use were defined, and the truck was designed
assuming these nominal conditions plus a “reasonable” tolerance in case these conditions were
exceeded for some duration of time. In addition, requirements on the quality of the cooling
liquid in the radiator was specified. These trucks were extremely popular and sold and used in a
variety of settings. In some cases, failures were reported within the warranty period. Root cause
analysis revealed that some trucks were used in mountainous, jungle settings with dirt roads and
elevated temperatures and humidity. Often the loads carried by the trucks exceeded the
recommended max load limits, especially when going up steep hills. As a result, the trucks over
heated and radiators lost cooling liquid. Often, the only replacement liquid readily available was
muddy water from a stream along the road. This resulted in cooling system failures…
A FMEA should be done on every external and internal input and output, to identify possible
errors or faults concerning the inputs and outputs [3, 4a]. Failure to address these errors or faults
will result in an incomplete set of needs and associated set of design input requirements.

E E
Nominal Nominal
x Function/ x
t Source Input Activity Output Customer t
e F(1) e
Off-Nominal Off-Nominal
r r
n Nominal Nominal n
Function/
a a
Source Input Activity Output Customer
l F(2) l
Off-Nominal Off-Nominal
S S
y y
s Nominal Nominal s
Function/
t Source Input Activity Output Customer t
e F(n) e
m Off-Nominal Off-Nominal m
s s
Operating Environment
Figure 4-10: Input/output Risk Assessment.
The project can use the context diagrams, boundary diagrams, and external interface diagrams,
SIPOC, FFBD, and SAD diagrams to assess what can go wrong (faults/errors) for each input,
output, and interface. First, they should define the nominal and alternate-nominal inputs and
outputs. Then they can do a FMEA to identify possible “off-nominal” error or failure mode
cases. Each off-nominal case represents a risk which must be mitigated depending on its

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 143

likelihood and impact/consequence. This type of FMEA is often referred to as an Interface


FMEA (IFMEA).
For example, during functional analysis using the SIPOC diagram shown in Figure 4-7, the
project team can do an IFMEA for each input and output. As part of the IFMEA, they can define
nominal/alternate nominal and off-nominal inputs and outputs each of which can be assessed for
both external and internal interactions as shown in Figure 4-10 by simulating the model. This
improves the effectiveness of the FMEA from a table-based to a simulation-based analysis.
For each off-nominal input or output, the possible reasons for the off-nominal cases can be
assessed. The FMEA assessments will identify each hazard and associated threat, the likelihood,
the consequence, and urgency. The urgency takes into consideration priorities, criticalities, and
safety of key activities and functions. Based on this information, the project team can determine
how they will manage the risk.
If the decision is to mitigate a risk, the mitigation action could involve people (training/skills),
processes and procedures (instructions for use), and/or the system or product itself. The focus
for people or processes is on preventing or minimizing errors and hazards associated with
user/operator interactions with the system that may result in the system not fulfilling its critical
functions and performance or could result in harm to the user/operator or other stakeholders
during operations.
If the risk will be mitigated by the system or product, then part of the lifecycle concept analysis
and maturation will be a concept for how best to mitigate the risk via design. Will the approach
be to remove the hazard and associated threats, reduce the likelihood, and/or reduce the
consequences or a combination? For the system, the focus is on faults or failures that may
prevent the system from fulfilling its critical functions and performance. The project team will
need to communicate the concept for mitigation as part of the integrated set of needs and then
transform these needs into the set of design input requirements.
Considering system behavior as a result of a fault or failure, there may be a need statement and
resulting design input requirement concerning “fault tolerance” or on how the system will
behave when a fault or failure occurs. For safety critical systems there may be higher-level
needs and design input requirements concerning “fail safe”.
Some projects communicate the results of their FMEA assessments in reports, often in the form
of a spreadsheet that includes a list of hazards, their risk, how the risk will be managed, if
mitigated, how, and who is responsible for tracking and implementing the mitigation actions. In
data-centric approaches, this information is stored within a database via the project toolset.
For critical or safety related risk, traceability across the lifecycle artifacts (risk, needs, design
input requirements, design, design output specifications, system verification, and system
validation) will be expected by the Approving Authorities.
All risks need to be recorded within the SOI’s integrated dataset. Once the set of needs has been
defined based is a feasible lifecycle concept to mitigate the risk, they will be transformed into the
design input requirements and traceability established within the toolset between the needs and
resulting design input requirements and the concepts associated with risk mitigation.
The project team will then develop a design approach to mitigate the risk and implement that
approach in the design output specifications and provide traceability with the design input
requirements associated with the risk mitigation. To help manage the needs and requirements
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 144

associated with risk mitigation, a risk mitigation attribute should be defined for each need and
resulting design input requirement that is involved in the mitigation of the risk as discussed in
Section 15.
For risk to be mitigated by the system, the resulting design input requirements will flow down to
the subsystems and system elements that have a roll in the mitigation. It is important that
traceability is established for the resulting lower-level subsystem and system element design
input requirements, so it is clear how the risks were mitigated within the system architecture.
4.5.7 Iteration to Mature Lifecycle Concepts
SE is a knowledge-based practice and is iterative and recursive by nature. With each iteration
valuable knowledge is gained. Based on this knowledge, the next iteration can be performed,
increasing the maturity of the models, physical architecture, lifecycle concepts, and associated
work products and artifacts. These iterations can be thought of as a series of cycles, zeroing in
on lifecycle concepts and an initial physical architecture as shown in Figure 4-11.

Preliminary set of
lifecycle concepts
Section 4.4
Model development,
analysis, and maturation
Iteration - Section 4.5.7.1
Increase
Resolution

Feasible lifecycle concepts,


integrated set of needs, Trade space -
define candidate
preliminary physical
physical
architecture, models, architectures
“Zero In” on an
plans, budgets, schedules Section 4.5.7.2
initial physical
architecture and
corresponding set
Preliminary physical architecture –
of lifecycle
feasibility analysis, technology readiness
concepts
assessment, risk assessments, trade studies
Section 4.5.7.4
Section 4.5.7.3

Figure 4-11: Zeroing in on a Set of Feasible Lifecycle Concepts


Lifecycle analysis and maturation starts with the preliminary set of lifecycle concepts and inputs
to those concepts, performing functional/performance analyses, developing analytical/behavior
models, performing an initial feasibility assessment, defining alternate physical architectural
concepts resulting in trade space. The project team can then assess the candidate physical
architectures in terms of cost, schedule, technology, risk, value, and ROI. Trade studies are
conducted to zero in on a feasible physical architecture concept. These activities result in a
smaller set of candidate physical architectural concepts.
Concurrently, project and SE management team members are developing a WBS, PBS,
preliminary budgets and schedules, draft management plans, acquisition plans, and maturing the
lifecycle concepts for development, procurement, design, system integration, system verification,
system validation, transportation, installation, maintenance, and retirement. With the knowledge
gained during each iteration, these concepts will be fine-tuned.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 145

The resolution is increased for the next iteration. For each iteration, the definition of the
functional architectural model, analytical/behavioral models, preliminary physical architecture,
and design concept are better understood and refined. These refinements may require updates to
the MGOs, measures, business operations level and system level stakeholder needs and
stakeholder-owned system requirements, preliminary OpsCon/ConOps/SysOps based on the
feasibility assessments completed during each spiral. These updates will be coordinated with the
stakeholders and approved.
Additional iterations are repeated until the project team has “zeroed in” on a set of feasible
lifecycle concepts and a preliminary physical architecture they feel is mature enough, with
acceptable risk for this lifecycle stage. Concurrently, project team members are maturing plans,
WBS, PBS, budgets, schedules, and related work products. With this maturity, the project team
can define and baseline the integrated set of needs.
As discussed in Section 8, for design verification and design validation a similar cyclic process is
used for maturing the physical architecture, design concept, and design output specifications.
The following sections provide a more detailed description of the lifecycle analysis and concept
maturation activities that occur during each iteration shown in Figure 4-11.
4.5.7.1 Model Development, Analysis, and Maturation
Based on the preliminary set of system lifecycle concepts and the inputs shown in Figure 4-5,
functional analysis is continued as needed, and the project team defines or refines the functional
architectural and analytical/behavioral models for the SOI.
During the first spiral, the models will be developed, if not already started as part of defining the
preliminary set of lifecycle concepts. During subsequent iterations, the models will be updated
and refined based on the knowledge gained during the previous iteration. Initially, the level of
detail should be limited to a stakeholder view of the integrated system - what is observable
externally (functionality, performance, quality, physical attributes, and interfaces). It is
common to start with a focus on capabilities, features, functionality, and interactions with
external systems. Functional flow diagrams and data flow diagrams are developed as a result.
Then a functional architecture can be defined to aid in the transformation into a preliminary
physical architecture as described in the next section.
It is important that the models address the external interactions (connectivity, interaction, and
flow of information) between the SOI and the macro system of which it is a part as shown in the
external interface diagram, boundary diagram, or context diagram. The models need to reflect
the interactions and interfaces across all lifecycle stages, not just during operations. There may
be interfaces needed during testing, system verification, system validation, production,
transportation, installation, or maintenance that are not used during operations. Leaving out a
lifecycle could result in missing needs and requirements.
It is seldom the case that a single analytical model of all the needs and characteristics can be
constructed, though this is desirable. Rather, the project team will need to establish a set of
integrated models to demonstrate why and to what degree certain characteristics and capabilities
are necessary for satisfying the business operations level and system level stakeholder needs and
stakeholder-owned system requirements within the defined drivers and constraints and risk.
Such considerations as optimization, availability, reliability, and effectiveness (achieving the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 146

desired outcomes) may need an integrated set of models that relate the desired outcomes to
characteristics of the SOI and the project (e.g., budget, schedule, and risk).[7]
As part of developing and maturing the models, the project team will identify and resolve
inconsistencies, correctness, and completeness issues that may exist (a major benefit of using
diagrams and models for analysis). Part of this analysis will involve identifying the source of
each input and the “destination/customer” for each output. (Note: the use of “customer” here is
because of the definition of customer includes “entity that has requested or needs the output”. If
there is no customer that has a need for the output, why does it exist and the function that
produced that output?)
Using the models, the functions, performance, features, and capabilities are assessed based on
value, ROI, criticality, safety and how well the model addresses the stakeholder needs and
stakeholder-owned system requirements within the defined drivers and constraints and risk.
A key consideration at this stage is understanding the “partials”, that is, how ROI or value
changes as a function of some key performance parameter (e.g., mass, data volume,
performance, quality attribute, communication bandwidth, computing power, operating
environment, technologies used, etc.). How will the ability of the SOI to meet the needs be
affected as a function of changes in cost, schedule, technology, or another key parameter? For
example, how would the cost, schedule, and proposed technologies be affected by a change in
any of the needs?
For complex systems where parameters across the system architecture have a dependency
(directly proportional or inversely proportional) it is difficult to track and understand the partials
“manually”. With the analytical/behavioral models, the project team can evaluate changes to
assess the impact of the change to meeting the needs and resulting design input requirements.
This knowledge will be of great benefit in choosing or optimizing the physical architecture
within the defined drivers and constraints.
As a result of this analysis, schedule, resource, and cost estimates are developed or revised.
Inputs shown in Figure 4-5 are addressed and revised based on the knowledge gained during
these activities. The lifecycle concepts are revised as needed based on the information gained
during this analysis. Plans are developed or revised. These revisions may require updates to the
business operations level and system level stakeholder needs and stakeholder-owned system
requirements. These changes must be coordinated with the stakeholders and approved.
Concurrently with the model development, analysis, and maturation the project team should be
identifying a preliminary integrated set of needs that will result in meeting the higher-level needs
contained within the MGOs within the identified drivers and constraints with an acceptable level
of risk for this lifecycle stage.
The goal is a demonstrable complete, correct, consistent, and feasible integrated set of needs that
include functions and observable outputs from the functional analysis and simulations with
needed performance within the conditions of operation (states, modes, environments) and
triggering events. A key concept of this Manual is that the project team must establish a set of
needs that are complete, correct, consistent, and feasible to transform them into a set of design
input requirements that will be complete, correct, consistent, and feasible.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 147

The use of models and diagrams for analysis help establish that individual needs and
requirements have the GtWR characteristics C1 - Necessary and C8 - Correct; and the sets of
needs and requirements have the GtWR characteristics C10 - Complete and C11 - Consistent.
4.5.7.2 Trade Space - Define Candidate Physical Architectures
Based on the knowledge gained from the functional architectural and analytical/behavioral
model development, analysis, and maturation activities, the project team will define one or more
candidate physical architectures and design concepts for implementing those architectures. Part
of defining the physical architectures is to map the functions and interfaces contained in the
functional architecture model to the candidate physical architectures.
In a green field development environment, when a new SOI is being developed, there are often
multiple candidate architectures and corresponding design concepts to be considered. At this
stage of development, each of these need to be defined at a level that will allow feasibility to be
evaluated.
In a brown field development environment, when a legacy or heritage system exists, the physical
architecture and design concept will already be defined. The key issue is the impact of changes
to the inputs shown in Figure 4-5 and their impact(s) on the system elements that are contained
within the physical architecture. At a minimum, any retained (or legacy) system elements must
have their interfaces satisfied. A key consideration of the project team is whether they want to
continue to evolve the existing system or start over with a “blank piece of paper” green field
development. This approach allows for more innovation especially given new technologies, new
stakeholder needs, and changes to the operating environment.
In either case, the project team will identify which system elements may already exist either
within the enterprise as OTS or OTS from external suppliers, which may exist but would need to
be modified, and which they think may need to develop. From a cost and schedule perspective,
reuse of existing OTS parts within the enterprise normally would take priority over modified
OTS (MOTS) or OTS from suppliers. Developing new parts from scratch is higher risk
especially if a technology is needed that is beyond current state-of-the art. (Refer to Section 12
on a more detailed discussion on using OTS system elements.)
Based on the choices, one or more candidate physical architectures and design concepts are
defined, and alternate system elements are identified. These candidates will be assessed based
on their feasibility to meet the MGOs, measures, and other key system parameters within the
drivers and constraints with acceptable risk.
Considerations When Defining the Trade Space
There are several important considerations when identifying and evaluating candidate physical
architectures, design concepts, and alternate system elements.
• Supply chain. In today’s world the supply chain and associated risk is a key
consideration. Factors to consider include availability, cost, and risk. Factors that can
influence availability, cost, and risk include whether the system element is produced
domestically or non-domestically and whether there is a single source or multiple
sources. If non-domestic, politics, tariffs, and trade restrictions must be considered as
part of the project’s risk assessment. Social considerations must also be considered in
context of human rights and the environment.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 148

• Use of existing/heritage system elements. A common mistake is assuming the TRL of an


existing or heritage system element is higher than it really is. TRLs are a function of a
specific use in a specific operational environment. This environment includes both the
operational and induced environments within the system of which the system element is a
part. If an existing/heritage system element was at TRL 9 (common use) for a specific
use and operational environment in another system, it is a best practice for the project
team to assume an initial TRL 5 or 6, until proven otherwise, for their specific use and
operational environment for the system being developed. This can be an issue when
evaluating OTS or MOTS system elements. Was the OTS element designed for the exact
same use in the exact same operational environment? If not, the TRL for the OTS system
element will have to be assessed for specific use and specific operational environment for
the system under development. (Refer to Section 12 on a more detailed discussion on the
use of OTS system elements.)
• Production capability. Another key issue is the production capability of the organization
or applicable external organizations if the production is being outsourced. Being able to
use an existing production capability is much more cost effective than choosing a design
that requires the use of new technologies for production, which result in the need for new
or modified facilities, equipment, skills, etc. Closely related to TRLs for critical
technologies used in the SOI, there are Manufacturing Readiness Levels (MRLs) used to
manage the risk associated with production of a new system or product. An example is
for pharmaceuticals or vaccines that were of high quality when developed in low
quantifies in a laboratory setting, but scaling factors resulted in quality issues when large
quantities were being produced in a factory setting.
• Availability and cost. For those system elements whose development, manufacturing or
coding will be outsourced to an external organization, the project team needs to research
what is available and from which suppliers. Government projects will often issue a
Request for Information (RFI) to find out this information. The project team members
responsible for procurement and contracting will issue the RFI and the resulting RFP.
Feasibility issues concern the cost and schedule of the suppliers to deliver the system
element consistent with the overall project budget and integration schedule.
4.5.7.3 Physical Architecture Selection and Analysis
It is the subsystems and system elements within the system physical architecture that will be
built, integrated, verified, validated, and delivered to customers or provided to consumers.
The project team will perform trade studies between the candidate physical architectures, design
concepts, and system elements, support systems, and enabling systems with elaboration to better
understand the relationship between the parts, cost, schedule, risk, and value.
Value improvement is achieved though assessing trade-offs of the candidate architectures.
Analytical models should be developed to address an optimized solution that adds the most
value. Additionally, these assessments may be used to hybridize innovative solutions resulting
in value creation. Only having one candidate means there is no decision necessary, and the
solution is only guaranteed to be satisfactory but not necessarily optimal.
For each candidate, a TRA is performed to determine the TRL of the candidate subsystems and
system elements that are proposed to be part of the physical architecture, a common approach is
the process outlined in the US Government Accountability Office (GAO) TRA Guide. [15] A

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 149

TRA Report is generated for each candidate physical architecture and subsystems and system
elements that are a part.
In addition to the TRLs, the MRL of the production facility should also be assessed as it relates
to the candidate physical architectures and design concepts.
The most promising, candidate physical architectures, design concepts, and system elements are
identified that will best implement the SOI lifecycle concepts selected to achieve the integrated
set of needs and desired ROI with risk appropriate for this lifecycle stage.
These physical architectures and design concepts are defined to the level of detail appropriate for
this lifecycle stage. Lower levels of detail are performed in later lifecycle stages. More in-depth
analysis and trade studies are performed for each candidate physical architecture and subsystems
and system elements that are part of that architecture. De-scope and backup options are defined
in case critical technologies cannot be matured as needed based on the established priorities and
critically assessments.
The interface analysis activities discussed in Section 4.3.6.3 and risk assessment activities
discussed in Section 4.3.7 should be completed or updated for each iteration and architecture and
associated design concept being considered.
An analysis of enabling systems required during the different lifecycle stages including design,
production, system verification, system validation, and operations is performed. Information
needed is the availability of the enabling systems at the times needed to support project activities
and whether any of the enabling systems will needed to be upgraded or modified to meet the
needs of the project. This analysis is important for the project to develop their budget and
schedule as well as defining and evaluating the interfaces.
Interactions between the system and stakeholders (operators, maintenance, and update personnel,
etc.) across the system lifecycles need to be assessed and failure analysis, such as a UFMEA,
need to be completed for each candidate design concept. From a stakeholder perspective, the
focus in on roles, functions, performance, and quality - what the stakeholders do with and how
they will interact with the system. These considerations are part of HSI and HSE activities.
As an aid to help with the analysis of the candidate physical architecture and design concepts, the
project team may also use “rapid prototyping”. With advances in 3D printing and additive
manufacturing, study/design teams can develop prototypes quickly to be used as part of the
architectural and design concept trade activities. Similarly, for software, prototypes of user
interfaces can be developed.
When prototypes are developed, various configurations can be made available to the actual users.
These prototypes can be functional, non-functional, or “form, fit, and function”. A prototype is
useful to help the project team better understand stakeholder needs and stakeholder-owned
system requirements which will drive the definition of the set of needs and resulting set of design
input requirements. Prototypes are developed based on the currently known needs and
requirements. By using prototypes, the users can get an “actual feel” of the SOI in the
representative operational environments.
Also referred to as “discovery learning”, user interactions with the models and prototypes can
enable both the user and study/design team to better understand the needs and requirements for
the desired SOI. Models and rapid prototyping allow for user feedback much earlier in the
development lifecycle concerning errors and problems, such as missing functions, substandard
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 150

performance, safety, security, and quality issues, and confusing or difficult user interfaces. This
is an interactive process that allows stakeholders to understand, modify, and eventually approve
a model of the system that meets their needs.
The project team will “down-select” to the most promising physical architectures and design
concepts in terms of feasibility and ROI. Schedule, resource, and cost estimates are developed
and refined during each iteration.
4.5.7.4 Zeroing in on a Feasible Architecture and Design
The outcomes of the system lifecycle concept maturation activities include functional
architectural and analytical/behavioral models of the SOI as well as at least one preliminary
feasible physical architecture and design concept. The information from the lifecycle analysis
and concept maturation activities will be fed back to the of inputs shown in Figure 4-5 which
may need to be adjusted based on the knowledge gained during these activities, with
coordination with and approval by the stakeholders.
From the use cases, operational scenarios, and user interactions with SOI models or prototypes, a
preliminary set of needs can be developed addressing core functions and associated performance
that will result in the stakeholder real-world expectations being met as communicated within the
MGOs. Because feasibility has been addressed, the integrated set of needs and resulting set of
design input requirements should also be feasible with acceptable risk for this lifecycle stage.
Based on the results of the TRA and AD2 assessment for the selected physical architecture and
design concept, a Technology Maturation Plan (TMP) will be developed to mature the critical
technologies needed in accordance with the processes outlined in the GAO TRA Guide. For US
Government projects, the GAO [15] recommends that the critical technologies should be at least
TRL 3 to be considered during the concept stage and be capable of being matured to at least TRL
6 by the time of the PDR) and TRL 7 by the time of the CDR. As stated earlier, technology
maturity relates to development and operational risk. Failing to follow these guidelines puts the
project a risk of failure.
Based on the MRL assessment for the selected physical architecture and design concept, a
Production Maturation Plan (PMP) will be developed for the production organization to develop
the production capability needed to produce the SOI. The implementation of this plan will be a
separate project, with its own PM and SE activities that will result in a production capability that
has successfully passed its own system integration, system verification, and system validation
program in time to support the production of the SOI.
In addition to TRLs and MRLs, it is a best practice to define development cost and schedule
reserves and operational margins to help mitigate risk from unknown unknowns concerning
development of the SOI as well as operational risk.
With the knowledge gained to this point, activities completed, and the maturity of the resulting
artifacts, the project team needs to determine whether or not they are ready to proceed with the
activities associated with completing the definition of the mature set of lifecycle concepts and
integrated set of needs or go back and do another iteration repeating the activities to further
refine and mature the lifecycle concepts and the preliminary physical architecture as shown in
Figure 4-11.
This activity helps ensure individual needs and requirements have the GtWR characteristic C6 –
Feasible and sets of needs and requirements have the GtWR characteristic C12 – Feasible.
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 151

Activities Concurrent with Lifecycle Concept Analysis and Maturation


Concurrently with the lifecycle concept analysis and maturation activities, project and SE
management will define their implementation approaches and concepts including PM processes
and plans, SE plans, contracting, procurement, production, integration, system verification, and
system validation strategies, cost, and schedule. Relationships and dependencies, partnering, key
risk, risk mitigation plans, and system “buy” (from an external source), “build/code” (make
internally), “reuse/modify” (existing systems) or “buy/try/decide” strategies are defined.
PM and SE work products and artifacts that should be in various stages of development during
these lifecycle concept analysis and maturation activities include the following. Many, if not all,
of these artifacts will be required in some form of maturity at the gate review that baselines the
lifecycle concepts and resulting integrated set of needs. Examples of completed activities and
artifacts include:
• Stakeholders identified and engaged.
• Stakeholder needs and stakeholder-owned system requirements elicitation complete.
• Mission, goals, objectives, measures defined.
• Use cases, user stories, operational scenarios captured.
• Drivers and constraints identified.
• Risks identified and Risk Management Plan developed addressing how each risk will be
managed.
• Interface diagrams completed.
• Sketches, diagrams, drawings developed.
• Functional architecture and analytical/behavioral models developed to the fidelity.
appropriate for this lifecycle stage.
• Proof of concept prototypes developed.
• Trade studies performed.
• At least one preliminary physical architecture identified.
• Preliminary PBS defined.
• PMP in work.
• Preliminary budget, schedule developed.
• WBS developed.
• SEMP in work.
• Document Tree definition in work.
• Technology Assessment Reports completed.
• Technology Maturation Plans in work.
• Production Maturation Plans in work.
• Information Management Plan in work.
• Acquisition, procurement, and contracting Plans in work.
• Master Integration, Verification, and Validation (MIVV) and System Integration.
Verification, and Validation (SIVV) Plans in work.
• Project ontology and database schema definition in work.
• Draft integrated set of needs for the SOI are defined.
• System validation planning artifacts (Method, Strategy, Success Criteria, etc.) defined.
• Draft design-input requirements definition in work.
• Draft system verification planning artifacts (Method, Strategy, Success Criteria, etc.) in
work.
• Trace records for needs and design input requirements and their sources are in work.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 152

Practicing PM and SE from a data-centric approach, the data and information contained in these
work products and artifacts will be represented within the SOI’s integrated dataset as discussed
previously.

4.6 Define and Record the Integrated Set of Needs


4.6.1 People and Process Needs
The mature set of lifecycle concepts includes concepts for PM, SE (developing the SOI), as well
as concepts for development, procurement, production, transportation, storage, operations,
sustaining engineering, and retirement. From these concepts, the organization can identify
people (organizational) and process needs. In this context “people” needs represent what
stakeholders at the organization’s strategic and business operations levels need from the people
and organizations responsible for performing the activities associated with each of the above
concepts.
The people needs will be the basis for the PMP, SEMP, and other plans that contain requirements
and process for the organizations to which the needs apply.
For system development and production that will be contracted out to suppliers, specific
concepts, activities, processes, and deliverables should have been identified as part of the
lifecycle analysis and maturation activities discussed previously. The activity IPO and activity
flow diagrams help identify what activities and deliverables the project needs from the suppliers.
These needs can then be transformed into specific requirements on the suppliers and
communicated via a SOW or SA.
A common issue and risk for projects is developing a SOW or SA without doing the analysis
needed to clearly define the procurement process and what is expected from the supplier and
defining the customer/supplier roles, responsibilities, interactions. This analysis helps identify
and define the specific PM and SE processes expected to be followed by the suppliers, activities
performed, required deliverables, expected performance, and what is necessary for acceptance.
From the perspective of the SOI, people and process needs are important in that the reason to
develop the SOI was to provide a capability that address the problem or opportunity statement
and resulting MGOs. Providing a capability includes people, process, and product. All three
must be addressed.
When developing the integrated set of needs and resulting set of design input requirements, there
are certain assumptions made concerning the conditions of use and users/operators. In addition
to defining detail processes for the user/operator interaction with the system, there are human
factors that must be taken into consideration including vision, hearing, anthropometrics,
education, training, skills, certifications, etc. These should have been addressed when defining
the “personas/user classes” discussed previously.
That is one of the reasons why the lifecycle concepts were developed from the different
perspectives which included the user/operator interactions with the system as well as the failure
analysis performed to identify potential hazards, threats, and risk associated with the use and
operations. For example, labels need be able to be read by the user/operator, the equipment may
need to be operable for a person wearing gloves and other personal protection equipment (PPE),
or a biological sample prepared in a specific manner before being inserted into a diagnostic
instrument.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 153

For validation purposes, the vision, hearing, capabilities, and level of expertise of the operator,
lighting conditions, as well as the language must be considered when writing the needs and
requirements for labels and instructions for use. Effective and safe operation of the system may
depend upon the user/operator following a precise sequence of events and actions. Safety risk
identified during the UFMEA may be mitigated via people (training) and/or process (procedure).
As stated previously, system validation determines whether the realized SOI can be “used as
intended” within the operational environment by the intended users. That is one reason for
defining “personas/user classes” so that the intended users are understood and defined, and the
system designed to be used/operated by these the people represented by these personas/user
classes. “Used as intended” implies the use or operations is defined by operating procedures or
instructions for use (IFU). Thus, the “conditions for use” must be defined to include not only the
realized system but also the “personas/user classes”, operating procedures, IFUs, and the
human/machine interface.
While important, further discussions concerning the people and process needs are beyond the
scope of this Manual.
4.6.2 Define the Integrated Set of Needs
The sources of the integrated set of needs are shown in Figure 4-12.

Analytical
Architectural and
models behavioral
models Mission,
Stakeholder goals,
real-world objectives
expectations
Needs
Analysis
Measures
Risks
Integrated
Set of
Needs
Regulations
& standards Feasible
lifecycle
concepts
Higher-level
Rqmts
Cost &
Interfaces schedule
Higher-level
with existing
Needs systems

Figure 4-12: Sources of the Integrated Set of Needs.


Defining and agreeing on a set of feasible lifecycle concepts for the SOI enables the project team
to define an integrated set of needs based on those concepts. In accordance with the definition of
a “need”, the project team derives an integrated set of needs that reflect the set of feasible system
lifecycle concepts, MGOs, measures, business operations level and system level stakeholder
needs and stakeholder-owned system requirements, drivers and constraints, and risk mitigation.
This integrated set of needs is what will be transformed into the set of design input requirements.
In addition, it is this integrated set of needs which the set of design input requirements, design,
set of design output specifications, and the system will be validated against.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 154

4.6.2.1 The Form of Need Statements


Needs are Not Requirements
Needs are written in a structured, natural language from the perspective of the what the
stakeholders need the SOI to do, while the design input requirements transformed from the needs
are written from the perspective of what the SOI must do to meet the need(s) from which they
were transformed.
To help distinguish needs from the requirements, the needs statements do not include the word
“shall”. Using “shall” in need statements results in confusion as to whether the statement is a
need or a design input requirement transformed from a need. One approach to avoiding this
confusion use the format: “The stakeholders need the system to ……….” or for a goal “The
stakeholders would like the system to ……”.
These statements are in contrast to the form of the SOI’s technical design input requirements,
“The SOI “shall” …” or for a goal, “The SOI “should” ……”
Using these distinct formats helps make clear what is a need statement and what is a design input
requirement. The GtWR defines the structure and characteristics of well-formed need statements
and sets of needs as well as rules that help to write need statements that have those
characteristics.
A common mistake made is when recording needs, the need statements are written as “shall”
statements and calling these “stakeholder requirements” rather than needs. For example: “The
system shall meet government safety standards and regulations”. While the level of abstraction
may be appropriate for a need, it is not appropriate for a requirement because it is ambiguous as
to which standards and regulations. The result is often “stakeholder requirements” that do not
have the characteristics of well-formed requirements as defined in the GtWR. (Remember that
the phrase “stakeholder or customer requirements” is a shorten version of what is really meant:
“stakeholder-owned or customer-owned system requirements” that were transformed from a set
of stakeholder or customer needs.)
Another example is when needs are written using a “shall”, but the entity is a stakeholder rather
than the SOI. For example: “The user shall be able to [do something]”. Avoiding the use of the
“shall”, this statement could be written as “The stakeholders need the system to allow users to
[do something]. After analysis, the implementing design input requirements are written to
communicate what the SOI needs to do such that users will have the capability to do that action.
4.6.2.2 Use of Attributes to Define and Manage Needs
As defined in Section 2, a need expression includes a need statement plus a set of attributes.
Attributes that can aid in definition and management of needs include those shown below: (Refer
to Section 15, for a more detailed discussion on attributes, definitions of each, and guidance
concerning the use of attributes for need statements.)
A1 - Rationale: Reason for the need’s existence, intent of the need.
A3 - Trace to Source: Where the need originated: stakeholder, user story, scenario, use case,
constraint, risk, lifecycle concept, analysis, model, etc.
A6 - System Validation Success Criteria.
A7 - System Validation Strategy.
A8 - System Validation Method.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 155

A9 - System Validation Responsible Organization.


A12 - Condition of Use: operational conditions of use expected in which the need applies and
will be validated.
A26 - Stability: stable, likely to change, and incomplete
A28 - Need Verification Status: true/false, yes/no, or not started, in work, complete, and
approved.
A29 - Need Validation Status: true/false, yes/no, not started, in work, complete, and approved.
A30 - Status of the Need (in terms of maturity): draft, in development, ready for review, in
review and approved. (A28 is a prerequisite for A29 and A30).
A31 - Status of implementation: one or more design input requirements have been defined that
will result in the intent of the need being met.
A34 - Priority: Relative importance of the need.
A35 - Criticality: Achievement of the need is critical to the SOI being able to meet its
intended use in the operational environment.
A36 - Risk (of implementation): one or more risk factors (cost, schedule, technology)
associated with being able to achieve the need.
A37 - Risk (mitigation): The need is linked to a risk the project has decided to mitigate. Often
related to safety, security, quality.
A38 - Key Driving Need (KDN): Implementing the need could have a significant impact or
cost and/or schedule.
It is a best practice to define the attributes for needs statements when the needs statements are
formulated. For example:
A1 - Rationale. If rationale cannot be defined when the need statement is being formulated, the
existence of the need statement is questionable.
A3 - Trace to Source. If there is no source to trace the need statement to, the existence of the
need is questionable.
A6 - System Validation Success Criteria. If the Success Criteria for successful validation that
the verified and built system has meet the need cannot be defined, the need statement
wording will have to be changed.
4.6.2.3 Organizing the Integrated Set of Needs
The integrated set of needs represent the agreed to outcomes of the stakeholder needs and
stakeholder-owned system requirements elicitation activities, definition of drivers and
constraints, and lifecycle analyses and maturation activities. These outcomes include
functionality (what the stakeholders need the system to do), expected performance and quality
(“how well” characteristics), the conditions of action, including triggering events, system states,
and operating environments (“under what operating conditions”), as well as compliance (with
standards and regulations).
To help with the development and organization of the design input requirements that will be
transformed from the integrated set of needs, it is useful to organize the integrated set of needs
into the following groupings: function/performance, fit, form, quality, and compliance.
• Function/Performance. the primary actions that the SOI needs to perform. Includes both
functionality and associated performance. The functions address the features the
stakeholder expect the SOI to have, performance addresses how well, how many, how fast,
etc. attributes of a function. Many of the critical functions involve interactions (interfaces)
between the SOI and external systems.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 156

• Fit. the ability of the system to interface with, interact with, connect to, operate within, and
become an integral part of the macro system it is a part. “Fit” includes human system
interactions and interfaces as well as both the induced and natural environments (conditions
of operations, transportation, storage, maintenance). Fit includes secondary (versus
primary) or enabling interactions between the SOI and external systems.
• Form. the shape, size, dimensions, mass, weight, and other visual parameters that uniquely
distinguish a system. “Form” addresses the physical nature of the SOI. For software
“form” could address programing language, lines of code, memory requirements, etc.
• Quality. fitness for use (safety, security, and various quality “ilities”, e.g., reliability,
testability, operability, availability, maintainability, operability, supportability,
manufacturability, interoperability, safety, security, etc.
• Compliance. with design and construction standards and regulations.
A key advantage of using these groupings is to help ensure the integrated set of needs has the
GtWR characteristics C9 – Conforming, and C10 - Complete. Each of the above groupings
represents a unique perspective and source of needs. Failing to consider each perspective will
result in missing needs and corresponding design input requirements.
The function/performance and fit needs come from both stakeholder elicitation as well as the
diagrams and models developed during lifecycle concept analysis and maturation activities.
However, relying strictly on diagrams and models as a source of needs often results in an
incomplete set of needs.
Form and quality needs are system attributes that are more associated with the physical system
rather than a functional architecture or analytical/behavioral models of the physical system.
Compliance needs and drivers and constraints come directly from the stakeholder elicitation
activities. While performance is included in the analytical/behavioral models, the technical
ability to achieve a given performance is a function of the physical architecture (physics,
chemistry, biology, thermodynamics, etc.).
4.6.3 Record the Integrated Set of Needs
The integrated set of needs must be recorded within the SOI’s integrated dataset in a form and
media suitable for review and feedback from the stakeholders as well as a form that allows
traceability. It is critical that the project team has confirmation from the stakeholders that the
project team understands their expectations, needs, and requirements, MGOs, measures, drivers
and constraints, and risk as communicated by integrated set of needs. Traceability is critical in
support of needs verification and needs validation as discussed in Section 5 as well as change
assessment and management as discussed in Section 14.
Confirmation with the stakeholders is critical because the integrated set of needs represents what
is “necessary for acceptance” of which the built or coded SOI will be validated against.
Needs can be recorded and managed via either a document-centric or data-centric approach,
however based on the discussion in Section 3, it is highly recommended the organization use a
data-centric approach and document the integrated set of needs within the project’s toolset.
The chosen method should allow:
• Traceability to the sources of the needs shown in Figure 4-12;

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 157

• Traceability between each need and the design input requirements transformed from the
need;
• The inclusion of attributes for the need statements resulting in need expressions (Section
4.6.2.5); and
• Traceability to system validation artifacts. (Section 4.7).

4.6.3.1 Managing Unknowns


During the definition of the set of needs there may be unknowns resulting in the project team
having to make assumptions regarding performance and functional criteria to allow the
subsequent lifecycle activities to proceed. This often happens when the project team skips the
lifecycle analysis and maturation activities discussed earlier prior to defining the set of needs.
In other cases, further analysis or research is still required that would interrupt the overall
workflow to develop and baseline a complete integrated set of needs, e.g., the maturation of
critical technologies. While this work will continue, it is critical to capture the unknowns and
resulting ongoing work to ensure the associated activities to address the unknowns are funded,
tracked, and managed. Refer to Section 14.2.5 for a more detailed discussion on managing
unknowns.
This activity helps ensure individual needs have the GtWR characteristics C3 – Unambiguous,
C4 – Complete; C6 – Feasible, C7 – Verifiable, and C8 – Correct.
4.6.3.2 Appropriate to Level
One of the characteristics of well-formed needs and sets of needs stated in the GtWR is the
characteristic C2 - Appropriate. As stated in the GtWR, the specific intent and amount of detail
communicated within a need or requirement statement must be appropriate to the level (the level
of abstraction) of the entity to which it refers. Section 4.5.4 discussed levels of detail and
abstraction which will help to determine the appropriate level to record needs statements.
Need statements tend to be written at a higher level of abstraction than the requirements that are
transformed from them. For example, it is acceptable for a need statement to state, “The
stakeholders need the system to meet the requirements contained in government safety standards
[list of standards.” or “The stakeholders need the system to meet the safety requirements
contained in government regulations [list of regulations]”. This clearly communicates the
stakeholder expectations concerning safety. However, this level of abstraction is too high for
what would be communicated within a well-formed design input requirement statement. The
technical design input requirements would be more specific as to exactly which specific
requirements in those standards or regulations are being invoked.
Another example for a medical diagnostic system:
• System need statement: “The stakeholders need the diagnostic system to [measure or
detect] [something] with an accuracy as good as or better than similar devices in the
market.”
This is an appropriate level of abstraction for a need statement, clearly stating the
expectation the stakeholders have concerning accuracy, however this would not be a good
design input requirement.
• Design input requirement transformed from the need statement: “The diagnostic system
shall [measure or detect] [something] with an accuracy of [xxxxx].”

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 158

The developers have explored various concepts for meeting the need for accuracy, have
examined candidate technologies, have assessed their TRL, and have decided the value
[xxxxx] is feasible with acceptable risk for this lifecycle stage. As stated, this is an
acceptable design input requirement. The developers will define other design input
requirements concerning precision, false positives, false negatives, time to determine a
result, etc. Each of the requirements will be traced to the need statement from which it was
derived.
4.6.3.3 Completeness of the Integrated Set of Needs
As stated in the GtWR, well-formed sets of needs have the characteristic C10 - Complete.
Sections 4.5.5, 4.5.6, and 4.6.2.3 discussed approaches to ensuring the set of lifecycle concepts
are complete. Completing the stakeholder needs and stakeholder-owned system requirements
elicitation, identification of drivers, constraints, and risk and defining, analyzing, and maturing a
complete set of lifecycle concepts are key to having a complete integrated set of needs.
From a completeness perspective, it is helpful for the project team to address the following
questions when defining the integrated set of needs:
• Are all relevant stakeholder viewpoints included?
• Have all conflicting needs and requirements been resolved?
• Have all product lifecycle stages been considered?
• Have all needs and requirements been prioritized?
• Have all critical functionality, performance, quality, and compliance needs been identified?
• Have all ambiguous and incorrect statements from the stakeholders been resolved?
• For each function and sub-function have the corresponding performance measures been
defined?
• For each of the MGOs are there corresponding needs for each objective?
• Is there a need for each defined measure?
• Are there needs defined for each applicable standard and regulation?
• Have all internal dependences/relationships been identified?
• Are the system lifecycle concepts from which the needs are transformed feasible (cost,
schedule, technology, legal, regulatory, ethical)?
• Does the integrated set of needs address risk that the project team has decided to mitigate
by design and traceability established?
• Has the product been compared to the competition?
• Have all dependences/interactions/interfaces with external and enabling systems been
addressed?
• Have all assumptions been recorded?
• Have the key terms used within the integrated set of needs been defined and definitions
agreed to?
• Have all the agreed to attributes that are part of each need expression been defined,
including those associated with system validation?
While these questions should have been addressed during the elicitation and lifecycle analysis
and maturation activities, it is a best practice to revisit these questions before the integrated set of
needs is submitted for baselining. If the answer is “no” to any of these questions, the integrated
set of needs is not complete which will result in an incomplete set of design input requirements
as well as risk to the project that the system will fail system validation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 159

4.6.3.4 Needs Feasibility and Risk


As stated in the GtWR well-formed need statements have the characteristic C6 - Feasible, and
integrated sets of needs have the characteristic, C12 - Feasible. Sections 4.5.1 and 4.5.7
discussed approaches to ensuring the set of lifecycle concepts are feasible. A set of feasible
lifecycle concepts are key to having an integrated set of needs that are feasible.
Feasibility and risk assessment are key reasons for doing the SOI lifecycle concept analysis and
maturation activities prior to defining and baselining the integrated set of needs. If not feasible
with acceptable risk, the need should not be included in the set. Doing so can negatively impact
cost and schedule and can increase the risk a need that will not be met (fail system validation).
The assessment of feasibility is not black and white but is based on the degree of risk in
successfully implementing individual needs and sets of needs within cost, schedule and
technology constraints before adding the specific need into the integrated set of needs.
The Needs Feasibility/Risk Bucket shown in Figure 4-13 is one method the project team can use
to address feasibly as well as to manage risk when defining the integrated set of needs.
A feasibility analysis of each need that is a candidate for inclusion in the integrated set must be
made in terms of the cost, schedule, technology, and risk before adding the specific need into the
“bucket”.
Risk

Add Remove

Reserves
Needs Needs Needs
Needs Needs
Needs Needs
Needs Needs Needs
Needs Needs
Needs Needs Needs
Cost Needs
Needs Needs Needs
Needs Schedule
Needs Needs
Needs Needs Needs
Needs Needs
Needs Needs Needs
Needs Needs
Needs Needs Needs
Needs Needs Needs
Needs Needs
Needs Needs Needs
Needs Needs

Technology
Figure 4-13: Needs Feasibility/Risk Bucket.
Feasibility of the Set of Needs
The feasibility of the integrated set of needs must also be considered. Given the cost and
schedule constraints, only so many needs will fit in the bucket without undue risk to the project.
While individual needs may be feasible, implementing the integrated set of needs within the
budget and schedule constraints may not be.
As part of baselining the integrated set of needs, an overall risk assessment is made of the set of
needs and risk mitigation plans are defined based on the level of risk. It is common for the risk
mitigation plans to include a descope plan as well as a management reserve to help mitigate the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 160

development risk for the unknown unknowns that frequently occur during a development project,
especially for a project that is dependent on the maturity of critical technologies.
Controlling the Size of the Bucket
A major challenge is limiting the number of needs that are put in the “needs bucket”. It is
common to see cases where projects define too many needs for a product or cases of scope creep
where needs are added without considering the feasibility or value of doing so. Rather than
focusing on the MGOs, the project tries to develop a system that does something for everyone.
The result is often a system that is “a jack of all trades, but a master of none” or a high-risk set of
needs that may not be feasible.
As discussed previously, a mandatory characteristic of any need expression is that it is “needed”
(C1 - Necessary). If a need is not necessary, why is it in the integrated set? The goal during
needs definition is to define a necessary and sufficient set of needs that when realized will result
in the mission being achieved as stated by the MGOs, within the drivers and constraints, with
risk acceptable for this lifecycle stage - and no more.
By its very existence, each need expression has a cost associated with it because it must be
maintained, managed, implemented, and the system validated to meet it. Unnecessary needs
result in work being performed that is not necessary and takes resources away from the
implementation of those needs that are necessary. In addition, implementing needs that are not
necessary may result in degraded system performance as well as introduces a potential source of
failure and conflict.
One reason for an excessive number of needs for a system, subsystem, or system element is the
inclusion of needs that are really design input requirements, i.e., they are stated at a lower-level
of abstraction that is not appropriate for a need statement at the level it is being defined or a need
statement for a lower-level subsystem or system element being defined for its parent system. In
either case the result is a need statement that is not consistent with the GtWR characteristic of
well-formed need statements C2 – Appropriate. The need statement may be valid and necessary
but is being communicated at the wrong level or in the wrong form.
“Gold plating” is another major cause of unnecessary needs being included in the set. Gold
plating is the act of adding features to a system that are not necessary to achieve the mission as
stated by the MGOs. How can gold plating be identified? If a need statement cannot be traced
to one of the sources shown in Figure 4-12, it could mean that the need statement is not
necessary, and thus, is gold plating. The project team needs to be sensitive to gold plating as
this is a major source of scope creep and can impact the cost and schedule of the project and adds
risk of project failure.
To help combat uncontrolled growth of needs or including needs that are not necessary, one
approach is for the project team to adopt a “zero-based” approach to defining the integrated set
of needs and maintain this “zero-based” approach throughout project execution.
A “zero-based” approach means that all needs are thoroughly evaluated by the project not only
for feasibility, but also for applicability and value in regard to meeting the agreed to MGOs,
measures, drivers and constraints, risk mitigation, and lifecycle concepts and thereby “earn” their
way into the set of needs.
In addition to the feasibility evaluation when needs are considered for addition to the set of needs
or accessing existing needs in the set, ask:
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 161

1) Why is the need statement needed? What role does it play in the realization of the MGOs,
measures, drivers and constraints, risk mitigation, and lifecycle concepts for the SOI. If
there is no rationale, or a weak rationale for its existence, consider not adding it to the set
or removing it from the set.
2) What value does this need statement add as compared to the other need statements? If the
value is low or questionable, consider not adding the need to the set or removing it from the
set.
3) What would happen if this need were not included in the set - would the developing
organization address this concern anyway? If nothing would happen or the developing
organization would have to address this concern anyway to meet other needs, then why
should it be included in the set?
4) Is there a trace from the need to the MGOs, measures, drivers and constraints, risk
mitigation, and lifecycle concepts? If it cannot be traced to an agreed to MGO, measures,
driver or constraint, risk mitigation, or lifecycle concept, why should it be included in the
set?
5) Is the need appropriate to the level of architecture the system, subsystem, or system
element exists? The need may be valid, but not appropriate the system, subsystem, or
system element at for that level. If the need is not being stated at the appropriate level,
move it to the appropriate level subsystem or system element to which it applies.
6) Is the need statement really a design input requirement i.e., states what the SOI must do to
meet a need rather than what the stakeholders need the SOI to do? If so, determine what
the real need is and state it a such. Asking “why” often will result in the real need
appropriate to the level the SOI is at.
Adopting a zero-based approach to defining the integrated set of needs, assessing feasibility, and
asking the above questions will help avoid gold plating and defining needs that are not needed
and defining a set of needs that is necessary and feasible at a risk that is appropriate for the
lifecycle stage of development.
Managing Change, Feasibility, and Risk
The needs feasibility bucket is also useful for managing change. Once the bucket is full and the
integrated set of needs is baselined, change will happen. If any of the needs change, a
feasibility/risk analysis must be made as part of the change process as well as addressing the
above questions as discussed in Section 14.2.5.
What if a stakeholder wants to add a new need to the already full bucket? One response could be
to remove a lower priority, non-critical need to make “room” in the bucket for the need being
added without adding risk or eating into the management reserves. (This is a key reason for
assigning priority and critically to each need statement.) Another response by the project team
could be “NO”, however, politically, this may not be advisable. A better, passive-aggressive
response would be “Yes, but……”. Often management will want to accept the new need without
removing any of the existing needs. In this case, either or both the management reserve will be
impacted as well as risk to the project increased.
Note: Any proposed change to a need will involve an assessment of the sources from which the
need was transformed as well as any dependent peer needs. For a more mature project, the
project team will also need to look down the trace chain to assess the potential impacts on the
design input requirements that were transformed for that need. (Refer to Section 14 for a more
detailed discussion concerning managing change and assessing the impacts of a change.)

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 162

4.7 Plan for System Validation


The successful outcome of a project is a validated system. System validation is obtaining data
that can be used as evidence the verified SOI satisfies the integrated set of needs, MGOs, and
measures that, together, define what is necessary for acceptance as discussed at the beginning of
this section.
The GtWR includes the characteristic, C14 - Able to be Validated, for a well-formed set of
needs. “Able to be Validated” means that the project team or customer will be able to validate
that the resulting SOI has met the set of needs.
A best practice to ensure the needs are “able to be validated”, is to plan for how the project will
validate that the system will meet the integrated set of the needs during design validation and
system validation activities as discussed in Sections 8, 10, and 11.
Information that should be defined concerning system validation for each need statement
includes the validation Success Criteria, Strategy, Method, and the organization responsible for
planning and executing the system validation activities. This information can be defined within
the validation attributes that should be included (along with the other attributes discussed in
Section 4.6.2.2) within each need expression.
• A6 - System Validation Success Criteria.
• A7 - System Validation Strategy.
• A8 - System Validation Method.
• A9 - System Validation Responsible Organization.

Note: Refer to the Section 10 for a detailed discussion concerning system verification and system
validation Success Criteria, Strategy, and Methods. (Refer to Section 15 for a detailed
discussion concerning the use of attributes.)
Defining the system validation Success Criteria, Strategy, and Method at this lifecycle stage is
important, in that it will help ensure the needs statements are worded properly and clearly state
what the intent is in terms of stakeholder real-world expectations. It is the intent that must be
shown to have been met as part of both design validation and system validation activities.
Additionally, addressing system validation early in the project during lifecycle concepts and
needs definition activities will provide important project requirements in terms of facilities, test
equipment, environments, resources, enabling systems, etc. that will be needed to support the
system validation activities. This information is used by project managers in their budget and
schedule planning.
For cases where there is a customer/supplier contractual arrangement, it must be made clear
during lifecycle concepts and needs definition activities which organization is responsible for the
planning and conduct of the system validation activities and recording the results: the customer,
the supplier, or a combination of both as discussed in Section 13.
In customer/supplier development projects there may be a formal “operational test and
evaluation (OT&E)” where users and other stakeholders use the SOI as they intend in the
operational environment as defined in the use cases and operational scenarios. In commercial in-
house development projects, the organization will conduct internal validation activities as well as
involve “beta” users to exercise the SOI in its operational environment. For highly regulated
products, such as medical devices, the system validation is defined in federal regulations.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 163

4.8 Baseline and Manage Lifecycle Concepts and Needs Definition


Outputs
The outputs of the Lifecycle Concepts and Needs Definition activities as shown in Figure 4-1 are
listed below. This list is not inclusive as it does not include the PM work products listed in
Section 4.5.7.4 that are developed concurrently with the SE artifacts. Some of the many outputs
of Lifecycle Concepts and Needs Definition activities for a SOI include:

• Integrated set of needs.


• Updated and baselined MGOs and measures.
• Drivers and constraints.
• Risks, Risk Management Plan.
• Set of feasible lifecycle concepts.
• Functional architectural and analytical/behavior models.
• Preliminary physical architecture.
• Technology Readiness Assessment and Technology Maturation Plan.
• Design and system validation planning artifacts.
• Draft PM and SE management plans, WBS, PBS, budget, schedules.
• For each need, traceability to its source:
Prior to baselining, the project team must verify and validate the integrated set of needs as
described in Section 5. The needs statements are verified against the needs statements quality
standards defined in the GtWR (or similar organizational needs quality definition document) and
validated against the MGOs, measures, business operations level and system level stakeholder
needs and stakeholder-owned system requirements, drivers and constraints, risk, and lifecycle
concepts from which they were derived. Section 5 goes into the details concerning needs
verification and needs validation.
Once the integrated set of needs has been verified and validated, they will be baselined, along
with other PM and SE work products and artifacts at a gate review such as a Scope Review (SR),
System or Mission Concept Review (SCR or MCR) in accordance with the activities discussed in
Section 14, Needs, Requirements, Verification, and Validation Management.
Applications within the project toolset should allow tracking of the status of the Lifecycle
Concept and Needs Definition activities using a dashboard that communicates key metrics
related to these activities. These metrics can be obtained using the needs attributes discussed
earlier. Making this information accessible will enable stakeholders to have the same view of the
maturity of the integrated set of needs. This information also represents a single SSoT for the
project.
A major activity in managing the needs definition is managing change. Establishing traceability
and keeping that information current is key to being able to manage impacts of changes
throughout the system development lifecycles. The details of needs management are included in
Section 14, Needs, Requirements, Verification, and Validation Management.
It is the baselined integrated set of needs which will be transformed in the design input
requirements for the SOI as discussed in Section 6 and will be what the resulting design input
requirements will be validated against as discussed in Section 7, the design validated against as
discussed in Section 8, and the SOI will be validated against as discussed in Sections 10 and 11.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 164

This activity is critical to ensuring the resulting individual needs have the GtWR characteristics
C1 – Necessary, C3 – Unambiguous, C4 – Complete, C6 – Feasible, and C8 – Correct and sets
of needs have the GtWR characteristics C10 – Complete, C11 – Consistent, C12 – Feasible, C13
– Comprehensible, and C14 Able to be Validated.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 165

Section 5: NEEDS VERIFICATION AND NEEDS VALIDATION

This section provides a detailed discussion on the planning, activities, and documentation
associated with needs verification and needs validation.
Note 1: In this section “needs verification” and “needs validation” refer to verification and
validation of the needs expressions themselves; not about validation that the SOI meets the needs
as discussed in Section 2 and Sections 10 and 11.
Note 2: While the focus of this section is on verification and validation of the needs, it is also
applicable to the verification and validation of business operations level stakeholder needs and
stakeholder-owned requirements discussed in Sections 1 and 2.
Needs verification and needs validation assesses the quality of the individual needs expressions
and set of needs to ensure they have the characteristics of well-formed need statements and sets
of needs as defined in the GtWR (needs verification) and correctly communicate the intent of the
sources from which they were derived as shown in Figure 5-1 (needs validation).
Do the lifecycle concepts and integrated
set of needs represent a system of interest
Needs that can accomplish its intended use in its
Validation operational environment when operated
“Do the needs communicate the
• Problem or opportunity intent of the stakeholders?” by its intended users?
• MGOs
• Measures Concept Needs
• Stakeholder real-world Validation Validation
expectations “Do the lifecycle concepts “Do the needs communicate
reflect the intent of the
• Use cases, user stories, stakeholders?”
the intent of the lifecycle
concepts?”
system concepts, OpsCon,
ConOps Implemented by Lifecycle Transformation
Integrated Set
• Higher-level Needs Concepts Needs Analysis of Needs
Lifecycle Concept Design Input
• Higher-level Requirements Analysis Requirements
• Higher-level lifecycle concepts Maturation Definition
• Drivers & constraints,
• External systems
• Standards Concept Needs
Drive

• Regulations Verification Verification


Drive

“Are the needs written


• Technology “Are the lifecycle
correctly?”
concepts defined
• Operating Environment correctly?”
• Risks
Organizational
Business & Mission Analysis and Organizational
Requirements for
Stakeholder Needs and Requirements for
defining
Requirements Definition Processes defining needs
INCOSE SE Handbook lifecycle concepts

Figure 5-1: Needs Verification and Needs Validation Overview.


Needs verification and needs validation should be conducted both continuously as the individual
need statements are defined and discretely as part of the baseline activities. Using a data-centric
approach to needs definition, rather than waiting to do needs verification and needs validation on
the integrated set of needs, individual needs can be verified and validated during definition
activities. The status of needs verification and needs validation can be tracked using the
attributes associated with needs verification and needs validation status. These attributes allow
the project team to track the progress of the needs verification and needs validation activities.
Once verification and validation of each individual need expression in the set is complete and
issues have been resolved, the integrated set of needs will be ready to be baselined as discussed
in Section 14.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 166

While needs verification and needs validation are discussed separately in this section, the
activities will often be performed concurrently. If a Natural Language Processing (NLP)
application is used for some of the needs verification activities, that analysis should be
completed prior to needs validation, enabling the reviewer to focus on content and intent, rather
than on structure.
Needs verification and needs validation may seem to be serial activities but are not. While the
integrated set of needs will be baselined, that does not mean they will not change. During the
design input requirement development activities, it is common to discover issues with the set of
needs, requiring them to be updated when the set of design input requirements is baselined.
During architecture and design analysis and maturation and definition of the set of design output
specifications, it is also common to discover issues with the set of needs (and resulting set of
design input requirements), requiring them to be updated when the physical architecture, design
concept, and design output specifications are baselined. These updated sets of needs will be the
focus of system validation activities. In either case, any changes to the integrated set of needs
must go through the needs verification and needs validation and CM activities prior to approval
as discussed in Section 14.
Even though the focus of this section is needs verification and needs validation, it is important
that the project team adopts a systems thinking view and consider the relationships, interactions,
and dependencies associated with needs and other SE artifacts and PM work products, especially
higher-level business operations level lifecycle concepts, needs, and requirements. As a result of
the needs verification and needs validation activities, any changes made must be reflected in
these other artifacts and work products. Section 14 goes into more detail concerning managing
and accessing change.

5.1 Needs Verification


A summary of the needs verification activities is shown in Figure 5-2.

Inputs Needs Verification Activities Outputs


• Draft Integrated set of needs • Verified Integrated set of
• Prepare for Needs Verification
• Risks, Risk Management Plan • Perform Needs Verification needs
• Set of feasible life-cycle concepts. • Manage Needs Verification Results • Needs Verification Results
• Functional architectural and Record
analytical/behavior models • Updated traceability records
• Preliminary physical architecture • Updated sources shown in
• Technology Readiness Assessment and Figure 4-12
Technology Maturation Plan Enablers • Updated system validation
• Design and system validation planning • Enterprise tailored Guide for planning artifacts
artifacts Writing Needs and Requirements
• For each need: • Enterprise tailored process for
⁃ Traceability to the need sources shown developing & managing needs &
in Figure 4-12 requirements
⁃ Traceability to system validation • Enterprise Needs verification
planning artifacts Inspection Checklist
• Enterprise Product Development
Process
• Trained systems engineers
• Requirement management tool
• Diagraming & modeling tools
• Stakeholders, stakeholder
representatives or surrogates

Figure 5-2: Needs Verification IPO Diagram.


The needs verification activities will review the needs expressions and the set of needs to verify
they have the characteristics and adhere to the rules that result in those characteristics as defined

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 167

by the GtWR or similar organizational guide. In terms of needs verification, the GtWR
represents the organizational requirements for writing well-formed need statements. The needs
verification activities will also include inspection of traceability records from the sources from
which the needs were transformed to ensure traceability with those sources.

5.1.1 Prepare for Needs Verification


As shown in Figure 5-2, there are several enablers to successful needs verification. These
include an enterprise tailored GtWR and a process for the development and management of sets
of needs and sets of design input requirements. There should also be an enterprise product
development process, including verification and validation across the system lifecycle, and
systems engineers trained in and knowledgeable of what is in the guide, as well as how to
perform the process activities.
Of particular importance are the needs and requirements management and modeling/diagraming
applications within the project’s toolset used for the underlying analysis used to produce the
input artifacts from which the integrated set of needs were transformed and recorded, and which
the needs verification activities defined in this section are dependent.
Using a data-centric approach to SE, traceability can be established within the project toolset and
the traceability matrices can be represented as reports generated by the toolset. With a well-
defined traceability strategy and a well-defined need attribute strategy as discussed in Section
5.3, needs verification in terms of traceability and attributes can, to some extent, be automated
using these tools, enabling advanced analysis involving traceability of needs to the input artifacts
shown in Figures 2-5 and 5-2. As a minimum, these tools can identify missing traceability or
attributes via reports. For example, a report could be generated to list all needs that do not trace
to a source or a source that does not have an implementing lifecycle concept and resulting need.
Note: While applications within the project toolset can produce trace reports, these applications
cannot yet determine the accuracy and correctness of the traces between entities. This
assessment must be done manually.
Assuming the processes are in place and applications are in use, the artifacts listed as inputs
should have been produced and matured during Lifecycle Concepts and Needs Definition to the
point where they are ready for the needs verification activities. Using a data-centric approach,
these artifacts will have been recorded within the project toolset.
While some needs verification activities must be done manually, others may be able to be
automated depending on the capabilities of the applications in the project toolset. To what
extent the project can rely on automated needs verification depends on a tradeoff between effort
and risk. The need for, and importance of, using automation for needs verification will increase
as systems become more complex and the number of needs increases.
NLP applications provide the capability to automate needs verification to some extent. Many of
these tools use the characteristics and rules defined in the GtWR as a basis for assessing the
quality of the needs statements and integrated sets of needs. These tools can be used as both a
“digital assistant” to aid in the writing of needs statements as well as to assess the quality of
individual needs statements and the of the set of needs. (Note: Currently many of these tools
focus on the quality of requirements statements and not needs statements. Hopefully, in the
future, the tools will address both needs and requirements statements and understand the
differences between the two.).

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 168

Many of the NLP applications provide a “score” concerning the quality of the needs statements
based on criteria defined by the project team, as well as identify specific defects. The project
team will determine how this score will be used in the definition and management of the needs
and needs verification activities.
A key preparation activity for needs verification is the creation of a Needs Verification
Inspection Checklist if one does not already exist. If the organization has a generic checklist,
they can tailor the checklist to the system being developed and the project’s processes. This
checklist serves as a standard to measure the needs against and will help guide all the needs
definition and verification activities. Having addressed each of the areas and questions within
the checklist will help lead to successful completion of the Lifecycle Concepts and Needs
Definition activities and needs verification activities. (An example Needs Verification Inspection
Checklist is included in the GtNR Appendix D).
5.1.2 Perform Needs Verification
There are several activities that should be performed to ensure the individual needs expressions
and set of needs are well-formed and provide objective evidence they have been verified.
Guided by the Needs Verification Inspection Checklist, the project team should:
• Manually verify individual needs expressions and the sets of needs have the characteristics
in accordance with the rules defined in the GtWR [19] or similar guide. This could be done
by using the Needs Verification Inspection Checklist as a guide to inspect each need
expression by individuals or as part of a tabletop or peer review. Given the number of
characteristics and the number of rules to help ensure the needs statements have those
characteristics, this task is difficult to do manually especially for large sets of needs. This
activity helps establish each need has the GtWR characteristic C9 - Conforming.
• Verify the set of needs contains individual needs that are unique, do not conflict with or
overlap with other needs in the set, and the units and measurement systems they use are
homogeneous. This activity helps establish each need has the GtWR characteristics C9 –
Conforming and C11 – Consistent.
• Verify the language used within the set of needs is consistent (i.e., the same words are used
throughout the set to mean the same thing) and that all terms used within the requirement
statements are consistent with the architectural model, project glossary, and data dictionary.
This activity helps establish each need has the GtWR characteristics C9 – Conforming and
C11 – Consistent.
• If included in the project toolset, use an NLP application that provides the capability to
automate the verification of the needs statements in terms of how well they adhere to the
rules for writing needs and sets of needs. For needs statements with defects, members of
the project team will have to examine the defective need statements and fix the defects the
application identified. This activity helps establish each need has the GtWR characteristic
C9 - Conforming.
• Verify individual needs expressions have the set of attributes defined and agreed to by the
project team. The project toolset should be able to produce a report concerning whether
any of the attributes are “null’. i.e.., no values have been defined for a given attribute.
While a report can tell if an attribute has been defined, it cannot assess the quality or
accuracy of the information in the attribute - that assessment will have to be done
manually. For example, does the text in the rationale statement include the information
expected to be in the rationale? Does the rationale state why the need statement is

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 169

necessary? Is the source of any numbers explained? This activity helps establish each
need has the GtWR characteristic C4 - Complete.
• Verify individual needs expressions have the set of system validation attributes defined and
agreed to by the project team. The project toolset should be able to produce a report
concerning whether any of the system validation attributes are “null’. i.e., no values have
been defined. While a report can tell if a system validation attribute has been defined, it
cannot assess the quality or accuracy of the information in the attribute- that assessment
will have to be done manually. For example, does the text in the validation attribute that
defines the validation success criteria include the information expected? This activity helps
establish each need has the GtWR characteristics C9 - Conforming and the set of needs has
the GtWR characteristic C14 - Able to be Validated.
• Use the project toolset to generate reports to confirm traceability of each need to one or
more input artifacts (sources). Each need must trace to at least one source from which it
was derived. In a document-based approach, trace matrices are often developed and
managed manually requiring a lot of time and effort. This activity helps establish each
need has the GtWR characteristic C1 - Necessary.
• Use the project toolset to generate reports to confirm each source shown in Figure 4-12 has
at least one derived need that addresses that source. (Bidirectional traceability - if the tool
allows a trace from a need to its source, it should also include the capability to trace each
source to its implementing lifecycle concept and associated need statement(s)). This
activity helps establish the set of needs has the GtWR characteristic GtWR C10 - Complete.
• Confirm the project has done risk assessments and for each risk that will be mitigated, the
project has established traceability between the risk and the lifecycle concepts that define a
concept for mitigation of that risk and traceability to the need that addresses that mitigation
concept. This activity helps establish the set of needs has the GtWR characteristic C10 -
Complete.
• Referring to the SOI External Interface Diagrams, Context Diagrams, Boundary Diagrams,
or functional models, verify there are needs that address each of the interfaces and
interactions across the interface and that each need that addresses an interface trace back to
the source that identified that interface. This activity helps establish the set of needs has the
GtWR characteristic C10 - Complete.
5.1.3 Manage Needs Verification Results
A needs verification record is created recording the results and outputs of the needs verification
activities. The outputs of the needs verification activities include the updated input artifacts and
PM work products shown in Figure 5-2, Outputs. Ensure attribute A28 - Need Verification
Status (true/false, yes/no, not started, in work, complete, and approved) has been filled out.
Defects found in the set of needs as well as any defects found in any of the input SE artifacts or
PM work products, must be addressed and corrected before they are baselined.
If it is identified that there is insufficient data to complete needs verification or a lack traceability
records within the project toolset, the issue should be attributed as a project risk that could cause
subsequent requirement, design, and system validation activities to be deemed unsuccessful.
Applications within the project toolset should allow tracking of the status of the needs
verification activities using a dashboard that communicates key metrics related to the needs
verification results. These metrics can be obtained using the need attributes contained within
each need statement. Making this information accessible will enable all project team members

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 170

and key stakeholders to have the same view of the maturity and status of the needs verification
activities.

5.2 Needs Validation


The GtWR includes the characteristic, C14 - Able to be Validated, for a well-formed set of
needs. “Able to be Validated” means that the set of needs is formed such that the project team
will be able to show that the integrated set of needs will lead to the achievement of the MGOs,
measures, business operations level and system level stakeholder needs and stakeholder-owned
system requirements, risk mitigation, and lifecycle concepts within the constraints (such as cost,
schedule, technical, legal and regulatory compliance) with acceptable risk.
The needs validation activities will review the needs expressions and the set of needs to validate
each need statement and the integrated set of needs clearly communicate the intent of the sources
from which they were transformed, in a language understandable by all project team members,
customers, and other key stakeholders.
The needs validation activities will determine if the integrated set of needs will result in an SOI
that does what it was intended in its operational environment when operated by its intended users
and will be acceptable to the customers, users, and other stakeholders.
A summary of the needs validation activities is shown in Figure 5-3.

Inputs Needs Validation Activities Outputs


• Verified Integrated set of needs • Prepare for Needs Validation • Validated Integrated set of
• Risks, Risk Management Plan • Perform Needs Validation needs
• Set of feasible life-cycle concepts. • Manage Needs Validation Results • Needs Verification Results
• Functional architectural and Record
analytical/behavior models • Updated traceability records
• Preliminary physical architecture • Updated sources shown in
• Technology Readiness Assessment and Figure 4-12
Technology Maturation Plan Enablers • Updated system validation
• Design and system validation planning • Enterprise tailored Guide for planning artifacts
artifacts Writing Needs and Requirements
• For each need:
• Enterprise tailored process for
⁃ Traceability to the need sources shown developing & managing needs &
in Figure 4-12
requirements
⁃ Traceability to system validation • Enterprise Needs Validation
planning artifacts Inspection Checklist
• Enterprise Product Development
Process
• Trained systems engineers
• Requirement management tool
• Diagraming & modeling tools
• Stakeholders, stakeholder
representatives or surrogates

Figure 5-3: Needs Validation IPO Diagram.


5.2.1 Prepare for Needs Validation
The first step in planning for needs validation is to ensure the enablers shown in Figure 5-3 are in
place, and those project team members doing the needs validation activities have access to the
inputs.
Even though individual needs statements and the set of needs may be well-formed, and
traceability has been verified, the message they communicate may not be as intended. It is
important that organizations do both needs verification and needs validation. Failing to do so
adds risk that the SOI being developed will fail to do what it was intended in its operational

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 171

environment when operated by its intended users and not meet the validation Success Criteria
that defines what is necessary for acceptance.
Assuming the Lifecycle Concepts and Needs Definition activities were completed as defined in
this Manual and tools are in use, the artifacts listed as inputs should have been produced and
matured to the point where they are ready for the needs validation activities. Using a data-
centric approach, these artifacts will have been recorded within the project toolset.
The Lifecycle Concepts and Needs Definition activities should have resulted in analysis records,
diagrams, and models that provide the underlying analysis and rationale for the transformation
that resulted in each of the needs expressions. Each need expression should include a trace to its
source and rationale to help understand the source of the need and intent of what the need
statement is communicating.
For example, a stakeholder may have an expectation for how long it should take to do some task,
like to replace a tire. Assuming the expected time was stated as no longer than 3 minutes, what
assumptions did the stakeholder make when stating that value? Is there sufficient analysis and is
a feasible concept available from which the needs statement was transformed? What is the
variation in the conditions of use for replacing a tire considering different vehicles and tire types,
operational environment, tools needed, location of the spare tire, location of the tools,
availability, ease of use, and availability of the instructions for changing a tire using the supplied
tools, as well as the capability of the person changing the tire? Is the organization targeting
100% satisfaction for a given audience or is there a tradeoff range? Were personas/user classes
defined for the class of stakeholder that would be expected to change the tire in this amount of
time? Were their use cases defined for changing a tire that this need traces to? Was there a
UFMEA done for each step of the use case?
A key preparation activity for needs validation is the creation of a Needs Validation Inspection
Checklist if one does not already exist. If the organization has a generic checklist, then tailor the
checklist to the SOI being developed and the project’s processes. This checklist serves as a
standard to measure the needs against and will help guide the needs definition and validation
activities. Having addressed each of the areas and questions within the checklist will help lead to
successful completion of the Lifecycle Concepts and Needs Definition activities and needs
validation activities. (An example Needs Validation Inspection Checklist is included in the GtNR
Appendix D).
5.2.2 Perform Needs Validation
There are several activities that should be performed to provide objective evidence that the
individual needs expressions and integrated sets of needs are validated to accurately
communicate the intent of the sources from which they were transformed.
Note: Unlike needs verification, needs validation confirming that the intent of the source is
effectively communicated cannot be done without the project team doing the analysis manually -
currently none of the AI or NLP applications in a project toolset have the capability to do this
type of analysis.
Guided by the Needs Validation Inspection Checklist, the project team should:
• Use the trace matrices to perform an analysis to validate that each needs expression clearly
communicates the intent of those source(s) from which it was derived. This activity helps
establish each need has the GtWR characteristic C8 - Correct.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 172

• Assess whether the needs within the set of needs are necessary and sufficient to meet the
intent of the sources they are traced to and derived from. (Note: there will be cases where
a need or group of needs satisfies more than one source.). This activity helps establish the
set of needs has the GtWR characteristic C10 - Complete.
• For each need that references a capability or performance value dependent on a critical
technology, confirm the risk (of implementation) attribute has been defined indicating this
dependency. Also confirm a TRL has been assigned to the technology and there is a TMP
to mature this technology. This activity helps establish each need has the GtWR
characteristic C6 - Feasible.
• Confirm the project documented their assessment that the integrated set of needs is feasible
in terms of cost, schedule and technology maturation and has included key product
development activities in their cost and schedule estimates, including use of enabling
systems, lifecycle concept analysis and maturation, design input requirement definition,
design verification and design validation, system integration, system verification, and
validation, and procurement. This activity helps establish the set of needs has the GtWR
characteristic C12 - Feasible.
• Confirm with the stakeholders associated with each source that the message being
communicated by each need statement is correct and acceptable to ensure the integrated set
of needs are the right needs, i.e., do they accurately represent the agreed-to sources from
which they were transformed? Do the needs correctly and completely capture what the
stakeholders need the system to do in the context of its intended use in its operational
environment, when operated by its intended users, in terms of form, fit, function,
compliance, and quality? There is no substitute for the stakeholders validating that
individual needs and the integrated set of needs represents what is necessary for
acceptance. This activity helps establish each need has the GtWR characteristics C1 -
Necessary, C3 - Unambiguous, and C8 - Correct and the set of needs has the GtWR
characteristics C10 - Complete, C13 Comprehensible, and C14 - Able to be validated.
• For each need expression, ensure system validation attributes have been defined and
included in the need expression addressing the validation success criteria, strategy, method,
and organization responsible for system validation. This information must be defined and
documented before the integrated set of needs is baselined. Doing so ensures what is
necessary for acceptance has been defined and agreed to as well as the project has
allocated the necessary resources for completing system validation activities. This also
helps ensure each need is worded such that the design input requirements, design, and the
system can be validated to meet the need. This activity helps establish the set of needs has
the GtWR characteristic C14 - Able to be validated.
• For each need that addresses an interaction with an external SOI, confirm the specific
interactions have been defined and documented in some type of interface definition type
document or record, e.g., Interface Control Document (ICD), Data Dictionary, etc., or there
is a plan in place to define these interactions. interface This activity helps establish the that
the needs associated with interfaces have the GtWR characteristic C14 - Able to be
validated.
5.2.3 Manage Needs Validation Results
A needs validation record is created documenting the results and outputs of the needs validation
activities. The outputs include the updated input SE artifacts and PM work products shown in
Figure 5-3, Outputs. Ensure attributes A29 - Need Validation Status (true/false, yes/no, not

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 173

started, in work, complete, and approved) and A30 - Status of the Need (in terms of maturity)
(draft, in development, ready for review, in review and approved) have been filled out.
Defects found in the integrated set of needs as well as any defects found in any of the input SE
artifacts or PM work products, must be addressed and corrected before they are baselined.
Changes to any of the system validation information contained in the system validation attributes
included in each need expression should be updated in other system validation planning artifacts
discussed in Section 10.
If it is identified that there is insufficient data to complete needs validation or a lack of a set of
feasible lifecycle concepts from which the needs were transformed, the issue should be addressed
as a risk that could cause subsequent requirement, design, and system validation to be deemed
unsuccessful.
Applications within the project toolset should allow tracking of the status of the needs validation
activities using a dashboard that communicates key metrics related to the needs validation
results. These metrics can be obtained using the needs attributes discussed in Section 5.3 within
the RMT. Making this information accessible will enable all project team members and key
stakeholders to have the same view of the maturity and status of the needs validation activities.

5.3 Use of Attributes to Manage Needs Verification and Needs Validation


Needs attributes that can aid in needs verification and needs validation management include:
(Refer to Section 15 for a more detailed discussion on attributes and definitions of each.)
A1 - Rationale: intent of the need, reason for the need’s existence.
A3 - Trace to Source: Where the need originated: stakeholder, concept, MGO, measures,
user story, scenario, use case, constraint, risk, lifecycle concept, architectural model,
diagram, etc.
A26 - Stability: stable, likely to change, and incomplete.
A28 - Needs Verification Status: Binary - true/false, yes/no, or incremental - not started, in
work, complete, and approved.
A29 - Needs Validation Status: Binary - true/false, yes/no, or incremental - not started, in
work, complete, and approved.
A30 - Status of the Need (in terms of maturity): draft, in development, ready for review, in
review and approved. (A28 is a prerequisite for A29 and A30).

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 174

Section 6: DESIGN INPUT REQUIREMENTS DEFINITION

The focus of this section is an elaboration of the concepts in the System Requirements Definition
Process described in ISO/IEC/IEEE 15288 and INCOSE SE HB. However, unlike those sources
which imply that the stakeholder-owned system requirements are directly transformed into the
system level design input requirements for the SOI, this Manual treats the stakeholder-owned
system requirements as inputs into the Lifecycle Concepts and Needs Definition activities
discussed in Section 4 resulting in an integrated set of needs for the SOI that represents the needs
(and subsequent requirements) for all stakeholders who have a stake in the SOI under
development.
In this section, it is this integrated set of needs that is transformed into the set of system
requirements for the SOI referred to in this Manual as “design input requirements” which address
what the SOI must do to satisfy the needs from which they were transformed.
Given that the SE technical lifecycle processes are applied iteratively and recursively as the
project team moves down the physical architecture, what is described in this section can be
applied to the development of a SOI (system, subsystem, and system element) set of design input
requirements- no matter the architectural level the SOI exists as discussed in Section 6.4.
A summary of the Design Input Requirements Definition activities is shown in Figure 6-1.

Inputs Outputs
• Baselined Integrated set of needs Design Input Requirements • System and allocated baselines sets of
• Set of feasible life-cycle concepts. Definition Activities design input requirements
• Functional architectural and • Prepare for Design Input • Updated feasible lifecycle concepts.
analytical/behavior models Requirements Definition • Updated model elements in the system
• Preliminary physical architecture • Perform Design Input Requirements architecture, analytical, & behavioral
• Design and system validation planning Definition models
artifacts • Manage Design Input Requirements • Physical architecture
• For each need: • Flow down, Allocation, & Budgeting • PBS
⁃ Traceability to its source as shown in • Definitions of interactions across interface
Figure 4-12 boundaries
⁃ Traceability to system validation • Design and system verification planning
planning artifacts artifacts
Enablers • For each design input requirement (as
• Enterprise tailored Guide for applicable):
Writing Requirements ⁃ Traceability to need(s), parent
• Enterprise tailored process for requirement(s), or source
developing & managing needs & ⁃ Traceability to peer requirements
requirements ⁃ Traceability to model elements in the
• Enterprise tailored Guide for system architecture, analytical, &
system verification and system behavioral models
validation ⁃ System verification attributes defined
• Enterprise Product Development ⁃ Traceability to system verification
Process planning artifacts
• Trained systems engineers ⁃ Allocation (flow down) of higher-level
• Requirement management tool design input requirements to the next
• Diagraming & modeling tools level of the system architecture systems
• Stakeholders, stakeholder and system elements
representatives or surrogates ⁃ Budgeting from higher-level design input
requirements to the next level of the
system architecture systems and system
elements

Figure 6-1: Design Input Requirements Definition IPO Diagram.


The focus of the Design Input Requirements Definition activities is on transforming the baselined
integrated set of needs for a SOI into a unique, quantitative, and measurable set of design input
requirements expressed as “shall” statements that are inputs for defining the system architecture,

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 175

flowing the requirements down (allocating) from one level of the architecture to the next, and
implementing a design solution.
The resulting set of design input requirements is verified against the requirement quality
standards defined in the INCOSE GtWR (or similar organizational requirements quality
definition document) and validated against the set of needs from which they were transformed as
described in Section 7.

6.1 Prepare for Design Input Requirements Definition


It is important to understand the I-NRDM approach defined in Section 3 and the Lifecycle
Concepts and Needs Definition activities discussed in Section 4. The result of completing these
activities is not only an integrated set of needs but also the underling analysis and associated
artifacts from which they were formed. As part of these activities, the project team will have
been concurrently defining a preliminary set of design input requirements.
Following this approach, the design input requirements definition activities discussed in this
section will build upon this work, resulting in a mature set of design input requirements that are
ready to be baselined and allocated/budgeted to the subsystems and system elements at next level
of the physical architecture of the SOI unless the SOI is a system element that needs no further
decomposition before being realized by the INCOSE SE HB Design Definition Process.
This concurrent approach is preferred in that issues that may come up while defining the
preliminary set of design input requirements can be addressed in a less formal, agile manner
earlier in the lifecycle during lifecycle concept analysis and maturation activities. The resulting
lifecycle concepts, models, and integrated set of needs will address these issues prior to them
being baselined; avoiding technical debt associated with a more serial document-centric
“waterfall” approach.
The reader is cautioned to be aware of the risks of using an existing set of requirements whether
they were developed for a similar system or were developed by a customer who did not perform
the precursor activities as advocated in this Manual. In either case, without lifecycle concepts
analysis and needs definition for the specific SOI, the real stakeholder intent and expectations
may not be well understood nor completely reflected within these sets of requirements, resulting
in a SOI that may be verified to meet those requirements, but fail to pass system validation.
Organizations that do not use the approach advocated in this Manual will have accumulated a
considerable amount of technical debt and will have to do the activities discussed for lifecycle
concept analysis and maturation activities and needs definition as part of the design input
requirements definition activities.
As shown in Figure 6-1, there are several enablers to successful definition of design input
requirements. These include an organizational tailored GtWR as well as tailored processes for
the definition and management of sets of needs and sets of design input requirements. There
should also be an organizational process for product development, procedures, work instructions,
and experienced systems engineers trained in and knowledgeable in how to perform the design
input requirements definition activities concurrently with the INCOSE SE HB Architectural
Definition Process.
Of particular importance are the RMTs and modeling/diagraming applications within the
project’s toolset used to develop and record the SOI lifecycle concepts, the resulting integrated
set of needs, and traceability among all artifacts. This section assumes the project will be

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 176

moving toward a data-centric approach to SE and recording and managing the set of design input
requirements and establishing traceability using applications within the project’s toolset that
support the data-centric approach discussed in Section 3.
Preparing for design input requirements definition consists of gathering or obtaining access to
the required input artifacts shown in Figure 6-1.
A key preparation activity is the creation of a Design Input Requirements Verification and
Validation Inspection Checklists if one does not already exist. If the organization has a generic
checklist, they can tailor the checklist to the SOI being developed and the project’s specific
processes. This checklist serves as a standard to guide the design input requirements definition
activities as well as provides a standard to measure the quality of the design input requirements
statements and sets of requirements against (requirements verification and requirements
validation as discussed in Section 7). Addressing the activities and questions within the checklist
will lead to successful completion of the Design Input Requirements Definition activities. (An
example Design Input Requirements Verification Inspection Checklist is contained in the GtNR,
Appendix D).

6.2 Perform Design Input Requirements Definition


Design Input Requirements Definition involves the activities shown in Figure 6-2. Each activity
results in data and information needed to define the design input requirement expressions.
Traceability and Feedback

Establish
Traceability

Section 6.2.2
Assess
interactions
(interfaces) &
define Baseline and
Baselined Transform interface Verify & Manage the Needs,
Integrated Set Plan for Needs into Finalize Validate the Requirement,
Design Input requirements Design Input Design Input
of Requirements Design input Requirements Set of Design Requirements Verification, &
Stakeholder Requirements Input Validation
Needs
Definition
for the SOI Section 6.2.3 Definition
Requirements
Definition Management
Outputs

Section 4.0 Section 6.1 Section 6.2.1 Record Section 6.2.6 Section 7.0 Section 6.3 Section 14.0
Section 5.0 Attributes Section 14.0
Section 14.0 or
Section 6.2.4
Flow down,
Plan for Allocation, Design Production
System and Budgeting
Verification

Section 6.2.5 Section Section 8.0 Section 9.0


6.4
Perform Design Input
Requirements Definition Lifecycle and
Section 6.2 Needs
Definition

Section 4.0

Figure 6-2: Design Input Requirement Definition Activities.


Key activities include:
• Transform the SOI integrated set of needs into a set of SOI design input requirements.
o Ensure there is at least one design input requirement that implements the intent of the
need from which it was transformed, and that the implementing requirement(s) is/are
sufficient to satisfy the need [5]. This activity helps establish each requirement has the
GtWR characteristics C1 - Necessary and C8 - Correct.
o Ensure each design input requirement is stated at the appropriate level of the
architecture. This activity helps establish each requirement has the GtWR
characteristic C2 - Appropriate.
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 177

o Ensure each design input requirement is necessary and is not “gold plating”. This
activity helps establish each requirement has the GtWR characteristic C1 - Necessary.
o Ensure each design input requirement and resulting set of design input requirements has
the characteristics of well-formed requirements as defined in the GtWR. This activity
helps establish each requirement has the GtWR characteristic C9 - Conforming.
o Ensure each design input functional requirement is defined in terms of the applicable
performance characteristics. This activity helps establish the set of design input
requirements has the GtWR characteristic C10 - Complete.
• Establish traceability:
o Between each design input requirement and the need from which it was transformed.
This activity helps establish each requirement has the GtWR characteristic C1 -
Necessary.
o Between child design input requirements developed in response to an allocated parent
requirement. This activity helps establish each requirement has the GtWR
characteristic C1 - Necessary.
o Between child design input requirements developed in response to a source (if different
from the need or parent requirement). This activity helps establish each requirement
has the GtWR characteristic C1 - Necessary.
o Between dependent peer requirements. This activity helps establish each requirement
has the GtWR characteristics C1 - Necessary, C8 - Correct, and C11 - Consistent.
• Address interactions (interfaces) and define interface requirements. This activity helps
establish the set of design input requirements has the GtWR characteristics C10 - Complete
and C11 - Consistent.
• Record attributes as part of each requirement expression (Refer to Section 6.2.1.5 and
Section 15 for a more detailed discussion on attributes). This activity helps establish each
requirement expression has the GtWR characteristic C4 - Complete.
• Plan for system verification. This activity helps establish each requirement expression has
the GtWR characteristics C3 - Unambiguous, C4 - Complete, and C7 - Verifiable.
• Finalize design input requirement definition. This activity helps establish the set of design
input requirements has the GtWR characteristics C10 - Complete, C11 - Consistent, C12 -
Feasible, C13 - Comprehensible, and C14 - Able to be Validated.
As part of finalizing the design input requirements the project team will perform the requirement
verification and requirements requirement validation activities described in Section 7. Once
these activities have been completed, the design input requirements can be baselined as descried
in Section 14. Unless the SOI is a system element that needs no further decomposition before
being realized by the Design Definition Process or outsourced to a supplier, the requirements
will flow down to the subsystems and system elements at next level of the SOI physical
architecture though decomposition and elaboration that involves analysis, allocation, and
budgeting as discussed in Section 6.4. For each subsystem and system element at the next level
of architecture the project team responsible will repeat the Lifecycle Concepts and Needs
Definition and Design Input Requirement Definition activities.
6.2.1 Transforming Needs into Design Input Requirements
The Design Input Requirement Definition activities begin with the transformation of the
integrated set of needs into a set of design input requirements appropriate for the level the SOI
exists that communicate “what” the system must do to meet the needs while not including
requirements associated with the “how” design realization of the physical SOI.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 178

This activity helps establish each requirement has the GtWR characteristics C1- Necessary, C2 –
Appropriate, C4 – Complete and the sets of design input requirements have the GtWR
characteristic C10 Complete.
The resulting design input requirements are recorded agreed-to, baselined, and placed under CM
in accordance with the Needs and Design Input Requirements Management activities discussed
in Section 14. For systems that are outsourced or procured, the requirements on the organization
supplying the service or developing the SOI are recorded in a SOW or SA separate from the
design input requirements.
Assuming the project team developed the integrated set of needs and preliminary set of design
input requirements, as discussed in Section 4, the transformation activities are a continuation and
elaboration of the analysis and modeling activities that were performed during lifecycle concept
analysis and maturation and needs definition.
An approach that is helpful is to use the needs-to-requirements transformation matrix shown in
Table 6-1.
Column A Column B Column C
Needs Design input requirements External Interface
Functional/Performance
(Function)
Need 1 Rqmt 1 (could be more than one) Interface (if applicable)
Need 2 Rqmt 2 (could be more than one) Interface (if applicable)
Operational (Fit)
Need 3 Rqmt 3 (could be more than one) Interface (if applicable)
Need 4 Rqmt 4 (could be more than one) Interface (if applicable)
Physical Characteristics
(Form)
Need 5 Rqmt 5 (could be more than one) ……….
Need 6 Rqmt 6 (could be more than one) …….….
Quality (-ilities)
Need 7 Rqmt 7 (could be more than one) ……….
Need 8 Rqmt 8 (could be more than one) ……….
Standards/Regulations
(Compliance)
Need 9 Rqmt 9 (could be more than one) ………
Need 10 Rqmt 10 (could be more than one) ………
Table 6-1: Needs-to-Requirements Transformation Matrix.

While the focus of needs is from the stakeholders’ perspective, the system design input
requirement statements are defined from the technical, developer perspective of the SOI. The
project team does requirements analysis to transform the integrated set of needs into a set of
design input requirements, asking: “What must the SOI do to fulfill each of the needs?” The
answer will be one or more design input requirements that are necessary and sufficient to meet
the parent need.
Using the needs-to-requirements transformation matrix, Column A consists of need statements
written from the stakeholder’s perspective and Column B reflects design input requirements
communicating what the system must do such that the intent of needs in Column A will be met.
Each need statement in Column A, will be transformed into one or more well-formed design
input requirement statement(s) that are written at a level of abstraction appropriate for the level
of architecture the SOI exists and to which the design input requirement is written.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 179

If a need in Column A involves a standard or regulation, multiple requirements will need to be


addressed as discussed below. The resulting requirements are the project team’s response to the
requirements in the standard or regulation whose implementation will result in compliance with
the applicable requirements in the standard or regulation.
Column C is used to record the fact that the SOI needs to interact with another system to
implement the design input requirement stated in Column B. Entries in Column C will be used
to validate the context diagrams and models developed during the lifecycle analysis and
maturation activities discussed in Section 4. If Column C indicates the requirement in Column
B is an interface requirement, then the Column B interface requirement will need to address the
specific interaction across an interface boundary between the SOI and the external system and
include a reference (pointer) to where that interaction is defined (ICD, data dictionary, etc.) as
discussed in Section 6.2.3.
Defining requirements is not an exercise in writing but is an exercise in engineering. Every
requirement represents an engineering decision as to what the SOI must do or a quality the SOI
must have to meet the needs from which they are transformed. The engineering decision as to
what the system must do to meet a need is a result of detailed requirements analysis (ideally
using models and simulations) as well as composing the requirements statements such that they
have the characteristics and follow the rules as defined in the GtWR.
The resulting set of design input requirements represent the analysis and agreed to
transformation from the baselined integrated set of needs. Areas addressed within the resulting
set of design input requirements include functionality (what the system must do), expected
performance and quality (“how well” characteristics), the conditions of action, including
triggering events, system states, interactions with other systems (interfaces) and operating
environments (“under what operating conditions”), compliance (with standards and regulations),
and physical characteristics of the SOI.
6.2.1.1 Organizing the Sets of Design Input Requirements
Organizations need to define a specific approach to organize and manage their design input
requirements best suited to their processes, toolset, culture, and product line - especially
concerning how they will manage requirements within design and construction standards to
which they must comply. This approach should be documented in their organizational needs and
requirements development and management process documentation, work instructions, and the
project’s SEMP.
It is useful to include a template or outline showing the specific method of organization
expected. This template/outline not only serves as a checklist to help ensure all the various
categories of design input requirements have been addressed. A key advantage of using a
template/checklist to help ensure the set of design input requirements has the GtWR
characteristic C10 - Complete.
When organizing the sets of design input requirements, it useful to have more granularity than
just “functional” and “non-functional” requirement categories. A major issue with this grouping
is that “performance” is considered “non-functional” resulting in functional requirements being
written without performance included within the requirement expression. This results in an
ambiguous requirement in that it is not verifiable because of the missing performance that is used
to show the function was performed as intended. Without stating performance as part of the
requirement expression it implies that any performance is acceptable. To avoid this issue, the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 180

GtWR and this Manual refers to functional/performance requirements. If there are multiple
performance expectations for a function, then there will be multiple functional/performance
requirements - one for each performance expectation as discussed below.
To help with the development and organization of the design input requirements, it is useful to
organize them using the same groupings as was discussed in Section 4.6.2.3 and is shown in
Table 6-1 for grouping the integrated set of needs and resulting design input requirements:
function/performance, fit, form, quality, and compliance.
Each of the groupings represents a distinct perspective and source of the design input
requirements. Failing to consider each perspective could result in missing requirements.
Note: For each of these requirement types, the project team should define a standard form or
template by which the requirement statement is written. This allows consistency in how each
type is communicated as well as helping ensure the requirement has the GtWR characteristic C9
- Conforming.
6.2.1.2 Considerations for Each Type of Requirement
Function/Performance
Functional design input requirements and their associated performance characteristics are unique
and are the heart of what actions and capabilities the stakeholders need the SOI to provide. Each
function will have one or more functional/performance requirements that address performance
characteristics such as how well, how many, how fast, etc. a function needs to be performed.
When documenting performance requirements make sure they trace to the function they apply to.
As discussed earlier, stating a functional requirement without some performance expectation is
ambiguous and it may not be possible to verify the system meets that requirement, i.e., the
requirement does not have the GtWR characteristics C4 – Complete, C7 – Verifiable, and C8 -
Correct. See Rule R1 in the GtWR for a more detailed discussion on the structure and form of
requirement statements.
Because of that, it is common to define a “family” of functional/performance requirements.
Each stating the functional name along with an expected performance value and the condition or
trigger associated with the execution of that function.
“The [SOI] shall [perform function A] [with a performance of xxxx] [when/if some trigger or condition]”.

“The [SOI] shall [perform function A] [with a performance of yyyy] [when/if some trigger or condition]”.

“The [SOI] shall [perform function A] [with a performance of zzzz] [when/if some trigger or condition]”.

The “functional/performance requirement family” will have similar attributes and system
verification activities and system verification procedures that will address the family of
requirements. (Refer to Sections 6.2.4 and 15 for more information on attributes.) Evidence that
the SOI provides the function will include evidence that the system successfully meets all
functional/performance requirements in the functional/performance requirement family.
The source of the functional/performance design input requirements can be traced back through
the integrated set of needs to information that resulted from both stakeholder elicitation as well
as the diagrams and models developed during lifecycle concept analysis and maturation activities
shown in Figure 4-12.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 181

While performance values are included in the analytical/behavioral models, the technical ability
(feasibility) to achieve a given performance value is a function of the physical architecture
(physics, chemistry, biology, thermodynamics, etc.). The maturity of the technologies needed to
achieve these performance values should have been assessed during lifecycle concept analysis
and maturation activities and TRL levels assigned to each.
It is common that a need statement for a function does not address all performance values that
need to be communicated. In these cases, it is up to the project team to identify and include all
performance expectations as part of requirements analysis when transforming the need into the
implementing set of design input requirements. This is important, in that these performance
values will need to flow down and be budgeted to the next level of the system architecture.
Functions stated in a need statement may be at the proper level of abstraction for a need
statement, but that level of abstraction may not be appropriate for a design input requirement.
For example: “The stakeholders need the SOI to monitor the physical environment at the
operator’s workstation”. Looking at the rationale for the need statement, the stakeholder’s intent
is to provide a “comfortable” environment for the operator to work in. The project team will
need to transform this need statement into a set of design input requirements that meet this intent.
Given that a comfortable environment is a function of temperature, humidity, and airflow; the
system will need to address all three. The function “monitor” will need to be decomposed into a
set of functions for each parameter: “measure” or “receive”, “store”, “display, and “control”.
(The problem with “monitor” is that only “display” is observable and therefore “verifiable”.
So “monitor” cannot be either a valid function or the action verb in the associated requirement
because the requirement is not verifiable.) Then for each of these functions specific performance
requirements will be defined concerning how frequently the data is sampled and displayed, how
much history is expected to be maintained, how the data will be displayed and in what form, the
frequency of updating the display, and specific parameters for the range the measurements are to
be kept within that will result in a “comfortable” environment.
The function “control” would need to be further decomposed concerning comparing each
parameter to the range it needed to be within and issuing commands to the systems responsible
for controlling each parameter to increase or decrease the value until it is within the proper
range. The requirements resulting from the decomposition could be communicated at the level
of the SOI or at a lower level of architecture.
Each function has inputs and outputs as discussed in Section 4.5.3. Because of this,
functional/performance requirements include interface requirements when the function involves
an interaction with an external system. In these instances, the performance part of the
requirement relates to a specific interaction across the interface boundary as defined in some sort
of interface definition type document such as an Interface Control Document (ICD) or data
dictionary.
The functions “receive”, “display”, and “control” in the example above involve interactions with
external systems across an interface boundary and thus must be written as interface requirements
with a form of:
“The [SOI] shall [interact in some way] [with external system xyz] [in accordance with the definition
documented in xxxxx] [when/if some trigger or condition]”.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 182

Refer to Section 6.2.3 for a more detailed discussion concerning defining interactions across
interface boundaries and defining “interface requirements” that address those interactions.
Some design input requirements can be classified into more than one requirement category. For
example, a functional requirement may address an operational consideration. The important
point is that the requirement has been defined. How the project team classifies it is up to the
organizational guidelines and how the project team applies the guidance consistently for
placement of that type of requirement’s placement.
A rule of thumb for functional/performance requirements:
• If the function deals with a primary function, purpose, or capability of the system, put it
under the Functional/Performance category. This would include functional/performance
requirements dealing with a core function or capability of the SOI. These requirements
would include those that were transformed from a need for functions that have the attribute
“critical” defined.
• If the function deals with a secondary concern during operations to accomplish the primary
functions, document the requirement in the operational section. This would include
functional/performance requirements dealing with enabling functions - functions that
enable the primary functions to be performed. For example, a function that involves
installation or maintenance but does not have anything to do with a primary purpose of the
system, would be documented as a Fit/Operational requirement
Fit/Operational
Fit/operational design input requirements deal with the ability of the system to operate within its
operational environment by its intended users. “Fit” includes human system interactions and
interfaces as well as both the induced and natural environments enabling the SOI to become an
integral part of the macro system it is a part. Some organizations classify “fit” requirements as
“Operational Requirements” given they relate to the external operational environment however
this can be misleading as this may omit aspects of a lifecycle beyond operations (such as
transportation, storage, facilities, personnel interface, maintenance, and logistics.
Fit/Operational requirements also include functional requirements that support or enable the
primary functional/performance requirements. Many of the functional requirements in this
category will be interface requirements.
The sources of fit/operational design input requirements should be able to be traced back through
the integrated set of needs to information that resulted from both stakeholder elicitation activities
as well as the external interface, context, and functional flow diagrams and models developed
during lifecycle concept analysis and maturation activities.
When defining the “fit/operational” requirements it is useful to assess how the SOI will interact
with the external operating environment not just during operations, but during all its lifecycle
phases.
Each of the areas below should have been addressed during the lifecycle concept analysis and
maturation activities and reflected with in the resulting integrated set of needs. Many of the
areas below involve interactions (interfaces) between the SOI and external systems.
Refer to Section 6.2.3 for a more detailed discussion concerning defining interactions across
interface boundaries and defining “interface requirements” that address those interactions.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 183

Things to consider include:


• Transportation, handling, and installation. Given the SOI may need to be moved,
transported, and installed, what this will involve? Are specific features needed to allow the
SOI to be moved around within a facility or transported between facilities? Often the size
and weight of a SOI is predicated on the mode of transportation. Are there any special
interfaces needed for handling, transportation, or installation, not needed during normal
operations? Are special packaging or containers needed during transportation to protect the
SOI from the environment associated with handling, transportation, or installation?
• Facilities. What are the facility requirements that enable the system to operate and perform
as needed? Facilities need to be considered for every lifecycle phase including
manufacturing, testing, and storage as well as operations. Each may have unique handling,
lifting, support/test equipment, and environmental requirements.
• Training and personnel. What are the training and personnel considerations that reflect on
how the product is designed and built? The military does this well…a 3-year enlistee
cannot take 2 years to train to operate or maintain a system. This area also involves
determination of anthropometric constraints based on an analysis of the typical users
(personas as discussed in Section 4), e.g., vision, grip, reach, mass, language of labels and
displays, training, expertise, certifications, etc. Requirements dealing with training and
personnel are challenging to write but are needed to reduce operational costs. Because of the
importance and difficulty addressing these types of requirements there are specialty engineering
subject matter experts who focus on HSE and HSI type requirements.
• Maintenance. How will the system be maintained and updated? What access is needed,
what information needs to be generated by the system to help with diagnostics and
troubleshooting, what type of tools or test equipment will be used? Are there any unique
interfaces that may be needed to support maintenance, i.e., a test port to connect diagnostic
equipment not used during normal operations?
• Environments. Address operational, non-operational, transportation, and storage
environments. Address both induced environmental conditions as well as natural
environment. Also, include requirements related to what the SOI is allowed to introduce
into its operational environment: vibration, noise, heat, EMI/EMC, etc. During movement,
transportation, or installation, the SOI may be subjected to environments (loads,
temperature, humidity, particulates, electromagnetic emissions) that are quite different than
it will be exposed during normal operations or storage. Does the SOI need to operate
during movement or transportation? Does the SOI need to meet all its requirements
(survive) after being subjected to the transportation environment?
• Logistics. To meet its requirements over its operational life, what supplies, and
consumables are needed over the operational lifetime for operations and maintenance? In
what quantities?
The areas above need to be defined and included in the project’s checklist and template for
design input requirements to ensure that all these areas are addressed that are applicable to the
SOI being developed. Each of these areas often result in unique requirements and involve
interactions across interface boundaries between the SOI and external systems. Missing or
incorrect “fit/operational” requirements often cause problems during not only operations but
during system integration, system verification, and system validation resulting in budget
overruns and schedule slips. Not addressing this class of requirements often results in an
inability if the SOI to be able to meet the primary functional/performance requirements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 184

Form
Form design input requirements address the shape, size, dimensions, mass, weight, and other
physical characteristics that uniquely distinguish the SOI. For software, “form” requirements
may address number of lines of code, memory requirements, programing language, etc.
“Form” requirements address SOI characteristics associated with the physical system that are not
always included within functional, architectural, or analytical/behavioral models. As design
input requirements, addressing “form” usually are constraints that are driven by the macro
system the SOI is a part. Form requirements may originate directly from the stakeholder
elicitation activities or from the lifecycle concept analysis and maturation activities as well as the
architectural definition activities.
The project team needs to ensure that each of the physical characteristic requirements are needed
and there is good rationale for including them in the set. It is easy to cross the line into
implementation. Stay at the “what” level, not “how”. Do not over constrain the SOI. It is
especially important that traceability is established to the source of all “form” related
requirements to ensure they are indeed “necessary”.
Form requirements will also be allocated/budgeted to the next lower level of the architecture for
implementation.
Quality
Quality design input requirements address “fitness for use” (safety, security, and various quality
“ilities”, e.g., reliability, testability, operability, availability, maintainability, operability,
supportability, manufacturability, interoperability, safety, security, to name a few.)

Some considerations when writing quality requirements include:


• Quality requirements associated with the physical architecture often are not identified from
the functional architecture or analytical/behavioral models.
• Quality requirements tend to apply to the system as a whole and will need to flow down via
allocation and budgeting to lower-level subsystems and system elements.
• Quality requirements tend to be difficult to define and implement. Because of this they are
often defined, managed, an implemented under the heading “specialty engineering” by
subject matter experts with the proper training and experience.
• Quality requirements are difficult to verify against and often involve statistical analysis
best performed by the specialty engineers with the proper training and experience.
• Quality requirements can be cost and schedule drivers and classified as “Key Driving
Requirements” (Refer to Section 15 concerning needs and requirements attributes.)
• System verification and system validation against quality requirements presents a challenge
that must be addressed early in the project in that some (e.g., lifetime related requirements)
may involve extensive testing over a period of time to gain the confidence needed for
acceptance.
• Key expectations of the stakeholders include quality; however, these expectations are often
not stated explicitly, if at all. Because of this, it is up to the project team to collaborate
with the stakeholders during the elicitation activities to ensure the stakeholder expectations
for quality are explicitly stated and addressed during lifecycle concept analysis and
maturation activities and communicated within the integrated set of needs.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 185

• There are many qualities “-ilities” that can be defined. Below are some examples. (The
reader can Search Wikipedia for quality or non-functional requirements to get a listing of
the most used “-ilities” along with definitions and example requirements.) Note that not
all “ilities” apply to all subsystems, system elements, or systems.
o Maintainability. Maintainability is the ability of a system to be maintained.
Maintainability can be expressed in terms of maintenance times, maintenance
frequency factors, Meantime to Repair (MTTR), maintenance labor hours, maintenance
cost, tools needed to repair, etc. Specific attributes of software that relate to ease of
maintenance of the software itself, mode for troubleshooting, diagnostics, ability to
update the software/firmware, etc.
o Operability. Ease of everyday operations…start automatically, cease operations,
number of actions an operator/user needs to perform to do something, etc.
o Availability. What are the expectations for how often the product is available for use
when operated in its intended environment by its intended users? 24x7, xx% of time
during peak periods? Availability is dependent on maintainability, reliability, and
periodic maintenance procedures.
o Supportability. What features and characteristics need to be defined to keep the SOI
operational?
o Manufacturability. Manufacturing requirements/constraints, need to retool, design for
assembly, design for manufacture, etc.
o Reliability. Lifetime, operational lifetime, storage lifetime, allowable failure rate,
Mean Time to Failure (MTTF), Mean Time Between Failures (MTBF), etc.
o Security. Consult with security subject matter experts early in the project to understand
which security related requirements should be included. For many software systems,
security and is a major concern. Especially at the interfaces and to prevent non
intended users from preventing the system to be used as intended or using the system in
an unintended way. There are many standards and regulations dealing with system
security. Note: Security requirements may involve critical functionality of the SOI or
deal with the way the SOI interacts with external entities across interface boundaries.
As such, they could be recorded within the function, fit, or compliance categories. The
reader is also advised to consult with the INCOSE Security Working Group for
additional guidance.
o Safety. Consult with safety subject matter experts early in the project to better
understand which safety related requirements should be included. There are many
standards and regulations dealing with safety. Safety can address both safety in respect
to the users and operators as well as the operational environment and systems in which
the SOI interacts. Many of the HSI requirements will be related to safety. Note: Safety
requirements may involve critical functionality of the SOI or deal with the way the SOI
interacts with external entities across interface boundaries. As such, they could be
recorded within the function, fit, or compliance categories. The reader is also advised
to consult with the INCOSE Safety Working Group for additional guidance.
o Interoperability. The ability of software and hardware on different machines from
different vendors to share parts and data. The ability of parts from one system to be
used “as is” in another similar system, operational environment, and purpose.
Each organization needs to define the types of quality requirements they will include within the
set of design input requirements based on the domain and expectations of their customers and
needs of other stakeholders and included in the checklist and template for design input
requirements to ensure that all are addressed. Each will result in unique requirements. Missing

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 186

or incorrect “quality” requirements are often the cause of failed system validation, product
recalls, warranty work, and negative reviews on social media. This determination should be
done within the strategic and business operations levels of the organization and reflected within
the business requirements and stakeholder needs and stakeholder-owned system requirements
and are allocated to the SOI.
Modern RMTs allow an organization to develop and maintain a library of -ility, safety, security
requirements that apply to their domain and product line. This allows projects to pull
requirements from this library, rather than each project from “reinventing the wheel” for these
types of requirements. This approach also helps ensure there will be no missing quality,
security, and safety requirements helping to achieve the characteristic of a set of design input
requirements C10 - Complete.
Compliance
Compliance requirements address the design and construction standards and regulations the
project team must show compliance. For many systems, applicable standards and regulations
can represent a substantial portion of the design input requirements. Compliance with standards
and regulations are drivers and constraints that come directly from the stakeholder elicitation
activities as discussed in Section 4. All applicable standards and regulations should have been
identified within the integrated set of needs.
Below are best practices and guidance to use for defining requirements dealing with standards
and regulations during the transformation activities.
• In most cases, the need statements will call out standards and regulations by document
number. As part of the transformation activities the project team will have to determine the
specific version of each standard and regulation and its date that is applicable.
• Within an organization, business unit, and product line, strategic level and business
operations level requirements will have identified the applicable standards and regulations
that apply to the products and services developed or supplied by the organization. Ideally,
the requirements within these standards and regulations will have been imported into the
organization’s toolset database in a form that will 1) allow the organization to assign
applicability of the standards and regulations to specific projects and systems to be
developed and 2) allow the projects to establish traces from their implementing
requirements to the applicable standard or regulation requirement(s).
o For each standard or regulation, the organization needs to establish which requirements
within a standard or regulation are applicable to the type of products produced or
services provided by the organization. It is dangerous to call out a complete standard or
regulation when only a portion of the requirements apply. All requirements invoked
within the set of design input requirements will have to be implemented in the design
and the system verified to meet those requirements.
One way to establish applicability to specific projects, products, or services is to
develop an applicability matrix [33][34] for each standard and regulation that are
applicable to the organization. In the applicability matrix for a given applicable
standard or regulation, sections of requirements or individual requirements are listed as
a row heading. Individual projects, products, and services are listed as column
headings. For each row, an “X” is placed in any column to which the requirement or

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 187

set of requirements identified for that row applies. (Note in a RMT or similar tool, the
“X” represents a link or trace.)
With this approach, need statements within the integrated set of needs would invoke the
columns within the organization’s applicability matrices for the SOI being developed.
For example: “The stakeholders need the SOI to comply with [regulation xyz]
requirements as indicated in column F of [regulation xyz applicability matrix.”] Using
this approach, the project team would then know which specific requirements in the
regulation or standard that applies to their SOI and to which they would have to show
compliance.
This approach can also be used within a SOI. The specific regulation or standard
requirements applicable to the SOI can be allocated to lower-level subsystems and
system elements using this same approach.
• Requirements within standards and regulations are written “generically” at a level of
abstraction that is applicable to a class of products, but not necessarily the specific products
being developed by the organization or a specific project. In addition, the requirements in
some standards and regulations do not have the characteristics of well-formed requirements
as defined in the INCOSE GtWR. As a result, the requirement statements often contain
wording that seems ambiguous or not appropriate (in terms of system verification) for the
level the project is recording the requirements. Because of this, the project team should not
copy and paste individual requirements from applicable standards and regulations into their
requirement set blindly, nor have requirements that just invoke all or part of the
requirements within a standard or regulation. There are several basic approaches the
organization can take to address this issue.
o For each applicable requirement in a standard or regulation, the organization can
require each project to derive custom, well-formed requirements having the
characteristics as defined in the INCOSE GtWR or similar document that meet the
intent of the source requirements within the standards and regulations. With this
approach, the project would establish traceability between their requirements and the
source requirements within the organizations database which meet the intent of the
requirements in the standards and regulations. They would also need to collaborate
with the Approving Authorities to define the system verification and system validation
attributes for each requirement such that verification that the SOI meets that
requirement would provide adequate evidence that the intent of the source requirement
within the standard or regulation was met and that the SOI is in compliance with the
source requirement.
o Alternately, the organization could develop their own version of each standard or
regulation tailored to the product lines developed by the organization, containing well-
formed derived requirements having the characteristics as defined in the INCOSE
GtWR or similar document) that meet the intent of the source requirements within the
standards and regulations.
With this approach, the organization would establish traceability between their
requirements and the source requirements. They would also need to collaborate with
the Approving Authorities to define the system verification and system validation
attributes for each requirement such that verification that the SOI meets that
requirement would provide adequate information that can be used as evidence that the
intent of the source requirement within the standard or regulation was met. Using this

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 188

information, the Approving Authorities could accept the organization’s tailored


standards and regulations as equivalent to those mandated. [27]
Using this approach, the project team could establish links within their set of design
input requirements to the applicable tailored requirements using the applicability matrix
concept. This approach is preferred from a reusability standpoint in that it would save
considerable time and money not requiring individual projects to repeat these actions,
over, and over.
• The number of requirements invoked on a project dealing with standards and regulations
can be large, taking considerable time, resources, and money to manage, implement, and
show compliance. [27] Alternate approaches include having the organization specify
specific requirements concerning stakeholder expectations for quality, safety, security, etc.
rather than calling out all the standards and regulations concerning these topics. The result
is often a much smaller number of requirements that still clearly communicate the intent
and expectations, but which can be implemented much more effectively.
As in the case above, the organization would need to collaborate with the Approving
Authorities to define the system verification and system validation attributes for each
requirement such that verification that the SOI meets that requirement would provide
adequate information that can be used as evidence the intent of the source requirement
within the standards or regulations would be met. Using this information, the Approving
Authorities could accept the organization’s tailored standards and regulations as equivalent
to the actual ones.
• Many standards and regulations contain at least three types of requirements: Process
requirements on the developer/designer; technical requirements (design input requirements
as well as design output specifications) on the SOI itself, and requirements dealing with
system verification and system validation activities. It is important that the process
requirements be addressed in project plans, SOWs, or SAs directing the project team or
supplier; the SOI technical requirements that are invoked in set of design input
requirements; and the applicable verification/validation/test planning artifacts and system
verification and system validation procedure requirements. Do not mix these three types of
requirements in the SOI set of design input requirements.
o There are cases where standards contain specific design implementation for some
concern, without communicating what the actual concern is or reason for that specific
implementation. In these cases, the design input requirement is a design constraint that
is an exception to the “avoid design implementation” within the design input
requirements.
• Requirements in standards and regulations change overtime. Organizations need a policy,
supported by processes, to determine how these changes will be managed for the
requirements standards and regulations invoked within the set of design input requirements.
Not all changes will have an impact on the SOI being developed. If not impacted by the
change, updates to set of design input requirements are not necessary. There are some
changes that will have an impact, e.g., a change to a regulation (law) or a change to an
interface definition document and the system will not be able to interact successfully with
the other system without invoking the change to the interface requirements within the set of
design input requirements.
There may also be changes that do affect the SOI, but not its intended use in the operational
environment or a critical function. In these cases, there should be provisions to

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 189

“grandfather” the changes in that the current system does not have to be compliant, but any
new versions or models of the system will have to be compliant.
• The organization must have a process that enables the organization to be knowledgeable
when any standard or regulation changes as well as which projects could be impacted by
those changes. This capability is often contained within the organization’s CM office.
• It is common for a standard or regulation to call out other standards or regulations that
contain requirements. This can be a serious issue when one document calls out another and
that document calls out yet another, and so on. Failing to address this issue, the project
team will have lost control of the project, because they no longer have a say if or which of
these lower tier requirements apply and which they will have to show compliance. One
way to address this issue is to consider the current set of design input requirements as “Tier 1”.
Any requirement in a standard or regulation invoked directly by a requirement in the Tier 1 set of
design input requirements is considered a “Tier 2” requirement. If that Tier 2 requirement calls out
requirements in another document, those requirements are considered “Tier 3”. In cases like this,
it is recommended the organization have a policy that says, “Any Tier 3 or lower requirements are
not applicable to the project - if any requirements within a Tier 3 or lower document do apply, they
will be invoked directly within the set of Tier 1 design input requirements”.
• In the past, it has been a customary practice to call out entire standards or regulations or
sections a standard or regulation within a requirement statement. “The SOI shall be
complaint with all applicable requirements within standard xyz”. or “The SOI shall meet
all requirements within regulation xyz, Section 4.5.9.11.” In the first example, who
determines which requirements are applicable? In the second example, how certain is it
that all requirements in this section are applicable? This is like kicking the can down the
road and letting someone else determine which requirements are applicable or not. This is
a real issue if contracting to a supplier who will implement the requirement set.
In either case, there are multiple issues.
o As discussed above, the quality of the requirements in the standard or regulation is
often lacking, and their intent unclear - often there is no rationale.
o A standard or regulation could contain hundreds of requirements, of which only a
portion apply to the SOI under development.
o In some cases, requirements in one standard or regulation may be inconsistent or
contradict a requirement in another similar standard or regulation. Who determines,
which one is applicable?
o Will all the requirements in the document or section invoked by the design input
requirement be allocated the same way to lower-level subsystems and system elements
within the system architecture?
o For cases when the development of the SOI is contracted to a supplier, who determines
which requirements are applicable and who determines the system verification and
system validation Success Criteria, Strategy, and Method for each?
o Lastly, is the question of design and system verification. Each requirement within the
invoked document or section will have to be implemented in the design and the design
and system verified to meet each of those requirements. All the system verification and
system validation attributes would need to be defined for each of these requirements
and the system verification and system validation artifacts discussed in Section 10
would have to be developed. This would involve a lot of time and resources if each
project did this, especially if the requirements in a standard or regulation are poorly
written and the intent not clear. If the organization develops their own tailored

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 190

standards and regulations as discussed earlier, they could also include the system
verification and system validation attributes and artifacts allowing the projects to reuse
this information.
6.2.1.3 Guidelines when Formulating Design Input Requirement Statements
Below are several guidelines to consider when formulating each design input requirement.
Design Input Requirements versus Needs
To help distinguish design input requirements from needs, design input requirements statements
include the word “shall” and need statements do not. “The stakeholders need the system to
……….” or for a goal “The stakeholders would like the system to ……”. versus design input
requirement, “The SOI “shall” …” or for a goal, “The SOI “should” ……”
Using these distinct formats helps make a clear distinction between design input requirements
and needs. The GtWR defines the structure and characteristics of well-formed design input
requirement statements and sets of design input requirements as well as rules that help to write
design input requirement statements that have those characteristics.
A common issue during the transformation of a need into a design input requirement is to write a
design input requirement on a stakeholder rather than the system. For example, there may be a
need: “The stakeholders need the system to allow users to [do something]”. A common error is
to rewrite the need statement as a requirement: “The user shall be able to [do something]”. This
is not an appropriate form for a design input requirement. The project team would need to do an
engineering analysis to determine what the system must to do such that users will have the
capability to do that action. Based on that analysis, the project team would then write one or
more design input requirements that when implemented by the design would result in the user
being able to do that action as stated in the need statement.
Tolerances and Ranges
Tolerance refers to a permissible deviation from a specified value. Tolerances may be expressed
in measurement units, percent of span, or percent of reading. A range refers to a span of
acceptable values. Tolerances and ranges are usually used in the production of a thing or a
characteristic of that thing. There are several considerations when defining tolerances and ranges
for values within a requirement statement.
First, if the tolerance or range is too “tight” or the range too “narrow” the cost to design and
manufacture a system that meets that tolerance or range will be more expensive, as will the cost
to verify the system meets that tolerance or range. It is important to plan ahead for design,
manufacturing, and system verification when stating tolerances and ranges in a requirement
statement.
Second, if the tolerance is too “loose” or range is too “wide”, the possible variability during
manufacturing may result in an issue with “tolerance stack up”. This is when the combination of
+/- tolerances or allowable ranges may result in a SOI that does not work. For example, there
may be a performance requirement for the overall SOI that has been allocated to several
subsystems and system elements at the next level of the architecture. At the SOI level the
performance requirement has a range of acceptable values. Each of the child requirements at the
next level will also have to have a range specified. Each child requirement may be further
allocated to lower-level subsystems and system elements, each deriving their own requirements

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 191

with a range. If these parts and components within the system elements are designed and
manufactured independently, there is a high likelihood that when integrated together the
combination of +/- ranges could result in the parent system requirement failing to perform within
its required range. For mechanical parts with tolerances, the result may be where two parts that
need to be mechanically attached will have mechanical interfaces that do not align properly.
Accuracy and Precision
For requirements that deal with taking a measure, the concepts of accuracy and precision (or
imprecision) must be considered as a way to express expected performance. While similar to
tolerance, accuracy and precision are different concepts.
Accuracy is a measure of how close an average of measures is to a baseline value expressed as a
percent. Precision is a function of the distribution of measurements taken, i.e., closeness of
agreement between independent, repeated measures obtained from the same sample under
specific conditions. The closer each measurement is to other measures, the more precise the
measuring system. Precision is represented by the standard deviation (in units of the test) or
coefficient of variation (in units of percent). Imprecision (random error or random variation)
represents a lack of repeatability or reproducibility of the same result; represented by the
standard deviation (in units of the test) or coefficient of variation (in units of percent).
As for tolerances, there are several important considerations. First, if the accuracy or precision
values are too “tight” or “narrow” the cost to design and manufacture a system that meets those
performance values will be more expensive, as will the cost to verify the system meets those
values. It is important to plan ahead for design, manufacturing, and system verification when
stating requirements that deal with accuracy and precision. Second, are the expectations for
accuracy and precision over the life of the system as discussed below.
System Lifetime and Expected Performance
It is common there will be design input requirements for performance stated separately from the
quality requirements (-ilities), e.g., a lifetime requirement. An issue that must be addressed
when defining the design input requirements is whether the performance or quality value in the
requirement statement applies to beginning of life (BOL) performance of the system or end of
life (EOL) expected performance, or both.
For the instrument example discussed previously in Section 4.6.3.2, the customers would expect
the accuracy and precision requirements to apply to both BOL and EOL. Degradation is a
certainty in most physical systems. In some cases, some degradation may be allowed in the
system performance. If so, there should be a design input requirement stating the amount of
allowed degradation over the required operational life of the system. This could result in a
system whose performance is better than stated in the design input requirement for BOL to meet
the EOL requirement. In some cases, it may be best to state requirements for both BOL and
EOL. If there is no degradation requirement and the expectation for performance is EOL, this
must be stated clearly so the project team can make allowances during design for natural
degradation within the system components so the verification Success Criteria can be met, and
the system will pass system verification and system validation when the system is produced.
Also, when there are requirements for EOL performance, do these requirements assume
preventative maintenance that will result in the EOL requirements to be met? If so, this must be
clearly communicated to the design team and reflected in the preventive maintenance plans.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 192

There is also what is referred to as “design” lifetime versus “operational” lifetime. Consumer
product warranties are often based on the design life. There are many cases when the actual
operational lifetime is greater than the design life (e.g., rovers on the surface of Mars, cars that
are driven 200,000 miles); there are also examples for some consumer products where the
operational life is remarkably close to the design life (that is, where a consumer product fails just
after the warranty period ends.).
Another consideration is when multiple parts of the system play a role in overall system
performance, how are lifetime performance requirements are allocated or budgeted to these parts.
If one part does not meet its budgeted value, can the other parts make up the difference, such that
the integrated system can be verified to meet its performance requirements across the entire
design lifetime?
Another issue with lifetime, is that the lifetime requirements are often stated incorrectly or
incompletely. It is common to have a design input requirement for lifetime that states: “The
[system] shall have a lifetime of at least 5 years”. If there are 50,000 copies of the system, what
does this requirement imply? After 5 years, does this mean all 50,000 copies of the system are
expected to meet all the design input requirements or some percentage of the copies? Does
lifetime include time spent during shipping, storage, and operations, or only operations? How
does routine preventative maintenance impact the lifetime requirement and expected
performance? Another common issue is whether the “years” is the appropriate unit of measure?
If the system is only operated 8 hours/day, 300 days/year over the 5-year period, then “hours” of
operation may be a more appropriate unit of measure for stating operational lifetime.
Lifetime for a space vehicle must be treated differently than for a terrestrial system that can be
maintained. For a long duration space exploration mission, there will be both beginning of
mission (BOM) and end of mission (EOM) requirements for key system performance, for
example a radio isotope driven power supply.
If a customer extends the system lifetime need and requirement after the product is released, this
is really a change in needs and requirements which could result in a need to requalify the system
for the extended lifetime, especially for an EOL/EOM requirement.
6.2.1.4 Appropriate to Level
One of the characteristics of well-formed design input requirements and sets of design input
requirements stated in the GtWR is the characteristic C2 - Appropriate. As stated in the
INCOSE GtWR, the specific intent and amount of detail of a need or design input requirement
statement is appropriate to the level (of abstraction) of the entity to which it refers as well as
appropriate to the level of architecture it exists. Refer to Sections 2.3 and 6.4 for a more detailed
discussion on “levels”.
Design input requirements statements are written at a lower level of abstraction than are need
statements. For example, it is acceptable for a need statement to state, “The stakeholders need
the system to meet government safety standards and regulations”. However, this level of
abstraction is too high for what would be communicated within a requirement statement. The
system level technical design input requirements would be more specific as to exactly which
standards and regulations apply and which specific requirements in those standards or
regulations are being invoked on the SOI as discussed earlier.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 193

For example, “The stakeholders need the SOI to be compliant with government safety standard
(specific standard name and number.)” While the level of abstraction may be appropriate for a
need statement clearly communicating that the stakeholders need the system to be compliant
with this safety standard, it is not appropriate for a design input requirement statement.
For this example, as part of the transformation activities, the project team would read the
standard listed, determine which specific requirements apply to the SOI, and then derive well-
formed design input requirement statements that meet the intent of each applicable requirement
in the standard as discussed earlier.
Another example for a medical diagnostic system:
• System need statement: “The stakeholders need the [xyz] diagnostic system to [measure or
detect] [something] with an accuracy better than similar devices currently in the market”.
This is an appropriate level of abstraction for a need statement, clearly stating the
stakeholder’s expectation concerning accuracy; however, this would not be a good design
input requirement.
• Requirement transformed from the need statement: “The [xyz] diagnostic system shall
[measure or detect] [something] with an accuracy of at least [xxxxx] [unit of measure]”.
The project team has determined the current state-of-art accuracy in the market, explored
various concepts for meeting the stakeholder’s need for accuracy, have examined
candidate technologies, have assessed their TRL, and have decided that the value that is at
least [xxxxx] is feasible with acceptable risk for this lifecycle stage.
As stated, this is stated at an appropriate level of abstraction for a design input
requirement. The developers will also define other related design input performance and
quality requirements concerning precision, total allowable error, false positives, false
negatives, time to determine a result, etc. Each of the requirements will be traced to the
need statement from which it was derived.
Requirements must also be appropriate to level of the architecture they are defined, and the level
the system will be verified to meet that requirement. For example, system level requirements are
written as “The System shall ……”. The integrated system will be verified to meet these
requirements. These system level requirements are allocated to subsystems and system elements
at lower levels of the architecture for implementation as discussed in Sections 2.3 and 6.4. The
subsystems and system elements at the next level will elaborate the allocated requirement
depending on the role the subsystem or system element has in the allocated parent’s
implementation.
For example, there may be a SOI level requirement that states, “The SOI shall operate at a
voltage of 28 VDC ± 4 VDC”. This requirement would be allocated to the lower-level
subsystems and system elements that use electrical power. One of these would be the power
system. The power subsystem would go through the needs definition activities discussed in
Section 4, and the resulting set of power subsystem needs would be transformed into a set of
power subsystem design input requirements of the form “The Power Subsystem shall …….”
These requirements are unique to the Power Subsystem. As such, during system integration, the
Power Subsystem would be verified to meet all its “Power Subsystem shall …” requirements. It
would not be appropriate to communicate any Power Subsystem unique requirements at the
system level. Nor would it be appropriate to communicate the system level power requirement at
the Power Subsystem level. (If it were, it would not be allocated to the other subsystems or
system elements that are required to operate at the required voltage and current.)
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 194

A common “appropriate to level” issue is stating design implementation details (design outputs:
“how”, build-to/code-to) within the design input requirement set. Design input requirements are
meant to be “why/what”, design-to level of abstraction. The detailed design requirements belong
in design outputs: design output specifications, drawings, algorithms, or diagrams. Stating
design output level of abstraction requirements as design inputs results in several problems.
First is the issue of innovation. By stating the “how”, it is like saying: “I do not care if there is a
better way, do it may way.” In most cases it is best to state the “why/what” and leave it up to the
designers to determine the most effective “how”. Of course, there are exceptions, in that there
may be a good reason for stating implementation. In these cases, the implementation
requirement is treated as a constraint. To avoid confusion, the rationale for the implementation
requirement (constraint) must be clearly stated.
Another problem with requirements that state the “how” concerns allocation (See Section 6.4).
When design details are shown as design inputs, there is often no definition of the why and what
concerning the intent the detailed design requirement is addressing. In some cases, the reason
“why/what” for the implementation reveals that more than one subsystem or system element has
a role in meeting the intent. The parent (why/what) needs to be captured at the system level and
then allocated to the subsystems and system elements having a role in meeting that requirement.
Failing to do so could result in there be missing requirements for the subsystems or system
elements. This issue is the main reason for this Manual to use the phrase “design input
requirements” rather than just “requirements” or “technical requirements”.

Problem Space
Design Inputs
Focus on design inputs, preliminary
logical & physical architectures
Integrated Set of Transformation
Needs The “line”
Design Input Transformation
Design Output Specifications
Requirements can include requirements,
Design-to specifications, algorithms,
“What” Transformation formulations, drawings, &
Architecture & other design output artifacts
Design

Solution Space Design Output Transformation


Focus on design outputs, maturing the Specifications
logical & physical architectures, design, Build-to/Code-to
design output specifications, realized “How” System of
system of interest Interest

Figure 6-3: The “Line” Between Design Inputs and Design Outputs.
As shown in Figures 6-3 and 6-4, a useful construct is “the line”. The “line” separates design
inputs from design outputs. In Figure 6-3, the line is shown between the design inputs and the
Design Definition Process where the “what/design to” requirements appropriate as design inputs
are communicated “above the line” and “how/build-to/code-to” requirements are communicated
“below the line” in the design output specifications.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 195

System
C|N|R

Analysis
Decomp

Subsystem Subsystem Subsystem


C|N|R C|N|R C|N|R

Analysis Analysis Analysis


Decomp Decomp Decomp

System System System System System System


Element Element Element Element Element Element
C|N|R C|N|R C|N|R
C|N|R The C|N|R The
C|N|R The
Analysis Design
“Line” Analysis Analysis Design “Line”
Design
“Line”

Decomp Spec Decomp Decomp Spec Spec

System System System System System System


Element Element Element Element Element Element
C|N|R The
C|N|R The
C|N|R The
C|N|R The
C|N|R The
C|N|R The
The “Line”
“Line” “Line” “Line” “Line” “Line” “Line”
Design Design Design Design Design Design
Spec Spec Spec Spec Spec Spec

Figure 6-4: The “Line” Within a System Architecture.


In Figure 6-4, the line is applied to a system architecture consisting of subsystems and system
elements. Design input requirements for the system flow down to subsystems and system
elements at the next level of the system architecture for further decomposition and elaboration.
For system elements that need no further decomposition to be realized by the Acquisition
Process or Design Definition Process (buy, build, code, or reuse), the line shows the boundary
between design inputs and design outputs.
Use of “the line” concept during design input requirement definition activities. During the
definition of the design input requirements, when someone proposes a requirement that is a level
of abstraction associated with design definition (design outputs), project team members can say:
“While that is a good design output requirement, it belongs below the line in the design output
specifications, not above the line in the set of design input requirements”.
6.2.1.5 Managing Unknowns
During the transformation of needs into the design input requirements, there may be needs that
contain values that are marked with a "To Be Determined (TBD)" or “To Be Resolved (TBR)”,
in place of, or in addition to, an actual value. In other cases, a need statement may contain an
ambiguous value. For example: “The stakeholders need the SOI to [process] the input data fast”.
Fast is ambiguous and not verifiable. Given those that defined the integrated of needs did not
define “fast”, the issue will need to be addressed during transformation. See Section 14.2.5 for a
more detailed discussion on Managing Unknows.
This activity helps ensure individual needs have the GtWR characteristics C3 – Unambiguous,
C4 – Complete; C6 – Feasible, C7 – Verifiable, and C8 – Correct.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 196

6.2.2 Establish Traceability


The system under development along with each of the subsystems and system elements shown in
Figure 6-4 are represented by a set of lifecycle concepts, an integrated set of needs, and a set of
design input requirements. Each of the system elements that are implemented via design are also
represented by a set of design output specifications. In addition, for each set of needs there is
system validation artifacts defined; and for each set of design input requirements there is system
verification artifacts defined.
The individual sets of lifecycle concepts, needs, design input requirements, design output
specifications, system validation artifacts, system verification artifacts do not exist in isolation,
rather they represent a multi-level, 3-dimensional “spider web” of relationships which represents
a data and information model of the integrated system. These relationships are documented via
links that allow the relationships to be traced between the entities that are linked both vertically
across levels and horizontally across the lifecycle. This is the concept of traceability.
• Traceability.
o A discernible association between two or more entities such as needs, requirements,
design, architecture, subsystems, system elements, verification artifacts, validation
artifacts, or tasks.
o The ability (process) to trace (via linkage) a lower-level requirement back to its parent
requirement (child-to-parent), a requirement to its source, a requirement to the need it
was transformed from, or a set of related requirements to each other (peer-peer).
• Bidirectional traceability. The ability to trace any given design input requirement or need
to its parent or source (bottom to top) while automatically establishing a reverse link back
to its implementing child need or requirement (top to bottom).
o Bidirectional traceability is an inherent characteristic of most RMTs and modeling
tools, in that once a link is made from one entity to another, a reverse link is
automatically formed. Thus, once a set of child requirements has been linked to its
parent or source, the parent is automatically linked to its child requirements. Likewise,
once a requirement is linked to the need or source from which it was transformed, the
need or source is automatically linked to the implementing requirement.
Traceability helps establish that the set of design input requirements has the GtWR
characteristics C1 - Necessary, C10 - Complete, and C11 - Consistent.
Traceability provides the ability to track needs and requirements from their origin to the
activities and deliverables that satisfy them. Traceability can be “bidirectional”, “forward and
backward”, or “up and down.” Traceability can be horizonal across the lifecycle as well as
vertical between levels of the architecture.
Not all projects require the same amount of traceability documentation, so the specific
deliverables that are traceable for the project are determined during needs and requirements
management planning. Generally, the more complex or regulated a system, the greater the need
for traceability. A project in a heavily regulated industry or one with numerous components,
interfaces, risk, and stakeholders requires more detailed traceability than a project without those
characteristics.
Requirements can have various types of traceability, including:
• Parent/Child - shows connection of a higher-level allocated requirement that sponsored the
need for one or more child requirements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 197

• Source - shows connection to where requirement content derived from (such as a


constraint, standard, regulation, MGO, measures, concept, risk, a model, analysis, or need)
• Allocation - a trace from a higher-level requirement to a lower-level subsystem or system
element the parent requirement is allocated or budgeted to. Note: this is not a requirement-
to-requirement link, but a requirement to a lower-level subsystem or system element within
the SOI physical architecture, for which child requirements will be defined and then trace
back to the allocated parent requirement.
• Peer - displays relationships among requirements at the same level, either within the same
set or requirements contained in different subsystem or system element sets of
requirements. The relationship could be general or grouped by topic (such as connecting
requirements of a particular theme, connecting interface requirements, requirements
sharing a common budgeted quantity, connecting performance requirements relating to a
common function, etc.)
• Interface definition - provides traceability between an interface requirement and the agreed
to definition concerning the interaction across an interface boundary between the SOI and
another entity.
• Dependency - shows a relationship of one requirement to one or more requirements in
which there is a dependency - e.g., items that must be completed together to be satisfied
(can be other requirements, or representation of specific conditions) or a relationship to
another requirement such that a change in one will result in the need to change the other.
The other requirement could be in a separate set of requirements for a different subsystem
or system element.
• Design - shows a relationship between a design input requirement and its design
implementation and resulting design output specifications.
• System Verification: displays relationship of requirements to verification artifacts or
activities that will provide evidence of requirement satisfaction.
• System Validation - displays relationship of needs to validation artifacts or activities that
will provide evidence of need satisfaction.
• Model entity - a trace between a need or requirement and an entity within a model. For
example, a functional requirement would be linked to a function within a functional model;
a performance characteristic of a function would be linked to that function within the
model.
This is not an exhaustive list but shows the kind of traceability that can be established within a
set of requirements, requirements in other sets of requirements, and other artifacts within the
SOI’s integrated dataset (needs, models, diagrams, design artifacts, system verification and
system validation planning artifacts, etc.).
Note: Not all requirements must trace to a parent. Allocated parent requirements are not the
only source of requirements. As shown in Figure 2-7, design input requirements are a result of a
transformation from one or more needs in the integrated set of needs which are transformed
from the set of lifecycle concepts as well as multiple other sources as shown in Figure 4-12.
While all the allocated requirements will have child requirements that trace back to the parent,
other requirements are derived based on the Lifecycle Concept and Needs Definition activities
and as such will not trace to an allocated parent requirement. Developing design input
requirements solely based on allocated parent requirements will result in an incomplete set of
design input requirements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 198

Some of this traceability can be supported by use of attributes (such as A2 - Trace to Parent, A3 -
Trace to Source, A5 - Allocation/budgeting, A32 - Trace to Interface Definition, and A33 - Trace
to Peer Requirements, and A37 - Risk (mitigation)) as defined in Section 15.
For complex systems consisting of multiple subsystems and system elements, each with their
own sets of design input requirements, establishing, maintaining, and managing all the traces
effectively can be difficult if done manually using standard office applications. This is a major
reason RMTs were developed so that traces could be established and managed within a relational
database. With the move towards a data-centric approach to SE and increased use of models,
applications have been developed to allow not only traceability within and between sets of
requirements but traceability between requirements and all other SE artifacts across all lifecycle
stages. Some RMTs enable the user to define a set of traceability rules within the tool. The
RMT then can help the user to both establish traceability per the rules, but also alert the user
when a rule is not being followed.
Within the SOI’s integrated dataset, the established traceability can be thought of as a
“Traceability Record”. Note: As used in this Manual, the traceability record is not a specific
thing, but is a representation of the traceability links established within the SOI’s integrated
dataset. See also the discussion on the use of traceability matrices below.
This is a key concept when adopting a data-centric approach to SE and the Information-based
Requirement Definition and Management discussed in Section 3. Multiple tools can build links
between requirements, needs, and other artifacts, and direction and type of links can be
established to describe unique relationships between requirements and other artifacts represented
within the SOI’s integrated dataset. It is this information that is part of the Traceability Record.
Parent/Child Traceability
It is a common convention to have child (lower-level requirements) link to parent requirements
(higher-level requirements) as these are often created after the parent requirements are generated.
An example of a parent - child trace that can be established from linking is shown in the Coffee
Maker (CM) example shown in Figure 6-5.

Coffee Maker (CM) SN1: The Stakeholders need the CM to provide a hot,
Need drinkable cup of coffee on demand.

Coffee Maker System CM1: The coffee maker shall heat water from an
initial temperature of 13°C +15°C/- 10°C to the
Design Input Requirements selected brewing temperature within 1 minute.

PWR1: The Power System shall supply 28 VDC Power


Other Subsystem and Power Subsystem having the characteristics defined in [TBD ICD] to the
System Element Design Input Requirements brewed coffee tank heating element within 2
seconds of receiving the CM Command System
Design Input Requirements Power On command defined in [TBD ICD].
(not shown for clarity)
PS1: The Power Supply shall receive from the facility
120 VAC power having the characteristics defined in
[TBD ICD].
Other Power Subsystem & Power Supply PS2: The Power Supply shall produce 28 VDC power
System Element System Element having the characteristics defined in [TBD ICD].
Design Input Requirements Design Input Requirements
(not shown for clarity) PS3: The Power System shall supply to the Coffee
Machine 28 VDC bus, 28 VDC Power having the
characteristics defined in [TBD ICD].

Figure 6-5: Example Requirement Parent / Child Trace.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 199

Starting at the bottom, the CM Power Supply system element requirements are traced to their
allocated parent CM Power Subsystem requirement, which is traced to its allocated parent CM
system requirement, which is traced to the CM need from which it was transformed.
These parent/child relationships can be established and maintained in the RMT as a set of links
from the lower-level requirements to the higher-level requirements. In a data-centric practices of
SE, the need can be traced to its source. Once these links are established, bidirectional
traceability is also established.
Traceability is performed concurrently with the transformation of needs into design input
requirements and continues as lower levels of subsystem and system element needs and
requirements are defined. It is important that when a need or design input requirement is written,
the associated trace attributes and linkages are be captured in the RMT traceability record at that
time. Going back later and trying to establish traceability after the fact, can be difficult and time
consuming.
Using Trace Matrices
Being able to visualize the parent/child relationships that result from traceability can be a
challenge. A “Trace Matrix” is a common visualization of the traceability record showing the
above relationships in tabular form. The display of a trace matrix supports the analysis needed
to show that each need has been transformed into one or more design input requirements, that
each requirement is needed by linking it to the need it was transformed, a parent, or source as
well as showing the requirement’s implementation at the next level of the system architecture by
displaying its child requirements for each subsystem or system element it was allocated to. As
discussed earlier, a subsystem requirement may not always trace to an allocated parent, but to a
subsystem level need or source.
System System Subsystem System Element Requirement
Need Requirement Requirement
SN1: The CM1: The coffee PWR1: Upon receipt PS1: The Power Supply shall receive
Stakeholders need maker shall heat of the CM Command facility120 VAC power having the
the CM to provide a water from an initial System Power_On characteristics defined in [TBD ICD].
hot, drinkable cup temperature of command defined in PS2: The Power Supply shall
of coffee on 13°C +15°C/- 10°C [TBD ICD], the Power produce 28 VDC power having the
demand. to the selected System shall supply characteristics defined in [TBD] ICD.
brewing 28+/-2 VDC Power to
temperature within the brewed coffee PS3: The Power System shall supply
1 minute. tank heating element to the Coffee Machine 28 VDC bus,
in less than or equal 28 VDC Power having the
to 2 seconds. characteristics defined in [TBD ICD].
[Additional
Subsystem
Requirements would
be shown below]
Table 6-2: Example Trace Matrix.

The trace matrix provides a visualization of the traceability record that can be used to manage
sets of needs and sets of design input requirements throughout the system lifecycle. The trace
matrix also provides a structure as an aid to help assess and manage changes, as well as assessing
consistency and completeness of the requirement set and artifacts the requirements are linked to.
Rather than a trace matrix, some RMTs have the capability to show the linkages between
requirements in a diagram or tree structure.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 200

6.2.2.1 Establishing Traceability Between Dependent Peer Requirements


Requirements are often related to other requirements at the same level. In fact, in today’s
increasingly complex, software-intensive systems, dependency between requirements for a
system, subsystem, or system element as well as between subsystems and system elements has
increased exponentially.
There are cases where a requirement cannot be satisfied in a solution without the other
requirements being satisfied. There may be dependent requirements such that a change in one,
could mean another must be changed. Interface requirements come in pairs - System 1 has an
interface requirement to interact with System 2; System 2 must have a reciprocal requirement
that is involved in the interaction with System 1. (Refer to Section 6.2.3 for a detailed
discussion on interface requirements.)
In other cases, a resource may have been allocated (budgeted) to multiple subsystems or system
elements at the next level of the architecture. The resulting requirements form a dependent set,
such that any changes in the budgeted parameters could require changes in another budgeted
parameter to be consistent with the parent budgeted parameter. In these cases, all the budgeted
parameters must be managed as dependent variables. (Note: This is a major issue in a
document-based practice of SE where these variables are frequently treated as independent
variables.) (Refer to Section 6.4 for a detailed discussion on allocation and budgeting.)
A major point is that the dependent requirements are often within different sets of design input
requirements across different subsystems and system elements within the system architecture.
To properly capture and manage these dependencies, all subsystems and system elements within
the system architecture need to be identified, defined, and managed within the SOI’s integrated
data and information model of the integrated system under development. This is especially
important when different internal and external organizational units are developing parts of the
architecture. (Note: Again, this is a major issue in a document-based practice of SE where
dependent requirements may exist in separate documents often developed at different times and
managed by different organizational units.)
Dependency analysis is a technique that is used to discover dependent relationships between
requirements and between requirements and other work products. Once analyzed, the set of
requirements is recorded by linking dependent requirements together. In addition to traceability
matrices, some RMTs allow the dependencies to be viewed visually either in tabular form or in a
graphic form, e.g., a traceability tree.
Dependency analysis can be used to help ensure alignment and consistency between needs,
design input requirements, and design output specifications and the project’s plans, PM work
products, and other SE artifacts generated across all system development lifecycle phases.
Dependency analysis also can be used to help ensure bidirectional traceability and consistency
between lifecycle concepts, needs, stakeholder-owned system requirements, system, subsystem,
and system element requirements, architecture, design output artifacts, system verification
artifacts, and system validation artifacts.
The management of dependencies is another major reason for using a data-centric approach to
SE and the advantage of using RMTs that support traceability across the lifecycle and language-
based modeling tools. Being able to manage dependencies is also critical in managing change

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 201

and assessing the impacts of change throughout all work products and artifacts generated across
the system lifecycle.
Note when using both RMTs to defined and manage needs and requirements as well as modeling
tools as part of the analysis used to define the needs and requirements, there needs to be
traceability between needs and requirements in the RMT and the representation of those needs
and requirements in the model. This is key to being able to maintain consistency and correctness
of the needs and requirements no matter which tool is used to view them. This capability results
in the ability to change a need or requirement in one tool and have that change automatically
reflected in the other tool so there is a single source of truth.
Dependency analysis helps establish that the set of design input requirements has the GtWR
characteristic C11 - Consistent.
6.2.2.2 Guidelines for Recording and Managing Traceability
There are a number of useful guidelines for recording and managing traceability:
• There is a range of tools available for establishing and managing traceability, from simple
spreadsheets and tables to high-end applications that control the requirements and provide
full traceability across the lifecycle. Unless there are a small set of requirements, it is
highly recommended the project team uses an RMT or other application that allows the
establishment and management of traceability relationships between requirements and their
parents, sources, and needs they were transformed from in the form of traceability records.
The tools used to establish traceability and create and manage the traceability records
should be identified at the beginning of the project, as traceability can quickly become
complex and switching tools mid-project could present major challenges.
• When models are used as an analysis tool to identify needs and design input requirements
as discussed in this Manual, the tools in the project toolset need to enable linking
requirements managed within the RMT to the models from which they were derived, even
when the model is developed and maintained within another application as discussed
above. Recording each of these links is part of the traceability record.
• Design input requirements are transformed from the integrated set of needs. A trace to the
need from which a requirement is transformed, should be established when the
requirements are initially defined and recorded within the RMT.
• Child requirements are created via either decomposition or derivation in response to a
parent requirement allocated to the SOI the child is being defined for. (Refer to Section 6.4
for a detailed discussion concerning allocation.) The trace to its parent and source should
be established as each child requirement is initially defined and recorded within the RMT.
• All requirements must trace to a need, source, or a parent. Requirements that do not have
this trace, are referred to as “orphan requirements”. Note: in some literature, the concept of
“self-derived requirements” is discussed. The justification is that the engineers know the
requirement is needed even if it cannot be traced to a parent. This is a bad practice. Even
if the requirement does not trace to an allocated parent, there should be a source or need
from which it was transformed. There should be no orphans.
• It is a best practice to define the system verification attributes when a requirement is
defined. If the information in these attributes is maintained in another location or
application, traceability to the system verification attributes should be established when the
requirement is initially defined and recorded within the RMT.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 202

• There are cases where a child requirement may have multiple parents, needs, or sources.
Each case must be assessed for its validity versus an error when establishing traceability
within the toolset.
• The trace of all requirements to a parent, source, or need should be evaluated,
independently, if possible, to ensure that the requirements trace is correct during
requirement verification as discussed in Section 7.
• Many of today’s modern RMTs allow traceability rules to be defined. These rules help
users to establish traceability when requirements are entered into the tool. The tool, in turn,
can inform users when the rules are not being met. This is an important capability needed
to help ensure the accuracy and validity of the trace record maintained within the tool.
6.2.2.3 Use of Traceability to Manage Requirements
The traceability information within the traceability records allows for needs and design input
requirements monitoring and controlling including approving and baselining the integrated set of
needs and set of design input requirements, managing changes, monitoring needs and
requirements status, and communicating results. As discussed in Section 7, traceability is a
major tool used during verification and validation of the sets of needs and sets of design input
requirements prior to baseline. Once the integrated sets of needs and sets of design input
requirements baseline is established, the project team members responsible for the needs and
requirements definition and management can use traceability to help ensure changes are
addressed throughout the lifecycle as defined in the project’s change management process as
discussed in Section 14.
Traceability records viewed as either a trace matrix or trace tree can provide valuable insight for
the project team. They can provide the project team an understanding of the relationships
between requirements at all levels of the system architecture and can provide project team
members an understanding of the impact of not being able to implement a requirement (what
other requirements and needs are impacted?).
Traceability along with allocation can be used to uncover possible issues within a requirement
set as discussed in Section 14.4.
6.2.2.4 Requirement Relationships within Models
As discussed in Sections 3 and 4, the use of language-based models is highly encouraged when
doing lifecycle analysis and maturation activities and identification of the needs that are
contained within the integrated set of needs. When this approach is used, traceability between
the needs and model elements representing those needs must be established as each need
statement is defined.
Then during the transformation of the needs into the design input requirements, the project team
elaborates these same models in the identification of the requirements, their allocation, definition
of child requirements as the architecture is defined and the team moves down to lower levels of
the architecture. As this is done, traceability relationships between requirements are established
within the tool. As these models mature, the project team can use the models to help validate the
requirements. [7] [8]
Many of the benefits in using traceability relationships are additionally enhanced when modeling
requirements in SysML and other language-based modeling tools.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 203

When using requirement content in SysML or other language-based modeling tools, there are
additional ways requirements can show relationships to other requirements or other elements
within the model using requirements diagrams. Requirements diagrams are used to display
textual requirements, the relationships between requirements, and the relationships between
requirements and other model elements. Types of relationships within SysML include:
• Containment - showing how a model element is contained within a larger package, such as
showing how requirements contained within a specific theme package.
• Trace - showing that requirements have a dependency, changes to a connected requirement
could result in the need to change a dependent requirement.
• Derive requirement - type of dependency, shows a requirement was derived from the
connected requirement.
• Refine - type of dependency, connecting a requirement to a model element that provides
more details, such as a use case.
• Satisfy - type of dependency, connecting a requirement to a model element that provides
fulfillment of the requirement within the design.
• Verify - type of dependency, connecting a requirement to a model element that provides
evidence of requirement satisfaction.
Current SysML and other language-based tools provide ability to make these relationships and
display them graphically or in tabular form.
SysML and other language-based tools also allow the ability to show allocations. This is most
often done showing allocation from structural or behavior elements from one model element to
another. Allocations are most commonly shown graphically through the SysML requirements
diagrams, showing the elements associated to the requirements through a "satisfy" relationship.
Note: at this time, the current version of SysML does not include an entity “needs” and thus does
not support the development of “needs diagrams” as it does for “requirements diagrams”.
When this capability is added to SysML most of the relationships above would apply except for
needs, a new relationship “validate” would should be included so a need statement could be
connected to a model element that provides evidence of need satisfaction.
6.2.3 Defining Interactions and Recording Interface Requirements
Because of the critically of properly addressing interactions across interface boundaries and
managing these interactions, this section is included to help the reader better understand the
concepts of interface boundaries, identifying those boundaries, identifying interactions across
those boundaries, defining those interactions, and writing design input requirements associated
with the interactions across interface boundaries. Refer to Section 14.5 for a discussion on
managing interfaces.
The phrase “interface requirement” refers to the specific form or template for a
functional/performance requirement that deals with an interaction of a system across an interface
boundary with another system. As such, interface requirements should not be considered a
separate type of requirement when organizing the set of design input requirements - doing so
often leads to confusion and duplication of requirements. Interface requirements may be
included with the functional/performance requirements or “fit” requirements discussed
previously. Safety, security, and HSI requirements often include interface requirements as well.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 204

In Section 4 the methods associated with identifying interactions (interfaces) between systems
and assessing and mitigating risk associated with those interactions was discussed. The
integrated set of needs addressed each interaction at an appropriate level of abstraction. During
the transformation from the needs to design input requirements, a lower level of abstraction is
needed when defining each of the interface requirements.
A key characteristic of today’s increasingly complex, software-intensive systems is the number
of internal interactions within a system between its subsystems and system elements, as well as
between the system and external systems as shown in Figure 6-6. The increased number of
interface boundaries and interactions across those boundaries relates directly to the complexity of
a system, increasing the complexity of integration of the system elements and subsystems as well
as assessing both positive and negative emerging behaviors of the integrated system as a result of
those interactions.
Another key characteristic of today’s software-intensive systems is the form of the interactions.
In the past when many of the systems were mostly mechanical/electrical/fluid the interfaces were
more visible involving connectors and pin assignments, wires, pipes, cables, pressure lines,
mechanical parts, bolts, etc. that could be easily shown on a drawing. In software-intensive
systems there can be multiple computer modules, each with embedded software that
communicates (data, commands, messages) across one or more communication busses. In
today’s automobiles, it is common to have more than 150 of these computer modules feed by
multiple sensors and controlling multiple actuators.
Operating
Environment

System
System
Element
em C|N|R
yst System System Subsystem
bs Element Element
Su
C|N|R C|N|R
System ∂
System System System
C|N|R Element Element
C|N|R
C|N|R C|N|R

System System
Element Element
C|N|R C|N|R

System System
Element Element
C|N|R C|N|R

System System m
te m
Element Element ys
u bs yste
C|N|R C|N|R S bs
System
Su
bsy Subsy Su
ste ste System
m m Element
C|N|R
C|N|R
System
C|N|R

C|N|R: Concepts | Needs | Rqmts

Figure 6-6: Complexity is a Function of the Number of Interactions Among System Elements.
Given that the behavior of a system is a function of the interaction of its parts as well as
interactions with the external systems and environment of which it is a part., it is critical the
project team identifies and defines each of the interactions between all subsystems and system
elements that make up the system as well as interactions with external systems. Failing to do so
will result in costly and time-consuming rework during system integration, system verification,
and system validation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 205

While the set of needs identifies the need for a SOI to interact with external systems across an
interface boundary, the resulting design input requirements must address each specific
interaction (power, mechanical, data, messages, commands, etc.) along with a pointer to where
those interactions are defined (e.g., an Interface Control Document (ICD) or similar type
document, location in a database, data dictionary) for each interaction (internal or external).
This section goes into more detail concerning identifying interface boundaries, defining each
interaction across each boundary, and writing interface requirements.
What an Interface is
“An interface is a boundary where, or across which, two or more systems interact” as shown in
Figure 6-7.
Physical
Electronic
Electrical
Hardware
Software
Software
Environment
Human/Machine

Interaction(s)
System System
1 Interaction(s) 2
Interface
Boundary
Figure 6-7: An Interface is a Boundary, not a Thing.
The systems could be engineered systems, human systems, or natural systems. The interaction
could be direct (actual connection between two systems or indirect (no direct connection but
there is some design feature of a system that can affect a design feature of another system, e.g.,
induced environments or competition for a common resource.)
In the definition of an interface, the key words are “boundary” and “interact”. From a
requirements standpoint, any time the wording of a requirement indicates or implies an
interaction with another system, there is an interface boundary involved across which the two
systems interact. “Interact” involves a function verb/object pair. The function verb indicates
some action concerning receiving an input or supplying an output, the object is the actual “thing”
that is crossing the interface boundary. The “performance” aspect is included in a definition of
the interaction, often contained in an interface definition or control type document as discussed
below in Section 6.2.3.2. If there is an interaction across an interface boundary, the requirement
dealing with the specific interaction is classified as an “interface requirement”.
Physical interactions can include mechanical, electrical, electronic, power, gases, fluids, and
software/hardware. There are functional interactions that include information transfer (data,
commands, messages), human/machine, maintenance, and installation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 206

Induced environments are environments that are the result of the operation of a system; natural
environments are the result of natural conditions. Induced environments include thermal,
loads/vibrations, acoustic, electromagnetic, radiation. As such, induced environments involve an
interaction across an interface boundary and are usually addressed along with other direct and
indirect interactions when defining the interactions and writing interface requirements.
Requirements concerning natural environments and induced environments from existing external
systems are usually covered when defining the operational environment as constraints.
Interactions between the SOI and the natural environment are not normally shown in external
interface or boundary diagrams, where the focus is interactions with other engineered or human
systems.
Often overlooked, induced environments also include outputs of the system to the natural
environment which could include pollutants and waste. Pollutants include light, thermal,
chemical, electromagnetic, hazardous materials, or radiation. Requirements concerning
pollutants and waste are also coved when defining what the system can output to the natural
environment as constraints contained in standards and regulations.
What an Interface is Not
It is important to understand what an interface is not. A general rule is that the word “interface”
should not be used in a requirement statement either as a noun or a verb. As a noun, it implies
the interface is a thing, which it is not - it is a boundary across which, or at, two systems interact.
As a verb, it is ambiguous, in that often there are multiple interactions between systems across a
single interface boundary.
It is a best practice to focus on individual interactions when writing interface requirements. This
is important from both a system verification perspective and an allocation perspective. Also,
multiple interactions imply multiple thoughts, resulting in a requirement statement that does not
have the GtWR characteristic C5 - Singular: Stakeholder needs or requirements statements
should state a single capability, characteristic, constraint, or quality factor.
Examples on how not to write an interface requirement are:
• The digital interface shall maintain full operational capability after two failures. This
requirement assumes the interface is a thing and has functionality - this is not true.
• The interfaces between the spacecraft and payload shall be designed to … This is a
requirement written in passive voice on the designers and also assumes the interfaces are
things. The requirement should be on accessibility of connectors, bolts, etc.
• The interfaces between the spacecraft and payload shall have standard labels, controls, and
displays. This requirement again is written in passive voice and assumes the interface is a
thing.
• The electrical interface between the spacecraft and payload shall have a reliability of
0.99999. This requirement again assumes the interface is a thing. The requirement is on
each of the systems and applies to any hardware or software of each system involved in the
interaction on each side of the interface boundary.
• The SOI shall interface with …………… This requirement is ambiguous because it does
not focus on a specific interaction. There are often multiple interactions, to be singular,
there should be a requirement for each interaction.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 207

Unfortunately, it is common to see statements like these. The bottom line: There should be no
requirements that say, “The interface shall …...” or “The [SOI] shall interface with ….”
Writing interface requirements is a three-step process:
Step 1: Identify the interface boundaries and interactions across those boundaries
Step 2: Define the interactions across the interface boundaries
Step 3: Write the Interface requirements.
The following sections are an elaboration of these steps.
6.2.3.1 Step 1: Identify the Interface Boundaries
Note: Step 1 should have been completed during the needs elicitation, drivers and constraints
identification, risk assessment, lifecycle concepts analysis and maturation, architecture
definition, and needs definition activities discussed previously in Section 4. As part of these
activities models and diagrams were developed that identified each interface boundary and each
of the interactions across those boundaries.
Before the interactions can be defined and interface requirements written, an analysis needs to be
done of the System of Interest (SOI) under development and the context in which it interacts
with the macro system it is a part (external interfaces) and an analysis of the parts that make up
the SOI and how they interact with each other (internal interfaces.)

Launch
Vehicle Launch
Simulators Pad
Ground
nical

ands

Support
Environment

Power
Co

Power, Mecha
Da

Data, Comm

nt

ds
r,

Equip
m

an l
ta

we

me

Supply
m

m
om ica
Po
an

Pow
on

, c han
ds

er
vir

ta c
Da , Me
En

r
we
Mechanical Po
Test Power, Mechanical
Access
Fixtures Thermal, Pointing Payload
t& Data, commands
Tes Data Com
Hea
lth ma n
ds
Ground
Spacecraft D at Control
Ground ds a
ma n Comm
Com
En

Sp

Test
Navigation

vir

Satellites
nt

Co

ac
on ,
vir ce

ds
me

on

Equip
e,
mm

ta
En Spa

an
me

Da
an

mm
D a an
Co
n
ds

ta
m

Co
m

Ground
ds

Ground Facilities
Transport GPS Comm
Network

Figure 6-8: Example External Interface, Context, or Boundary Diagram.


A common diagram used to show these interactions is an external interface diagram sometimes
referred to as an external interface, context, or boundary diagram shown in Figure 6-8.
Using a data-centric approach, diagrams, and models as discussed in Section 4, all the external
systems which the SOI has an interaction across its lifecycle should have been defined and

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 208

assessed. For the Spacecraft shown in Figure 6-8, there are 14 external systems shown. There
are multiple interactions between the Spacecraft and each of the external systems. The arrows
indicate directionality (inputs/outputs) of each interaction.
In some cases, there may be one or more intermediate systems between the SOI and another
external system it interacts as shown in the case for communications between the Payload, the
Spacecraft and Ground Control via a Ground Communications Network and one or more
communication satellites. While the focus may be interactions (exchange of data and
commands) between the Payload and Ground Control, the interactions with the intermediate
systems must be addressed as well.
In this example, from a Payload data and command perspective, there would be interface
boundary definitions and requirements for each interacting pair of systems: Payload/Spacecraft,
Spacecraft/Satellite, Satellite/Ground Comm Network, Ground Comm Network/Ground Control,
AND Payload/Ground Control, for a total of 5 sets of interaction definitions and interface
requirements.
For each system external to the spacecraft in Figure 6-8, an individual Interface Block Diagram
can be developed showing the specific interactions between the Spacecraft and each of the
external systems. For the example shown in Figure 6-8, there would be at least 12 separate
individual Interface Block Diagrams. An example showing the individual interactions between
the Spacecraft and its Payload is shown in Figure 6-9. Each of the individual interactions must
be defined and will result in one or more interface requirements.

Commands
Data
Power
Spacecraft Thermal Payload
Mechanical
Pointing

Interface
Boundary
Figure 6-9: Example Individual Interface Block Diagram.
6.2.3.2 Step 2: Define the Interactions Across the Interface Boundary
Each interaction shown in the individual Interface Block Diagrams, must be defined. To
completely define an interaction at or across an interface boundary, three things must be
addressed:
• The characteristics of the thing crossing the interface boundary.
• The characteristics of each system at the interface boundary.
• The media involved in the interaction.
The characteristics of the thing crossing the interface boundary are important design inputs as
they communicate the information the designers need to know to realize the interactions. The
thing that is involved in the interaction could be electrical, in which case the characteristics of
the electricity involved need to be defined: voltages, currents, noise, impedance, ripple, rise and

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 209

fall times, etc. Also included would be any requirements concerning protection from shorts,
crosstalk, and current spikes. The thing crossing the interface boundary could be commands,
data, messages, gases, or hydraulic fluid. In the case of commands, data, and messages the
definitions would include what specific data, commands, and messages, their format, specific
identifiers, and rate (number per unit of time). Protection from errors in the exchange of data,
commands, and messages also need to be defined as well as any security requirements associated
with the interaction. If gases or fluids, the characteristics and quality of the gases or fluids must
be defined along with pressures, temperatures, and flow rates.
The characteristics of each system at the interface boundary are defined as design outputs. For
an electrical, electronic, or fluid/gas interfaces the specific connectors or for a mechanical
interface, the details concerning the mechanical connections would be defined as part of the
Design Definition Process, e.g., fasteners, bolts, etc. The physical characteristics of the system
at the interface may be recorded in a drawing showing the mechanical interface, bolt hole
patterns and sizes, thickness of the metal, characteristics of the mating surfaces, torque values,
mechanical loads, thermal transfer, etc. If an electrical, data, or command interface, the
connectors involved with the connection: the type and part number of connectors, pin
assignments, isolation, grounding, etc. would be defined. If a fluid or gas connection, the
allowable leak rate, if any, must be defined both for during mating/de-mating and while mated.
Actual part numbers would be shown on the drawings. Individual data parameters, commands,
and messages are often defined in a data dictionary.
The media is also defined as a design output. The media could be electrical/electronic through a
wire, physical contact; fluid or gas flow through a tube, pressure line, or pipe; an RF signal
through the air or space, fiber optics; data via a common communication bus, electro-magnetic,
Bluetooth, WIFI, etc. Wire sizes, types of wire, shielding, wire covering, pipes, pressure ratings,
burst pressure requirements, leak rates, and flexibility would all have to be addressed as part of
the design activities and communicated in ICDs and design output specifications.
Communications across an interface boundary can be complex. Using the Open Systems
Interconnection (OSI) model for networking and telecommunications, there are seven layers of
interactions (e.g., physical versus functional) across interface boundaries that must be defined
and addressed by the design.
In many cases, there is a standard that defines both the media and the characteristics of the
systems at the interface boundary for example, Ethernet, USB, Networks (IEEE 802.xx), wiring,
pressure lines, etc. These standards are important from safety, security, and interoperability
perspectives. An operator does not want to be injured when disconnecting or connecting a high-
pressure line, homeowners do not want unauthorized personnel able to access their home
network, someone buying a new printer expects it to work with their existing computers and
network. Standards for interactions between systems address these issues.
Applicable standards associated with interactions across interface boundaries need to be invoked
within the set of design input requirements. As such these standards both constrain and drive the
design. It is common to reference the standards in the interface definition documents or
database.
For developing systems, not all this information will be known until the design is complete. In
the beginning all that can be defined as design input requirements is what the thing is that is
involved in the interaction and its characteristics and the role each system has depending on
whether the interaction is an input or output.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 210

The details of what the system looks like at the interface boundary and the media involved are
design outputs and will be included as part of the design output specifications. Thus, the
definition statements in an ICD or other similar interface definition document or database may
start out with placeholders - TBDs/TBRs - for tables, drawings, graphs, etc. When the design
dependent information is known, the TBDs/TBRs can be replaced with the actual design
information. Before the systems can be built or coded, there can be no TBDs/TBRs in the design
output specifications nor in the document or location in which the definitions are recorded. In
this sense, interface definitions evolve as the design evolves. (Refer to Section 6.2.1.3 for more
details concerning managing TBXs.)
The evolutionary nature of interface definitions for developing systems must be addressed when
contracting out the development of system elements to a supplier. The role of the supplier, their
relationship with other suppliers their SOI interacts with, their role with the customer and/or
integrating organization, and how they are to accommodate the evolution of the interface
definitions must be addressed in the SOW or SA. Failing to do so often results in expensive
contract changes as well as budget overruns and schedule slips.
The general format of an interface definition statements is:
• [Thing being defined] is[are] [whatever the definition is]. or
• [Thing being defined] is as shown in [Drawing xxxxx] or [Figure yyyy].
• [Thing being defined] has the characteristics shown/defined in [Table or Graph zzzz.]

It is important to understand the difference between interface definitions and the interface
requirements that invoke those definitions. Notice the terms “shall” and “will” are not used for
an interface definition because the definition is just stating an agreed-to fact. The design input
requirement that will drive design and to which the design and system will be verified against
will invoke the applicable definition for the specific interaction the requirement is addressing.
Given that an interface requirement is a type of functional requirement, the interface definition is
the performance part of the requirement.
Example interface definition statements include:
• The DC voltage [supplied by System 1] has the characteristics shown in Table xyz or
Figure 123.
• The mechanical attach points [between System 1 and System 2] are as shown in Drawing
xyz.
• The fluid [supplied by System 1] has the characteristics defined in Table xyz (pressure,
quality, flow rate, temperature, etc.)
• The leak rate at the connection [between System 1 and System 2] is less than xxx units per
unit of time.
• The commands [sent by System 1] are defined in table xyz.
• The data stream [accepted from System 2] has the characteristics defined in ……….
• The data parameters used within the SOI are defined in [Data Dictionary xxxxx].
• System 1 printer port complies with USB 3.0 standard.
These are statements of fact that need to be recorded in the data and information model, agreed
to, baselined, and configuration managed in a form that can be referred to by the interface
requirement.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 211

Defining Interfaces with Existing Systems


For existing systems, their design is complete so their interactions with external systems will be
defined in an existing ICD or similar form in tables, figures, and drawings developed as outputs
of the INCOSE SE HB Architecture Definition Process and Design Definition Process.
The interface definitions for the existing system define what some future developing system
must do to interact with the existing system. As such, interface definitions for existing systems
are constraints on the new developing system. Any developing system that wants to interact with
the existing system must comply with the existing system’s interface definitions for each
interaction. The existing system’s definitions do not contain “shall” statements because they are
defining the as-built system’s interface boundary, media, and characteristics of the things
crossing the interface boundary - statements of fact.
In the example shown in Figure 6-10, when existing System 1 was designed and built, the
existence of System 2 specifically was not known, but there was a requirement for System 1 to
interact in some way with future systems like System 2.
In this case there will be no specific requirements stating, “System 1 shall [interact in some way
with System 2] as defined in [location the interaction definition is recorded]”. From System 1’s
viewpoint, if any other future system wants to interact with it, that other system has to do it in
accordance with System 1’s requirements [definitions].

Interface
Boundary

Existing Interaction(s) New


System Interaction(s)
System
1 2
System 1 System 2
interaction definitions interface requirements
recorded in an ICD or Definition invoke System 1
electronic form interaction definitions
Figure 6-10: New System 2 interfacing With an Existing System 1.
As shown in Figure 6-10, the owner of existing System 1 will have recorded the definitions for
interactions across the interface boundary in a configuration-controlled document or location so
others, e.g., System 2, can be designed to interact with System 1 in accordance with System 1’s
definitions for each interaction.
Developing System 2 will include interface requirements in their set of design input
requirements or design output specifications that refer to existing System 1 interface definitions
for each interaction the developing system will have with the existing system.
For the example in Figure 6-10, System 1’s definitions in its ICD for supplying power across the
interface boundary could include a Drawing 3-4 that defines the wiring, connector, pin
assignments, shielding, and grounding information for an external system obtain power from

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 212

System 1 and a Table 3-6 that defines the power characteristics such as voltage, current, noise,
filtering, etc. Then System 2 would include interface requirements concerning obtaining power
from System 1 in its set of design input requirements:
System 2 shall operate on power obtained from System 1 having the characteristics defined in
System 1 ICD 2345 Table 3.6. This requirement addresses the characteristics of the thing
crossing the boundary.)
System 2 shall obtain power from System 1 in accordance with the wiring defined in System 1
ICD 2345 Drawing 3-4. (This requirement addresses the media.)
System 2 shall obtain power from System 1 in accordance with the connections defined in
System 1 ICD 2345 Drawing 3-4. (This requirement addresses the boundary.)
In this example where there is an existing System 1whose design in complete, the new System 2
will define three separate design input requirements that are needed to completely address this
specific interaction with the existing system. Because System 1 is existing, these requirements
are constraints on System 2’s design.
Defining Interactions for Two Systems Being Developed Concurrently
For the case where both systems are being developed concurrently (neither system currently
exists, e.g., subsystem or system elements within the system architecture or a new external
system being developed concurrently with the SOI), defining the interactions get more
complicated.
The definitions of the interactions between the two systems will evolve over time as the design
matures. In the beginning, in the problem space, and the focus is on “what” not “how” - design
input requirements. Concerning the interaction between the two systems, what information
needs to be defined so the design team can design each system so they can interact as required
across the interface boundary? What do they need to know to do the design? What are the
constraints?
Interface
Boundary

New Interaction(s) New


System Interaction(s)
System
2 3
System 2 Common System 3
interface requirements interaction definitions interface requirements
invoke common Definition recorded in an ICD or Definition invoke common
interaction definitions electronic form Interaction definitions
Figure 6-11: New System 2 and System 3 interfacing With Each Other.
As shown in Figure 6-11, an agreement is reached by the project teams for each system
concerning the definitions for each of the interactions and then the applicable interface
requirements would be included in each of the developing system’s set of design input
requirements that invoke those agreed to definitions. Each system’s interface requirements
would invoke the same common, agreed to, configuration-controlled interface definition.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 213

For the example shown in Figure 6-11, System 1 transmits a command to System 2 when some
trigger event occurs, and System 2 must perform some action upon receipt of the command from
System 1. In this case, the characteristics of the command would be defined, recorded, agreed
to, baselined, and configuration controlled in a common ICD or similar document or in a
database accessible by both system’s project teams. In this case the resulting interface
requirements would be:
Common definition: The xyz command has the characteristics described in Table 2-2.
When [trigger event], System 1 shall transmit to System 2 the xyz command defined in
[Definition Location] Table 2-2 less than or equal to 5 ms.
System 2 shall execute the [xyz] command defined in [Definition Location] Table 2-2 less
than or equal to 4 ms of receipt from System 1.
Once the design for both systems is complete, as in the case of an existing system, the definitions
concerning the interactions, what the systems characteristics are at the interface boundary, and
the media involved will be recorded in an ICD like document or electronically within a database
in the form of figures, tables, and drawings which will be referenced by both the design input
requirements and design output specifications for both systems.
For systems that are being developed concurrently, the organizations responsible for these
systems must mutually agree, record, baseline, and configuration control the definitions.
It is common to form an Interface Working Group (IWG) to address these definitions and
resulting agreements for the interactions across each interface boundary or the organization may
address the definition, agreement, and control of the interface boundaries within a SE and
Integration (SE&I) Working Group. Suppliers that are developing system elements must be
included as part of these working groups as defined in their SOW or SA.
From a configuration control standpoint, the common parent organization to both projects
responsible for the systems under development controls the document. For larger complex
systems where various system elements development is contracted outside the organization, the
integrating organization would control the interface definitions and include them with the set of
design input requirements for each of the system elements. As the design matures for each
system element, the suppliers would provide detailed definitions for each interaction to the
integrating organization as specified in the supplier SOW or SA. This can be a challenge when
multiple suppliers design activities are dependent on the design decisions concerning the
interactions made by another supplier. Failing to address this issue adequately in the contract
for each supplier can result in significant cost if the evolution in the design results in changes to
one or more contracts.
Recording the Definitions Associated with Interactions Across Interface Boundaries
The detailed information concerning interactions across the interface boundaries must be defined
and recorded somewhere - no matter what the document is called or how the information is
recorded.
When two systems that will interact with each other are being developed concurrently, it is
critical that the interactions are defined, baselined, and configuration managed within common
sets of definitions and not separately for each of the interacting systems. Doing so can have
negative consequences if either of the separated definitions change without the corresponding
change being made in the other set of definitions. It is critical that there is a sole source of

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 214

“truth” concerning the agree-to definition concerning how two SOIs will interact across an
interface boundary.

Take for example a case where two mechanical systems that will be bolted together are being
concurrently developed by separate contractors. Rather than having a common interface
definition document and drawing to which each system was built to, each organization had their
own, separate mechanical interface drawing as a deliverable as part of their contract. At the
parent system’s PDR, it was discovered that the number of bolt holes in the individual drawings
for each system was different!!!

It is common practice in a document-centric practice of SE to define and record interface


definitions in some type of document whose purpose is to contain these definitions, e.g., an ICD.
However, interface definition documents can have a variety of names. Some organizations put
the predesign definition information in an ICD Part 1, and the post design details in ICD Part 2.
Others may use different names for the document that contains the definitions: Interface
Definition Document (IDD), Internal IDD (IIDD), Interface Agreement Document (IAD),
Interface Definition Agreement (IDA), Application Program Interface (API), or a Data
Dictionary. The name does not really matter - what matters is that the interface definitions are
recorded, baselined, and configuration managed.
Note: Some organizations develop an Interface Requirements Document (IRD). This is not
recommended because the title contains the word “requirements”. As a result, some feel that the
document must include requirements (shall statements). In some cases, the organization puts
“shall” in the interface interaction definitions. In other cases, the organization pulls all
interface requirements from the sets of design input requirements for the two systems that
interact with each other and documents all the interface requirements into a common IRD
managed and controlled by the parent organization of the two systems. This can result in each
system’s set of design input requirements to be incomplete which is problematic from a flow
down, allocation and design and system verification perspective, especially when most of the
system’s functional and operational requirements involve interactions with external systems.
The point of any “ICD” interface definition type document is to establish a common location or
repository to record an agreement concerning information defining interactions across an
interface boundary used by two or more SOI’s and their associated design input requirements
and design output specifications to eliminate errors resulting from recording duplicate technical
content in multiple locations with each location under configuration control by a different
organization.
In a data-centric practice of SE, the interface definitions are recorded electronically within a
database associated with an RMT or other application used to manage the interface definitions,
allowing the interface requirements to traced to the definitions for the interactions, as well as
trace to any dependent interface requirements.
For an existing system, whatever the form, the interface boundary definitions reflect the existing
system’s “as built” configuration.
As the project team moves down the levels of the system architecture, interactions between the
subsystems and system elements at each level of the architecture are identified, defined, and
interface requirements written. In the end, all interactions will be implemented by the design for
the system elements and communicated via the design output specifications for each system
element. It is a best practice to record and manage the internal interface definitions separately

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 215

from the external interface definitions. For the Spacecraft example shown in Figure 6-8 there
would be a set of definitions for each external system boundary, as well as one or more internal
sets of interface boundary definitions. For the internal boundary definitions, some organizations
divide and manage the sets of definitions based on technical discipline, mechanical, electrical,
fluids, software, human/machine, etc.
Special considerations need to be made when OTS or MOTS system elements are procured.
Because they are “off-the-shelf” - they already exist. In this case, the project team will have to
assess how the OTS, or MOTS system element will interact with other system elements and
based on this assessment, how it will be integrated into the SOI physical architecture. One
option is to design the other system elements to interact with the OTS system element based on
its definitions as documented in its ICD or similar document. In other cases, the project team
may be able to modify the OTS system element (MOTS) such that it can interact with other
system elements within the SOI based on the project team’s definitions. In other cases, the
project team will build or procure an “adapter” to enable the OTS system element to be
integrated into the SOI. (Refer to Section 12 for a more detailed discussion concerning OTS and
MOTS subsystems and system elements.)
6.2.3.3 Step 3: Write the Interface Requirements.
As discussed earlier, these requirements are included within the applicable type
(functional/performance or fit) and not separately as a distinct type.
Once the interfaces have been identified and the interactions across the interface boundaries
defined, the actual interface requirements can be written. Following this order is an ideal case.
In the real world, often the interface requirements are written before all the interactions have
been defined, especially when two systems are being developed concurrently. In this case, the
interface requirements point to a TBD document or location in the data base that will contain the
definitions for each interaction across an interface boundary. When the interface is with an
existing system, the definitions with the existing system should already be recorded and under
configuration control. Again, these TBDs represent future work that must be completed before
the system design output specifications can be completed.
What an Interface Requirement is
An interface requirement is a design input requirement that involves a defined interaction
(function verb/object) across and interface boundary with another system. The format of the
interface requirement is such that it includes a function verb indicating directionality
(input/output; supplier/receiver), the name of the object involved in the interaction, AND a
reference (pointer) to the specific location where the definition of the specific interaction across
the interface boundary is located. Note: a common error concerning interface requirements is
not including the reference pointer to where the interaction is defined. Without this, the
interface requirements are incomplete and unverifiable (the system will not be able to be verified
to meet the requirement).
All interface requirements have the same general form: (if the interaction is in response to some
trigger event, then that trigger event would be included in the requirement text.)
[The System] shall [interact (function verb/object) with] [Another System] as defined in
[location where the interaction is defined].”

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 216

[The System] shall [use/provide from/to] [Another System] [something] having the
characteristics defined in [location where the something is defined]”.
As discussed earlier, the word “interface” is not included in an interface requirement as a noun or
a verb.
Concerning system verification, because each interface requirement has a “shall”, the SOI is
being verified that it was designed and built such that it can interact with the other system in
accordance with the agreed-to definition for that interaction. Prior to system integration, each
subsystem and system element on either side of an interface boundary must be verified to have
met its interface requirements in accordance with the agreed to definitions for the specific
interactions along with all their respective sets of design input requirements. Having passed
system verification, once integrated, the resulting parent system can be verified to meet is own
set of design input requirements, including any of its interface requirements.
As discussed earlier, for the case where the SOI has an interaction with an existing system, the
interface requirement will include a pointer to the existing system’s ICD or other location where
the interaction is defined. This assumes that the existing system 1) has recorded the definition in
some configuration managed form and 2) that the definition is current (defines the current
configuration of the existing system.) This may not always be the case and represents an
integration risk to the project.
Interface Requirement Examples

Below are some examples concerning the existing Spacecraft interactions with a new Payload
being developed to be integrated into the Spacecraft with the interactions between the Spacecraft
and Payload shown in Figure 6-9. In this example, the interactions between the Payload and the
Spacecraft across the interface boundary are defined in existing Spacecraft to Payload ICD 1234.
• The Payload shall communicate with the Spacecraft processor via a 1553 bus as shown in
Spacecraft to Payload ICD 1234, Figure 6. [Specifies the media used for communicating
payload sensor data to the Spacecraft.]
• The Payload shall send Sensor A data to the Spacecraft having the characteristics defined
in Spacecraft to Payload ICD 1234, Table 5.4. [Specifies the format the payload needs to
send the Sensor A data to the spacecraft over the 1553 bus.]
• The Payload shall receive from a [ground power supply] ground power having the
characteristics described in Spacecraft to Payload ICD 1234, Table 4.2. [Specifies the
characteristics of power used during development and testing. The characteristics are the
same as that provided by the Spacecraft during operations.]
• The Payload shall receive from the Spacecraft, 28-volt power having the characteristics
described in Spacecraft to Payload ICD 1234, Table 4.2. [Specifies the characteristics of
the power the spacecraft is providing to the payload.]
• The Payload shall receive 28-volt power from the Spacecraft in accordance with the
connections defined in Spacecraft to Payload ICD 1234, Drawing 2-5. [Specifies the
characteristics of the physical connections the Payload needs to connect to the Spacecraft
28-volt payload power bus.]
• The Payload shall receive from the Spacecraft, pointing data that have characteristics
defined in Spacecraft to Payload ICD 1234, Table 7.2. [Specifies the characteristics and
format of the pointing data supplied by the Spacecraft to the Payload.]
• The Payload shall mechanically attach to the Spacecraft in accordance with the mechanical
connections shown in Spacecraft to Payload ICD 1234, Drawing 5-5. [Specifies the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 217

mechanical connections, bolt holes, bolt sizes, torque values, etc. to be used to mechanical
attach the Payload to the Spacecraft.]
If the Spacecraft and Payload were being developed concurrently, each system will need to
include in their set of design input requirements an interface requirement for each of its
interactions with the other system. Because of this, interface requirements for these systems are
developed in pairs. For the Spacecraft/Payload example, for each of the “The Payload
shall……” interface requirement there would be a corresponding “The Spacecraft shall……”
interface requirement.
The Spacecraft shall [interact (function verb/object)] with the Payload [as defined in or
having the characteristics shown in] [common location where the interaction is defined].
The Payload shall [interact (function verb/object)] with Spacecraft [as defined in or having
the characteristics shown in] [common location where the interaction is defined].
Prior to integration, during design and system verification, the Payload would be verified that it
can interact with Spacecraft in accordance with the interface requirements that point to the
common interaction definitions. The Spacecraft would also be verified it can interact with the
Payload in accordance with its interface requirements that point to the same common definitions.
To enable these verifications prior to integration into the actual parent system, emulators or
simulators are often developed.
Traceability and Interfaces
If two system’s interface requirements are in response to a common allocated parent, they will
also both have a trace to the common parent. For example, a system may have a requirement to
perform some function. That function is decomposed into subfunctions, each of which is
implemented within a different lower-level subsystem or system element. In this case, the
implementing lower-level subsystems or system elements may have to interact with each other,
thus there would be an internal interface boundary across which each would interact. The
specific interactions would be defined, and each would define appropriate interface requirements
invoking those common definitions.

System A Parent
Requirement
Trace to Trace to
Parent Parent

Subsystem B Trace to Peer Subsystem C


Child Interface Child Interface
Requirement Requirement

Common
Trace to Trace to
definition for the
Definition Definition
interaction
across the
internal interface
boundary

Figure 6-12: Interface Requirement Traceability.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 218

As shown in Figure 6-12, each of the interfacing systems will develop their half of the interface
requirement pair, with each pointing to the common interaction definition, wherever that is
recorded. From an RMT standpoint, each system’s interface requirement will trace to their
common parent, trace to the other system’s corresponding interface requirement recording the
dependency, and trace to the common interaction definition.
6.2.3.5 Common Interface Requirements Defects and Issues
When defining interface requirements, there are several common defects and issues that need to
be avoided. Undetected and unresolved, these defects and issues can result in one or more of the
following undesirable outcomes:
• ambiguous requirements that the system cannot be verified to meet,
• a set of design input requirements that is incomplete,
• failure to successfully integrate the SOI into the macro system it is a part,
• failed system verification,
• failed system validation,
• costly schedule slips,
• budget overruns, and
• a SOI that is rejected by the customer or that is not certified for release and used by the
public.
Common defects and issues concerning interface requirements include:
• Writing interface requirement statements that include the word “interface” either as a noun
or verb.
• Interface requirements not written in the form of an interface requirement. The most
common defect is a failure to include a pointer within the requirement statement to where
the interaction is defined and agreed to.
• Failing to identify all external systems in which the SOI interacts with across an interface
boundary.
• Identifying an interface boundary with another system, but not addressing all interactions
across that boundary within the set of design input requirements.
• Failing to define, agree to, and configuration manage all interactions across an interface
boundary.
• Failure to include all interactions (functional and physical) with external systems in the
system model and assess overall system behavior as a function of the interactions with
external systems.
• Failure to include all interactions (functional and physical) within the system model and
assess overall system behavior as a function of the interactions of the system elements that
make up the SOI.
• Failure to verify a subsystem or system element meets all its interface requirements prior to
integration into the macro system it is a part.
• Assuming that design verification of all functional interactions across system boundaries
using a model of the system is an adequate substitute for verification of the actual physical
system’s interface requirements.
• Assuming that if a system is verified to meet all interface requirements, the system’s
behavior within the operational environment when operated by the intended users will meet
the stakeholder needs.
• Failure to do a risk analysis for each interaction across all interface boundaries. What
could go wrong? What happens if an input or output are not as defined and agreed to? For
security critical interactions, how could an unintended user interact across the system

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 219

boundary such that the intended use of the system is compromised? How does the SOI
address these issues?
• From an integrated system behavior, another issue is cascading failures. A non-nominal
input results in a function to produce an off-nominal output which is then an off-nominal
input to another function, and so on. In today’s software intensive systems, cascading
failures across interface boundaries must be addressed.
The best practices advocated in this Manual are designed to help avoid these defects and issues.
For today’s increasingly complex, software-intensive systems, it is critical that the project team
uses a data-centric approach to address all interactions across interface boundaries and
developing all the associated artifacts. From a completeness and correctness perspective, the
project team must use diagrams and models to identify all functional and physical interface
boundaries and interactions across those boundaries with both internal subsystems and system
elements as well as with external systems - including the users and operators.
To help ensure the proper form is used for interface requirement statements, the project team is
highly encouraged to use a Natural Language Processing Tool to assess the quality of the
interface requirements statements and help ensure the interface requirement expressions have the
characteristics for well-formed requirements as defined in the INCOSE GtWR or similar
standard.
6.2.3.6 Interface Requirements Audit
Because of the critical importance of correctly addressing all interactions between the SOI and
the external systems, the common interface requirements defects and issues discussed above
must be avoided or corrected before the set of design inputs are baselined.
When developing subsystems and system elements within the system architecture, it is common
to assign each to different groups based on discipline, organizational function, or procurement
strategy. As a result, these subsystems or system elements are often developed in silos. From an
interface perspective, each may develop an external interface diagram or boundary diagram for
their specific SOI. Using this approach there are often inconsistencies between diagrams.

Take for example an audit for a system development effort that revealed that when integrating all the
boundary diagrams for the subsystems and system elements that made up the system into an integrated
system view of the subsystems and system elements, on an average, there was a 40% mismatch. The
boundary diagram for one system element showed an interaction with another system element, yet the
other system element’s boundary diagram did not show the same interaction with the first system element.
This meant that for the integrated system, 40% of the internal interactions had not been defined and the
resulting interface requirements were missing. It is not surprising that once the results of this audit were
made known, the Lead Systems Engineer made the statement, “No wonder we have so many integration
problems!”

To help avoid situations like this and ensure there are no missing interface requirements or
interactions that have not been defined, it is important the project team conducts an “interface
requirements audit” before baselining the set of design input requirements. Sadly, it is common
to find numerous inconsistencies during such audits confirming that the effort is time well spent.
The approach to conducting an interface requirements audit is relatively simple. Create a
spreadsheet with five columns and label them as: “SOI Interface Requirements”, “SOI
Interaction Definitions”, “External System Interaction Definitions”, “External System”, and
“External Systems Interface Requirements” as shown in Table 6-3.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 220

SOI SOI External System External Systems


External
Interface Interaction Interaction Interface
System
Requirements Definitions Definitions Requirements

Table 6-3: Interface Requirements Audit Spreadsheet.

Start with the external interface diagram or boundary diagram for the SOI for which the audit is
being conducted. If done correctly, the diagram should show all external systems with an
interface boundary across which or at which the SOI is interacting and an indication concerning
what each of the interactions are. Given there can be multiple interactions with a single system,
each interaction needs its own interface requirement and corresponding agreed-to definition. As
discussed previously, to completely define an interaction, three things must be defined:
(1) what each system looks like at the interface boundary,
(2) the characteristics of the thing involved in the interaction, and
(3) the media involved in the interaction.
With this knowledge, review the set of design input requirements and copy all requirements
where there is even a hint of an interaction between the SOI and any external system, and paste
the requirement text in Column 1 “SOI Interface Requirements”. If there is an interaction, there
is an interface boundary. Note - if there are multiple interactions across an interface boundary
between the SOI and an external system but the interface requirement is not written properly as
discussed earlier, the defects will need to be corrected to proceed with the audit. There should
be at least one interface requirement (there can be up to three requirements) for each interaction
between the SOI and an external system across the interface boundary; each interaction must be
defined and agreed to.
Next, assuming it is defined, copy the pointer in the interface requirement concerning the
location of the interaction definition and paste the location of the definition in Column 2,
“Interaction Definitions”. If there is no pointer to the interaction definition, place “definition
missing or not defined” in red text in Column 2. If the definition refers to a “TBD” or “TBR”,
place that text in Column 2 in yellow text.
In Column 4, “External System” put the name of the external system that is involved in the
interaction.
Next, fill out Column 5, “External System’s Interface Requirements”. This involves reviewing
the set of design input requirements for the external system named in Colum 4 and locating the
“other half” of the interface requirement pair that “should” exist as a complement to the SOI
interface requirement in Column 1. Ideally, the external system will also have an external
interface block diagram or boundary diagram that can be referred to indicate its external
interactions with other systems - including the SOI for which the audit is being performed. If the
complement interface requirement does not exist, flag this as “missing” in red in column 5.
Next, assuming it is defined, copy the pointer in the external system’s interface requirement
concerning the location of the interaction definition and paste the location of the definition in
Column 3 “External System Interaction Definitions”. Again, if there is no pointer to the
interaction definition, place “definition missing or not defined” in red text in Column 2. If the
definition refers to a “TBD” or “TBR”, place that text in Column 2 in yellow text.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 221

Ideally, the external system complement interface requirement will point to the same agreed-to
definition that the SOI’s interface requirement points to. If the pointers to the interaction
definitions in Columns 2 and 3 are different, flag the difference by turning the text of both
definitions to red, indicating the inconsistency.
Once all the SOI’s interface requirements concerning the external system have been addressed in
the spreadsheet, it is important to look at the interface diagram or boundary diagram and
resulting interface requirements for the external system to determine whether the external system
has indicated an interaction with the SOI; yet the SOI diagrams and interface requirements did
not address that interaction. If these interactions are not addressed by the SOI, then fill out
Columns 3, 4 and 5 for the external system. Then if the SOI’s complement requirement does not
exist, flag this case as “missing” in red in column 1.
Repeat the above steps for every external system with which the SOI has an interaction. If there
are any external systems the SOI has indicated an interaction with, but that external system has
no indication of any kind of interaction with the SOI, type the name of the external system in
Column 4 in red text.
Table 6-4 is an example of a finished audit spreadsheet, with a few of the rows filled in. For an
interface requirement audit for the spacecraft example shown in Figure 6-8, there will be
multiple rows. Given there are 14 external systems and assuming an average of four interactions
with each external system with three interface requirements for each interaction, there could
easily be 168 rows, one for each interface interaction/requirement.
SOI SOI External System External External Systems
Interface Interaction Interaction Interface
System
Requirements Definitions Definition Requirements
SOI IR 1 Def 111 Def 111 ES1 ES1 IR 1
SOI IR 2 Def 112 Def 123 ES1 ES1 IR 2
SOI IR 3 Def 113 ES1 Missing
SOI IR 4 TBD TBR ES1 ES1 IR 4
SOI IR 5 Missing Def 134 ES2 ES2 IR 1
Missing Def 135 ES2 ES2 IR 2
SOI IR 6 Def 114 Def 114 ES2 ES2 IR 3
SOI IR 7 Def 115 ES2 Missing
SOI IR 8 Def 116 Def 128 ES3 ES3 IR 1
SOI IR 9 Def 117 ES3 Missing
SOI IR 10 Missing Def 131 ES3 ES3 IR 1
SOI IR 11 TBD TBR ES3 ES3 IR 3
Missing Def 131 ES4 ES4 IR 1
SOI IR 12 Def 138 Def 138 ES4 ES4 IR 2
SOI IR 13 Def 119 ES4 Missing
Missing Def 135 ES4 ES4 IR 3
Table 6-4: Example Interface Requirements Audit.

Now the fun begins! When looking at the results of the initial audit, there will be a lot of red
and yellow distributed across the rows and columns. These indicate problems that need to be
investigated and resolved. This is what makes the audit worthwhile. The project does not want
to wait until the start of system integration, system verification, and system validation to find out
these problems exist- the impact to cost and schedule would be significant.
Note: This example is for the systems external to the SOI. Referring to the internal interactions
between system elements within a SOI shown in Figure 6-6, the number of interactions could be
much larger. Because of this, it is critical for the project team to do an interface requirement

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 222

audit for all internal system elements as well. Ideally, the project team would develop one or
more internal interface diagrams to show all the internal interactions between system
components.
Using RMTs to Manage Interfaces
If the traceability records for the links as shown in Figure 6-12 exist within the RMT, the RMT
should be able to create a report and export the data such that the interface requirement audit
spreadsheet shown in Table 6.4 can be created using that data. Ideally, RMTs would be able to
enforce the use of the template for interface requirements. In this case, when one of the internal
subsystems or system elements project team members writes an interface requirement, the RMT
would have the following capabilities:
1) Require a pointer to where the interaction is defined or indicate the definition is missing,
2) Notify the other internal subsystem or system element project team of the need for them to
include the complement interface requirement for the pair in their set of design input
requirements,
3) Require the complement interface requirement to point to the same interaction definition,
4) Include a flag to indicate the status of the pair of interface requirements and interaction
definition, i.e., indicate if both requirements exist and point to a common interaction
definition, if it exists. If it does not exist, the RMT could notify both project teams
concerning the need to define the interaction.
These capabilities would help automate the definition and management of the internal interface
requirements and help avoid many of the defects and issues discussed earlier.
This activity helps establish each interface requirement has the GtWR characteristics C1 -
Necessary, C4 - Complete, C8 - Correct, and C7 - Verifiable. It also helps establish the set of
design input requirements has the GtWR characteristics C10 - Complete, C11 - Consistent, and
C14 - Able to be Validated.
6.2.4 Use of Attributes to Develop and Manage Design Input Requirements
As defined in Section 2, a design input requirement expression includes a requirement statement
and a set of attributes. Requirement attributes that can aid in definition of the design input
requirements include those shown below: (Refer to Section 15, for a more detailed discussion on
attributes, definitions of each, and guidance concerning the use of attributes.)
A1 - Rationale: intent of the requirement statement.
A2 - Trace to Parent: The parent need or parent requirement from which the requirement
was transformed
A3 - Trace to Source: Where the requirement originated: stakeholder, user story, scenario,
use case, constraint, risk, lifecycle concept, analysis, model, etc.
A5 - Allocation/Budgeting: Subsystem or system element at the next level of the architecture
to which the requirement is being allocated/budgeted
A26 - Stability: stable, likely to change, and incomplete.
A28 - Requirement Verification Status: true/false, yes/no, or not started, in work, complete,
and approved.
A29 - Requirement Validation Status: true/false, yes/no, not started, in work, complete, and
approved.
A30 - Status of the requirement (in terms of maturity): draft, in development, ready for
review, in review and approved. (A28 is a dependent on A26 and A27)

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 223

A31 - Status of implementation: at higher levels of the architecture a trace to the


implementing child requirements. At the bottom level, a trace to the design description
that implements the intent of the requirement.
A32 - Trace to Interface Definition
A33 - Trace to Peer Requirements
A34 - Priority: Relative importance of the requirement.
A35 - Criticality: Achievement of the requirement is critical to the SOI being able to meet its
intended use in the operational environment.
A36 - Risk (of implementation): one or more risk factors associated with being able to achieve
the requirement.
A37 - Risk (mitigation): The requirement is linked to a risk the project has decided to mitigate
within the SO design. Often related to safety, security, quality.
A38 - Key Driving Requirement (KDR): Implementing the requirement could have a
significant impact or cost and/or schedule.
It is a best practice to define the attributes for a requirement statement when the requirement
statement is formulated. For example:
A1 - Rationale. If rationale cannot be defined when the requirement statement is being
formulated, the existence of the requirement is questionable.
A2 - Trace to parent. If there is no need or parent requirement to trace the requirement
statement to, the existence of the requirement statement is questionable.
A3 - Trace to source. If there is no source to trace the requirement statement to, the existence
of the requirement statement is questionable.
Inheritance
When it comes to attributes, it is important to understand the concept of “inheritance”. In the
context of needs and design input requirements, when the needs expressions are formed, they
include both the need expression and a set of attributes. When these needs are transformed into
design input requirements, each design input requirement expression also consists of requirement
expression and a set of attributes. In several cases, the attribute assigned to the design input
requirement should be inherited from the need from which it was transformed. For example,
owner, priority, criticality, risk (mitigation), and KDR. If a need is critical, the implementing
design input requirements must also be critical. The concept of inheritance also applies to
parent/child relationships where there are some attributes of the parent that need to be passed
down (inherited) by the child implementing requirements.
The concept of inheritance can also be applied to cases where models were used to identify needs
and design input requirements. Model elements can be assigned attributes as well. If a function
within a model has an attribute of “critical”, the corresponding needs and design input
requirements linked to that function within the model, should also inherit the “critical” attribute.
As in genetics, a design input requirement will inherit attributes from its source (need) and parent
requirement. There may be cases where the attributes of the allocated parent requirement and the
need the requirement was transformed are not the same. For example, a parent requirement may
not have the attribute “critical” in the context of the SOI it represents higher in the architecture,
however the need for a subsystem or system element to which the requirement was allocated and
from which the child design input requirement was transformed may have the attribute “critical”
in the context of the subsystem or system element for which the need and requirement applies.
In this case, the concept of “dominant” gene also applies to a “dominant” attribute. The

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 224

“critical” attribute by its nature would be considered dominant (more important), thus the child
requirement would inherit the more important “critical” attribute.
6.2.5 Plan for System Verification
The outcome of all successful projects is a verified and validated SOI that has been accepted by
the customer or has been approved for use by the public. System verification is obtaining the
evidence needed to show that the SOI satisfies its set of design input requirements.
The GtWR includes the characteristic, C7 - Verifiable, for well-formed design input requirement
statements. “Verifiable” means each requirement statement is structured and worded such that
its realization by the design and resulting SOI can be verified to have been met to the customer’s
or regulator’s satisfaction at the level the requirement exists.
A best practice to ensure the design input requirements are “verifiable”, is to plan for how the
project will verify that the system will meet each requirement within the sets of the design input
requirements during system verification activities discussed in Section 10 and 11.
Information that should be defined concerning system verification for each requirement
statement includes system verification Method, Strategy, Success Criteria, and the organization
responsible for the planning and execution of the system verification activities. This information
can be defined within the system verification attributes that should be included (along with the
other attributes discussed in Section 6.2.4) within each design input requirement expression.
These verification attributes include as a minimum:
A6 - System Verification Success Criteria
A7 - System Verification Strategy
A8 - System Verification Method
A9 - System Verification Responsible Organization
A12 - Condition of Use: operational conditions of use expected in which the requirement
applies
Note: Refer to the Section 10 for a detailed discussion concerning the system verification
Method, Strategy, and Success Criteria and Section 15 for a discussion on the use of attributes.
Defining this information when the requirement statements are defined is important, in that it
will help ensure the requirement statements are worded properly and clearly state the intent. It is
the intent that must be validated to have been met as part of both design and system verification
activities.
Additionally, addressing system verification early will provide important project requirements in
terms of facilities, enabling systems, test equipment, environments, resources, etc. that will be
needed to support the system verification activities. This information is used by project team in
their budget and schedule planning. More detailed design verification and system verification
planning will be defined concurrently during the architecture definition and design definition
activities.
For cases where there is a customer/supplier contractual arrangement, it must be made clear
during design input requirement definition activities the roles and responsibilities for the
planning and conduct of the system verification activities and recording the results: the customer,
the supplier, or a combination of both as discussed in Section 13.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 225

In the past, using a document-centric approach to recording and managing sets of needs and sets
of design input requirements, a major challenge of system verification and system validation is
the time delay between when the needs and requirements were defined and when system
integration, system verification, and system validation activities are performed. During this
extended time, the problem or opportunity and operating environment may have changed along
with the resulting needs and design input requirements. In a document-centric approach the
various documents can become out of date and not in synchronization with the changing needs of
the stakeholders. Often it is difficult to identify a “single source of truth (SSoT)”. These
changes may be significant to the point the system (as specified by the design input
requirements) is no longer required or fit for its intended use by its intended users.
In a data-centric approach to SE, with the SSoT maintained within the SOI’s integrated dataset,
the changes will automatically be reflected in all applicable artifacts across all lifecycle stages
minimizing this risk.
In either case, it is important to perform continuous validation of all SE artifacts across the
system lifecycle including the integrated set of needs, set of requirements, design, and the SOI
itself. This requires addressing the problem or opportunity statement, lifecycle concepts and
integrated set of needs throughout the lifecycle to validate that they are still accurate (and,
therefore, and the resulting design input requirements are still necessary).
When the problem or opportunity statement, lifecycle concepts, and set of needs have changed,
the SOI design input requirements and perhaps the design solution communicated via the design
output specifications must be modified to maintain relevance and avoid cancellation because of a
mismatch between the design input requirements and the offered solution’s ability to address the
changed problem or opportunity statement, lifecycle concepts, and integrated set of needs.
6.2.6 Finalize Design Input Requirements Definition
6.2.6.1 Record the Design Input Requirements
The set of design input requirements must be recorded within the SOI’s integrated dataset in a
form and media suitable for review and feedback from the stakeholders as well as support
traceability across the lifecycle and the requirement verification and requirement validation
activities discussed in Section 7.
Design input requirements can be recorded and managed via either a document-centric or data-
centric approach, however based on the discussion in Section 3, it is highly recommended the
organization use a data-centric approach and document the set design input requirements within
the project’s toolset.
The chosen method should result in traceability records that show:
• Traceability to the needs from which they were transformed.
• Traceability to the parent requirements and other sources.
• Traceability to dependent peer requirements.
• Traceability between interface requirements and interface definitions.
• Ability to define attributes for the design input requirement statements resulting in need
expressions.
• Traceability to system verification artifacts.
• Traceability to functional architectural and analytical/behavioral models.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 226

When using a document centric approach to communicating and managing requirements, it is


useful to provide information about requirement relationships within the published document.
Developing document publication methods within different requirement tools is an area that will
need consideration when working the requirement management approaches that allow links and
attributes to be exported along with the requirements themselves.
Examples of this are displaying information about the parent/child relationships which can often
be provided from a link or attribute within the RMT database in the form of a trace matrix, or
about verification attributes that address how the SOI will be verified to meet the design input
requirements in the form of a system verification matrix.
When a requirement document form is used as part of a contract it is particularly important to
ensure the correct amount of information is provided or omitted, as the document will be used to
inform another company's legally binding delivery of a product.
If the requirements are used entirely within the organization that is producing the SOI, there are
many benefits to the project team working directly to the requirements within the RMT (a data-
centric SE approach) and avoid incurring overhead on hardcopy documentation (a document-
centric SE approach).
Once the set of design input requirements for the system or a subsystem or system element
within the system architecture has been recorded, the set can be baselined in accordance with
Needs, Requirements, Verification, and Validation Management activities discussed in Section
14. As part of the baseline activities, the set of design input requirements will go through the
design input requirement verification and requirement validation activities discussed in Section
7.
Before submitting the set of design input requirements for baseline, the project team should do
their own verification and validation of the set of design input requirements to help ensure
completeness, consistency, feasibility, and risk.
Below are some special considerations concerning completeness, consistency, feasibility, and
risk that should be addressed when preparing the set of design input requirements for baselining.
6.2.6.2 Completeness, Correctness, and Consistency
As stated in the GtWR well-formed sets design input requirements have the characteristics C10 -
Complete. Sections 4.5.5, 4.5.6, and 4.6.3.3 discussed approaches to ensuring the set of lifecycle
concepts and resulting integrated set of needs are complete. Well-formed requirements also have
the GtWR characteristic C8 – Correct and sets of requirements have the GtWR characteristic
C11 – Consistent. A complete, correct, and consistent set of lifecycle concepts is key to having a
complete, correct, and consistent et of needs which, in turn, is key to having a complete, correct,
and consistent set of design input requirements. If the project has not developed an integrated
set of needs prior to defining the set of design input requirements as defined in this Manual,
there is a greater risk that their set of design input requirements will not be complete or
consistent.
From a completeness, correctness, and consistency perspective, it is helpful for the project team
to address the following questions when defining the set of design input requirements:
• Are there one or more design input requirements for each of the SOI’s needs?
• Do all requirements trace to a parent or source? (No orphans.)

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 227

• Are there design input requirements defined for each of the areas: Function, Fit, Form,
Quality, and Compliance?
• Have all conflicting design input requirements been identified and resolved?
• Have all product lifecycle stages been considered?
• Have all design input requirements been prioritized and criticality established?
• Have all ambiguous terms been addressed?
• For each design input requirement that addresses a function, have all the corresponding
performance requirements been defined?
• Has rationale been included in each design input requirement containing numbers to
explain how the numbers were derived and a trace to the source of those numbers?
• Have all internal dependences/relationships been identified and linked (traceability)?
• Are the functional/performance and quality requirements feasible (cost, schedule,
technology, legal, regulatory, ethical)?
• For all requirements dependent on a critical technology has the TRL been defined for that
technology and has a TMP been developed?
• For each risk, whose mitigation involves the design of the SOI, have design input
requirements been defined and traceability established?
• Are there interface requirements included in the set of design input requirements
concerning all dependences/interactions/interfaces with systems external to the SOI across
all lifecycle stages? Have all the interactions been defined, agreed to, and baselined?
• Have all assumptions been recorded and validated?
• Are the terms used within the requirement statements consistent with the ontology defined
for the project?
• Have all the attributes that have been agreed to by the project been defined within the
requirement expressions, including rationale and the attributes associated with system
verification?
While these questions should have been addressed during the lifecycle analysis and maturation
activities and during the definition of the integrated set of needs, it is a best practice to revisit
these questions when formulating the set of design input requirements. If the answer is “no” to
any of these questions, the set of design input requirements may not be complete, correct nor
consistent resulting in a risk that the system will fail system validation.
6.2.6.3 Requirements Feasibility and Risk
As stated in the GtWR well-formed requirement statements have the characteristic C6 - Feasible,
and sets of design input requirements have the characteristic, C12 - Feasible. Sections 4.5.1 and
4.5.7 discussed approaches to ensuring the set of lifecycle concepts are feasible. A set of
feasible lifecycle concepts are key to having an integrated set of needs that is feasible (Section
4.6.3.4) which, in turn, is key to having as set of design input requirements that is feasible.
Feasibility and risk assessment are key reasons for doing the SOI lifecycle concept analysis and
maturation activities prior to defining and baselining the integrated set of needs from which the
design input requirements are transformed. If not feasible with acceptable risk, the requirement
should not have been included in the set. Doing so can negatively impact cost and schedule and
can increase the risk a requirement that cannot be met (fail system verification).
The assessment of feasibility is not black and white but rather is based on the degree of risk in
successfully implementing both individual design input requirements as well as the set of design

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 228

input requirements within cost, schedule and technology constraints before adding the specific
requirement into the set of design input requirements.

Risk

Add Remove

Reserves
Rqmts Rqmts
Rqmts Rqmts
Rqmts
Rqmts Rqmts
Rqmts Rqmts
Rqmts
Rqmts Rqmts
Rqmts Rqmts
Cost Rqmts
Rqmts
Rqmts

Rqmts Rqmts
Rqmts Schedule
Rqmts Rqmts
Rqmts Rqmts Rqmts
Rqmts Rqmts
Rqmts Rqmts
Rqmts
Rqmts Rqmts
Rqmts Rqmts
Rqmts
Rqmts Rqmts
Rqmts Rqmts Rqmts
Rqmts Rqmts
Rqmts Rqmts Rqmts

Technology
Figure 6-13: Requirements Feasibility/Risk Bucket.
Similar to the Needs Feasibility/Risk Bucket discussed in Section 4.6.3.4, the Requirements
Feasibility/Risk Bucket shown in Figure 6-13 is one method the project team can use to address
feasibly as well as to manage risk when defining a set of design input requirements for a SOI.
A feasibility analysis of each design input requirement that is a candidate for inclusion in the set
must be made in terms of the cost, schedule, technology, and risk before adding the specific
requirement into the “bucket”.
Feasibility of the Set of Design Input Requirements
The feasibility of the set of design input requirements must also be considered. Given cost and
schedule drivers and constraints, only so many requirements will fit in the bucket without undue
risk to the project. While individual requirements may be feasible, implementing the set of
design input requirements within the budget and schedule constraints may not be.
As part of baselining the set of design input requirements, an overall risk assessment is made of
the set and risk mitigation plans are defined based on the level of risk. It is common for project
risk mitigation plans to include a de-scope plan as well as a management reserve to help mitigate
the risk for the unknown unknowns that frequently occur during a development project,
especially for a project that is dependent on the maturity of critical technologies.
Managing the Size of the Bucket
A major challenge is limiting the number of requirements that are put in the “requirement
bucket”. It is common to see cases where projects over specify their requirements for a product.
Take as an example where one government organization had defined over 4,000 requirements for
a single system element.
As discussed previously, a mandatory characteristic of any design input requirement is that it is
“needed” (C1 - Necessary). If a requirement is not necessary, why is it in the requirement set?
The goal during Design Input Requirement Definition is to define a necessary and sufficient set

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 229

of design input requirements that clearly and completely communicates the set of needs from
which they were transformed to those responsible for defining the SOI architecture and design -
and no more.
By its very existence, each design input requirement has a cost associated with it because it must
be maintained, managed, implemented, and the system verified to meet it. Design input
requirements that are not necessary result in increased management cost which, in turn, increases
overall project costs and leaves fewer resources for design input requirements that are necessary.
Unnecessary design input requirements result in work being performed that is not necessary and
takes resources away from the implementation of those design input requirements that are
necessary. In addition, implementing design input requirements that are not necessary may
result in degraded system performance as well as introduces a potential source of failure and
conflict.
Often, when there are an excessive number of design input requirements, a common reason is
implementation (i.e., design) creeping into the set of design input requirements. When
developing the “design-to” set of design input requirements, the focus should be on the “what”
not “how”. With this information, the organization responsible for architecture and design
addresses the “how” - what hardware, mechanisms, and software will result in the set of design-
to requirements being met. That is the major reason the set of “design-to” set of requirements
are referred to as “design input requirements” in this Manual.
Another reason for an excessive number of design input requirements for a system, subsystem, or
system element at a given level is the inclusion of lower-level requirements at too high a level,
thus those requirements are not consistent with the GtWR characteristic C2 - appropriate. The
requirements may be valid and needed but they are being communicated at the wrong level.
“Gold plating” is another major cause of unnecessary design input requirements being included
in the set. Gold plating is the act of adding requirements for features that are not necessary to
address the problem or opportunity the SOI is being developed to address. This results in
requirements that do not conform the GtWR characteristic C1 – Necessary.
How can gold plating be identified? If a design input requirement cannot be traced to a need
from which it was transformed, an allocated parent requirement, or a source it could mean that
the design input requirement is not necessary, and thus, is gold plating. The project team needs
to be sensitive to gold plating as this is a major source of requirements creep and can impact the
cost and schedule of the project and adds risk of project failure. Refer also to Section 14.2.5.1 to
managing gold plating and needs and requirements creep.
To help combat uncontrolled growth of requirements that are not necessary, one approach is for
the project team to adopt a “zero-based” approach to defining the set of design input
requirements and maintain this “zero-based” approach throughout project execution. A “zero-
based” approach means that all requirements are thoroughly evaluated by the project for not only
feasibility, but also for applicability and value in regard to meeting the agreed to lifecycle
concepts and integrated set of needs; thereby “earning” their way into the set of design input
requirements.
In addition to the feasibility evaluation when adding design input requirements into the set of
design input requirements or accessing existing requirements in the set, ask:

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 230

• Why is the requirement needed? Why is it in the SOI requirement set? What role does it
play in the realization of the stakeholder need from which it is being transformed, its
allocated parent, or other source? If there is no rationale, or a weak rationale for its
existence, consider not adding it to the set or removing it from the set.
• What would happen if this requirement were deleted- would the developing organization
address this concern anyway? If nothing negative would happen or the developing
organization would have to address this concern anyway to meet other requirements, then
why should it be included in the set?
• Is the requirement communicating “how” to do something (implementation), i.e., it is a
design output rather than a design input? If not justified, consider not adding it to the set
or removing it from the set of design input requirements.
• Is there a trace from the requirement to a need, allocated parent requirement, or source?
If it cannot be traced to a valid need, allocated parent requirement, or source, why should
it be included in the set? Note: there may be cases during analysis in which the project
team determines the requirement is necessary even if it cannot be traced to a need,
allocated parent requirement of source. In this case the issue may be a missing need,
parent requirement, or source which the project team will need to resolve.
• Is the requirement appropriate to the level of architecture the system, subsystem, or
system element exists? The requirement may be valid, but not appropriate for the system,
subsystem, or system element at that level. If the requirement is not being stated at the
appropriate level, move it to the appropriate level to which it applies.
Adopting a zero-based approach to defining design input requirements, assessing feasibility, and
asking the above questions will help avoid gold plating and specifying requirements that are not
needed and defining a set of design input requirements that is necessary and feasible at a risk that
is appropriate for the lifecycle stage of development.
Managing Change, Feasibility, and Risk
The requirement feasibility bucket is also useful for managing change. Once the bucket is full
and the set of design input requirements for the SOI is baselined, change will happen. If any of
the requirements change, a feasibility/risk analysis must be made as part of the change impact
assessment activities as well as addressing the above questions.
What if a stakeholder wants to add a new requirement to the already full bucket? One response
could be to remove a lower priority, non-critical requirement to make “room” in the bucket for
the requirement being added without adding risk or eating into the management reserves. (This
is a key reason for assigning priority and critically to each requirement statement.) Another
response by the project team could be “NO”, however, politically, this may not be advisable.
Maybe a better, passive-aggressive response would be “Yes, but …”.
Often management will want to accept the new requirement without removing any of the existing
requirements. In this case, either or both the management reserve will be impacted as well as
increased risk to the project
(See Section 14.2.5 for a more detailed discussion on change management and change impact
assessment.)

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 231

6.3 Baseline and Manage Design Input Requirements


The outputs of the Design Input Requirements Definition activities are a set of data and artifacts,
shown in Figure 6-1, are listed below.
This list is not inclusive as it does not include the PM work products that are developed
concurrently with the SE artifacts.
• Baselined set of design input requirements for the SOI.
• Updated feasible lifecycle concepts.
• Updated integrated set of needs.
• Updated model elements in the system architecture, analytical, behavioral models
• Physical architecture.
• PBS.
• Definitions of interactions across interface boundaries (interface definitions in an ICD or
similar form.)
• System verification planning artifacts.
• For each design input requirement (as applicable):
⁃ Traceability to need(s), parent requirement(s), or source,
⁃ Traceability to peer requirements,
⁃ Traceability to model elements in the system architecture, analytical, and behavioral
models,
⁃ Attributes defined for System verification and system validation,
⁃ Traceability to system verification planning artifacts,
⁃ Allocation (flow down) of higher-level design input requirements to the next level of
the system architecture subsystems and system elements,
⁃ Budgeting from higher-level design input requirements to the next level of the system
architecture subsystems and system elements.
Many of the RMTs allow tracking of the status of the requirements definition activities using a
dashboard that communicates key metrics related to the requirements definition. These metrics
can be obtained using the needs attributes within the RMT as discussed in Section 6.2.4 and
Section 15. Making this information accessible will enable stakeholders to have the same view
of the maturity of the integrated set of needs.
Refer to Section 14, Needs, Requirements, Verification, and Validation Management for a more
detailed discussion concerning managing the sets of design input requirements across the
lifecycle.
The approval and baselining of the requirement set is discussed in Section 14, Needs,
Requirements, Verification, and Validation Management. As part of the approval and baselining
of the sets of design input requirements, the project team will need to complete the design input
requirements verification and requirements validation activities defined in Section 7.
This activity is critical to ensuring the resulting individual needs have the GtWR characteristics
C1 – Necessary, C3 – Unambiguous, C4 – Complete, C6 – Feasible, and C8 – Correct and sets
of needs have the GtWR characteristics C10 – Complete, C11 – Consistent, C12 – Feasible, C13
– Comprehensible, and C14 Able to be Validated.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 232

6.4 Architectural Levels, Flow down, Allocation, and Budgeting


Note: If the reader has not done so, it is highly advised the reader review Section 2.3.2
concerning levels prior to proceeding.
Unless a SOI requires no further elaboration as discussed in Section 2.3.2, once its set of design
input requirements have been defined, verified, validated, and baselined, the project team will
flow the requirements down to the subsystems and system elements at the next level of the
physical architecture via allocation and budgeting.
For some, architecting is part of the Design Definition Process, when in fact they are two vastly
different processes. The Architecture Definition Process defines the architecture of the
subsystems and system elements that make up the integrated Product or System. The focus is on
function, organization, interactions, and relationships between the subsystems and system
elements that make up the SOI. Each subsystem and system element within the system physical
architecture is defined by its own set of lifecycle concepts, integrated set of needs, and set of
design input requirements in the context of the system they are a part.
Architecting and design input requirement definition go together iteratively and recursively as
the project team defines the levels of the architecture [11]. The project team identifies subsystems
and system elements at one level of the architecture, define the lifecycle concepts, integrated sets
of needs, and sets of design input requirements for those subsystems and system elements, and
flow the requirements down to the subsystems and system elements at the next level, identify and
define the interactions (interfaces) and repeat until all system elements have been defined, no
further elaboration is needed for the project team to make a build, buy, code, or reuse decision.
The system elements can then be realized via the customer’s Acquisition Process or internal to
the developing organization using the Design Definition Process.
If the system element is to be developed by a supplier, the system element becomes that
supplier’s SOI. The supplier will focus on developing the SOI based on the lifecycle concepts,
integrated set of needs, and set of design input requirements that are included in the contract. In
this context, the supplier could be responsible for the design and definition of the set of design
output specifications. If the customer has completed the design and has developed the design
output specifications, the supplier is responsible for the production (manufacturing and/or
coding) of the system element in accordance with those design output specifications.
The Design Definition Process focus is on the physical realization of the system elements based
on the set of lifecycle concepts, integrated set of needs, and set of design input requirements for
system element. The outputs of the Design Definition Process are a set of design output artifacts
and specifications to which a system element is produced along with design verification and
design validation artifacts.
Once the system elements have been produced, they can be verified against their set of design
output specifications (production verification) and set of design input requirements (system
verification), validated against their integrated set of needs (system validation), and integrated
into the higher-level system element, subsystem, or system they are a part.
For more details on the Architectural Definition Process and Design Definition Process, refer to
the INCOSE SE HB.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 233

6.4.1 Moving Between Levels of the Physical Architecture


When talking about moving between levels, what is being referred to is defining and baselining a
set of lifecycle concepts, set of needs, and set of design input requirements for a SOI, defining
the next level of the physical architecture, and then flowing those requirements down to the
resulting subsystems and system elements for implementation.
As advocated in this Manual, lifecycle analysis and maturation activities are key activities
performed during the Lifecycle Concepts and Needs Definition activities discussed in Section 4.
During these activities, functional, analytical, and behavioral models are developed as part of
identifying one or more feasible concepts for developing a SOI that addresses the stakeholder
needs and stakeholder-owned system requirements, use cases, operational scenarios, drivers and
constraints, and risk defined as part of defining the inputs to the lifecycle analysis and maturation
activities.
For brown field systems, some elements of the SOI physical architecture will already be defined.
For green field systems, as part of the feasibility analysis, a functional architecture is developed
and mapped to a physical architecture. This enables the project team to identify and assess the
maturity of critical technologies needed based on the stakeholders needs and requirements for
SOI performance, quality, safety, security, and interactions with external systems. Also, it is the
subsystems and system elements within the physical architecture that will be procured or
designed, manufactured/coded, integrated, verified, validated, and delivered.
From a design input requirements perspective, it is this physical architecture that is the focus of
requirements flow down from one level of the physical architecture to another.
Unless the SOI is a system element and needs no further elaboration, for each subsystem and
system element at the next level, the Lifecycle Concepts and Needs Definition activities and
Design Input Requirement Definition activities will repeat.
6.4.2 Product Breakdown Structure and Document Tree
From a PM perspective, the physical architecture can be mapped to a PBS. The PBS is similar in
concept to a WBS. The system along with each subsystem and system element within the
system physical architecture represents an entity within the PBS. Each of these entities are
represented by a budget, schedule, development concept, procurement concept, and a set of both
project work products and engineering artifacts.
Key engineering artifacts for each entity within the PBS include:
• Set of lifecycle concepts.
• Architectural description.
• Analytical/Behavior/Architectural models (contained within the integrated system models).
• Integrated set of needs.
• Traceability (may be included with the integrated set of needs).
• System validation planning artifacts.
• Set of design input requirements.
• System verification planning artifacts.
• Interface definition documentation (ICDs, etc.)
• Traceability (may be included with the set of design input requirements).
• Allocation and budgeting (may be included with the set of design input requirements).

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 234

In addition to the above artifacts, system elements that require no additional elaboration will also
include:
• A Design Description.
• Design verification and design validation records.
• Set of design output specifications.
• Production verification records.
• System integration records.
• System verification and system validation records.
• Maintenance plan.
• Instructions for Use.
• Disposal Plan.
These sets of artifacts for system and each subsystem and system element in the system
architecture are shown in Figure 6-14 in context of the PBS and physical architecture.
System
C|N|R

Analysis
Decomp

Subsystem Subsystem Subsystem


C|N|R C|N|R C|N|R

Analysis Analysis Analysis


Decomp Decomp Decomp

System System System System System System


Element Element Element Element Element Element
C|N|R C|N|R C|N|R
C|N|R C|N|R C|N|R
Analysis Design Analysis Analysis Design Design
Decomp Spec Decomp Decomp Spec Spec

System System System System System System


Element Element Element Element Element Element
C|N|R C|N|R C|N|R C|N|R C|N|R C|N|R
The “Line”
Design Design Design Design Design Design
Spec Spec Spec Spec Spec Spec

Figure 6-14: PBS and Associated Sets of Engineering Documentation.


In a data-centric practice of SE, the data and information representing the various artifacts are
produced and managed within the project toolset and the data representing these artifacts exist in
the SOI’s integrated database. As such, each of the artifacts are visualizations of the data and
information managed within the integrated database. This enables the project team to establish
traceability between related data items and artifacts helping ensure consistency and a single
source of truth.
Analytical/behavior/architectural model(s) for each subsystem and system element within the
system architecture must be developed in context of the integrated system model(s)s. These
models are analysis tools that are used to help define many of the artifacts listed above. Given
that the behavior of a system is a function of the interaction of its parts, subsystem and system
element models should not be developed as standalone models, but rather developed within the
overall integrated system model. Thus, the PBS is represented within a model element
hierarchy, e.g., class or block diagrams.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 235

In a document-centric practice of SE, each form of these artifacts is represented by an actual


document in either printed or electronic form. From a needs and requirements perspective, there
are separate needs and requirements documents for each entity in the PBS. The documents
shown in Figure 6-14 are organized by levels into a document tree. As part of project planning
and development of the SEMP, the document tree is defined. Each document in the tree is
included in the WBS and the development and delivery of each is included in the project budget,
master schedule, and acquisition plan. For subsystems or system elements that are contracted to
a supplier, these sets of documents are addressed in a SOW and associated Contract Deliverables
Requirements List (CDRL) or in a SA as a list of contract deliverables.
To completely describe the SOI, lifecycle concepts, needs, and requirements sets for each entity
within the PBS are needed. As discussed earlier, system, subsystem, and system element
lifecycle concepts, needs, and requirements sets are highly interrelated and dependent. These
relationships and dependencies must be considered to ensure the integrated and verified system
can be validated to meet its integrated set of needs. A single need or requirement on its own nor
a single set of lifecycle concepts, needs, and requirements for a subsystem or system element that
is part of the SOI on its own would not achieve this (nor would standalone models of the
subsystems or system elements within the SOI architecture).
This family is often shown notionally in a tree diagram, such as the one shown in Figure 6-15.
Stakeholder needs, and Regulations,
Stakeholder-owned Standards,
System Constraints Operational Level
Requirements

External Interface Coffee Machine


Definitions Lifecycle Concepts , System Level
needs, and System
Requirements

Brewing Subsystem Dispenser Subsystem Power Subsystem Control Subsystem


Lifecycle Concepts, Lifecycle Concepts, Lifecycle Concepts, Lifecycle Concepts,
Needs, and Needs, and Subsystem Level
Needs, and Needs, and
Requirements Requirements Requirements Requirements

Internal Interface Power Supply Wiring


Lifecycle Concepts, Lifecycle Concepts, System Element
Definitions
Needs, and Needs, and Level
Requirements Requirements

Figure 6-15: Tree Diagram Example for a Coffee Brewing Machine.


The result is an integrated family of lifecycle concepts, integrated sets of needs, and
requirements sets that exist at multiple levels of the system architecture, linked together to form a
3D data and information model of the integrated system.
Other items to consider when developing the family of lifecycle concepts, integrated sets of
needs, and sets design input requirement for the system is inclusion of other sources of
requirements concerning industry standards, regulations, constraints, interface definition
documentation, operating environments, enabling systems, test equipment, etc. that may be
referred to within the integrated set of needs and set of design input requirements. Some projects
will invoke these within the various requirements for subsystems and system elements at each
level, others may generate standards and interface definitions that are levied across the system,

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 236

subsystem, and system elements at each level of the physical architecture or across levels (such
as common structural design standard or an ICD) as discussed previously.
In some SE literature, the top-level set of lifecycle concepts, integrated set of needs and set of
design input requirements and associated ICDs for a system, represent the “functional baseline”
for the system, and the family lifecycle concepts, integrated set of needs, set of design input
requirements, and interface definitions artifacts represent the “allocated baseline”. At the
preliminary design review (PDR), the design team addresses how their design will result in the
implementation of the allocated baseline. The sets of design output specifications for the
subsystems and system elements that are part of the SOI physical architecture represent the
“product baseline” to which the subsystems and system elements will be manufactured.
Commitment and approval of the sets of lifecycle concepts, sets of needs, and sets of design
input requirements for the system and each subsystem and system element within the system
physical architecture are obtained from the customer, business operations and system level
stakeholders. Once approved, these sets are baselined resulting in the SOI allocated baseline.
These sets of design input requirements are the focus of design verification and system
verification, and the integrated sets of needs are the focus of design validation and system
validation.
6.4.3 Allocation - Flow Down of Requirements
Allocation is the process by which the design input requirements defined for an entity at one
level of the physical architecture are assigned (flow down) to the entities at the next lower level
of the architecture that have a role in the implementation of the allocated requirement as shown
in Figure 6-16. The arrows shown in Figure 6-16 indicate the flow down of requirements from
one level of the architecture to the next level.
System
Design Input
Requirements
Analysis
Allocate, Budget

Subsystem System Element


Design Input Design Input
Requirements Requirements
Analysis Design
Allocate, Budget Spec

System Element System Element


Design Input Design Input
Requirements Requirements
Design Design
Spec Spec

Figure 6-16: Flow down of Design Input Requirements via Allocation and Budgeting.
Based on analysis of the design input requirements and the function of the system whose
requirements are being allocated, the Architecture Definition Process decomposes the system
into subsystems and system elements, resulting in the next level of the SOI physical architecture.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 237

Organization’s Strategic Level


Traceability Traceability
Lifecycle Concepts:
Stakeholder Traceability Development, Production, Business Business Level 0
real-world Acquisition, Deployment, Needs Business Requirements
Operations, Support, Business
expectations Lifecycle Retirement Needs Requirements

Trace
Analysis & Analysis Analysis
Maturation

Constrain Trace to

Trace
Parent

Business Operations Level


Lifecycle Concepts: Traceability Traceability
Stakeholder Traceability Development, Production, Business Business
real-world
Acquisition, Deployment, Needs Operations Requirements Operations Level 1
Operations, Support, Analysis Needs Requirements
expectations Retirement Analysis
Lifecycle
Analysis &
Maturation

Trac
Tra
Trace to

ce
Parent

e
Constrain
Product/System
MGOs, measures, Use Traceability Traceability
Cases, Operational
System Traceability
Lifecycle System
Stakeholder Traceability Scenarios, Stakeholder System Design Input
real-world needs & Requirements Lifecycle
Analysis &
Concepts and
Architecture Needs
Needs Requirements
Analysis Requirements Level 2
expectations Drivers & Constraints, Risks Analysis
Lifecycle Maturation
Analysis & Section 6 Design
Maturation Section 4 Lifecycle Concepts & Needs Definition Input Requirements
Definition

Flow down Trace to


(Allocation & Budgeting)
Trace

Trace
Constrain Parent
Subsystems
MGOs, measures, Use Traceability Traceability Subsystem
Cases, Operational Subsystem Traceability Design Input
Stakeholder Traceability Scenarios, Stakeholder Lifecycle Subsystem Requirements Requirements
real-world
needs & Requirements
Drivers & Constraints, Risks
Lifecycle
Analysis & Concepts and Needs Needs Analysis Level 3

Flow down
expectations Maturation Architecture Analysis

Constrain
Lifecycle

Trace
Analysis & Section 6 Design

Trace
Trace
Constrain

Maturation Section 4 Lifecycle Concepts & Needs Definition Input Requirements


Definition

Lower-Level System Elements Level 4

Figure 6-17: Flow down of Design Input Requirements via Allocation and Budgeting.
As part of this analysis, the project team determines what “role”, if any, each subsystem and
system element at the next level of the architecture has in the implementation of each design
input requirement being allocated.
For each subsystem or system element that has a role, the requirement will be allocated to those
subsystems or system elements. As shown in Figure 6-17, the allocated requirements are
constraints to the receiving subsystems or system elements. As such they are inputs to the
Lifecycle Concepts and Needs Definition activities. The resulting set of needs are transformed
into a set of design input requirements for the subsystem or system element the higher-level
parent requirements were allocated to.
The design input requirements for the receiving subsystems and system elements will trace to the
needs from which they are transformed. In addition, any of the resulting design input
requirements that address the allocated parent will also have a trace to that parent. As such they
are referred to a child requirements for the allocated parent. As a set, the child requirements
contained in all the sets of design input requirements for each subsystem and system element the
parent requirement was allocated to must be necessary and sufficient to meet the intent of the
allocated parent requirement. See Section 6.4.4 for a more detailed discussion on defining child
requirements.
It is important to understand the distinction between allocation and traceability in the context of
design input requirements. While requirements traceability is establishing a link between two
requirements (parent/child, child/parent, peer/peer, requirement/source), allocation is linking a
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 238

parent requirement to a subsystem or system element at the next level of the physical
architecture.
Theoretically for green field systems, at the time of allocation the design input requirements for
the subsystems and system elements at the next level of the physical architecture have not yet
been defined.
Once the child requirements have been defined for each of these subsystems and system
elements, they will be recorded and traceability to the allocated parent requirement will be
established. With the concept of bi-directional traceability, once the trace from child to parent is
established, a reverse trace from parent to child is also established.
If using the data-centric approach advocated in this Manual, role analysis, and allocation are
done within a single integrated model. As such, the role analysis and allocation are like “pealing
back layers of an onion” increasing the level of abstraction as the project team moves down the
levels of physical architecture within the model. Out of this analysis comes both the definition
of the next level architecture as well as the allocations of requirements to the applicable
subsystems and system elements at that next level.
In a document-centric practice of SE, the role analysis and allocation are more reliant on the
knowledge and experience of the members of the project team. Often spreadsheets are included
as appendices to show allocation as well as parent/child relationships.
Software-Centric System Architecture
It is common to define physical architectures in terms of “system”, “subsystem”, and “system
element’ designations. While these naming conventions work for electrical/mechanical-centric
systems, they may not work well for software-intensive systems that tend to have a “flatter”
architecture organized more by function or feature.
In the past when a subsystem included software, the software was listed under the subsystem
along with other hardware or mechanical parts that made up that subsystem. As a result, the
software was shown several levels below the system level at either the subsystem or system
element levels. An issue with this approach was that software development was often done in
siloes by the organization responsible for developing that subsystem or system element. When
there were multiple subsystems and system elements containing software, the result is often a
fragmented approach to software development, leading to system integration issues and failed
system validation.
In today’s software-intensive systems, it is common for aircraft, spacecraft, and even
automobiles to have over a million lines of code. Today’s automobiles may have over 150
software modules and associated hardware microprocessors, and multiple communication
busses. In our increasingly software-intensive systems, core functionality and performance are
more dependent on the software rather than hardware/mechanical systems. However, while
discrete functionality is assigned more to software, there is no software that runs without
associated hardware: processor, memory, power, networks, sensors, and actuators. Because of
this, team members who focus on developing the embedded software must work closely and
collaboratively with the team members responsible for the hardware in which the software
modules run and which provides the inputs to the software, and which are commanded by the
software.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 239

Unfortunately, many organizations are still using the same traditional hardware-centric
architecture when developing software-intensive systems, resulting in multiple software
segments being not only developed in a silo, but also going through independent software
segment verification “testing” with emulators or simulators of external hardware and software
systems rather than actual system hardware and software. In some cases, this “testing” is
deemed adequate evidence that the software “works”. To save time and money, integrated
system software and hardware verification with the software running within the actual integrated
hardware/software operational environment with the intended users is often not performed,
resulting in the integrated system failing system validation.

System
Design Input
Requirements
Analysis
Allocate, Budget

Mechanical
Design Input
Requirements
Hardware Software
Design Input Interactions Analysis Interactions Design Input
Requirements Allocate, Budget Requirements
Analysis Analysis
Allocate, Budget Interactions across interface boundaries Allocate, Budget

H/W Subsystem H/W Element Mech Subsystem Mech Element S/W Segment S/W Segment
Design Input Design Input Design Input Design Input Design Input Design Input
Requirements Requirements Requirements Requirements Requirements Requirements
Analysis Design Analysis Design Analysis Analysis
Allocate, Budget Spec Allocate, Budget Spec Allocate, Budget Allocate, Budget

Spec = “built-to/code-to”
design output specifications

Figure 6-18: Alternate Architecture for Software-intensive Systems.


A different approach to system engineering architectures is needed to accommodate software-
intensive systems. Rather than developing subsystems that contain software, the view should
change that we are developing software-intensive systems where hardware and mechanical
systems are enabling systems for the software. The software runs on hardware microprocessors,
using hardware memory, communicating over hardware supplied busses, gets data from
hardware sensors, interacts with the user via hardware supplied I/O devices, and commands
hardware systems. Rather than standalone applications, the software is “embedded” in the
hardware and “dependent” on that hardware. In this context, the software is “constrained” by the
hardware. The mechanical systems hold the hardware together providing structure and the
“skin” of the system. However, it is the software systems that provide the core functionality as
viewed by the users.
Before dividing a system directly into traditional subsystems, and decomposing the subsystems,
an additional layer needs to be acknowledged that exists between the top system level and
traditional subsystems. One approach is to first divide the system into hardware, mechanical,
and software as shown in Figure 6-18, and then decompose the hardware, mechanical, and
software systems into lower-level subsystems and system elements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 240

With this approach, the top-level SOI requirements will first be allocated and budgeted to the
hardware, mechanical, and software involved in meeting a requirement. Because the allocations
involve hardware, mechanical, and software, there will be dependencies and interactions between
the hardware, mechanical, and software systems, thus the increased importance of identifying
interface boundaries, define the interactions across those boundaries, define interface
requirements, and identify constraints for each interaction.
Using this approach, the hardware, mechanical, and software systems are much more tightly
coupled. Because of this, the software modules must not be disconnected from the hardware
architecture in which it is imbedded. The intent is to define a single “architecture” with multiple
views. This is a key consideration for imbedded software. As such, it would be a mistake to
develop a distinct software architecture separate from the integrated system architecture
consisting of hardware, mechanical, and software subsystems and system elements. This is a
major difference between developing standalone software applications and software embedded
within the SOI.
Rather than the hardware, mechanical, software decomposition shown in Figure 6-18, some
organizations choose a different breakdown. For example, railroad systems are commonly first
divided into “onboard systems”, “off-board systems”, and “control systems”. A medical
diagnostic system be divided into “instrument”, “assay”, and “software”. Where the assay
consists of a biological sample, slide or cartridge and reagents. The assay is inserted into the
instrument that collects data in several forms (e.g., high-definition images at different
wavelengths of light) and then the data is analyzed by the software to detect whatever it is
intended to detect. The software also has modules involved in the user interface with the
instrument, control of hardware components, and reporting the results of the analysis.
To be successful, the project team members must work much more closely as an integrated,
collaborative team to develop integrated models of the SOI and focus more on the integrated
system behavior rather than on any one system, subsystem, or system element. As an example,
for the medical diagnostic system discussed above, requirements associated with accuracy,
precision, total allowable error, total time to get a result are allocated to the instrument, assay,
and software. The engineers and scientists responsible for each must work together to be able to
ensure each of the system level requirements are met.
It is also important to note that the traditional hardware-centric approach and the traditional
software-intensive approaches to system development will need to be combined into one
integrated approach where the organizational silos are minimized and there is truly one
integrated set of data and information that models the SOI under development.
Project team members will need to have a better understanding of the culture associated with the
other team members. For example, software architectures tend to be “flatter” with fewer levels
of decomposition and tend to be organized more based on features and capabilities (with implicit
assumptions about enabling hardware performance) rather than the traditional hierarchical view
of hardware/mechanical systems. In addition, the trend is toward a more “Agile” approach to
software development that will need to be acknowledged by the more “waterfall” driven
approach commonly used by the hardware/mechanical focused systems engineers. This can
result in a “WAgile” approach to SE taking advantage of the strengths of both approaches.
Using this approach, software can be developed under a common management structure, using a
common ontology and definition of interactions in terms of messages, data, telemetry, and
commands. The software testing and design and system verification validation can be performed

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 241

in a more integrated manner and integration issues should be much less, thus the risk of budget
overruns and schedule slips and time to market will be reduced.
Allocation Matrix
A common tool used for allocation is the allocation matrix shown in Table 6-5 using the medical
diagnostic system as an example. Within the project’s toolset, the allocations can be established
within the models as well as within the RMT by including Attribute A5 - Allocation/Budgeting.
Assuming this is done, then the allocation matrix can be generated by the RMT.
Column A Column B Column C Column D Column E Column F Column G
Instrument Assay Software
System A systems Systems Systems
Design Input Instrument Instrument Assay Assay S/W S/W
Requirements System 1 System 2 System 1 System 2 System 1 System 2
Functional/Performance X X
Rqmt 1 X X X X
Rqmt 2 X X X X X
Operational (Fit)
Rqmt 3 X X X
Rqmt 4 X X X
Physical Characteristics
(Form)
Rqmt 5 X X X X X X
Rqmt 6 X X X
Quality (-ilities)
Rqmt 7 X X X X X X
Rqmt 8 X X X X X X
Standards/Regulations
(Compliance)
Rqmt 9 X X X X X
Rqmt 10 X X X X X X
Table 6-5: Example Allocation Matrix.

While similar, the analysis associated with allocation is slightly different for each of the types of
requirements discussed earlier: functional/performance, operational (fit), physical characteristics
(form), quality, and compliance. The functional/performance and operational requirements will
be allocated to the specific subsystems and system elements that have a role in meeting that
parent requirement.
Operational requirements dealing with power, will only be allocated to those systems that use
power, but not to software nor a mechanical system like structure. Physical characteristics like
mass will be allocated to all applicable physical subsystems and system elements, but not
software. Requirements dealing with quality tend to apply to all subsystems and system
elements so they would be allocated accordingly. Standards and regulations would be allocated
to all subsystems and system elements to which a specific standard or regulation applies.
Generating the allocation matrix is important as it allows the project team to review and assess
the allocations. If allocation is addressed properly within an RMT, the allocation matrix should
be able to be generated as a report. For each set of design inputs for entities within the system
architecture that require further elaboration, this assessment should address the following
questions:
• Has every requirement been allocated?
• Are the allocations consistent with the allocations within the models?
• Does the owner of the allocated parent requirement agree with the allocation?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 242

• Do the owners of each receiving entity agree with the allocation?


• If a requirement is allocated to a single entity, should it be also allocated to entity at the
same level, or is the parent requirement stated at the wrong level? (If a parent requirement
only applies to a single entity, then it could be the requirement is at the wrong level and a
proper parent requirement is missing.)
• For the requirements that are allocated to multiple entities, does that involve an interaction
(interface) between those entities?
While a report can be generated from the RMT to determine if each requirement is allocated, the
report cannot address the correctness of the allocation-was the requirement allocated to the right
entities and all the entities that have a role in meeting the intent of the allocated requirement?
Correctness questions will have to be answered by members of the project team.
In a document-centric practice of SE, the allocation matrix is often included as an appendix to
the design input requirements document. In some cases, rather than an allocation matrix, the
project includes a parent/child traceability matrix, with the assumption that if the project team
responsible for a system, subsystem, or system element derives child requirements for a parent
requirement, that parent must have been allocated to that system, subsystem, or system element.
Conversely, if there are no child requirements for a system, subsystem, or system element, then
the parent requirement must not have been allocated to that system, subsystem, or system
element. In both cases, these assumptions could be incorrect. It is best to have separate matrices
for allocation and parent/child traceability. As discussed in Section 14.4, the project team can do
the analysis needed to assess the “correctness” of both the allocations and traceability.
This activity helps establish individual requirement statements have the GtWR characteristic C2
– Appropriate and the set of design input requirements has the GtWR characteristics C10 -
Complete and C11 - Consistent.
6.4.4 Defining Child Requirements That Meet the Intent of the Allocated
Parents.
As shown in Figure 6-17, once the parent design input requirements have been allocated, they
become constraints for each of the receiving subsystems or system elements along with all the
other constraints identified during the Lifecycle Concepts and Needs Definition activities
discussed in Section 4. As such, the project teams for the receiving entity will include in their
lifecycle concept analysis and maturation activities, lifecycle concepts the specific “role” they
play in the implementation of the intent of each of the allocated parent requirements.
This cannot be done in a silo. The “role” a system, subsystem, or system element has must take
into consideration the “role” of the other subsystems or system elements at the same level that
were allocated the same parent requirement. Because they were allocated the same parent
requirement often there will be some degree of dependency.
For example, if the parent requirement is a functional/performance requirement, then each
receiving system, subsystem, or system element needs to define one or more subfunctions and
performance child requirements, which together will result in the parent requirement’s function
and performance to be achieved. This may involve an interaction between subfunctions and thus
an internal interface whose interaction must be defined and implemented. Each of the child
requirements for each of the receiving subsystems or system elements contribute to the
performance associated with the parent functional requirement.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 243

This is especially true for software-intensive systems. It will be common to have a


functional/performance requirement allocated to both hardware and software. Each of the
project teams will need to determine their specific role and how each will interact such that the
intent of the parent requirement is met. (Note: this may be a new concept for software engineers
experienced in developing standalone software applications, but not have experience in
developing embedded software dependent on hardware systems.)
These dependencies are much easier to determine and assess within the functional, analytical,
and behavioral models. If using the data-centric approach advocated in this Manual,
dependencies will be discovered and managed within the models helping to ensure consistency
of the requirements within a set as well as consistency with requirements that have a dependency
with requirement sets for other subsystems and system elements.
Performing the Lifecycle Concepts and Needs Definition activities discussed in Section 4, there
will be needs that address the allocated parent requirements. For example, referring to the
example Allocation Matrix shown in Figure 6-5, there could be a Subsystem 3 need statement
that says: “The stakeholders need Subsystem 3 to implement the allocated requirements from
System A shown in Column D of the System A Allocation Matrix contained/recorded in [TBD
location]”.
Then the project team would transform this need statement into the set of derived Subsystem 3
child requirements that address Subsystem 3’s role in meeting the allocated parent requirements
in accordance with the activities discussed above in Section 6.2.1. The project team must
determine whether the resulting child requirements for their system, subsystem, or system
element as well as the other subsystems or system elements to which the allocated parent
requirement was allocated are both necessary and sufficient to meet the intent of the allocated
parent requirement.
Caution. When defining the child requirements DO NOT just copy and paste the parent
requirement and change the noun. For example, if there is a parent requirement: “System A
shall do X with a performance of Y.” Do not write child requirements “Subsystem 3 shall do X
with a performance of Y.” and “Subsystem 4 shall do X with a performance of Y.” The project
team needs to derive child requirements based on the specific role Subsystem 3 and Subsystem 4
have that contributes to the parent requirement being met, i.e., the logical architecture drives and
controls the decomposition and allocation of requirements at the next-lower level of the
architecture.
This activity helps establish the set of design input requirements has the GtWR characteristics
C10 - Complete and C11 - Consistent.
6.4.5 Budgeting of Performance, Resource, and Quality Requirements
Allocation involves more than just “flowing down” requirements from one level to another.
There are two types of allocation. One type of allocation is for responsibility - the receiving
entity has some role in meeting the intent of the allocated parent requirements. The other type of
allocation involves the allocation of some quantity such as resource production or utilization,
performance, quality, or some physical attribute. Physical attributes include mass, volume, etc.
Performance is associated with functional requirements in terms of how well, how fast, how
many, etc. For example, accuracy, precision, time, bandwidth, consumption of a consumable, or
power use.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 244

Budgets need to be managed and controlled at the system level. In at data-centric practice of SE
budgets are managed and controlled within a model of the system. In a document-centric
practice of SE, budgets are commonly managed and controlled either within the RMT or a
spreadsheet referenced by the requirements.
A critical concept associated with budgeting is that the budgeted quantities result in requirements
that have a dependency - a change in one will result in the need to change another. Because of
these dependencies, establishing traceability between the child requirements and their allocated
parent as well as between peer requirements is critical. The RMT being used should allow
management of the allocations to the entities separately from the traceability. These
relationships are shown in Figure 6-19.

System A
Power Use Requirement PW(t)
Tra
on
cati
o Allocation Trace to
Allo Par ce to
lo t ca en
Al c e nt Parent ti o t
Tra are n
P
Subsystem B Subsystem C Subsystem D
Child Power Use Trace Child Power Use Trace Child Power Use
Requirement to Peer Requirement to Peer Requirement
pwb pwc pwd

Trace
to Peer
Figure 6-19: Allocation and Budgeting Example.
Because of the dependencies, it is useful to view allocation of resources as an equation.
Sys A PW(t) = SSB (pwb) + SSC (pwc) + SSD (pwd)
where PW(t) is the total power available for use, SS = subsystem, and pwx = the allocated power
use values. In this context, changes to any variables on the right side of the equation will require
a change in the other variables to keep the equation balanced.
The project team can use either models or spreadsheets to establish these equations. However,
each of the subsystems may also allocate/budget their values to the system elements that make
up the subsystem, so now there are second order allocations/budgets. Each of the system
elements at the lower level may sub allocate/budget their values, resulting in third order
allocations/budgeting. There will be cases were there may be a dependency between second or
third order allocated/budget values across subsystems as shown in Figure 6-20.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 245

Sys A
PW

SS SS SS
B C D

SE SE SE SE SE SE SE SE SE
11 12 13 21 22 23 31 32 33
Dependency

Sys PW(t) = SSB(pwb) + SSC (pwc) + SSD (pwd)


=S =S =S
E11 E21 E31
(pw (pw (pw
11 21 31
)+ ) +S )+
SE1 E22 SE3
SS = Subsystem, SE = System element 2( 2(
pw (pw pw
PW(t) = Maximum power use 12) 22 3 2)
+ )+ +
Pwx = Allocated value SE1 SE2 SE3
3 (pw 3(p 3 (pw
13 w 23 33
) ) )

Figure 6-20: Allocation and Budgeting Dependencies.


Identifying and managing these lower order dependencies is difficult to do unless the project
team is using an integrated system model. Developing separate models for lower-level
subsystems and system elements in organizational silos will make it extremely difficult to
manage the budgets at multiple levels of subsystems and system elements.
For greenfield systems, especially those depending on low maturity critical technologies, the
managing of budgets can be challenging in that initially they are often estimations with a
minimum of analysis, especially for a document-centric approach to SE.
Using analytical and behavioral models, the project team can do some optimization. However,
the budgets are often dynamic as the design progresses for each system element. Some system
elements may need less that what was budgeted and other more. These changes have a ripple
effect for all dependent budgets up and down the levels of the system architecture. Because of
this, it is critical for the project team to manage all budgets from the top using a single integrated
model of the SOI.
Due to the dynamic nature of budgeted qualities, many organizations do not include the actual
budgeted values within the requirement statements. The budgets are managed separately in a
configuration managed form (database, spreadsheet, model). With this approach, the individual
design input requirements then include a pointer to this source. For example, the project team
may export the allocations into a spreadsheet. Then the requirements would point to the
spreadsheet. For spacecraft, mass is a critical allocated quantity. The spacecraft would have a
maximum allowable mass and then allocate that mass to the hardware and mechanical systems.
“The power subsystem shall have a mass equal to or less than the power subsystem mass
allocation in [spacecraft mass management spreadsheet xyz or database]”. As lower-level
subsystems and system elements are defined for the power subsystem, the power subsystem mass
would be suballocated and managed within the same spreadsheet or data base.
For subsystems or system elements that are contracted to a supplier, special provisions need to be
made in the contract and contract to manage the dynamic nature of budgeting. To help manage

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 246

the risk associated with the uncertainties associated with budgeted values, the customer and
supplier will need to define and agree to margins and reserves for the budgeted quantities as
discussed in Section 6.4.6.
Allocations and Budgets Across Interface Boundaries
A common occurrence is when a design input performance requirement is allocated to multiple
subsystems and system elements that have a role in meeting that performance requirement. A
classic example is an observation spacecraft that an instrument with sensors to obtain
observation data (e.g., the Earth’s Sea level, temperature, or an image) and transmit that data to
observers on Earth for display and analysis.
For this example, there is an instrument on the spacecraft that collects the observation data,
processes, stores, and provides the observation data to the spacecraft communications system.
The communications system integrates the observation data into its downlink data stream and
transmits that data stream to a communications satellite that transmits the data stream to a ground
communications network which provides the data stream to the spacecraft control center. The
spacecraft control center strips off the instrument observation data from the spacecraft data
stream and sends that observation data to the instrument control center which processes and
stores the observation data. This data is then made available for download by observers that
need to receive, store, process, display and analyze the data.

Spacecraft Spacecraft
Downlink Downlink
Data Stream Data Stream
Instrument Spacecraft Ground
△t Control Control Communications △t
Center △t Center
△t
Network

△t Observation
Data
△t Spacecraft
△t
Downlink
Data Stream

△t Observer
Communication
Satellite △t
Spacecraft
Downlink △t
Data Stream
Spacecraft
Spacecraft
Instrument Communications
Observation
Observation System
Data
Data
△t △t △t △t
Figure 6-21: Allocation and Budgeting Across Interface Boundaries.
There are many systems, both internal to the instrument and spacecraft and external, that are
involved; several of which are enabling systems owned and operated by external organizations
(space and ground communications systems). There are interface boundaries between each of
these systems and interactions across those boundaries. Each step of this process involves some
form of data manipulation as well as the time of each interaction across the interface boundaries.
Each instance of data manipulation and each instance of interaction across and interface

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 247

boundary takes some amount of time (delta T). As shown in Figure 6-21, there are 13 delta-Ts
involved. (There will be internal delta-Ts internal to each system as well.)
At the operations level there may be a stakeholder requirement for the maximum time allowed
from the time an observation event occurs on the surface and the observation data is available for
display at the instrument control center by an observer. This requirement would be allocated to
the various systems that make up the overall architecture. Each of those systems would then do
an analysis of their allocated time to 1) define a concept for achieving that time and 2)
determining if that time is feasible. In some cases, feasibility will be an issue for one or more of
the systems involved. The project team will then need to address these issues, find a solution,
and reallocate the times based on this analysis - assuming they can define an end-to-end concept
that is feasible. If not feasible, they will need to push back to the customer and renegotiate a
value that is feasible.
For systems in this chain that are existing, the delta-T will be known (often fixed), leaving the
remaining time to be divided up between the developing systems. For the developing systems,
the actual answer as to what is feasible will be a function of the physical design and the maturity
of critical technologies.
For cases when the SOIs are being developed by different suppliers external to the project team’s
organization, managing these allocations will be a challenge unless addressed in the supplier’s
contract.
This example illustrates the dynamic nature of allocation and budgeting which gets more
complex with the number of subsystems and system elements involved. This complexity also
results in increased uncertainty concerning feasibility which may not be known until the design
is complete. To help manage this uncertainty, the concept of defining margins and reserves can
be used by the project teams for each of the subsystems or system elements being developed.
This activity helps establish the set of design input requirements has the GtWR characteristics
C10 - Complete and C11 - Consistent.
6.4.6 Budget Management: Margins and Reserves
Budgets are established as limits within which a quantity is managed. Given there is uncertainty
with the budgets, there is inherent risk to the project being able to stay within the allocated
budgeted values. One way to help manage those risk is the use of margins and reserves.
A major problem when defining and managing design input requirements is a failure of systems
engineers to appreciate the concept of managing resource margins and reserves [53].
• Development margin or technical margin is defined as the difference between the
estimated budgeted value and the actual value at the end of development when the system
is delivered. Margins allow for both expected and unexpected change as the design
matures over the system development lifecycle. Development margins for resources like
mass, power, and time or margins for performance like, accuracy, precision, or rate are
defined at the system level and allocated to the parts of the system architecture.
• Operational margin is defined as the difference between what is required during
operations and what is actually provided. Operational margin provides additional
capability to address unexpected changes, anomalies, security issues, or errors in defining
the expected operational environment that may occur during operations. (The need to
address operational margins and issues is discussed in several different subject areas

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 248

including agile systems and resilient systems. The reader is encouraged to explore each
of these areas in more debt depending on the needs of the project and customer.)
• Management Reserve is defined to be the portion of the available quantity held back or
kept “in reserve” by management or the quantity owner during development and not
made available through allocation. Reserves allow management to deal with the
unexpected events such as out of-scope demands, unplanned changes, uncertainties as to
what is feasible, and other uncertainties.
A key challenge is how to manage budgeted items over the development and operations life of
the SOI. At the beginning of a project, it is common to do a preliminary analysis and compute
an estimate of the various needs for the quantity of something or needed performance and then
communicate these estimates as design input requirements.
A key issue in managing the allocation/budgets during both development and operations is a
failure to understand that these initial computations are only approximations based on
assumptions that may or may not be correct and may change as the system design matures.
Budgeted values should be treated as TBR values as discussed earlier.
Experienced systems engineers have learned over time that often the projected resource
utilization, like mass and consumption rates, are often underestimated and tend to grow over the
system development lifecycle. On the other hand, the ability of a system to produce resources
(power, fuel, water, food, air, etc.) are often overestimated and the production efficiency of the
systems tend to be lower than predicted as the design matures.
In either case, knowledge concerning utilization and production is directly proportional to the
maturity of the technologies being used. The lower the TRL, the larger the uncertainty of
successfully integrating the desired technological implementation, or system capability. As the
design matures, parts are procured and integrated together; the knowledge of the actual mass,
consumption, and production numbers will mature.
During operations, consumption or utilization needs and production efficiencies must consider
not only nominal operations, but also alternate and off-nominal operations as well as degradation
is performance over time. During production, consumption and utilization needs and production
capability are based on assumptions, and these assumptions may not be valid due to a lack of
actual operational experience for the specific project or the reliance on systems using
technologies with lower levels of technical maturity (low TRLs), e.g., this is the first time the
system is actually used for this specific purpose in this actual operational environment. There
are also the unknown unknowns that are sure to occur.
For example, the project team is rolling out an updated version of a software application. This
application turns out to be immensely popular. The number of people wanting to acquire the
application overwhelms the servers and network capabilities and there are either long wait times,
slow download speeds, or the servers crash. Or how about a new online government system that
crashes because of the unexpected substantial number of concurrent users that are trying to set up
new accounts and log in or external systems this system interfaces with were not designed for
that peak volume. The application was designed based on an estimate of the average number of
users on any given day. The initial peak of the number of users (demand) at the beginning of the
project or surges in demand or periodic decreases in supply were not considered, or at best,
underestimated, thus the ability to supply the services during peak periods was exceeded causing
the system to fail.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 249

Operational Capability provides additional resources during surge or peak consumption periods
as well as enabling the system to succeed even when the unexpected happens. Operational
capability also provides additional resources when operational conditions or the environment are
different from those assumed when the system resource requirements were generated, and the
system was not designed to accommodate.
The size of the margins and reserves are based on the risk associated with projects. Brown field
systems are normally lower risk, so the size of the margins and reserves can be lower. Green
filed systems are higher risk, especially those whose critical technologies are at low TRLs, so the
size of the margins and reserves will need to be higher.
The early establishment of adequate margins and reserves and the effective management of them
throughout the project’s lifecycle play a critical role in the ability of the project to deliver a
winning system.
From the beginning, the project team is strongly encouraged to define adequate margins and
reserves -- especially for programs with significant complexity and high risk. Failing to define
these margins places the project at great risk of cost overruns and schedule slips. When defining
the values within the design input requirements, it is critical these values take into consideration
the margins and reserves defined and being managed by the project.
Projects that fail to define and manage margins and reserves for all allocated quantities are
doomed for failure from the beginning.
6.4.7 Use of Traceability and Allocation to Manage Requirements
Combining the concept of allocation with the concept of traceability provides the project team a
powerful way to manage the design input requirements, especially across levels and across
subsystems and system elements within a specific level.
Referring to Figure 6-14, there are 16 subsystems or system elements within the SOI
architecture. Assuming an average of 50 requirements per system, subsystem, or system
element, that results in 800 requirements. Sadly, in many organizations the average number of
requirements per system, subsystem, or system element are more like 400 requirements - for a
total of 6400 requirements. While the use of the traceability and allocation matrices discussed
above is useful for smaller sets of requirements with fewer levels, as the number of subsystems
and system elements and their requirements increase, the usefulness of these matrices or any
other visualizations are limited as a tool to assess the correctness, consistency, and completeness
between and within the sets of design input requirements.
As requirements are developed and flow down from one level to another, it is critical that
allocation and traceability is assessed for completeness, correctness, and consistency. These
assessments are not only needed while defining the sets of design input requirements but is a
major function of managing the sets of needs and sets of design input requirements, especially
when assessing changes.
This activity helps establish each design input requirement has the GtWR characteristics C1 -
Necessary and C8 - Correct. It also helps establish the set of design input requirements has the
GtWR characteristics C10 - Complete, C11 - Consistent, and C14 - Able to be Validated.
Refer to Section 14.2.6.1 for a more detailed discussion concerning the use of allocation and
traceability to manage the sets of design input requirements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 250

6.5 Summary of Design Input Requirements Definition


The focus of the Design Input Requirements Definition activities is to define well-formed sets of
design input requirements for the integrated system as well as each subsystem and system
element within the physical architecture of the SOI. These sets of design input requirements
represent the allocated baseline to which the Design Definition Process will implement.
Well-formed refers to the quality of the sets of design input requirements in terms of content as
well as the structure as defined in the INCOSE GtWR. The goal is to have well-formed sets of
design input requirements that clearly communicate the intent of the needs to users of the
requirements. These users include those responsible for the design, design verification and
design validation; developing the design output specifications; production, integration, system
verification, system validation, and management of the design input requirements.
Ensuring the sets of design input requirements have the characteristics of well-formed design
input requirements as defined in the INCOSE GtWR is necessary to ensure high-quality,
requirements that will not be as volatile as many organizations currently experience.
Projects often ask the question: “How do we know requirements are “done” enough to proceed
with design?” There is always a trade-off between “better” and “good-enough”. One definition
of “good enough” is: the point where the cost of potential changes is less than the effort needed
to define every requirement.
There really is not a simple indicator, the decision should be knowledge driven and not schedule
driven. Baselining poorly formed sets of design input requirements often results in the
accumulation of technical debt that will be more costly in terms of both schedule and budget
rather than spending the time and effort that will result in well-formed sets of design input
requirements as discussed in this guide.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 251

Section 7: DESIGN INPUT REQUIREMENTS VERIFICATION AND


VALIDATION

This section provides a detailed discussion on the planning, activities, and artifacts associated
with design input requirements verification and requirements validation illustrated in Figure 7-1.
Note 1: In this section “design input requirements verification” and “design input requirements
validation” is about the design input requirements expressions themselves; not about verification
that the system meets the requirements as discussed in Section 2.4 and described in Sections 10
and 11. It is also distinct from design verification and design validation discussed in Section 8.

Design Inputs Rqmts Validation


“Are we building the
right thing?”

Integrated Set Transformation Transformation


Design Input Design Output
Lifecycle Concepts & of Needs Design Input Requirements Architecture & Specifications
Needs Definition Requirements Design
Definition Definition

Requirements
Verification
Drive

“Are the requirements


written correctly?”

Organizational
Requirement
Definition
Requirements
Derived from Ryan, M. J.; Wheatcraft, L.S., “On the Use of the Terms Verification and Validation”, February 2017

Figure 7-1: Design Input Requirements Verification and Validation.


Design input requirements verification and requirements validation consist of a series of
activities assessing the quality of the design input requirements themselves and sets of design
input requirements to determine whether they correctly represent the needs, parent requirements,
and other sources from which they were transformed (validation), and that the requirements
statements conform to standards for writing well-formed requirements statements (verification).
“Other Sources” include customer-owned and other stakeholder-owned requirements, standards,
regulations, risk, diagrams and models, lifecycle concepts, and the needs developed as part of the
Lifecycle Concepts and Needs Definition activities discussed in Section 4.
If the integrated set of needs was developed as defined in this Manual, the needs should already
have traces to these other sources, however, if the organization has not documented an integrated
set of needs, then the set of design input requirements will need to trace to the sources shown in
Figure 4-12 from which the needs would have been derived.
Developing an integrated set of needs may seem to be an “added” activity, however a common
issue is that the quality of a customer-owned system requirements is often questionable in terms
of completeness, consistency, correctness, and feasibility. This can result in suppliers to submit

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 252

proposals based on a defective set of customer-owned system requirements, expecting the


suppliers to build what “the customer meant to tell the supplier to build in the first place.” The
needs verification and needs validation activities can minimize the risk of a gap in what the
customer says they want versus what they really need and expect.
Requirements verification and requirements validation activities should be done both
continuously as the design input requirements are defined and as well as part of the baseline
activities during an SRR or similar type of gate review. Using a data-centric approach to design
input requirements definition, rather than waiting to do requirements verification and
requirements validation on the completed sets of design input requirements, they can be verified
and validated individually during requirements definition activities.
The status of design input requirements verification and requirements validation can be tracked
using the attributes associated with design input requirements verification and requirements
validation status discussed in Section 6.2.1.5. These attributes allow the project team to track the
progress of design input requirement verification and requirement validation activities. Once
verification and validation of each individual design input requirement in the set is complete, the
set of design input requirements can be verified to have the characteristics of well-formed sets of
requirements defined in the GtWR.
While design input requirements verification and requirements validation are discussed
separately in this section, the activities will often be performed concurrently. If an NLP tool is
used for some of the design input requirements verification activities, that analysis should be
completed prior to requirements validation, enabling the reviewer to focus on content and intent,
rather than on structure.
Design input requirements verification and requirements validation may seem to be a discrete set
of activities, but they are not. While the set of design input requirements will be baselined and
put under configuration control, that does not mean they will not change. During physical
architecture definition and design analysis and maturation activities, as well as the definition of
the resulting design output specifications, it is common to discover issues with the baselined set
of design input requirements, requiring them to be updated when the physical architecture,
design, and design output specifications are baselined.
These updated sets of design input requirements will be the focus of system verification
activities. Also, the problem or opportunity, stakeholder needs, stakeholder-owned
requirements, drivers and constraints, risk, as well as the intended operational environment, may
have changed during the development cycle. In either case, any changes to the set of design
input requirements must go through a Configuration Management Process prior to approval.
Even though this section is about verification and validation of the design input requirements
statements, it is important that the project team adopt a systems thinking view and consider the
relationships, interactions, and dependencies associated with design input requirements and other
SE artifacts and PM work products across the lifecycle. As a result of the design input
requirements verification and requirements validation activities, any changes made must be
reflected in these other SE artifacts and PM work products. Section 14 goes into more detail
concerning managing change.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 253

7.1 Design Input Requirements Verification


A summary of the design input requirement verification activities is shown in Figure 7-2.

Inputs Outputs
• Sets of design input requirements Design Input Requirement • Sets of verified design input
• Feasible lifecycle concepts Verification Activities requirements
• Model elements in the system • Prepare for Design Input • Updated requirement attributes
architecture, analytical, & behavioral Requirements Verification • Requirements Verification Results
models • Perform for Design Input Records
• Physical architecture Requirements Verification • Updated allocation and budgeting
• PBS • Manage for Design Input records
• Definitions of interactions across interface Requirements Verification Results • Updated traceability records
boundaries • Updated interface diagrams
• Design and system verification planning • Updated definitions of interactions
artifacts across interface boundaries
• For each design input requirement (as • Updated model elements in the
applicable): Enablers system architectural, analytical, and
⁃ Traceability to system need, parent • Enterprise tailored Guide for behavioral models
requirement, or source Writing Requirements • Updated physical architecture
⁃ Traceability to peer requirements • Enterprise tailored process for • Updated integrated sets of system
⁃ Traceability to model elements in the developing & managing needs & needs
system architecture, analytical, & requirements • Updated sets of lifecycle concepts
behavioral models • Enterprise Design Input • Updated system verification
⁃ Attributes defined for system verification Requirements Verification planning artifacts
⁃ Traceability to system verification Inspection Checklist
planning artifacts • Enterprise Product Development
⁃ Allocation (flow down) of higher-level Process
design input requirements to the next • Trained systems engineers
level of the system architecture • Requirement Management Tool
engineering elements • Diagraming & Modeling Tools
⁃ Budgeting from higher-level design input • Stakeholders, stakeholder
requirements to the next level of the representatives or surrogates.
system architecture systems and system
elements,

Figure 7-2: Design Input Requirement Verification IPO Diagram.


The design input requirements verification activities will review the design input requirements
expressions and the sets of design input requirements to verify they have the expected
characteristics and adhere to the rules that result in those characteristics as defined in the
INCOSE GtWR or the developing and customer organization’s guide for writing requirements.
In terms of requirements verification, the guide represents the organizational requirements for
writing well-formed requirements. The requirements verification activities will include
inspection of traceability records from the sources from which the requirements were
transformed to ensure traceability with those sources as well as an audit of the interface
requirements as discussed in Section 6.
7.1.1 Prepare for Design Input Requirements Verification
The first step in preparing for design input requirements verification is to ensure the enablers
shown in Figure 7-2 are in place. Assuming the enablers are in place and tools are in use, the
artifacts listed as inputs should have been produced and matured during the design input
requirement definition activities to the point where they are ready for the requirements’
verification activities. Using a data-centric approach as defined in this Manual, these artifacts
should have been recorded within the project toolset.
Requirements verification requires that the project team establish defined requirements templates
for all associated requirement types, so that the resulting requirements can be compared (and
verified) with respect to the defined standard. Without such standard templates, it is difficult to

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 254

do requirements verification of the different types of requirements performed manually or by


NLP tools.
While some of the of the design input requirements verification activities must be done
manually, others may be able to be automated depending on the capabilities of the applications in
the project toolset. NLP applications provide a capability that allow requirements verification to
be automated to some extent. Many of these tools use the characteristics and rules defined in the
INCOSE GtWR as a basis for assessing the quality of the requirements statements and sets of
requirements. These tools can be used as both a “digital assistant” to aid in the writing
requirements statements as well as assess the quality of individual requirements statements and
the set of design input requirements.
Many of the NLP applications provide a “score” concerning the quality of the requirements
statements based on criteria defined by the project team, as well as identify specific defects on
which the score was based. The project team will determine how this score will be used in the
management of the requirements and requirements verification.
To what extent the project can rely on automated requirements verification depends on a tradeoff
between effort and risk. The need for and importance of using automation for requirements
verification will increase as systems become more complex and the number of design input
requirements increases.
Using a data-centric approach to SE, allocation and traceability can be established within the
project toolset and the matrices can be reports generated by the tool. With a well-defined
allocation and traceability strategy and a well-defined requirement attribute strategy, requirement
verification in terms of allocation, budgeting, traceability, and attributes can, to some extent, be
automated using these tools, especially as the interoperability between tools and analysis
capabilities improves, enabling advanced analysis involving traceability of requirements to the
input artifacts shown in Figure 7-1.
As a minimum, these tools can generate reports that identify missing traces, requirements that
have not been allocated, and attributes not defined. For example, a report could be generated to
list all requirements that do not trace to a source or a report that lists all needs that do not have
implementing requirements, all allocated higher-level requirements that have no implementing
child requirements, or a report showing budgeting equations that are not balanced. Refer to
Section 14.4 for a more detailed discussion concerning the use of these kinds of reports to
manage allocation and traceability as well as to perform requirement verification as discussed
in this section.
Note: While applications within the project toolset can produce allocation and trace matrices or
reports, these applications cannot yet determine the accuracy and correctness of the allocations
or traces between entities. This assessment must be done manually. Deriving requirements from
the behavioral and architectural models [7] significantly reduces the risk of errors in the
definition and allocation of design input requirements.
A key preparation activity for design input requirement verification is the creation of a
Requirements Verification Inspection Checklist if one does not already exist. If the organization
has a generic checklist, then tailor the checklist to the SOI being developed and the project’s
processes.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 255

This checklist serves as a standard to measure the requirements against and will help guide all
the requirements verification activities. Having addressed each of the areas and questions within
the checklist will lead to successful completion of the design input requirements definition and
verification activities. (An example Requirements Verification Inspection Checklist is included
in the GtNR, Appendix D).
7.1.2 Perform Design Input Requirements Verification
There are several activities that should be performed to ensure the individual requirements
expressions and integrated set of design input requirements are well-formed and provide
objective evidence they have been verified. Using the Design Input Requirements Inspection
Checklist as a guide, the project team should:
• Manually verify that individual requirements expressions and the sets of requirements have
the characteristics in accordance with the rules defined in the INCOSE GtWR or similar
guide. This could be done by using the Design Input Requirements Verification Inspection
Checklist as a guide to inspect each requirement statement by individuals or as part of a
tabletop or peer review. Given the number of characteristics, the number of rules to help
ensure the requirements have those characteristics, this task is difficult to do manually
especially for large sets of design input requirements. This activity helps establish each
design input requirement has the GtWR characteristic C9 - Conforming.
• Verify the set of requirements contains individual requirements that are unique, do not
conflict with or overlap with other requirements in the set, and the units and measurement
systems they use are homogeneous. This activity helps establish each need has the GtWR
characteristics C9 – Conforming and C11 – Consistent.
• Verify the language used within the set of requirements is consistent (i.e., the same words
are used throughout the set to mean the same thing) and that all terms used within the
requirement statements are consistent with the architectural model and project data
dictionary. This activity helps establish each need has the GtWR characteristics C9 –
Conforming and C11 – Consistent.
• Alternatively, if in the project toolset, use an NLP application that provides the capability
to automate the verification of the requirements statements in terms of how well they
adhere to the rules for writing requirements and sets of requirements as well as checking
for consistent use of terminology.
o For requirements statements with defects, members of the project team will need to
examine each defective requirement statement and fix the defects the NLP application
identified.
• Verify that individual requirements expressions have the set of attributes agreed to by the
project team defined. The project toolset should be able to produce a report concerning
whether any of the attributes are ‘null’- that is, no values have been defined for a given
attribute. While a report can tell if an attribute has been defined, it cannot assess the
quality or accuracy of the information in the attribute - that assessment will have to be done
manually. For example, does the text in the rationale statement include the information
expected to be in the rationale? Does the rationale state why the requirement is necessary?
Is the source of any numbers explained? This activity helps establish each design input
requirement expression has the GtWR characteristic C4 - Complete.
• Verify that individual requirements expressions have the set of system verification
attributes agreed to by the project team defined. The project toolset should be able to
produce a report concerning whether any of the system verification attributes are ‘null’-
that is, no values have been defined. While a report can tell if a system verification

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 256

statement has been defined, it cannot assess the quality or accuracy of the information in
the statement- that assessment will have to be done manually. For example, does the text
in the verification statement include the information expected? This activity helps establish
each requirement expression has the GtWR characteristic C4 - Complete.
• Use the project toolset to generate traceability reports to verify each requirement traces to
the need, an allocated parent requirement, or a source from which it was derived. In
addition, use the project toolset to generate a report that lists all requirements that do not
trace to a need, parent, or source. In a document-based approach, trace matrices are often
managed manually requiring considerable time and effort to ensure their completeness and
correctness and are often defective. This activity helps establish each design input
requirement has the GtWR characteristic C1 - Necessary.
• Use the project toolset to generate traceability reports to confirm each SOI need, source, or
parent requirement allocated to the SOI has at least one derived requirement that addresses
that need, parent, or source. In addition, use the project toolset to generate a report that
lists all needs, parent requirements, and sources that do not trace to an implementing design
input requirement. This activity helps establish each design input requirement has the
GtWR characteristic C1 - Necessary and the set of design input requirements has the GtWR
characteristic C10 - Complete.
• Perform the interface audit discussed in Section 6.2.3.6.
o Using the interface diagrams and architectural diagrams developed during concept
analysis and maturation activities and refined as part of the transformation of the needs
into the design input requirements as a guide, verify that all interfaces have been
addressed and the associated interface requirements are included in the requirement set.
This activity helps establish the set of design input requirements has the GtWR
characteristics C10 - Complete and C11 - Consistent.
o For each interface requirement, verify it is clear what the specific interaction is between
the SOI and the external system, and that the requirement includes a pointer to where
that interaction is defined, recorded, and agreed to. This activity helps establish each
interface requirement has the GtWR characteristic C4 - Complete and C7 - Verifiable.
o For each interface requirement, verify the external system referred to has a
corresponding interface requirement or has included the interaction with the SOI being
developed in its interface control documentation. This activity helps establish the set of
design input requirements has the GtWR characteristics C10 - Complete and C11 -
Consistent.
• For the set of design input requirements, verify there are requirements included that address
form, fit, function, quality, and compliance. This activity helps establish the set of design
input requirements has the GtWR characteristics C10 - Complete and C14 - Able to be
Validated.
• Assess allocation to the next level of architecture. As discussed in Section 6.4.2, A system
will have a hierarchy of requirements, based on the physical architecture. Unless no further
elaboration of the system, subsystem, or system element in needed and is ready for a buy,
build, code, or reuse determination, the SOI requirements will be allocated to the next level
subsystems and system elements contained within the system physical architecture. Using
the project toolset to generate allocation and trace matrices, perform an analysis that
verifies:
o Each of the SOI requirements have been allocated to the next level of the architecture
o Each allocation is correct and complete, i.e., the requirements were allocated to all
applicable subsystems and system elements at the next level of the architecture and
each of the allocations were to the correct subsystems and system elements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 257

o The resulting dependent child requirements in response to allocations of performance,


quality, or resources are linked to manage changes to the allocated/budgeted values.
This activity helps establish the set of design input requirements has the GtWR
characteristics C10 - Complete and C11 - Consistent.
Note: Allocation assessments will be easier if the project has developed architectural,
analytical, and behavioral models during the lifecycle analysis and maturation activities
and refined those models during the transformation from needs to design input
requirements. The models will be refined and elaborated for each system, subsystem, and
system element within the SOI architecture until all the design input requirements for each
system elements have been defined.
7.1.3 Manage Design Input Requirements Verification Results
A design input requirements verification record is created recording the results and outputs of the
design input requirements verification activities. The outputs include the updated input artifacts
and PM work products shown in Figure 7-2, Outputs. Defects found in the set of design input
requirements as well as any defects found in any of the input SE artifacts or PM work products,
must be addressed and corrected before they are baselined.
System verification information contained in the verification attributes include in each design
input requirements expression should be compiled into the update System Verification planning
artifacts, such as the System Verification Matrix (SVM).
Applications within the project toolset should allow tracking of the status of the requirements
verification activities using a dashboard that communicates key metrics related to the
requirements verification results. These metrics can be obtained using the requirements
verification attributes discussed in Section 7.4 within the project’s toolset. Making this
information accessible will enable all project team members and key stakeholders to have the
same view of the maturity and status of the requirements verification activities.

7.2 Design Input Requirements Validation


The GtWR includes the characteristic C14 - “Able to be Validated” for sets of design input
requirements. In the context of requirements validation “Able to be Validated” means the
project team or customer will be able to validate that the SOI that was designed and built/coded
in accordance with the set of design input requirements will be able to be obtain evidence that
the SOI meets the integrated set of needs and higher-level allocated requirements from which
they were transformed within the constraints (such as cost, schedule, technical, and regulatory
compliance) with acceptable risk.
The design input requirements validation activities will review the requirements expressions and
the integrated set of design input requirements to confirm each requirement statement and the
integrated set of design input requirements clearly communicate the intent of the needs, parent
requirements, and sources, from which they were transformed, in a language understandable by
all project team members, customers, and other key stakeholders.
A summary of the design input requirements validation activities is shown in Figure 7-3.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 258

Inputs Design Input


• Verified sets of design input requirements Requirement Validation Outputs
• Feasible lifecycle concepts Activities • Validated sets of design input
• Model elements in the system requirements
• Prepare for Design Input
architecture, analytical, & behavioral • Updated requirement attributes
Requirements Validation
models • Requirements Validation
• Perform Design Input Requirements
• Physical architecture Results Records
Validation
• PBS • Manage Design Input Requirements • Updated allocation and
• Definitions of interactions across interface budgeting records
Validation Results
boundaries • Updated traceability records
• Design and system validation planning • Updated interface diagrams
artifacts • Updated definitions of
• For each design input requirement (as interactions across interface
applicable): Enablers boundaries
⁃ Traceability to need, parent requirement, • Enterprise tailored Guide for • Updated model elements in the
or source Writing Requirements system architectural, analytical,
⁃ Traceability to peer requirements • Enterprise tailored process for and behavioral models
developing & managing Needs & • Updated physical architecture
⁃ Traceability to model elements in the
Requirements • Updated integrated sets of
system architecture, analytical, & • Enterprise Design Input
behavioral models system needs
Requirement Validation Inspection
⁃ Attributes defined for system validation • Updated sets of lifecycle
Checklist
⁃ Traceability to system validation planning • Enterprise Product Development concepts
artifacts Process • Updated system validation
⁃ Allocation (flow down) of higher-level • Trained Systems Engineers planning artifacts
design input requirements to the next • Requirement Management Tool
level of the system architecture • Diagraming & Modeling Tools
• Stakeholders, stakeholder
engineering elements
representatives or surrogates.
⁃ Budgeting from higher-level design input
requirements to the next level of the
system architecture system elements,

Figure 7-3: Design Input Requirement Validation IPO Diagram.


7.2.1 Prepare for Design Input Requirements Validation
The first step in preparing for design input requirements validation is to ensure the enablers
shown in Figure 7-3 are in place, and those project team members doing the requirements
validation have access to the inputs.
Because the focus of design input requirements validation is on content and intent concerning
what is being communicated, design input requirements validation is difficult to automate using
AI algorithms. However, if the design input requirements are derived from a model, then
validation can have lower risk of missing critical needs from which they were transformed.
Even though individual design input requirements and sets of design input requirements may be
well-formed and traceability has been verified, the message they are communicating may not be
as intended. It is important that organizations do both design input requirements verification and
design input requirements validation. Failing to do so results in technical debt adding risk to the
project that the SOI being developed will fail system validation and will not be approved for its
intended use.
Assuming the design input requirements definition activities were completed as defined in this
Manual and tools are in use, the artifacts listed as inputs should have been produced and matured
to the point where they are ready for the requirements’ validation activities. Using a data-centric
approach, these artifacts should have been documented within the project toolset.
The design input requirements definition activities should have resulted in analysis records,
diagrams, and models that provide rationale for the transformation that resulted in each of the
design input requirements expressions. Each requirement expression should include rationale to

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 259

help those validating and implementing the requirement understand the source and intent of what
the requirement statement is communicating.
A key preparation activity for design input requirements validation is the creation of a Design
Input Requirements Validation Inspection Checklist if one does not already exist. If the
organization has a generic checklist, then tailor the checklist to the system being developed and
the project’s processes. This checklist serves as a standard to measure the requirements against
and will help guide the design input requirements definition and validation activities. Having
addressed each of the areas and questions within the checklist will help lead to successful
completion of the design input requirements validation activities. (An example Design Input
Requirements Validation Inspection Checklist is contained in GtNR, Appendix D).
7.2.2 Perform Design Input Requirements Validation
There are several activities that should be performed to provide objective evidence that the
individual design input requirements expressions and sets of design input requirements are
validated to accurately communicate the intent of the needs, parent requirements, and sources
from which they were transformed.
Note: Unlike design input requirements verification, design input requirements validation cannot
be done without the project team doing the analysis manually - currently, none of the NLP
applications in a project toolset have the capability to do this type of analysis with any degree of
acceptable confidence.
Using the Design Input Requirements Validation Inspection Checklist as a guide, the project
team should:
• Use the project tool set to generate traceability reports along with the rationale attribute to
perform an analysis to validate that each requirement statement clearly communicates the
intent of need, allocated parent requirement, or source from which it was derived. This
activity helps establish individual design input requirements have the GtWR characteristic
C8 - Correct.
• Assess allocation, budgeting, and traceability within the design input requirements set. A
system will have a hierarchy of sets of design input requirements for each system,
subsystem, or system element within the system architecture. Assuming the allocation and
traces exist as previously assessed during requirements verification, use the traceability,
allocation, and budgeting reports to perform an engineering analysis to validate that:
o The allocations from one level to the next was completed for each requirement and the
allocations are correct and complete. This activity helps establish individual design
input requirements have the GtWR characteristic C8 - Correct and the set of design
input requirements has the GtWR characteristic C10 - Complete.
o Confirm budgeted values (physical characteristics, performance, quality) are managed
such that changes can be made as the design matures, changes are within the budgeted
allocation, and dependent requirements are identified and changed appropriately. This
activity helps establish individual design input requirements have the GtWR
characteristic C8 - Correct and the set of design input requirements has the GtWR
characteristic C11 - Consistent.
o For each need, allocated parent requirement, and source, assess whether the derived
design input requirement(s) are necessary and sufficient to meet the intent of the
need(s), allocated parent requirement(s), or source they are traced to and from which
they were derived. Given that an allocated parent requirement is often allocated to

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 260

more than one subsystem or system element at the next lower level of the architecture,
this means evaluating all child requirements that trace back to the allocated parent
requirements for all subsystems and system elements to which the common parent
requirement was allocated. This activity helps establish the set of design input
requirements has the GtWR characteristics C10 - Complete and C14 - Able to be
Validated.
• For each design input requirement that references a capability, performance value, or
physical characteristic dependent on a critical technology, confirm the risk attribute has been
defined indicating this dependency. Also confirm a TRL has been assigned to the technology
and there is a plan to mature this technology. This analysis helps establish each design input
requirement has the GtWR characteristic C6 - Feasible.
• Confirm the project documented their assessment that the set of design input requirements is
feasible in terms of cost, schedule and technology maturation and has included key product
development activities in their cost and schedule estimates, including use of enabling
systems, lifecycle concept analysis and maturation, flow down of design input requirements,
design verification, design validation, system integration, system verification, system
validation, and procurement. This analysis helps establish the set of design input
requirements has the GtWR characteristic C12 - Feasible.
• To reduce the risk of unknowns, using the priority, critically, and Key Driving Requirement
(KDR) attributes (See Section 15), confirm the project has included adequate budget and
schedule margins and reserves as well as defined a descope plan. This analysis helps
establish the set of design input requirements has the GtWR characteristic C12 - Feasible.
• Confirm with the stakeholders associated with each need, allocated parent requirement, or
source that the message being communicated by the design input requirement expression is
correct and acceptable to ensure the set of design input requirements are the right
requirements, i.e., do they accurately represent the intent of the agreed-to needs, parent
requirements, or other sources from which they were transformed? Do the design input
requirements correctly and completely capture what the stakeholders need the system to do in
the context of its intended use in its operational environment it terms of form, fit, function,
compliance, and quality? Will a system designed to the set of design input requirements
result in a system that meets the stakeholder’s real-world expectations over its lifecycle?
It is critical that the project team has confirmation from the stakeholders that the set of design
input requirements communicates the intent of the set of needs from which they were
transformed because it is the set of design input requirements that represent what is
“necessary for acceptance” against which the built or coded system will be verified.
This activity helps establish each design input requirement has the GtWR characteristics C1
– Necessary, C3 – Unambiguous, and C8 - Correct and that the sets of design input
requirements have the GtWR characteristics C10 - Complete, C11 - Consistent, C13 -
Comprehensible, and C14 - Able to be Validated.
• Ensure system verification attributes have been included with each requirements expression
addressing the verification Method, Strategy, and Success Criteria for each design input
requirement. This information must be defined and documented before the set of design
input requirements is baselined. This helps ensure each design input requirement statement
is worded such that the design and the system can be verified to meet the requirement. This
activity helps establish each design input requirement has the GtWR characteristics C4 -
Complete and C7 - Verifiable and that the set of design input requirements has the GtWR
characteristic C14 - Able to be Validated.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 261

• Confirm with the Approving Authorities that the defined verification attributes represent
what is necessary for acceptance. This activity helps establish each design input requirement
has the GtWR characteristic C7 - Verifiable and that the set of design input requirements has
the GtWR characteristic C14 - Able to be Validated.
7.2.3 Manage Design Input Requirements Validation Results
A design input requirements validation record is created documenting the results and outputs of
the design input requirements validation activities. The outputs include the updated input
artifacts and PM work products shown in Figure 7-3, Outputs. Defects found in the set of
design input requirements as well as any defects found in any of the input SE artifacts or PM
work products, must be addressed and corrected before they are baselined.
If it is identified that there is insufficient data to complete requirement validation or lack of an
integrated set of needs from which the set of design input requirements were transformed, the
issue should be recognized as a risk that could cause both design and system validation to be
deemed unsuccessful.
Applications within the project toolset should allow tracking of the status of the design input
requirement validation activities using a dashboard that communicates key metrics related to the
requirements validation results. These metrics can be obtained using the requirement attributes
discussed in Section 7.4 within the project’s toolset. Making this information accessible will
enable all project team members and key stakeholders to have a shared view of the maturity and
status of the design input requirements validation activities.

7.3 Use of Attributes to Manage Requirements Verification and Validation


Requirement attributes that aid in requirements verification and requirements validation
management include: (Refer to Section 15, for a more detailed discussion on attributes and
definitions of each.)
A1 - Rationale: intent of the requirement.
A2 - Trace to Parent: The allocated parent from which the requirement was formed.
A3 - Trace to Source: The need from which the requirement was transformed.
A26 - Stability: stable, likely to change, and incomplete.
A28 - Requirements Verification Status: Binary - true/false, yes/no, or incremental - not
started, in work, complete, and approved.
A29 - Requirements Validation Status: Binary - true/false, yes/no, or incremental - not started,
in work, complete, and approved.
A30 - Status of the Requirement (in terms of maturity): draft, in development, ready for
review, in review and approved. (A28 is a prerequisite for A29 and A30)
A32 - Trace to Interface Definition: Helps insure completeness of interface requirements
A33 - Trace to Peer Requirements: manage dependencies when requirements are related to
each other, to help insure consistency and completeness.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 262

Section 8: DESIGN VERIFICATION AND DESIGN VALIDATION

This Section provides a discussion on the planning, activities, and artifacts associated with
design verification and design validation. Refer to the INCOSE SE HB for a more detailed
discussion on the Design Definition Process.
The goal of successfully completing design verification and design validation is a physical
architecture and a set of design output specifications, that when implemented, will result in a
system that meets its intended use in the operational environment, when operated by the intended
users, as defined by the integrated set of needs.

Design Design Validation


“Do we have the Design
Inputs right design?”
Outputs

Integrated Set Transformation Transformation Transformation Realized


Design Input Design Output
of Needs Design Input Requirements Architecture & Specifications System of
System Interest
Requirements Design Implementation,
Definition Definition Integration

Design
Verification
“Did we design
Drive

it right?”

Design
Verification
“Did we design it
Organizational correctly?”
Architecture &
Design
Definition
Requirements
Derived from Ryan, M. J.; Wheatcraft, L.S., “On the Use of the Terms Verification and Validation”, February 2017

Figure 8-1: Design Verification and Design Validation.


Design verification and design validation helps ensure the design is the “right” design
communicated by the resulting design output specifications that will result in a SOI that will pass
system verification and system validation as shown in Figure 8-1.
For each SOI that is being designed, it is assumed that there is an integrated set of needs to
validate against which have gone through the needs verification and needs validation activities
discussed in Section 5 and there is a set of design input requirements to verify against which
have gone through the requirements verification and requirements validation activities discussed
in Section 7 as well as organizational Architecture Definition Process and Design Definition
Process guidelines and requirements to verify the design and resulting design output
specifications where done “right” by the project team.
A major outcome of design verification and design validation and early system verification and
early system validation is a mature physical architecture, design, and design characteristics
communicated via a well-formed set of a set design output specifications which will result in
fewer issues during system verification and system validation activities during system
integration.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 263

One of the main reasons for system integration, system verification, and system validation
problems, is a failure to complete design verification and design validation during development
before production. Successful integration, system verification, and system validation is
dependent on a proper design and subsystems and system elements that are built in accordance
with the design output specifications.

8.1 Design Definition Process Overview


As shown in Figure 8-1, the baselined set of design input requirements are transformed in
accordance with the Design Definition Process activities into a design of the SOI that is
communicated to the builders/suppliers via a set of design output specifications.
A powerful tool in performing design verification and design validation is the creation of
integrated system architectural, analytical, behavioral models, and simulations of the SOI. These
models and simulations can be crucial in confirming that the design will result in a SOI that can
be validated to meet its integrated sets of needs and verified to meet its set of design input
requirements.
Architectural and analytical/behavioral models will mature as the design concepts mature
through the development lifecycle activities. These models help to ensure completeness,
correctness, consistency, and feasibility of the integrated set of needs as well as the set of design
input requirements that are transformed from these needs. As the integrated set of needs is
defined, they are linked to the models, as are the resulting design input requirements.
Traceability is established and managed across the lifecycle. The resulting end-to-end
traceability across all lifecycle artifacts is key for successful design verification, design
validation, system verification, and system validation.

Integrated set of needs,


design input requirements,
preliminary physical architecture,
lifecycle concepts, models, prototypes, Model refinement and
plans, budgets, and schedules analysis
Iteration - System analysis,
characterization, &
optimization

Trade space – mature the physical


Baselined physical design using models, simulations,
architecture, design-output prototypes, engineering test units,
specifications, lifecycle technology readiness assessment,
concepts, models, plans, “Zero In” on the risk assessments, trade studies
budgets, schedules physical architecture,
design concepts,
updated lifecycle Physical architecture and design -
concepts, and perform functional, performance,
artifacts quality, compliance, and behavioral
analysis, and design V&V

Figure 8-2: Zeroing in On a Feasible Design and Physical Architecture.


As shown in Figure 8-2, design cycles are used to incrementally mature the system design
concepts, models, and associated logical and physical architectures zeroing in on a feasible
design.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 264

This process starts with the integrated set of needs and set of design input requirements for the
SOI as well as a preliminary physical architecture, models, prototypes, budgets, and schedules.
Candidate design solutions developed during the lifecycle analysis and maturation activities
discussed in Section 4 are refined. Trade studies are done based on feasibility analysis of the
candidate design concepts. This analysis includes functional, performance, and behavioral
analysis, simulations, technology readiness assessments, and risk assessments.
The level of detail for the initial physical architecture is matured by expanding it to include lower
levels of the architecture such that all assemblies, subassemblies, parts, and components can be
defined in terms of design output specifications.
It is common to use prototypes and engineering units to mature the physical architecture and
design. The concept is to examine the performance of these prototypes and engineering units
more thoroughly (spending “quality time” with them and their data), and formally map their
analysis and test activities to not only design input requirements but also the integrated set of
needs (validation). This type of ‘cross-check’ can be done efficiently, and the risk-buydown
payoff for finding a flaw early can be large.
The end of each cycle involves coordination (validation) with the key stakeholders including the
customer(s) and users/operators. Based on their feedback, the resolution is increased for the next
iteration and the project team enters the next cycle. For each iteration, the physical architecture,
design concept, artifacts and associated models and prototypes are revised based on the increased
level of knowledge and feedback from the stakeholders. The number of cycles that are needed
would ideally be specified in the project SEMP; in other cases, management may have dictated
the fixed number of cycles based on cost and schedule, and the role of the project team is to
perform as many design cycles as needed within these constraints.
Progress through the cycles is tracked and assessed both continuously and at formal discrete gate
reviews such as the SDR, PDR, and CDR or similar reviews. By the time of the PDR there is an
expectation that ~20% of the design output specifications are completed and by the time of the
CDR there is an expectation that ~80%-90% of the design output specifications are completed.
As the design concepts mature and design verification and design validation activities are
performed, issues are identified and resolved. The functional architectural and
analytical/behavioral models are updated, and the physical architecture and the design output
specifications are revised as needed. These updates will be coordinated with the stakeholders
approved, and baselined.
From a feasibility perspective, there is an expectation that the TRL of all critical technologies
have matured to at least TRL 6 by PDR and TRL 7 by CDR (best practice from the USA
Government Accountability Office (GAO) [15] and National Aeronautics and Space
Administration (NASA) [37]. If not at this level of maturity, the system may not be able to meet
the design input requirements and/or needs resulting in a high risk that the system will fail both
system verification and system validation.)
Tracking progress continuously while progressing through the various design cycles involves
informal reviews and coordination with the key stakeholders similar to the approach used in
Agile methodologies in which “sprints” are defined, implemented, and reviewed periodically
leading up to one of the formal gate reviews. Both the formal and informal reviews are design
verification and design validation activities.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 265

As the design matures through the various cycles, the project team may have to “push back” on
some of the design input requirements (and possibly the needs from which the design input
requirements were transformed). For example, a need and resulting requirement may require a
performance value of “10”. With the cost, schedule, and technology constraints, the best that can
be done is “9”. Management, customers, and users will have to determine if “9” is acceptable or
not.
To help the stakeholders with this determination, the project team will compute the incremental
cost for performance gain (or loss) for each proposed value, so the stakeholders are presented
with alternative values to assess. Depending on the decided value, either the needs and design
input requirements will be updated, or a variance approved using the organization’s
Configuration Management Process.
Without this early warning of a missing (or unfeasible) need or design input requirement, and the
negotiations that follow, the result could be a failure to pass system verification and system
validation. If the project team learns of an issue that could result in the SOI failing system
verification and system validation, at any time, the issue must be brought to the attention of
management immediately and resolved. As discussed previously, assigning priority and a
criticality to each need and design input requirement, and addressing margins and reserves when
quantifying performance requirements are valuable tools to use when these types of issues are
uncovered during design maturation activities.
Note: Any changes made to address these issues may have a ripple effect that could impact
meeting other design input requirements, satisfying the needs from which they were transformed
or satisfying higher level needs or requirements. This ripple effect also could impact meeting
lower-level needs and requirements. Changes could also cause substantial updates to the system
verification and system validation planning artifacts. All changes must be assessed as to the
possible impacts to all SE artifacts including cost, schedule, and risk. Traceability will need to
be updated as needed. Refer to Section 14.2.5.3 concerning change management across the
lifecycle and Section 14.2.5.4 on change impact analysis.
Change is a normal part of SE and the Design Definition Process. From a needs and
requirements perspective, changes (updates) to the integrated sets of needs and sets of design
input requirements are indicative of the interactive and recursive nature of SE resulting in a
maturation of the needs and requirements such that individual needs and requirements have the
GtWR characteristics: C3 – Unambiguous, C4 – Complete, C6 - Feasible, C7 – Verifiable, and
C8 – Correct and the sets of needs and requirements have the GtWR characteristics: C10 –
Complete, C11 – Consistent, C12 – Feasible, C13 – Comprehensible, and C14 – Able to be
Validated.
No one likes surprises, especially management and the customer. Following the concurrent
practice of the lifecycle activities advocated in this Manual using an integrated, collaborative,
multidisciplined team where the design matures concurrently with the lifecycle concepts analysis
and maturation activities, needs definition activities, and design input definition activities most
issues will be able to be identified and addressed much earlier in the lifecycle.
Once the design concept and implementing design output specifications have passed design
verification and design validation, and the updated lifecycle concepts, architecture, models,
plans, budgets, and schedules have matured and also been reviewed, the entire set of data will be
ready to be baselined at a formal gate review, such as, CDR or other similar review.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 266

The project team will make a build, code, buy, or reuse decision for each mechanical, hardware,
and software system elements and develop a set of design output specifications for each.
If the decision is to build or coding internally, the design output specifications will be provided
to those responsible for manufacturing or coding the system element. If the decision is to buy,
the design output specifications will be provided to a supplier as part of a procurement action.
The procurement action could be to obtain an OTS system element or obtaining the services of a
supplier to manufacture the system element or code the software. (If the decision is to reuse an
existing system element, they will need to map the design output specifications to the as-built
specifications for the reused system element. (Refer to Section 12, for a more detailed
discussion for procuring OTS system elements and reusing existing parts.)
Assuming the project team completes the above activities, the risk of issues will be minimized
during physical integration of the physical system elements, system verification, and system
validation While no approach is fool proof, this approach minimizes risk during system
integration, system verification, and system validation of the physical subsystems and system
elements because it (in part) provides the project team opportunities to find issues and defects
early during the Design Definition Process.

8.2 Early System Verification and System Validation


There is sometimes a misconception concerning when system verification and system validation
may occur; it is not required to always be at or near the end of the project. In many cases, it may
be possible to begin system verification and system validation activities early during
development before production. In this context, because these system verification and system
validation activities occur before system integration, system verification, and system validation of
the manufactured physical system, they are sometimes referred to as “early” system verification and
system validation.
Note: there are some who define “early verification and validation” as any verification or
validation activity that occurs prior to formal system verification and system validation of the
manufactured physical system. This would include needs verification and needs validation,
requirements verification and requirements validation, and design verification and design
validation. In this section the focus is on early system verification and system validation that occurs
as part of or concurrently with design verification and design validation before the physical system
is built or coded.
Early system verification and system validation can be performed as part of, or concurrently
with, design verification and design validation before the physical SOI is manufactured or
software written using the behavioral models, simulations, prototypes or engineering
development units or test articles that were developed to mature the design and refine the design
output specifications.
Doing so can reduce the risk of issues and anomalies being discovered during more expensive
system integration, system varication, and system validation activities of the actual physical
hardware, mechanisms, and software. It will be much less expensive and time consuming to resolve
these issues before the actual realization of the physical hardware and software.
This is a tremendously crucial step, as manufacturing and writing code takes time and costs
money - sometimes a large percent of the overall development budget. The intent with early
system verification and system validation is to postpone committing these resources on a design

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 267

that has not been properly verified and validated avoiding expensive rework if these issues were
discovered later, after the physical system has been built or coded.
It is a best practice to perform early system verification and system validation progressively
during development, obtaining objective evidence with the required level of confidence that the
architecture and design as communicated by the design input requirements will result in a system
that meets its set of design input requirements (system verification) and its integrated set of
needs (system validation).
Early system verification and system validation occurs against the SOI architecture and design
concepts, models, simulations, and later against actual prototypes or engineering units of the
physical (hardware, mechanical, and software) parts of the architecture that make up the SOI.
Simulations, prototypes, and engineering test units allow early system verification and system
validation of the system or parts of the system to help uncover issues with the architecture and
design to meet the integrated set of needs and set of design input requirements.
Examples of early system verification and system validation activities performed as part of
design verification and design validation.
• Developing an enabling facility and test fixtures for testing jet engines and the series of
disposable jet engines that are tested to destruction during the design program. Each facility
and test stand has a development cycle of its own, defining needs and requirements,
developing a design, building it, completing its own system verification and system
validation prior for use during jet engine design and test activities.
• Performing bench testing of a component or system element by integrating it into an
assembly consisting of the control system (software), other components, and a test rig (test
facility). This assembly will never be part of the final product. Its existence and use are for
design maturation and design verification and design validation only.
• To mitigate a particular risk for an aircraft, launch vehicle, or spacecraft, there may be a
need to conduct tests of the control system connected to the fuel pumps or thrust vector
control (TVC) system for design maturation and design verification and design validation
and before system integration, system verification, and system validation.
• Lifetime testing over extended periods of time to gain sufficient confidence the SOI can
meet its EOL performance requirements and lifetime requirements.
Concurrently with the early system verification and system validation activities, the project team
is updating the draft set of design output specifications used to build further prototypes and
engineering verification units or proceed to produce the SOI. The architecture and design cycle
activities are repeated using the physical prototypes and engineering test units as shown in Figure
8-2. Based on the results, the draft design output specifications are updated and verified to
correctly represent a system that can be verified to meet its design and the set of design input
requirements and its integrated set of needs.
Using this approach, the project team is continuously doing early system verification and system
validation during design verification and design validation, never losing sight of both meeting
the set of needs and set of design input requirements. Continuous design verification and design
validation can be performed in support of design concept maturation activities for any SOI - no
matter the level of the architecture.
Early system verification and system validation helps ensure that individual needs and
requirements have the GtWR characteristics: C3 – Unambiguous, C4 – Complete, C6 - Feasible,

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 268

C7 – Verifiable, and C8 – Correct and the sets of needs and requirements have the GtWR
characteristics: C10 – Complete, C11 – Consistent, C12 – Feasible, C13 – Comprehensible, and
C14 – Able to be Validated.
Modeling and Simulation Challenges
A major challenge when planning for and doing early system verification and system validation,
is to be able to run simulations of the integrated system. Being able to do so requires the
development of a single model of the integrated system which includes models of all the
subsystems and system elements within the system architecture.
A major tenant of systems thinking is that a system will have characteristics and behaviors that
are not directly relatable to the parts that make it up resulting in emergent behaviors - both good
and bad - that are not observable until all the parts are integrated into the whole. While there are
some emergent behaviors that are out of the reach of even the most sophisticated modelling tools
- an end-to-end integrated system model, created and executed early, can still uncover some of
these behaviors.
Developing models and simulations of a SOI in a silo independently from the integrated system it
is a part, is of limited benefit without the knowledge of how the SOI interacts with the other
subsystems and system elements within the integrated system in its actual operating environment.
Another major challenge is being able to simulate the actual operating environment in the
physical world, which is governed by the laws of physics, thermodynamics, chemistry, biology,
as well as human factors. Given that validation is concerned about the system doing what is
intended in its operational environment when operated by its intended users, early system
verification and system validation can consider either the actual operational environment without
expensive environmental chambers or a simulated operational environment that is as close to the
actual operational environment as practical.
The operational environment also includes the macro system in which the SOI is a part.
Fortunately, many modern tools are sufficiently powerful to not only model the SOI, but also the
surrounding environment and interfaces; herein lies an extra opportunity to detect any interface
or environmental issues early on before the production and integration of the physical parts of
the architecture. Both natural and induced environments (heat, acoustics, friction, vibrations,
EMI/EMC, etc.) must be considered. Another key tenant of systems thinking is that the behavior
of the system is a function of the interaction of the parts that make up the system as well as
interactions with the external systems and environment of which it is a part.
These interactions include the classic interactions across interface boundaries as well as
interactions in the form of the induced environments caused by other systems within the macro
system it is a part, as well as the impacts the SOI may have on these other systems, including the
human operators. Just because it has been verified that a SOI meets its requirements during
standalone system verification and system validation activities does not mean it will do so when
integrated into the macro system it is a part of, over a sustained period. To be of the maximum
benefit, the models and simulations would both simulate the classic interactions across interface
boundaries as well as the induced environments.

8.3 Validation of the System Verification and System Validation Artifacts


While the focus of design verification and design validation activities is the architecture and
design concept behavioral models, prototypes, engineering units, and simulations used to mature

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 269

the design, and implementing design output specifications; maturation and validation of the
system verification and system validation artifacts introduced in Sections 4 and 6 and further
described in Section 10 is also a major consideration.
System validation planning starts when developing the system validation attributes that are part
of each need expression addressing question, “How will we validate the SOI fulfills this need?”
Likewise, system verification planning starts when developing the system verification attributes
that are part of each design input requirements expression addressing question, “How will we
verify the SOI fulfills this design input requirement?”.
As part of this planning, the system verification and system validation Success Criteria, Strategy,
Method, Activities, and Procedures should be developed as described in Section 10. As much as
practical, the project team should define and use these artifacts during design verification and
design validation to both mature and validate these artifacts. Any issues discovered with the
system verification and system validation artifacts during design verification and design
validation should be corrected so there are fewer issues during system integration, system
verification, and system validation.
This also means the system validation attributes for each of the needs must be recorded and
maintained, and system verification attributes for each of the design input requirement
expressions must also be recorded and maintained in the SOI’s integrated dataset. The reader is
urged to consider an automated tool to manage the data associated with all the system
verification and system validation artifacts as discussed in Section 10.

8.4 Design Verification


Design verification is a confirmation that the design is an agreed-to transformation of the design
input requirements into a design as communicated to the builders or coders in the sets of design
output specifications that clearly implements the intent of the design input requirements. The
goal of design verification is to obtain evidence that the design and resulting design output
specifications address all its design input requirements and will result in a SOI that can be
verified to meet those requirements.
In some organizations, design verification is referred to as a FCA where the design for the
integrated system is verified to meet its functional baseline approved at the PDR and CDR.
Validating that the design output specifications will satisfy the appropriate needs of the SOI at
the given level as well as the system level is discussed in the next section, under design
validation.
In addition to design verification obtaining evidence that the SOI’s design input requirements
have been met, design verification also provides evidence that the design meets the
organization’s guidelines and requirements that guide the Design Definition Process shown in
Figure 8-1. These design guidelines and requirements are commonly developed at the business
management and business operations levels discussed in Section 2-1. These guidelines and
requirements are a result of lessons learned and best practices that the project team is expected to
follow.
Design verification involves both assessing the “correctness” of the design in the context on how
well the design will result in the set of design input requirements being met by the built/coded
SOI, as well as the quality of the resulting design output specifications that communicate the
design to builders and coders. Two distinctive designs could satisfy the design input

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 270

requirements equally - but may differ in quality and adherence to industry-specific design
standards and processes, especially for software development processes.
Design verification involves inspection of traceability records from the design input
requirements to both of the following:
• To the design itself, i.e., the design output requirements
• To the analytical/behavior models of the system elements that make up the system as well
as the integrated system modelled in its macro environment.
As discussed previously, design verification should also include verification that prototypes,
engineering verification units (mechanical, hardware, or software), and simulations also meet the
design input requirements. The design verification activities will include a combination of
testing or demonstrations (if prototypes, engineering verification units, or simulations are used),
and analysis.
Note: Some projects may choose not to map individual design input requirements to physical
system elements - such as a cam arm or choice of metal for the exterior “skin”. In this case,
prototype testing may be mapped back directly to the design input requirements. While this is
not the most rigorous approach, the project team may choose it as long as there is sufficient
objective evidence with a sufficient level of confidence that the design, if realized, would result in
a SOI that will meet its design input requirements.
The practice of SE is intended to give the designers freedom to use their creativity in a design
solution, as long as the baselined set of design input requirements and integrated set of needs are
met.
A summary of the design verification activities is shown in Figure 8-3. Note that it is assumed
the draft design output specifications are reasonably mature and at least preliminary traceability
of both the design input requirements to the design artifacts and the design output specifications
have been completed.

Outputs
Inputs Design Verification Activities • Verified Design
• Baselined set of design input • Prepare for Design verification • Verified Design Output
requirements • Perform Design Verification Specifications
• System verification attributes • Manage Design Verification Results • Design Verification Results
included with each design input Record
requirement expression • Waivers, deviations, statements
• Enterprise design guidelines and of non-compliance
requirements • Physical architecture
• Architectural and behavioral Enablers • Updated design input
models, prototypes, and • Enterprise Product Development requirements and parent system
engineering verification units Process needs
• Preliminary physical architecture • Enterprise Design Process • Updated traceability records
• Draft Design Output Specifications • Enterprise Design V&V Inspection • Updated model elements in the
• For each design input requirement Checklist system architectural and
Traceability to Needs, parent or • Systems engineers trained in behavioral models
source requirements design, system integration, • Updated prototypes and
o Traceability to interface definition system verification processes engineering verification units
documents (e.g., ICDs, IDDs) • Requirement Management Tool • Updated system verification
• Diagraming & Modeling Tools planning artifacts
o Traceability to system analysis
• Stakeholders, stakeholder • Updated System Verification
records representatives or surrogates.
o Traceability to model elements in attributes within the design input
the system architectural and requirement expressions
behavioral models
o Traceability to system verification
planning artifacts

Figure 8-3: Design Verification IPO Diagram.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 271

Design verification activities also help ensure individual needs and requirements have the GtWR
characteristics: C3 – Unambiguous, C4 – Complete, C6 - Feasible, C7 – Verifiable, and C8 –
Correct.
8.4.1 Prepare for Design Verification
As shown in Figure 8-3, there are several enablers to successful design verification. These
include a process for developing and managing sets of needs and sets of design input
requirements, an enterprise product development process and Design Definition Process and
systems engineers trained in and knowledgeable on how to perform the design verification
activities.
Inputs to design verification include a verified and validated set of design input requirements
along with the enterprise’s design guidelines and requirements and the architectural and
behavioral models of the SOI. Of particular importance are the engineering design applications
and modeling/diagraming tools within the project’s toolset used to produce the initial concepts
and artifacts of the design.
Performing traceability of the design with respect to the integrated set of needs, set of design
input requirements, interface definition documents, system analysis records, to model elements
in the architectural and analytical/behavioral models, and finally to the system verification
planning artifacts is essential to successful design verification.
An important input to design verification is the system verification attributes that (ideally) are
part of each design input requirement expression. Given the system must meet the defined
system verification Success Criteria in accordance with the defined verification Strategy and
Method in these attributes once it is built in accordance with the design output specifications, it
is only logical that during design verification the project team will ensure the design output
specifications will result in a SOI that will meet the verification Success Criteria using the
verification Strategy and Method defined in the system verification attributes.
Assuming the design verification processes are in place and tools are in use, the artifacts listed as
inputs shown in Figure 8-3 should have been produced and matured to the point where they are
ready for the design verification activities. Preparing for design verification consists of gathering
or obtaining access to these input artifacts. On many projects, design verification can begin on
one set of system elements, while artifacts on another part of the design are still being defined.
8.4.2 Perform Design Verification
There are several activities that should be performed to provide objective evidence that the
design is verified to meet the design input requirements.
• Verify that the organization’s business operations level needs, requirements, and Design
Definition Process, guidelines, and requirements were followed resulting in input artifacts
shown in Figure 8-3 and the required traceability records are available.
If the processes were not followed, the required input artifacts may not be available
including the verified and validated sets of design input requirements.

• Use the project’s toolset to generate trace matrices that show traceability of the design
descriptions and other design artifacts to each of the design input requirements at each level
of the physical architecture. This will help identify any design input requirements not
currently addressed by the design. If traceability records are not available, it will be

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 272

difficult to do effective design verification. This traceability is extremely important for design
input requirements that are addressing a risk mitigation action. Safety and quality personnel will
use this information to close out this risk. This activity helps show that the design is complete.

• Verify the design and resulting design output specifications adequately address each of the
design input requirements. During gate reviews (such as PDR and CDR), it is a customary
practice to first list specific subsets of design input requirements and then provide evidence
that the design will result in an SOI that will meet those requirements. This activity helps
show that the design is complete and correct.
• Using the information in the system verification attributes included within each design
input requirement expression and associated system verification artifacts discussed
previously, verify the proposed design and resulting design output specifications will result
in a system that can be verified to meet the design input requirements.
To do this, the project team can define system verification activities that will determine if
the SOI, once built, will meet the system verification Success Criteria in accordance with
the Strategy and Method defined in the verification attributes. These activities can first be
performed using the models and then using the prototypes and engineering verification
units. As part of this effort, the project team may need to update the verification Success Criteria,
Strategy, and Method defined in the system verification attributes. The updated information will be
reflected in system verification artifacts discussed in Section 10 and will be used for system
verification. Updating the verification plan or strategy at this point is far easier, than mid-way
through system verification. If the design verification activities have resulted in changes to
the existing design input requirements, these changes will need to be managed via the
project’s configuration control process and updates to the design must be incorporated into
the design output requirements.
• Perform a technology readiness assessment (TRA). Based on the project’s or applicable
corporate or government design guidance and requirements, verify the TRL for critical
technologies has been achieved appropriate for this lifecycle stage as defined in the
project’s Technology Maturation Plan.
• Using approaches similar to those discussed for design input requirements verification,
verify the quality of the design output specifications. How this is done will be organization
specific. The organization will want to verify all the artifacts contained not only in the
design output specifications but also in the traceability records and other development
artifacts. If the organization has an internal Quality Management system or is certified to
an existing quality standard (e.g., ISO 9000, AS 9100) the project team needs to include
those activities to verify conformance to this system or standards. Requirements for those
artifacts need to have characteristics consistent with those defined in those standards, and
the artifacts verified to be correct, complete, consistent, feasible, understandable, and
verifiable. Smaller projects may not adopt such standards, although different corporate
requirements may still apply.
8.4.3 Manage Design Verification Results
The data involved in, and resulting from, the design verification activities must be recorded and
managed. First the project team should create a verification record documenting the results and
outputs of the design verification activities shown in Figure 8-3 summarizing two items: 1) the
ability of the design to implement the design input requirements as well as 2) traceability to the
evidence that the set of design output specifications will result in a system that can be verified to

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 273

meet the design input requirements. Such an ‘executive summary’ can be helpful during system
integration, system verification, and system validation as well as during final acceptance.
There may be cases during design verification where the project team determines that proposed
design fails to meet a design input requirement. It is common to have issues with the design not
being able to meet a design input requirement, this is part of the evolutionary, knowledge-based
practice of SE and a prime reason for the design cycles discussed previously.
For all nonconformances, the project team must either address the design deficiency, request the
subject design input requirement be changed, or request a variance from management in
accordance with corporate policy, and the Approving Authorities. Any issues with the baselined
set of design input requirements discovered during design verification activities need to be
addressed and updates made to the design input requirements as they will be the focus of the
system verification activities.
All changes to design input requirements must be assessed concerning the impacts to other
related artifacts in the trace chain. Often the change of one requirement in the chain can have a
ripple effect that must be managed. Failing to do so could result in other design or system
verification and system validation activity failures or a consequential failure of the system during
operations.
Practicing SE from a data-centric perspective, RMTs that allow needs and requirements to be
managed across the lifecycle and the use of modeling tools can also be useful in addressing and
managing changes due to issues found during design verification helping maintain consistency
and correctness of all artifacts develop across the system lifecycle.
Project teams are highly encouraged to use a documented change impact analysis process as
discussed in Section 14, including Change Control Boards (CCBs) if the design input
requirements and associated artifacts need to be changed. Doing so results in a change history of
design input requirement evolution the customer may want to see - and conveys a
professionalism to the customer that can result in an increase customer confidence.
The project’s toolset should allow tracking of the status of the design verification activities using
a dashboard that communicates key metrics related to the design verification activities. Many of
these metrics can be obtained using the requirement attributes discussed in Section 8.6 within the
project’s toolset. Making this information accessible will enable all members of the project team
to have the same view of the maturity and stability of the design, status of the design, CCB
activity, and status of the design verification activities.

8.5 Design Validation


Design validation is a confirmation that the physical architecture and design, as communicated in
the design output specifications, will result in a SOI that meets its intended purpose in its
operational environment, when operated by its intended users and does not enable unintended
users to negatively impact the intended use of the system, as defined by the baselined integrated
set of needs.
Closely related to design validation is the concept of System Effectiveness Analysis to determine
if criteria defining the effectiveness of the system such as measures, are addressed and
implemented in the design and will result in a realized system that will meet these criteria.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 274

Design validation also involves assessing whether the defined validation Success Criteria,
Strategy, and Method as documented in validation attributes that are part of each need expression
will be able to be executed by the project team and achieved by a SOI built to the set of design
output specifications.
Even though the design has been verified to meet the design input requirements, there is still the
possibility the resulting SOI will fail system validation. This can happen if the design input
requirements were defective or were not a correct transformation from the baselined integrated
set of needs.
This can also happen if the designers did not address all the design input requirements or ignored
one or more design input requirements. Even worse, some organizations fail to define, verify,
validate, and baseline an integrated set of needs before defining the set of design input
requirements. The customer and developing project team needs to ask, “Without a baselined
integrated set of needs, what will the design and system be validated against?”
The design validation activities will include a combination of testing, demonstrations, and
analysis using the models, prototypes, and engineering validation units.
A summary of the design validation activities is shown in Figure 8-4.

Inputs Design Validation Activities Outputs


• Verified & validated set of needs • Prepare for Design Validation • Updated & validated Design
• Verified design • Updated & validated physical
• Perform Design Validation
• Verified set of design output architecture
• Manage Design Validation Results
specifications • Validated set of Design Output
• System Validation attributes within the Specifications
needs expressions. • Design validation results record
• Architectural and behavioral models, • Waivers, deviations, and
prototypes, and engineering validation statements of non-compliance
Enablers • Updated design input
units
• For each Need Expression:
• Enterprise product requirements expressions and
o Traceability to lifecycle concepts development process parent stakeholder needs
o Traceability to MGOs and MOS • Enterprise design process expressions
o Traceability to Stakeholder • Enterprise design validation • Updated traceability records
expectations, user stories, operational inspection checklist • Updated model elements in the
scenarios, use cases system architectural and
• Systems engineers trained
o Traceability to drivers & constraints, behavioral models
- External Interface Block in design, system • Updated prototypes and
Diagram/Context Diagram integration and system engineering validation units
- Standards & regulations validation processes • Updated system validation
- Higher level requirements • Requirement management planning artifacts
- Operating environment definitions tool • Updated System Validation
- Risks mitigated by the system • Diagraming & modeling Attributes within the needs
design Tools expressions
o Traceability to system analysis records • Stakeholders, stakeholder
o Traceability to model elements in the representatives or
system architectural and behavioral surrogates.
models
o Traceability to system validation
planning artifacts

Figure 8-4: Design Validation IPO Diagram.


The following discussion on design validation assumes there is a baselined integrated set of
needs to validate against. If the set of needs has not been defined, verified, validated, and
baselined as described in this Manual, the project is at risk of failing system validation.
Design validation helps ensure the sets of needs and requirements have the GtWR
characteristics: C10 – Complete, C11 – Consistent, C12 – Feasible, C13 – Comprehensible, and
C14 – Able to be Validated.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 275

8.5.1 Prepare for Design Validation


As shown in Figure 8-4, there are several enablers to successful design validation. These include
a process for developing and managing sets of needs and sets of design input requirements, an
enterprise product development and Design Definition Process - both of which address design
validation, and systems engineers trained in and knowledgeable on how to perform the design
validation process activities.
Inputs to design validation include a verified and validated set of needs along with the
enterprise’s design guidelines and requirements and the architectural and behavioral models of
the SOI. Of particular importance are the applications and modeling/diagraming tools within the
project’s toolset used to produce the input artifacts from which the design was transformed.
Traceability is with respect to the needs and their sources, to interface definition documents,
system analysis records, to model elements in the architectural and analytical/behavioral models,
and to the system validation planning artifacts. While the amount of traceability may be tailored
to the size of the project, ideally according to organization tailoring guidelines, all of these are
highly recommended for successful design validation.
An important input to design validation is the system validation attributes that are part of each
need expression. Given the system must meet the defined system validation Success Criteria in
accordance with the defined system validation Strategy and Method in these attributes once it is
built in accordance with the design output specifications, the project team must ensure their
physical architecture and design will result in a SOI that will meet the system validation Success
Criteria using the validation Strategy and Method defined in the validation attributes.
Assuming the processes are in place and tools are in use, the artifacts listed as inputs in Figure 8-
4 should have been produced and matured to the point where they are ready for design
validation. Preparing for design validation includes the gathering or obtaining access to these
input artifacts. The project team may be able to start design validation on some areas and system
elements of the SOI, while artifacts on another part of the design are still being defined.
The process for developing and managing sets of needs and sets of design input requirements
should result in analysis records to provide sufficient rationale for the transformation that
resulted in the design and resulting set of design output specifications.
Ideally, rationale should be one of the attributes (Refer to Section 15) maintained with the needs
statements to help understand the real intent of what a need statement is communicating. For
whatever is being communicated in the need statement, there must be rationale, the assumptions
made, as well as traceability to the sources from which the need was transformed.
8.5.2 Perform Design Validation
There are several activities that should be performed to provide objective evidence that the
design is validated to meet the integrated set of needs; some of these may already have been
completed concurrently during design verification.
• Confirm that the organization’s needs, requirements, and design definition processes were
followed resulting in input artifacts shown in Figure 8-3 and the required traceability
records are available. If the processes were not followed the required input artifacts may
not be available including the verified and validated integrated set of needs and traceability
matrices. If not available, it will be difficult to do effective design validation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 276

• For each need, perform a design analysis to confirm that the design as communicated in the
design output specifications will result in the intent of the need being met. Often to
understand the intent of the need, the rationale (if it exists) may not be sufficient. The use
of traces from a need statement to its source is a good way to better understand the intent.
Once the intent is understood, the project team can determine whether the design solution
will result in the intent being met.
• Using the information in the system validation attributes included within each need
expression and associated system validation artifacts, validate the proposed design and
resulting design output specifications will result in a SOI that evidence can be obtained that
can be used to determine whether the SOI meets the baselined integrated set of needs.
To do this, the project team can devise validation activities that will determine if the SOI,
once built, will meet the system validation Success Criteria defined in the system validation
attributes. These activities can first be done using the models and then using the prototypes
and engineering validation units.
As part of this effort, the project team may need to update a need statement or the system
validation Success Criteria, Strategy, and Method defined in the system validation
attributes for each need statement. The updated validation attributes will be reflected in
system validation artifacts that will be used for system validation.
If the design validation activities have resulted in changes to the existing integrated set of
needs, these changes will need to be managed via the project’s configuration control
process. The project team is encouraged to put any new knowledge on history or intent of
the need, into the need’s rationale statement/attribute.
• If a system simulation capability was developed, the project team should run simulations
using representative inputs to determine if the needed outcomes result. If a range of inputs
is possible, the simulations should include the range of all possible inputs. If multiple
inputs are involved, then all combinations of inputs across each of their ranges must be
exercised along with across the ranges of each of the operational environmental factors.
Having a simulation capability, enables the discovery of issues that may not be discovered
until actual system verification or worse yet, after the system has been released for
operations.
• If prototypes and engineering design validation systems have been developed, the project
team will use those as part of design validation. If possible, it is a best practice to involve
the actual users in the actual operational environment to do these activities.
8.5.3 Manage Design Validation Results
The data involved in, and resulting from, the design validation activities must be recorded and
managed. First the project team should create a design validation record documenting the results
and outputs of the design validation activities shown in Figure 8-4 concerning whether the design
and associated design output specifications will result in a system that meets the baselined
integrated set of needs.
If it is identified that there is insufficient data to complete design validation, such as a lack of a
baselined integrated set of needs, the issue should be recognized as a risk that could cause system
validation to be deemed unsuccessful.
Having a baselined set of needs agreed to by the customer helps avoid what some call the “bring
me a rock and I will tell you if that is what I wanted” problem. This often happens when a

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 277

system is designed according to the developer’s interpretation (assumption) of the customer’s


undocumented implicit needs - instead of an integrated set of needs that have been agreed to by
the customer(s). Without this agreed to set of needs, at acceptance, the customer(s) may not be
satisfied with the rock you brought them and wants “a different rock”.
There may be cases during design validation where the project team determines that the proposed
design fails to meet a need. For all nonconformances, the project team must either address the
design deficiency, request the subject need be changed, or r variance from management and the
Approving Authorities. Any issues with the baselined integrated set of needs discovered during
design validation activities need to be addressed and updates made to the needs as they will be
the focus of the system validation activities.
An updated need should drive an impact analysis to see if any design input requirements, design
output specifications, system verification attributes, or verification activity descriptions should
be updated. A CCB can assist in approving any updates to needs or requirements.
Note that even updating one need can have large effect, rippling across many of the development
lifecycle artifacts, especially at the higher levels of the architecture. A change to the integrated
set of needs at the system level may result in updates to the set of design input requirements,
architecture, design concept, models and simulations used for design verification and design
validation, design output specifications, prototypes and engineering test units, and design
verification and design validation activities redone. Failing to do address the impacts of a
change to a need could also result in other design or system validation activity failures.
A primary reason for design validation is to find and correct issues in meeting the integrated sets
of needs before production, where the cost and time to address these issues is much less that
waiting to discover these issues during system integration, system verification, and system
validation of the actual physical subsystems and system elements that make up the integrated
system.
The project’s toolset should allow tracking of the status of the design validation activities in the
same way, and with the same visibility, as discussed previously for the design verification
artifacts and activities.

8.6 Use of Attributes to Manage Design Verification and Design


Validation
Requirement attributes that can aid in design verification and design validation management
include: (Refer to Section 15, for a more detailed discussion on attributes and definitions of
each.
A1 - Rationale: intent of the need or requirement
A26 - Stability of a need or requirement: stable, likely to change, and incomplete
A31 - Status of implementation: an indicator of the status of the implementation or realization
of the requirement in the design outputs. Possible values include requirement
implemented in design; requirement not implemented and no plan to do so; and
requirement not implemented but have plan to do so. Note: It is a good practice to
establish trace between design artifacts and the requirements being implemented by the
design. Many SE tools and modeling tools enable this capability.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 278

Section 9: PRODUCTION VERIFICATION

Once the design and design output specifications have passed design verification and design
validation and have been baselined at a gate review, the SOI can be implemented (manufactured
or coded) via the Implementation Process defined in the INCOSE SE HB. In this Manual, the
manufacturing and coding is referred to as “production”. The focus of this section is on
“production verification”. In other words, was the SOI built to spec?
Production verification, sometimes referred to as a Physical Configuration Audit (PCA),
confirms the system was “properly built or coded”. System verification and system validation,
assuming the SOI was properly built, confirms the design is sound. A system that was “properly
built or coded” to the design output specification is a prerequisite to system integration, system
verification, and system validation. While system verification is performed once against the
design input requirements, production verification is done continuously as a quality function for
each SOI that is manufactured or coded.

Design Outputs

Design Input Transformation Design Output Transformation Realized


Requirements Architecture & Specifications System System of
Design Implementation, Interest
Definition Integration

Production
Verification
Drive

“Did we build it
right?”

Production
Verification
Organizational “Did we build it
correctly?”
System
Realization
Requirements
Derived from Ryan, M. J.; Wheatcraft, L.S., “On the Use of the Terms Verification and Validation”, February 2017

Figure 9-1: Production Verification.


Referring to Figure 9-1, production verification is concerned about both verifying the system was
built “to spec” as defined by the design output specifications as well as the organizational
guidelines, best practices, and requirements concerning the equipment and processes used to
manufacture and code the SOI defined at the business management and business operations
levels shown in Figure 2-1.
In addition, there may additional requirements concerning the manufacturing/coding processes
defined by the customer, standards organizations, and regulatory agencies. This includes
documentation and artifact-collection requirements. The focus of the process requirements is on
ensuring the quality of the workmanship as defined by work instructions and standards. For
example, soldering or welding standards.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 279

Another focus of these process requirements is on the scalability and repeatability of the
manufacturing and coding processes to consistently produce a safe and high-quality product.
This presents unique issues as to what production verification activities need to occur routinely
during each step of the manufacturing process. This may drive the need for requirements
concerning test points or inspection points for components, subassemblies, assemblies, and
subsystems that are only used during manufacturing, but not used, nor accessible, once the
system has been built. These requirements for accessibility would be included as part of both the
design input requirements and the design output specifications. (In many cases, these test points
may also need to be accessible during system verification as well.)
Scalability is an important concept. Being able to build a working prototype or engineering unit
in a laboratory may not carry through to the manufacturing of multiple versions of the SOI at the
frequency required.
One of the goals of production verification is to verify the resulting manufactured/coded versions
can meet the design output specifications that were based on the laboratory prototype or
engineering unit that will result in a SOI that can be verified to meet its set of design input
requirements and validated to meet its set of needs. This is not always the case.
There are often issues where a design that passed design verification and design validation in a
laboratory or development setting, fails system verification and system validation after
production in a production facility.
For example, medical devices that involve instruments to assess biological samples. An “assay”
is developed consisting of a special “slide” or “cartridge” along with chemical “reagents”. These
are provided in a special test kit for use by technicians to prepare a biological sample for
insertion into the instrument. An issue often encountered is that while the chemistry or
formulation has been demonstrated to work in the laboratory, there are often scalability issues
concerning preparing 10,000 kits during manufacturing that consistently work the same way to
produce the intended results. In this case, the manufacturing organization must develop and
validate a process that will produce test kits that will consistently meet the design input
requirements for the kit.
Repeatability is another important concept. Building one copy of a system is a lot different from
when manufacturing is turning out hundreds or thousands of copies. This is especially important
when manufacturing safety critical systems. For example, the FDA addresses the manufacturing
process in Title 21, Part 820, defining [manufacturing] process validation as “establishing by
objective evidence that a process consistently produces a result or product meeting its
predetermined specifications”.
Verifying repeatability would mean the need for obtaining objective evidence that a
manufacturing process used during production consistently produces a SOI meeting its the
design output specifications, compliant with organizational guidelines, requirements, and best
practices for manufacturing and coding.
Because of this, the manufacturing facility, equipment, and processes will need to be treated as
enabling systems undergoing their own system development and successfully passing their own
system verification and system validation and be certified to be ready for production of the SOI.
This is sometimes called, “qualifying the (production) line.”

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 280

Production and production verification are part of the lifecycle concepts that are defined and
matured during Lifecycle Concepts and Needs Definition discussed in Section 4.
It is common for production verification against the design output specifications and production
standards to be performed separately from system verification against the design input
requirements as discussed in the Sections 10 and 11. In fact, for many organizations, production
verification is a prerequisite to the system integration, system verification, and system validation
activities.
In many organizations, production verification is overseen by the quality engineering or quality
control department; quality assurance would then monitor production and assess and manage any
production drift. Here tools such as lean six-sigma, process controls, and Pareto charts would be
used.
Often when a manufactured product fails system verification or system validation, it is not
immediately clear if the cause was a production fault or a design flaw. To reduce the risk of a
production fault, production verification is a formal and important activity in the product
development lifecycle.
However, this approach may not always be the case. For parts and components at lower levels of
the physical architecture, some projects may accept the production verification outcome as
evidence that a part or component meets its design output specifications and skip the system
verification and system validation activities needed to provide evidence that it also meets its set
of design input requirements and set of needs. This approach assumes that if a system’s design
verification and design validation was performed successfully, a system built to the resulting
design output specifications will pass system verification and system validation. This is often a
budget and schedule decision, where the project is willing to accept the risk of this approach.
For cases where the project procures an OTS system element or contracts out the production of
the SOI, the project may elect to accept the supplier’s certification that the system element or
SOI passed production verification - with the appropriate, pre-negotiated set of documentation
from the vendor. In other cases, the customer may have their own acceptance process or may
make provisions in the contract to have their own quality inspectors be involved in the
production and production verification activities in the supplier’s facility. (Refer to Section 12,
for a more detailed discussion concerning the use of OTS system elements.)
While system verification is performed once against the design input requirements, production
verification is done continuously as a quality function. However, when larger quantities of a part
or component are being produced, some aspects of system verification may be performed as part
of production verification on a periodic basis (lot testing). Even with lot testing, once production
begins, the verification activities are intended to detect production drift - not repeat development
testing which has already been performed.
A key quality metric that is used to monitor the production process is the concept of “yield,”
where “yield” is defined as the percent of copies of a system that pass production verification.
While yield does not directly impact product design - if yield is too low it could indicate other
issues such as a hard-to-manufacture design. In this case, SE would need to be engaged to
consider redesigns as needed: either to the SOI being produced or the equipment used to produce
the SOI. Any redesign - i.e., any change to the design output - would need to be carefully
analyzed and assessed using processes mentioned earlier in this Manual

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 281

These manufacturability issues need to be considered at the very least in the PMP but ideally,
would also be addressed in the SEMP. Engineering a manufacturing line is a technical task that
requires knowledge of not only part design but also design input requirements and overall needs.
One of the needs, may be a very high-quantity throughput or production run.
An approach to mitigating production issues is to use “Manufacturing Readiness Levels”
(MRLs) to define and develop the organization’s production process to the point where a quality
and safe SOI can be produced consistently that results in a product that meets both the design
output specifications (production verification) as well as its design input requirements (system
verification).
Special considerations include:
1. Building systems that either cannot be tested as an integrated system in its operating
environment, or it is not practical to do so. This could include a space launch vehicle or a
weapons system. In these cases, system verification and system validation will consist of a
combination of production verification, design verification, and design validation activities.
The assumption is that if design verification and design validation was successful AND the
system was manufactured or coded in accordance with the verified and validated design
output specifications using organizational best practices and guidelines, then the result
should be an integrated system that will meet its intended purpose in the operational
environment.
2. Consumer products that are built in large quantities. In this case classical system
verification and system validation as discussed in Section 10 and 11 will be completed
once per model, but to ensure quality and repeatability, production verification will need to
be performed periodically to assure quality. It is common that for some consumer
products, the first time they are put into use by a customer, is the first-time power will have
been applied.
3. Production verification of software applications These will use different approaches than
hardware systems. Production verification for software, would involve verifying that the
code set, or executable delivered for production or insertion into a hardware assembly - is
the same exact executable obtained from the repository. When DVDs are burnt with the
software, there is an error-checking step to ensure the DVD was “produced” right - i.e., no
bits were flipped in the DVD production process. Note that the hardware that receives the
software would be tested in the normal way: production verification, followed by system
verification and system validation.
4. Embedded software will also use different approaches. Software production verification
would be performed as described in the previous item; after this, the embedded software
would need to pass its “operational” system verification and system validation. This
means, the firmware would need to be tested after being installed in the destination
hardware and that hardware has been integrated into the macro system it is a part. Just
because firmware worked (passed system verification and system validation) in a
simulation or on development hardware, does not mean it will work in the actual SOI or
once the SOI is integrated into the macro system it is a part.
5. Projects that have multiple suppliers, each of which have their own unique production
facilities and processes. The lead system engineer, or product engineer would need to
review each supplier’s processes, procedures, and documentation to determine if their
production processes were acceptable, and whether the received items were truly built to
the design output specifications. This may involve several vendor visits and audits. In

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 282

some cases, the customer may define mandatory inspection points in the production
process witnessed by a customer supplier quality control person.
Addressing each of these considerations is beyond the scope of this Manual. For more details
concerning production the reader is encouraged to read the INCOSE SE HB section on the
Implementation Process.
A summary of the production verification activities is shown in Figure 9-2.

Inputs Production Verification Activities Outputs


• Baselined set of Design Output • Engineering Elements that
• Prepare for Production Verification
Specifications have passed production
• Perform Production Verification
• Design verification verification and are ready for
• Manage Production Verification
documentation and records system integration, system
Results
• Design validation verification, and system
documentation and records validation
• Early System verification and • Production Verification results
system validation Records documentation and records
• Production verification required for qualification,
Enablers
procedures, work instructions, certification, and acceptance.
• Enterprise processes and
and test equipment • Non-conformance reports
requirements for production and
• Waivers/Deviations.
production verification
• Final baselined set of
• Regulatory Agency processes and
production definition artifacts:
requirements for production and
work instructions, drawings,
production verification
verified software/firmware
• Project Production Plan
final tester designs and
• Project Production Verification
instructions.
(Quality) Plan
• Enterprise quality processes
• Production Facilities
• Production Test and support
equipment

Figure 9-2: Production Verification IPO Diagram.


Preparing, performing, and managing production verification results would be performed
according to an organization’s production readiness and manufacturing procedures. This is
outside the scope of this Manual.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 283

Section 10: SYSTEM VERIFICATION AND SYSTEM VALIDATION


COMMON PRINCIPLES

Once the system elements and subsystems that are part of the system physical architecture have
been procured, manufactured, or coded, passed production verification, and have been accepted
by the customer, system integration, system verification, and system validation process activities
can begin. While system verification and system validation are two distinct processes, they
share many common principles. Before discussing these process areas individually in Section
11, this section covers principles each has in common.
The definition, development, and management of the system verification and system validation
artifacts described in this section are concurrent and crosscutting activities that begin early in the
system lifecycle during Lifecycle Concepts and Needs Definition, continues to be developed and
matured during Design Input Requirement Definition, and are further matured and validated
during design, design verification, design validation, early system verification, and early system
validation discussed in Section 8. Doing so will help reduce the number of issues that may
come up during system integration, system verification, and system validation activities on the
actual physical SOI; further reducing the risk of potential budget overruns and schedule slips.
Unfortunately, it is common to use the phrase “Test Phase” when what is meant is either system
verification or system validation. In some cases, what is meant is that tests are being conducted
as part of a design cycle, maturing the design, or doing design verification and design validation.
Another issue with using “Test Phase”, is that system verification and system validation are not
only accomplished by Test as a Method of system verification or system validation but can be
accomplished using other methods such as Analysis, Inspection, or Demonstration.
Another common issue is the use of the phrase “requirements verification” when what is really
meant is “system verification” as discussed in Section 2.
To avoid these ambiguities, it should be made clear what is being verified or validated and
against what. System verification refers to verifying the SOI against its design input
requirements; system validation refers to validating the SOI against its integrated set of needs.
System Verification and System Validation Process Stages
Both the system verification and system validation processes can be divided into five stages:
Planning, Defining, Executing, Reporting, and Approval as shown in Figure 10-1.
Given system integration, system verification, and systems validation are a bottom-up processes,
system verification and system validation is repeated for each system element, subsystem within
the system’s physical architecture as well as the integrated system.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 284

Executing Stage Reporting Stage


• Schedule verification and • Prepare a verification and
validation Events validation Execution
• Execute verification and Record for each
validation Procedures verification and validation
• Record verification and Activity
validation results • Prepare a verification and
Needs,
validation Approval
Design Input Requirements Package
for each architectural entity • Provide the verification
Defining Stage and validation Approval
• Define verification and Package to the Approving
validation Activities Authority
Planning Stage • For each verification and
• Define a verification or validation Instance included
validation Instance for each in a verification or
need and design input validation Activity, define a Approval Stage
requirement for each system set of procedure • Gain Approval (Qualification,
and system element that are requirements that will Certification, Acceptance)
part of the physical result in the verification or from the Approving
architecture validation Strategy to be Authority
• Define validation attributes realized using the selected
for each need and verification Method
attributes or each • Develop verification and
requirement: validation Procedures
⁃ Success Criteria System that is: verified
⁃ Strategy to meet the design input
⁃ Method
⁃ Responsible Organization
Repeat for each system and requirements and
system element that is part of validated to meet the
the physical architecture integrated set of needs

Figure 10-1: System Verification and System Validation Process Stages.


The activities in these stages may overlap, in the sense that some system verification and system
validation activities for the subsystems and system elements at one level of the architecture may
be completed before other system verification or system validation activities for other
subsystems and system elements have been fully defined at the next higher level of integration:
• Planning Stage. Each need and design input requirement represent a system verification or
system validation Instance. For each Instance, system verification and system validation
attributes concerning the system verification and system validation Success Criteria,
Strategy, Method, and the responsible organization are defined. These attributes are
included within the needs or design input requirements expressions when they are defined.
(Refer to Section 10.1 for a detailed discussion on the Planning Stage.)
• Defining Stage. When sufficient architecture and design detail is available, a system
verification or system validation Activity is defined that addresses one or more Instances.
For each Instance within an Activity, a system verification or system validation Procedure is
developed consisting of a sequence of steps or actions, whose performance will result in the
evidence whether the SOI meets the Success Criteria. (Refer to Section 10.2 for a detailed
discussion on the Defining Stage.)
• Executing Stage. The project team schedules system verification and system validation
Events which can include the execution of one or more Procedures per Event. In
accordance with the project’s master schedule, the Procedure(s) are executed to obtain the
data needed to provide the evidence that the SOI meets the Success Criteria defined for a
specific Instance. The data resulting from the execution of each step or action within the
Procedure is recorded. (Refer to Section 10.3 for a detailed discussion on the Executing
stage.)
• Reporting Stage. A system verification and system validation Execution Record for each
Activity is created after the completion of each Procedure. The Execution Record will state
the status and outcome of the Activity in terms of whether the resulting evidence obtained is

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 285

used to determine whether that the Success Criteria for each Instance was met. The family
of Execution Records are combined into a system verification and system validation
Approval Package. (Refer to Section 10.4 for a detailed discussion on the Reporting stage.)
• Approving Stage. The Approval Package is submitted to the appropriate Approving
Authorities for approval (qualification, certification, or acceptance). (Refer to Section 10.5
for a detailed discussion on the Approving stage.)
When different subsystems or system elements of the SOI are procured from a supplier, system
verification and system validation for those subsystems and system elements are part of the
qualification, certification, and acceptance criteria for the SOI they are a part.
In some cases, the acceptance of a procured system element will be based on production
verification against the design output specifications, in other cases acceptance will be based on
both system verification and system validation against the SOI’s integrated set of needs and set
of design input requirements as well as production verification for that SOI. Refer to Section 9
for a more detailed discussion on production verification and Section 13 for a more detailed
discussion on customer/supplier system verification and system validation considerations.
Successful system validation that the SOI meets its integrated set of needs is dependent upon
successful system verification that the SOI meets its design input requirements. At the integrated
system or product level, the execution, reporting, and approval stages for system verification will
normally happen prior to the execution, reporting, and approval stages for system validation,
especially when system verification is done by a different organization than system validation as
discussed in Section 13. For some government projects, federal regulations require that system
validation be done by a different organization than the one that did system verification.
However, for some needs and the resulting design input requirements, both system verification
and system validation may be accomplished concurrently when the same organization is
responsible for doing both as is common for systems developed and integrated “in-house” and
many consumer products. When cost effective and warranted by analysis, the expense of system
validation activities separately can be mitigated by combining them and performing system
verification and system validation concurrently.
There will be some cases where evidence that the SOI can be validated to have met a need can be
based on the evidence from verifying that the SOI has met the implementing design input
requirements traced to that need. In other cases, verification that the SOI has met the
implementing design input requirements traced to that need is a prerequisite to the system
validation activity associated with that need.
Which case applies will be determined by the project during the planning stage when the system
validation attributes are defined for each of the needs expressions. A key consideration is that
system validation is intended to be completed in the actual operational environment by the
intended users; for system verification that is not always the case.

10.1 Planning Stage


Thorough system verification and system validation planning from the beginning of the project
[44]
is critical to ensuring a timely and smooth system integration, system verification, and system
validation program.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 286

Because of this, the planning and definition of the system verification and system validation
activities and artifacts must be completed before implementing these activities. Planning begins
during Lifecycle Concepts and Needs Definition to mitigate the risk of budget overruns and
product launch delays caused by incomplete system verification and system validation planning.
These activities include defining lifecycle concepts for procurement, design, design verification,
design validation, early system verification, early system validation, production, production
verification, system integration, system verification, and system validation.
The planning activities should be documented in the project’s PMP from a PM perspective and
elaborated within the project team’s SEMP from a SE perspective. The PMP and SEMP provide
an overview of the project’s design verification, design validation, early system verification, and
early system validation system integration, system verification, and system validation processes,
highlighting the details towards implementing these activities, i.e., how each of the subsystems
and system elements that are part of the SOI physical architecture will be validated to meet each
of their needs and verified to meet each of their design input requirements. Refer to Section 14
for a more detailed discussion concerning the PMP and SEMP.
Because system integration, system verification, and system validation are formal development
lifecycle processes, project teams develop dedicated plans for how they will address system
integration, system verification, and system validation for their SOI. These plans include the
MIVV Plan and SIVV plans. Refer to Section 14 for a more detailed discussion concerning the
MIVV plan and SIVV plans.
This early planning is especially important given that system integration, system verification, and
system validation activities are key cost and schedule drivers. Early identification and
maturation of the Success Criteria, Strategy, and Method as well as identification of the
responsible organization helps to ensure the project team has the budget, schedule, and resources
needed to successfully execute and complete its system integration, system verification and
system validation program. This information also helps to ensure the project has included in
their WBS, schedule, and budget adequate time and resources for all system integration, system
verification, and system validation activities that need to be completed before the SOI is
accepted and approved for use.
Developing these concepts early is also critical when contracting the definition, design, design
verification, design validation, early system verification, early system validation, production,
production verification, system integration, system verification, and system validation for a SOI
to a supplier. The information from the maturation of the design verification, design validation,
system verification, and system validation concepts and implementing plans will be used to
define the requirements and deliverables in the SOWs or SA as discussed in Section 13.
For each stage shown in Figure 10-1, specific system verification and system validation artifacts
are generated and managed. Figure 10-2 shows the relationships of each of these artifacts.
System verification and system validation planning begins as soon as each need or design input
requirement is defined. Attributes containing this information is included within the needs and
design input requirements expressions. The needs and design input requirements expressions are
not complete until these attributes are defined.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 287

Verification or Validation Verification or Validation Verification or Validation


Instance Instance Instance
System Need or Design Input System Need or Design Input System Need or Design Input
Requirement Requirement Requirement

Success Criteria Success Criteria Success Criteria Planning


Strategy Strategy Strategy

Method Method Method

Verification or Validation
Verification or Validation Activity Activity

Procedure Requirements Procedure Requirements Procedure Requirements Defining

Verification or Validation Procedure, steps & actions Procedure, steps & actions

Verification or Validation Event, Executing


Verification or Validation Event, Executed Procedure Executed Procedure

Execution Record Execution Record Reporting


Verification or Validation Approval Package

Verification or Validation Approving Authorities Approving

Qualified, Certified, Accepted System

Figure 10-2: System Verification and System Validation Process Artifacts.


For each system verification and system validation Instance, key information is defined to start
the system verification and system validation planning process.
• Well-defined Success Criteria (Section 10.1.1) which must be met by the SOI to which the
need or requirement applies.
• The Strategy (Section 10.1.2) that must be followed to obtain evidence that the Success
Criteria has been met.
• The Method (Section 10.1.3) (Test, Demonstration, Inspection, or Analysis) that is part of
the strategy to obtain data that provides evidence the Success Criteria was met.
Ultimately, it is the project team responsible for the integrated system that is responsible for
integrating all the system verification and system validation plans, attributes, activities, and
results into a coherent whole for eventual Approving Authority acceptance of the SOI. This
includes finalizing (and updating) the budget and schedule based on the number of needs and
associated system validation attributes and the number of design input requirements and
associated system verification attributes.
To avoid technical debt, planning for system integration, system verification, and system
validation must be addressed for each system, subsystem, and system element within the SOI’s
physical architecture.
Note: Because budgets and schedules of the system verification and system validation activities
evolves during development of the SOI, initial budgets are only estimations with a margin of
error. Once all the sets of needs and implementing design input requirements for each system,
subsystem, and system element at each level of the physical architecture are defined, a more
accurate budget and schedule can be defined. This frequently happens when the project

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 288

conducts the Preliminary Design Review (PDR). If contracts must be let early, these
uncertainties must be addressed when contracting out a SOI to a supplier and should be
documented in the contract.
For projects using system modeling and tools, initial planning can begin with the creation of a
system verification or system validation Instance in the SOI system model for each need and
design input requirement. Each Instance is a unique entity within the system model used to
manage system verification and system validation actions associated with a given need or design
input requirement.
Even non-modeling tools that are table driven can define system verification and system
validation Instances; the important thing is that for each design input requirement and need, the
above artifacts be created within the project tool set to identify each system verification and
system validation Instance.
10.1.1 Define the System Verification and System Validation Success Criteria
For each system verification and system validation Instance, the Success Criteria is defined and
recorded as an attribute of the need or design input requirement expression. The Success Criteria
is a set of criteria defined by the customers, regulatory agency, or developing organization that
must be shown to have been met, with some level of confidence, before the Approving
Authorities will qualify, certify, or accept the SOI to be used as intended in the operational
environment when operated by its intended users. The Success Criteria represents the expected
result of a system verification or system validation Activity for a specific Instance.
The Success Criteria is not a restatement of a need or design input requirement, nor is it intended
to change the scope of the associated need or design input requirement. By defining and
recording the Success Criteria concurrently when the needs statements and design input
requirements statements are formed, the quality of the statements will improve as well as helping
to define the evidence needed to determine whether the SOI will be able to meet them.
For example, as tolerances and ranges are examined, the need for margins are assessed to ensure
the data collection and Success Criteria can be achieved. In addition, the operational
environment in which a system verification or system validation Activity must take place is
determined as well as the quality expectations (e.g., reliability.) The feasibility to meet a need or
design input requirement will be reassessed as the project team moves through the SOI
development lifecycle stages.
Formulating the Success Criteria Statement
The wording of the needs or design input requirements statements provides the foundation of for
defining the Success Criteria. For example, given the following requirements for a pressure
vessel:
• “The pressure vessel shall have an operating pressure of 200 ±5 psi.”
• “The pressure vessel shall not burst when pressurized to a maximum pressure of 300 ±5
psi.”
• “The pressure vessel shall have a burst pressure safety margin of xx %.,”
• “The pressure vessel shall meet its pressure requirements when operating within an
external temperature range of xx degrees F to yy degrees F.”
• “The pressure vessel shall meet its pressure requirements when operating within an internal
temperature range of xx degrees F to yy degrees F.”

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 289

The value “200±5 psi” is the value the pressure vessel must be verified to operate at; “300±5
psi” is what the pressure vessel must be verified to achieve without bursting; and xx% is the
required safety margin the pressure vessel must be verified to have. The external and internal
temperature ranges address operational environmental factors to which the other requirements
apply.
At this point, to define the Success Criteria, the requirements are examined collectively to
determine what criteria must be obtained that will provide evidence that the pressure vessel can
meet these requirements. The system can be verified to meet these requirements by conducting a
series of tests across the expected range of performance and thermal ranges. Some tests could be
conducted concerning the 200 psi and 300 psi requirements and other tests concerning the safety
margin would be run at the pressure that represents the safety margin. Multiple tests would be
needed at the temperature extremes. Note: A destructive test on an engineering unit would be
conducted first as part of design and early verification in that the pressure would be increased
until the vessel bursts to establish what the burst pressure is, which is then compared to the
required safety margin.
Assuming the system verification or system validation Method is Test, the resulting Success
Criteria statement for the operating pressure requirement could be: “The requirement will be
shown to have been met when the pressure vessel has been able to be pressurized to the
operating pressure of 200±5 psi for [TBD] [time period] at each of the internal and external
thermal extremes.”
For the maximum pressure requirement, the Success Criteria could be: “The requirement will be
shown to have been met when the pressure vessel has been pressurized to the maximum pressure
of 300±5 psi for [TBD] [time period] AND the pressure vessel has not fractured at each of the
internal and external thermal extremes with a confidence level of [TBD %].”
For the safety margin requirement, the Success Criteria could be: “The requirement will be
shown to have been met when the pressure vessel has been pressurized to safety margin of xx%
greater than the maximum operating pressure of 300±5 psi for [TBD] [time period] at each of
the internal and external thermal extremes, AND the pressure vessel has not fractured with a
confidence level of [TBD %].”
The pressure vessel would be verified to meet its requirements by obtaining the data needed to
provide evidence the Success Criteria was met via the steps in the verification Procedure with the
stated level of confidence.
In is important to understand that the Success Criteria must not contain any hidden requirements
that are not included in the set of design input requirements. For example, the need for
qualification safety margins specified by a regulatory agency must be addressed in the set of
design input requirements along with the requirements for normal and maximum operating
pressure as all these requirements must be implemented in the design.
As shown in Figure 10-3, the Success Criteria is driven by at least three sources: the need or
design input requirement; organizational design guidelines and requirements; and qualification,
acceptance, or certification requirements.
The Success Criteria is used to plan the Strategy, select the Method, plan associated system
verification and system validation Activities, and define the system verification and system
validation procedure requirements which are implemented via the resulting Procedures which

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 290

collects the evidence needed to determine that the SOI met the need or design input requirement.
The actual results of the Procedure will be compared to the expected results as defined by the
Success Criteria to determine whether the SOI has met the need or design input requirement.

Strategy &
Method
System Need, or
Used to Used to
Design Input
plan define &
Requirement
develop

Organizational Activity
Design Guidelines Success Criteria Procedure Rqmts
& Requirements Procedure

Qualification, Defines
expected Used to
Acceptance & Results are execute
Certification results documented
Requirements by
Pass Execution
Event
? Record

N Y Used to provide
proof of
Resolve Approve satisfaction
Discrepancy

Figure 10-3: Success Criteria Influence on System Verification and System Validation Planning and
Implementation.
Questions that need to be addressed when defining the Success Criteria include:
• What evidence must be gathered to determine if the need or design input requirement is
met?
• Beginning of Life (BOL) or End of Life (EOL)? (See discussion below.)
• Under what operating environment?
• What users/operators need to be involved?
• What level of confidence is needed consistent with the priority and criticality of the need or
requirement? (See discussion below)
The Success Criteria will evolve during development of the SOI and will be baselined after the
completion of design verification and design validation at a formal gate review such as the CDR
or Integration Readiness Review prior to system verification, system validation, and system
integration. A major outcome of design verification, design validation, early system verification,
and early system validation, is updated Success Criteria, Strategy, Method, system verification
and system validation Activity definition, and system verification and system validation
procedure requirements based on the results of the design verification, design validation, early
system verification, early system validation activities discussed in Section 8. This updated
information will be reflected in the system verification and system validation Procedures.
In some cases, the customers or regulatory agencies will specify the Success Criteria, Strategy,
and Method that must be used to provide evidence that the sets of needs and sets of design input
requirements have been met to their satisfaction. In other cases, the customers or regulatory
agencies may specify the Success Criteria and leave the Strategy and Method up to the supplier.
Not specifying the Strategy and Method may appear to save cost and schedule for the project but
must be traded against the need to provide this information to the suppliers to help ensure the
evidence conforms to the needs of the project or regulatory agency and traded against the needs

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 291

of the customers and stakeholders to ensure this approach will be accepted at their levels. In the
end, it is the Approving Authorities that determine what is “necessary for acceptance” as defined
by the Success Criteria for each need and design input requirement.
Whichever approach is used, the project team must clearly document in the SOW or SA the
supplier’s system verification and system validation roles and responsibilities with required
activities, deliverables, and contents clearly specified. Refer to Section 13 for a more detailed
discussion concerning customers and supplier roles and requirements for system verification and
system validation activities.
Considerations for Defining System Verification and System Validation Success Criteria
When defining the need and design input requirement statements and associated Success
Criteria, there are several things that must be considered. These considerations are major reasons
why the system verification and system validation attributes must be defined and included for
each need and design input expression and approved when the needs and design input
requirements are baselined.
Confidence Level
The confidence level concept is rooted in statistics. When making measurements of
performance values or other quantitative parameters, not only the correctness (accuracy and
precision) of the data collected needs to be considered, but also the degree of confidence in the
correctness and repeatability of that data. The confidence level is a measure on a scale of 0 - 100
percentage points on the confidence that subsequent tests will yield the same result within the
accuracy and precision requirements. What is the confidence level that subsequent testing will
result in the same “correctness” of the data? If 100 tests are conducted and the system meets the
Success Criteria for the subject need or requirement just once, the degree of confidence would be
low. What about a 50/50 pass/fail rate? What about a 95 out of 100? What pass/fail rate is
acceptable to the business stakeholders, customers, and regulatory agencies who are the
Approval Authorities? Keep in mind six-sigma represents 1.3 defects per million.
For example, if the system under development is an instrument that measures some quantity,
along with the sample being measured, there will be requirements on the accuracy and precision
of the measurements over the life of the instrument. During system verification there would be a
sample with a known, baseline value of the sample being measured. Each time the instrument is
tested while taking a measurement, the result will probably be a slightly different result.
Accuracy is a measure of how close an average of measures is to the baseline value. Precision is
a function of the distribution of the measurements taken. Using a firing range as an example,
precision is how “tight” the cluster is. Accuracy is how close the center of the cluster is to the
bull’s eye. A test case could be defined where 10 measures of the baseline sample are taken and
averaged together, and the results compared to the accuracy and precision requirements. If a
single test is conducted, what is the confidence that a subsequent run of the test will result in the
same result? The test after that? For a weapon system, how many live-fire tests need to be
conducted such that the customers and users will have a high confidence level the weapon will
hit the target while meeting the accuracy and precision requirements? What about at beginning
of life (BOL) versus end of life (EOL)? (See discussion below concerning BOL and EOL
considerations.)
Confidence levels can be addressed in either the requirement statement or in the Success Criteria
definition. When stated as part of the requirement, the Strategy will need to address how that

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 292

confidence level will be achieved. For example: “The instrument shall measure [something] in
the range of xxx-yyyy [units] with an accuracy of +/- z [units] with a confidence level of 95%”.
(Note: both range and accuracy are stated in the same requirement statement because in this
case it is assumed, they are dependent variables, and the system will be verified to meet each
value in the same verification Activity.)
When stated as part of the Success criteria, the issue is confidence that the system verification or
system validation Activity will result in objective evidence that the system meets the need or
requirement as defined within the Success Criteria with the desired degree of confidence. The
confidence level stated in the Success Criteria will influence the Strategy and Method chosen,
the size of the population of the entities being tested, as well as the number of tests. Generally,
the degree of confidence will be greater when the Method is Test versus Analysis.
When considering priority, critically, or risk, not all requirements are of such stature to need a
confidence level to be stated. For example: “The system shall be the color blue as defined in
xxxxx standard.” or “The system shall be x+/- yy inches high.” Safety and security needs and
requirements would justify a confidence level to be stated as would higher priority or critical
needs and design input requirements.
When defining the confidence level, considerations of the impacts to the cost and schedule of the
design, system verification activities, and system validation activities must be considered. The
higher the required confidence level, the more expensive it will be to achieve that level both in
design and during system verification and system validation. The population size (number of
samples tested) and number of tests (tests per sample) will have a direct impact on budget and
schedule. Because of this, tradeoffs are often made as to what confidence level is practical and
feasible.
System Lifetime and Expected Performance
Another important consideration is the stated lifetime versus needed performance of the system.
For a design input requirement like the requirement above for the instrument, does that
requirement represent the needs and design input requirements for BOL or the instrument or
EOL? All too often this question is not considered when defining the sets of needs and sets of
design input requirements.
This concept complicates system verification and system validation planning in that to address
the issue, for any given performance requirement, the members of the project team responsible
for design will have to understand which parts of the system could degrade over the operational
life of the SOI that would impact the ability of the system to meet the performance requirements
at the end of the design lifetime; this needs to be taken into account when defining the Strategy
and Method to be followed during system verification and system validation. For example, the
Method for a BOL requirement may be Test, but because of a long lifetime (e.g., 14 years or
more) the Method for EOL requirement would be Analysis. In cases like this it is common to
procure or build key parts that are subject to degradation and conduct lifetime testing in a
laboratory to collect the data needed for the Analysis.
10.1.2 Determine the System Verification and System Validation Strategy
For each system verification and system validation Instance, once the Success Criteria have been
defined, a Strategy must be determined which will result in the data needed that can be used as
evidence the Success Criteria is met. The Strategy is one of the attributes concerning system

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 293

verification and system validation defined for and included within each need or design input
requirement expression as discussed earlier.
By defining the Strategy, the project team provides an overview of the concept to be
implemented by the system verification or system validation Activity that will result in the data
needed to provide evidence the SOI has met the defined Success Criteria. The Strategy is
tailored to the defined Success Criteria based on cost, schedule, risk considerations, and required
confidence level. The Strategy could also be influenced by the Strategy selected for the level
below or above the level the system, subsystem, or system element is being verified or validated.
An effective Strategy reduces technical debt while also preventing gaps and duplication in efforts
across the lifecycle.
While this Manual discusses Success Criteria, Strategy, and Method separately, each are closely
related and dependent. As shown in Figure 10-4, defining the Success Criteria, determining the
Strategy, and selecting the Method are iterative. Selecting a Method is part of defining the
Strategy. Using the knowledge gained in defining the Strategy using a specific Method, the
project team will assess the resulting costs, schedule, risk, confidence level, and needed enabling
systems.
Based on this assessment, the project team will assess the feasibility of the Strategy. If
feasibility is an issue, the project team will need to either reassess the wording of the need or
design input requirement, redefine the Success Criteria, modify the Strategy, or select an
alternate Method such that the Strategy is feasible given the constraints levied on the project.

Determine the
Strategy Informs
Informs
Modify the
V&V Strategy
Need or Design Instance Define the
Input Select a
Success
Requirement Method
Criteria
Statement
Select a
Reassess the need Redefine the different
or requirement OR Success Criteria OR Method OR
statement
wording
N

Cost, schedule, risk,


Feasible confidence level, and
? Access enabling systems Results in
Feasibility
Proceed with
verification and Y
validation planning

Figure 10-4: Iterative Relationship Between Success Criteria, Strategy, and Method.
If the needs or design input requirements can be changed, that provides some options; if they
cannot be changed, the challenge is to find a system verification or system validation approach
(Success Criteria, Strategy, Method) that is feasible while able to obtain the data needed to
provide evidence the system meets the subject need or design input requirement.
Questions that need to be addressed when defining the Strategy for each Instance include the
following. Note that some of these considerations may have been defined in the Success

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 294

Criteria. If not in the Success Criteria, the project team will need to decide what is most
appropriate.
• What specific actions? How many times will the actions be repeated? On how many
samples?
• What will these actions cost? How long will it take to complete each action?
• Are the intended users/operators available or will surrogates by used?
• Will the system verification or system validation Activity be conducted in the actual
operating environment or a simulated operating environment?
• What enabling systems are needed? Do they exist? Will they be available when needed?
If they exist, do they need to be modified? If they do not exist, how will they be acquired
and at what cost?
• What is the risk associated with using this Strategy and Method in terms of successful
system verification or system validation with the required level of confidence for
acceptance of the results?
• Is the selected Strategy feasible in terms of cost, schedule, risk, confidence level, and
enabling system availability?
As discussed in the next section, answers to these questions will greatly influence which Method
will be used for system verification or system validation.
This thought process is repeated for each need and design input requirement for each subsystem
and system element within the system architecture as well as for the integrated system. For large
integrated sets of needs and sets of design input requirements and an architecture with many
subsystems and system elements, this process can take a lot of time and resources. Also, the
initial selections and determinations will evolve over the development lifecycle as the project
team moves down the levels of architecture and as the design matures and design verification
and design validation activities are completed. The resulting changes will need to be managed
and impacts assessed.
10.1.2.1 Considerations When Determining the Strategy
Operational Environment Ranges versus Ranges of Performance versus Quality
There is an expectation that system verification and system validation are conducted on the
system elements and subsystems that are part of the system architecture in their operational
environment.
In addition, for system validation, the expectation is that the intended users/operators will be
involved. To help ensure success, the classes of users/operators (personas/user classes) should
have been defined and addressed in the integrated set of needs and resulting design input
requirements.
The operational environment includes natural and induced environments that exist within the
macro system the system elements, subsystems, and the system are a part. The project tea should
have addressed the operational environment by specific needs and design input requirements.
By their nature, requirements dealing with environmental factors (temperature, pressure, EMI,
EMC, humidity, mechanical loads, vibrations, acoustics, etc.) are stated as a range of values.
Thus, there are multiple environmental factors - each having a range of values that must be
considered when defining the Strategy and selecting a Method. In some cases, the environmental
factor range is stated in a three-dimensional graph of frequency, magnitude, and range.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 295

As a result, there are multiple environmental factors each with their own range of values. Even
if not explicitly stated in the Success Criteria, the expectation is that the system elements,
subsystems, and the integrated system meet all needs and requirements in any combination of
extremes across the ranges for all environmental factors.
Another complication to be addressed is system performance values are usually defined within a
range. In some cases, the defined performance across a range of a given environmental factor is
not linear. The performance may be better in the middle of the range and degrades closer to the
extremes. In other cases, the time the system operates at the extremes of performance combined
with the environmental factor extremes affects performance, e.g., while the system can operate at
the nominal operating temperature for an extended time, it may not be able to do so at the
extremes of temperature, pressure, or another environmental factor.
From a stakeholder perspective, the expectation is that the SOI performs predictably and
reliability across all the stated ranges of performance as well the stated range of environmental
factors as defined in the integrated set of needs (system validation) and the set of design input
requirements (system verification). Predictability and reliability are quality factors, so expected
quality (-ilities) needs and requirements must also be considered.
While a key characteristic of well-formed needs is that the system can be validated to meet that
need and for well-formed requirements that the system can be verified to meet that requirement.
From a system verification or system validation perspective, needs and requirements have
dependencies that must be considered when defining the Success Criteria and Strategy.
The main point of this discussion is that in many cases, system verification and system validation
activities will involve the system verification or system validation of multiple needs or
requirements concurrently within the same system verification or system validation Activity.
Because of the number of dependencies, it is important to have developed detailed models of the
SOI as well as models of its operational environment and external systems it interacts that can be
used to run simulations during design verification, design validation, early design verification,
and early design validation activities as discussed in Section 8.
With this capability, all the combinations and permutations of the dependent requirements across
each of their ranges of performance is possible, allowing evaluation of “stacked” ranges or
tolerances and possible failures. “Stacked” is used when the system is tested when all
performance ranges and all environmental ranges are at an extreme simultaneously. There are
many cases where a system works as intended within the middle of the combined ranges, but fail
when tested at the extremes, especially if all the dependent requirements are at their extremes (all
high or all low ends of their ranges.
System Verification and System Validation Considerations in Terms of Levels of
Integration
At what level of integration should system verification and system validation activities be
performed? As part of system verification and system validation planning, when, where, and at
what level are primary concerns. When and where during system integration should system
verification and system validation be performed for a given subsystem or system element?
As shown in Figure 2-10, system verification and system validation for subsystems or system
elements are against the integrated set of needs, set of design input requirements, and set of
design output specifications for each of those subsystems or system elements. The system
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 296

verification and system validation of the integrated system are against the set of needs and set of
design input requirements for the integrated system.
A general rule of thumb is that a need or design input requirement for a system, subsystem, or
system element should be recorded and managed at the level the system verification and system
validation activities for that system, subsystem, or system element will be conducted. (i.e., a
verification activity expressed in terms of a subsystem should not be associated with a system
level need or design input requirement; it should be associated with the need or design input
requirement stated for that subsystem.)
As a bottom-up activity, system integration, system verification, and system validation should be
done starting with the system elements, then working up to the subsystems they are a part, then
to the top integrated system level. However, for some projects that may not be the case. Some
projects may accept production verification that a system element meets its design output
specifications and skip the system verification activities needed to provide evidence it also meets
its design input requirements and system validation activities that it meets its needs.
Reduction of Verification Activities and Risk
The project team must balance the reduction of system element, subsystem, and integrated
system level system verification and system validation activities and risk. The project may be
tempted to reduce the budget and shorten the schedule for system verification and system
validation by doing only subsystem or integrated system level system verification or system
validation against their design input requirements and needs - and only using production
verification on lower-level system elements. Using this strategy, the logic, though faulty, is that
once evidence has been obtained that the subsystem or integrated system has met its set of needs
and set of design input requirements, then the system elements that made it up must have met
their set of needs and set of design input requirements.
However, this strategy could be risky; a critical problem may not be discovered until later in the
system integration process or during integrated system validation or customer’s or regulatory
agency acceptance. It may be difficult (time consuming and expensive) to trace the problem to
its source for a large, complex system.
Once the source of the problem is discovered, it will be more difficult to resolve, especially if
more than one part, component, or system element is involved and the subsystem or system will
need to be disassembled as part of the anomaly resolution.
A single problem discovered during integrated system level system verification or system
validation may cancel all savings projected from eliminating lower-level system element
verification and system element validation activities. Worse yet, a defect may go undetected
until after the integrated system has passed system verification or system validation and has been
released for use. In the case of safety critical consumer products (e.g., automobile, manned
spacecraft, aircraft, medical device) the consequences could be a loss of life.
It is also risky to assume a SOI was built or coded to the design output specifications, without
proof. If this is a bad assumption, and there were production quality issues, then it will be more
difficult to trace the non-conformance to its source - was the design incorrect, were the resulting
design output specifications wrong, or was the subsystem or system element built incorrectly?
If an organization does design verification and design validation as described in this Manual, any
issues with the design should have already been addressed, so the question of the source of a
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 297

problem will either be a production issue or an integration issue. As discussed in Section 9,


production issues should be identified during production verification. A robust production
verification process should help quality engineers isolate any production faults.
Another issue is that quality and compliance needs and design input requirements for a
subsystem or system element may have issues that are not addressed (or discoverable) during
system verification and system validation of the parent system in which the subsystem or system
element has been integrated. Remember, that the parent system is verified against its own design
input requirements and validated against its own integrated set of needs.
Theoretically, if allocation and budgeting were done properly, the resulting necessary and
sufficient set of child requirements for the subsystems and system elements that make up the
integrated system should adequately address the quality and compliance requirements. However,
without explicit evidence obtained during system verification and system validation of the
subsystem or system element against its needs and requirements, it is risky to assume the
subsystem or system element was designed and built such that it meets those needs and
requirements.
Alternatively, budget and schedule constraints may make system verification or system
validation of every subsystem or system element in the SOI architecture against every one of
their needs and design input requirements cost-prohibitive and unnecessary.
If system verification activities must be reduced due to cost and schedule concerns, this can be
done with a risk-based approach. If the system, subsystem, or system element has needs and
design input requirements that are high priority, critical, or associated with safety or security, the
system verification and system validation should be done to provide evidence the system,
subsystem, or system element meets those needs and requirements prior to integration.
For system verification and system validation activities dealing with non-critical, lower priority
needs and design input requirements that are lowest in risk, i.e., the risk of a need or requirement
not being met with the design or the consequences of the SOI not meeting the need or
requirement are low; the system verification or system validation activity may be considered for
reduction.
For OTS or MOTS systems, subsystems, or system elements (Refer to Section 12) or in a
contracted-development setting (Refer to Section 13), it may be that the suppliers are only
required (via the SOW or SA) to show the customer that the delivered system, subsystem, or
system element meets its design input requirements. Lower-level system verification and system
validation of internal subsystems and system elements is treated less formally as a supplier “in
house’ activity. This approach may be risky, but it could result in significant reductions in cost
and delivery times. This is where production quality requirements in the SOW or SA can help.
The reader is urged to resist the temptation to blindly reduce the number of, or the costliest,
system verification or system validation activities due to budget or schedule concerns. Gaps and
misses are more costly and time consuming to correct later in the lifecycle - especially when
these gaps show up at the integrated system level from reduced subsystem or system element
testing. If additional resources become available that allows the opportunity to do system
verification or system validation to additional depth, the project should do so to reduce risk and
increase the degree of confidence.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 298

Projects must do a risk assessment and determine which needs and corresponding design input
requirements represent the highest risk if not properly implemented. Inadequate system
verification and system validation represent risk to the project.

The following types of needs and requirements warrant additional assurance that system
verification and system validation is well planned and executed. Examples of types of needs and
requirements that represent risk to the project if not met include:
• Critical needs and requirements that must be met otherwise there is a high risk the SOI will
be unable to provide critical functions and performance, i.e., will not be able to be used as
intended, in the intended operating environment, by the intended users.
• Safety and Security needs and requirements that must be met otherwise there is a risk of a
safety or security issue. (For example, a requirement that will cause something to explode
versus one which is just the wrong color or a requirement that addresses the risk of
unintended users negatively impacting the intended use of the system).
• Needs and Requirements associated with risk mitigation that must have evidence that they
have been implemented to determine that the risk has been addressed.
• High priority needs and requirements that must met otherwise there is a risk the SOI will
be unable to provide functions and performance key stakeholders view as high priority.
Even if not critical, safety, or security related, the key stakeholders expect their high
priority requirements to be met.
• Interface requirements. Failure to meet interface requirements can 1) impact the system
integration, system verification, and system validation activities, and 2) result in a failure of
the system to operate once integrated into the macro system it is a part, 3) may enable
unintended users to negatively impact the intended use of the system.
• Regulatory needs and requirements the project must be compliant. For safety critical
systems, the regulatory agency may specify the Method to be used that will provide them
with the evidence they need to approve and certify the system for its intended use, when
operated by the intended users.
System Verification and System Validation Using the Integrated System Model versus the
Integrated Physical SOI
The reader is cautioned to not substitute system verification and system validation of the actual
physical hardware and software with the design verification and design validation results
obtained using models, simulations, or prototypes, unless necessary. Doing so reduces the
confidence level (as compared to system verification and system validation against the actual
integrated physical system in its actual operational environment when operated by its intended
users) and adds risk of the realized physical system failing system validation.
Showing that a model of a SOI in a simulated operational environment with simulated interfaces
in a simulated operational environment meets a set of design input requirements (system
verification) or a set of needs (system validation) does not mean the actual physical system
interacting with actual external systems in its actual operational environment when operated by
the intended users will meet its set of design input requirements or set of needs.
While some organizations may need to save time and money on system verification or system
validation by substituting the use of models in place of the actual physical components and
actual operational environment, they are adding and accepting additional risk as well as technical
debt. Such use of simulations to verify the system model meets the design input requirements or
validate the system model meets its set of needs in lieu of system verification or system

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 299

validation against the actual physical system in its actual operational environment should be
done with caution, and with full knowledge of the project, technical, and operational risk.
There are several reasons for this.
• It is difficult to model the actual physical and functional interactions between system
components in their actual operational environment.
• A goal of system verification is to detect errors, faults, and defects within the realized
physical integrated system. Using models and simulations of the SOI will not always
uncover errors, faults, and defects in the actual physical subsystems and system elements.
• The behavior of a system is a function of the interaction of its parts as well as interactions
with the external systems and environment of which it is a part. Thus, a major goal of
systems validation is assessing the behavior of the integrated physical system and
identifying emergent properties not specifically addressed in the needs or requirements.
Emerging properties may be positive or negative. For example, cascading failures across
multiple interface boundaries between the subsystem and system elements that are part of
the SOI’s architecture. Relying on models and simulations of the SOI and operational
environment may not uncover all the emerging properties and issues that may occur in the
physical realm.
• Another goal of system validation is to evaluate that the product or service performance is
predictable in its intended operational environment when operated by its intended users and
does not enable unintended users to negatively impact the intended use of the system.
Relying on models and simulations of the SOI and operational environment is not a reliable
substitute for uncovering issues when the actual physical system is operated by its intended
users as well as showing that unintended users (e.g., hackers) are unable to negatively
impact the intended use of the system.
While design verification or design validation using models and simulations allows a theoretical
determination that the modeled system will meet its needs or requirements in the operational
environment once realized, determination that the actual physical integrated system meets its
needs and requirements when operated by its intended users/operators, as well as addresses the
above goals of system verification and system validation, must be done whenever possible in the
physical realm with the actual hardware and software integrated into the SOI in the actual
operational environment by the intended users.
As long as the physical system is not completely integrated and/or has not been validated in the
actual operational environment by the intended users and does not enable unintended users to
negatively impact the intended use of the system, no result must be regarded as definitive until
the acceptable degree of confidence is realized.
How the System Verification or System Validation Activities May Drive the Design
The SOI may need specific features dedicated to support production verification, system
verification, or system validation activities. The need to provide evidence that a SOI performs as
defined by its integrated set of needs and set of design input requirements and have been built
correctly as defined by their set of design output specifications results in design considerations
concerning how test or diagnostic data will be obtained.
In the definition of “Test” as a Method of system verification or system validation, the need for
special instrumentation and test support equipment is included in the definition. In many cases,
this will require the SOI design to include dedicated interfaces, which may not be needed for

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 300

operations, to connect this instrumentation and test support equipment to collect the data needed
as evidence the system was built to the design output specifications and meets the defined
Success Criteria for a need or design input requirement.
For example, additional interfaces may be required to provide diagnostic information, access to
test data, or provide commands for test operations. This could result in the need for additional
connectors, test points, and wiring harnesses to connect to special test instrumentation or external
power, extra data to display or record, or a database to give visibility into an internal process, an
inspection portal, or a bracket to hold the system, subsystem, or system element in a test fixture.
When conducting system verification or system validation of software or hardware with test code
or test points inserted into the SOI to assist with system verification or system validation, do
these test points and extra code remain in the SOI after delivery? If so, how is the extra code
disabled - how is that test code made unreachable with assurance that it will not affect system
performance? What if the customer stipulates no unreachable code? Or, that all code be
exercised during system verification and system validation?
Alternatively, are the test points and/or test code only in engineering test units and not in the
production items? If the test points are only in the engineering test units, then the actual SOI
being produced and delivered are not the same exact items undergoing system verification or
system validation. How is that managed? These are questions that the project team must
address.
This is one of the advantages of early system verification and system validation planning,
especially addressing the Strategy and Method, because it enables system requirements to be
derived to support system verification and system validation activities long before the actual
activities.
Enabling Systems Needed to Support System Verification or System Validation
When defining the Strategy for the system verification or system validation activities, it is
important to pay particular attention to other systems that “enable” system verification and
system validation activities. Unique support or test equipment, special facilities, or models may
be needed to perform the system verification or system validation activities. Of particular
importance is what is needed to perform system verification or system validation at the
interfaces. The actual system, a simulator, or emulator? In some cases, the system going
through system verification or system validation is dependent on external systems to supply
something as an input. Will that other system (or a simulator or emulator) be available when
needed to support the system verification or system validation activities?
These systems are referred to as enabling systems. They need to be identified, defined, designed,
modified, built, or procured, verified, and validated in time to meet the system verification or
system validation schedule for the SOI under development.
Each facility, support equipment, and other enabling systems will have their own development
cycle where needs and requirements will be defined, the enabling systems designed and built,
and will go through their own system verification and system validation prior to being certified
for use for the SOI’s system verification or system validation activities.
Even OTS equipment will need to be exercised and at least validated for appropriate use. For
any enabling system that needs to be developed, there could be a long lead time before it will be
ready for use. For existing systems, there may be modifications needed to meet a project’s
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 301

specific needs - these modifications take time and money and must be included in the project
budget and schedule.
Even existing facilities, equipment, and personnel must be scheduled so they are available when
needed. Facilities, support equipment and enabling systems may be needed by other programs,
and schedule conflicts could arise that impact the system integration, system verification, and
system validation activities.
Because of this, it is critical to begin system verification and system validation planning early in
the lifecycle, so the enabling systems are ready when needed. In some organizations, there are
dedicated departments that build and furnish custom support equipment; once these groups have
requirements, and some guidance, they can work concurrently with SOI development. If this is
the case, schedule alignment will be important as well as technical alignment. For technical
alignment, a major consideration is at the interface boundaries and the interactions across those
boundaries.
If sufficient planning was conducted early in the project, these enabling systems should be ready
to support the SOI’s system verification and system validation activities when needed.
System Integration Activities Effects on System Verification and System Validation
System integration, system verification, and system validation are a bottom-up processes. The
way a system is assembled during integration is primarily driven by the design, the physical
architecture, procurement, and the manufacturing and coding sequence, sometimes influenced by
the need to package and transport sub-assemblies when manufacturing or coding is
geographically distributed.
For mass produced products, the concepts of “design for assembly” or “design for
manufacturing” are common to reduce the time and expense to build and assemble a system.
Both “design for assembly” and “design for manufacturing” are needs the satisfaction of which
will have to be validated. These needs also may result in specific design input requirements.
The sequence of integration is influenced by the defined system integration lifecycle concept
reflected in the SEMP and MIVV plan. Prior to integrating a component into the physical
assembly that it is a part; it must be approved for integration into the assembly. Sometimes this
can be done by inspection or a “bench test” of the component is performed by integrating the
component into a test assembly consisting of the control system (software), power supply, other
support components, test instrumentation, and a test stand (mechanical support) that mimics the
larger system. Interfaces with external components may be simulated or emulated as needed.
This specific system verification or system validation configuration may never be part of the
final system. It is a temporary configuration solely to support subsystem or system element
verification or system element validation activities so they can be qualified or certified for
acceptance prior to integration into the next higher assembly. Such a setup can also do
continuity and input-source checks, to ensure power supply currents are not exceeded or a
random short is not present in the given subsystem or system element that is being verified.
There may also be cases where there is a need to do system verification and system validation on
a set of system elements that have a dependency and interact (interface) with each other prior to
their integration into the final physical system they are a part.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 302

For example, to mitigate a particular risk for a launch vehicle, there may be a need to conduct
tests of the control subsystem connected to the fuel pumps prior to integrating these systems into
the launch vehicle. In this case, an operating environment would need to be provided to allow
this testing to be completed. Another example is in the Oil and Gas industry is when
hydrocarbons are released into the system during commissioning. Prior to releasing hazardous
materials into the system, partial commissioning is done to mitigate the risk. These approaches
allow the project team to verify the SOI against high priority or critical requirements concerning
the interaction of these two systems prior to their final integration into the overall system.
All this drives home the need to plan how the system will be integrated for system verification
and system validation purposes. As a system verification or system validation Activity is
planned, the corresponding integration of components for that activity is also planned, even if the
assembly of such parts, components, or subsystems cut across the system architecture. While
this may seem tedious, the payoff is avoiding unforeseen behaviors at the top-level of integration
due to a defect, or simply an unanticipated interaction, that could have been detected earlier.
When preparing for system integration, system verification, and system validation everything
must be included that is part of the operational environment including all maintenance and
support equipment, software, and all facilities into which the system is to be deployed. When
developing a new system, all support and enabling systems needed to maintain, handle, power,
support, test, configure, and transport the system being integrated must be developed and go
through their own system verification and system validation prior to using those items to
integrate and conduct system verification and system validation for the SOI under development.
For example, for a new launch vehicle, the Assembly, Integration and Check-Out Facility must
be “proofed”, including verifying that the overhead crane, handling equipment, access stands,
and ground support equipment meet their requirements, including regulatory and safety
requirements prior to being certified for system integration, system verification, and system
validation activities.

Preliminary versus Final System Verification and System Validation


In addition to the early system verification and system validation conducted concurrently with
the design verification and design validation activities discussed in Section 8, some system
verification and system validation activities may be performed in phases.
As shown in Table 10-1, for some subsystems or system elements the project will have both
preliminary and final system verification and system validation activities.
Preliminary system verification and system validation may be done on an engineering version of
the SOI, and final system verification and system validation will be done on the final version of
the SOI. This is often the case where access to key data needed as part of the Success Criteria is
not accessible for the end system, so addition test code or test points are included within the
engineering version of the SOI, but not in the actual end system.
In software, this is called a “debug” version of the code - where the final production executable
would have the debug code removed before compilation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 303

Component Subsystem Integrated System (SOI)


(system elements)
Preliminary All subsystem The subsystem has The integrated system has
System parts/components successfully completed successfully completed
verification and developed in house subsystem verification system verification and
system have successfully and subsystem system validation by the
validation completed production validation by the project project in an operational
verification and in a non-operational “like” environment with
preliminary system environment using emulators or simulators for
verification and system simulated interfaces external systems and
validation by the project with external systems. operated by surrogate
in a non-operational OR users.
environment. The subsystem has OR
OR successfully completed The integrated system has
All subsystem subsystem verification successfully completed
parts/components and subsystem system verification and
developed by a supplier validation by the system validation by the
have passed production supplier in a non- supplier in an operational
verification and have operational “like” environment with
been successfully environment with or emulators or simulators for
verified and validated without using simulated external systems and
by the supplier in a non- interfaces with external operated by surrogate
operational systems. users.
environment.
Final All subsystem The subsystem has The integrated system has
System parts/components successfully completed successfully completed
verification and developed in house subsystem verification system verification and
system have successfully and subsystem system validation by the
validation completed preliminary validation by the project project in the operational
system verification and in an operational “like” environment when
system validation by the environment using operated by the intended
project in an operational simulated interfaces users or trained surrogates
“like” environment. with external systems. and actual interfaces with
OR OR external systems.
All subsystem The subsystem has OR
parts/components successfully completed The integrated system has
developed by a vendor subsystem verification successfully completed
have been verified and and subsystem system verification and
validated by the validation by the system validation by the
supplier an operational supplier in an supplier in the operational
“like” environment AND operational “like” environment when
the vendor results have environment AND the operated by the intended
been accepted by the supplier results have users and actual interfaces
project. been accepted by the with external systems AND
project using simulated the supplier results have
interfaces with external been accepted by the
systems. project.
Table 10-1: Tracking Preliminary and Final System Verification and System Validation Status.

Because the actual end item is not being used during these system verification and system
validation activities, the project team will need to determine which system verification and
system validation activities will need to be done on the engineering version of the SOI and which
will need to be done on the actual end item.
As discussed in Section 13 for supplier developed SOIs, the supplier may be responsible for
system verification and the customer responsible for system validation. In other cases, the
customer may accept as preliminary the results of the supplier system verification and system
validation in a “operational like” environment, interacting with simulators or emulators that
represent external systems, using contractor personnel as the users/operators. Then the customer
or another organization that represents the customer will conduct final system verification and
system validation of the SOI in the actual operational environment, interacting with the actual
external systems, and operated by the intended users.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 304

For lower priority, non-critical, or non-safety, non-security sensitive requirements for the
supplier developed SOI, the customer may accept both the supplier’s system verification and
system validation results. However, for high priority, critical, safety, or security sensitive
requirements, the customer may elect to do their own or additional system verification and
system validation.
The strategy used comes down to acceptance of risk versus the cost to buy down the risk.
Supplier history and track-record can come into play making such a decision. These strategies
must be addressed in the MIVV and SIVV plans.
Often, a mix of both preliminary and final system verification and system validation activities
can be the most efficient strategy. There are some details worth considering when such a mix is
used, as described below.
• In some cases, the first round of system verification and system validation activities will be
conducted without establishing the actual operational environment or actual external
systems and then there will be a second round of system verification and system validation
activities addressing only needs and design input requirements that are related to the
operational environment and interactions with the actual external systems.
• In other cases, especially for system verification and system validation activities associated
with quality, safety, security, and lifetime requirements, preliminary system verification
and system validation activities may be warranted to verify the system meets these types of
requirements in the operational environment prior to being accepted for final integration.
If the operational environment is not available, then extensive environmental testing in
specialized chambers may be substituted at the system element level.
• Another reason for preliminary system verification and system validation (at an Integration
and Test (I&T) facility, test stand, or on the workbench) of a part or component is to gather
data prior to system verification and system validation by Analysis of the next higher level
of architecture that part will be integrated into.
Here, data is collected at the sub-component or system element level - and that data is used
a part of the Analysis of the next-higher assembly. The preliminary system verification
and system validation activities will directly affect the confidence level of the final system
verification and system validation results once that system element is integrated into the
next higher level of the system architecture.
Embedded Software System Verification and System Validation Challenges
From a system integration, system verification, and system validation perspective of hybrid
hardware/software systems, many standalone software development and system verification and
system validation strategies are not well suited to embedded software. In this context
“operational environment” has a different meaning.
Embedded software acts as a system element that exists within a hardware system element with
interactions with other software modules that are embedded within other hardware system
elements and communicates across multiple communication busses. In addition, the embedded
software has interactions with external sensors that provide data needed by the embedded
software as well as interactions with physical system elements that are controlled by the
embedded software.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 305

In this context, standalone testing of this software is not a substitute for system verification and
system validation of the software once embedded into the hardware and that module is then
integrated into the macro system it is part.
Many of today’s automobiles contain over 150 of these modules [10] (electronic control units
(ECUs)). This is especially an issue for integration given that there could be 50 different
suppliers each with their own development approach, operating systems, and languages. Each of
the suppliers has limited insight into the ECUs being developed by the other suppliers or how
their ECUs will be integrated into the larger system. Because of this, it is not always clear how
changes to the embedded software will affect the performance of other ECUs. T
The result is a much more complex system that presents additional challenges for system
integration, system verification, and system validation than the traditional hardware/mechanical
centric systems of the past. There may be fault modes and the possibility of cascade failures
where a failure of a hardware component (e.g., a sensor) could ripple through the entire system
resulting in system failure.
To summarize this sub-section, a major part of defining the Strategy is deciding on how the
project will conduct system integration, system verification, and system validation for
subsystems and system elements at each of the levels of the physical architecture. These
activities also allow tailoring of the system verification and system validation effort for
subsystems and system elements at lower levels of the physical architecture.
10.1.3 Select a System Verification and System Validation Method
As each need or design input requirement is defined, the Success Criteria defined, and the
Strategy determined; a Method (Test, Demonstration, Inspection, Analysis) is selected that will
be used to verify the system meets a design input requirement or used to validate the system
meets a need as defined by the Success Criteria.
Selecting the Method is based on the Success Criteria and Strategy defined for each need and
requirement. The Method selected affects cost, schedule, risk, and confidence level. The
temptation may be to assign ‘Test’ to each need and requirement at first - then reduce the scope
to analysis or demonstration later in the lifecycle to meet changing cost and schedule targets.
While “Test” may be preferred, it is generally the most expensive and time consuming, is not
always possible, and may not be the most appropriate for some of the needs and requirements as
discussed later under the “Considerations for Selecting the System Verification and System
Validation Method” discussion at the end of this section.
Alternately, there may be a temptation to select “Analysis” as the method instead of test because
it may save time and money. However, from a risk and confidence level perspective it may not
be the best choice depending on the type of need or requirement the SOI is being verified or
validated against.
No matter which Method is selected, the project team should document the rationale for why a
specific method was chosen. If Test is possible, but Analysis was chosen as the system
verification and system validation Method, why? Section 10.1.3.5 provides more detailed
guidance on selecting the Method most appropriate for a given need or design input requirement
against which the SOI is being verified or validated.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 306

10.1.3.1 Test
Test is a Method which leverages measured data taken from one or more test activities to provide
evidence that the system, subsystem, or system element satisfies the defined Success Criteria
Test as a method, uses controlled, predefined sets of inputs, data, or stimuli obtained using
special test equipment. Responses to specific inputs are measured and compared against
expected outcomes as defined by the Success Criteria.
Test activities are performed for many reasons (e.g., risk reduction, design maturation,
prototyping, qualification), and when used as a Method for system verification and system
validation can provide evidence that the system meets a need or design input requirement.
Test as a Method for system verification is often conducted in a controlled operational
environment (or simulation of) in accordance with predefined use cases or operational scenarios,
and are typically conducted by engineers, technicians, or test personnel using baselined system
verification or system validation procedures. Test as a Method for system validation should be
conducted in the actual operational by the intended users using actual operating procedures or
instructions for use.
Using Test as a Method, one or more test activities can be performed using final versions of the
end item or dedicated design or engineering units or platforms of varying levels of fidelity as
discussed in the previous section.
Emulators or simulators of external systems may be used to verify or validate interactions across
interface boundaries prior to integration of subsystems and system elements into the next higher
level of the physical architecture.
Test is a preferred Method as it provides direct, measurable evidence; however, due to the
expense relative to other methods, tests must be used strategically and consistently with the
program cost, schedule, and risk constraints as discussed previously. Test is generally selected
as the Method for system verification or system validation when other methods are incapable of
providing results of sufficient fidelity or high enough degree of confidence or when a need or
requirement is high priority, critical, or of particular importance to the system’s ability to meet
needs or requirements concerning safety, security, or risk mitigation.
For Test as a Method, the following questions should be considered. In addition to helping to
describe the Strategy, the answers to these questions will also be used to define the system
verification and system validation operational environment, special conditions for operations, the
system verification and system validation Activity, system verification and system validation
procedure requirements, and resulting Procedures.
• Where will the test activities be conducted?
• What evidence will be measured?
• Who will be conducting the tests? The project? The vendor? An independent contractor?
The intended users, or representative surrogate users?
• At what stage or level of integration?
• What fidelity of SOI is needed? Engineering test unit? Production unit?
• What enabling equipment, facilities, tools are needed to perform the test Procedure?
• What special test equipment is needed to command the SOI, power the SOI, physically
support the SOI, collect and store the data collected?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 307

• Have the equipment, facilities, tools, and special test equipment been verified, validated,
and qualified or certified for this specific use?
• Are additional measurement points needed to obtain the needed data?
• Are there additional interfaces needed to connect special test hardware/software?
• Which interfaces with external systems will the SOI under test need to interact with during
operations that will need to be emulated or simulated versus using the actual systems to
support the test?
• Have the emulators or simulators for external systems been verified and validated,
especially at the interface boundaries?
• If using the actual external systems associated with the interaction, will they be available to
support the testing?
• Will their side of the interface be verified, validated, and qualified or certified for this
specific use?
• What is the operational environment needed to conduct the test? Normal facility
environment, simulated operational “like” environment, or the actual operational
environment?
• Are the conditions for use clearly stated and understood?
• How many tests need to be successfully completed to obtain the stated confidence level?
• If multiple copies of the SOI are being manufactured, how many copies need to be tested
(lot size) and what number of tests per unit (sample size) are needed to obtain the stated
confidence level? (See the discussion in Section 10.1.1 for a more detailed discussion on
confidence levels.)
• What analysis tools are needed to analyze the data collected as part of the test activities?
10.1.3.2 Demonstration
Demonstration is a Method which denotes the actual operation of a SOI to provide evidence that
the required functions were accomplished under specific scenarios and operational environments.
Demonstration is the manipulation of a system, subsystem, or system element as it is intended to
be used to verify that the results are as expected as defined in the Success Criteria.
Demonstration consists of a qualitative determination made through observation, with or without
the use of special test equipment or instrumentation, to verify characteristics such as human
engineering features, services, access features, and physical accommodation.
If the result of an activity is needed to be seen only once (e.g., a parameter exists) then
demonstration could be used. Demonstration may be appropriate for event triggered
requirements. For example, issuing a command and observing the immediate result. Using
Demonstration is often less complicated and less expensive than Test as it is usually performed
at the extremes of range of performance rather than multiple actions across the entire range of
performance.
For Demonstration as a Method, the following questions should be considered. In addition to
helping to describe the Strategy, the answers to these questions will also be used to define the
system verification and system validation operational environment, special conditions, system
verification and system validation Activity, system verification and system validation procedure
requirements, and resulting Procedures.
• Where will the demonstration test activities be conducted?
• What evidence needs to be observed?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 308

• Who will be conducting the demonstration test? The project? The vendor? An
independent contractor? The intended users, or representative users, or surrogate users?
• At what stage or level of integration?
• What enabling equipment, facilities, tools, etc. are needed to perform the demonstration
test?
• Which interfaces with external systems that the system interacts with during operations will
need to be emulated or simulated versus using the actual systems to support the
demonstration test?
• Have the emulators or simulators been verified and validated, especially at the interface
boundaries and qualified or certified for this specific use?
• If using the actual systems, will they be and qualified or certified for this specific use and
available to support the demonstration test?
• What is the operational environment needed to conduct the demonstration test? Normal
facility environment, simulated operational “like” environment or the actual operational
environment?
• Are the conditions for use clearly stated and understood?
• For the SOI, how many demonstration tests need to be completed to obtain the stated
confidence level? (See the discussion in Section 10.1.1 for a more detailed discussion on
confidence levels.)
• If multiple copies of the system are being manufactured, how many copies need to be
demonstrated (lot size) and what number of demonstration tests per system (sample size)
are needed to obtain the stated confidence level?
10.1.3.3 Inspection or Examination
Inspection or Examination is a Method that is nondestructive and typically includes the use of
sight, hearing, smell, touch, and taste; simple physical manipulation; or mechanical and electrical
gauging and measurement. Inspection could be inspection of the end-item-system (code,
physical attributes, or artifacts that represent the SOI such as drawings, parts listings, part
specifications).
If a person can observe or use a simple measurement to determine if the requirement is satisfied,
then this is an appropriate method. This tends to be applicable when:
• There is a binary decision.
• Can involve a simple judgment, one where no special competency is necessary.
• May be a simple measurement (torque, length, weight, etc.).
• Can be seen to exist (note on a drawing, feature is present, label present).
• Non-destructive and executed on an actual system or system documentation (drawing,
physical feature, line of code, record from a supplier).
Inspection tends to be the least expensive Method of system verification or system validation and
can be used to verify design details communicated in the design output specifications, e.g.., built
to drawing, built to spec determination.
For Inspection or Examination as a Method, the following questions should be considered. In
addition to helping to describe the Strategy, the answers to these questions will also be used to
define the system verification or system validation environment, special conditions of operations,
the system verification or system validation Activity, system verification or system validation
procedure Requirements, and resulting Procedures.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 309

• Where will the inspections be conducted?


• What evidence will be observed?
• Who will be conducting the inspections? The project? The vendor? An independent
contractor?
• At what stage or level of integration?
• What specifically is being inspected?
• What special access is needed to perform the inspection?
• What equipment, facilities, tools, etc. are needed to perform the inspection?
• Is the equipment, facilities, tools, etc. qualified or certified for this specific use?
• Under what conditions (lighting, environment, etc.) will the inspections need to take place?
10.1.3.4 Analysis
Analysis is a Method that uses established technical or mathematical models or simulations,
algorithms, charts, graphs, circuit diagrams, or other scientific principles and procedures to
provide evidence that design input requirements were met (system verification) or needs were
met (system validation). This can also consist of engineering assessments and logic usage based
on documented evidence obtained during design verification, design validation, early system
verification, early system validation, production verification activities, or results of lower-level
system, subsystem, or system element system verification or system validation activities.
Analysis allows the organization to make predictive statements about the expected performance
of a system, subsystem, or system element based on the confirmed test results of a sample set or
by combining the outcome of individual tests, demonstrations, or inspections performed on
lower-level subsystems or system elements that are part of the SOI undergoing system
verification or system validation to conclude the SOI meets its needs or design input
requirements.
Analysis as a Method is often used to predict the breaking point or failure of a product or system
by using nondestructive tests to extrapolate the failure point. Analysis is also the primary
Method for the system verification or system validation of many quality (-ilities) requirements.
For example, for lifetime or reliability requirements or needs, the project will conduct a series of
tests for a given time on parts of the actual system or on developmental versions of the physical
system to collect data needed as dictated by statistical analysis, e.g., [xxxx] number of data sets
(samples) to have a confidence level of [yyyy]. (Refer to Section 10.1.1 for a more detailed
discussion on confidence levels.)
If Test as a Method of system verification or system validation is impractical, then Analysis is
often the next best approach. For Analysis, mathematical or behavioral models can approximate
the physical system, represent the operational scenario, and simulate the operational
environment. It may be more difficult than Test as it could involve multiple runs (e.g., Monte
Carlo simulations) and the approach and assumptions need to have a basis in reality. Analysis is
generally less expensive than Test, however some form of measured test data on parts of the
actual system or on developmental versions of the physical system is required to generate the
appropriate analysis correlation to actual expected outcome. From an expense perspective, if
using models and simulations, they will need to first be developed, verified, and validated before
being qualified or certified for use.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 310

For system verification or system validation by Analysis, the confidence level will usually be
lower than using Test as the method. In the end, the pass/fail determination for Analysis is based
on the knowledge and experience of the engineer and the type and fidelity of the models,
simulations, and data used to verify and validate the model or simulation. A major consideration
is how well the physical system, the actual operational environment, as well as external systems
and interfaces are modeled.
The form of the analysis (activity) performed results in data upon which to make the pass/fail
determination. Because the confidence level may be lower when using Analysis as a Method,
the risk is higher that the system will fail to perform as expected as compared to actual operation
of the physical system in the actual operational environment when operated by the intended
users.
There are several subcategories of Analysis, including:
• Analysis by Analogy or Similarity. This category is considered a type of an Analysis, rather
than a separate Method. Analysis by analogy or similarity is normally performed by
comparing the SOI under development to another similar SOI that has successfully been
verified to meet a similar set of design input requirements or validated to meet a similar set
of needs in a similar operating environment and operated by similar users/operators.
“Similar” is defined in terms of form, fit, function, quality, compliance, and operating environment.
This approach is useful for a design upgrade or building of a similar design using the same
components. Analysis by Analogy or Similarity consists of assessment and review of
hardware/software configuration, hardware/software application, function, performance,
operating environment, external interfaces, and prior test data including a comparison
against prior design or early system verification and system validation results as compared
to the “similar” system. Differences in configuration, application, operating environment,
external interfaces, or test conditions usually require enveloping by the original item
qualification or additional analyses and testing (activities) to complete system verification
or system validation. Using Analysis by analogy or similarity can be risky for interfaces. The
above analysis makes a critical assumption that the SOI that is undergoing system verification or
system validation was “built to spec” and there are no defects at the physical interface boundary.
Experience has shown that a major source of system integration issues involves issues concerning
connectors, e.g., bent pins, shorts, grounding issues, etc.
• Analysis by Certification. On some programs, usually government-sponsored ones, the
supplier may be directed to reuse certain components that are from a system that is already
fielded but being decommissioned. In certain cases, the customer (government) may direct
the supplier to use the part “as-is,” without a rigorous physical testing regime as part of
Test as a method. This may happen when the technical risk of reusing the part is low, the
part cannot easily or cost-effectively be remanufactured, or the customer has a limited
supply of this part, and a testing program would simply consume too many useable parts
that cannot be replaced. The customer would assume the technical risk.
The technical maturity of a system is based on a specific use in a specific operational
environment. If the existing component or system was qualified for a different use in a
different operational environment, there is a risk that it may not perform as needed when
integrated into the new system.
For a supplier produced system, with a well-established supplier system verification and
system validation program, the customer may accept the Supplier’s Execution Records as
evidence rather than doing the system verification and system validation activities
themselves. For this to be an acceptable Strategy, provisions need to be made for the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 311

supplier to do the system verification and system validation activities and provide the
deliverables needed for Analysis by Certification. In addition, the customers may include
in the contract provisions for customer participation (insight or oversight) in the Supplier’s
system verification and system validation activities. Refer to Section 13 for more detailed
discussion on Customer/Supplier considerations for system verification and system
validation.
• Analysis by Model or Simulation. This method is performed on analytical or behavioral
models, prototypes, or engineering test units (not on the actual/physical elements) for
verifying features and performance as designed. There are cases were the actual/physical
system may not be able to be verified to meet a requirement or validated to meet a need
directly by test of the actual system, without operating the system for the first time in the
actual operational environment by the intended users. An example is a system that is being
used to go into space or installed on the ocean floor. Another example is an expensive or
destructive weapons system where an actual test of the weapon results in the destruction of
that weapon. There are both natural and induced environmental requirements that will be
encountered while operating a system within which the SOI must work either while
encountering those conditions or work after being subjected to those conditions. In cases
like this, obtaining evidence that a system can meet a subset of the system’s operational,
performance, and quality needs and design input requirements may be able to be verified or
validated using the Method “Analysis by model or simulation”. For today’s complex,
software-intensive systems, Analysis by Model or Simulation is a major method used for
design verification and design validation as discussed in Section 8.
Model Verification and Model Validation
Before models or simulations can be used for design or system verification or system validation,
they will have to be developed and successfully complete model verification and model
validation and be certified or qualified for use as part of the SOI system verification and system
validation activities.
Model verification and model validation is done using measured data obtained from partial tests
of similar systems, allowing a comparison of the inputs/outputs from predicted and actual data to
confirm the model provides a realistic and accurate reflection of the actual physical system,
subsystem, or system element.
Going back to the space system example for a launch vehicle, one approach is to build a physical
“mass model” of the launch vehicle that is well instrumented and stimulate the mass model with
forces at various vectors, magnitudes, and frequencies. The resulting data is then used to
develop an analytical model which can be used for both design and system verification and
system validation. Once the launch vehicle is built, each segment can go through loads and
vibration testing. The resulting data will then be fed into the analytical model. The results can
then be used to verify the launch vehicle meets its design input requirements and validate the
launch vehicle will meet the needs.
Final launch vehicle system verification and system validation will occur during the first launch.
Because of this, projects responsible for the development of launch vehicles (and other space
systems) will often include additional instrumentation in the first set of vehicles to collect data to
validate their models with actual “flight” data. For example, the Space Shuttle Program included
special “Development Flight Instrumentation (DFI)” on the first space shuttle to collect this
information over several flights.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 312

Issues Concerning the Use of Models and Simulations as a Method of Analysis


There are a number of issues concerning the use of models and simulations as a method of
analysis that must be considered:
• How credible is the model? Was the model developed for a specific purpose that is
applicable to the system verification and system validation activity for which it is being
used? Has the model itself been verified against its design input requirements and
validated against its intended use?
• How complete is the model or simulation? A model or simulation approximates the
actual physical SOI addressing a subset of characteristics. It is difficult to model every
aspect of the SOI under development. How complete is the model or simulation, i.e.,
what aspects of the SOI are included in the model or simulation? Logic? Conceptual
behavior? Data, commands, message flow between software components? Is the model
of the system or artifacts generated as part of defining the system? Is the model primarily
of the software included in the system but not the physical attributes and characteristics
of the system? How well are physical aspects of the system modeled, e.g., physics,
chemistry, biology, thermodynamics, electrodynamics?
• If an organization completes design verification and design validation as described in
Section 8, then system verification or system validation by model or simulation during
system integration is really accepting the results of design verification and design
validation as well as production verification as evidence rather than accepting as evidence
the results of a system verification and system validation activity of the actual physical
system that a specific design input requirement (system verification) or need (system
validation) was met.
• How well the actual operational environment as well as external systems and interfaces
modeled or simulated. If not modeled or not modeled well, the confidence level would
be low that the actual physical system will work as intended in the actual operational
environment when operated by the intended users solely based on the design verification
and design validation results.
• Using modeling and simulation as a method of system verification or system validation
does not consider that system verification and system validation also includes production
verification that the system was built or coded in accordance with the design output
specifications. This approach ignores the fact that one of the goals of system verification
is to detect faults in the actual physical system that could be a result of either a poor
design or a production issue that resulted in defective parts.
• A basic tenet of systems thinking is that the behavior of a system is a function of the
interaction of its parts as well as the interaction with the external systems within the
macro system the SOI is a part. To accurately assess the behavior of the SOI undergoing
system verification or system validation, an integrated model of the macrosystem it is a
part must be the model that is used for system verification and system validation when
using models or simulations for Analysis.
This is also an issue when applying this concern to individual subsystems and system
elements that are part of the integrated system. For example, a model of a pendulum can
be developed. However, if there is a need for a system with two connected pendulums,
the model of a single pendulum cannot be added to another copy of the model to produce
a model of the two-pendulum system because it is a different system and the interaction
of the two pendulums must be included in the model to accurately model the behavior of
the two-pendulum system.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 313

Likewise, a model can be developed for an automobile and a model of a trailer, but the
two models cannot be added together to form a model of the integrated system consisting
of an automobile attached to the trailer. Again, the integrated system is a different
system and the interaction between the automobile and the trailer determines the behavior
of the integrated system - for example, the integrated behavior when the operational
environment includes icy roads.
Note: It should be noted that with the advent of MBSE, model-based design, and the
increasing use of modeling and simulation some practitioners of MBSE have proposed the
use of modeling and simulation as a fifth system verification and system validation method.
While this change is well underway, this Manual uses the four classical methods discussed
in this section.
Analysis by Engineering Assessment
This category of Analysis uses engineering judgement for a collection of information to provide
a logical outcome of results. This can include an assessment of a set of design features to show
that a safety failure tolerance is in place (such as a hazard analysis or FMEA), a set of processes
to show that a desired protocol will be enacted (such as a ground operation analysis), and a set of
observations to show capabilities for a service.
This approach is less rigorous than the prior approach using models and simulation as it relies
more on engineering judgement and logic, however it is still a useful approach in certain
applications. For validation that the system meets the needs, analysis by engineering assessment
may be used when it can be determined that the intent of a given need was met by successful
verification that the system met all the child requirements that were transformed from that need.
For example, needs dealing with compliance and with quality (-ilities).
Analysis by Sampling
When multiple copies of a system are being produced, there may be issues concerning
consistency between the copies of the system. In other cases, multiple copies are produced in
“batches”. Just because one copy of the system has been shown to meet a need, design input
requirement, or design output specification; can it be assumed all copies will do so? It is often
cost prohibitive to do system verification or system validation against all copies within a batch.
Based on statistical methods, a sample of a given size will be selected for periodic system
verification or system validation activities. Analysis by sampling is often done as a quality
function during production verification activities as discussed in Section 9 concerning quality of
workmanship during manufacturing.
Factors to be Considered for Analysis as a Method
For Analysis as a Method, the following questions should be considered. In addition to helping
to describe the Strategy, the answers to these questions will also be used to define the system
verification and system validation environment, special conditions, the system verification and
system validation Activity, system verification and system validation procedure requirements,
and resulting Procedures.
• Where will the analysis (activities) be conducted?
• What evidence will be calculated or explained?
• Who will be conducting the analysis (activities)? The project? The vendor? An
independent contractor? What are their qualifications to do this analysis?
• At what stage or level of integration?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 314

• What type of analysis? Similarity, certification, model or simulation, or engineering


assessment?
• If using models or simulations for the Analysis, has the integrated model or simulation for
the SOI been verified, validated, and certified or qualified for this specific use?
o Has the operational environment (natural and induced) been included in the model?
o Have the interfaces with external systems been included in the model?
o How well have the physical aspects of the SOI been modeled?
• What specific data is needed for the analysis?
• How will the data be obtained? What testing is needed on what fidelity of the system
(physics model, engineering test unit, production unit) to obtain the data needed for the
analysis? How much data is needed?
• What level of analysis is needed that will result in the required confidence level?
• What analysis (activity) tools are needed to analyze the data?
• Have the tools to be used for analysis activity been verified and validated?
• Are there changes or differences in the SOI configuration or modeled operational
environment that impact Method of Analysis?
Questions Associated with each System Verification and System Validation Method
As part of determining the Strategy and selecting a Method, Project managers need to know the
answers to the above list of questions for each Method to plan for the resources, cost, and time
needed to implement the project’s system verification and system validation programs as defined
in their MIVV and SIVV plans.
It is best to address these questions both as the project is maturing the lifecycle concepts,
defining the integrated set of needs, and defining the set of design input requirements before the
project unknowingly spends resources on designing or building a system based on a design input
requirement that the SOI cannot be verified to meet or a need that the SOI cannot be validated to
meet, or performing a system verification or system validation Activity that cannot be
accomplished within the project’s budget, schedule, and resources.
System verification and system validation is a knowledge-based set of activities that evolve over
the system lifecycle. The answers to the above questions may not be known until later in the
development lifecycle, needs and design input requirements may change, or the status and
availability of enabling systems may change. Based on these changes, the project team will need
to actively manage the system verification and system validation programs and resulting artifacts
throughout the system lifecycle.
Considerations for Selecting a System Verification and System Validation Method
Risk, Cost, Schedule Considerations
When selecting a method of system verification or system validation it is best to consider factors
of risk, cost, schedule, precision of value, sensitivity of the value, confidence level, and
consequences of not satisfying the need or requirement.
Risk is a major consideration when choosing the Method. This is a particularly prominent issue
from a PM standpoint. Test provides the highest confidence level that the system meets a design
input requirement or need. While it is preferable to use Test as the Method, it may not be
practical for all needs or design input requirements. In some cases, Test may be banned by treaty
(e.g., Nuclear Test Ban Treaty). In many cases the project cannot afford the cost or does not

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 315

have the time or resources to do a full-up test for all design input requirements and needs at all
levels of the system architecture. In other cases, a special facility to simulate the operational
environment or equipment to assess the system’s interactions with other subsystems or external
systems may not be available nor cost effective to develop.
When a need or design input requirement poses a lower risk to the project and a lower
confidence level is acceptable, one of the other Methods may be more appropriate. However,
using Analysis as a Method can be misused or overused resulting in a higher risk to the project
when good rationale for using Analysis is not defined. Reducing the number of system
verification or system validation activities or selecting a lower cost system verification or system
validation Method due to cost overruns or schedule slips can also add risk to the project.
These considerations need to be addressed when defining the Success Criteria, Strategy, and
Method when each need or design input requirement is defined.
Because choosing the system verification and system validation Method is really a cost,
schedule, and risk decision; the Project Manager and Lead Systems Engineer for in-house system
development efforts, and customers for contracted development, need to be involved in the
decision and agree on the Success Criteria (including level of confidence), Strategy, Method, and
organizational roles and responsibilities for system verification and system validation. This is
especially important when contracting development to a supplier. Refer to Section 13 for a more
detailed discussion concerning contractor/supplier considerations for system verification and
system validation.
Need or Requirement Type
The type of need or requirement can also influence which Method is the most appropriate.
Functional/Performance needs and requirements are best verified by Test whenever possible.
Needs or requirements whose action is binary - it either does an action or not based on a defined
trigger, may be best suited for Demonstration. A need or requirement that deals with a physical
characteristic that can be observed by sight, may be best suited for Inspection. Quality type
needs and requirements are most suited for Analysis as a method. Organizations should have
guidelines as to which Method should be used based on the type of need or requirement. These
guidelines should be included in the project’s MIVV and SIVV plans.
Considerations Concerning the Macro System of Which the SOI is a Part
What information is needed to verify or validate the SOI in the context of the next level “macro”
system which the SOI is a part in its intended operational environment when both are being
operated by their intended users? The type and quality of the information needed is dependent
on the Method used.
Failing to verify and validate that the system performs as needed across its external interfaces
and in its operational environment, when both are being operated by their intended users, can
result in major embarrassment when the delivered system fails to perform as expected or meet its
intended purpose in its operational environment, when operated by its intended users (system
validation).
Even though every system element and subsystem that is part of the system’s physical
architecture has been verified to meet their design input requirements and validated to meet their
set of needs, the project must ensure they work together as a whole within the integrated system
before the system is delivered to the customers or released to the public for use. Once integrated,
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 316

can the integrated system be verified to meet its design input requirements and validated to meet
its set of needs?
System verification and system validation of both internal and external interfaces often requires
Test as the preferred Method. (Using Analysis by similarity can be risky for interfaces as
discussed earlier.) While the cost can be high, failure to successfully verify the SOI interacts
with external systems as required across all interface boundaries can lead to major, and even
catastrophic, problems during operations.
Single or Multiple System Verification or System Validation methods?
Should a single Method or multiple Methods be stated for a given system verification or system
validation Activity? This question can be a source of heated discussions. There are those that
feel a SOI should be able to be validated to meet a need or verified to meet a design input
requirement using a single Method. They think that if multiple methods are required to
determine if the end-item meets a need or design input requirement, the need or design input
requirements should be broken into separate statements, each with a single thought that the
system can be verified or validated against.
Others maintain that it is common to use multiple Methods (e.g., Test and Analysis) to obtain the
needed data to obtain definitive evidence that can be used to determine whether the system meets
a need or requirement. Using a combination of methods, the Success Criteria will be established
for each method.
For example, when stating both methods of Test and Analysis, the Success Criteria will define
what test data is needed to provide evidence that will be analyzed to determine that the SOI
meets a performance requirement across a range of operating environments or across a range of
performance values, and what analysis will be done to provide evidence that the entire parameter
range of the requirement is satisfied (this is a common approach when a specific performance
value applies over a range of operating environments.)
One reason for these different perspectives could be a failure to understand the difference
between testing, inspecting, and analyzing as activities), versus Test, Inspection, Demonstration,
and Analysis as Methods (noun) of system verification and system validation.
The concepts of Method (as a noun) and activity (as a verb) are completely different, yet often
this difference is often not well understood nor demonstrated in practice. Conducting a test
(activity) is different from using Test as a Method of system verification or system validation.
The same word is used for each of two quite different concepts.
Test as an activity is used to say a procedure is being executed, i.e., conducting a test procedure.
In fact, test as an activity is part of each the verification Methods of Test, Demonstration, and
Analysis. The same is true when it comes to the word “analysis”, which is used as a Method as
well as an activity. In their verb form, the activities of testing, demonstrating, inspecting, and
analyzing are also key activities used during design verification and design validation discussed
in Section 8.
An approach that can be used to determine the method is to ask whether the activity is on the
actual end-item being verified or validated or some artifact generated during the activity. For
example:

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 317

• Verification by Test and Analysis. Test as a Method involves running multiple “tests”
(activities) to collect data on the SOI that will be used to provide evidence the requirement
or need has been met. Because there are multiple sets of data collected, the data is
“analyzed” (activity) to decide whether the Success Criteria have been met. In this case,
what is being analyzed is the data collected during the test, not the actual end-item being
tested. Thus, the Method of verification is Test, not Test and Analysis
• Verification by Test and Inspection. The words inspection and examination are often
misused when there is a need to inspect or examine (activity) paperwork from other system
verification or system validation Activities as a prerequisite to completing one of the other
Methods.
For example, before running a test procedure (activity) as part of verification by Test to
verify the interaction between two systems (interfaces), the project may want to examine or
inspect (activity) the verification paperwork to make sure each subsystem was verified to
meet its respective interface requirements prior to integrating the two subsystems together
and then verifying that the integrated system performs as required across the interface.
Again, what was inspected was the paperwork, not the actual end-item being verified by
Test. Thus, the Method is Test, not Test and Inspection.
• Verification by Analysis, Test, and Inspection. Analysis as a Method that often involves
testing or inspecting some parts of a SOI to collect actual data to base the Analysis on.
Using this data and the project’s knowledge of the SOI design, an engineering judgment
can be made based on the analysis (activity) of the partial sets of system data to determine
whether the Success Criteria has been met. Again, the tests and inspections were on parts
of the SOI, not the actual end-item being verified by Analysis, thus the Method is Analysis,
not Analysis, Test, and Inspection.
• Validation by Analysis and Inspection. For the validation that the SOI meets a need, the
validation may be based on whether the SOI was successfully verified to have met the
Success Criteria defined for the implementing design input requirements that trace to that
need and it has been determined no other system validation activity is necessary. This
determination is made by first inspecting the system verification records concerning each of the
design input requirements that were transformed from that need and then doing an analysis of the
set of records to determine whether the specific need implemented by those requirements has been
met. Was successful verification that the SOI met each of the design input requirements sufficient
to make the determination that the need from which those requirements were transformed has been
met? In this case the question is what was the primary Method of system validation? “Inspection
because the project inspected the system verification and system validation Records for the
implementing design input requirements or Analysis because the final determination was
– based on the project’s knowledge that the implementing design input requirements were
successfully verified to have been met by the SOI, and
– during requirement verification and requirement validation, it was determined that the
set of implementing design input requirements were necessary and sufficient such that
their implementation results in the Success Criteria defined for the need being met, and
– knowledge of the design, a determination by Analysis can be made that the need has
been met.
Again, what was inspected was the system verification and system validation Records, not
the actual end-item being validated by Analysis. Thus, the Method is Analysis not
Analysis and Inspection.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 318

Whichever perspective is selected should be consistent across the program and defined in the
MIVV plan.
10.1.4 System Verification and System Validation Matrices
System verification and system validation Matrices (SVaM/SVM) are a matrix/table
visualization of the system verification and system validation Attributes associated with each
need and design input requirement often used to help both plan and manage system verification
and system validation activities.
An example SVaM is shown in Table 10-2.

Need ID Need Validation System Validation Critical


Method Success Criteria
SN.La.1 The stakeholders Inspection The intent of this need will be Yes
need the coffee validated to be met when inspection Safety
machine to have of the coffee machine shows the
safety labeling as labels are in place and worded in
defined in labeling accordance with the labeling
standard (TBS). standard.
SN.NF.5 The stakeholders Demonstration The intend of this need will be Yes
need the coffee validated to be met when it is Performance
machine to allow the demonstrated that the user can
user to brew up to six brew up to six cups of coffee at a
cups of coffee at a time without having to replenish
time without having to consumables (coffee beans, water,
replenish and waste control.)
consumables.
SN.NF.22 The stakeholders Analysis The intent of this need will be Yes
need the coffee validated to be met when an Compliance
machine to comply analysis of all system safety
with OSHA consumer requirements derived from this
product safety need have been verified to have
standard (TBS) been met by the coffee machine.
Table 10-2: Example System Validation Matrix.
An example SVM is shown in Table 10-3.
Rqmt ID Requirement Verification System Verification Critical
Method Success Criteria
SR.La.1 The coffee machine Inspection The coffee machine will be verified to Yes
shall display the have met this requirement when the Safety
received safety inspection provides evidence that
certificates in there is a label located as shown in
accordance with drawing xyz showing the received
labeling standard xyz. safety standards.
SR.NF.5 The coffee machine Demonstrati The coffee machine will be verified to Yes
shall allow the on have met this requirement when the Performance
operator to brew six demonstration test of the unit
cups of coffee with a provides evidence that the unit does
volume of 236 ml for allow an operator to brew up to six
each cup without cups of coffee with the specified
refilling the system volume in a single load of coffee
with coffee beans, beans, water, and without having to
water, and without empty the waste in between cups.
emptying the waste.
SR.NF.22 The coffee machine Analysis The coffee machine will be verified to Yes
shall meet OSHA have met this requirement when the Compliance
consumer product analysis provides evidence that all
safety standard (TBS) parts that make up the system, child
requirements as requirements were derived that met
shown in applicability the intent of the requirements in the
matrix xxx. applicability matrix allocated to the
parts AND that each part was
successfully verified to have meet
those derived child requirements.
Table 10-3: Example System Verification Matrix.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 319

Note: In the above examples, only a sample of the possible fields (columns) are shown due to
space. Organizations will often include more columns based on their needs.
These matrices provide a snapshot of the project’s planned system verification and system
validation programs and provide assurance that one or more system verification and system
validation Activities will be defined to address each need and design input requirement, the
scope of the system verification and system validation program is well understood, and that each
Activity is planned, defined, and all are included in the project’s MIVV Plan and SIVV plan for
the SOI under development.
These matrices are created for each subsystem and system element within the system architecture
as well as for the integrated system. The SVaM will contain a listing of all the needs in a SOI’s
integrated set of needs. The SVM will contain a listing of all the requirements in a SPO’s set of
design input requirements.
Key information contained in both system verification and system validation matrices can
include the following information. Note: The specific information included will be defined in the
project’s MIVV and SIVV Plans.
• The need or requirement identifier and the need or requirement statement
• Proposed Success Criteria, Strategy, and Method (Test, Demonstration, Inspections,
Analysis)
• Criticality: Whether the need or requirement is critical in terms of functionality,
performance, safety, security, or compliance.
• Integration level within the physical architecture at which the system verification or system
validation Activity will take place
• Project phase in which the system verification or system validation Activity will take place
(e.g., design, purchasing, manufacturing, assembly, integration, commissioning).
• Organization responsible for the execution of the system verification or system validation
Activity, Procedure, and production of the Execution Record.
• “Occurrence” - how often the system verification or system validation Activity needs to be
repeated based on updates to the configuration (per serial number) or once (per Drawing
number).
• Need [or Requirement] system verification or system validation Description Sheet (NVaDS
or RVDS) Identifier (Refer to Section 10.1.5)
• Need [or Requirement] system verification or system validation Activity Description Sheet
(ADS) unique identifier when known (Refer to Section 10 1.6)
• System verification or system validation Activity name or identifier (when known)
• System verification or system validation Procedure number and name (when known)
• Organization responsible for submitting the system verification or system validation
Execution Record to the Approving Authorities
In the past, using a document-centric approach to SE, these matrices were created manually,
using a common office word processing tool or spreadsheet. However, in a data-centric practice
of SE, the information displayed in the matrices is included in the SOI’s integrated or federated
dataset. As such, the project’s toolset should be able to generate these matrices as reports which
could be imported into a spreadsheet, if desired. If the organization has a separate module within
their project toolset dedicated to recording and managing the system verification and system
validation information and activities, this information would be defined and managed within that
module.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 320

The information contained in these matrices will be used for more detailed system verification
and system validation planning and updated as needed.
10.1.5 System Verification and System Validation Description Sheets
An aid to managing an individual system verification and system validation Instance is the use of
system verification and system validation description sheets (VaDS or VDS) [46]. The VaDS and
VDS are visualizations that expand on the information in the System Verification and System
Validation Matrices including additional supporting information for a specific system
verification or system validation Instance.
There should be one VaDS or VDS for each row in the System Verification and System
Validation Matrices. Below is an example of information that may be included:
1. Need or Requirement number and text
2. Success Criteria
3. Strategy
4. Method
5. Criticality
6. Operational Environment: What are the environmental conditions under which the SOI will
be verified or validated to meet the subject need or requirement? This includes
environmental conditions such as temperature, pressure, altitude, humidity, vibrational
loads, etc., as well as the operational environment needed to perform the system
verification or system validation Activities. This could be environmental characteristics
such as mountainous terrain, underwater, specific rainfall amounts, electromagnetic
interference conditions, or other such environmental constraints necessary to determine
whether the operation of the system is per the intent of the design criteria. Depending on
the level of architecture the SOI. Also included are the external interfaces as well as the
users (intended or surrogate) when doing system verification or system validation
activities. The operational environment should be defined when the Strategy is defined.
7. Special Conditions: These are the special conditions (e.g., item configuration) necessary to
determine that the SOI verified or validated against not only nominal operating conditions
but worst-case conditions or boundary conditions, if possible. The angle at which a line
replaceable unit must be positioned relative to rainfall would be considered a special
condition, e.g., place the line replaceable unit at 45° angle to the rain path and conduct
functional testing periodically (at a minimum of five minutes) throughout the course of the
test. Again, special conditions should be defined when the Strategy is defined.
8. Rationale: The rationale for why the Strategy and Method were chosen. For example, why
a Method of Analysis versus Test. Why a specific configuration for the system verification
or system validation Activity?
9. Information associated with the implementation and management associated with each
system verification or system validation Instance.
10. Information associated with the closure of the system verification or system validation
Instance.
For each SOI (System, subsystem, or component) there will be a set of VaDSs or VDSs. The set
of VaDS or VDSs for an SOI are grouped together. In a document centric practice of SE, the set
would be contained in a System Verification [or System Validation] Description Document
(VDD or VaDD) or electronic equivalent. An example VaDS /VDS is shown in Figure 10-5.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 321

Figure 10-5: Example VaDS or VDS.


Ideally, the information contained in a VaDS or VDS is recorded and managed electronically
within the SOI’s integrated or federated database. This information along with the needs and
design input requirements statements and attributes would allow the information in the VaDS or
VDS to be developed within the toolset.
With this approach, the VaDS /VDS would be generated as a report from the toolset. All the
data items in the attributes in the need or requirements expressions associated with system
verification and system validation, the system verification and system validation matrices, and

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 322

the VaDS or VDS would be recorded only once resulting in the individual data items in all
system verification and system validation artifacts being consistent and current. A change in a
data item would be reflected in all views that include that information.
It is important to maintain traceability throughout the system development lifecycle and link all
the artefacts associated with system verification and system validation planning, defining,
executing, reporting, and approval for each system verification and system validation Instance.
This should be able to be done within the project’s SE toolset.

10.2 Defining Stage


At the defining stage, when sufficient design detail is available and the integrated set of needs
and set of design input requirements are mature enough, the organization responsible for
executing the system verification and system validation program can begin defining specific
system verification and system validation Activities, system verification and system validation
procedure requirements for that activity, and Procedures.
“Mature enough” is subjective; if the set of needs or design input requirements are not complete
and are evolving, defining system verification and system validation Activities may result in
unnecessary rework. However, waiting too long to define system verification and system
validation Activities could result in resource, budget, and schedule issues. Defining the details
associated with each system verification and system validation activity early in the system
lifecycle minimizes the risk of system verification and system validation cost overruns schedule
delays.
For example, to complete a given system verification or system validation Activity or set of
activities, a test facility or other enabling system many need to be modified or constructed, a
thermal-vacuum chamber may be needed for environmental testing, or special test and support
equipment may be needed to collect the data needed as evidence to determine that the Success
Criteria has been met as defined by the Strategy for each system verification and system
validation Instance.
In some cases, the resources or enabling systems may be shared with or owned by another
organization. The project team will need to budget for the use and possible modifications as well
as ensure the availability and readiness of these resources or enabling systems are consistent with
the project’s system verification and system validation schedule and budget.
10.2.1 System Verification and System Validation Activity Definition Sheets
A system verification or system validation Activity is a specific activity that is defined, for the
purpose of verifying the SOI meets one or more design input requirements or validating the SOI
meets one or more needs.
A system verification or system validation Activity may address more than one system
verification or system validation Instance e.g., dependent functional performance requirements
along with the requirements dealing with conditions of use and operating environment. There
are often cases where multiple needs can be the focus of a single system validation Activity or
multiple design input requirements can be the focus of a single system verification Activity.
There are also cases where a single system verification or system validation Activity could
address both system verification and system validation for a given need and design input
requirement transformed from that need.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 323

A tool that is useful for gathering and managing key information associated with a system
verification or system validation Activity is the Activity Definition Sheet (ADS) [46] shown in
Figure 10-6.

Figure 10-6: Example ADS.


The ADS is a visualization of the system verification or system validation planning artifacts
developed as a precursor to developing the specific system verification or system validation
requirements that will be used by the project team to develop a system verification or system
validation Procedure.
Considerations for combining multiple system verification or system validation Instances within
a single system verification or system validation Activity include:
• A functional requirement may have multiple performance requirements associated with that
function, as well as related requirements dealing with conditions of use, the operational

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 324

environment, and quality. In such cases, it may be possible to verify each of these
requirements within the same system verification or system validation Activity, often
concurrently.
• The Method is the same.
• Doing multiple inspections, tests, or demonstrations on the same part or component, in the
same location
• The Strategy is similar in terms of the operational environment, configuration of the SOI,
conditions of use, facility, support equipment, command and control, data acquisition,
personnel, etc.,
For each system verification and system validation Activity, the project team members
responsible for system integration, system verification, and system validation will use
information for each system verification or system validation Instance from the system
verification or system validation Description Sheets as well as answers to the questions
addressed when defining the Strategy and selecting the Method to collect key information
needed to carry out the system verification or system validation Activity.
Below is an example of the types of information that could be collected for each system
verification and system validation Activity:
• Activity Title: A title that clearly communicates the nature of the Activity.
• Activity Number: A unique identification number for the Activity.
• Type of Activity: System verification or system validation
• System verification or system validation Instance(s): List of Instances (needs or design
input requirements) included within this Activity.
• System verification or system validation Description Sheet(s): Identifier or Pointer to the
system verification or system validation Description sheets for each Instance included in
the Activity.
• Activity Location: Where will the Activity be performed?
• Hazardous operation: Is this a hazardous operation? Is a hazard analysis needed?
• System verification or system validation Procedure: Identifier for the implementing
Procedure.
• Schedule: When is the Activity planned to be performed and the expected overall duration
(hours/days)? These dates must be consistent with the other activities included in the
Project’s Master Schedule.
• Predecessor Activity(s): Are there any prerequisite Activity(s) that must be completed
before this Activity can be performed?
• Successor Activity(s): Are there any other Activity(s) that cannot be executed before this
Activity has been completed? Is this activity part of a larger (parent) activity? If so, which
Activity(s).
• Constraints: Are there any constraints to the performance of the Activity? Include
anything that limits or constraints the performance of the Activity. Also include
impacts/constraints on other activities during the performance of this task. For example, no
other work is allowed in test area while this Activity is being performed.
• Workmanship Codes/Standards: List any workmanship codes or standards with which this
Activity must be compliant.
• Resources Needed: A description of the equipment/ components/ assemblies/ subsystem/
systems involved in the Activity. List of any resources needed to perform this task
(utilities: steam, power, GN2, air) as well as any other systems, portable equipment, leak

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 325

test unit, power supply, etc. that are needed during the performance of the Activity. Do any
of the resources need certifications for their intended use?
• Documentation: Do new checklists and/or procedures need to be developed to perform this
Activity? Or are there existing checklists or procedures that can be used? Are there any
existing supplier checklists or procedures that can be used perform parts or all the Activity?
• Organizations/Personnel: What key organizations need to be involved in the planning
and/or performance of the Activity? (Project Engineer, Test Director, Supplier,
Safety, Security, Quality, Technicians, Test Operations, Others)?
• Training/Certifications: Are there any training/certifications required by personnel
involved in the Activity?
Ideally, the information within the ADS is recorded and managed electronically within the SOI’s
integrated or federated database. The information contained in the ADS would allow the ADS to
be developed within the project’s toolset and the form shown in Figure 10-6 would be generated
as a report from the SE tool.
Using this approach all the data in the system verification and system validation matrices, VaDS
or VDS, and ADS would be recorded only once resulting in the individual data items in all
system verification and system validation artifacts being consistent. A change in one data item
would be reflected in all other views that include that data.
Again, traceability is important. For each VaDS or VDS, once the information displayed in the
ADS has been defined, the VaDS or VDS the ADS is implementing should be updated with the
ADS number and linked together within the project toolset.
10.2.2 System Verification and System Validation Procedure Requirements
Definition
Note: In the past, system verification or system validation “requirements” were used to state the
Method, Strategy, and Success Criteria for each design input requirement or need [43]. The
approach used in this Manual, is to define the Method, Strategy, and Success Criteria within the
set of attributes for a design input requirement or need as discussed in Section 15. What was
missing before was the concept of defining specific requirements on the organization performing
each system verification or system validation Activity that would be implemented within a
Procedure that would be used to address the steps and actions needed for that Activity. To
address this, the concept of “Procedure Requirements” is used as described in this section.
A project's system verification and system validation Activities are implemented via system
verification and system validation Procedures. The steps and actions within a Procedure are
defined based on a set of requirements that are implemented by the Procedure.
The Procedure Requirements consist of a set of requirements statements concerning the details
involved in implementing the Strategy and Method defined for each system verification or
system validation Instance that will result in objective evidence that a need or design input
requirement has been satisfied by the SOI as defined by the Success Criteria for each Instance
included in the Activity or Activities addressed by the Procedure.
These procedure requirements are written as shall statements from the perspective of the
organization responsible for planning and conducting the system verification and system
validation Activities. i.e.,

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 326

“The [organization] shall [perform some action associated with the [system verification or
system validation] Activity],”
“The [Operator] shall [stimulate the SOI in some way],”
“The [Operator] shall [record/document] [the result of the stimulation].”
When defining the Procedure Requirements, the project’s system integration, system
verification, and system validation teams will use information related to each Instance from
several sources:
• The applicable VaDS or VDS.
• The answers to the questions addressed when determining the Strategy and selecting a
Method for each system verification and system validation Instance discussed in Sections
10.1.2 and 10.1.3.
• The information contained in the ADS.
• Requirements associated with the facility being used.
• Requirements associated with the systems the SOI will be interfacing with during the
Activity.
• Requirements associated with the any special support equipment being used.
• Answers to the following questions:
o Where will the system verification or system validation Activity be performed?
o What enabling systems are needed? What certifications or qualifications are needed to
use the enabling systems for this specific use?
o What power is needed? Will the facility supply power directly to the SOI, or to a
project supplied power supply? Does the quality of the power and power connections
need to be verified before being connected to the SOI? Is there an existing procedure
for operating the facility power supply or project supplied power supply?
o How will the interfaces to external systems be addressed - connecting with actual
external systems or is an emulator or simulator needed?
– What actions are required to configure and operate the external systems, emulators,
or simulator? Is there an existing procedure for doing so?
– What certifications or qualifications are needed to use the emulators or simulators
for this specific use?
– What power is needed for the external systems?
o What external command and control capability is needed and other support systems?
o For each Instance, what are the actions needed that will result in the data needed
defined in the Success Criteria.
o What data is needed to be displayed to the operators conducting the Procedure?
o Has the required test code been inserted or access to test points established to allow the
needed data to be collected?
o What data must be recorded? At what rate? At what bandwidth? What volume of data
needs to be recorded? In what form does the data need to be recorded and format
supplied to the organization responsible for the Activity being addressed by the
Procedure?
o What environmental conditions need to be provided during the Activity? Actual or
simulated? Is a capability to adjust the environmental conditions across a range
needed?
o Are there any special conditions or configurations of the SOI expected during the
performance of the Procedure?
o Are there specific requirements specified with a standard or regulation that must be
complied with in the execution of the Procedure?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 327

o Who needs to be involved in the system verification or system validation Activity?


Intended users/operators or surrogates? Customer or Customer representative?
o Who must observe the test, demonstration, or inspection activity, sign off that the
activity was performed in accordance with the Procedure, perform the analysis of the
data resulting from the Activity?
o What training or certifications do the personnel need to have to participate in their
assigned role?
o What safety and security considerations are there?
o What resources are needed to complete this activity?
o How long will it take to complete all steps and actions defined in the Procedure? How
much will it cost?
o Who is responsible for preparing the system verification or system validation Execution
Record that documents the result of executing the Procedure?
o Who is needed to signoff that the Procedure is ready to be used? Has been completed?
The operators of the facility, external systems, and special support equipment may have their
own set of requirements that drive and constrain the system verification and system validation
Activities that are performed within the facility. There may be safety and security provisions
that must be followed, especially for hazardous operations or operations involving classified or
sensitive systems. Key personnel will be needed to conduct the steps and actions specified
within the Procedures. Who supplies these personnel? There are cases where these personnel
may need to be certified to conduct certain operations.
Determination of the procedure requirements is based on the specific project. In some cases, the
customer may perform system verification or system validation activities, in other cases the
customer or regulatory agency may require the supplier to provide objective evidence the system
has successfully passed system verification and system validation in the operational environment
when operated by the intended users.
As discussed in Section 13, in the case of a customer/supplier contractual agreement, the specific
roles, responsibilities, and deliverables must be clearly documented in a contract. The customer
may levy requirements concerning performing a system verification or system validation
Activity on a supplier in addition to the design input requirements as a means to impose
contractual requirements on how the system will be verified or validated and to provide the
system verification and system validation Execution Records as part of the contract deliverables.
Approaches to system verification and system validation may vary depending on the type of
contracts issued by the project - firm fixed price versus level of effort versus cost plus as
discussed in Section 13. In some instances, the customer may choose to direct the system
verification or system validation Activities via specific requirements, in other cases the customer
may specify requirements that are negotiable, and in other cases they may only specify the
Success Criteria, Strategy, and Method for each system verification or system validation
Instance. When this is the case, each line in the SVM and SVaM is a system verification or
system validation Instance and the information in the matrix for that Instance is treated as
contractual requirements for the supplier. The supplier will then be responsible for developing
the VaDSs and VDSs, ADSs, Procedure Requirements, Procedures, Execution Records, and
Approval Packages.
Within a project, requirements for their in-house system verification and system validation
programs are developed in accordance with the processes defined in their MIVV and SIVV

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 328

plans. In the case of a regulatory agency, the specific roles, responsibilities, and deliverables
will often be documented within a regulation. (An example of this is for medical devices
controlled by the Federal Food and Drug Administration (FDA)).
10.2.3 System Verification or System Validation Procedure Development
A system verification or system validation Procedure consists of a sequence of steps or actions,
which result in the collection of data that will be used as evidence that the system meets the
Success Criteria defined for each system verification or system validation Instance within a
given Activity in accordance with the set of procedure requirements for the Activity the
Procedure applies.
For each system verification or system validation Instance included in the Activity, the
Procedure Requirements associated with each system verification or system validation Instance
are implemented within the Procedure. For example, an Activity may require a site visit where
the SOI will be verified to meet multiple requirements whose Method is Inspection. The set of
inspections is divided into a series of steps or actions within the Procedure. Each series of steps
or actions may focus on one or more specific inspections such as witnessing the correct
configuration of piping, orientation of pumps, or inspecting several aspects of a mechanical part
to see if it was assembled as shown in the engineering drawing included within the design output
specifications.
For the above inspection example, as part of defining the procedure requirements, the project
team will need to coordinate with the integration and quality organizations to ensure the proper
steps are planned in the sequences of assembly operations of that part or component to ensure the
inspection steps are invoked properly and at the right time within the assembly sequence.
While the specific form of Procedure will vary from one organization to another, the procedures
are not created in a vacuum. Developing well-formed Procedures is a complex process. Before
a Procedure can be written, there is a lot of preparation.
The enablers shown in Figure 10-7 must be available, or the Procedure cannot be developed nor
executed. The organizational processes, procedures, and work instructions must be complied
with; the system verification or system validation facility, and support equipment must be
“ready” to support the steps and actions as specified in the Procedure.
“Ready” means that all test, support equipment, emulators, simulators, and models must have
been identified, modified, or built, have gone through their own system verification and system
validation processes, and have been certified for use for this purpose. A means to command and
control (if applicable) the SOI that is the subject of the Procedure must exist along with the
means to collect, display, and record the data that results from executing the steps and actions
within the Procedure that will be used as evidence that the SOI meets its needs, requirements, or
specifications.
The preceding sections walked the reader through the processes needed to define the inputs
shown in Figure 10-7. These include developing System Verification and System Validation
Matrices for each subsystem and system element within the system architecture as well as for the
integrated system, developing the SVDS or SVaDS for each system verification and system
validation Instance being addressed within a specific Activity, the ADS for the Activity, and the
Procedure Requirements to which the Procedure is being developed.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 329

Inputs V&V Procedure


• System verification and
Development
validation Matrices Output
• Prepare for Procedure
• System Verification and System • Approved Procedures
Development
Validation Description Sheets
• Write the Procedures
(VaDS or VDS)
• Approve the Procedures
• Activity Definition Sheet (ADS)
• Procedure Requirements
• Safety requirements
• Security requirements
• Facility requirements, Enablers
procedures and checklists • Organizational process for
• Support equipment developing verification and
requirements, procedures, and validation Procedures
checklists • Enterprise Quality Work
• Operating procedures and Instructions
instructs for use • Enterprise Safety Procedures
• Enterprise Security Procedures
• Verifications or Validation
Facility
• Verifications or Validation
Test/Support Equipment
• Command & Control System
• Data Collection System
• Qualified and certified
Personnel

Figure 10-7: System Verification or System Validation Procedure Development IPO Diagram.
In addition to this information, there will be organizational requirements dealing with quality,
safety, and security. There will also be requirements concerning operations within the facility as
well as requirements concerning the use and operation of the test and support equipment. All
these inputs must be reflected within the Procedure.
Once the preparations are complete, the Procedure can be written, reviewed, and approved.
Given that the Procedure is a work product (and could be a contract deliverable), the review is
really another verification and validation activity applied to the Procedure.
In many cases, procedures or checklists may already exist for common tasks such as operating
facility systems, set up and operations of support equipment, etc. In addition, operating
procedures and instructions for use will have been developed as part of defining the conditions
for use. It is a best practice to use these operating procedures and instructions for use during
system verification and system validation. The organization should have validated the operating
procedures, instructions for use, and checklists prior to using them during system verification or
system validation.
When these are available, the Procedure will call out the execution of applicable steps and
actions within the existing procedures, instructions for use, and checklists rather than including
them within the Procedure itself.
The output of this process is an approved Procedure that is ready to be scheduled for execution
as a system verification and system validation Event within the project’s Master Schedule.
Once the Procedure identifier has been assigned, this identifier should be added to the ADS for
which the procedure is implementing, the VaDSs or VDSs for each system verification and
system validation Instance, and the SVM or SVaM.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 330

It is important to maintain traceability throughout the system development lifecycle. The


Procedures should be linked to the needs, design input requirements, or design output
specifications the system is being verified or validated against. This can be done within an SE
toolset and can be included for each system verification and system validation Instance for each
subsystem, system element within the system architecture as well as the integrated system. The
various system verification and system validation artifacts listed as inputs also need to be linked
together. This traceability is critical to managing changes to any of the system verification and
system validation artifacts to ensure consistency.

10.3 Execution Stage: Performing the System Verification and System


Validation Procedures
During the Executing stage, the schedule for when each Procedure is to be performed is added to
the project’s Master Schedule as a system verification and system validation Event. A system
verification and system validation Event is a scheduled event that will result in the performance
of a Procedure at the date and time specified in the Master Schedule.
Frequently, the project’s Master Schedule is developed and managed within a dedicated
scheduling application. Ideally, the system verification and system validation artifacts in the
SOI’s integrated/federated database can be linked to the system verification and system
validation Events in the project’s Master Schedule. This is important, in that in many cases
scheduling tools are not only used to schedule an Event, but also address the resources needed
for, and costs associated with, that Event to be allocated and tracked. This allows the project
team to monitor cost and schedule and better manage the project’s system integration, system
verification, and system validation programs as specified in the project’s MIVV Plan and SIVV
Plans.
Per the project’s Master Schedule, the steps and actions within the Procedure(s) are executed to
obtain the data needed to provide the evidence that the system meets the Success Criteria defined
for a specific Instance associated within each Activity addressed by the Procedure. As these
steps and actions are completed, the results are recorded.
System verification and system validation are formal processes, often with legal and contractual
implications. The integrity of the data collected as a result of Procedure execution is of utmost
importance. Because of this, the organization’s Quality Assurance (QA) office needs to be
involved in monitoring the steps and actions and certifying the data was recorded accurately. In
some organizations this involves a quality “stamp” for each step or action that resulted in data
being obtained and recorded. There also may be an overall sign-off for the each completed
Procedure by QA personnel. To help ensure integrity, it is important that the QA function is
conducted independently from the project.
For the execution of a Procedure by a supplier, the customer must clearly state in the contract the
need for the QA function, as well as the roles of both supplier and customer QA personnel during
Procedure execution, and the required deliverables. For some projects, the customer may specify
“mandatory inspection points” where the customer’s QA representatives are present to witness
the execution of a particular step or action in the Procedure.
Prior to executing a Procedure, many organizations will have a Test Readiness Review (TRR) or
other similar gate review that begins the formal System integration, system verification, or
system validation series of activities. For cases where a supplier is responsible for conducting
the Procedures, the customer may be present at this review if specified in the contract.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 331

For each scheduled Event, it is common for the executing organization to have a pre-test
readiness review with all personnel that will be involved in the execution of a Procedure. At this
meeting, the organization will determine the readiness of the SOI and support equipment,
facilities, and personnel that participate in the performance of the Procedure. Assuming the
focus of a Procedure is the design input requirements, the readiness assessment could include a
review of the results of the early system verification and system validation, design verification
and design validation, and incremental system verification and system validation activities as
well as production verification and acceptance activities concerning whether the built or coded
SOI is in compliance with the design output specifications and whether or not there were any
nonconformance issues, waivers, or deviations.
If the SOI to which the Procedure applies has interfaces with external systems, emulators or
simulators, the organization will assess the readiness of those systems concerning their ability to
safely interface with the SOI during the execution of the Procedure.
The organization will also assess the readiness of the facility, test/support equipment, the
Command and Control System, and Data Collection System needed to support the execution of
the Procedure.
The organization will make sure the Procedure has been approved and that participating
personnel are certified for their roles and will be available at the time the Procedure is scheduled.
Depending on the safety, security, and criticality of the SOI undergoing the Procedure, the
organization may also conduct a table-top, page-by-page review of the Procedure with all
participants prior to the actual execution of the Procedure.
While the likelihood of a failure of the SOI “under test” is reduced if the organization has
completed the design verification, design validation, early system verification, early system
validation, and production verification actions as described and advocated in this Manual,
problems may still be uncovered.
When a problem occurs during execution of the steps and actions within the procedure, the
organization will troubleshoot and identify what the problem is. It could be an issue with
manufacturing that was not uncovered during production verification against the design output
specifications, an installation/integration problem, a failure of the SOI itself, or an incorrect
performance of a step or action within the Procedure. Whatever the cause, the organization will
have to determine the course of action, fix the defect or anomaly within the SOI, redesign the
SOI, or get a waiver or deviation. In the cases of either fixing or redesign, there will be a need to
rerun the Procedure.
Needs and design input requirements’ attributes as discussed previously, allow the project to
both track the status of the Procedures execution as well as the results.
Upon completion of the Procedure, it is common for the executing organization to have some
form of closeout process or post-test review. This involves a review of the completed
procedures, any problems found during execution, problem resolution, quality “stamps” of
applicable steps or actions and sign off and approval of the Procedure’s execution.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 332

10.3.1 Formal System Verification or System Validation Event Representative


Process
Because qualification, certification, and acceptance of the SOI is based on the results of system
integration, system verification, and system validation activities, a more formal approach is often
used than what is used during needs, design input requirements, design verification, design
validation, early system verification, and early system validation performed during development
prior to formal system verification and system validation.
This formality often involves the participation of project managers, the customer, regulatory
agencies, and other key stakeholders in the preparation and approval of qualification,
certification, and acceptance plans and Procedures. These formal system verification and system
validation processes are often associated with government contracted system development or the
development of highly regulated systems. The specific artifacts, events, reviews, and approval
process will be documented in the project’s MIVV Plan and SIVV Plan.
If the customer contracts these series of system verification and system validation activities to a
supplier, the system verification and system validation planning artifacts and events are formal
contract deliverables that will be specified in the contract as discussed in Section 13.
Whether the project team or their customer conducts system integration, system verification, and
system validation activities, these activities usually involve QA representatives, test
conductor(s), users, facility personnel, safety, security, and customer witnesses. While the
specific process and types of reviews may vary depending on organization, domain, and product
type; a representative approach is defined below.
• Development of formal qualification, certification, and acceptance system verification and
system validation planning artifacts defined earlier in this Manual. This involves review
and iteration with the project manager, the customer, and/or regulatory agencies until the
system verification and system validation planning artifacts are agreed upon.
• Dry run(s) and approval of the Procedures. Given that system acceptance is a major
milestone that precedes final payment for the system or approval for use and release to the
public, it is critical that performance of the Procedures goes smoothly without unexpected
issues occurring during procedure execution. Dry runs of the Procedures are often
performed multiple times until the steps are error free, and the test conductors know exactly
how to execute the procedures. Once a sufficient level of confidence in the procedures as
been achieved, the procedures can be approved for use. Procedure review and approval is a
prerequisite to the activities discussed below.
Note: with the increased use of behavioral models and the concept of the “digital twin”,
early system verification and system validation as discussed previously can be conducted
as part of design verification and design validation activities. As part of these activities the
Procedures developed for system verification and system validation should be used
whenever possible. This will result in issues being resolved in both the design as well as
with the procedures themselves prior to starting formal system integration, system
verification, and system validation activities. For example, a sequence diagram that
matches the system verification or system validation Procedure will provide early insight
into issues that can be resolved prior to execution of the Procedure for formal system
verification or system validation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 333

• Test Readiness Review (TRR): A TRR often precedes each test phase (FQT, FAT, SAT).
The TRR is often a formal gate review that must be passed prior to the execution of a
Procedure or family of procedures. At the TRR, an overall assessment of readiness of the
system, procedures, and personnel is conducted. A TRR will typically also address system
configuration (including any simulators or emulators), risk, and other information pertinent
to the test.
• Formal Qualification Test (FQT): Sometimes, especially when there are large numbers of
design input requirements, and sets of requirements, an FQT phase may precede the
execution of the system verification and system validation acceptance procedures. The
FQT is a series of formal activities that involves the project manager and/or the customer
that are designed to provide evidence that can be used to determine compliance
(verification) with all contractual requirements. The FQT activities may use an
environment and users/operators that is different than that expected during operations.
This environment or test inputs are meant to stimulate the system in a particular way to
verify the system meets each requirement. This is not a validation test.
• Factory Acceptance Test (FAT): Often, but not always, the development organization will
conduct a series of FAT activities at their facility that are witnessed by the customer. The
FAT series of activities, to the extent possible given they are not usually in the operational
environment, are designed to obtain evidence that can be used to determine that the SOI
meets the customer’s and other stakeholder’s needs (system validation but in a more
controlled (and often less expensive) environment. System level SOI design input requirements
may undergo final system verification during the FAT series of activities. While the focus
of the FAT is more system validation against the integrated set of needs, system design
input requirements may undergo final verification during the FAT.
• Site Acceptance Test (SAT): A system validation series of activities whose successful
completion results in customer or Approving Authorities acceptance of the SOI for use or
release to the public. After the SOI is delivered to the customer’s location or location of
intended use, the SAT activities are executed in the operational environment with the
intended users to validate system operability and to perform a final system verification of
the interfaces with external systems. The SAT activities will often execute operational
scenarios - usually “day in the life” type scenarios based on use cases or an operational
scenario that exercises critical functionality and performance of the system. Depending on
the contract type, this is equivalent to the final DT&E event. As an example, the US DoD
requires that the DT&E acceptance be by the contracting branch of the government (e.g.,
Air Force procurement) transferring the system from the contractor to the government (e.g.,
Air Force). This is followed by an OT&E event conducted by an independent agency (e.g.,
AFOTEC) prior to authorizing operation by military personnel.
• Post Test Review (PTR): A PTR often concludes each test phase (FQT, FAT, SAT) of the
acceptance process. At the PTR, the result of each Procedure is presented, along with a list
of any deviations from the Procedure, Success Criteria, and any non-conformances. The
nature of any issues is discussed to determine if they are acceptable or to agree on a course
of action to resolve the issue. The severity and type of issues are reviewed. If the project
manager, the customer, or regulatory agencies agree that the system is acceptable as is,
then the deviations and discrepancies may become liens that the system developer will
need to work off. If the deviations and discrepancies are determined to be too severe, then
the Procedure fails, and the development organization will need to resolve the issues and

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 334

redeliver the updated system prior to final acceptance for use by the intended users in the
operational environment.
• Test Report (Execution Record): The system verification and system validation Execution
Record provides a formal written record of all formal tests. Usually, a separate report is
done for the FQT, FAT and SAT. The results of all procedures are documented, along with
a complete list of deviations and waivers. The Execution Records are used to develop the
system verification and system validation Approval Packages.
10.3.2 Discrepancies and Non-conformances
When the Success Criteria for a given system verification or system validation Instance are not
met, the discrepancy or non-conformance must be recorded in the applicable system verification
or system validation Execution Record and reported to management for follow-up action and
closure. Failure to meet the Success Criteria is a failure to provide evidence that the SOI
complies with a need or design input requirement contained in the established configuration item
(CI) baseline.
Follow-up actions could include one or more of the actions:
• Repeat the system verification or system validation activity to confirm the non-
conformance.
• Develop a troubleshooting plan to identify the possible cause of the non-conformance.
• Redesign of the part of the system that failed system verification or system validation and
subsequent repeat of the system verification or system validation activity. (This could have
a significant impact on the budget and schedule.)

In some cases, when redesign is not feasible due to cost and schedule constraints, it becomes
clear the project, or their suppliers, cannot comply with a need or design input requirement
contained in the established CI baseline.
There may be any number of reasons for this occurring. Normally, these non-conformances
would be rectified using the formal engineering change process as discussed in Section 14, such
as:
• Request a change to the baselined need, design input requirement, or design output
specification.
• Request a change to the system verification or system validation Success Criteria.
• Request a change to the Strategy.
A change to a need or a design input requirement could have a domino effect that could result in
changes to other design input requirements, the architecture, design, and design output
specifications associated with the changed need, requirement, or related artifacts.
The risk of non-conformance during system integration, system verification, or system validation
is reduced if the organization follows the needs definition, design input requirements definition,
design verification, design validation, early system verification, and early system validation
activities presented in this Manual.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 335

10.3.3 Variances, Concessions, Waivers, and Deviations


However, there are situations when departures from baselined needs, design input requirements,
or design output specifications may be accepted by the customer or Approving Authority without
making a change to the CI baseline.
CM calls these special cases requests for variance [i] (previously called deviations or waivers
[1], [30], [31]) or concessions [23]. Note that a variance differs from an engineering change in
that an approved engineering change requires corresponding revision of the CI’s current
approved baseline, whereas a variance does not.
Note: There are various standards that use a range of terminology when talking about
discrepancies and non-conformances. Although the terms ‘waivers’ and ‘deviations’ are still in
common use, the US DoD [30] has moved away from using ‘waivers’ and just uses ‘deviations’.
Some CM standards do not use the terms ‘waivers’ and ‘deviations’ at all. calling these special
cases either ‘requests for variance’ [1] or ‘concessions’ [23] yet acknowledge that the terms
waivers and deviations are still in use.
Deviations and Waivers
In some organizations, the older terms of deviations and waivers may still be in use. Deviations
and waivers are forms of request for variance—although, strictly speaking a deviation is the
closest to a request for variance.
• A deviation is defined as ‘A specific written authorization, granted prior to the manufacture
of an item, to depart from a particular requirement(s) of an item’s current approved
configuration documentation for a specific number of units or a specified period of time.’
[32]

• A waiver is defined as ‘A written authorization to accept an item, which during


manufacture, or after having been submitted for Government inspection or acceptance, is
found to depart from specified requirements, but nevertheless is considered suitable for use
‘as is’ or after repair by an approved method.’ [32]
The principal difference between these two types of variances relates to when the variance is
authorized. Deviations are essential decisions made before the event (design, production, system
integration, system verification, or system validation) to allow the project to continue without
unnecessary delay. Waivers are granted after the event and, as tacit acceptance of failure to meet
requirements, are becoming a less commonly accepted means of allowing a departure from the
baseline. Note again that deviations and waivers differ from an engineering change in that the
CI’s current approved baseline is not amended.
Variance Management
When dealing with a discrepancy or non-conformance, it is important to know both the priority
and criticality of the need or design input requirement, or design output specification the current
SOI is unable to meet.
When requesting a variance, the customer or other Approving Authorities will want to see an
analysis of the impacts of the discrepancy or non-conformance concerning the ability of the
realized SOI to achieve its mission. For low priority or non-critical needs or design input
requirements, if it can be shown that the overall impact on the mission is minimal and the high

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 336

priority and critical needs and design input requirements can still be met, they are more likely to
approve the variance.
Once approved, the variance is included in the Execution Record and compliance matrix, where
it is noted that the system verification or system validation Instance was closed with a variance.
When there are waivers, often the waiver is a one-time occurrence, and the need or design input
requirement is left unchanged. The waiver is approved based on the SOI being able to still meet
the high priority and critical needs and design input requirements and achieve its mission. For
future versions of the system, the customer’s expectation is that the project will find a way to
meet the baselined need or design input requirement that is temporarily being waived.
When there is a deviation, the developing organization may request from the customer or
Approving Authority a permanent variance when it is determined the need or design input
requirement, as written, is not feasible within current cost, schedule, and technology constraints
or cannot ever be met. In these cases, the project or supplier request from the customer or
Approving Authority for a variance to tailor the baselined requirement to what is feasible using
the organization’s Configuration Management Process.
As in the case for a waiver, the customer or other Approving Authorities may choose to keep the
requirement as-is (there may be other suppliers that may be able to meet the requirement) or they
assume the requirement will be able to be met in the future once critical technologies mature.
Either way, the acceptance of the discrepancy or non-conformance with variance is still
considered closed whether the SOI passed or failed system verification or system validation of
that specific system verification or system validation Instance.
From a contracting perspective, it is best for the supplier to avoid accepting requirements that are
not feasible. From a customer’s perspective they should do the necessary analysis to have some
level of confidence as to what is feasible before issuing a contact. To do this, feasibility must be
addressed during lifecycle concept analysis and maturation as discussed in Section 4 resulting in
needs and design input requirements and sets of needs and sets of requirements that have been
assessed for feasibility. Failing to do so will result in significant technical debt in the form of
expensive and time-consuming contract changes.
For any contract, the supplier wants to have a clear definition of the problem, what is needed,
and what they evidence that need to provide for the customers to accept the product. Clearly
defining this information in the contract helps to mitigate litigation. Best practice is to ensure
everything is recorded, and what is recorded is feasible.

10.4 Reporting Stage: Documenting the Results


During the Reporting stage, an Execution Record for each Activity is created after the
completion of each Procedure associated with that Activity. The Execution Record will state the
status and outcome of the Activity in terms of whether the results provide sufficient evidence
that the Success Criteria for each system verification and system validation Instance were met.
The family of Execution Records for the SOI are combined into Approval Packages.
Execution Records formally document the results of the execution of the Procedures. There will
be one Execution Record for each Activity as shown in Figure 10-2. The results of the
Procedures will be recorded in one or more forms of objective evidence. This evidence can take
the form of a formal report, data set, or a form like the VADSs and VDSs. Regardless of its

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 337

form, each piece of objective evidence must be uniquely identifiable and stored in a
configuration managed document or database. The Execution Record should contain the
following types of information:
• A unique identifier of the Execution Record. This identifier will be used to locate and
access the Execution Record. If stored within the project’s toolset, this identifier can be
used as a pointer to the Execution Record.
• Date when the Procedure was completed that generated the data within the Execution
Record.
• Location where the Procedure was executed.
• Name of the organization responsible for the execution of the Procedure.
• The Quality Control (QC) process that was used to manage the integrity of the data.
• The name of the Quality Control person(s) that was monitoring the test and who signed off
on the integrity of the data collected.
• The Success Criteria that were to be met.
• The Strategy and Method used to collect the data.
• The environment and any special conditions in which the data was collected.
• Description and form of the data collected.
• Description of the analysis that was used to determine whether the data collected provided
sufficient evidence that the Success Criteria was met.
• A statement of conformance or non-conformance by the executing organization and person
doing the analysis and making the pass/fail judgement.
The preparation of the Execution Records will often be done concurrently with the close-out
activities for the Procedure discussed earlier. Once the Execution Records are complete, they are
assembled, along with any other information needed by the Approving Authorities, into
Approval Packages for submittal to the Approving Authorities.
In addition to the Execution Records, other records included in the Approval Packages may
include:
• A Certificate of Conformance to the standard or regulation, often applicable to design and
manufacturing processes.
• Approved waivers, deviations, or exceptions.
• Evidence in component end item data packages (design output specifications), such as a
materials and parts list or a test report.
• Evidence collected in build (postproduction artifacts) records, such as specific inspections
showing wire bundles, grounding measurements, etc.
• Evidence that demonstrates that the design was developed in accordance with the approved
design plan and system design outputs specifications (design verification and design
validation).
• Evidence that demonstrates that the device was manufactured in accordance with the
approved processes and design output specifications for the system (Production
verification).
As an example, for medical devices developed under the oversight of the FDA, CFR Title 21,
Part 820 defines the process organizations must follow and the set of records that must be
developed, maintained, and submitted to the FDA to get a medical device approved for its
intended use. The requirements in this regulation include key definitions for parts of the process
including design inputs, design outputs, specifications, design reviews, design verification,
design validation, process validation, and many other definitions.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 338

Concerning compliance and record keeping the regulation defines three key records and
requirements for each:
• Design History File (DHF) is a compilation of records which describes the design history
of a finished device. The DHF contains or references the records necessary to demonstrate
that the design was developed in accordance with the approved design plan and the design
input requirements. The results of the design verification, including identification of the
design, method(s), the date, and the individual(s) performing the verification, are
documented in the DHF.
• Device History Record (DHR) is a compilation of records containing the production history
of a finished device. Each manufacturer is required to maintain DHR's. Each manufacturer
is required to establish and maintain procedures to ensure that DHR's for each batch, lot, or
unit are maintained to demonstrate that the device is manufactured in accordance with the
DMR and the requirements of this part.
• Device Master Record (DMR) is a compilation of records containing the procedures and
specifications for a finished device. The DMR for each type of device includes, or refers to
the location of, the following information:
(a) Device design output specifications including appropriate drawings, composition,
formulation, component specifications, and software specifications.
(b) Production process specifications including the appropriate equipment specifications,
production methods, production procedures, and production environment
specifications.
(c) Quality assurance procedures and specifications including acceptance criteria and the
quality assurance equipment to be used.
(d) Packaging and labeling specifications, including methods and processes used; and
(e) Installation, maintenance, and servicing procedures and methods.
The total finished design output consists of the device, its packaging and labeling, and the
DMR.
In context of what is presented in this Manual, the DHF includes the design inputs including the
set of needs and set of design input requirements. It would also include the Execution Records
and Approval Packages that provide sufficient evidence the realized medical device was verified
to have met the design input requirements and validated to have met the set of needs.
The DHR includes all the records associated with production verification. The DHR includes all
the design output specifications, which via production verification, the medical device was
manufactured and coded to, the production procedures and processes used to manufacture and
code the medical device as well as the quality assurance processes and procedures used during
production verification. It would also include all the packaging, labeling, instructions for use,
installation, maintenance, and servicing procedures.
10.4.1 Chain of Evidence Showing Conformance or Compliance
The project must maintain and manage records that provide a chain of evidence of conformance
to and compliance with the set of needs, set of design input requirements, and set of design
output specifications. Of special importance is compliance with the customer’s requirements,
standards, regulations, and needs and requirements associated with the mitigation of safety and
security risk.
The chain of evidence of conformance or compliance could be complex, given the various levels
of needs, design input requirements, the design implementation of those requirements, the design
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 339

output specifications, manufacturing/coding that implemented those specifications and all the
system verification and system validation artifacts developed and data gathered to determine
compliance. There could easily be thousands of system verification and system validation
Instances and hundreds of Execution Records included in the system verification or system
validation Approval Packages, depending on the size and complexity of the SOI under
development.
Because of this, the organization must address how they will record this chain of evidence of
conformance/compliance in their SEMP, MIVV, and SIVV (or equivalent type plans.) These
plans must specify the approach the project will use compile records that provide specific
evidence or to generate a summary document that builds on assessments and evidence to
determine that the system is compliant with its set of needs, set of design input requirements, and
set of design output specifications. It is important for an organization to clearly identify the
processes and resulting records they will develop and maintain. Customers, regulatory agencies,
and other Approval Authorities must clearly define their requirements for records that are needed
to determine compliance.
Often the organization will have an internal “compliance” or “quality” group responsible for
both the CM of the sets of needs and requirements and resulting system integration, system
verification, and system validation artifacts as well as to work with individual projects within the
organization throughout the development lifecycles to help ensure compliance. This compliance
group will also interact with the external regulatory agencies to make sure the intent of the
customer requirements, standards and regulations are being met as well as to ensure the objective
evidence needed to determine compliance and obtain certification or qualification and
acceptance is properly documented and submitted to the regulatory agency in accordance with
the requirements defined by the agency.
Many regulatory agencies, as well as customer’s, will want the project to show traceability
between the requirements from the customer, relevant standards and regulations, concepts to
meet them, needs that communicate the which specific standards the project will be compliant
with, the resulting design input requirements that address what the must be done to meet the
needs, the implementing architecture and design, design output specifications, production,
production verification, the end system, and the project’s system verification and system
validation activities that result in the objective evidence that proves that the intent of the relevant
customer’s requirements and standards and regulations have been met.
Using a medical device company as an example, as part of the development process for
pharmaceuticals and medical devices the FDA is concerned with quality and safety, especially
during use. To address this, the project is expected to perform a detailed UFMEA as discussed
in Section 4. During the UFMEA all the things that could go wrong during manufacturing,
shipping, use, and disposal are identified. The project must then assess the risk associated with
each hazard, determine which ones they will mitigate and how. Mitigation could involve people
(skills, certifications, training), process procedures, Instructions for Use (IFU), and/or the
medical device itself. If it is the medical device, the FDA wants to see traceability from
individual risks, concepts, needs, design input requirements, and the design outputs (design,
specifications, manufacturing, system verification and system validation. This traceability must
be documented in the Design History File (DHF) and Device Master Record (DMR) discussed
previously.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 340

10.4.2 Use of Compliance Matrices


The results of the system verification and system validation Activities for each need and design
input requirement the SOI was verified or validated against should be tracked as soon as the
Procedure has been completed. This can be done using the attributes for each need or design
input requirement expression as defined earlier. This information can then be used to generate
summary reports referred to as a System Verification Compliance Matrix and System Validation
Compliance Matrix (SVCM and SVaCM).
SVCM or SVaCM are a matrix/table visualization of the system verification or system validation
information that lists the needs or design input requirements, the system verification or system
validation event, system verification or system validation result in terms of compliance
(pass/fail), and a summary of the objective evidence that was used to determine compliance or a
pointer to where the evidence is located.
Table 10-4 shows an example of a simple SVCM, each design input requirement is listed as a
row.
Verification Verification Verification
Req ID
Event Result Evidence
Coffee Pot Assembly Pass Execution Record xxxxx
SR.La.1 Inspection Procedure
xxxxx
Coffee Pot Pass Execution Record xxxxx
Performance
SR.NF.5
Demonstration
Procedure xxxxx
Coffee Pot Analysis Pass Execution Record xxxxx
SR.NF.22
Procedure xxxxx
Table 10-4: Example System Verification Compliance Matrix (SVCM).

Some organizations will include the information shown in Table 10-4 as part of their SVM and
SvaM discussed in Section 10.1.4
The resulting matrix provides a useful visualization of this information for each system
verification or system validation activity, providing the project team with the ability to evaluate
the status of the system verification or system validation process on the path to certification and
approval for the SOI’s intended use in its operational environment. For projects with a large
number of needs and requirements the use of this form may be of limited use. Modern SE tools
allow the generation of dash boards that provide a status and summary of the project’s system
verification and system validation activities using the attributes defined for each need and design
input requirement as discussed in Section 10.6.
In the past, in a document-centric approach to product development, these matrices were created
and managed manually in an office application, however, in the data-centric approach to product
development advocated in this Manual, the information needed to create these matrices is
included as part of the needs and design input requirement attributes and the SOI’s
integrated/federated dataset.
Using this data and information, the projects toolset should be able to generate these matrices
automatically as reports which could be imported into a spreadsheet or document, if desired. If
the organization has a separate module within their project toolset dedicated to recording and

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 341

managing the system verification and system validation information and activities, this
information would be defined and managed within that module.

10.5 Approving Stage: System Approval


During the approving stage, the Approval Packages are submitted to the Approving Authorities
for approval (acceptance, certification, readiness for use, or qualification). Given System
verification and system validation are bottoms-up processes, they are repeated for each
architectural entity (subsystem, system element, or integrated system).
The Approving Authority is any individual, group of individuals, or organization that has the
authority to approve the system for use in its operational environment by its intended users. The
Approving Authorities could be a combination of internal or external customer(s), a regulatory
agency, or a third-party certification organization. The Approving Authorities (a) decide what
constitutes necessary for acceptance, and (b) determines what is necessary for acceptance.
The approval process should be well defined in the project’s SEMP, MIVV plan, and SIVV
plans. For regulatory agencies, the process is often defined as part of the regulations governing
the system under development. Some organizations will conduct a formal System Acceptance
Review (SAR) or Readiness for Use Review as part of the approval process.
Assuming the project follows the process defined by the Approving Authorities and followed the
system verification and system validation processes for sets of needs, sets of design input
requirements, design, and system verification and system validation defined in this Manual, the
risk of non-approval is low. Sadly, this may not be the case. In the previous FDA examples, one
of the major reasons for non-approval was the failure to follow the defined product development
process and submit the required records to the Approving Authority - in this example the FDA.
For many products developed for use around the world, there will be multiple Approving
Authorities, each with different defined approve processes and associated requirements for
documentation and records. For example, US DoD programs there is a Developmental Test an
Evaluation (DT&E) process for system verification and Operational Test an Evaluation (OT&E)
process for system validation. USC Title 9 requires these processes to be conducted by different
organizations. In this case, the project will have to be in conformance/compliance with each set
of regulations and go through multiple system verification and system validation approval
processes.
There can be multiple outcomes involved with system approval including:
• Acceptance is an activity or series of activities conducted before transition of the SOI from
supplier to customer against predefined and agreed to “necessary for acceptance” criteria
such that the customer can determine whether the realized SOI is suitable to change
ownership from supplier to the customer. Acceptance can include system verification,
system validation, certification, and qualification activities or a review of system
verification, system validation, certification, and qualification results is completed in
accordance with the necessary for acceptance criteria as agreed to in a contract.
• Certification is the result of some audit or a written assurance that the realized SOI has
been developed, and can perform its assigned functions, in accordance with legal or
workmanship, design, and construction standards (e.g., for an aircraft, consumer product,
or medical device). The development reviews, system verification, and system validation
results form the basis for certification. Often certification is performed by a third party to
determine compliance with the applicable standards. As such, a product could have

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 342

multiple certifications for compliance by multiple certification organizations. Many


standards include requirements for specific methods (test, demonstration, analysis, or
inspection) required to be used for certification to that standard. For example, Conformité
Européenne (CE) certification in Europe and Underwriters laboratories (Ul) certification in
the United States and Canada. Certification activities are separate from the standard
system verification, system validation, and qualification activities, but may use the results
of these activities.
• Qualification. System qualification requires that all system verification, system validation,
and required certification actions have been successfully performed. The qualification
process demonstrates that each subsystem and system element that is part of the system
physical architecture and the integrated system, meet the applicable needs, design input
requirements, and design output specifications, including performance and safety margins.
Because qualification includes testing at the extremes and testing to failure, special
qualification versions of the SOI are developed as “qualification units” that are
representative to what requirements and specifications are being qualified. Qualification
activities can be done as a subset of design verification and design validation as well as
system verification and system validation.
• Readiness for Use. A determination of readiness for use by Approving Authorities based
on an analysis of the system verification, system validation, certification, and qualification
results. This may occur multiple times in the system lifecycle, including the first article
delivery, completion of production (if more than a single system is produced), and
following maintenance actions. In the field, particularly after maintenance, it is necessary
to establish whether the system is ready for use. The readiness for use determination could
be made by a supplier prior to submitting the realized SOI to the customer or regulatory
agency for acceptance or by the customer prior to making the SOI available for operations
or release to the public.
The system verification and system validation approval process can be long, complex, and
frustrating. Because of this, the focus of the project must be on both the approval process
requirements what is “necessary for approval” in addition to verifying the SOI meets the design
input requirements and validating the SOI meets its integrated set of needs.

10.6 Use of Attributes to Manage System Verification and System


Validation Activities
As discussed in Section 15, there are needs and design input requirements attributes to help
manage the projects system verification and system validation programs across the system
development lifecycle. Using these attributes, tools within the project’s toolset should be able to
generate reports and dash boards that allow the project team to target various aspects of the
project’s system verification and system validation programs based on these attributes.
Many current tools allow the user to define a dashboard display that includes a graphical
representation of key metrics based on the selected attributes. This is only possible if the project
includes in the tool database schema the attributes that contain the information needed to produce
these reports and dashboards at the beginning of the project AND keeps the information within
each attribute current.
This set of attributes can be used to help track and manage the system verification and system
validation programs and status to make sure the designed and built system meets the set of

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 343

design input requirements (system verification), set of design output specifications (production
verification), and the set of needs (system validation).
This set of attributes can be used for developing many of the system verification and system
validation artifacts discussed in this section as well as provide metrics that management can use
to track the status of the project’s system verification and system validation programs.
Below is a list of attributes that should be included in each need or design input expression for
projects to be able to use attributes to help manage their system verification and system
validation programs. (Refer to Section 15 for a more detailed discussion on attributes and
definitions of each.
A1 - Rationale: intent of the need or requirement, reason for the existence of the need or
requirements
A6 - System Verification and System Validation Success Criteria (Refer to Section 10.1.1 for
a more detailed discussion on Success Criteria)
A7 - System Verification and System Validation Strategy: (Refer to Section 101.2 for a more
detailed discussion on Strategy.)
A8 - System Verification and System Validation Method: (Refer to Section 10.1.3 for a more
detailed discussion on Methods.)
A9 - Responsible Organization: The organization that is responsible for system verification
and system validation for the need or requirement.
A10 - System Verification and System Validation Level: Architecture level at which the system
verification or system validation activity will be performed to obtain evidence that the
SOI meets the requirement (verification) or need (validation). Possible values could
include: <system>, <subsystem>, <assembly>, <component>, <hardware>, <software>,
<integration>, etc.
A11 - System Verification and System Validation Phase: Lifecycle phase in which the system
verification or system validation activity will be performed to obtain evidence that the
SOI meets the requirement (verification) or need (validation). Possible values could
include design, coding/testing, proof testing, qualification, and acceptance.
A12 - Condition of Use: operational conditions of use expected in which a need or requirement
applies. This information can be used to set up the environment in which system
verification or system validation activities need to take place.
A13 - System Verification and System Validation Results: The results of each system
verification or system validation activity.
A14 - System Verification and System Validation Status: Indicates the status of the system
verification or system validation activities.
Attributes for priority, criticality, and safety risk could also be useful.

10.7 Maintaining the System Verification and System Validation Artifacts


This Manual uses a specific ontology of terms for the various types of data and work products
needed to successfully execute and manage the project’s system verification and system
validation programs. These include system verification and system validation Instance, Method,
Strategy, Activity, Procedure, Event, Execution Record, Approval Package, and Approving
Authorities.
A major point made in the RWG whitepaper, “Integrated-data as a Foundation of SE” [20], is that
all the SE and PM project data and information should be recorded and managed within an
integrated/federated dataset. This allows each data item to exist in a single location.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 344

Project’s Integrated/Federated Dataset


for the SOI Under Development

Visualizations of the System Verification and Validation Data and Information

System System Activity System System System Models,


Verification Verification Description Verification Verification Verification Reports, &
& Validation & Validation Sheets & Validation & Validation & Validation Dashboards
Matrices Description Procedures Execution Approval
Sheets Records Packages

Figure 10-8: Visualizations of the Project’s System Verification and System Validation Data and
Information.
As shown in Figure 10-8, the various system verification and system validation artifacts:
matrices, descriptions, sheets, procedures, execution reports, and approval packages along with
any models, reports, and dashboards used to manage the project’s system verification and system
validation programs should be thought to be different visualizations of this single set of data and
information. The basic data included in each visualization is stored in a single location and then
visualized as a report based on the needs of the project.
A key advantage of this data-centric approach is that a change in one piece of information will be
reflected automatically no matter the visualization. If the Method for a specific system
verification and system validation Instance is changed, all matrices, reports, and dashboards will
reflect that change. If the Success Criteria are updated, those updates will again be reflected
across all the various visualizations.
From a CM perspective, it is the integrated set of data that is managed, rather than the individual
visualizations as was done in the past using a document-centric approach to PM and SE.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 345

Section 11: SYSTEM VERIFICATION AND SYSTEM VALIDATION


PROCESSES

After the subsystems and system elements that are part of the SOI physical architecture have
been built or coded and passed production verification, the concepts of system verification and
system validation take on a formal meaning.
Each of these processes represent a set of activities that cumulate with one or more gate reviews
associated with the qualification, certification, and acceptance of the SOI by the customers or by
regulatory agencies for release for use by the intended users. Because of the formality and legal
aspects associated with the system verification and system validation processes and the need to
provide documentation of the objective evidence obtained resulting from those processes with
the required degree of confidence, system verification and system validation are separate and
distinct processes within the system development lifecycle.
Some organizations focus only on system verification rather than both system verification and
system validation. While the methods discussed in Section 10 are used for both system
verification and system validation, the intent and focus of each process is much different as
shown in Figure 11-1.

System Validation
“Did we build the
right thing?”

Design Inputs Design Outputs

Integrated Set Transformation Transformation Transformation Realized


Design Input Design Output
Lifecycle Concepts of Needs Design Input Requirements Architecture Specifications System System of
and Needs Requirements and Design Implementation, Interest
Definition Definition Definition Integration

System Verification
“Did we build
it right?”

Derived from Ryan, M. J.; Wheatcraft, L.S., “On the Use of the Terms Verification and Validation”, February 2017

Figure 11-1: System Verification and System Validation Processes.


System verification is used to obtain objective evidence of compliance with the system’s set of
design input requirements as well as to detect errors/defects/ faults in the built/coded physical
system. System verification process activities are the official “for the record” activities
performed on a SOI to obtain objective evidence that is used to determine whether it meets its set
of design input requirements defined during Design Input Requirements Definition activities
discussed in Section 6.
System validation relates back to the integrated set of needs, use cases, user stories, operational
scenarios, and lifecycle concepts defined during Lifecycle Concepts and Needs Definition
activities discussed in Section 4. System validation determines whether the designed, built, and
verified system, subsystem, or system element will result or has resulted in a SOI that meets its
intended purpose in its operational environment when operated by its intended users and does not
enable unintended users to negatively impact the intended use of the system.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 346

To do this, whenever feasible, system validation is conducted under the actual operational
conditions by the intended users. In addition to validating the SOI meets the integrated set of
needs, system validation also used to access emergent properties (good and bad) and system
behavior not expressively communicated via its set of needs or set of design input requirements.
To focus only on system verification and limiting system validation activities could result in a
system that does not meet the stakeholder’s real-world expectations.
To be successful, objective evidence is required that the set of design input requirements and the
integrated set of needs have been met by the realized SOI with the required degree of confidence.
While unusual, it is possible for a SOI to pass system verification and fail system validation; it is
also possible for a SOI to fail system verification yet pass system validation. In either case the
root cause was most likely defective integrated sets of needs or set of design input requirements.
To help prevent these failures, needs verification, needs validation, design input requirements
verification, requirements validation, design verification, design validation, early system
verification, and early system validation must be done during development to help ensure
successful system verification and system validation during system integration as discussed
earlier in this Manual.
System Verification and System Validation per Level
A system may have several levels of subsystems and system elements within its physical
architecture. Because of this, system integration, system verification, and system validation are a
bottom-up series of activities. These activities begin with system verification and system
validation of lower-level system elements against their needs and requirements, integrating those
into higher level subsystems, doing system verification and system validation of the higher-level
subsystems against their needs and requirements, integrating those subsystems into the integrated
system and finally completing system verification and system validation of the integrated system
against its needs and requirements.
Thus, every subsystem and system element within the system physical architecture is verified to
meet its set of design input requirements and validated to meet its set of needs in their
operational environment before being integrated into the next higher level of the physical
architecture.
Any issues or discrepancies must be corrected before a subsystem or system element is
integrated into the next higher-level entity. A basic strategy is too complete system verification
and system validation activities at the lowest possible integration level of the physical
architecture that makes sense. This ensures that system verification and system validation is
demonstrated at the earliest practical time to identify system verification and system validation
problems early in the system integration process when corrective measures typically have lower
cost and schedule implications.
A major activity that should be completed prior to integration of a subsystem or system element
into the next higher-level entity in the physical architecture is system verification and system
validation of the interactions across interface boundaries. Does the subsystem or system element
meet its design input interface requirements and its design output interface specifications? Will
the subsystem or system element meet its needs in terms of interactions with other external
systems in its operating environment?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 347

Experience has shown that a major source of defects found during system integration, system
verification, and system validation activities occur both at the interface boundaries and the
interactions across those boundaries. These types of risk should have been identified and
mitigated during the lifecycle concept analysis and maturation activities discussed in Section 4
and the Architectural Definition Process and reflected in the integrated set of needs and resulting
design input requirements. The Design Definition Process will then implement the design input
requirements and communicate their design via the sets of design output specifications.
Production verification will verify the subsystems and system elements were built in accordance
with the design output specifications. System verification and system validation activities will
then determine whether the SOI meets these needs and requirements with the required level of
confidence.
For highly regulated safety critical systems, system verification and system validation are
processes defined within the regulations and standards. The release of the product for use by the
public are dependent upon successful qualification, certification, and approval for use by
Approval Authorities within the regulatory agency.
System verification and system validation Success Criteria, Method, Strategy, and system
verification and system validation procedure requirements that are levied on suppliers impose the
same philosophies described herein, ensuring a consistent system verification and system
validation Strategy at all levels of integration. Section 13 goes into more detail concerning
customer/supplier relationships in terms of system verification and system validation.
Managing the Project’s System Verification and System Validation Programs
In the progress of the project, it is important to know, at any time, which needs the SOI has not
been validated against, which design input requirements the SOI has not been verified against,
the status of all system verification and system validation activities, anomalies discovered, and
non-compliances. This knowledge enables project managers to better manage the budget and
schedule as well as estimate the risk of non-compliance against the possibly of eliminating some
of the planned system verification and system validation actions to meet budget and schedule
constraints.
Using the data-centric approach advocated in this Manual, the data and information associated
with system verification and system validation will be maintained within the SOI’s integrated
dataset and reports and dashboards will be able to be provided within the project’s toolset. This
enables the project team to have accurate and current status of all system integration, system
verification and system validation activities.
More details concerning managing the project’s system verification and system validation
programs are included in Section 14.

11.1 System Verification Process


The purpose of the system verification process is to provide objective evidence with an
acceptable degree of confidence that:

• The transformation it to the SOI has been made “right” according to the design input
requirements and design output specifications in accordance with the defined Success
Criteria.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 348

• No error/defect/fault has been introduced during the Design Definition Process


transformation of design input requirements to design output specifications, or during the
production process of transforming the design output specifications into the realized
physical SOI.

• The selected verification Strategy, Method, and Procedures will yield appropriate
evidence that if a fault were introduced, it would be detected.
The focus of system verification is on the physical SOI and subsystems and system elements that
make up the SOI. During system verification the design input requirements are not being
verified, the SOI is being verified that it conforms or is compliant with its design input
requirements. Any verification of the design input requirements and sets of design input
requirements should have been done during the development and baseline of the design input
requirements as discussed in Sections 6, 7, and 14.
System verification is performed as part of system integration as discussed in Section 2, against
the set of SOI design input requirements the SOI is being verified. During integration, the
verified and validated system elements and subsystems are assembled to form the incremental
aggregate of the SOI using the defined assembly procedures, the related integration enabling
systems, and the interface definitions.
Prior to integration of system elements or subsystems into the next higher level of the physical
architecture, system verification is completed to verify the correct implementation of their design
input requirements and to verity the system elements or subsystems were built correctly in
accordance with their design output specifications (production verification). Of special
importance is the system verification and system validation of the system element or subsystem
interfaces to avoid issues that often occur at interface boundaries during integration.
A summary of the System Verification Process is shown in Figure 11-2.

Inputs Outputs
SOI that is to be verified System Verification Activities • Verified subsystems and system
• Verified & validated set of • Prepare for System Verification elements within the SOI physical
design input requirements • Perform System Verification architecture as well as the
against which the SOI will be • Manage System Verification Results integrated SOI
verified • Completed and signed off
• Design verification & validation verification Pocedures
records • Verification Approval Package
• Early System verification & including the Verification
Enablers Execution Records and other
validation Records
• Enterprise Product Development documentation and records
• Production Verification Records
Process required for qualification,
• Approved non-conformances,
deviations, waivers, and • Regulatory Agency processes & certification, and approval.
requirements • Non-conformance reports
exceptions
• Project MIVV Plan • Waivers/Deviations.
• Project SIVV Plan • Updated System Verification
• Trained systems engineers Description Sheets
• Enterprise quality processes • Updated Activity Description
• Enterprise safety processes sheets
• Enterprise security processes • Updated System Verification
• Enabling verification facilities, test Matrices
equipment, and support • System Compliance Matrices
equipment • Updated requirement attributes
dealing with system verification
• Entities to be submitted for
configuration control

Figure 11-2: System Verification IPO Diagram.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 349

11.1.1 Prepare for System Verification - Planning and Defining


As shown in Figure 11-2, there are several enablers to successful system verification. These
include an enterprise product development process that defines each development lifecycle stage,
a project MIVV plan, and specific SIVV Plans for each system element and subsystem within the
SOI physical architecture. It is critical the project team members responsible for planning for
and implementing the project’s system verification program are trained in these processes.
In addition, all system verification activities will need to adhere to the enterprise’s Quality,
Safety, and Security processes. If the SOI is governed by a regulatory agency, the system
verification activities must be conducted in accordance with the requirements in the governing
regulations and other guidance documents issued by the regulatory agency.
Finally, all needed enabling systems such as facilities, test equipment, and support equipment
must be approved for use to support the project’s system verification activities. The facilities
need to have the ability to simulate the operational environment. If the actual external systems
are not available, the capability to simulate or emulate interactions with external systems is
required.
Inputs to the System Verification Process include the SOI that is to be verified and the verified
and validated set of design input requirements the SOI is being verified against.
A major input to system verification is the completion of design verification and early system
verification activities prior to baselining the sets of design output specifications for each entity
and the production of each entity.
Another key input is successful completion of production verification discussed in Section 9
where each entity was verified to have met its design output specifications, i.e., “built to spec”.
Other inputs include the results of the design verification and design validation, early system
verification and system validation, and production verification records for each entity. These
records include information concerning any nonconformance’s, deviations, waivers, or
exceptions.
As part of the planning stage, the system verification Success Criteria, Strategy, and Method, are
defined and included as attributes for each of the design input requirements for each entity.
During the defining stage, for each entity, verification Instances are grouped into verification
Activities and Activity Description Sheets developed. System verification procedure
requirements are defined, and Procedures are developed in accordance with their Procedure
Requirements, reviewed (verified and validated), and approved.
11.1.2 Perform System Verification Activities - Executing
In the executing stage, once the Procedures for each entity have been approved, they will be
scheduled for execution as system verification Events within the project’s Master Schedule.
Each scheduled Event represents a commitment of personnel, time, and equipment.
As described previously, prior to the execution of each Procedure, there will be a TRR or similar
review as well as a separate pre-test review to establish readiness to execute the Procedure:
availability and configuration status of the SOI, the availability of the verification enablers,
qualified personnel or operators, resources, etc. The Procedures should be performed in the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 350

operational environment or one as close to it as possible; the verification Strategy for each
verification Instance should cover what operational environment the Procedure should be
conducted in.
During the execution of the Procedures, the required data is gathered, documented, and approved
by the organization’s QA organization that was monitoring the performance of the steps and
actions within the Procedures. Any anomalies are documented and resolved. The Procedure, or
portions of a Procedure, may be repeated as needed as part of anomaly resolution.
Once a Procedure has been completed, often there will be a PTR or similar review to review the
status and results of the executed Procedure and any issues that occurred. Anomalies observed
during the execution of the Procedure are recorded and resolved (corrective actions or
improvements) using the organization’s QA process.
The anomalies could be due to the verification Strategy, the enabling systems, execution of the
Procedure steps and actions, faulty test equipment, a faulty design, poorly formed design input
requirements, poorly formed design output specifications, or a manufacturing or coding defect.
Problem resolution and any subsequent changes will be managed through the organization’s QA
and Project Assessment and Control Processes. Any changes to the SOI definition artifacts (i.e.,
integrated set of needs, set of design input requirements, architecture, design, set of design output
specifications, or interfaces) and associated engineering artifacts and PM work products are
managed within the Needs, Requirements, Verification, and Validation Management activities
discussed in Section 14.
Once these issues have been addressed, the completed Procedures will be signed-off in
accordance with the organization’s Configuration Management Process. Any issues or non-
conformances will be resolved prior to final signoff of each completed Procedure.
“Signed-off” refers to key project team members to include their signatures certifying that the
Procedure was completed, all data collected is accurate, and all issues and anomalies identified
during the execution of the Procedure have been resolved.
11.1.3 Manage System Verification results - Reporting and Approving
For each system verification Instance covered by a Procedure, the results will be recorded in an
Execution Record and maintained in accordance with organizational policy.
The recorded data will be analyzed against the Success Criteria defined for each design input
requirement to determine whether the SOI being verified meets its design input requirements
with an acceptable degree of confidence. Any issues or non-conformances will be documented
within the Execution Record.
Bidirectional traceability is established between the system verification artifacts and the design
input requirements against which the SOI was being verified against. How this traceability is
managed should be defined in project’s SIVV Plans or SEMP.
The individual Execution Records are combined into Approval Packages and submitted to the
Approving Authorities for approval.
The project team will assess success of the system verification activities. The evaluation of
system verification results and follow-up corrective action can vary depending on the purpose of

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 351

the verification activity, the risk of the original requirements not being met, and expected degree
of confidence.
For lower-level subsystems or system elements within the SOI physical architecture, this could
be a simple action to address a failed subsystem or system element followed by re-verification,
or a more significant action such as a major project re-direction based on a failure to attain a key
milestone.
In some cases, a variance may be approved by the Approving Authorities for system verification
failures against non-critical, lower priority design input requirements. Failed system verification
can often lead to a wholesale project re-baseline.
The project team will provide baselined system verification artifacts and verified entities for CM.
The organization’s Configuration Management Process is used to establish and maintain
configuration items and baselines.
The result will be a verified SOI ready to undergo system validation along with all the associated
system verification artifacts.

11.2 System Validation Process


System validation is performed as part of system integration, system verification, and system
validation activities against the integrated set of needs for the SOI being validated. System
validation is a process that normally occurs after system verification, however, there are cases
where system validation and system verification activities can be performed concurrently within
the same procedure.[2]
Of particular importance is system validation of the integrated system. As advocated in this
Manual, the project should manage the integrated system from the beginning of the project. The
concept of integrated testing promotes a continuum of system integration, system verification,
and system validation activities using collaborative planning and collaborative execution of these
activities providing shared data that can be used for independent analysis. [54]
General Considerations
The integrated set of needs the SOI is being validated against are derived from the set of SOI
lifecycle concepts. The lifecycle concepts include operational scenarios and use cases that are
performed in a specific operational environment by the intended users for not only operations,
but during other lifecycles including transportation, storage, installation, operations,
maintenance, upgrades, and retirement. The integrated set of needs address all these lifecycle
activities that represent the stakeholder needs for the SOI as well as expectations for function,
form, fit, quality, and compliance.
Complete system validation must also address all stakeholder needs for each lifecycle.
It is common for the operational scenarios and use cases for each applicable lifecycle to be
exercised during the conduct of the validation procedures within the operational environment by
the intended users. The common aerospace saying “test as you fly, fly as you test” applies.
When using operational scenarios and use cases, in addition to just nominal operations it is
important to address alternate nominal and off-nominal cases including attempts by unintended
users to negatively impact the intended use of the system.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 352

A positive system validation result obtained in a defined operational environment by specific


users can turn noncompliant if the operational environment or class of users changes. These
changes may not be immediately known by the developer; however, changing needs should be
accommodated by the customer and developer’s CM, PM, SE, and acquisition process activities.
During systems validation, especially for walkthroughs and similar activities, it is highly
recommended to involve the intended users/operators under their own local operational
environment.
When the system is validated at a supplier facility or development organization, often the
customer will want to conduct some system validation activities in their own facility, operational
environment, and with the actual users. The stakeholders who participated in defining the
lifecycle concepts and needs must be presented with the results of the system validation activities
to ensure their needs and requirements have been met.
Assessing System Behavior and Emerging Properties
Because the behavior of a system is a function of the interaction of its parts and interactions with
the external systems and operational environment of which it is a part, a major goal of systems
validation is assessing the behavior of the integrated physical system and identifying emergent
properties not specifically addressed in the integrated set of needs or set of design input
requirements.
Emerging properties may be positive or negative. For example, cascading failures across
multiple interface boundaries between the system elements that are part of the SOI’s architecture.
Operating
Environment

System
System
Element
em C|N|R
yst System System Subsystem
bs Element
Su Element
C|N|R C|N|R
System ∂
System System System
C|N|R Element Element
C|N|R
C|N|R C|N|R

System System
Element Element
C|N|R C|N|R

System System
Element Element
C|N|R C|N|R

System System m
te
Element Element ys tem
bs
C|N|R C|N|R Su bsys
Su u
System bsy Subsy System
S
ste ste
m m Element
C|N|R
C|N|R
System
C|N|R

C|N|R: Concepts | Needs | Rqmts

Figure 11-3: Holistic view of the SOI.


Figure 11-3 presents a holistic view of the integrated system that illustrates the many interactions
between subsystems and system elements that are part of the system physical architecture. It is
the sum of these interactions that determine the overall behavior of the integrated system.
Relying on models and simulations of the SOI and operational environment may not uncover all
the emerging properties and issues that occur in the physical realm.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 353

While validation using models and simulations allows a theoretical determination that the
modeled system will meet its needs in the operational environment by the intended users once
realized, the assessment of the actual physical system behavior (system validation) must be done,
whenever possible, with the actual hardware and software subsystems and system elements
integrated into the SOI in the actual operational environment by the intended users.
A summary of the system validation process is shown in Figure 11-4.

Inputs Outputs
System Validation Activities
• The SOI that has passed system • Validated SOI
• Prepare for System Validation
verification. • Completed and signed off
• Perform System Validation
• Verified & validated integrated set validation Procedures
• Manage System Validation n • Validation Package including
of system needs against which the Results
SOI will be validated against. the Validation Execution
• Design verification & validation Records and other
records documentation and records
• Early System verification and required for qualification,
validation records certification, and approval.
Enablers • Non-conformance reports
• Approved non-conformances, • Enterprise Product Development
deviations, waivers, and exceptions • Waivers/Deviations
Process • Updated System Validation
• Regulatory Agency processes & Description Sheets
requirements • Updated Activity Description
• Project MIVV Plan sheets
• Project SIVV Plans • Updated System Validation
• Trained systems engineers Matrices
• Enterprise quality processes • System Compliance Matrices
• Enterprise safety processes • Updated system needs
• Enterprise security processes attributes dealing with
• Enabling Facilities, test equipment, validation per the project’s CM
and support equipment process

Figure 11-4: System Validation IPO Diagram.


11.2.1 Prepare for System Validation - Planning and Defining
As shown in Figure 11-4, there are several enablers to successful system validation. These
include an enterprise product development process that defines each development lifecycle stage,
a project MIVV plan and specific SIVV plans for each system element and system within the
SOI architecture. It is critical the project team members responsible for planning for and
implementing the project’s system verification and system validation programs are trained in
these processes.
In addition, all project system validation activities will need to adhere to the enterprise’s Quality,
Safety, and Security Processes. If the SOI is governed by a regulatory agency, the project will
need to conduct all system validation activities in accordance with the requirements in the
governing regulations and other guidance documents issued by the regulatory agency. Finally,
all needed enabling systems such as facilities, test equipment, and support equipment must be
approved for the project’s system validation activities.
Inputs to the System Validation Process include the SOI that has passed system verification and
the verified and validated integrated set of needs against which the SOI will be validated against.
As part of the planning stage, the validation Success Criteria, Strategy, and Method, are defined
and included as attributes for each of the needs. Using this information, System Validation
Matrices and System Validation Description Sheets are developed.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 354

During the defining stage, validation Instances are grouped into validation Activities and
Activity Description Sheets are developed. Requirements for each validation Procedure are
defined, and Procedures are developed in accordance with the defined Procedure Requirements,
reviewed (verified and validated), and approved.

11.2.2 Perform System Validation Activities - Executing


During the executing stage, once the system validation Procedures have been approved, they will
be scheduled for execution as system validation Events within the project’s Master Schedule.
Each scheduled Event represents a commitment of personnel, time, and equipment.
As described previously, prior to the execution of the Procedure(s), there will be a TRR or
similar review as well as a separate PTR or similar review to establish readiness to execute the
Procedures: availability and configuration status of the SOI, the availability of the validation
enablers, qualified personnel or operators, and resources. For system validation, the Procedures
should be performed in the operational environment or one as close to it as possible using the
intended users; the verification Strategy for each system validation Instance should define the
operational environment the Procedure should be conducted in, and which personnel should be
involved.
During the execution of the Procedures, the required data is gathered, documented, and approved
by the organization’s QA organization that was monitoring the performance of the steps and
actions within the Procedure. Any anomalies are documented and resolved. The Procedure, or
portions of the Procedure may be repeated as needed as part of anomaly resolution.
Once a Procedure has been completed, often there will be a PTR or similar review to review the
status of the executed Procedure and any issues that occurred.
Anomalies observed during the execution of the Procedures are recorded and resolved
(corrective actions or improvements) using the organization’s QA process. The anomalies could
be due to the validation strategy, the validation enabling systems, execution of the validation
procedure steps and actions, defective test equipment, a faulty design, poorly formed needs, or a
manufacturing or coding defect.
Problem resolution and any subsequent changes will be managed through the organization’s QA
and Project Assessment and Control Process. Any changes to the SOI artifacts (i.e., needs,
design input requirements, architecture, design, design output specifications, or interfaces) and
associated engineering artifacts and PM work products are performed within the Needs,
Requirements, Verification, and Validation Management activities discussed in Section 14.
Once all issues have been addressed, the completed Procedure will be signed-off in accordance
with the organization’s Configuration Management Process. Any issues or non-conformances
will be resolved prior to final signoff of the completed Procedure.
11.2.3 Manage System Validation Results
For each system validation Instance covered by a Procedure, the results will be recorded in an
Execution Record and maintained in accordance with organizational policy.
The recorded data will be analyzed against the validation Success Criteria to determine whether
the SOI meets its needs with an acceptable degree of confidence. Any issues or non-
conformances will be documented within the Execution Record.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 355

Bidirectional traceability is established between the validation artifacts and the needs against
which the SOI is being validated against. How this traceability is managed should be defined in
project’s system integration, system verification, and system validation plans or the SEMP.
The individual Execution Records are combined into validation Approval Packages and
submitted to Approving Authorities for qualification, certification, and approval for use in the
operational environment.
The project team will assess success of the system validation activities. The evaluation of
system validation results and follow-up corrective action can vary greatly depending on the
purpose of the system validation activity, the risk of the baselined integrated sets of needs not
being met and expected degree of confidence.
For lower-level subsystems or system elements, this could be a simple action to address a failed
system element followed by re-validation, or a more significant action such as a major project re-
direction based on a failure to attain a key milestone.
In some cases, a variance may be approved by the Approving Authorities for system validation
failures against non-critical, lower needs. Failed system validation can result in the SOI failing
to be qualified, certified, or approved for use in the operational environment by the intended
users which often leads to a wholesale project re-baseline or cancellation.
The project team will provide baselined system validation artifacts and validated entities for CM.
The Configuration Management Process is used to establish and maintain configuration items
and baselines.
The end goal is a successfully verified and validated SOI ready to be integrated into the next
higher level of the system architecture or, if at the top level, the integrated system will be
accepted, qualified, or certified and will be able to be released for use in the operational
environment by the intended users.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 356

Section 12: THE USE OF OTS SYSTEM ELEMENTS

When the project team is making a buy, build, code, or reuse decision for a system element, one
consideration is using and existing OTS system element during system design and development
rather than developing the system element from scratch. This can be a commercially acquired
product (COTS) obtained through procurement efforts, an existing system element previously
developed for use in other projects within the organization (e.g., a power supply, a display, a
microprocessor, or an existing software application). In some cases, an “as is” OTS system
element may not be able to be used without minor modifications. This is referred to as modified
OTS (MOTS).
OTS system elements are produced to satisfy a capability needed within a specific market and
are often designed and built/coded to the supplier's needs and requirements to meet a particular
application of use in a specific operational environment rather than the project’s specific needs
and requirements.
There are several reasons why an OTS system element may be an appropriate choice for use in a
new development project:
• OTS system elements have heritage of use - they have been approved for a specific use in a
specific operational environment.
• OTS system elements are often available sooner as compared to developing a custom system
element from scratch.
• OTS system elements can be cheaper without the overhead associated with developing a
custom system element (either internally or externally).
• OTS system elements are often built or coded to a standard interface (plug and play) based
on an open architecture concept.
Determination for OTS or MOTS usage is made as the project moves down the levels of the
physical architecture, as depicted in Figure 12-1 as part of the Architecture Definition Process
and during the Design Definition Process.
Most often the determination is made as a design decision at the lower levels of the architecture
in response to design input requirements, however the decision to use an OTS or MOTS system
element may be made by higher level management stakeholders or the customer. In this case the
requirement to use the OTS or MOTS system element is considered a constraint to which the
project team must comply.
As the project moves down the levels of the physical architecture, the subsystems and system
elements that make up the SOI are decomposed through the various levels as discussed in
Section 6.4. For each subsystem and system element in the physical architecture, design
concepts are defined as part of the lifecycle concept analysis and maturation activities in
response to MGOs, measures, drivers and constraints, and risk for that system, subsystem, or
system element as discussed in Section 4. As part of the lifecycle concept analysis and
maturation activities, the project team makes a buy, build, code, or reuse determination until all
subsystems and system elements have been defined.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 357

System
C|N|R

Analysis
Decomp

Subsystem Subsystem Subsystem


C|N|R C|N|R C|N|R

Analysis Analysis Analysis


Decomp Decomp Decomp
OTS?
System System System System System System
Element Element Element Element Element Element
C|N|R C|N|R C|N|R
C|N|R The C|N|R The
C|N|R The
Analysis Design “Line” Analysis Analysis Design “Line”
Design “Line”

Decomp Spec Decomp Decomp Spec Spec

OTS? OTS? OTS?


System System System System System System
Element Element Element Element Element Element
C|N|R The
C|N|R The
C|N|R The
C|N|R The
C|N|R The
C|N|R The
The “Line”
“Line” “Line” “Line” “Line” “Line” “Line”
Design Design Design Design Design Design
Spec Spec Spec Spec Spec Spec

Figure 12-1: OTS Determination as Part of Architecture and Design.


For the cases when the buy or reuse determination is being considered as shown in Figure 12-1,
the project team evaluates existing OTS system elements (hardware, software, assemblies) as
part of their architecture and design concept definition activities. (Note: The “line” shown in
Figure 12-1 is when the project team has decided the system element needs no further
decomposition by them and makes the buy, build, code, or reuse determination.)
As part of this determination, the acquisition or reuse of an OTS system element is traded against
developing (building or coding) a custom system element (either internally or by an external
supplier). Key considerations are cost, schedule, and fit for use. Can the project realize a
reduction in cost and schedule (with acceptable risk) by using an OTS system element with
required technical functionality, performance, quality, and compliance compared to a custom
development effort? Can the OTS system element fulfil the needs and requirements for the
intended use in the intended operating environment?
Choosing to use an OTS system element comes with some challenges; notably, there is still often
an expectation of compliance to government regulations and standards applicable for the system
being developed. This can be difficult considering the suppliers of an OTS system element may
not provide all the documentation required by the customer and the supplier may not be willing
to provide specific details of their product development and associated artifacts they consider
proprietary.
As an alternative, it is a customary practice for suppliers to develop the subsystems and system
elements to industry standards and government regulations and supply the customer with a

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 358

certificate of conformance or compliance (certification and qualification) against those standards


and regulations rather than providing detailed SE artifacts.
In addition, it is common for suppliers to provide an “as built specification” which states the
physical characteristics, interface definitions for the interface boundaries and characteristics of
the interactions across those boundaries, material listings including any hazardous materials, and
operating environment (transportation, storage, and use) the OTS subsystem or system element
was designed to operate within.
A major challenge for OTS or MOTS system elements with embedded software such as
Electronic Control Units (ECUs) that are commonly procured as OTS or MOTS, is that the
customer has limited insight into the actual embedded software; while it may do what the
customer specifically requires - what else does it do that potentially could result in unintended
behaviors? In addition, the supplier often has little insight into how their OTS or MOTS system
element will be integrated into the customer’s system and resulting behavior as a function of the
interactions of their OTS or MOTS system elements with customer or other supplier developed
system elements.
Another challenge includes interface boundaries and interactions across those boundaries,
behaviors when integrated within the SOI, the operational environment, and specific use for the
OTS system element versus what is required when integrated into the SOI.
OTS system elements are developed in response to the supplier defined set of needs and set of
design input requirements rather than specific needs and design input requirements defined for
the OTS or MOTS system element by the customer.
These challenges represent risk when addressing system verification and system validation of the
OTS or MOTS system element as well as the system within which it is integrated.
When determining the set of needs and set of design input requirements for the OTS or MOTS
system element, the project team takes an external view of the OTS or MOTS with a focus on
form, fit, function, quality, and compliance addressing the following questions:
• What functionality and level of performance is needed when the OTS or MOTS is
integrated into the SOI architecture and is operating within the SOI’s operational
environment?
• What are the allowable induced environments the OTS or MOTS system element is allowed
to generate?
• Are the OTS or MOTS system element interfaces compatible with the SOI it will be
integrated within?
• What are the interface boundaries, where are they defined, and what are the characteristics
of each interaction across those boundaries?
• What is the allowable envelope, mass, power requirements, and other physical attribute
requirements for the OTS or MOTS system element?
• What quality (-ilities) requirements need to be met by the OTS or MOTS system element?
• What standards and regulatory requirements does the OTS or MOTS system element need to
comply?
When addressing these questions, the project team must be careful to not over specify the needs
and requirements for the OTS or MOTS system element. Doing so will make it more difficult to
find an acceptable OTS or MOTS system element. It is also important to address specific
rationale, priority, and criticality for each need and requirement. Because the OTS candidates
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 359

were not developed to the project’s specific needs and requirements, not all needs and
requirements defined for the OTS or MOTS will be able to be met. Understanding the rationale,
priority, and critically for all needs and requirements allows the project team to make tradeoffs
during their evaluation and selection process.
A framework [26] for evaluating the use of OTS or MOTS subsystems and system elements is
shown in Figure 12-2. This framework reconciles the needs and requirements for the SOI with
the data available for the candidate OTS or MOTS system elements from the suppliers.

Identify Project Needs, Establish OTS Criteria Obtain Data for the OTS or MOTS
Requirements and Constraints Checklist System Element and Supplier
Define the project objectives, needs, and Generate a project-specific Use the checklist to obtain the necessary
design input requirements associated checklist to evaluate the OTS data for the OTS or MOTS system element
with the OTS or MOTS system element. or MOTS system element and supplier.
and supplier.

Proceed with N
Analyze to Perform Risk Assessment Recommendation on
Consider Other
Determine Gaps and Document Results OTS or MOTS Design Solution
Assess the checklist, OTS or MOTS system Assess the gaps for risk to project; Usage?
element, and supplier data to determine develop mitigation plans to address
gaps to needs and requirements or risks; document the results for the Y
verification and validation evidence for OTS or MOTS system element.
the OTS or MOTS system element.

Obtain Project and Stakeholder Provide Documentation as Evidence to


Approval for OTS or MOTS Usage Support Verification
Provide recommendations to project Provide the assessment documentation and
management and stakeholders to use the associated approval, along with any mitigation plan
OTS s or MOTS system element with results, as evidence for the OTS or MOTS system
associated risks and mitigation plans. element verification against program requirements
and validation against program needs.

Figure 12-2: OTS Evaluation for Usage in the SOI.[26]


For this proposed framework, the project team oversees the evaluation process, which includes
the project manager, procurement personnel, systems engineers, lead design engineers and
subject matter experts. This framework involves assessing the needs and requirements for the
OTS or MOTS system element, the risk, budget, and schedule state of the project, needs and
expectations of the stakeholders, and a set of project-developed criteria to assess the OTS or
MOTS system element capability to be used within the SOI.
When completed, the documented findings of the assessment, including results of risk
mitigations, is evidence that supports system verification to the project’s design input
requirements and system validation to the SOI’s set of needs for the OTS or MOTS system
element. The project team will also need to assess whether once the OTS or MOTS system
element is integrated into the SOI architecture, will the integrated system be able to pass system
verification and system validation.
During the evaluation, it is critical to assess overall cost. Data for costs associated with purchase
of OTS system element and custom assemblies is available through various records; however,
the hidden costs associated with OTS usage also need to be addressed. For example, the need to

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 360

modify the OTS system element may offset any savings associated with using the OTS system
element. There have been cases where the costs and time associated with the MOTS system
element turned out to be greater than if the project would have designed and built their own
custom system element.
Often a project will use the term “heritage” to refer to an existing system element that has a
proven performance record. No matter the term used, heritage system elements are really OTS,
and the above discussion applies. The use of heritage OTS system elements frequently ends up
driving system level requirements.
When evaluating the use of any OTS or MOTS system element (hardware or software) it is
important to assess the TRL of the critical technologies used by the OTS or MOTS system
element. TRLs as discussed in Section 4 consider specific use in a specific operational
environment. Thus, an OTS or MOTS system element that was designed and used for a specific
purpose and operational environment is often assumed to have a TRL of 9, however when being
considered for use in a different manner or in a different operational environment, even if only
slightly different, the TRL drops to at least TRL 5 until proven differently for the specific
intended use and operational environment for which it is being considered.
Advancing from TRL 5 to higher levels represents budget, schedule, and resource considerations
that must be considered as part of the cost and risk evaluation. In some cases, the cost and time
associated with the TRL advancement degree of difficulty may counter any savings associated
with using an OTS or MOTS system element.
During the evaluation process, all costs associated with assessments and mitigation plans
(included design and test additions as well as TRL advancement) need to be factored into the
trade determination of usage. OTS or MOTS usage becomes less favorable when the actions of
mitigating risk outweigh the cost of developing a custom system element.
While the steps shown in Figure 12-2 are fairly basic, the true value of an OTS or MOTS
evaluation framework is in the process of establishing a checklist of criteria for the project that is
optimized based on its parameters of concern. Going through the criteria development activity at
least once at the project level will create an assessment approach that can be used for all OTS or
MOTS system elements evaluated for that project, addressing specific concerns of the project
and its stakeholders. The result is an assessment approach for OTS or MOTS system element
usage in a way that provides sufficient evidence that it meets the intent or is equivalent to the
needs and requirements defined by the project team for the system element. For project needs
and requirements for a system element not specifically met by the OTS or MOTS under
consideration, the project team may need to get a variance approved prior to approval for use.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 361

Section 13: SUPPLIER DEVELOPED SOI

This section provides considerations for a supplier developed SOI when portions of the SOI
development, production, system verification, and system validation are contracted out by a
customer to a contractor, supplier, or vendor.

13.1 Customer/Supplier Relationships


All projects have customers, where a customer is defined as an organization or individual that
has requested a work product. From a customer’s perspective the organization responsible for
developing a work product may be internal or external. Conversely, from a developer
perspective, the customers may be either internal to their organization or external.
The focus of this section is when the developer is external to the customer’s organization.
External developers can be referred to as contractors, suppliers, or vendors—for the rest of this
discussion, the term “supplier” is used.
The customer/supplier relationship will be formal in the form of a contract, SA, or Purchase
Order (PO). Contracts with a supplier for specific activities and deliverables often include a
well-developed SOW that clearly defines the activities, deliverables, and relationship between
the customer and supplier.
For some organizations, the SA is a combination of contract items as well as a SOW, where the
SOW is an appendix or attachment. The customer may also have a general contract with a
supplier and issue Task Orders (TO) for specific tasks that are authorized by the contract.
Contracts for SOI development efforts will have a clear start date and delivery date. In between
these dates there will be specific milestones based on system development lifecycle phases
which typically culminate with some form of “gate review” activity prior to acceptance and
delivery of the SOI to the customers.
These gate reviews involve the review of the results of system verification or system validation
activities and cumulates with an approval of one or more deliverables that will be accepted by
and supplied to the customer. For example, for a specific SOI to be supplied to a customer there
may be a scope review (SR) or system concept review (SCR) to baseline the set of needs, a SRR
to baseline the set of design input requirements, a SDR to approve the architecture and design
concept, a PDR, and a CDR to baseline the design prior to manufacturing or coding.
Depending on the contract, the outcome of each of these reviews is often one or more
deliverables. For example, a set of needs, set of design input requirements, set of design output
specifications, system verification artifacts, system validation artifacts, or the realized SOI.
From a system verification and system validation perspective, the project plan, SOW, SEMP,
MIVV Plan, and SIVV Plans will specify the specific activities, reviews, and deliverables that
will be included in the SOW or SA.
A key question for both the supplier and their customers is what their relationship is during the
concept, development, production, system integration, system verification, and system validation
lifecycle activities for the SOI that is being contracted for. The supplier’s relationship to their
external customer is dependent on contract type and approach. As shown in Figure 13-1, the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 362

contract type could be fixed price or cost reimbursement. The contract approach could be
performance-based/completion form or level of effort/term.

Fixed Cost
Contract Price Reimbursement
Type (FP) (CR)

Performance-
Contract Level of Effort
Base(PBC)/
Approach (LOR)/
Completion
Term
Form (CF)

Figure 13-1: Contract type and approach


Fixed Price, Performance-based Contract
If the contract is a fixed price, performance-based contract there will typically be little
interaction between the customer and supplier during the development of the SOI. The
contracting mechanism is frequently a PO, and the SOI is frequently OTS or MOTS. The
contractual obligation for the supplier is to deliver the SOI along with evidence it meets the set
of needs and set of design input requirements or set of design output specifications and other
deliverables that were required by the customer as specified in the PO.
With this type of contracting mechanism, the supplier’s system verification and system
validation programs are what is normally followed. The form of the evidence that the SOI
passed the supplier’s system verification that the SOI meet the customer’s requirements must be
specified in the PO.
In this case, often the customer does their own system validation against their own set of needs in
their operational environment with their intended users and the supplier is not involved. This is
especially true when the SOI developed by the supplier is a subsystem or system element which
the customer will be integrating with other subsystems and system elements. (See also Section
13.2.)
Cost-plus, Performance-based/Completion Form Contract
If the contract is a cost-plus, performance-based/completion form contract there will be more
interaction from the standpoint of the supplier providing more “insight” to the customer into the
development lifecycle activities as defined in the contract. This interaction could be the supplier
involving the customer in the development efforts of various artifacts and work products during
the concept, development, production, integration, system verification, and system validation
lifecycle activities. The set of needs, set of design input requirements, architecture and design,
set of design output specifications, production verification artifacts, system verification artifacts,
and system validation artifacts could all be deliverables for the system elements being produced
as part of the contract.
Also included in the contract could be the customer’s participation in major gate reviews. The
customer may define specific deliverables in the SOW or SA to give them the insight they need

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 363

as well as may define key inspection points during production to ensure quality of the
workmanship and as part of their participation in the supplier’s production verification activities.
While the customer may participate in these activities, for performance-based contracting they
do not normally have an approval role. To do so would transfer the risk of non-compliance, cost
overruns, and schedule slips from the supplier to the customer.
With this type of contract, the supplier’s system verification and production verification
programs are what is normally followed, and the successful completion of these activities is what
the customer bases their acceptance on.
Again, in this case, often the customer does their own system validation against their own set of
needs in their operational environment with their intended users especially when the SOI
developed by the supplier is a system, subsystem, or system element which the customer will be
integrating with other subsystems and system elements. (See also Section 13.2.)
Cost-plus, Level of Effort/Term Contract
If the contract is cost-plus, level of effort/term contract, the customer is providing “oversight” to
the supplier and will be involved in the development and approval of all SE artifacts developed
across the SOI’s development: integrated set of needs, set of design input requirements,
architecture, design, design verification, design validation, early system verifications, early
system validation, set of design output specifications, production, production verification, system
integration, system verification, and system validation activities.
The gate reviews result in customer approval of the intermediate work products and the realized
SOI. Because of the customer’s approval role, they are accepting the risk of non-compliance,
cost overruns, and schedule slips. With this type of contract, the customer’s system verification
and system validation programs are what is normally followed.
Contracting for Specific Lifecycle Activities
Another aspect of contracting is which part of the development lifecycle activities has the
supplier been contracted to support. Referring to Figure 2-10, from a lifecycle perspective, the
customer must decide where in the development or production lifecycle they will issue a contract
to a supplier. In some cases, the customer may develop a set of business operations level needs
and requirements (sometimes referred to as a “Statement of Objectives”) and issue a contract to a
supplier to develop system level lifecycle concepts, integrated set needs, and a set of design input
requirements, develop an architecture and design, produce a set of design output specifications,
and produce the system element. In other cases, the design and/or manufacturing/coding may be
done by separate suppliers.
From an architectural perspective, a customer may contract out the development of the entire
system or a subsystem or system element that is part of the system physical architecture, or a
specific part or component. The supplier, in turn, may subcontract out system elements, parts or
components. Some system elements, parts or components could be existing OTS or MOTS, and
some produced from a set of design output specifications developed by the customer. In cases
like this, the customer/supplier relationships could be complex; especially if there are multiple
suppliers and some of the suppliers are customers to their own lower-level suppliers.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 364

Customer Versus Supplier Roles


A key question concerns who oversees integration of all the parts across all lifecycle stages that
make up a SOI? Who defines and manages all the interface definitions? Who manages the flow
down, allocation, and budgeting of requirements from subsystems and system elements at one
level of the architecture to the system elements at the next level? Who defines the acceptance
criteria for each subsystem or system element before it is accepted for system integration? Who
is responsible for the system integration of all the subsystems and system elements that make up
the integrated system? Who pays for the development and or use of special facilities, test or
support equipment needed to do system integration, system verification, and system validation?
What is the supplier versus customer roll during system integration, system verification, and
system validation?
No matter the contracting type and approach used, the customer must decide who is responsible
for needs verification, needs validation, requirements verification, requirements validation,
design verification, design validation, production verification, system integration, system
verification, and system validation and clearly document the roles, responsibilities, and
deliverables in the contract for each supplier.
Of particular importance, who will be approving the Success Criteria, Strategy, and Method for
each system verification and system validation Instance? Who will decide at which level of the
system integration will system verification and system validation be conducted versus less
formal (less documentation) at lower levels as discussed in Section 10? Remember these
decisions are cost, schedule, and risk decisions the customer may not want to delegate to a
supplier. Who is responsible for the system verification and deliverables versus system
validation and deliverables? Who is the verification Approving Authority? The validation
Approving Authority. Who is responsible for all records and documentation required by the
Approval Authority? All these decisions must be addressed in the supplier’s contract, SOW, or
SA.
In some cases, who is responsible for system verification could be different from who is
responsible for system validation (Refer to Section 13.2 for some challenges concerning who
does system validation) as is required for many government contracted system development
projects. In many government developed systems, the customer is required to contract to a third
party to do “independent verification and validation”.
Another major issue is whether a verified and validated integrated set of needs has been defined
by the customers as defined in Section 4 of this Manual. A key tenet of the approach advocated
in this Manual is that validation is a continuous activity across all lifecycle stages. Sadly, in
many cases there will not be a baselined set of business operations level or system level
integrated set of needs to validate the development artifacts and the realized SOI against. When
this is the case, what is expected of the supplier in terms of design input requirements validation,
design validation, design output specification validation, and integrated system validation in
respect to what the supplier is expected to validate against?
Once the contracted SOI has been built and completed to whatever level of integration was
required and the corresponding system verification and system validation of the SOI completed,
the Execution Records and other specified records will need to be prepared, assembled into
Approval Packages, and submitted to the appropriate Approving Authority. For a system
element that has been contracted out to a supplier, the Approving Authority will most likely be
the customer. Based on the information submitted, the Approving Authority will accept the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 365

system element for use in its operating environment by its intended users in accordance with the
acceptance criteria specified in the contract.
The requirements for the Execution Records and other documentation used by the Approving
Authorities vary across different companies, industries, and regulatory agencies. However, the
end goal is the same: provide evidence to the Approving Authorities that the SOI meets its set of
design input requirements, set of design output specifications, and the set of needs with the
desired level of confidence. Without the required evidence, the Approving Authorities will be
unable to make this determination. It is therefore critical for the customer to articulate in the
supplier contract what evidence is needed with regard to production verification, system
verification, and system validation.
As part of defining the contract requirements for activities and deliverables, the customer must
develop a plan concerning what activities the supplier is responsible for and the deliverables
needed from the supplier for qualification, certification, and acceptance. The customer must
define their next steps once the supplier delivered SOI has been qualified or certified and
accepted by the customer. Is the delivered SOI a system, subsystem, or system element that is
going to be integrated into another system? By whom? Is the completed SOI that has been
developed and delivered by the supplier, going to be submitted to a regulatory agency for
qualification or certification and approval for use? If so, what data, information, and Execution
Records will the customer need from the supplier to be used as evidence that the system meets
the defining regulations and standards? Without this information the system may not be
approved for its intended use in the operational environment.
Consequences Resulting from Poorly Written Contracts Concerning System Verification
and System Validation Expectations
Sadly, customers do not always adequately define their requirements in the contract, especially
in terms of all the various issues discussed above. There are many consequences resulting from
poorly written contracts in terms of system integration, system verification, and system
validation:
• The customer will lack insight into what will be involved, in terms of cost and schedule to
verify and validate the SOI under contract.
• The customer will not have the opportunity to review and buy in as to the suppliers’ system
verification and system validation programs as well as Success Criteria, Strategy, and
Method, for each system verification and system validation Instance.
• The customer frequently will be surprised by the actual cost and schedule needed to meet
their undocumented SOW requirements for system integration, system verification, and
system validation.
• When issues occur during system integration, system verification, and system validation,
the customer may not be kept apprised of these issues and the resulting impacts on cost,
schedule, and risk.
• The customer’s unstated requirements for quality and functionality may not be realized.
• What was expected by the customer and what is actually delivered by the supplier may be
different. Perfection may not be achievable and there may be emerging properties (good
and bad) that may not be discovered until after the SOI is approved for use.
• When the supplier delivers the SOI, there may be a set of liens or open discrepancies
accompanying the delivered SOI with requests from the supplier seeking waivers or
deviations. If these are not approved, what will be the cost and schedule impacts?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 366

• If not clearly specified in the contract as deliverables, the supplier’s records and artifacts
generated as part of their system verification and system validation activities and
specifically during the execution of the system verification and system validation
procedures may not be available or their quality may not meet the customer’s needs.
Without these records, the customer may not have the evidence they needed to submit to an
external Approving Authority to determine whether the system meets the integrated set of
needs, set of design input requirements, and set of design output specifications. This is
often the case for suppliers who develop highly regulated products, such as medical
devices. Without adequate proof, the regulatory agency may not approve the device for
use.
• If not clearly specified in the contract as deliverables, but later required by the customer,
the resulting contract changes could be expensive and time consuming.
• If not clearly specified in the contract as deliverables, data and information gathered by the
supplier as part of system verification and system validation will not be available for use by
the customer for sustaining engineering. They will not be able to use this data for analysis
if there are failures of the SOI during later system verification and system validation
activities performed by the customer during integration or during operations.
• If the supplier’s roles concerning system verification and system validation and associated
deliverables are not clearly specified in the contract, suppliers operating on a very thin
margin may be pressured to take liberal interpretation of any vagueness in the system
verification and system validation portions of the contract. Lack of agreement of the
supplier’s roles concerning system verification and system validation and associated deliverables
may also bankrupt the supplier if court action determines the supplier is responsible; this may be a
short-term win for the customer, but a new supplier would then need to be sought at additional and
unplanned expense and time before the SOI could be approved for use. If court action is in favor of
the supplier, the result would also be additional and unplanned expenses and schedule slips for the
customer.

To avoid these consequences, each of these issues must be addressed in the supplier contract,
SOW, or SA.
Below is a case study that illustrates some of these issues.

Hubble Space Telescope Project—System verification and system validation Lessons [44]
The Hubble Space Telescope project was originally funded for approximately $400 million with an
anticipated launch date of 1983. However, it was not actually launched until 1990 with a cost of
approximately $4.7 billion and was estimated to cost approximately $10 billion in the first twenty years of
its life. With such a history, the project provides a rich source of PM case studies including a particularly
telling lesson with regard to system verification and system validation.
The most critical component in the Hubble Space telescope was a 2.4m glass parabolic mirror. Only
after the telescope had been launched into space in 1990 was it discovered that the telescope could not
capture a clear image due to errors made in manufacturing the mirror, which had been polished with an
aberration of some 2.2x10-6m. The problem was able to be fixed with a corrective optics package that
displaced the High-Speed Photometer (HSP) - a solution which cost many millions of dollars and required
an unscheduled Space Shuttle mission in 1993.
The building of the telescope’s mirror had been competitively contracted, with the successful supplier
required to subcontract for a second back-up mirror to be built by a losing bidder. The error in the
launched mirror would have been discovered had each of the two companies been tasked to test the mirror
of the other, instead of relying on a single flawed test of the primary contractor’s mirror. Late in the
project it had been too difficult to address the associated commercial issues, particularly since the project

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 367

was already faced with significant cost and schedule pressure. Yet, had those managing the project been
able to insist that this testing was to occur, or the requirement had been mandated by the original
manufacturing contracts, the initial error would have been discovered before launch and then corrected by
launching with the backup mirror.
When seeking corrective solutions to the errored mirror, it was discovered that the backup mirror was
perfectly shaped. If the problem with the mirror had been detected during production or system
verification, the backup mirror - which met the specifications - could have been substituted. Instead, a
corrective optics package was developed an installed on the telescope during a service mission, which
required transporting a new Corrective Optics Space Telescope Axial Replacement (COSTAR) system
and installation during space walks by astronauts.
Lessons learned concerning verification and validation across the lifecycle would have avoided tens of
millions of dollars in additional expenditure, several years in project delay, and significant loss of face for
all responsible.

From this case study, the following lessons should be apparent:


• If more attention were placed on production verification (was the mirror built to its design
output specifications) as discussed in Section 9, the manufacturing error with the primary
mirror would have been discovered earlier in the project, before system integration allowing
the backup mirror to be installed before formal system verification and system validation
activities begin.
• When the customer developed the contract, provisions should have been made for a customer
or other customer delegated representative to participate in the production of the mirror, with
mandatory inspections points during manufacturing to ensure the mirror was “built to spec”
before system integration.
• Provisions should have been made in the contract for a pre-integration readiness review
where the results of production verification activities were presented.
• After integration, specific system verification and system validation activities should have
been performed on the integrated system to check image clarity.
• Provisions within a contract must address verification and validation across the system
lifecycle and not just at the end of development during system integration when the discovery
and resolution of problems cause significant increases in cost and schedule slippages.
• Failing to learn from these lessons can result in problem discoveries after the system is put
into operations, increasing the impacts even more as was demonstrated by the Hubble Space
Telescope Project.

13.2 Customer/Supplier Verification versus Validation Considerations


When a system is being developed by a supplier in response to a contract, some organizations
may feel that they are only responsible for system verification and that the customer is
responsible for system validation. [2]
To help avoid issues concerning which organization is responsible for system validation the
customer should address the following cases:
Customer Responsible for System Validation
The SOI is contracted to a supplier for development according to the customer’s design input
requirements or production in accordance with customer developed design output specifications,
but actual system validation is done by the Customer or contracted out to a third party.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 368

The primary legal responsibility for the supplier is providing evidence that the contracted SOI
meets the customer’s design input requirements and/or design output specifications as defined in
the contract.
In this arrangement, the SOI may have passed system verification and or production verification
activities performed by the supplier but fail during customer system validation. The customer
determines whether their integrated set of needs, set of design input requirements, or set of
design output specifications where defective and then makes a contract change to their needs,
requirements, or specifications at their cost.
Often for a supplier developed SOI which the customer will be integrating with other subsystems
and system elements, final system validation of the supplier developed SOI cannot be completed
until the supplier developed SOI is integrated with other subsystems or system elements that
make up the customer’s integrated system.
As discussed in Section 10, there are cases where the customer specifies in the contract that the
supplier does some type of preliminary system validation in a simulated operational environment
by surrogate users and the customer will then do final system validation in the actual operational
environment by the intended users once the supplier supplied system, subsystem, or system
element is integrated into the macro system it is a part.
This preliminary validation is done to reduce risk prior to the SOI being validated in its
operational environment by the intended users during system integration. In this case, the
customer will have had to clearly define what the supplier will validate their SOI against
(operational scenarios, use cases, and integrated set of needs) in the contract.
For this type of contractual arrangement, the customer has accepted all the risk of a SOI failing
final system validation, even if final system validation is contracted to a third party. If the
system does not meet the customer needs and does meet is intended use in the intended
operational environment when operated by the intended users, the impacts range from loss of
reputation for the customer to program cancellation. Legal action is another possible outcome.
As a minimum, often large sums of money and time will be spent fixing problems.
Supplier is Responsible for System Validation
In addition to the supplier being responsible for system verification as described above, the
contract is written such that the supplier is responsible for final system validation. This approach
only makes sense if the supplier has the ability to do system validation of their developed SOI in
the actual operational environment by the intended users. The operational environment includes
the actual external systems the SOI interacts with.
For this case, the customer must clearly define, in the contract, what is necessary for acceptance
in terms of the SOIs intended use in the operational environment when operated by the intended
users. Using the approach advocated in this Manual, what is necessary for acceptance is not
only the design input requirements the SOI will be verified against, but also the set of business
operations level needs and system level set of needs the system will be validated against.
Contractually, the understanding is that when the supplier provides the customer objective
evidence that both the design input requirements are met and the business operations level needs
and system level set of needs are met, then the supplier delivered SOI will be accepted by the
customer and approved for its intended use when operated in its intended operational
environment by its intended users.
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 369

However, there is an issue with this approach as to who is accepting the risk if the system passes
system verification but fails system validation. If the set of design input requirements provided
by the customer is defective, i.e., it did not have the characteristics of a well-formed set of design
input requirements or the transformation of the set of needs into the set of design input
requirements was defective, such that the set of design input requirements did not reflect what
was really needed, then even if the system can be verified to meet these requirements it could
still fail system validation. Because of this, the customer has still accepted the risk of the SOI
failing system validation even if system validation is performed by the supplier for the customer.
For the supplier to assume the risk associated with a system failing to pass system validation, the
customer must provide the supplier with a well-formed integrated set of needs for the SOI being
developed that have successfully passed needs verification and needs validation as discussed in
Section 5.
Assuming this is the case, the supplier would transform the integrated set of needs into a well-
formed set of design input requirements, perform requirement verification and requirement
validation, develop a physical architecture and design based on those requirements, transform the
design into a set of design output specifications, perform design verification and design
validation on the design and design output specifications, produce the SOI according to those
specifications, and verify the SOI meets the design input requirements, and perform system
validation against the customer’s integrated set of needs. The result will be Approval Packages
that would be provided to the customer for acceptance of the integrated system.
In this case, any issues associated with not meeting the customer defined integrated set of needs
would be the responsibility of the supplier.
Once the system is accepted by the customer, the system can be approved for its intended use in
its operational environment by its intended users. If there are any issues with the system after
that; for example, the integrated set of needs was defective, the issue resolution is the
responsibility of the customer.
Importance of System Verification versus System Validation
Another issue concerns the importance of system verification versus system validation. For
supplier developed systems, some organizations tend to rely more on system verification than
system validation, expending more time, money, and resources on system verification than on
system validation. In this case there is a question on the need for system validation or how much
system validation is needed. The answer to this question is really an issue of risk.
This issue is should be addressed in the supplier contract. The need for system validation should
be tied to the risk of negative consequences if the system does not meet the customer’s needs in
their operational environment by the intended users.
The basic approach to determine how much system validation is needed is to perform an analysis
of the risk involved. A minimal amount of validation is probably appropriate when the supplier
is developing a known SOI with existing technologies to be used in a known operational
environment by known users, and the customer has a good history working with that supplier.
However, a greater emphasis on system validation is warranted when contracting with a new
supplier or when a supplier is developing a new system with new technologies to be used in an
unfamiliar operational environment by intended users whom which the supplier is not familiar.
When working with a new suppler, developing a new system in an unfamiliar environment with
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 370

unproven technologies, and unknown or unfamiliar users, the probability of a system failing
system validation is greater.
Having considered risk, customers can take action to collaborate with the suppliers to reduce the
probability or magnitude of a system failing system validation even though the system has been
verified to meet the design input requirements and/or the design output specifications.
System Validation Only
There is a trend, especially for standalone software applications, where the focus is on system
validation against stakeholder needs. The logic of this is that if the supplier can provide
evidence, with the required level of confidence, that the SOI meets its intended use in its
intended operational environment when operated by the intended users, and the customer is
willing to accept that evidence, then developing a set of design input requirements and verifying
the SOI meets those requirements is a waste of time and money.
While this approach is not suitable for all product types and domains, it may be the most
effective way to engineer a SOI at reduced cost and a shorter development schedule when the
approach is suitable. The primary cost and schedule savings are associated with informal
definition and management of requirements rather than the more formal traditional definition and
management of requirements and associated design and system verification activities defined in
this Manual.
Using this paradigm, customers would focus on the needs definition activities defined in Sections
4 and 5 to ensure they have a well-formed integrated set of needs for the supplier to validate
against.
If the SOI is being developed internally, the project team would elicit stakeholder needs, identify
constraints and risk and mature the lifecycle concepts concurrently with the architecture and
design definition activities. While there may be requirements associated with the needs, they
would be communicated and recorded informally within the development team as appropriate to
the level of communication needed by the various project team members.
If development is being contracted out to a supplier, the customer would provide the supplier
with the well-formed integrated set of needs against which the system would be validated against
for acceptance for use. The customer/supplier roles concerning system validation would be
defined within the contract as well as any other required contract deliverables.
This approach is similar to how a customer would select an OTS or MOTS SOI as discussed in
Section 12. The SOI would be described from the customer’s external perspective of the SOI,
communicating the customer needs for the SOI concerning the intended use, operational
environment, constraints, quality, compliance, and risk. The supplier would be responsible for
validating the delivered SOI meets the customer’s integrated set of needs - how the supplier met
those needs would be transparent to the customer. (This is how many consumer products are
developed today.)

13.3 Addressing the Evolutionary Nature of Interface Definitions


As discussed in Section 6, the definition of interactions across interface boundaries evolves as
the design matures for developing systems. In cases where development is contracted out to a
supplier, the design input requirements provided to a supplier will include interface requirements
dealing with what is crossing the interface boundary as part of an interaction. However, what the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 371

systems look like at the interface boundary and the media involved in the interaction are design
dependent. As a result, these definitions may be TBD or TBR at the time the contract is agreed
to. Thus, the corresponding interface requirements will include a pointer to a TBD definition.
It is critical that the customer clearly define in the contract the process for dealing with the
changes associated with these TBDs or TBRs as the design matures. In some cases, the supplier
will be required to participate in the customer or integrating organization’s Interface Working
Group (IWG) such that they can participate in decisions concerning the definitions and assessing
any impacts that may result from the specific definitions, especially the cost associated with one
definition versus another. For example, for the exchange of data, what preprocessing of the data
is required? Should the sender of the data process the data in some way before sending the data
across the interface boundary or is sending the raw, unprocessed data acceptable? Depending on
the decision, costs will be incurred for the developer of either the sending or receiving system.
Moving into the physical world, who is responsible for developing or supplying the actual
cables, pipes, communication buses, etc. that are part of the media involved in the interactions
across the interface boundary? Going even into more detail, who is responsible for the actual
connectors? Experience has shown that it is risky for the suppliers involved to procure their own
connectors independently from the other suppliers. While they may procure the same part
number, often there are variants (dash numbers), and the variants may not be compatible. It is
problematic to discover these incompatibilities during system integration as is often the case.
A primary goal of this Manual is to provide guidance and best practices that will help the
customer to avoid accumulating technical debt and enabling projects and suppliers to deliver a
winning product. For contracted system development, one of the best ways to reduce the risk of
a system failing system validation (no matter who is responsible for system validation) is to
ensure the processes and associated deliverables defined in this Manual are reflected in the
supplier contracts.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 372

Section 14: NEEDS, REQUIREMENTS, VERIFICATION, AND


VALIDATION MANAGEMENT

Needs, Requirements, Verification, and Validation Management (NRVVM) separates the


“management” of needs definition, design input requirement definition, design verification,
design validation, and system integration, system verification, and system validation processes
from the “execution” of these activities.
NRVVM is a cross-cutting series of activities that spans all lifecycle process activities including
elicitation, lifecycle concept analysis and maturation, needs definition, design input requirement
definition, architecture, design, production, system integration, system verification, system
validation, transportation, installation, operations, maintenance, and retirement.
The focus of NRVVM activities is to manage the integrated sets of needs, sets of design input
requirements, sets of design output specifications, sets of system verification artifacts, and sets of
system validation artifacts to ensure alignment and consistency across the lifecycle. Included in
the management of the needs, requirements, and specifications is the interface definition
documentation (e.g., ICDs) and interface management in general.
NRVVM involves the following activities:
• Define, baseline, and oversee the organization’s lifecycle concepts, needs, and
requirements definition policies, requirements, processes, and work instructions.
• Define, baseline, and oversee the organization’s verification and validation policies, plans,
requirements, processes, and work instructions across the lifecycle.
• Define, baseline, and manage all artifacts concerning interfaces both internal and external
to the SOI.
• Provide the enablers needed to implement these policies, requirements, processes, and
work instructions including the PM and SE tools to be used to manage the projects data and
information.
• Ensure all PM and SE team members are trained in the use of these tools, processes,
concepts, and work instructions associated with practicing PM and SE from a data-centric
perspective.
• Receive, review, and baseline sets of needs, design input requirements, design output
specifications, system verification artifacts, and system validation artifacts.
• Manage changes to the baselined sets of needs, design input requirements, design output
specifications, system verification artifacts, and system validation artifacts over the
lifecycle.
• Manage and control the flow down, allocation, and budgeting of design input requirements
between subsystems and system elements at all levels of the of the SOI architecture.
• Manage bidirectional traceability: between parent/source and child requirements as well as
traceability between dependent peer requirements.
• Ensure vertical alignment and consistency between lifecycle concepts, needs, and
requirements for all subsystems and system elements at all levels of the SOI architecture.
• Ensure horizontal alignment and consistency between lifecycle concepts, needs, design
input requirements, design output specifications, system verification artifacts, and system

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 373

validation artifacts and the project’s plans, budgets, schedules, work products, and other SE
and PM artifacts generated across the lifecycle.
• Monitor, track, and report the development and configuration status of needs, design input
requirements, design output specifications, interface definition documentation, system
verification artifacts, and system validation artifacts across all levels of the SOI architecture
and lifecycle.
• Manage and configuration control the work products and artifacts associated with needs,
requirements, design, and system integration, system verification, and system validation
activities.
A summary of the Needs, Requirements, Verification, and Validation Management activities is
shown in Figure 14-1.

Inputs from the Lifecycle Concepts and Needs Definition activities:


• Integrated Sets of Needs Needs, Requirements, Outputs
• Baselined MGOs Verification, & Validation Baselined and Configuration
• Baselined Measures Management Controlled
• Project, development, manufacturing, and operations risks • Integrated Sets of Needs
• Feasible life cycle concepts • Sets of design input
• Prepare for Needs, requirements
• Model elements in the system architecture, conceptual, logical models
• Design and system validation planning artifacts Requirements, Verification & • Sets of design output
• Traceability Records Validation Management specifications
• Perform Needs, Requirements • Interface Definition
Inputs from the Design Input Requirement Definition activities : Verification & Validation Documentation
• Sets of design input requirements Management • Change Management
• Interface Definition Documentation artifacts
• Feasible life cycle concepts. • MGOs
• Model elements in the system architecture, conceptual, logical models • Measures
• Design and system verification planning artifacts • Risks
• Traceability records Enablers • Sets of life cycle concepts
• Allocation and budgeting records • Enterprise level policies and • Model elements in the
plans system architecture,
Inputs from the Design Verification and Design Validation activities:
• Data Governance conceptual, logical models
• Baselined Design
• Information Management • Allocation, budgeting
• Sets of Design Output Specifications
• Configuration Management records
• Design Verification and validation Results records
• Risk Management • Traceability Records
• Waivers, deviations, exceptions, statements of non-compliance
• Project Management • Verified and validated
Inputs from the System Verification Process: • Systems Engineering subsystems and system
• System Verification Artifacts • Product Development elements within the SOI
• Completed and approved system verification procedures • Needs & Requirements physical architecture as
• Verification Execution Records Definition & Management well as the integrated
• Verification Approval Packages process and plans system
• Waivers/Deviations, exceptions, non-conformance reports • Systems Verification & • System Verification Artifacts
• Updated requirement attributes dealing with system verification Systems Validation process • System Validation Artifacts
and plans
Inputs from the System Validation Process:
• System validation artifacts • Trained systems engineers
• Completed and approved validation procedures • Needs and requirements
• Validation Approval Packages management tool
• Validation Execution Records • Diagraming & modeling tools
• Waivers/Deviations, exceptions, non-conformance reports • PM tools
• Updated needs attributes dealing with system validation

Figure 14-1: Needs, Requirements, Verification, and Validation Management IPO Diagram.

14.1 Prepare for Needs, Requirements, Verification, and Validation


Management
As shown in Figure 14-1, there are several enablers to successful NRVVM. These include
enterprise level and business level policies and plans for data governance, information
management, CM, risk management, PM, and SE. (See the INCOSE SE HB for more
information on each of these process areas.)
There should also be an organizational product development process, procedures, and work
instructions, and experienced systems engineers trained in and knowledgeable in how to perform
NRVVM activities according to these processes, procedures, and work instructions.
Of particular importance are the RMTs, modeling/diagraming applications, and PM tools within
the project’s toolset used to develop and record the PM and SE artifacts.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 374

This section assumes the project will be moving toward a data-centric approach to SE and
recording and managing these artifacts using applications within the project’s toolset that
support the data-centric approach discussed in Section 3.
Preparing for NRVVM includes gathering or obtaining access to the required input artifacts
shown in Figure 14-1 and preparing the following project level plans.
14.1.1 PM and SE Plans
NRVVM does not happen in a vacuum. The overall processes, procedures, and work
instructions for NRVVM will be defined at the business operations level of the organization.
Each project will develop a PMP and a SEMP as part of their PM and SE planning activities that
are compliant with the business operations level lifecycle concepts, needs, and requirements
concerning PM and SE.
The INCOSE SE HB Project Management Process includes the development of a PMP and
SEMP that establishes the direction and infrastructure necessary to enable the assessment and
control of the project progress and identifies the details of the work and the needed personnel,
skills, and facilities with a schedule and budget for resources from within and outside the
organization needed to produce the SOI.
The SEMP contains structured information describing how the SE effort, in the form of tailored
processes and activities across all lifecycle stages, will be managed and conducted within the
project.
From a NRVVM perspective, the SEMP:
• Provides a high-level description of the needs and requirements development and
management process and how they fit into the overall system development lifecycle
processes.
• Provides a high-level description of the verification and validation activities across the
lifecycle and how they fit into the overall lifecycle process activities.
• Establishes how the project will develop, maintain, and manage the sets of lifecycle
concepts, integrated sets of needs, sets of design input requirements, sets of design output
specifications, sets of system verification artifacts, and sets of system validation artifacts
and the relationship of that information to the other SE artifacts and PM work products
generated across the lifecycle.
• Defines how the project will manage interfaces including identification, definition,
interface requirements definition, and change control of all associated artifacts.
• Includes key definitions of the needs and requirements definition, verification, and
validation activities and identification of all artifacts and work products generated as part of
these activities as well as the major deliverables of the project at each lifecycle stage.
• Addresses the form of the work products (paper versus electronic), the applications to be
included in the project SE toolset to be used to generate and maintain and configuration
manage the artifacts and work products and underlying data and information, and the IT
infrastructure needed.
• Defines attributes for needs and requirements expressions that will be used to manage
development of the SOI.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 375

• Defines relationships between the needs and requirements definition and management
activities defined in the Needs and Requirement Management Plan (NRMP) and the system
verification and system validation processes defined in the project MIVV Plan.
• Manages the work products and artifacts associated with needs, requirements, design,
system verification, and system validation activities.
• Defines a project ontology.
Both the PMP and SEMP identify the measures and reports that will be used to manage and track
progress across the lifecycle. These reports help define the data and information needed to be
managed within the SOI’s integrated sets of data and information.
Knowing which data and information will be included in the reports helps inform the formation
of the project master schema to which individual sets of data and databases will conform.
14.1.2 Needs and Requirements Definition and Management Plan
Supplementing the PMP and SEMP is the Needs and Requirements Definition and Management
(NRDM) Plan. The NRDM Plan focuses on the needs and requirements definition and
management activities to be conducted, artifacts to be developed, and deliverables to be
produced. Key provisions of the NRDM Plan can include, but are not limited to following:
• Provide details needed to implement NRDM activities consistent with the project
requirements defined in the PMP and SEMP concerning how the NRDM activities of the
project will be conducted.
• Define the oversight (control) and insight (monitoring) of the project’s NRDM activities.
• Identify the relevant stakeholders who will be involved in the NRDM activities.
• Identify stakeholder engagement and peer review activities
• Assign roles and responsibility, authority, and resources needed to define needs and
requirements, perform the needs and requirements management activities, and develop the
needs and requirements management work products.
• Define the artifacts and work products that need to be developed as part of NRDM.
• Identify and manage the relationships between integrated set of needs, sets of design input
requirements, and sets of design output specifications and other project and system
engineering artifacts and work products throughout the system lifecycle.
• Provide a schedule for performing the NRDM activities and delivery of NRDM artifacts
and work products.
• Define how the sets of needs, sets of design input requirements, and sets of design output
specifications will be developed, maintained, tracked, managed, verified, validated, and
reported.
o Define how, and the form in which the needs, design input requirements, and design
output specifications will be recorded and managed.
o Define the attributes that will be defined and maintained as part of each need and
design input requirement expression.
o Define the measures, metrics, and reports that will be used to monitor and control the
development of the integrated set of needs, design input requirements, and design
output specifications.
o Define the review and approval processes for baselining integrated sets of needs, sets of
design input requirements, and sets of design output specifications.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 376

o Define the system verification and system validation success criteria, strategy, and
method for each need and requirement against which the SOI will be validated and
verified.
o Describe the process for the flow-down (allocation) and budgeting of requirements
from one level of subsystems and system elements within the architecture to another
and the management of those allocations and budgets.
o Describe the process for establishing bi-directional traceability between levels of
requirements (parent/child, child/parent, source/child child/source) as well as peer-to-
peer traceability between dependent requirements at the same level both within a
subsystem or system element and with other subsystems and system elements.
• Define the activities associated with TBX tracking and resolution.
• Define the change management process for changes to needs, design input requirements,
and design output specifications.
• Define the level of CM/data management control for all NRDM artifacts and work
products.
• Identify the training for those who will be performing the NRDM activities.

NRDM activities do not exist in isolation from other PM and SE activities. A successful NRDM
Plan requires integrated execution with the other activities defined in the PMP and SEMP. To be
successful, it is critical to get buy-in of all the provisions in the NRDM Plan from all the key
stakeholders addressed in the plan to reduce the risk of stakeholders failing to support the work
to be performed within budget and schedule constraints. Getting this buy-in will result in an
approved NRDM Plan.
14.1.3 System Verification and System Validation Management Plans
The MIVV Plan expands and implements the project team’s design verification, design
validation, early system verification, early system validation, system integration, system
verification, and system validation philosophy/concepts outlined in the PMP and SEMP. The
MIVV Plan defines the more detailed approach and activities that will be used for design
verification, design validation, early system verification, early system validation system
integration, system verification, and system validation. Developing an MIVV Plan removes the
need for the SEMP to contain this detailed information and can result in a much more
manageable SEMP.
The MIVV does not have individual system, subsystem, or system element system verification
and system validation plans and schedules; these are addressed by individual SIVV plans
developed for each subsystem and system element within the SOI physical architecture.
SIVV plans specific to each subsystem and system element are created concurrently by the
project teams responsible for each subsystem and system element as individual sets of needs and
sets of design input requirements are defined. The SIVV Plans contain detailed description of
the activities to be performed to implement the project team’s MIVV Plan design verification,
design validation, early system verification, early system validation, system integration, system
verification, and system validation concepts and activities. Resources including test equipment,
facilities, and personnel are addressed. A detailed budget and schedule consistent with the
MIVV Plan are included.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 377

14.1.4 Configuration Management Plan


The CM Plan (CMP) supplements the PMP and SEMP addressing the functions associated with
CM. The CMP ensures SOI needs, requirements, specifications, and system verification and
system validation artifacts are defined, documented, validated, and verified to establish product
integrity and that changes to these artifacts are identified, reviewed, approved, documented, and
implemented.
Not all artifacts and work products need to be put under configuration control. Which artifacts
or work products that are put under configuration control are identified in the PMP and SEMP
and often represented via a “document tree” (Section 6.4.2). From a supplier contract
perspective, contract deliverables are usually put under configuration control while intermediate
work products may not be.
It is the set of configuration managed artifacts and work products that represent the SOI baseline.
This baseline represents the SSoT concerning what was agreed to and is being developed and
delivered in accordance with those agreements.
Historically, the configuration managed artifacts are represented by documents in either a
hardcopy or electronic form. A key issue with these documents is that they are often generated
at different times and are valid only at the time they were baselined and put under configuration
control. To make this clear, most organizations adhere to ISO 9001 standards and include a
statement on the front page of these documents stating this fact. Because of different timing of
the baselined documents, they are often out of sync and inconsistent, thus the SSoT is not always
clear.
A key benefit of a data-centric approach advocated in this Manual is that the artifacts are
different visualizations of the SOI’s integrated data set. When this is the case, changes to the
data and information managed within the integrated dataset are propagated across all the various
visualizations of artifacts represented by the data and information in that data set.
In the future, projects that have matured their CM process to be consistent with a data-centric
approach, may baseline the dataset from which the visualizations are generated rather than the
individual artifacts. Using this perspective, all the artifacts should be consistent with the data
and information in the baselined data set. SE tools support this approach, enabling the creation
of baselines by removing write permission from the dataset, freezing the data at the time of
baseline. A copy of the data set can be made and changes to the baseline data set are allowed
only if they go through a formal CM change process.
Moving from a document-centric view of CM to a data-centric view of CM is a major challenge
for many organizations.
Refer to the INCOSE SE HB for more details concerning the Configuration Management
Process.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 378

14.2 Perform Needs, Requirements, Verification, and Validation


Management

Baselined Sets Baselined Sets


Baselined System System
of Design of Design
Integrated Verification Validation
Input Output
Sets of Needs Artifacts Artifacts
Requirements Specifications

Section 4 Section 6 Section 8 Section 10 Section 10


Section 5 Section 7 Section 11 Section 11

Prepare for
Needs,
Requirements,
Verification, &
Validation
Management
Section 14.1

Monitor &
Communicate Manage & Combine Manage
Baseline Control
Baselined Manage Control Allocation & System
Needs, Baselined Manage Manage
Needs, Unknowns flow down, Traceability to Verification &
Requirements, Needs, Change Interfaces
Requirements, allocation, and Manage System
& Specifications Requirements,
& Specifications budgeting Requirements Validation
& Specifications

Section Section Section Section Section Section Section Section Section


14.2.1 14.2.2 14.2.3 14.2.4 14.2.5 14.2.6 14.2.7 14.2.8 14.2.9

Perform Needs, Requirements, Verification, and


Validation Management
Section 14.2

Figure 14-2: Needs, Requirements, Verification, and Validation Management Activities.


NRVVM involves the activities shown in Figure 14-2. Key activities include:
• Baseline needs, requirements, and specifications (Section 14.2.1).
• Communicate baselined needs, requirements, and specifications (Section 14.2.2).
• Monitor and control the baselined needs, requirements, and specifications (Section 14.2.3).
• Manage unknowns (Section 14.2.4)
• Manage change (Section 14.2.5).
• Manage and control the flow down, allocation, and budgeting (Section 14.2.6).
• Combine allocation and traceability to manage requirements (Section 14.2.7).
• Manage interfaces (Section 14.2.8).
• Manage system verification and system validation and associated artifacts (Section 14.2.9).

14.2.1 Baseline Needs, Requirements, and Specifications


A key part of system development is the establishment, control, and maintenance of baselines of
the integrated sets of needs, sets of design input requirements, sets of design output
specifications, and sets of interface definition documentation for the SOI under development.
Changes to needs and requirements must be managed as they evolve, identifying inconsistencies
that may occur among them, as well as with other project plans, work products, and engineering
artifacts. Prior to baselining, changes to needs and requirements will occur as they are initially
defined and matured.
When the integrated sets of needs, sets of design input requirements, sets of design output
specifications, and sets of interface definition documentation for a subsystem, system element, or

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 379

the integrated system are completed and ready for baselining, they will undergo verification and
validation activities to review their quality as discussed in Sections 5, 7, and 8.
The interface definitions will evolve during the SOI lifecycle as part of needs verification, needs
validation, requirements verification, requirements validation, design verification, and design
validation activities. Refer to Section 14.2.8 for a more detailed discussion concerning interface
management.
The design output specifications will be reviewed as part of design verification and design
validation activities to ensure they were formed in accordance with the organization’s work
instructions, meet the organizations quality standards for the various artifacts contained within
the design output specifications, and accurately communicate the approved design.
The baselines, or reference points, are established by review, commitment, and approval of the
needs, requirements, specifications, interface definition documentation, and other related SE
artifacts and PM work products generated as part of the lifecycle activities. During the
baselining activities, the needs, design input requirements, design output specifications, and
interface definition documentation will be assessed and reviewed to address any issues
concerning their content, quality, relationships to other artifacts and work products, and resolve
any misunderstandings as to what they are communicating.
Rigorous needs and requirements verification and requirements validation that occurred during
baselining will ensure that the needs and requirements are complete, correct, consistent, and
feasible as well as proper traceability, allocation, and budgeting.
Once the needs have been verified, validated, reviewed, and approved in a gate review and
requirements have been verified, validated, reviewed, and approved by the project stakeholders
at the System Requirements Review (SRR) or similar gate review, they are baselined along with
other PM and SE artifacts and work products appropriate to the specific lifecycle stage and
placed under formal configuration control. After baseline, any suggested change initiates the
CM process.
The creation of a baseline may coincide with a project milestone or decision gate. For example,
integrated sets of needs are commonly baselined during a gate review sometimes referred to as a
Scope Review (SR) or Mission Concept Review (MCR); the design input requirements during an
SRR; and the design output specifications during a PDR and CDR.
In some SE texts, the system level lifecycle concepts, integrated set of needs, and set of design
input requirements and associated ICDs for a SOI, represent the “functional baseline”, and the
SOI physical architecture and resulting family of sets of needs, sets of requirements sets and sets
of interface definition documents for the subsystems and system elements within the system
physical architecture represent the “allocated baseline”.
At the PDR and CDR, the design team addresses how their design will result in the realization of
the allocated baseline. The resulting family of sets of design output specifications for the
subsystems and system elements that are part of the SOI physical architecture represent the
“product baseline”.
The baselined integrated sets of needs, sets of design input requirements, and sets of design
output specifications represent an agreement between the customer (internal or external) and the
developing project team (internal or external) responsible for the SOI. Once baselined they are
put under CM in accordance with the process defined in the project’s CMP. If a contract
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 380

deliverable, the contracting organization will accept and approve the work product as defined in
the Contract Deliverable Requirements List (CDRL) that is part of the contract.
Baselining and CM of the integrated sets of needs, sets of design input requirements, sets of
design output specifications, and sets of interface definition artifacts is normally the
responsibility of a change control board (CCB) or configuration control board (CCB). A CCB is
a formally chartered group of business operations level stakeholders responsible for reviewing,
evaluating, approving, delaying, or rejecting changes to project SE artifacts and PM work
products in addition to recording and communicating such decisions. Not all projects require the
use of a CCB. A project in a heavily regulated industry or one with numerous components,
interfaces, risk, and stakeholders may require the use of a formal CCB more than a project
without those characteristics.
The systems engineer, project manager, and other key personnel usually participate in the CCB
approval and change management processes to assess the impact of a change including cost,
performance, quality, compliance, programmatic, security, and safety.
The CCB is often the ultimate source for approving the integrated sets of needs, sets of design
input requirements, and sets of design output specifications. Once baselined, any changes are
submitted through the CCB. The CCB may choose to have change requests under a prescribed
dollar amount approved by business operations level stakeholders and/or the sponsor/customer
and change requests over the threshold approved by the CCB. Those thresholds usually are
defined by impact on risk, cost, schedule, or deliverables and should be defined in the project’s
PMP, SEMP, and CMP.
This activity is critical to ensuring the resulting individual needs have the GtWR characteristics
C1 – Necessary, C3 – Unambiguous, C4 – Complete, C6 – Feasible, and C8 – Correct and sets
of needs have the GtWR characteristics C10 – Complete, C11 – Consistent, C12 – Feasible, C13
– Comprehensible, and C14 Able to be Validated.
Refer to Sections 14.3.3 and 14.3.4 for more details concerning needs and requirements creep
and change management.
14.2.2 Communicate Baselined Needs, Requirements, and Specifications
Communicating the integrated sets of needs, sets of design input requirements, and sets of design
output specification baselines keeps project stakeholders apprised of the current status and
maintains a level of insight and collaboration. This is especially important with the increasing
complexity of today’s increasingly complex software-intensive systems.
The overall state of the needs, requirements, and specification management activities, key
metrics, and overall status of needs and requirements definition activities and their
implementation via the Design Definition Process should be captured and communicated to
stakeholders in accordance with the project’s Stakeholder’s Communications Management Plan
(SCMP). The metrics to be captured and communicated as part of needs and requirements
management should be captured and maintained within the SOI’s integrated data set. The
metrics to be monitored will be communicated via reports and dashboards shared with the
project’s stakeholders. A major use of the needs and requirements attributes discussed in this
Manual is to aid in the management and reporting on the status of the project in terms of the
needs and requirements and their implementation. (Refer to Section 15 for a detailed discussion
on the user of Attributes to manage the product development effort.)

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 381

14.2.3 Monitoring and Controlling the Baselined Needs, Requirements, and


Specifications
Needs, requirements, and specifications monitoring (insight) and controlling (oversight)
monitors the status of needs and requirements definition process activities and manages and
controls their baseline and implementation over the lifecycle. It should be noted that the process
activities involved in the definition and management of needs and requirements are done
concurrently and collaboratively with the other PM and SE activities and resulting artifacts and
work products.
The needs and requirements attributes defined and managed during needs and requirements
definition and analysis along with traceability are used as part of needs and requirements
monitoring to help control project risk, budget, and schedule.
The impacts of changes are assessed and updated as changes are approved. As new needs and
requirements are identified, they are assessed for impacts to the project and product and
presented to stakeholders for approval using the needs and requirements “bucket” discussed in
Sections 4.6.3.4 and 6.2.6.2.
Monitoring and controlling the needs and requirements includes monitoring their implementation
during the INCOSE SE HB Design Definition Process and the development and maturation of
the sets of design output specifications to which the system elements, subsystems, and the SOI
will be manufactured or coded. This should be both a continuous activity as part of design
verification and design validation activities as well as participation in key gate reviews such and
the SDR, PDR, and CDR.
A major part of monitoring and controlling includes managing the traces between sets of needs
and requirements for each subsystem and system element that is part of the SOI architecture.
Maintaining the correctness and completeness of these traces is critical in support of change
management. Sec Section 14.2.7 for more information concerning the use of traceability along
with allocation to manage requirements.
The project must define change management processes at the beginning of the project in their
PMP, SEMP, NRMP, CMP, MIVV Plan, and SIVV Plans. Usually, changes are managed within
an organization’s existing CM process as communicated in the Project’s CMP. Managing
change involves following the official CM process to ensure that changes are submitted,
assessed, and dispositioned (rejected, approved, approved with modifications, or deferred) in
accordance with a common process.
The CM process also ensures that any needs, design input requirements, design, design output
specifications, system verification artifacts, system validation artifacts, and other PM and SE
artifacts that are affected by the change are updated once the change is approved. The technical
team should also ensure that the approved changes are communicated in a timely manner to all
relevant stakeholders. See Section 14.2.5 for a more detailed discussion on managing change.
Needs and requirements changes in later lifecycle stages are more likely to cause significant
impacts to cost and schedule due to possible changes in the design and rework to parts of the
system that have already been built or coded because of the change. The possibility of these
impacts must be a major consideration when doing change impact assessment. See Section
14.2.5.3 for a more detailed discussion on managing change across the lifecycle.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 382

Because of this, it is imperative that all changes be thoroughly evaluated to determine the
impacts on the cost, schedule, risk, architecture, design, interfaces, lifecycle concepts, higher and
lower-level needs and requirements, system verification artifacts, and system validation artifacts.
See Section 14.2.5.4 for a more detailed discussion change impact analysis.

14.2.4 Managing Unknowns


During the definition of the sets of needs and transforming them in to sets of design input
requirements there may be unknowns resulting in the project team having to make assumptions
regarding performance and functional criteria to allow the subsequent lifecycle activities to
proceed. This often happens when the project team skips the lifecycle analysis and maturation
activities discussed earlier prior to defining integrated sets of needs and transforming them into
sets of design input requirements.
In other cases, further analysis or research is still required that would interrupt the overall
workflow to develop and baseline a complete integrated set of needs and resulting set of design
input requirements, e.g., the maturation of critical technologies. While this work will continue, it
is critical to capture the unknowns and resulting ongoing work to ensure the associated activities
to address the unknowns are funded, tracked, and managed.
One common method to do this is to use the TBD or TBR indications in the need or requirement
statement, in place of or in addition to an actual value. When the actual value has not been
determined, this can be represented as TBD, as shown in the following example: “The
stakeholders need the SOI to [process] the input data fast”. Fast is ambiguous and not verifiable.
If this ambiguity was not able to be resolved during concept analysis and maturation activities,
then a TBD can be used: “The stakeholders need the SOI to [process] the input data at a rate of
TBD [parameters]/sec]”. Given those that defined the integrated of needs did not provide a value
for the TBD, the issue will need to be addressed during transformation of the need into one or
more design input requirements. In this example, the need statement will initially include at TBD
in the design input requirement until a specific value can be defined. “The SOI shall [process]
the input data at a rate of at least TBD [parameters/sec]”.
There may be cases where the value indicted by the TBD has been defined, however there is
disagreement by the stakeholders what the specific value should be. In other cases, achievability
of the value may still be in question. In this case, it is common to put brackets “[xxx]” around
the value that is uncertain and assign a TBR as shown in the following example: “The
stakeholders need the SOI to [process] the input data at a rate of [1000 TBR] parameters/sec.”
and the corresponding design input requirement: “The SOI shall process the input data at a rate
of at least [1000 TBR] parameters/sec.”
The use of a TBD or TBR is an indication the requirement will require further analysis during
transformation from the parent need into the implementing design input requirements to
understand what the stakeholder believes is "fast" (what is the minimum value and why) and
align it with what is physically feasible based on the TRL of the critical technology needed to
achieve that value. In this sense, the TBD or TBR is a place holder that indicates additional
work needs to be done.
As such, all TBDs and TBRs need to be identified and managed formally as action items. A
person within the organization should be assigned to the manage resolution of a TBD or TBR by
a specific date.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 383

In the case where the customer is going to contract out the transformation of the integrated set of
needs into the set of design input requirements; the customer must decide who is responsible for
resolving the TBDs or TBRs. Those being assigned to the supplier for resolution would be
addressed in the SOW along with a requirement for the supplier to do the work needed to resolve
the TBDs and TBRs. This extra work would be reflected in the supplier’s proposal. (A common
error in contracting is to fail to include in the SOW or SA provisions concerning these kinds of
activities. The result is often very expense contract changes.)
The above examples reflect a simple use of TBDs and TBRs to show that the confidence in the
values is low, and that the project team responsible for transforming the need into one or more
design input requirements or defining the design based on the design input requirements are
aware that additional work is required to resolve the TBD or TBR.
This additional future work represents technical debt as discussed previously. The later the
resolution of the TBD or TBR is in the development lifecycle, the more interest is accrued
driving up costs. This work and management of the technical debt is often referred to as "TBX
Management", as it provides an indication of the effort required to resolve the various TBDs and
TBRs in the resulting requirement set or design.
Not all TBDs and TBRs are bad. If analysis is needed to fully develop the value, showing a
nominal value within brackets “[ ]” with TBR shows that it is currently a placeholder. While it
is important to reduce technical debt to prevent rework later, it is also important to resist the
temptation to set a questionable value that overly constrains the resulting design just to remove
the TBD or TBR.
TBXs can be managed multiple ways using common PM techniques. One way often used is to
control these within the integrated set of needs or set of design input requirement to assign a
unique identifier for each TBX (e.g., TBD1, TBR3, etc.), and a summary report showing all
TBXs and associated unknowns. Often the unique identifier may be the identifier for the need or
requirement statement appended to the letters TBD x.x.x or TBR x.x.x where “xxx” is the
number of the need or requirement to which the TBD or TBR applies.
To aid in the management of TBDs and TBRs it is useful to include attributes such as A26 -
Stability and A27 - Responsible Person defined in Section 15. This will allow reports to be
generated from the data set for all needs that have the stability attribute set and who the
responsible person is for resolving the TBD or TBR.
In a document-centric practice of SE, it is common to include the TBDs and TBRs in an
appendix of the needs or design input requirement documents with sufficient information to track
and manage the resolution of the TBDs and TBRs
If multiple sets of needs or requirements exist, the work to resolve the TBXs may become
complex and involve several resources and actions. Of particular concern is when a value in one
need or requirement statement has a dependency with values in one or more other need or
requirement statements.
If this is the case, a comprehensive TBX tracking mechanism would be helpful, such as using the
project’s toolset to connect all TBXs to a common database, where tracking data such as forward
work, assignee, and closure plan is defined and managed. This could be linked (traced) directly
to the needs and design input requirements they impact. The toolset would also allow dependent
TBDs or TBRs to be linked, to help ensure consistency as the values are defined and agreed to.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 384

Some PM and SE management applications can produce a report showing the needs and
implementing design input requirements that contain unresolved TBDs and TBRs and their status
and resolution. Keeping track of the TBXs allows for awareness of the maturity of the needs and
implementing design input requirements throughout the lifecycle and is a valuable metric to
evaluate completion and maturity of the set of needs and set of design input requirements.
Capturing TBDs and TBRs contained in a set of needs and set of design input requirements
statements that have dependencies within the project’s toolset is critical for complex systems to
help ensure they have the characteristics defined in the GtWR C3 – Unambiguous, C4 –
Complete; C6 – Feasible, C7 – Verifiable, and C8 – Correct.
14.2.5 Managing Change
NRVVM involves managing all changes to needs, design input requirements, design output
specifications, system verification artifacts, and system validation artifacts baselines over
lifecycle.
Note: When referring to needs and design input requirements changes, the reference is to the
needs expressions and requirements expressions which include the need statement or
requirement statement along with the set of attributes. Managing change applies to changes for
both the need statements and requirement statements as well as all associated attributes.
Given that drivers and constraints are imposed on the project, the project must monitor them
closely for changes as part of their CM processes. To do this, the project or their organization
must have a process in place enabling the project to be notified of these potential changes, assess
their impacts, and communicate those impacts to those that have CM authority over the drivers
and constraints. For those changes that are approved, the project will need to then formulate
change requests for all artifacts affected by that change that were identified during change impact
assessment.
Not all changes have an adverse impact, for example a requested change that clarifies a
requirement can reduce ambiguity in design or a requested change that simplifies interfaces may
reduce complexity in design and integration. A regulation or standard may change, but specific
requirements within the standard or regulation applicable to the SOI under development may not
change. A key challenge is for the organization to have a process that will notify projects when a
standard or regulation changes so the project team can determine whether the change impacts
their SOI.
All change requests must be captured and placed under configuration control. In addition to the
change requests, the impact analysis and any other documents created during the change request
process should be captured. The status and disposition of change requests should be readily
available to the relevant stakeholders and monitored through change logs. Most RMTs include
the capability to maintain a history of all changes made within the tool.
All changes should be subjected to a review and approval cycle to ensure the resulting changed
needs and requirements have these characteristics and that traceability is maintained to ensure
that the impacts of any proposed changes are fully assessed.

When managing changes, the CCB needs to consider the distribution of information related to
the decisions made during the change process. The CCB needs to communicate the needs,
requirements, and specifications change decisions to the affected organizations in a timely

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 385

manner. During a CCB meeting to assess and approve a change, actions to update artifacts and
work products need to be included as part of the change package. These actions should be
tracked to ensure that affected artifacts and work products are updated in a timely manner to help
maintain consistency and correctness. A major challenge is establishing and maintaining a single
source of truth.

Note: Beware of changes that are fast tracked through the CM processes. Often fast-tracked
changes do not involve the proper degree of change impact analysis that is used to identify
possible impacts due to the change. As a result, the fast-tracked change could be implemented
with unintended negative consequences. Another type of change to avoid are deferred changes.
These are changes that are approved, but their implementation is deferred to a later time, e.g.,
after a key milestone or moved into a different budget cycle. When the deferred change was
approved it was approved for the system configuration at that time. The danger is that,
depending on the deferred time period, other changes could have been approved and
implemented resulting in a different system configuration. When the deferred change is
implemented, it again could have unintended negative consequences because of the changed
configuration.
14.2.5.1 Controlling Needs and Requirements Creep
Needs and requirements instability is a leading cause of change, and the sets of needs and sets of
design input requirements monitoring and controlling activities ensure that requested changes are
processed through the project’s change control process.
“Scope creep” “needs creep”, and “requirements creep” are the terms used to describe the subtle
way that sets of needs and sets of design input requirements tend to grow incrementally during
the course of a project. There is a tendency for the number of needs and requirements to increase
during development, resulting in a SOI that is more expensive and complex than originally
intended.
Some of this growth may not be warranted, while some of the sets of needs and sets of design
input requirements creep involves new needs and design input requirements that were not known
when the original sets of needs and requirements were baselined, and were not anticipated,
during the Lifecycle Concepts and Needs Definition and Design Input Requirements Definition
activities. These new needs and resulting design input requirements are the result of evolution,
and if a relevant SOI is to be developed, they cannot be ignored.
There are several approaches for avoiding or at least minimizing needs and requirements creep:
• Focus on the problem, MGOs, and constraints defined at the beginning of the project and
determine whether a change is warranted. Often changes, especially later in the
development lifecycle will require rework with associated costs and schedule issues, which
will need to be addressed if the change is approved. If the change does not directly address
the problem, MGOs, or constraints, why approve the change?
• In the needs elicitation phase, work with the stakeholders to bring out both implicit as well
as explicit needs and requirements that might otherwise might not be stated. This helps to
avoid missing needs and requirements at the beginning of the project.
• Define a set of lifecycle concepts that has been through the lifecycle concepts analysis and
maturation activities discussed in Section 4 and agreed-to by the customers, users, and
other relevant stakeholders. In addition to operations, address all lifecycle stages of the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 386

SOI as well as alternate nominal and off-nominal cases. This helps to avoid missing needs
and requirements.
• Establish a configuration control and change management process. This will determine
which stakeholders have the authority to submit changes formally to the CCB and the type
of changes that will be allowed. Maintaining configuration control is essential to having a
control over the project budget and schedule.
• Establish a process for assessing changes and their impacts on the rest of the system and
other artifacts within the project’s data and information model. Compare this impact with
the consequences of not approving the change.
• Determine the feasibility of implementing a change in terms of budget, schedule,
technology, and risk. If it cannot be accommodated within the established resource
margins, then the change most likely should be disapproved. If the change does not “fit”
within needs and requirements “bucket” discussed in Sections 4.6.3.4 and 6.2.6.3, then do
not approve the change.
• Determine criticality. If a change does not address the ability to meet a critical need or
requirement, a requirement dealing with safety or security, or a mandatory regulation or
standard, the do not approve it.
One of the authors attended a briefing of a project that was getting an award for their success in
developing a system that met the stakeholder needs within cost and schedule constraints. When
the project manager was asked what was key to the project success, the project manager said that
he had extremely strict rules for change management. His philosophy was that if it is not broke,
is not safe, or is not breaking a law – then leave it alone! It did not take long for members of the
project team to limit any proposed changes to those that met these criteria. While this seems
drastic, it worked.
14.2.5.2 Why Needs and Requirements Change
It is useful to understand common reasons why needs and requirements change so this
knowledge can be used to help avoid, or at least minimize the number of changes as well as
avoid unnecessary needs and requirements creep.
Why needs change:
• Poorly defined Lifecycle Concept and Needs Definition activities: This can result in
defective, incorrect, inconsistent, and missing needs as well as needs that are not feasible.
The later in the development lifecycle before discovering these problems, the greater the
impact on cost and schedule.
• Some stakeholders may not know what they want until they see it. They say: “Show me a
rock, and I will tell you if it is the right rock.” The project team may have developed
something, like a graphical user interface (GUI) interface or a report a stakeholder said they
needed, but when delivered they say: “No, that is not what I need, that’s not what I meant;
what I really meant was ……….” That is one reason why prototyping and modeling is
encouraged so stakeholders can evaluate proposed concepts during lifecycle concept
analysis and maturation activities so issues can be resolved early in the lifecycle before the
integrated set of needs are baselined and transformed into the set of design input
requirements instead of discovering these issues during design verification, design
validation, system verification, or system validation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 387

• Changing expectations: Stakeholder real-world expectations tend to change over time if not
managed. If the project team does not involve the stakeholders at each phase of
development and setting expectations to let them know what to expect, other people could
be influencing them and changing their expectations. To help manage changing
expectations and the resulting needs and requirements creep, communicate, communicate,
communicate to set and reset stakeholder expectations and minimize potential changes.
• Changing technology: Technology is changing at an increasing rate and often the
stakeholders expect the latest and greatest. For SOIs with a long development time, the
available technologies can change, and the project will be challenged to keep up. The
stakeholders may have not asked for some feature or level of performance initially because
the technology was not mature, but now that technology is available and mature, the
stakeholders may demand the new features or performance be included enabled by those
technologies.
• Changing drivers and constraints: One source of change is changes to drivers and
constraints. These changes could be due to a change in schedule or budget, a change to
how the SOI needs to interact with an existing external system, a change in the operating
environment, or a change to a standard or regulation the project must provide sufficient
evidence of compliance. Failing to implement changes to drivers and constraints could
result in integrating issues during integration or a compliance failure.
• New and changing stakeholders: Some stakeholders may not exist at the beginning of the
project. Over time, stakeholders leave and are replaced with new stakeholders. Each of
these stakeholders could see the problem and desired solution (end state) differently.
Because of this they may want to change or add new needs and requirements.
• Needs change. Sometimes the “problem” that the SOI is to address and the MGOs and
measures, the operations environment change, enabling systems change as well as other
external systems in which the SOI will interact. When this happens, the whole project
needs to be rethought. All the deliverables that have been prepared to date that were based
on meeting the originally stated problem statement, MGOs, and needs could be obsolete.
When this happens, the project team will have to redo a lot of the work.
• Missing or ignored stakeholders: There may be key stakeholders that were not identified or
were ignored at the beginning of the project during elicitation. Stakeholders represent
needs and requirements. Missing or ignored stakeholders result in missing needs and
requirements. For example, the safety or security office stakeholders were not involved at
the beginning of the project during elicitation. As a result, specific safety and security
needs and requirements were not defined at the beginning of the project. Later, during
certification or qualification activities, safety and security representatives will not certify or
qualify the system for use because the SOI did not meet their needs and requirements.
• Overly optimistic budget or schedule: Promising something that cannot be delivered with
the available resource, or in the time allotted or without establishing feasibility before the
project is formulated. It is human nature to be overly optimistic.
• All product lifecycle stages not addressed: A key product lifecycle was missed (test,
system verification, system validation, transportation, storage, transition, upgrades,
maintenance, etc.). Unique needs to address a missing lifecycle will need to be added.
• Unknowns not addressed. At the time of baselining, there were unknowns not yet resolved
resulting in need statements containing TBDs and TBRs. See Section 14.2.4 for a detailed
discussion managing unknowns.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 388

Why requirements change:


• Poorly defined Design Input Requirement Definition: This can result in defective,
incorrect, inconsistent, and missing requirements as well as requirements that are not
feasible. The later in the development lifecycle before discovering these problems, the
greater the impact on cost and schedule. Given a defective set of design input
requirements, developers will find major problems and issues and so the changes begin.
• Failure to define and mature lifecycle concepts and derive an integrated set of needs prior
to defining the set of design input requirements. A common problem is the definition of
design input requirements with little or no underlying analysis of the lifecycle concepts and
needs from which the requirements are transformed.
• Changing needs: Changing needs due to the issues discussed previously is often perceived
as the major reason for change and requirements creep. If the needs change, then the
resulting design input requirements transformed from those needs will change.
• Changing drivers and constraints: One source of change is changes to drivers and
constraints. These changes could be due to a change in schedule or budget, a change to how
the SOI needs to interact with an existing external system, a change in the operating
environment, or a change to a standard or regulation the project must provide sufficient
evidence of compliance. Failing to implement changes to drivers and constraints could
result in integrating issues during integration or a compliance failure.
• Ignored requirements. Another thing that could have happened is that the developers
could have ignored some of the original requirements. Either they did not understand the
requirements, the requirements were too complex, or the developer just chose to ignore the
requirements. As a result, the developers designed the SOI without reference to one of
more of the requirements resulting in failed system verification and system validation.
• Immature technology: Projects sometimes base their ability to meet the needs based on a
technology that is not mature enough to use. Doing so adds risk to the project as well as
the potential for change if the technology does not deliver the needed functionality,
performance, or quality.
• Interfaces not defined. A key interface was overlooked. Without addressing the interface,
the product cannot be integrated into the macro system of which it is a part.
• Unknowns not addressed. At the time of baselining, there were unknowns not yet resolved
resulting in requirements statements containing TBDs and TBRs. See Section 14.2.4 for a
detailed discussion managing unknowns.
The concepts in this Manual are designed to help avoid the above issues, resulting in more stable
needs and requirements that have less “churn” that if these concepts were not followed.
14.2.5.3 Change Management Across the Lifecycle
Change management is of critical importance across all lifecycle activities. The architecture,
allocation, and traceability discussed in Section 6 results in a 3-dimensional spider web of
relationships both vertically (between levels) and horizontally between dependent requirements
at a given level both within a given SOI as well as other SOIs at that level as well as other PM
and SE artifacts generated across the lifecycle. This spider web is represented within the SOI’s
integrated data and information dataset. For today’s increasingly complex systems, it is difficult
to understand the effects of change across all aspects of this spider web.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 389

Gentry Lee from the Jet Propulsion Laboratory notes: “A good systems engineer knows the
partial derivative of everything in respect to everything.” This means that a change that occurs
anywhere in a SOI’s integrated/federated dataset could have an impact on other data and
information in that dataset. The project team must have the ability to identify and understand
these impacts.
Because all the data and information developed across all lifecycle stages are linked together and
included in this dataset, it is much easier for the project team to assess a change in any data item
within the dataset to determine whether the change could have impacts to other data items.
A change to a stakeholders’ needs or stakeholder-owned requirements could impact a lifecycle
concept, which could impact multiple needs, which could impact multiple design input
requirements, which could impact the design and implementing design output specifications,
which would impact production, system integration, system verification, and system validation.
Any of these changes could impact cost and schedule or the ability to address the ability of the
system to address the problem or opportunity which the system is supposed to address.
What are the impacts to system verification and system validation planning when a level 3
design input requirement changes? Does that change impact the subsystem at level 2 from which
its parent requirement(s) were allocated and associated system verification artifacts?
Related/dependent peer requirements and associated system verification artifacts at the same
level?
How will Level 4 system element requirements and associated system verification artifacts be
impacted by a change in the allocated Level 3 parent requirement? How will a design input
requirement change impact the architecture and design? What is the ripple effect of that one
change? How will the change impact the design output specifications? Production? Will
software need to be recoded or hardware re-built because of the changed design output
specifications? What will be the total cost of the change? How will the change impact the
schedule?
For example, consider a large government program where requirements existed to six to seven
levels across multiple projects and architectures within each project that made up the program.
Due to changes in mission and funding (primarily due to politics), several key changes were
mandated at the top levels of management. At the program level, it seemed that only four or five
stakeholder-owned requirements for the overall system architecture would be changed. What is
the big deal? Because of the ripple effect, thousands of requirements at the lower levels were
impacted along with design implementations of those requirements. The associated system
verification and system validation artifacts for those requirements were impacted as well. Sadly,
the cost and schedule impacts associated with “just a few” top-level program requirements
changes were too great, and the program was canceled.
For today’s increasingly complex, software-intensive systems, it is difficult, if not impossible,
for a human brain to comprehend all the relationships and impacts across the lifecycle due to
change. Because of this, it is critical that projects have the SE tools necessary to develop the
integrated/federated dataset, enabling them to manage these relationships and access impacts of
changes across all lifecycle activities and associated artifacts.
For highly regulated systems, e.g., medical devices or nuclear based systems, being able to
manage the relationships and assess the impacts of changes, no matter which level of architecture

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 390

or where in the lifecycle, and documenting the impacts are mandatory for certification,
qualification, and approval for use.
Because of these possible impacts of a change, it is critical that the developing organization’s
CM office assess the impacts of changes across the entire web of data and associated artifacts,
especially all the artifacts that are part of the project’s system verification and system validation
programs and associated artifacts.
14.2.5.4 Change Impact Analysis
Changes need to be analyzed, which typically involve performing an impact analysis to evaluate
the proposed change, if approved, in relation to how it will affect other needs, requirements,
design, risk, the system, the project, and the program as well as impacts if not approved. The
systems engineer, project manager, and other key engineers and subject matter experts
participate in the CM process to assess the impact of the change including cost, performance,
programmatic, security, and safety.
Effective change management requires a process that assesses the impact of proposed changes
prior to their approval and implementation. For CM to perform this function, a baseline
configuration for each artifact under CM should be recorded, and resources and tools used to
assess impacts to the baseline.
When performing change impact analysis, key considerations include:
• How the change will affect other needs, requirements, design, design output speculations,
manufacturing, system verification, system validation, the integrated system, the project,
and the program.
• Risk associated with the change both if implemented and if not implemented.
• Work that will be required to incorporate the change and who will be affected.
• Affects the change will have on requirement allocations and budgeting and impact of
change to development teams and suppliers of lower-level subsystems and system
elements, Will the change require a change be made to a suppler contract.
• Schedule and cost implications are. Given the timing of the change, how the work in
progress will be affected.
• How the proposed change may impact the value of the solution to be delivered.
• When implemented, will the resulting system continue to adequately address the problem
and MGOs that were approved by the stakeholders.
If the change is not understood, if impacts to all areas that respond to the changing needs or
requirements are not captured, or if the change is not communicated, then the needs and
requirements can become misaligned at multiple levels. When a need or requirement change
occurs at the system level, it permeates down to lower-level subsystems and system elements
through change orders.
A key benefit of completing an impact analysis is that it allows for changes within the project to
be considered in an integrated fashion, thereby reducing risk, which often arises from changes
being made without consideration as to the possible impacts.
Typical data, information, and methods used to analyze the change impacts is shown below.
Ideally, this information is maintained within the project toolset.
• Budgeting of resources, performance, and quality. (Refer to Section 6.4.5)

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 391

• Margins and Reserves. A list of key margins for the system and PM reserves and the status
of the margins and reserves. For example, the propellant performance margin will provide
the necessary propellant available versus the propellant necessary to complete the mission
or budget reserves accounting for unknowns and unknown unknowns during both
development and operations. Changes should be assessed for their impact on margins and
reserves. A threats list is normally used to identify the costs associated with all the risk for
the project. Project reserves are used to mitigate the appropriate risk. Analyses of the
reserves available versus the needs identified by the threats list assist in the prioritization
for reserve use. (Refer to Section 6.4.6)
• Stakeholder Register. Managed by the project to ensure that the appropriate subject matter
experts and other applicable stakeholders are evaluating the changes and communicating
impacts that could result from implementing or not implementing the change. All changes
need to be provided to the appropriate individuals with the needed experience and
knowledge to ensure that the change has had all impacts identified and assessed across the
lifecycle.
• Risk Identification and Management. Changes can affect the consequences and likelihood
of identified risk or can introduce new risk to the project. (Refer to Section 4.3.7 for a
more detailed discussion concerning the identification, assessment, and handling of risk
and the INCOSE SE HB Risk Management Process.)
• Interface Audit. Changes to external systems in which the SOI interacts or changes to the
SOI that effects the interaction of the SOI with an external system is a major risk to the
project. In addition, missing interface requirements and/or definitions concerning the
interaction represent key risk to the project. Use of an interface audit as defined in Section
6.2.3.6 will help identify and address these issues.
• Allocation, Budgeting, and Traceability. Changes to any requirement need to be assessed
in terms of allocation, budgeting, and traceability as discussed in Section 6 and below in
Sections 14.2.6 and 14.2.7.
• Cost and Schedule. All changes must be assessed in terms of impacts to cost and schedule
14.2.6 Manage and Control Flow Down, Allocation, and Budgeting
A key part of managing and controlling the needs and requirements includes linkages between
needs and implementing requirements, and parent and child requirements as well as traceability
between the design input requirements and design output specifications.
As discussed in Section 6.4.3 during the Design Input Requirements Definition, based on
analysis of the design input requirements and the SOI whose requirements are being allocated,
the INCOSE SE HB Architecture Definition Process decomposes the system into subsystems
and system elements, resulting in the next level of the architecture. During this analysis, the
project team determines what “role”, if any, each subsystem and system element at the next level
of the architecture have in the implementation of the design input requirement(s) being allocated.
For each of the allocated requirements, the receiving subsystems and system elements define
child requirements (Refer to Section 6.4.4) that are necessary and sufficient to meet the intent of
the allocated parent requirement. Each of these child requirements are traced to their allocated
parent requirements. “Necessary and sufficient” are addressed both during the definition process
as well as part of requirements verification and requirements validation prior to baselining each
set of design input requirements. A major part of requirements management is managing the
allocations and traceability to 1) ensure each requirement is allocated to the next level until no

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 392

further elaboration is necessary and 2) once baselined, the changes to the requirements at any
level are assessed in terms of the impacts of those changes on allocation and traceability.
As part of allocation, performance, form, and quality requirements are apportioned (budgeted) to
each system, subsystem, and system element that has a role in the realization of the budgeted
value (Refer to Section 6.4.5). Budgets need to be managed and controlled at the system level.
A critical concept associated with requirements and budgeting is that the budgeted quantities
result in requirements that have a dependency - a change in one will result in the need to change
another.
Because of these dependencies, establishing traceability between the child requirements and their
allocated parent and between peer requirements that have a dependency is critical. Identifying
and managing these lower order dependencies is exceedingly difficult to do unless the project
team is using an integrated system model.
Managing these budgets can be challenging in that initially they are often estimations with a
minimum of analysis, especially for a document-centric approach to SE. The budgets can be
very dynamic as the design matures for each subsystem and system element a requirement was
budgeted. Some subsystems or system elements may need less that what was budgeted and other
more. These changes have a ripple effect for all dependent budgets up and down the levels of
the system architecture. Because of this, it is critical to manage all budgets within the integrated
system architecture from the top using a single integrated model of the SOI.
Budgets are established as limits within which a quantity is managed. Given there is uncertainty
with the budgets, there is inherent risk to the project being able to stay within the allocated
budgeted values. One way to help manage those risk is the use of margins and reserves (Section
6.4.6). Another key role of requirements management is the management of the margins and
reserves.
The uncertainty concerning budgeted quantities decreases as the design matures. A common
management role is to “release” reserves as they are needed and to tighten the margins. For
example, for spacecraft mass, the project may define a reserve of 30% when the integrated set of
needs are baselined for the SOI, but once allocated baseline of all the sets of design input
requirements for each part of the SOI architecture are complete, this reserve can be reduced to
20%. As the design matures, more margin can be released at PDR and the rest released at CDR.
14.2.7 Combine Allocation and Traceability to Manage Requirements
Another key requirement management activity is managing traceability (Refer to Section 6.2.2).
Because allocation is closely tied to traceability, it is a useful to combine the concepts from a
management perspective.
Combining the concept of allocation with the concept of traceability provides a powerful method
to manage the design input requirements, especially across levels and across subsystems and
system elements within a specific level.
A major advantage of RMTs is their ability to produce reports based on filtering on the
information contained within the requirement attributes and other information within the RMTs.
These reports can identify issues within and between requirement sets using the allocation and
traceability information that will need to be addressed and corrected.
There are two common issues concerning allocation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 393

• Requirements not allocated: Unless the project has determined that no further elaboration
of the requirements for a subsystem or system element is needed and they are ready to
make a build, buy, code, or reuse decision, all requirements must be allocated to the
subsystems or system elements at the next level of the physical architecture that have a
role in meeting the allocated requirement. This is a major advantage and reason for using
RMTs and models to aid in establishing and managing allocations and budgeting. For an
SOI that requires further elaboration, the project team can use the RMT to generate a
report that lists all design input requirements for the SOI that are not allocated to a lower-
level subsystem or system element. Ideally, the report will be “null”. If it is not, the
unallocated requirements will need to be allocated. If not allocated, the implementing
child requirements will not have been defined and further allocated, resulting in missing
requirements for the system elements at lower levels of the architecture. A missing
requirement at the system level of the architecture, could result in a multitude of missing
requirements for the subsystems and system elements at the lower levels of the
architecture.
• Requirements not allocated correctly: It is one thing to ensure all requirements have
been allocated, but another to assess whether the allocations are correct; either to a wrong
subsystem or system element or failing to be allocated to all applicable subsystems and
system elements that have a role in realizing the allocated parent requirement. RMT
reports can indicate that requirements have been allocated, but the RMTs have no way to
automatically determine whether the allocations are correct, that must be done by
members of the project team. Note that traceability occurs naturally (as it should) after
requirements are decomposed and allocated. [“Traceability” without allocation is merely
an unfounded assertion.]
Unfortunately, the concept of allocation is not as well understood as traceability. There are
several common misconceptions and bad practices concerning allocation and traceability:
• Some feel they can use the traceability matrices to assess allocation. The thought process
is that if a parent has child requirements defined for a subsystem or system element, it is a
safe assumption that the parent must have been allocated to that subsystem or system
element. However, people make mistakes during the allocation process, and that
assumption is not always valid. Allocations can be incorrect or incomplete. Ideally,
allocation is both a top-down and bottom-up activity. The system architect and owner of
the parent requirement makes an initial allocation, and the owners of the receiving
subsystems or system elements confirm the validity of the allocation. The likelihood of
incorrect allocations is less when the allocations are based on the architectural, analytical,
and behavioral models developed by the project team.
• Another issue is that when the traceability matrices are developed, rather than including the
requirement text in the matrix as shown in Table 6-2, only requirement numbers are used.
With only requirement numbers it is hard to assess the correctness of the allocations just
seeing that the allocated parents have some child requirements without seeing the wording
of the parent and child requirements.
• Not all tool vendors understand the real meaning of allocation and thus do not always
implement the concept correctly within their tools. One way to test this is to ask the tool
vendors if they can generate a report that lists all child requirements that trace to a parent
requirement that was NOT allocated to the subsystem or system element in which the child
requirements exist. Ideally, they can generate this report AND the results in the report are
“null”. If not null, the project team will have to fix the discrepancy. In most cases it will

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 394

be a failure to have allocated the parent requirement to that subsystem or system element.
Sadly, few RMTs are able to generate such a report.
Other issues that can be identified when combining the concepts of allocation and traceability
include:
• Parent requirements with no child requirements Unless no further elaboration is need, all
parent requirements must have implementing child requirements defined for each
subsystem or system element to which the parent requirement was allocated. As stated
earlier, managing the traceability of large sets of requirements in a trace matrix manually is
difficult. This is another major advantage and reason for using models and RMTs. The
models will help avoid missing child requirements, RMTs can help identify cases when a
parent has no child requirements.
Use the RMTs to generate a report that lists all allocated parent requirements that do not
trace to one or more implementing child design input requirement(s). Again, the report
should be “null”. If not, the project team must define child requirements that are necessary
and sufficient such that when implemented, the intent of the allocated parent requirement
will be achieved.
• Needs with no implementing design input requirements. All needs must have implementing
design input requirements defined for each system, subsystem, or system element to which
the need applies. Models will help avoid needs that were not transformed into a design
input requirement, RMTs can help identify cases when a need has no implementing design
input requirements.
Use the RMTs to generate a report that lists all needs that do not trace to one or more
implementing design input requirements. Again, the report should be “null.” If not, the
project team must go through the transformation process defined in Section 6 resulting in
one or more design input requirements that are necessary and sufficient such that when
implemented, the intent of the need will be achieved (requirement validation).
• Orphan needs that do not trace to a source. As shown in Figure 4-12, needs are
transformed or derived from multiple sources. All needs must trace to a source. Models
will help avoid needs that do not trace to a source, RMTs can help identify cases when a
source has no implementing need.
Use the RMTs to generate a report that lists all needs that do not trace to one or more
sources. Again, the report should be “null”. If not, the project team must go through the
Lifecycle Concept and Needs Definition activities defined in Section 4 to determine the
source and establish traceability. Without this traceability it will be difficult to validate
each need to ensure it communicates the intent of the source from which it was derived as
well as assess the possible impacts of proposed changes.
• Orphan requirements that do not trace a need, parent, or a source. All design input
requirements must trace to a need, source, or parent. If a design input requirement does not
trace to a need, parent, or source, it should be assumed either that the traceability process is
flawed and should be redone or that the requirement is “gold plating” and should be
removed from the set.
As stated earlier, traceability helps establish that the set of design input requirements has
the GtWR characteristic C1- Necessary. If the requirement cannot be traced to a need,
source, or parent, why is the requirement in the set? In addition to traceability, attribute A1
- Rationale also helps establish whether a requirement is needed, if the writer cannot
provide rationale, why is the requirement in the set?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 395

The project team can use the RMT to provide a report for all design input requirements that
do not trace to a need, parent, or source. Again, the result should be “null”. If not null, the
project team must determine whether each requirement without a need, parent, or source is
needed, and if so, trace the requirement to the correct need, parent, or source and provide
rationale for why the requirement is needed. One common reason for requirements not
having a need, parent, or source, is a failure of the writer to trace the requirement to its
need, parent, or source when the requirement was added to the set.
Another reason could be the need, parent, or source is missing. The project team members
responsible for the lower-level subsystem or system element know that, based on
experience with similar subsystems or system elements, the requirement needs to be
included in the set even if there was no need to transform it from, no source to derive it
from it from, or no parent requirement allocated to the subsystem or system element A
major reason for no need is that the project team did not define an integrated set of needs
for the system, subsystem, or system element before defining the set of design input
requirements as advocated in this Manual.
No matter the reason, it is important to perform an analysis to determine if there is a
missing need, source, or parent requirement in the applicable higher-level system and add it
if the parent should have been included. If not included, the result could be that that parent
requirement was not allocated to all the applicable lower-level subsystems or system
elements or a need or source was not identified that should have been, resulting in missing
requirements. Once the missing need, source, or parent has been added, the project team
will need to allocate the parent to the next level of subsystems and system elements to
which it applies or derive the appropriate requirements that address the intent of the added
need or source.
• Needs, sources, or requirements with incorrect or missing implementing child
requirements. Again, it is one thing to ensure all needs, sources, and parent requirements
have implementing child requirements, but another to assess whether the child
requirements are correct or if there is a missing implementing child requirement. RMTs
can indicate that needs, sources, and requirements have implementing child requirements,
but the RMTs have no way to automatically determine whether the child requirements are
correct or there are missing child requirements— that must be done by members of the
project team. Models can help the project team avoid incorrect or missing child
requirements. A common reason for incorrect child requirements is the result of incorrect
traceability— when the child requirement was added to the set, the writer failed to trace it
to the proper need, source, or parent within the RMT. A common reason for missing child
requirements is a failure to use models as an analysis tool to identify the child
requirements. Incorrect or missing child requirements can be hard to identify.
• Requirements with an incorrect parent or source. Again, it is one thing to ensure all child
requirements trace to need, source, or parent, but another to assess whether the need,
source, or parent it traces to is correct. RMTs can indicate that requirements have a need,
source, or parent, but the RMTs have no way to automatically determine whether the need,
source, or parent is correct - that must be done by members of the project team. Models
can help the project team avoid incorrect needs, sources, or parents. A common reason for
incorrect need, source, or parent is the result of incorrect traceability - when the
requirement was added to the set, the writer failed to trace it to the proper need, source, or
parent within the RMT. Traces to incorrect needs, sources, or parents can be hard to
identify.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 396

• Sets of child requirements are not necessary and sufficient to implement the parent
requirement, need, or source from which it was transformed/derived. The sets of child
requirements for a given need, source, or parent, must form a necessary and sufficient set,
such that, when implemented, the intent of the need, source, or parent will be met.
“Necessary” implies the requirement is needed to meet the intent of the parent requirement
or need - if not necessary, why is it in the set? “Sufficient” implies the set of child
requirements, when implemented will result in the intent of the need, source, or parent
being met - if there is a missing child requirement, the set will not be sufficient.
Again, it is one thing to ensure all parent requirements have child requirements or a need or
source has implementing design input requirements but another to assess the sets of child
requirements or design input requirements are necessary and sufficient. RMTs can indicate
that parent requirements have child requirements or that the needs or sources have
implementing design input requirements, but the RMTs have no way to automatically
determine whether they are necessary and sufficient, that must be done by members of the
project team. Addressing the question of necessary and sufficient is difficult to do unless
the project team uses models to aid in the assessment.
Addressing the issues discussed above is hard and can take a considerable amount of time and
resources, but the effort is necessary to define and manage the sets of design input requirements
for a SOI that have the characteristics defined in the GtWR for well-formed sets of design input
requirements.
Using a data-centric approach as advocated in this Manual can reduce the occurrence of these
issues as well as make it much easier to identify and correct these issues. Failing to spend the
time and resources to do these assessments results in an accumulation of technical debt that will
have to be paid back later, at an exceedingly high interest rate.
This activity helps establish each design input requirement has the GtWR characteristics C1 -
Necessary and C8 - Correct. It also helps establish the set of design input requirements has the
GtWR characteristics C10 - Complete, C11 - Consistent, and C14 - Able to be Validated.
14.2.8 Managing Interfaces
Managing interfaces cuts across all SOI lifecycle process and activities. Given that the behavior
of a system is a function of the interaction of its parts, it is critical that the project team identify
and define each of the interactions across interface boundaries between all subsystems and
system elements that make up the SOI as well as interactions with external systems including
users and operators.
Failure to identify and manage all interface boundaries and interactions across those boundaries
is a significant risk to the project, especially during system integration, system verification,
system validation, and operations. Failing to do so will result in costly and time-consuming
rework.
Each interaction across an interface boundary must be accessed in terms of stability,
documentation, threats, and risk. The SOI is particularly vulnerable to undesirable things
happening at and across the interface boundaries especially when interfacing with external
systems over which they may have little or no control. Identifying risk associated with interface
boundaries and interactions across those boundaries is key to exposing potential risk to the
project.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 397

Because of this, it is critical that the project team address the management of interfaces starting
at the beginning of the project as a distinct project function defining lifecycle concepts and needs
for how the project will ensure the SOI will work safely and securely with all the external
systems with which it must interact in the intended operational environment AND is protected
from outside threats across those interface boundaries.
Managing interfaces includes the oversight and management of the identification of interface
boundaries, identification of interactions across those boundaries, defining and agreeing on
definitions for each interaction, identifying the risk associated with each interaction, and defining
interface requirements for each interaction. The identification of interface boundaries is a key
function of the Lifecycle and Needs Definition activities and the INCOSE SE HB Architectural
Definition Process, and concurrent Design Input Definition activities.
The interface requirements are defined during Design Input Requirements Definition activities
and implemented in accordance with the interface definitions during the INCOSE SE HB Design
Definition Process. During design, the interface definitions evolve, and the resultant definitions
recorded with in interface definition type documents such as an ICD. The ICD contains
definitions dealing with each the characteristics of the “thing involved in the interaction” that is
crossing each interface boundary, the media involved, and what each SOI looks like at the
boundary.
Managing the interfaces is a major activity across the lifecycle. Many of the issues found during
system integration, system verification, and system validation involve an interface. Interface
issues are also common during the integration of the SOI into the macro system it is a part. Once
the SOI has been successfully integrated into the macro system it is a part, interfaces must
continue to be managed and maintained.
As a crosscutting activity starting at the beginning of the project, managing the interfaces across
the lifecycle:
• Highlights underlying critical issues much earlier in the project than would otherwise be
revealed that could impact the project’s budget, schedule, and system performance.
• Clarifies the dependencies a SOI has on other systems (enabling systems) and
dependencies other systems have on the SOI.
• Helps ensure compatibility between the SOI and those external systems with which it
interacts.
Managing interfaces includes the following key functions:
• Facilitating cooperation and agreements with other stakeholders.
• Defining roles and responsibilities.
• Enabling open communication concerning issues.
• Establishing timing for providing interface information, problem resolution, and agreeing
on definitions for the interactions across interface boundaries early in the project.
• Accessing and managing risk as part of the INCOSE SE HB Risk Management Process
avoiding potential impacts, especially during integration and operations.
• Establishing baselines for interface requirements, interface definitions, architecture, and
design artifacts.
• Ongoing management and CM of the interface requirements and definitions, as well as any
associated artifacts (such as interface control documents and interface
description/definition documents or repositories) as part of the INCOSE SE HB
Configuration Management Process defined in the project CMP.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 398

Best Practices Associated with Managing Interfaces


Best practices to defining and managing interactions across interface boundaries and recording
interface requirements include:
1. Define how the project team will manage interfaces in their SEMP and NRDM Plan.
2. Assign responsibility for the identification of all interface boundaries, definition of the
interactions across those boundaries, and management of artifacts associated with interface
management. It is a customary practice to assign one or more individuals to manage
interfaces throughout the system lifecycle.
a. Involve all interface stakeholders - they are the ones with the knowledge, and they are
the ones the project team needs to work with to make sure all interfaces are addressed,
and associated artifacts developed.
b. Include all interactions in the integrated set of system needs and transform those needs
into interface requirements to be included within the SOI’s set of system requirements.
c. Ensure all interactions have been defined appropriate for the lifecycle stage, recorded,
baselined, and all interface artifacts are put under configuration control.
d. For developing systems, ensure a process is in place to define, agree, and configuration
manage how the developing systems will interact with external systems across the
interface boundary.
e. For systems being developed by suppliers, insure there is a plan in place concerning
how interfaces will be managed within the contract, especially for cases where the
interface definitions are evolving with the design.
f. Make all interface documentation available to developers as well as to those
responsible for the external systems the SOI needs to interact.
g. Provide traceability between interface requirement pairs, to parent requirements, and to
the common interaction definitions.
h. Track/monitor changes to all interface artifacts. A change to an interface definition can
impact both sides of the interface as well as the parent requirement. Failing to manage
interfaces, is a major reason for issues during system integration and for systems failing
system verification and system validation.
3. Effective communication is a vital part of interface management. Many projects
incorporate the use of an Interface Control Working Group (ICWG), which include
members responsible for each of the interfacing subsystems and system elements as well as
external systems and enabling systems. The use of ICWGs formalizes and enhances
collaboration within project teams or between project teams and external organizations.
The use of ICWGs is an effective approach that helps to ensure adequate consideration of
all aspects of the interfaces.
4. Identify external interfaces early as part of the definition of drivers and constraints and
lifecycle concept analysis and maturation. Diagrams and models should be used to aid in
the identification of all internal interactions between subsystems and system elements.
Because of their importance, all interfaces must be identified to ensure compatibility with
other systems, define the system’s boundaries, and manage risk associated with interfaces.
5. Obtain copies of all interface documentation for existing systems. If the interface
definitions are not documented, work with the owners of the existing systems to document
them. Ensure their current configuration is defined in sufficient detail the developing SOI

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 399

can be designed to successfully interact with the existing systems across each interface
boundary.
6. Plan for system verification of all interface requirements, system integration, and assessing
and validating the behavior of the integrated system as a function of the interactions across
the interface boundaries.
System verification of all interface requirements can be expensive. To do system
verification against an interface requirement, often there will be a need for special
equipment to assess the interactions across the interface boundary.
In support of system integration, system verification, and system validation activities, the
system on the other side of the interface may not be available or verification that the
interactions are as required may be a prerequisite to integrate the SOI with the other system
until both systems have competed system verification of all interface requirements. To
complete system verification, simulators or emulators (software and/or hardware) may be
needed. These must be budgeted for, developed, and go through their own system
verification and system validation in accordance with a schedule consistent with the SOI’s
system integration and system verification, and system validation schedule.
7. Throughout the lifecycle, bi-directional traceability must be maintained between the
interface requirements, definition of interactions across interface boundaries, architecture
elements, system analysis results, design artifacts, and system verification and system
validation artifacts.
8. For today’s increasingly complex, software-intensive systems, it is critical that the project
team uses a data-centric approach to address all interactions across interface boundaries
and developing all the associated artifacts. From a completeness and correctness
perspective, the project team must use diagrams and models to identify all functional and
physical interface boundaries and interactions across those boundaries with both internal
and external systems.
9. As part of the interface definition, many projects find the need or benefit to apply interface
standards. In some cases, such as for plug‐and‐play elements or interfaces across open
systems, it is necessary to strictly apply interface standards to ensure the necessary
interoperation with systems for which the project team does not control. Examples of these
standards include Internet Protocol (IP) standards and Modular Open Systems Architecture
(MOSA) standards. Interface standards can also be beneficial for systems that are likely to
have emergent requirements by enabling the evolution of capabilities through the use
standard interface definitions that allow new system elements to be added.
10. A major issue concerning interface definition is that when a SOI is contracted out to a
supplier and the SOI interacts with other supplier developed SOIs. Often the contracts are
issued prior to design and thus the design definitions of what the SOIs look like at the
interface boundary and the media involved in the interaction have not yet been defined. In
addition, it is common for the suppliers to have little insight into the workings of other
suppler-developed SOIs with which they interact and how changes to those SOIs could
affect the interactions and performance of their SOI or changes to their SOI could affect
other SOIs. In these cases, it is important that the customer clearly addresses in the
contract how each supplier will support, participate in, and comply with the interface
management activities during interface definition, design, system integration, system
verification, and system validation.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 400

This activity helps establish the set of design input requirements has the GtWR characteristics
C10 – Complete and C11 – Consistent, C14 – Able to be Validated.
14.2.9 Managing System Verification and System Validation
A key management activity concerns the planning and preparation for and overseeing system
verification and system validation activities across the lifecycle and assessing all changes to the
integrated sets of needs and sets of design input requirements as to their impact on system
verification and system validation. Planning and preparation begin during the project’s lifecycle
analysis and maturation activities concerning the concepts for how the project plans to do system
verification and system validation and developing and implementing MIVV Plan and individual
SIVV plans.
A key part of planning and preparation is ensuring that the system validation attributes for each
need in the integrated sets of needs are defined when the need expressions are formulated as well
as the system verification attributes for each design input requirement are defined when the
requirement expressions are formulated. This applies for each subsystem and system element
within the SOI physical architecture as well as for the integrated system. These attributes
include defining the Success Criteria, Strategy, Method, level of integration when system
verification or system validation will occur, and the organization responsible for system
verification or system validation as discussed in Sections 10 and 11.
This planning and preparation are critical as system verification and system validation activities
represent a significant portion of the project’s budget and schedule as well as the fact that
acceptance of the SOI is dependent on successful system verification and system validation.
Oversight of the system verification and system validation activities includes overseeing and
management of:
• The implementation of the provisions defined within the MIVV Plan and each SIVV Plan.
• The development of information contained in the System Verification and System
Validation Description Sheets for each system verification and system validation Instance.
• The definition of system verification and system validation Activities and developing an
ADS for each Activity.
• The definition of the system verification and system validation Procedure Requirements.
• The development, review, and approval of the system verification and system validation
Procedures.
• Monitoring and reporting on the status of the execution of these Procedures.
• Reporting the results of the execution of the Procedures via the Execution Records.
• The combination of the Execution Records into Approval Packages.
• Tracking the status of the Approval Authorities acceptance, certification, and qualification
of the system elements, subsystems, and the integrated system.
To ensure the project’s system verification and system validation programs are managed
effectively to meet schedule milestones and budget, metrics should be developed to track and
manage the planning and performance of the system verification and system validation programs
across all lifecycle stages.
Examples of metrics include:

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 401

§ The number of needs and design input requirements that have the system verification and
system validation attributes defined concerning Success Criteria, Strategy, Method, level,
and responsible organization as they are written.
§ The number of system verification and system validation Instances (needs, design input
requirements, design output specifications) that have completed system verification and
system validation description sheets.
§ The number of system verification and system validation description sheets that are linked
to an ADS.
§ The number of ADSs are linked to approved system verification and system validation
Procedures.
§ The number of system verification and system validation Events that have been scheduled.
§ The number of system verification and system validation Procedures that are in work,
completed, successful, unsuccessful, approved.
§ The number of system verification and system validation Execution Records that have been
completed.
§ The number of system verification and system validation Approval Packages ready for
submission to the Approving Authorities.
§ The number of system verification and system validation Approval Packages approved or
disapproved by the Approving Authorities.
§ The percentage of system verification and system validation Instances that have been
closed (status and outcomes).
§ The burn-down plan for system verification and system validation Instances closures
(against needs, design input requirements, and design output specifications).
§ The number of non-conformances/compliances and associated variances.
System verification and system validation metrics can be generated to by the project’s toolset to
produce reports or dashboards that communicate the status of the project’s system verification
and system validation programs to the upper-level management, the project team, and the
customers. Metrics need to be kept current to provide the project team and the customers’ the
latest insight into the status of the project’s system verification and system validation programs.
The closure of hundreds (thousands?) of system verification and system validation Instances can
involve a significant percentage of a project’s resources, budget, and schedule.
These metrics can be generated from various sources including information from the project’s
budgeting and scheduling tools, the attributes defined for the individual needs and design input
requirements expressions, as well as any special metrics contained in the SOI’s
integrated/federated datasets developed to help manage the project’s system verification and
system validation programs.
This activity helps establish each design input requirement has the GtWR characteristic C7 -
Verifiable. It also helps establish the set of design input requirements has the GtWR
characteristic C14 - Able to be Validated.
.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 402

Section 15: ATTRIBUTES FOR NEEDS AND REQUIREMENTS

Attributes [47] are included as part of the needs and design input requirements expressions to
define and capture key information to aid in the definition, verification, validation, management,
and reuse of not only the needs and design input requirements, but the management of the SOI
across all lifecycle activities. The attributes discussed in this section apply to needs and
requirements no matter the level they exist.
A list of attributes is provided that can be associated with each need and design input
requirement statement. The need or requirement statement plus its attributes results in a need or
requirement expression as defined in Section 2.
Note: Many of the attributes listed are useful for both managing needs as well as requirements.
Others may be more useful as applied to only requirements.
This list is not exhaustive and is not meant to be prescriptive or proscriptive in any way. It is not
the intention that an organization should include all these attributes when defining needs or
requirements expressions. The purpose is to present a set of attributes that have been, and are
being used, by various organizations. An organization may select a reduced set of these
attributes or may well have other attributes that apply to the organization’s unique domain,
product line, culture, and processes.
The important thing is that organizations define an attribute scheme that is specific to their
domain, product line, and organization. The business operations level stakeholders must agree
on a set of attributes that will be used for all levels of needs and design input requirements and
implemented within the project team’s toolset and integrated dataset.
Although it is unlikely an organization would include all the attributes listed herein, there is a
subset of these attributes that is proposed to represent a minimum set to be defined for each need
or design input requirement. This minimum set supports the mandatory characteristics of well-
formed needs and requirements statements and supports the maintenance of the needs and
requirements statements, especially CM and tracking the progress of the system design, system
verification, and system validation activities throughout the product lifecycle. In the discussion
below, the attributes in that minimum set are annotated with an asterisk (“*”).
The attributes are organized within the following five broad categories:
• Attributes to help define needs and requirements statements and understand their intent.
• Attributes associated with system verification or system validation.
• Attributes to help manage the needs or requirements across the lifecycle.
• Attributes to show applicability and enable reuse of the needs and requirements.
• Attributes to aid in product line management
Note: In the following definitions, the term SOI is used. The SOI is the entity, system, subsystem,
or system element to which the need or requirement statement applies.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 403

15.1 Attributes to Help Define Needs and Requirement and Their Intent
This set of attributes is used by both the author of the needs and design input requirements and
anyone that will be reviewing, implementing, or managing the needs and requirements as well as
those that will be involved in verifying and validating that the SOI meets the needs and
requirements.
The attributes in this set help ensure the needs or requirements have the characteristics of well-
formed needs or requirements statements defined in the GtWR as well as help understand the
intent and reason for including the need or requirement.
A1 - Rationale*
Rationale states the reason for the need or requirement’s existence. Rationale defines why the
need or requirement should be included and other information relevant to better understand the
reason for and intent of the need or requirement. Rationale can also be used to record
assumptions that were made when writing the need or requirement statement, the source of
numbers, and what design effort, if any, drove the requirement. Rationale, along with the
attributes of A2 - Trace to Parent and A3 - Trace to Source, helps to support the claim that the
requirement GtWR characteristics C1 – Necessary C3 – Unambiguous, and C13 –
Comprehensible is true.
A2 - Trace to Parent*
Requirements at one level are implemented at the next level of the system architecture via
allocation (see A5 - Allocation/budgeting). A child requirement is one that has been derived or
decomposed from the allocated parent. The achievement of each of the child requirements is
necessary to the achievement of the parent requirement. Each of the child requirements must be
traced to its parent requirement. When managing requirements within the project toolset, when a
trace is established from the child to the parent, a bidirectional trace is also established between
the parent and that child requirement.
The project toolset should support the concept of traceability and a separate attribute may not be
needed as the applications in the toolset provide the ability to link entities together as an inherent
capability of the application. However, for those are using common office applications to
document their requirements, trace to parent is accomplished via this attribute.
The attribute A2 - Trace to Parent, along with A1 - Rationale and A3 - Trace to Source, help
ensure the GtWR characteristics C1 – Necessary and C10 - Complete are met. This attribute
may also be classified under attributes used to manage needs and requirements. See Section 6
for a more detailed discussion on traceability.
A3 - Trace to Source*
Design input requirements result from a transformation of one or more needs, so all requirements
must trace to need(s) from which they were transformed. Each need and requirement must be
able to be traced to a source. For requirements, this is different from tracing to a parent
requirement because it identifies where the requirement came from and/or how the requirement
content was determined (rather which specific requirement is its parent). Each need must trace
to a source to establish where the need was derived from. Examples of sources include mission,
goals, or objectives, measures, constraints, system concepts, user stories, use cases, models,
analysis, documents, regulations, standards, risk, derived from a trade study, interviews with a

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 404

stakeholder, a specific stakeholder, minutes of stakeholder workshop, or Engineering Change


Proposal. Sources could also be a functional area within an enterprise or business unit
(marketing, safety, compliance, quality, engineering, manufacturing, etc.).
Maintaining this trace is key to being able to show compliance to higher level organizational
requirements, customer requirements, regulations, and standards. This trace is also important in
terms of change management. If something related to a source changes, then the need or
requirement traced to that source may also need to be changed. For example, if the analysis used
to generate a number in a requirement is updated as the design matures, the requirement must
also be updated. A3 - Trace to Source, along with A1 - Rationale and A2 - Trace to Parent, helps
to ensure the GtWR characteristic C1 - Necessary is met.
A4- States and Modes
The state or mode of the SOI to which a need or design input requirement applies. Some
systems have various states and modes, each having a separate set of requirements that apply to
the specific state or mode. If the system and associated needs and requirements is structured in
this way, this attribute allows needs and requirements to be assigned to the applicable states and
modes.
Rather than use this attribute, some organizations choose to include the state or mode as a
condition within the need or requirement statement. A state could also represent a precondition
for the execution of some action. That precondition could be included in this attribute or could
be included in the need or requirement text.
This attribute helps to ensure the GtWR characteristic C10 - Complete is met.
A5 - Allocation/Budgeting*
As discussed in Section 6, requirements at one level are allocated or budgeted to parts of the
architecture for implementation. There are two types of allocation. The first type, allocation
(budgeting) of performance, resources, or quality, involves allocating a quantity at one level to
the next level, where the quantity is budgeted between subsystems and system elements at the
next level (such as performance, power, mass, reliability, accuracy, precision, quality). The
second type of allocation is allocation of responsibility where requirements at one level are
assigned to subsystems and system elements at the next level for implementation.
For green field systems, when allocation is performed there are no requirements at the next level,
so allocation is linking a requirement at one level to subsystems or system elements at the next
level of the physical architecture.
The project toolset should support the concepts of allocation and budgeting and a separate
attribute may not be needed as the applications in the toolset provide the ability to link entities
together as an inherent capability of the application. However, for those that are using common
office applications to document their requirements, allocation is accomplished via this attribute.

15.2 Attributes Associated with System Verification and System Validation


This set of attributes is used to help track and manage the system verification and system
validation activities and status to make sure the designed and built SOI meets a set of design
input requirements (system verification) or a set of needs (system validation). This set of
attributes can be used for developing system verification and system validation matrices and

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 405

VDS or VaDS, as well as provide metrics that management can use to track the status of the
project’s system verification and system validation activities across the lifecycle. For projects
that have a separate application for managing their system verification and system validation
programs, these attributes can be links or pointers to the information in that application database
that would be included in these attributes. Refer to Section 10 concerning defining the
information that is included within these attributes.

A6 - System Verification or System Validation Success Criteria*


The criteria which must be shown to have been met by the Strategy and Method to provide
sufficient evidence that the SOI has successfully met the need or design input requirement.
Identifying the system verification and system validation Success Criteria helps to ensure the
need and requirement has the GtWR characteristics C3 - Unambiguous, C6 – Feasible, C7 -
Verifiable, and C8 - Correct are true.
A7 - System Verification or System Validation Strategy*
Strategy to be used to verify the SOI meets a design input requirement or validate the SOI meets
a need as defined by the Success Criteria in accordance with an agreed to Method used to obtain
the data that provides the evidence that the system meets a need or requirement.
A8 - System Verification or System Validation Method*
The system verification or system validation Method for each need or design input requirement
states the planned Method to be used (Test, Demonstration, Inspection, Analysis) to provide the
evidence defined in the Success Criteria that can be used to determine the designed and built SOI
meets the requirement (system verification) or need (system validation) with the required degree
of confidence. Identifying the Method helps ensure the need or requirement GtWR
characteristics C3- Unambiguous, C6 – Feasible, C7 - Verifiable, and C8 - Correct are true.
A9 - System Verification or System Validation Responsible Organization*
The organization that is responsible for system verification and system validation for a need or
design input requirement or sets of needs and sets of design input requirements for the SOI.
A10- System Verification or System Validation Level
Architecture level at which the verification or system validation activity will be performed to
provide sufficient evidence that the SOI meets the requirement (verification) or need (validation)
during system integration. Possible values could include: <system>, <subsystem>, <assembly>,
<component>, <hardware>, <software>, <integration>, etc. The actual name of the level can be
organization/domain specific based on the product breakdown structure or architecture
description document defined in the project’s MIVV plan or SIVV plans.
A11 -System Verification or System Validation Phase
Lifecycle phase in which a system element or subsystem verification or system validation
activity will be performed to provide sufficient evidence that the system element or subsystem
meets a design input requirement (system verification) or need (system validation). Possible
values could include design verification and design validation, production verification, system
integration, system verification, or system validation, proof testing, certification, qualification, or

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 406

acceptance. The actual name of the phase can be organization/domain specific as defined in the
project’s MIVV plan or SIVV plans.
A12 - Condition of Use
Description of the operational conditions of use in which the need or requirement applies. Some
organizations prefer to include the condition of use as part of the need or requirement statement
(Refer to R18 in GtWR); others state the conditions of use as separate requirement to define the
operation environment in which the system will be used. In some cases, condition of use
involves a specific trigger event or state of the system. Some organizations prefer to include the
trigger or state as part of the need or requirement statement. Understanding the condition of use
is key to a proper implementation in design as well as conducting system verification and system
validation activities.
Identifying the condition of use helps ensure the need or requirement GtWR characteristics C4 –
Completes, and C8 - Correct are true.
A13 -System Verification or System Validation Results
The results of each system verification or system validation Activity will most often be contained
in a separate document or electronic record, e.g., the completion of a system verification or
system validation Procedure. This attribute traces each need and requirement to the associated
system verification or system validation Activity results Execution Record as discussed in
Sections 10 and 11. Possible values could include: complete - successful, complete -
unsuccessful, passed, or failed. This attribute allows reports to be generated or status to be
displayed on a dashboard, for example, percent of requirements for the SOI whose system
verification Activity that has been successfully completed, percent of needs for the SOI whose
system validation Activity has been successfully completed, or the number or percent of system
verification or system validation Activities that were not successful.
A14 -System Verification or System Validation Status
Indicates the status of the System Verification or System Validation Activities including sign-
off/approval of the system verification or system validation Execution Record stating whether
the SOI has been verified that it meets the design input requirement or validated that it meets the
need. Possible values could include not started, in work, [percent] complete, complete, sign-off
in work, or Execution Record complete. This attribute allows reports to be generated or status to
be displayed on a dashboard, for example, percentage of requirements whose Execution Record
is complete and included in the system verification or system validation Approval Package
(Refer to Sections 10 and 11.).

15.3 Attributes to Help Manage the Needs and Requirements


This set of attributes is used to manage and maintain the needs and design input requirements
and sets of needs and sets of design input requirements across the lifecycle. Areas of prime
importance to management, in addition to the above attributes dealing with system verification
and system validation include managing risk, managing change, ensuring consistency and
completeness, and having insight into the status of needs and requirements definition and
implementation across the lifecycle.
Managing risk is a key role of management as well as making sure needs and requirements are
tracked across the lifecycle especially if they are high priority or critical/essential to project

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 407

success. Including attributes dealing with these topics allows reports to be generated or
information to be displayed on a dashboard by applications within the project’s toolset that will
help the project team to keep the project on track and manage changes not only as they relate to
individual needs and requirements but also changes to the project such as budget cuts and
problems resulting in cost overruns and schedule slips.
A15 - Unique Identifier*
A unique identifier, which can be either a number or mixture of characters and numbers used to
refer to the specific need or design input requirement. It can be a separate identifier or
automatically assigned by applications within the project’s toolset. This identifier is used once
and never reused. A unique identifier is also used to link needs and requirements in support of
the flow down of requirements (allocation and budgeting), traceability, and to establish peer-to-
peer relationships. Some organizations include in the unique identifier codes that relate to the
SOI or level of architecture to which the need or requirement applies e.g. [SOI]SNxxxx or
[SOI]SRxxxx. Organizations should never use a document paragraph number as a requirement
unique identifier.
A16 - Unique Name
A unique name or title for the need or requirement that reflects the main thought the need or
requirement is addressing. This is useful to provide a short title to allow the requirements to
viewed in a document form, as a tree structure, or is graphical form. Caution should be used
when using this attribute as discussed in R25 in the GtWR. This attribute was common in
requirements documents but is not used as often when the sets of requirements are maintained
and managed within a database.
A17 - Originator/Author*
The person defining and entering a need or design input requirement expressions into the RMT.
When entering a need or requirement expression into the projects’ database many of the
applications will automatically log the name of the person entering the requirement statement
and associated attributes; in this case the application automatically fills in this attribute.
A18 - Date Requirement Entered
The date the need or requirement was entered into the projects’ toolset. When entering a need or
design input requirement into the projects’ database many of the applications will automatically
log the data and time of entry; in this case the application automatically fills in this attribute.
A19 - Owner*
The person or organizational element that maintains the need or design input requirement, who
has the right to say something about this need or requirement, approves changes to the need or
requirement, and reports the status of the need or requirement. The same person could be both
the Owner and the Source [of the need or requirement], but it is recommended that Owner and
Source are two different attributes. The Owner maintains both the need or requirement
statements and all associated attributes.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 408

A20 - Stakeholders
List of key stakeholders that have a stake in the implementation of the need or design input
requirement and who will be involved in the review and approval of the need or requirement as
well as any proposed changes. Within the project’s toolset, this list of stakeholders is those that
will be automatically notified when either the need or requirement statement is entered into the
data set or any associated change to a need or requirement statement or attribute is proposed.
This attribute enables collaboration within the RMT.
A21 - Change Control Board
The organizational entity that has CM authority over the need and design input requirement
expressions and has the authority to baseline the needs and requirements and approve proposed
changes to a need or set of needs or changes to a requirement or set of requirements of which it is
a part. Depending on the level of the architecture, organizations may have different levels of
configuration control boards.
A22 - Change Proposed
An indication that there is one or more proposed changes to the need or requirement that the
owner or other stakeholders need to act on. Specific changes will normally be managed as
unique entities within the RMT by the organization’s configuration control board defined above,
such that their status can also be tracked within the RMT.
A23 - Version Number
An indication of the version of the need or design input requirement. This is to make sure that
the correct version is being implemented as well as to provide an indication of the volatility of
the need or requirement. A need or requirement that has a lot of changes could indicate a
problem or risk to the project. The version number may be automatically assigned by an
application within the project toolset whenever a change has been approved. A major feature of
most RMTs is the ability to store all versions of a need or requirements along with each change
associated with a need or requirement and the status of that change. Once the change has been
approved, the need or requirement will be updated, and a new version number assigned.
A24 - Approval Date
Date the current version of the need or design input requirement was approved. This may be
automatically assigned by an application within the project toolset.
A25 - Date of Last Change
Date the need or requirement was last changed, i.e., the date of the current version. This may be
automatically assigned by an application within the project toolset.
A26- Stability/Volatility
An indication of the likelihood that the need or requirement will change. Some needs and
requirements, when first proposed, will have numbers that are best guesses at the time, or the
actual value is not readily available when the requirement has been entered into the project
database. The number may not be agreed to by all stakeholders or there may be an issue on the
achievability of the need or requirement. Some needs or requirements will have a to-be-
determined (TBD), to-be-computed (TBC), or to-be-resolved (TBR) in the text.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 409

Stability/Volatility is related to a high or medium risk need or requirement (see A36- risk of
implementation attribute below for more information). Possible values could include stable,
likely to change, incomplete, or unresolved TBX.
TBXs represent risk to the project and should be treated as separate entities as they must be
managed and resolved before the need or requirement can be implemented by design. The
longer they remain unresolved, the more technical debt the project is accumulating. The RMT
should provide the means to manage the TBXs as discussed in Sections 4 and 6 as action items
stating the issue, the person or organization responsible for closing out the TBX and the required
date of closure. This attribute could be a link to the TBX module within or external to the RMT
where the TBXs and other risk are tracked and managed.
This attribute also enables reports to show the GtWR characteristics C6 - Feasible and C12 -
Feasible.
Refer to Section 14.4 for a more detailed discussion on TBX management and managing
unknowns.
A27 - Responsible Person
Person responsible for ensuring that the need or requirement is implemented in the design as well
as verifying that the SOI met the requirement or validating that the SOI met the need. This is
different from need or requirement owner defined previously. The Responsible Person maintains
attribute A31 -Status [of implementation].
A28 - Need or Requirement Verification Status*
An indication that a need or requirement has been verified. As defined in Section 2, need or
requirement verification is the process of ensuring the need or requirement meets the rules and
characteristics (necessary, singular, conforming, appropriate, correct, unambiguous, complete,
feasible, and verifiable) for well-formed needs or requirements statements as defined in the
GtWR or a comparable guide or checklist developed by the organization. Possible values
include not started, in work, complete, or verified.
A29 - Need or Requirement Validation Status*
An indication the need or requirement has been validated. Requirement validation is the
confirmation the requirement is an agreed-to transformation that clearly communicates the intent
of needs of the stakeholders in a language understood by the designers and those responsible for
design and system verification. Need validation is the confirmation the need is an agreed-to
transformation that clearly communicates the MGOs, measures, and lifecycle concepts in a
language understood by the requirement writers, designers, and those responsible for design and
system validation. Need and validation activities need to involve the customers and users and all
other stakeholders of the system being developed. Possible values include not started, in work,
complete, or validated.
A30 - Status of the Need or Requirement
Maturity of the need or requirement. Possible values include draft, in development, ready for
review, in review and approved, disapproved, deleted. In general, the set of needs or
requirements would not be baselined until all the individual need or requirement verification and

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 410

validation status attributes have been set to indicate that verification and validation of the need or
requirement statement is complete. Values include in work, disapproved, deleted, or approved.
A status of “approved” should only be allowed if the above need or requirement verification
attribute (A28) and validation attribute (A29) both indicate the need or requirement has been
both verified and validated, and the requirement expression is stable; A36 - Risk (of
implementation) is at an acceptable level and has the organization’s mandatory attributes
defined. Even if the need or requirement has been disapproved or deleted, it is useful to keep its
history within the data base for future consideration.
A31 - Status (of implementation)
For a need, an indicator of the status of transformation of a need into a design input
requirement(s). Possible values include transformation complete, transformation in work, and no
plans to transform the need into requirement(s). When the transformation is complete, all
resulting requirements must trace to the need(s) from which it was transformed. See also A3-
Trace to Source. All needs will have at least one implementing requirement.
For a requirement, an indicator of the status of the implementation or realization of the
requirement in the design and design output specifications. Possible values include requirement
implemented in design; requirement not feasible, requirement not implemented and no plan to do
so; and requirement not implemented but have plan to do so. If implemented and the project
toolset allows, this attribute could be a trace between the design definition artifacts, design
output specification, and the design input requirement. If using an SE modeling tool, this
attribute could indicate the requirement has been implemented in the model or linked to a portion
of the model.
This attribute also enables reports to show the GtWR characteristics C6 - Feasible and C12 -
Feasible.
The table below shows an example of how one organization records and reports the status of
implementation of design input requirements.
Implementation waived - No plans to
Waived
implement
Implementation planned and is expected
Pending but has not occurred yet
Under review The decision to implement is under review
Successful Implemented Implemented in the design successfully
Unsuccessful Implementation Implementation attempted by failed
because of xxxx - waver in work
Implementation attempted but only
Partial Implementation partially successful. Deviation in work
Table 15-1: Example Implementation Status Recording and Reporting.

Note: if there is no plan to implement a need or requirement, a change, waiver, deviation, or


exception would have to be submitted and approved by the configuration control authority (A21 -
Change Board).
A32 - Trace to Interface Definition
As discussed in Section 6, the interactions between two systems across an interface boundary are
described in interface definitions, which are often contained in a document (or other similar
electronic representation) which has a title such as an Interface Control Document (ICD), an

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 411

Interface Agreement Document (IAD), an Internal Interface Definition Document (IIDD), or an


Interface Definition Document (IDD. In software, the interface definition could be in a data
dictionary, an API, or Software Development Kit (SDK).
The interface design input requirements contained in each of the interacting systems’
requirement sets will include a reference to where the interaction is defined. This attribute
provides a link tracing the interface requirements to where the interaction referenced in the
requirement is defined.
This attribute facilitates reports out of the SOI’s integrated database so that, for any interface
definition, it is obvious which interface requirements invoke that definition. This aids in change
control. If any interface requirement changes, the definition may need to be changed. If the
definition changes, interface requirements that are linked to that definition may need to be
assessed or changed as well (or at least the owners of the interface requirement need to be made
aware that the definition has changed).
This attribute also enables reports to show the GtWR characteristics C1 - Necessary, C4 -
Completeness, C7 - Verifiable, and C11 - Consistent. If no requirement points to an interface
definition or only one requirement points to the definition, there may be a missing interface
requirement. This attribute supports the interface audit activity discussed in Section 6.
A33 - Trace to Dependent Peer Requirements*
This attribute links design input requirements that are related to, or dependent on, each other
(other than parent-child) at the same level. Peer requirements may be related for several reasons,
such as: they may be co-dependent (a change to one could require a change to the other) or
bundled (to implement this requirement, this other peer requirement must also be implemented),
or a complementary interface requirement of another system to which the system interacts.
This trace may also result from the allocation and budgeting process. If a resource were
allocated from one level and budgeted to multiple system elements at the next level, the values of
the resulting child requirements are dependent - a change to one would result in a change in one
or more of the other child requirements. Because of this dependency, all child requirements
having a common parent would need to be linked together. (See A5 - Allocation/Budgeting.).
See Section 6 for more information on traceability, allocation, budgeting, and interface
requirements.
This attribute enables reports to show the GtWR characteristics for individual requirements C1 -
Necessary and for a set of requirements C10 - Complete and C11 - Consistent. For most RMTs
or other SE tools, having a trace from one co-dependent requirement to another results in an
automatic bi-directional trace such that if there is a proposed change to one, the tool can notify
the applicable stakeholders and the impact of that change on the other(s) dependent requirements
and their parent can be assessed.
A34 - Priority*
Priority is an indication of how important the need or design input requirement is to the
stakeholders. It may not be a critical/essential requirement—that is, one the system must
possess, or it will not work at all (see A35 - Criticality or Essentiality)—but may be something
the stakeholder(s) hold very dear. Priority may be characterized in terms of a number (1,2,3) or
label (high, medium, low). The reason for classifying a need or requirement as high priority
should be communicated in the rationale attribute (A1 - Rationale). Assuming each child
INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022
Needs and Requirements, Manual 412

requirement is necessary, their priority will be inherited from their parent requirement. In the
case of needs, all requirements transformed from that need, would inherit the priority of the need.
High priority needs and design input requirements must always be met for the stakeholder
expectations to be met; lower priority needs and requirements may be traded off when conflicts
occur or when there are budget or schedule issues resulting in a de-scope effort. If there is a
need to trade-off (modify or delete) a need or requirement, a change request must be submitted to
the organization that has CM authority for the set of needs and requirements (A21 - Change
Control Board).
A35 - Criticality or Essentiality*
A critical or essential need or design input requirement is one that the system must achieve for
the system to function at all—that is, without it, the system will not be able to achieve its primary
purpose or intended use in the operational environment when operated by its intended users. A
critical or essential requirement would also be included in the system’s key performance
requirement set. Criticality/essentiality is most often characterized in terms of yes or no. Not all
input needs or requirements are critical or essential. (The reason for classifying a need or
requirement as critical or essential should be communicated in the rationale attribute (A1 -
Rationale).
Assuming each child requirement is necessary, their criticality or essentiality will be inherited
from their parent (requirement or need from which the requirement was transformed). Critical or
essential needs and requirements must always be met. Unlike high priority needs or
requirements, critical or essential requirements may not be traded off when there are budget or
schedule issues. If a critical need or requirement cannot be met, the feasibility of the whole
project will have to be re-examined. To prevent this from happening, the authors advocate that
projects identify at least one feasible set of lifecycle concepts prior to baselining the set of needs.
While all critical/essential requirements will also have a high priority, it is possible to have a
non-critical yet high priority requirement.
A36 - Risk (of implementation) *
A value assigned to each need or design input requirement indicating the risk of the need or
requirement not being met.
Risk of implementation may be characterized in terms of a number (1, 2, 3) or a label (high,
medium, low). Some organizations communicate risk as a cross product of likelihood and
impact (a high likelihood and a high impact would be represented in a risk matrix as 1×1, while a
low likelihood and high impact would be 3×1). Some organizations use a 3×3 risk matrix, others
a more granular 5×5 matrix. An unstable requirement is also a risk factor (see A26 - Stability).
Risk can also address feasibility/attainability in terms of technology, schedule, cost, politics, etc.
If the technology needed to meet the requirement is new with a low maturity (low TRL), the risk
is higher than if using a more mature technology that has been used successfully in other similar
projects (use and environment). The requirement can be high risk if the cost and time to develop
a technology is outside what has been planned for the project. Risk may also be inherited from a
parent requirement.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 413

Needs or requirements that are high risk will also be tracked more closely, especially if they are
high priority or are critical. These will be treated as Technical Performance Measures (TPMs)
and monitored closely by the project manager.
Needs or requirements that are at risk include those that fail to have the characteristics defined in
the GFWR. Failing to have these characteristics can result in the need or requirement not being
implemented (will fail system verification) and needs not being realized (will fail system
validation).
This attribute also enables reports to show the GtWR characteristics C6 - Feasible and C11 -
Feasible.
A37 - Risk (Mitigation) *
This attribute indicates whether a need or design input requirement is part of a risk mitigation
action.
As part of lifecycle analysis and concept maturation activities, projects should assess
management, development, production, system integration, system verification, and system
validation, compliance, and operational risk as discussed in Section 4. For those risk allocated to
the system under development, the management of the risk mitigation is needed throughout all
lifecycle activities. To do this, lifecycle concepts for mitigating the risk are defined and the
associated needs to implement these concepts are defined. Design input requirements are
transformed from these needs and allocated to lower levels of the architecture for
implementation. Validation attributes are defined for those needs and verification attributes are
also defined for those requirements.
To manage the risk mitigation across the lifecycle and to ensure the risk allocated to the system
under development have been mitigated, the inclusion of this attribute is needed. This attribute,
along with trace to parent, trace to source, allocation, priority, and critically/essentiality, allow
the risk mitigation to be managed throughout the SOI lifecycle.
Risk (to be mitigated) may be characterized in terms of a value of yes or no. The actual risk will
be communicated as a cross product of likelihood and impact and included in the organizations
risk tracking database. Having this attribute will allow the status of the mitigation to be tracked.
This attribute, along with A2 - Trace to Parent, A3 -Trace to Source, A5 - Allocation, A34 -
Priority, and A35 - Critically or Essentiality, allow the risk mitigation to be managed throughout
the development lifecycle.
A38 - Key Driving Need or Requirement
A Key Driving Need (KDN) or Key Driving Requirement (KDR) is a need or design input
requirement that, to implement, can have a significant impact on cost or schedule. A KDN or
KDR can be of any priority or criticality/essentiality. Knowing the impact that a KDN or KDR
has on the budget and schedule allows better management of sets of needs and sets of design
input requirements.
If a project is over budget and late, the project team may decide to descope. As part of their
descope efforts they may want to consider deleting a low-priority, high-risk KDN or KDR. If
there is a need to delete or waive a KDN or KDR need or design input requirement, a change

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 414

request must be submitted to the organization that has CM authority for the set of needs and
requirements (A21 - Change Control Board).
This attribute also enables reports to show the GtWR characteristics C6 – Feasible and C11 -
Feasible are met.
A39 - Additional Comments
Generic comment field that can be used to document possible issues with the need or design
input requirement, any conflicts, status of negotiations, actions, design notes, implementation
notes, etc. Further, evaluation and prototyping of the system concept may have identified
important guidelines for the implementation of the need or requirement. This information may
be useful as the need or requirement is being reviewed and serves as a place to document
information not addressed by other attributes.
A40 - Type/Category
Each organization will define types or categories to which a need or design input requirement
fits, based on how they wish to organize and manage their sets of needs and requirements. The
Type/Category field is most useful because it allows the database to be viewed by a large number
of designers and stakeholders for a wide range of uses. For example, maintainers could review
the database by asking to be shown all the maintenance needs and requirements, engineers
developing test plans could extract all corrosion-control needs and requirements, and so on. See
also the GtWR rules R40 - Related Requirements together, and R41 - Structured.
Examples of Type/Category of needs and requirements include:
• Function: Functional/Performance.
• Fit: Operational: interactions with external systems - input, output, external interfaces,
operational environmental, facility, ergonomic, compatibility with existing systems,
logistics, users, training, installation, transportation, storage.
• Quality (-ilities): reliability, availability, maintainability, accessibility, safety, security,
transportability, quality provisions, growth capacity.
• Form: physical characteristics.
• Compliance:
– Standards and regulations - policy and regulatory.
– Constraints - imposed on the project and the project must show compliance.
– Business rules - a rule imposed by the enterprise or business unit.
– Business requirements - a requirement imposed by the enterprise or business unit.
Refer to Sections 4 and 6 for a more detailed discussion on this approach to organizing needs and
requirements.
This attribute also enables reports to show the GtWR characteristic for sets of needs and
requirements C10 – Complete is met

15.4 Attributes to Show Applicability and Enable Reuse


These attributes may be used by an organization that has a family of similar product lines to
identify the applicability of the need or design input requirement (to product line, region,
country, etc.) and reuse of needs or requirements that may apply to a new product being
developed or the upgrade of an existing product.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 415

The use of these attributes and the terminology used within the text for each are very domain and
product line dependent.
A41 - Applicability
Can be used to indicate which increment, build, release, or model a need or design input
requirement applies to.
A42 - Region
Region where the product will be marketed, sold, and used a need or design input requirement
applies to
A43 - Country
Countries where the product will be marketed, sold, and used a need or design input requirement
applies to.
A44 - State/Province
State(s) or province(s) within a country or region where the product will be marketed, sold, and
used a need or design input requirement applies to.
A45 - Market Segment
Segment of the market that will be using the product a need or design input requirement applies
to.
A46 - Business Unit
A specific business unit within the enterprise that produces the product a need or design input
requirement applies to.

15.5 Attributes to Aid in Product Line Management


When developing a product line, or a specific product within a product line, different versions of
a given product are referred to as “variants”. Within the sets of needs and requirements there
will be needs and requirements that will have different applicability and values depending on the
variant of the product they apply.
Depending on the various product variants there may be similar needs and requirements defined,
with slightly different values depending on the product variant. Thus, there are also needs and
requirements variants as well.
The project’s toolset (RMT and modeling applications) should have a capability to allow users to
define and manage variant needs and requirements of a product variant. This will enable the
project team to identify needs and requirements that are common to all product variants as well
as needs and requirements that are unique to a specific variant.
Individual product variants may have common requirements that exist for all variants as well as
unique needs and requirements that exist only for that variant. For example, needs and
requirements dealing with quality and compliance may be common to all variants. Some
functions may be common to all variants but have variations in performance.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 416

Other functions may be unique to a specific variant. For example, a coffee maker product line
may have one variant that a smaller model for individual consumption, another variant that is a
larger model designed for a larger household, and an even larger variant for use in a business.
The project team will ensure the common product line features are maintained in each variant as
well as address the unique aspects of the user community that is reflected in the individual
variants.
For the definition of needs and requirements within a product line, the needs include both the
overall product line needs as well as needs associated with each variant.
In addition to the previous attributes concerning reuse, the following attributes can be used to
manage needs and requirements that apply to a specific variant within the product line. Using
these attributes, the project toolset could be used to form specific sets of needs and requirements
for each product variant. Each set would include both the needs or requirements common to
each variant as well as the needs or requirements specific to a given variant.
A47 - Product Line
A specific brand or product line within a given business unit a need or design input requirement
applies to.
A48 - Product Line Common Needs and Requirements
An indication that a need or requirement applies to all variants within the product line.
A49 - Product Line Variant Needs and Requirements
A list of variants within a product line. For needs and requirements that apply to a specific
variant, this attribute would be set for that specific variant.
Using this approach, each need or requirement variant would be entered into the sets of needs
and requirements and the above attributes would be defined for that product line and variants of
the products within that product line. Once done, the user will be able to view only the needs
and requirements that apply to a specific variant. For a case when there are four different
performance values set for a given function, there would be four versions of the functional
requirement in the dataset. Which one applies to a given variant would be determined by how
the above attributes are defined.
Using this approach there is an issue with maintaining correctness of and consistency among
dependent needs and requirements and child requirements of a variant parent requirement.
It may be that selecting a specific variant of a functional/performance requirement would mean
that any other requirements where a dependency exists would have to have their variants selected
as well and the project team would need to ensure they are consistent with the selected variant
This consistency would need to be accessed with other peer requirements at the same level either
within the system, subsystem, or system element or peer requirements in other subsystems and
system elements. For example, different variants of a functional/performance requirement may
have different power or cooling requirements.
In the case of a parent variant requirement, its set of child requirements would need to be
selected as well. Selecting a variant requirement that has child requirements defined for the
subsystems and system elements at the next level of the architecture, would mean that all the

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 417

child requirements would need to be selected automatically within the RMT. If at higher levels
of the architecture, there could a chain of multiple lower levels of requirements effected by that
variant. The child requirements may be allocated to lower-level subsystems and system
elements, each with its own set of child requirements.
Unless the relationships of all the needs and requirements that have variants are established and
managed within the RMT it will be difficult to maintain correctness and consistency across all
the sets of needs and requirements at each level of the system architecture.
While this section deals with attributes as applied to needs and requirements, a project could also
define attributes for subsystems and system elements within the SOI physical architecture. Then
the above attributes dealing with variants could be set for these subsystems and system elements.
Selecting a specific system element would result in all the requirements for that system element
being selected. If that system element also has variants, the individual needs and requirements
for that specific variant of the variant system, subsystem, or system element could be set.
The result is that once these attributes have been set, the user would be able to display needs and
requirements that apply only to that variant product and the subsystems and system elements
within that variant’s physical architecture.

15.6 Guidance for Using Attributes


The information within the attributes must be managed to the same extent as the needs and
design input requirement expressions are managed. Changes to some attributes may have a
direct impact on how a need or requirement is addressed in design, and the Strategy and Method
used to obtain evidence the SOI meets the need or requirement during system verification and
system validation. For example, a requirement that was originally low priority becoming high
priority.
The reason for using attributes is to help the project team better manage the project. Given that
needs, requirements, verification, and validation are the common threads that tie each of the SE
lifecycle process activities together, having insight into these activities is necessary to manage
the project effectively.
Attributes help support the SE activities enabling the information contained within the attributes
to be structured for ease of processing, filtering, sorting, etc., enabling the needs or requirements
to be sorted or selected for further action, and enabling management and insight into the needs
and design input requirements definition as well as the development activities of the SOI across
its lifecycle.
A major feature of applications within the project toolset is the reports that can be generated to
give insight into the progress being made across all lifecycle stages. Managers can define
specific dash boards and reports that target various aspects of their project based on the
attributes. Some applications within the project toolset allow dashboard displays to be defined
that include graphics based on the selected attributes. This is only possible if the project includes
in the toolset schema the attributes describing the information needed to produce these reports
and dashboards at the beginning of the project.
Knowing the priority helps to plan better project activities. Knowing the risk of implementation
allows mitigation of that risk. Combining implementation risk and priority or
criticality/essentiality can provide management with valuable information they can use to
manage the project’s needs and requirements and associated risk. Identifying needs and

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 418

requirements that are both high priority (or criticality/essentiality) and high implementation risk,
allows management to focus on the most important issues.
Again, the project team can create a 3×3 matrix similar to the risk matrix, but in this case one
axis is risk and the other priority or criticality/essentiality. This allows management to know
which high priority or critical needs and requirements are high risk and their status. If these
attributes are not documented for each need and associated design input requirement(s), how will
management have this knowledge?
Knowing the criticality/essentiality of a requirement or the fact a need is a KDN or a requirement
is a KDR allows the project team to plan accordingly. When under schedule or budget pressure,
a KDN or KDR that is low priority or low criticality, but high risk, may be a candidate for
deletion if a project must be descoped.
Activities associated with system verification and system validation are key cost and schedule
drivers on any project. Knowing the priority, critically/essentiality, and risk of a need or
requirement is valuable information when defining the Success Criteria and selecting the system
Strategy and Method. Knowing the Strategy and Method facilitates the development of a more
realistic budget and schedule. Knowing the status of a design input requirement and status of the
system verification and system validation activities allow the project team to manage the budget
and schedule more effectively. With this knowledge, actions can be taken when there are
indications of problems that could lead to budget overruns and schedule slips before they become
real problems.
A major source of budget and schedule issues is change. Attributes allow managers to assess the
change and the potential impacts of that change. Attributes that link artifacts from one system
engineering lifecycle to another aid in change management and assessing the impacts of change
across all lifecycle activities.
A word of caution; as with the use of all information, a “lean” approach should be taken when
deciding which attributes will be used. Do not include a specific attribute unless the project
team, their management, or their customer has asked for that attribute and will be using that
attribute in some manner to manage the project and sets of needs and requirements. While
attributes are all potentially useful, too many should not be created because of the time and effort
needed to define and maintain them. The attributes the project team selects should “add value”.
Attributes are used to manage projects more effectively. To use attributes to do so, they need to
be accurate and current. As the old saying goes, “garbage in; garbage out.” Another applicable
saying is “A time saving tool should not take more time to maintain than the time it saves.”

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 419

Section 16: FEATURES AN SE TOOLSET SHOULD HAVE

16.1 Choosing an Appropriate Toolset


As discussed in Section 3, the I-NRDM data-centric approach advocated in this Manual requires
the project team to have a toolset that allows the creation of an integrated/federated data and
information model of the SOI being developed.
Individual tools tend to focus on specific needs and types of work products. Organizations (at
the strategic and business operations levels) need to perform trade-studies to see if the expense of
purchasing a specific application or toolset, maintaining the licenses, training people to use the
tool(s), maintaining the tool(s), maintaining needs, requirements, models, and other work
products and their underlying data and information developed by the tool(s) are going to provide
a positive ROI, improved time to market, reduce the number of product defects, reduce the
amount of rework, or reduce warranty work and recalls.
Given today’s increasingly complex, software-intensive systems, a toolset that includes
requirement management tools, diagraming tools, modeling tools, budgeting tools, and
scheduling tools are needed. Ideally these tools can share data allowing SE and PM artifacts to
be linked helping endure consistency among artifacts and work products as well as provide
management more insight into the status and progress of a project across the lifecycle.
To develop systems more effectively, the toolset needs to be tailored to an organization’s needs,
as evidenced by statements such as the following in NASA’s NPR 7123.1, NASA Systems
Engineering Processes and Requirements (NASA 2013) “...technical teams and individuals
should use the appropriate and available sets of tools and methods to accomplish required
common technical process activities. This would include the use of modeling and simulation as
applicable to the product-line phase, location of the WBS model in the system structure, and the
applicable phase exit criteria."
Going beyond needs and requirements, there are tools that can support the entire system lifecycle
including budgeting, scheduling, defining, designing, building/coding, verifying, validating, and
sustaining engineering activities. These tools are used to collect, link, visualize, analyze,
manage, and communicate data and information across all system lifecycle stages.
These more robust tools allow the organization to produce various views of the system under
development and create and maintain the various work products and artifacts (needs,
requirements, design artifacts, system verification artifacts, system validation artifacts,
documents, databases, reports, diagrams, drawings, models, budgets, schedules, WBS, PBS, etc.)
and their underlying data and information needed to manage the system development efforts
more effectively.
A key issue with tools that claim to support the entire lifecycle of a product, lack the robustness
of tools that focus on a specific capability. For example, while a RMT is good at supporting the
definition and management of sets of needs and requirements across the lifecycle, these tools
often lack the capability to include diagraming and language-based models modeling to support
the underlying analysis from which the needs and requirements are derived. Similarly, tools that
are good at supporting diagraming and development of language-based models often lack key

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 420

features of RMTs to adequately support the definition and management of sets of needs and
requirements.
What capabilities are needed from a project toolset depends on the product line, its complexity,
green-field versus brown-field products, issues the organization is having and wants to address,
and the workforce knowledge and experience. Organizations need to understand what data and
information best meets their needs and which set of tools they need to work with and manage
this data and information.
These tools are like any other software application…one size does not fit all. The project toolset
that is best for an organization is the toolset that meets the organization’s needs and requirements
management, PM, SE, and modeling needs. Consider the outcomes needed because of using the
tools and the ROI resulting from these outcomes.
Before embarking on a project toolset evaluation and selection initiative, work with business and
operations management stakeholders, project teams, engineering staff, and other key
stakeholders to determine what the organization needs to help better manage the development of
the systems in their domain. What features and functionality are needed in a project toolset so
the projects can effectively and efficiently manage their needs, requirements, design, design
output specifications, system integration, system verification, and system validation throughout
the lifecycle?
Specifically, choose the toolset that supports the level of data-centricity the project has decided
to strive for. Select tools that support the concept of PM and SE from a data-centric perspective
using the SOI’s integrated or federated, shareable sets of data. (Refer to INCOSE RWG
whitepaper [20] “Integrated Data as a Foundation of Systems Engineering”.
It is advisable to choose tools that support the generation and management of multiple lifecycle
artifacts and work products and their underlying data and information and especially tools that
fully support interoperability standards for compatible tools, schemas, and databases.
The perfect case would be to procure a single SE tool that “does it all”, i.e., the one tool would
result in the project having integrated or federated, shareable sets of data by default. That would
help to ensure all data and information is current and consistent across all system lifecycle
stages. Again, vendors are in the process of developing tools that will support the development
and shareability of PM and SE data and information across all lifecycle stages. However, it is
doubtful that a single tool will be developed that can “do it all” with the features and capabilities
needed by all project team members.

16.2 Desirable Features of a SE Toolset


This section key features to be considered when selecting a set of tools to procure for inclusion
within the project toolset. For consistency, it is recommended that this selection be made at the
strategic and operations levels of the organization. Doing so results in consistency between
projects within the organization and enables the reuse of data and information as well as the
personnel that have experience in the use of these tools. For example, for a given enterprise, a
common set of standards and regulations may apply across multiple product lines or to manage a
product line there is a benefit to being able to reuse data and information, including needs and
requirements rather than each new project beginning from nothing. With a common toolset, the
requirements in these standards and regulations can be imported once in to a “library” and shared
across all projects allowing the associated data and information to be reused resulting in a shorter
time to market and increased profitability.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 421

Including the features in this section will enable the organization to achieve the capabilities they
need to effectively implement their PM and SE processes from a data-centric perspective.
The order of the list does not in any way imply priority. Priority of these features and functions
and the “importance-weighing factor” for each is left up to the evaluating organization based on
its unique product development and management needs.
Currently it is unlikely that any one tool will include everything in this list as many vendors
tailor their tool to a specific client base or a specific system lifecycle stage and set of artifacts
and work products. However, it would be preferable to minimize the number of different
applications in the organization’s toolset tailored to their specific domain, product line, and
processes consistent with the level of data centricity they are moving toward.
The INCOSE Tools Integration and Model Lifecycle Management (TIMLM) WG has developed an SE
Tools Database (SETDB) that is available to INCOSE members. This database includes a listing SE
tools in the database, with specific capabilities and features defined. The SETDB is interactive, allowing
users to specify the capabilities and features they need and to set up priorities/weighing factor of each to
allow them to select and rank SE tools available to meet the needs of their organization.

16.3.1 Functionality
(What capabilities and feature are recommended?)
Needs and Requirements Quality: Does the toolset include the capability to support best practices
concerning the quality of needs and requirement statements? For example, does the toolset
enforce requirement standards such as those defined in the INCOSE Guide for Writing
Requirements? This includes the ability of the toolset to help needs and requirement authors to
write properly formed requirements (spelling, grammar, unambiguous terms, requirement
statement structure, consistency, etc.) and to assess the quality of a set of needs and requirements
based on the organization’s standards for writing needs and requirements.
Grammatical Structure of Needs and Requirements: Rather than treating needs and requirement
statements as an indivisible entity, does the toolset allow textual needs and requirements
statements to be managed as a grammatical structure? Within this structure the requirement
statements refer to various entities: architectural entities, functions, conditions, states, modes,
events, transition, interfaces, units of measure. To relate those references to the corresponding
entities in the overall system model involves getting inside the grammar of the needs and
requirements statement. This capability will allow needs and requirements to be an integral part
of the overall system model. This capability also is key to ensuring the terminology used within
the needs and requirements statements is consistent with the project-wide ontology.
Allocation, Budgeting, and Traceability: Does the toolset support the key concepts of allocation,
budgeting, and traceability between not just requirements but all work products and their
underlying data - no matter the level or lifecycle as discussed in Sections 6 and 14. If developing
functional, analytical, and behavioral models, this capability allows needs and requirements to be
linked to the applicable parts of the architecture within the model. From a budgeting
perspective, the toolset should allow the budgeting of performance, physical characteristics, and
quality from one level of the physical architecture to another and establish relationships between
the resulting child requirements and with their allocated parent.
Interface management: Does the toolset support the documentation of interface definitions (e.g.,
ICDs) and the corresponding interface requirements that are linked to those definitions? Can the
toolset be configured to link an interface requirement from one system, subsystem, or system
element of the SOI architecture to the corresponding interface requirement for another system,

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 422

subsystem, or system element with which the first element interacts with? Can the toolset be
configured to notify owners of a proposed change to a complementary interface requirement(s)
or their definition? Will the toolset enable users to perform the interface audit described in
Section 6? (This topic deals with the not only internal interfaces, but also interfaces between the
SOI under development and external systems it is required to interact with.)
Dependencies between artifacts and work products and their underlying data and information:
Does the toolset allow users to link dependent requirements and other work products across all
system lifecycle process activities and their underlying data and information to each other? (This
is important when a change to one artifact or work product could necessitate a change in another
artifact or work product along with the underlying data and information.) The dependent artifact
or work product may be part of the SOI under development or another system, subsystem, or
system element. Does the toolset allow users to do consistency assessments between dependent
requirements and artifacts and work products? Can the toolset be configured to notify owners of
dependent artifacts and work products when they are defined, or a change is made to one of the
dependent artifacts and work products? Note: this feature is supported by the traceability
feature.
Impact Assessment: Does the toolset allow the user to assess the impact of a change vertically
among systems and system element at different levels of the architecture as well as horizontally
across all work products from all system lifecycle activities helping the user to understand the
impact of a change to other artifacts and work products and the project’s delivery schedule, cost,
quality? Does the toolset allow the user to do change impact assessment to other artifacts and
work products generated in other system lifecycle activities whose underlying data resides in a
separate database? For example, what are the impacts of a requirement change on design? A
change to an analytical or behavioral model on a need or requirement linked to that model? A
change to a dependent requirement in a different system, subsystem, or system element? A
change to a requirement on system verification planning? A change to a need on system
validation planning?
Ontology: Does the toolset allow users to define an ontology for a specific SOI as well as
include the capability to expand its inherent ontology to define a project-wide ontology? An
ontology includes the formal naming and definition of a set of terms, entities, data types, and
properties as well as defining the relationships between these terms, entities, data types that are
fundamental to a domain. Defining an ontology is critical to ensuring consistency and allowing
sharing of data and information across system lifecycle process activities as well as reusability
within the enterprise. Note: Most tools provide the capability to define an ontology for the data
and information managed within the tool, but often the ontology is proprietary. From a
shareability perspective, what is needed is for all tools in the project’s toolset to have an
ontology that is consistent with the enterprise-wide ontology.
Schema: Does the project’s toolset include the capability to define a master project schema for its
integrated or federated, shareable sets of data consistent with the enterprise-wide schema? The
schema is a description, in a formal language, of the database structure that defines the objects in
the databases, relationships between those objects, shows how real-world entities are modelled in
the database, and integrity constraints that ensure compatibility between parts of the schema. Do
the tools in the toolset conform to standards for development of a common schema (e.g., OSLC)?
SE tools in the project’s toolset need to ensure their schemas are consistent with the project’s
master schema defined for the SOI’s integrated or federated, shareable sets of data to ensure
compatibility of the data, allowing the data to be shared among the various tools within the
project’s toolset. (See also interoperability and tool integration later in the list.)

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 423

Embedded Objects: Does the SE toolset allow the user to embed objects with various electronic
formats (tables, pictures, drawings, diagrams, RTF files, word processing documents,
spreadsheet documents, test procedures, drawings, etc.) that can be linked to other work
products?
Diagrams and Drawings: Does the SE toolset support the development and management of
diagrams and drawings as electronic files that can be linked to other work products and their
underlying data independently from an analytical modeling tool?
Modeling: Does the toolset support the development and use of functional, architectural,
analytical, behavioral, and physical language-based models? Does the toolset allow the
development and documentation of use cases, functional flow block diagrams, states and modes
diagrams, timing diagrams, external interface diagrams, requirement expressions, and other types
of models needed by the project and store the underlying data and information representing these
activities and diagrams in a database consistent with a project’s master schema? Will the toolset
allow the user to develop high fidelity models that support simulations - if that capability is
needed by the organization? Does the toolset allow the creation of an extensible data model that
can be easily constrained by a rule set; an extensible API to allow incorporation of custom data
creation and manipulation utilities; a rich, natural language query engine?
Reusability: What features do the tools within the project toolset have that will enable re-use of
work products and their underlying data and information for similar projects or projects involved
in updating an existing product? Can the work products and underlying data for one version of a
product be duplicated and used as the basis for the next version? Does the toolset support the
development of a library of common needs, requirements, standards, and regulations applicable
to types of systems developed by the enterprise? With such a library, each project can pull
applicable needs and requirements from the library rather than having to recreate and enter these
requirements separately for each project?
Product-line management: In addition to reusability, what features does the SE toolset have that
supports product-line management? Does the tool allow branching of work products, e.g., for a
class of systems, the same root requirement can be branched to multiple versions of the root
requirement? Does the toolset the support the definition of variant systems, subsystem, system
elements as well as variant needs and requirements?
16.3.2 Tool Attributes
(What features do the tools need to have to allow the tool to be tailored to support the
organization’s specific needs?)
Tailorable: Can the SE toolset be tailored within the organization based on a project’s needs e.g.,
complexity, team knowledge, development methodology, product line, size, processes,
timeframe, customer requirements, ontology, schema).
Configuration/Customization: Does the toolset include the ability to configure and/or customize
the toolset to the customer’s domain, product line, culture, and organizational processes? Does
the toolset allow individual users to configure their interface based on their unique role and use
of the SE toolset with minimum help from the vendor? Note: Configure refers to the ability to
configure the tool to meet user needs without changing the code. Customize involves changes to
the tool code to provide new or tailored features needed by the customer. Having a tool that can
be configured to meet an organization’s needs is cheaper than paying a vendor to customize the
tool to meet those needs.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 424

Learnability/usability: Do tools within the project toolset have a user interface that is intuitive,
user friendly, and easy to use with a small learning curve? How much training is necessary and
available? Does the tool require users to go through significant training to learn a specific
language to use the tool? Is online documentation and help functionality included? Does the
toolset provide methods allowing the user to navigate between various artifacts and work
products and visualizations such as: needs, design input requirements, documents, CM
information, reports, diagrams, models, design artifacts, design output specifications, etc.?
Security: Does the toolset provide security of the data and information in terms of access (at
multiple levels, within levels, and different user classes), protection (from loss), and integrity?
Does the toolset support the security standards applicable to the organization’s domain and
product type(s) and data governance policy? - Information security includes the principles of
confidentiality, integrity, and availability (CIA). Data and information must be protected from
unauthorized use and disclosure, must be able to be trusted (accurate, consistent, of high quality,
managed), and accessible to authorized personnel - and not accessible by non-authorized
personnel. Tools within the project’s tool set must support the enterprise data governance and
security policies and requirements for both internal data storage as well as cloud storage.
Accessibility (devices/location): Does the toolset allow users to access data securely via
desktops, laptops, portable devices (tablets, smart phones) both inside and outside the
organization’s firewalls? Are the sets of data created by the toolset accessible by another
organization’s (vendor/supplier) toolset based on user class and respective access privileges?
Online versus Offline Modes: Does the toolset require the user to be connected to the server
continuously (online) to use the toolset or does the toolset allow offline work to be accomplished
with synchronization after going back online?
Concurrent Access: How many concurrent users does the SE toolset allow to work within the
same area? What happens when more than one user wants to edit the same work products and
underlying data? For some complex systems there may be over a hundred users modifying
various work products in the SOI’s integrated or federated, shareable sets of data simultaneously.
Performance: What is the maximum wait time between user actions? How does the toolset
minimize performance impacts as the number and complexity of work products increase as well
as the number of concurrent users increase?
Collaboration: Does the toolset support real-time collaboration among the users within the tool
across all lifecycle process activities? Does the toolset allow users to collaborate no matter
where their workplace is located? Globally? Does the toolset allow external organizations
(customers/vendors/suppliers) to collaborate with the project team?
Tool integration -needs and requirements: Does the SE toolset allow the integration of needs and
requirements developed in an RMT to be linked to entities defined and managed in external
diagraming and modeling tools? For example, can needs and requirements developed and
managed within an RMT be linked to entities within SysML or other types of models developed
and managed in another application?
Interoperability/tool integration - data sharing: Does the toolset allow the sharing of data
between tools within the project tool set as well as with external organizations involved with the
project, e.g., suppliers or customers, (ReqIF compliant for example) as well as with other word
processing and spreadsheet application supported formats? How easy is it for information to be
transferred into and out of the toolset to support the organization’s processes and people? Does
the toolset provide a standardized interface for importing or exporting data from/to other
applications (e.g., Model-based tools), rather than requiring specialized scripting, etc. to achieve

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 425

a transfer/interaction? Can the tools perform extraction, transformation, and loading (ETL) of
data created by other toolsets external to the SOI’s integrated or federated, shareable sets of data
so the data and information in the external tool’s database can be imported into the SOI’s
integrated or federated, shareable sets of data and used by the project? How well can the
individual tools be integrated with each other, i.e., can one tool access and manipulate the data
and information (single source of truth) created by a different tool? Do the tools in the toolset
conform to a common data exchange standard (e.g., AP239, AP233 XML)? When a tool vendor
says their tool conforms with a standard, does it conform partially or fully? Do the tools in the
toolset allow data exchange between tools seamlessly, with minimal and straightforward data
model mapping required on the part of the user? How well does the degree of integration of the
tools in the toolset meet the needs of the organization?
Sharing of Data - External: Does the SE toolset allow the project to identify and securely share
specific sets of data with external organizations, e.g., customers or suppliers? Does the toolset
include an industry standard import/export utility? Is the tool partially or fully compliant with
that standard?
Storage Location: Does the toolset require artifacts and work products and their underlying data
to be stored in the “cloud” provided by the tool vendor or stored in-house on the organization’s
server(s) or cloud-based storage? While “in the cloud” aids in collaboration, security and
protection of sensitive, classified, or IP information is a concern when storing data in the cloud.
Accessibility and protection (from loss) are also key considerations for any storage location. Is
the storage location consistent with the enterprise data governance policy?
Scalability/Extendibility: Will the toolset be able to support the development and management
of the volume of work products consistent with the size and complexity of the systems the
organization develops? If the enterprise is procuring the toolset, will the toolset be able to
support the number of projects within the enterprise given the size and complexity of the systems
developed within the enterprise.
Archive/Backup/Long Term Availability: Does the toolset provide the capability to archive and
backup all the data and information consistent with enterprise data governance policy? Do the
formats used provide long term availability as storage and retrieval technologies evolve or a tool
changes or the user changes their toolset? (Organizations should avoid using a backup/archive
format that is proprietary that may no longer be accessible if the tool vendor goes out of
business.)
16.3.3 Management and Reporting
(What features are needed to help more effectively manage the project?)
Attributes: Does the toolset allow the user to define and manage attributes for work products.
For example, for needs and requirements, does the SE tool allow the user to define attributes
needed to help manage their needs and requirements as discussed in Section 15?)
Measures: Does the toolset allow the enterprise and project to define specific measures that will
allow managers and systems engineers to monitor and assess progress, identify issues, and
ensure the system being developed will meet the stakeholder needs? Several key measures are
commonly used that reflect overall customer/user satisfaction (e.g., performance, safety,
reliability, availability, maintainability, and workload requirements: KPIs, MOPs, MOEs, and
leading indicators (LIs).)
Reports: Does the toolset include a robust, well documented report feature that allows users to
create unique reports (using the attributes and measures defined previously) as well as customize

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 426

standard reports provided with the tool? Does the toolset allow reports to be exported in multiple
formats (MS Word, Pages, RTF, spreadsheet, presentation, graphical, etc.)? At the beginning of
the quest for a toolset, one of the first things project should do is identify the lifecycle the
number and type of reports the tool needs to support. That will drive the schema of the data,
meta-data, measures, and attributes to be included in the SOI’s integrated or federated database.
Metrics/dashboards: Closely related to a report feature, does the toolset provide the capability to
do “data mining” and analytics of the measures and information in the attributes to enable the
display of and report historical and trend data? It is often not enough to just know what percent
of the requirements for the system have been successfully verified. Often it would be useful to
see if the trend to completion of system verification and system validation activities is on the
right pace, is slowing down, or speeding up. If slowing down, the project may not be able to
complete all the system verification and system validation activities in time for the customer
acceptance review. Management needs to know this.
Notifications: Can the applications within the toolset send notifications to applicable
stakeholders via email or texting concerning changes to data and information contained within
artifacts and work products? Can the notifications be sent from one user to another user (or
group of users) concerning actions, comments, and questions? Can the SE toolset send
notifications to the appropriate users when a specific measure is predicted to or has exceeded a
pre-specified threshold?
Project Management Work Products: Does the project toolset allow various PM work products
to be managed within the SE toolset or at least linked to artifacts within the SE toolset? This
includes budget, schedule, and risk management work products as well as development and
management of a WBS. Can these work products and underlying data and information be linked
to parts of the PBS and other SE artifacts and their underlying data? For example, can the WBS
be linked to a PBS?
Lifecycle Support: Does the project toolset support system development across all system
lifecycle process activities: needs and requirements definition and management, gate reviews,
architecture, design, manufacturing, coding, system integration, system verification, system
validation, and sustaining engineering? For system verification and system validation, does the
toolset allow the linkage of needs and requirements to their system verification and system
validation planning artifacts, Procedures, Execution Records, and Approval Packages?
Workflow: Does the toolset provide the ability to define and support the organization’s PM and
SE process workflow within the tools (e.g., for needs and requirements does the SE toolset allow
the project to track the needs and requirement’s status: draft, review, approve, baseline; design,
test, code/manufacture, system verification, and system validation)? Can the SE toolset allow
the creation, management, and execution of PM and SE processes, procedures, and work
instructions within the toolset?
CM: Does the project toolset provide robust CM of all system lifecycle work products and
underlying data and information including change, version, and baseline control? Does the
toolset allow the user to access the change history of any work product? If work products are
developed and maintained within the database, does the toolset allow configuration control of the
database (versus the various reports/visualizations representing the data and information in the
database)?

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 427

16.3.4 General Considerations


Price: Is the toolset affordable in relation to the number and size of the projects and number of
needs and requirements and sets of needs and requirement modeling activities and resulting
artifacts, system verification and system validation artifacts, number of concurrent users?
Concerning affordability, is there a single upfront application fee, individual license fee (if a
license fee, one-time or yearly)? Are the licenses fixed or floating? Does the price include
initial setup, installation, configuration or customization or is that extra? Is ongoing technical
support included or extra? Is training included or extra? Would it be more cost effective to
spend more on a single tool that has most of the above features or multiple tools to give the
organization all the features needed to manage system development across all lifecycle stages?
Cost of infrastructure to support the use of the SE toolset: What are the IT requirements to host
and deploy the toolset? What specialty skills are required to operate, extend, and maintain the
applications within the toolset?
Vendor/product maturity: How long have applications in the toolset been on the market? How
long have the vendors been in business?
User feedback and satisfaction: In today’s social media driven world, access is provided to
actual user comments concerning the applications within the tool set, the vendors, ease of use,
reliability, tech support, etc. Do not get overwhelmed by the hype and sales pitch from the
vendor. See what the actual users have to say about the applications being considered for
inclusion in the organization’s toolset.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 428

APPENDIX A: REFERENCES

The following references were consulted when developing this Manual. When possible, the
source is referenced in the text. In some cases, concepts and information from several sources
was used as a basis of the text but are not directly attributable to any single source.
[1] ANSI/EIA-649-B-2011, EIA Standard - National Consensus Standard for Configuration
Management, Arlington, VA.: Electronic Industries Association, 2011.
[2] Armstrong, J.R., 2007. The Continued Evolution of Validation: Issues and Answers.
[3] Carson, R. S. (1995). “A Set Theory Model for Anomaly Handling in System Requirements
Analysis”. St. Louis, MO, USA: Wiley.
[4] Carson, R. S., “Designing for failure: Anomaly Identification and Treatment in System
Requirements Analysis”, INCOSE IS 1996
[5] Carson, R. S., Noel, R. A., “Formal Requirements Verification and Validation,” INCOSE IS 2018
[6] Carson, R. S., “Integrating Failure Modes and Effects with the System Requirements Analysis”,
INCOSE IS 2004.
[7] Carson, R. S., “Using MBSE to Develop Requirements”, October 24, 2019.
[8] Carson, R. S., “Using Architecture and MBSE to Develop Validated Requirements”, presented at
INCOSE Western States Regional Conference, September 2020.]
[9] Carson, R. S., and al., e. (2004). “Requirements Completeness.” Proceedings of INCOSE 2004.
Wiley.
[10] Charette, R. N., “How Software is Eating the Car”; IEEE Spectrum Posted 2021-06-07
[11] Dick, J. a. (2004). The Systems Engineering Sandwich: combining requirements, models and
design. Proceedings of INCOSE 20014 (pp. 1401-1414). Toulouse, FR: Wiley.
[12] Dick, J., Wheatcraft, L., Long, D., Ryan, M., Svensson, C., Zinni, R., 2017, “Integrating
requirement expressions with system models”, paper presented at ASEC 2017, United Kingdom
[13] EIA-632, Processes for Engineering a System, 2003
[14] FDA, web page: The Most Common FDA Audit Findings From 2017
[15] GAO-20-48G, Technology Readiness Assessment Guide, January 2020
[16] Hoehne, O., 2017, “I Do not Need Requirements—I Know What I’m Doing Usability as a Critical
Human Factor in Requirements Management”, 27th INCOSE International Symposium, IS2017,
Adelaide, 17-20 July.
[17] INCOSE-TP-2003-002-04 2015, Jan 2015 Systems Engineering Handbook, Fourth Edition,
[18] INCOSE 2014, INCOSE Vision 2025, A World in Motion
[19] INCOSE-TP-2010-006-04, 2022, Guide for Writing Requirements, prepared by the Requirements
Working Group, INCOSE
[20] INCOSE-TP-2018-001-01, 2018, INCOSE Integrated Data as a Foundation of Systems
Engineering, prepared by the Requirements Working Group, INCOSE.
[21] INCOSE-TP-2021-004-01, 2022, Guide to Verification and Validation, prepared by the
Requirements Working Group, INCOSE
[22] INCOSE -TP-2021-003-01, 2022, Guide to Needs and Requirements, prepared by the
Requirements Working Group, INCOSE
[23] ISO 10007, Quality Management Systems—Guidelines for Configuration Management, 2017.
[24] ISO/IEC/IEEE 15288, Systems and software engineering — System lifecycle processes, First
edition 2015-05-15

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 429

[25] ISO/IEC/IEEE 29148, Systems and software engineering — Lifecycle Processes — Requirements
Engineering, Second edition, 2018-12
[26] Katz, T., 2019. Evaluation of OTS Hardware Assemblies for Use in Risk Averse, Cost Constrained
Space-based Systems, 29th Annual INCOSE International Symposium (IS2019).
[27] Katz, T., 2020. When to Constrain the Design? Application of Design Standards on a New
Development Program, presented at INCOSE IS2020.
[28] Llorens, J., 2014,” Ontology Supported Systems Engineering”, blog
[29] Micouin, P. (2014). Model Based Systems Engineering: Fundamentals and Methods. Wiley.
[30] MIL-HDBK-61A(SE), Military Handbook—Configuration Management Guidance, Washington
D.C.: United States of America Department of Defense, 2001.
[31] MIL-STD-481B, Military Standard Configuration Control - Engineering Changes (Short Form),
Deviations and Waivers, US Department of Defense, Washington D.C., 15 July 1988.
[32] MIL-STD-973, Military Standard—Configuration Management, Washington D.C.: United States of
America Department of Defense, 1992.
[33] NASA, CXP 70024, Human Systems Integration Requirements, Rev B, 3/3/2008, Appendix J,
Allocation Matrix.
[34] NASA, CXP 72208, Suit Element Requirements Document, Rev c.3, 9/22/2009, Appendix C,
Mission Applicability, Appendix D, Subsystem Allocation Matrix, and Appendix F, HSIR
Allocation Matrix.
[35] NASE NPR 7123.1C, NASA SE Processes and Requirements, February 14, 2020
[36] NASA Systems Engineering Handbook, NASA SP-2016-6105 Rev2, 2016
[37] NASA Expanded Guidance for Systems Engineering, Volumes 1 and 2, 2016
[38] The ReUse Company (TRC-1) 2018, “Knowledge Centric Systems Engineering”, Web page.
[39] Ryan, M.J., “An Improved Taxonomy for Major Needs and Requirements Artefacts”, INCOSE
International Symposium IS2013, June 2013
[40] Ryan, M., 2017, Requirements Practice, Argos Press, Canberra, Australia
[41] Ryan, M., Wheatcraft, L., Dick, J., and Zinni, R., 2014, “An Improved Taxonomy for Definitions
Associated with a Requirement Expression”, Systems Engineering / Test and Evaluation
Conference SETE2014, Adelaide, 28-30.
[42] Ryan, M, Wheatcraft, L, 2017. On the Use of the Terms Verification and Validation INCOSE
International Symposium IS2017, July 2017.
[43] Scukanec, SJ and VanGaasbeek, JR, 2010. A Day in the Life of a Verification Requirement.
[44] Smith, R.W., The Space Telescope: A Study of NASA, Science, Technology and Politics,
Cambridge University Press, Mass, (1989) and Hubble Space Telescope,
https://en.m.wikipedia.org/wiki/Hubble_Space_Telescope#.
[45] Wheatcraft, L., 2011, “Triple Your Chances of Project Success - Risk and Requirements” paper
presented at INCOSE IS 2011, June 2011, Denver, Colorado and NASA’s PM Challenge 2012,
February 2012, Orlando, Florida
[46] Wheatcraft, L., 2012. “Thinking Ahead to Verification and Validation” presented at NASA’s PM
Challenge 2012, February 2012, Orlando, Florida
[47] Wheatcraft, L., Ryan, M., Dick, J., 2016, “On the Use of Attributes to Manage Requirements”,
Systems Engineering Journal, Volume 19, Issue 5, September 2016, pp. 448-458.
[48] Wheatcraft, L., Ryan, M., Svensson, C., 2017-1 “Integrated Data as the Foundation of Systems
Engineering”, Presented at INCOSE IS 2017, Adelaide, Australia, July 2017.
[49] Wheatcraft, L., Ryan, M. “Communicating Requirements - Effectively!” paper presented at
INCOSE IS 2018.
[50] Wheatcraft, L., Ryan, M., Dick, J., Llorens, J., 2019. “Information-based Requirement
Development and Management”, paper presented at INCOSE IS 2019.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 430

[51] Wheatcraft, L., Ryan, M., Dick, J., Llorens, J., 2019. “The Need for an Information-based Approach
to Requirement Development and Management”, paper and poster presentation at INCOSE IS 2019
[52] Wheatcraft, L. 2019, The Role of Requirements in an MBSE World, SyEN newsletter, June 2019
[53] Wheatcraft, L., Resource Margins and Reserves, August 2016
[54] Wilson, B., “Integrated Testing: A Necessity, Not Just an Option,” ITEA Journal 2009, 30: 375-
380.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 431

APPENDIX B: ACRONYMS AND ABBREVIATIONS

ADS Activity Definition Sheet DOE Department of Energy


AI Artificial Intelligence EIA Electronic Industries Alliance
American Institute of Aeronautics and
AIAA EMC Electromagnetic compatibility
Astronautics
ALM Application Lifecycle Management EMI Electromagnetic interference
ANSI American National Standards Institute EOL End of Life
American Society of Mechanical
ASME EOM End of Mission
Engineers
BA Business Analyst ERD Entity Relationship Diagram
BNOD Board of Directors FAT Factory Acceptance Test
Function-Based Systems
BOL Beginning of Life FBSE
Engineering
BOM Beginning of Mission FCA Functional Configuration Audit
CAB Corporate Advisory Board FDA Food and Drug Administration
CAD Computer-aided Design FFBD Functional Flow Block Diagram
CAPA Corrective and Preventive Action FMEA Failure Modes and Effects Analysis
CCB Change Control Board FQT Formal Qualification Test
CCB Configuration Control Board GAO Government Accountability Office
CDR Critical Design Review GtNR Guide to Needs and Requirements
CDRL Contract Deliverables Requirements List GtVV Guide to Verification and Validation
CM Configuration Management GtWR Guide for Writing Requirements
CM Configuration Management HB Handbook
CMMI Capability Maturity Model Integration HSE Human Systems Engineering
CMMI Capability Maturity Model - Integrated HSI Human Systems Integration
Information-based needs and
CMP Configuration Management Plan I-NRDM requirements definition and
management
ConOps Concept of Operations I&T Integration and Test
COTS Commercial Off the Shelf IAD Interface Agreement Document
CR Concept Review ICD Interface Control Document
DFD Data Flow Diagram IDA Interface Definition Agreement
DHF Design History File IDD Interface Definition Document
International Electrotechnical
DHR Device History Record IEC
Commission
Institute of Electrical and Electronics
DMR Device Master Record IEEE
Engineers
Interface Failure Modes and Effects
DOD Department of Defense IFMEA
Analysis
IFU Instructions for Use NVDS Needs Verification Definition Sheet
International Council on System
INCOSE OpsCon Operational Concept
Engineering

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 432

IPO Input/Output PBS Product Breakdown Structure


IRD Interface Requirement Document PCA Physical Configuration Audit
International Organization for
ISO PCR Product Concept Review
Standardization
IT Information Technology PDD Process Definition Documents
IV&V Integration, Verification, and Validation PDR Preliminary Design Review
Product Lifecycle
IV&V Independent Verification and Validation PLM
Management
IW International Workshop PM Project Management
Project Management Working
KDN Key Driving Need PM WG
Group
KDR Key Driving Requirement PMI Project Management Institute
Program/Project Management
KPP Key Performance Parameter PMP
Plan
LI Leading Indicators PMP Production Maturation Plan
MBD Model-Based Design POC Primary Point of Contact
MBSE Model-Based Systems Engineering PSI Pounds per Square Inch
MGO Mission, Goals, and Objectives PTR Post Test Review
Master Integration, Verification, and
MIVV QA Quality Assurance
Validation
MOE Measures of Effectiveness QC Quality Control
MOP Measures of Performance RE Requirement Engineer
MOS Measures of Suitability RFI Request for Information
MOTS Modified Off the Shelf RFP Request for Proposal
MRL Manufacturing Readiness Level RM Requirement Management
Requirement Management
MTBF Mean Time Before Failure RMT
Tool
MTTF Mean Time to Failure ROI Return on Investment
Requirements Verification
MTTR Mean Time to Repair RVCRM
Cross Reference Matrix
National Aeronautics and Space Requirements Verification
NASA RVDS
Administration Definition Sheet
Requirements Verification
NGO Need, Goals, Objectives RVM
Matrix
NLP Natural Language Processing RWG Requirements Working Group
NPR NASA Procedural Requirements SA Supplier Agreement
Needs and requirements definition and
NRDM SAD System Architecture Diagrams
management
NRTM Needs and Requirements Trace Matrix SAT Site Acceptance Test
NRM Needs and Requirements Manual SBP Strategic Business Plan
NVaDS Needs Validation Definition Sheet SCL SE Capability Level
Stakeholder Communications
SCMP SSoT Single source of truth
Management Plan
“Standard Triangle Language"
SCR System Concept Review STL or “Standard Tessellation
Language

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 433

System Validation
SDK Software Development Kit SVaCM
Compliance Matrix
SDR System Design Review SVaM System Validation Matrix
System Verification
SE Systems Engineering SVCM
Compliance Matrix
SE HB Systems Engineering Handbook SVM System Verification Matrix
Systems Engineering and
SE&I WG SySML System Modeling Language
Integration Working Group
Systems Engineering Book of
SEBOK TBC To Be Computed
Knowledge
SEI Software Engineering Institute TBD To Be Determined
System Engineering Management
SEMP TBR To Be Resolved
Plan
Source, Input, Process, Output,
SIPOC TBS To Be Supplied
Customer
System Integration, Verification, Generic version of TBD, TBR,
SIVV TBX
and Validation TBS, TBC)
SME Subject Matter Expert TDP Technical Data Package
SNR Needs and Requirements VOX Voices of all Stakeholders
SOI System of Interest WBS Work Breakdown Structure
SOP Standard Operating Procedures WG Working Group
SOW Statement of Work WI Work Instruction
SR Scope Review
SRR System Requirements Review

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 434

APPENDIX C: GLOSSARY

Acceptance: an activity or series of activities conducted before transition of the SOI from supplier to customer
against predefined and agreed to “necessary for acceptance” criteria such that the customer can determine
whether the realized SOI is suitable to change ownership from supplier to the customer. Acceptance can
include system verification, system validation, certification, and qualification activities or a review of system
verification, system validation, certification, and qualification results is completed in accordance with the
necessary for acceptance criteria as agreed to in a contract.
Accuracy: A measure of how close an average of measures is to the baseline value.
Activity Description Sheet (ADS): A visualization of system verification and system validation
information for a given system verification or system validation Activity. The information in the
ADS is used for planning system verification or system validation activities that will be
implemented via a system verification or system validation procedure.
Allocated Baseline: The family of sets of design input requirements for each system, subsystem,
and system element within the SOI physical architecture along with interface definition
documentation for each interface boundary across which the SOI interacts with an external
system.
Allocation: The flow down and assignment of requirements for a system at one level to a
system, subsystem, or system element at the next level of the SOI physical architecture that that
have a role in the implementation of the allocated requirement.
Allocation Matrix: A visualization showing the allocation of requirements for a system at one
level to system, subsystem, and system elements at the next lower level of the SOI physical
architecture.
Approving Authorities: Any individual, group of individuals, or organization that has the
authority to approve the system for use in its operational environment by its intended users.
Approving Authorities could be a combination of an internal or external customer, a regulatory
agency, or a third-party certification organization The Approving Authorities (a) decide what
constitutes necessary for acceptance, and (b) determines what is necessary for acceptance.
Attribute: Additional information associated with a system, subsystem, system element, need
statement, requirement statement, or function which is used to aid in its development.
Bidirectional Traceability: The ability to trace any given design input requirement or need to
its parent or source (bottom to top) and to its allocated child needs and requirements (top to
bottom).
Brown Field Systems: Systems where a legacy or heritage systems where there is an existing
predecessor system. Brown filed systems will have a physical architecture defined at the start of
the project.
Budgeting: The allocation of specific quantities of resource production or utilization,
performance, physical attribute, or quality for a system to subsystems and system elements that
make up the system.
Certification: The result of some audit or a written assurance that the realized SOI has been
developed, and can perform its assigned functions, in accordance with legal or workmanship,

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 435

design, and construction standards (e.g., for an aircraft, consumer product, or medical device).
The development reviews, system verification, and system validation results form the basis for
certification.
Concept: A written or graphic representation that concisely expresses how an entity can satisfy
the problem, threat, or opportunity it was defined to address within specified constraints with
acceptable risk.
Compliance Matrix: A matrix/table visualization of the system verification or system validation
information that lists the needs or design input requirements, the system verification or system
validation event, system verification or system validation result in terms of compliance
(pass/fail), and a summary of the objective evidence that is used to determine compliance or a
pointer to where the evidence is located.
Compliance Requirements: Requirements that address the design and construction standards
and regulations the project team must provide sufficient evidence of compliance.
Confidence Level: The degree of confidence in the correctness and repeatability of the results of
the data from a system verification and system validation activity. The Confidence Level is a
measure on a scale of 0 - 100 percentage points on how confident that subsequent tests will yield
the same result.
Customer Requirements: Customer-owned requirements transformed from the customer needs.
For example, a set of customer-defined system requirements provided to a supplier. Customer-
owned requirements could apply to the SOI or to the organization developing the SOI. If they
apply to SOI, they would be inputs to the Lifecycle Concepts and Needs Definition Process
(Section 4). If they apply to the organization developing the SOI, they would be included in a
SOW or SA. Customer requirements are a subset of stakeholder requirements. See also
stakeholder requirements and user requirements.
Design Input Requirements: The technical design-to set of system requirements for the SOI
that were transformed from the baselined integrated set of needs and are inputs to the
architecture and design definition processes. The set of design input requirements communicate
the system perspective concerning what the system must do to meet the integrated set of needs
and is what the SOI is verified against.
Design Input Requirement Validation Record: A record of the results and outputs of the
design input requirements validation process activities.
Design Input Requirement Verification Record: A record of the results and outputs of the
design input requirements verification process activities.
Design Output Specifications: The set of design characteristics described in a form suitable for
implementation, design descriptions, end-item specifications, or technical data package (TDP)
that include equipment lists, parts lists, drawings, wiring diagrams, plumbing diagrams, labeling
diagrams and requirements, logic diagrams, algorithms, Computer-aided Design (CAD) files,
STL files (for 3D printing), end-item specification requirements on the system to be
manufactured or coded that can be thought of as the "build-to/code-to" requirements, and other
design output artifacts.
Design Validation: Confirmation that the design, as communicated in the design output
specifications will result in a system that meets its intended purpose in its operational
environment when operated by the intended users as defined by the integrated set of needs and
does not enable unintended users to negatively impact the intended use of the system.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 436

Design Validation Record: A record of the results and outputs of the design validation process
activities.
Design Verification: The process of ensuring that: 1) the design meets the rules and
characteristics defined for the organization’s processes, guidelines, and requirements for design;
2) the design reflects the design input requirements; and 3) the design output specifications
clearly implement the intent of the design input requirements.
Design Verification Record: A record of the results and outputs of the design verification
process activities.
Drivers and Constraints: Things outside the project’s control that constraint or drive the
solution space. Compliance is mandatory - failing to provide sufficient evidence of compliance,
will likely result in the system failing certification and acceptance for use. Drivers and
constraints represent a major source of needs and requirements and drive and constrain the
lifecycle concepts analysis and maturation activities.
Early Validation: Any validation activity (needs, requirements, or design) that occurs prior to
system validation.
Early System Validation: System validation activities that occur concurrently with design
validation prior to formal system validation.
Early System Verification: System verification activities that occur concurrently with design
verification prior to formal system verification.
Elicitation: Engaging with the stakeholders to understand the source and context their needs and
stakeholder-owned design input requirements for the SOI originating from their real-world
expectations, concerns, problems, challenges, issues, risk, opportunities, or successes. The
elicitation process allows the project team to discover and understand what is needed, what
processes exist, how stakeholders interact with SOI, what happens over the SOI’s lifecycle -
good and bad, what states and transitions the SOI might undergo or experience during use,
nominal, alternate-nominal, and off-nominal operations, and other considerations. The goal of
elicitation is to provide an implementation-free understanding of the stakeholders’ needs and
stakeholder-owned design input requirements by defining what is expected (design inputs) to
satisfy the MGOs, measures, and the rest of the integrated set of needs without addressing how
(design outputs).
Enabling System: Systems external to the SOI needed to “enable” certain lifecycle activities or
enable the SOI to operate. Enabling systems include lifecycle support systems and services (e.g.,
development, production, integration, system verification, system validation, deployment,
training, operations, maintenance, and disposal) that facilitate the progression and use of the
operational SOI through its lifecycle. For example, the project may need unique simulation
software or hardware, support or test equipment, special facilities, or models to perform the
system verification and system validation activities.
Entity: A single item to which a concept, need, or requirement applies: an organization, business
unit, service, SOI, system, subsystem, system element, product, process, or human.
Factory Acceptance Test (FAT): The FAT series of activities, to the extent possible given it is
not in the operational environment, are designed to provide evidence that the SOI meets the
customer’s and other stakeholder’s needs (system validation), design input requirements (system
verification), and design output specifications (production verification). System level SOI
requirements and needs may undergo final system verification and system validation during the
FAT series of activities.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 437

Fit Requirements: An operational requirement dealing with the ability of the system to operate
within its operational environment by its intended users. These requirements can include
secondary or enabling functions relating to the external operational environment and
users/operators needed to perform the primary functions of the SOI.
Form Requirements: Requirements that address the shape, size, dimensions, mass, weight, and
other physical characteristics that uniquely distinguish the SOI. For software, “form”
requirements may address number of lines of code, memory requirements, programing language,
etc. “Form” requirements address SOI characteristics associated with the physical system that
are not always included within functional, architectural, or analytical/behavioral models.
Formal Qualification Test (FQT): A series of formal activities that involves project
management and/or the customer that are designed to obtain sufficient evidence that can be used
to determine compliance with all baselined sets of needs (system validation) and sets of design
input requirements (system verification). The FQT activities may use an environment and
users/operators that is different than that expected during operations. This environment or test
inputs are meant to stimulate the system in a particular way to verify each requirement or need
individually.
Function: A task, action, or activity that must be performed to achieve a desired outcome.
Functional Baseline: The top-level baselined set of design input requirements for a SOI along
with interface definition documentation for all interface boundaries across which the system,
subsystem, or system element will interact. See also allocated and system baseline.
Functional Requirement: A requirement stating a task, action, or activity that the SOI must do
to meet the need it was transformed from or an allocated parent requirement. Functional
requirements include a performance measure such as how well, how many, how fast, etc. a
function needs to be performed.
Goals: Upper-level needs that form the second level of the hierarchy of the integrated set of
needs. Goals are elaborated from the mission statement communicating those things that need to
be achieved that will result in achieving the mission. Goals describe future outcomes that will
result in the mission statement to be met.
Gold Plating: The act of adding needs or requirements for features that are not necessary to
address the problem or opportunity the SOI is addressing and meet the stated MGOs and
measures.
Green Field Systems: A new system being developed where there is no adequate existing
predecessor system.
Induced Environment: Part of the operating environment including temperature, vibrations,
mechanical loads, electrical emissions, acoustics, etc.) created (induced) from external systems
as well as temperature, vibrations, mechanical loads, electrical emissions, acoustics, etc.)
resulting from the operation of the SOI. Induced environments from existing systems that the
SOI has no control over are constraints within which the SOI must operate. Induced
environments for existing systems or for the SOI under development may be negotiated and thus
are part of the needs and requirements definition processes. Once defined, the expectation is that
the SOI will be able to operate within the induced operating environments.
Integrated Set of Needs: Represents the integrated and baselined set of needs that were
transformed from the set of lifecycle concepts and other sources that define the SOI’s intended
use in its operational environment when operated by the intended users. The integrated set of
needs communicate an integrated stakeholder’s perspective concerning their real-world

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 438

expectations what they need the SOI to do and is what the SOI design input requirements,
design, and SOI is validated against.
Interface: An interface is a boundary where, or across which, two or more systems interact in
accordance with an agree-to interface definition.
Interface Definition: A common agreement concerning a specific interaction across an
interface boundary between the SOI and another system commonly recorded in an interface
control document or similar type interface definition document or location in a database.
Interface Boundary: A boundary where, or across which, two or more systems interact in
accordance with an agree-to interface definition.
Interface Requirement: A design input requirement that involves a defined interaction
(function verb/object) across and interface boundary with another system or entity.
Margins (Development and Technical): The difference between the estimated budgeted value
and the actual value at the end of development when the system is delivered.
Management Reserve: The portion of the available quantity held back or kept “in reserve” by
management or the quantity owner during development and not made available through
allocation.
Master Integration, Verification, and Validation (MIVV) Plan: A planning document that
expands and implements the project’s design verification, design validation, system integration,
system verification, and system validation philosophy/concepts as defined in the PMP and
SEMP. The MIVV Plan defines the detailed processes and approach that will be used for design
verification, design validation, system integration, system verification, and system validation.
The information in the MIVV Plan is used to manage and plan design verification, design
validation, system verification and system validation activities for all system, subsystem, and
system elements that are part of the SOI physical architecture. The MIVV Plan further defines
the design verification, design validation, system integration, system verification, and system
validation concepts and schedule contained in the PMP and SEMP.
Measures of Suitability (MOS): Key measures that will be used to determine the suitability of
the SOI to solve the defined problem or realize the defined opportunity. These measures are
referred to by various terms: Measures of Effectiveness (MOEs), Measures of Performance
(MOPs), Key Performance Parameters (KPPs), Technical Performance Measures (TPMs),
Leading Indicators, mission success criteria, acceptance criteria, etc.
Mission Statement: Top tier of the needs hierarchy which is based on the analysis of the
problem or opportunity the SOI is to address. The mission statement defines the “why” - why
the project exists? What does the organization’s strategic and business operations level
stakeholders or the customer need to be accomplished? “What are the expected outcomes?”
Sometimes referred to as “Need statement”. Usually communicated along with goals and
objectives (MGOs).
Natural Environment: Part of the operating environment (temperature, humidity, pollutants,
etc.) that exist naturally - part of nature that the SOI has no control over. As such the natural
operating environment is a constraint within the SOI must operate.
Need Expression: Includes a need statement plus a set of associated attributes, including
validation attributes.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 439

Need Set: A structured set of agreed-to need expressions for the entity and its external interfaces
captured in an Entity (Enterprise/Business Unit/System/System Element/Process) integrated set
of needs.
Need Statement: The result of a formal transformation of one or more lifecycle concepts into an
agreed-to expectation for an entity to perform some function or possess some quality within
specified constraints with acceptable risk.
Needs Validation: Confirmation that the needs clearly communicate the agreed-to lifecycle
concepts, constraints, and stakeholder expectations from which they were transformed in a
language understood by the requirement writers. A confirmation that the integrated set of needs
correctly and completely capture what the stakeholders need and expect the system to do in
context of its intended use in the operational environment when operated by its intended users.
Needs Validation Record: A record of the results and outputs of the needs validation process
activities.
Needs Verification: The process of ensuring that the need statements and set of needs meet the
rules and characteristics defined for writing a well-formed needs and well-formed sets of needs
in accordance with the organization’s standards, guidelines, rules, and checklists. These
standards, guidelines, rules, and checklists would be developed at the business management and
operations levels.
Needs Verification Record: A record of the results and outputs of the needs verification process
activities.
Objectives: Upper-level needs that form the third level of the hierarchy of the integrated set of
needs. Objectives are elaborated from the goals providing more details concerning what must be
done to meet the goals that will result in the mission to be achieved i.e., what the project team
and the system to be developed need to achieve so the system can fulfill its intended purpose
(mission) in its operational environment when operated by its intended users. There will be one
or more objectives for each goal defined.
Open Systems Interconnection (OSI) Model: A conceptual model that characterizes and
standardizes the communication functions of a telecommunication or computing system without
regard to its underlying internal structure and technology. Its goal is the interoperability of
diverse communication systems with standard communication protocols. The model partitions
the flow of data in a communication system into seven abstraction layers, from the physical
implementation of transmitting bits across a communications medium to the highest-level
representation of data of a distributed application. https://en.wikipedia.org/wiki/OSI_model
Operational Capability: Planned availability additional resources during surge or peak
consumption periods as well as enabling the system to succeed even when the unexpected
happens. Operational capability also provides additional resources when operational conditions
or the environment are different from those assumed when the system resource requirements
were generated, and the system was not designed to accommodate.
Operating Environment: The environment in which the SOI will be operated. The operating
environment includes the natural environment, induced environments, conditions for use, and a
definition of how the SOI is intended to be used. The operational environment also includes
external systems the SOI must interact with across the interface boundaries (external interfaces).
Operational Margin: The difference between what is required during operations and what is
actually provided.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 440

Precision: A function of the distribution of measurements taken. The closer each measurement
is to other measures, the more precise the measuring system.
Product: The integrated system which will be delivered to a customer or customers.
Product (System) Baseline: The baselined sets of design output specifications for the
subsystems and system elements that are part of the product (system) physical architecture. See
also allocated and functional baseline.
Product Breakdown Structure (PBS): A hierarchical view of the physical architecture
showing and naming actual physical parts (hardware, mechanical, software) subsystems and
system elements that are part of the SOI architecture. Similar to the concept of a WBS.
Post Test Review (PTR): A PTR often concludes each test phase (FQT, FAT, SAT) of the
acceptance process. At the PTR, the results of each Procedure are presented, along with a
list of any deviations from the Procedure, Success Criteria, and any non-conformances.
Qualification. Requires that all system verification, system validation, and required
certification actions have been successfully performed. The qualification process
demonstrates that each system, subsystem, and system element that is part of the system
physical architecture and the integrated system, meet the applicable needs, design input
requirements, and design output specifications, including performance and safety margins.
Quality Requirements: Requirements that address fitness for use (safety, security, and
various quality “ilities”, e.g., reliability, testability, operability, availability,
maintainability, operability, supportability, manufacturability, interoperability, safety,
security, to name a few.
Readiness for Use: A determination of readiness for use by Approving Authorities based
on an analysis of the system verification, system validation, certification, and qualification
results. This may occur multiple times in the system lifecycle, including the first article
delivery, completion of production (if more than a single system is produced), and
following maintenance actions. In the field, particularly after maintenance, it is necessary
to establish whether the system is ready for use. The readiness for use determination could
be made by a supplier prior to submitting the realized SOI to the customer or regulatory
agency for acceptance or by the customer or Approving Authority prior to making the SOI
available for operations or release to the public.
Requirement (project): Requirements on a project or organizational elements within the
enterprise that will be recorded in a project management plan and other plans, procedures,
and work instructions
Requirement (supplier): Requirements on a supplier, vendor, or contractor that will be
recorded in Statements of Work (SOW) and Supplier Agreements (SA).
Requirement (procedural): Requirements concerning actions the person or organization
responsible for conducting steps within a procedure resulting in those actions, e.g., a
system verification or system validation procedure
Requirement Expression: Includes a requirement statement and a set of associated
attributes, including verification attributes.
Requirement Set: A structured set of agreed-to requirement expressions for the entity and
its external interfaces captured in an Entity (Enterprise/Business Unit/System/ System
Element/Process) set of requirements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 441

Requirement Statement: The result of a formal transformation of one or more needs or


parent requirements into an agreed-to obligation for an entity to perform some function or
possess some quality within specified constraints with acceptable risk.
Requirements Validation: Confirmation that the requirements clearly communicate the intent
of the needs, parent requirements, and other sources from which they were transformed, in a
language understandable by the design and manufacturing/coding teams.
Requirements Verification: The process of ensuring that the requirement statements and sets of
requirements meet the rules and characteristics defined within the organization’s standards,
guidelines, rules, and checklists.
Site Acceptance Test (SAT): A system validation series of activities whose successful
completion results in customer or Approving Authorities acceptance of the SOI for use or release
to the public. After the SOI is delivered to the customer’s location or location of intended use,
the SAT activities are executed in the operational environment with the intended users to validate
system operability and to perform a final system verification of the interfaces with external
systems. The SAT activities will often execute operational scenarios - usually “day in the life”
type scenarios based on use cases or a scenario that exercises critical functionality and
performance of the system.
Single Source of Truth: The official state or baseline version of data and information.
Stakeholders. Any individual or organization with a personal stake in the SOI, may be affected
by the SOI, participate in the development of the SOI, or able to influence the system.
Stakeholders are individuals who are considered to be relevant to the development of the SOI
and whom the project team will interact. Stakeholders are the primary source of needs and
requirements for a SOI. There are stakeholders both internal and external to the developing
organization including customers and user/operators.
Stakeholder Register: List of stakeholders who will participate with the project team to develop
the SOI that includes key information for each stakeholder the project will use to engage
stakeholders, keeping them engaged, and managing changes in stakeholders and their needs and
requirements.
Stakeholder Requirements: Internal and external stakeholder-owned requirements transformed
from the stakeholder needs. Stakeholder-owned requirements could apply to the SOI or to the
organization developing the SOI. If they apply to the SOI, they would be inputs to the Lifecycle
Concepts and Needs Definition Process (Refer to Section 4). If they apply to the organization
developing the SOI, they would be included in a project management plan, SEMP, or other plan.
If the organization is external, those applying to the organization developing the SOI would be
included in a SOW or SA. Stakeholder requirements include customer and user owned
requirements. See also customer requirements and user requirements.
System: An entity that can be decomposed through elaboration that involves analysis, allocation,
and budgeting into lower-level subsystems and system elements defined within the SOI
architecture.
System (Product) Baseline: The baselined sets of design output specifications for the
subsystems and system elements that are part of the SOI (product) physical architecture. See
also allocated and functional baseline.
System Element: An entity within the SOI architecture where the project has made a buy, build,
code, or reuse determination and no further decomposition by the project team is deemed
necessary for successful system element design and realization.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 442

System of Interest (SOI): The system, subsystem, or system element that will be developed,
verified, validated, and delivered to either an internal or external customer. The SOI could be a
product, system, or system element within the end item architecture.
System Integration, Verification, and Validation (SIVV) Plan: The SIVV Plans are used to
implement the SOI project team’s MIVV Plan design verification, design validation, system
integration, system verification, and system validation concepts and activities for a given system,
subsystem, or system element (part, component, assembly, subsystem, or the integrated system).
The SIVV Plan contains a detailed identification of the activities to be performed as part of
design verification, design validation, production verification, system verification, and system
validation of each system, subsystem, and system element that makes up the integrated system.
Resources including test equipment, facilities, and personnel are addressed. A detailed schedule
consistent with the design verification and design validation, production verification, system
integration, system verification, and system validation schedule defined in the MIVV Plan is
included.
System Requirement: See Design Input Requirement.
System Validation: The process of ensuring that the designed, built, and verified system,
subsystem, or system element will result or has resulted in a SOI that meets its intended purpose
in its operational environment when operated by its intended users and does not enable
unintended users to negatively impact the intended use of the system as defined by its integrated
set of needs.
System Verification: The process of ensuring that the designed and built or coded system,
subsystem, or system element:
a) has been produced by an acceptable transformation of design inputs into design outputs,
b) meets its design input requirements and design output specifications,
c) no error/defect/fault has been introduced at the time of any transformation, and
d) meets the requirements, rules, and characteristics defined by the organization’s best
practices and guidelines.
System Verification or System Validation Activity: A specific system verification or system
validation Activity that addresses one or more system verification or system validation Instances.
The system verification or system validation activity will be realized via a system verification or
system validation Procedure that describes how the system verification and system validation
Activity will be executed.
System Verification or System Validation Approving Authorities: Any individual or
organization that has the authority to approve the system for use in its operational environment.
This could be an internal or external customer or a regulatory agency.
System Verification or System Validation Approval Package: A collection of system
verification or system validation Execution Records and other information to be submitted to the
Approving Authorities.
System Verification or System Validation Description Sheet: A visualization of the system
verification or System Validation information for a single system verification or system
validation Instance used to plan a system verification or system validation Activity.
System Verification or System Validation Event: S schedulable event that will result in the
performance of a system verification or system validation Procedure for a given system
verification or system validation Activity at the date and time in the Master Schedule.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 443

System Verification or System Validation Execution Record: A record that states the status
and outcome of a Procedure for a system verification or system validation Activity in terms of
whether the results provide sufficient evidence that the Success Criteria for each system
verification or system validation Instance within that activity was met (or not) by the steps and
actions within the Procedure.
System Verification or System Validation Instance: A unique entity within the system model
for system verification and system validation used to manage the system verification or system
validation actions associated with a given need or design input requirement. There is one system
verification or system validation Instance for each need and design input requirement.
System Verification or System Validation Matrix: A matrix/table visualization of the system
verification and system validation Attributes and other planning information associated with
each need and design input requirement used to help both plan and manage system verification
and system validation Activities. Each row of the Matrix represents a system verification or
system validation Instance.
System Verification or System Validation Procedure: A document that contains a sequence of
steps or actions, which result in the collection of data that provides evidence that the system
meets the Success Criteria defined for each system verification or system validation Instance
within a given Activity in accordance with the set of procedure requirements for the Activity the
Procedure applies.
System Verification and System Validation Procedure Requirements: A set of requirements
statements concerning the details involved in implementing the Strategy and Method defined for
each system verification and system validation Instance that will result in objective evidence a
need or design input requirement has been satisfied by the SOI as defined by the Success Criteria
for each system verification or system validation Instance included in the system verification or
system validation Activity addressed by the Procedure. The system verification and system
validation procedure requirements apply to the organization responsible for planning for and
conducting system verification and system validation Activities with the Procedure.
System Verification or System Validation Success Criteria: A set of criteria defined by the
customers, regulatory agency, or developing organization that must be shown to have been met,
with some level of confidence, before the Approving Authorities will qualify, certify, and accept
the SOI to be used as intended in the operational environment when operated by its intended
users. The Success Criteria represents the expected result of a system verification or system
validation Activity for a specific system verification or system validation Instance.
Technology Maturation Plan (TMP): A project’s plan and concept for maturing critical
technologies needed to be used within the SOI to meet stakeholders needs and requirements for
capabilities, performance, quality, and compliance.
Technology Readiness Assessment (TRA): An assessment of the maturity and associated level
of risk associated with a given technology being considered for use in the SOI.
Technology Readiness Levels (TRLs): A measure addressing the maturity and associated level
of risk associated with a given technology being considered for use in the SOI. TRLs are
expressed on a scale of 1 - 9. The lower the number the less mature the technology is for that
specific use and operating environment and the higher the risk to the project.
Test Readiness Review (TRR): A formal gate review that must be passed prior to the execution
of a Procedure or family of procedures. At the TRR, an overall assessment of readiness of the
system, Procedures, and personnel is conducted. A TRR will typically also address system

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 444

configuration (including any simulators or emulators), risk and other information pertinent to the
test.
Traceability: 1) A discernible association between two or more entities such as needs,
requirements, design, architecture, subsystems, system elements, verification artifacts, validation
artifacts, or tasks. 2) The ability (process) to trace (via linkage) a lower-level requirement back
to its parent requirement (child-to-parent) or source; or a set of related requirements to each other
(peer-peer).
Traceability Record: The record of all traces established. If managed electronically within a
SE tool like and RMT it is a representation of the traceability links established within the
projects integrated dataset between requirements, needs, and other artifacts. The traceability
record includes directionality and type of links established to describe unique relationships
between requirements and other artifacts.
Trace Matrix: A visualization of the traceability record showing relationships in a matrix form,
generally created and viewed as a spreadsheet that can be used to manage sets of needs and sets
of design input requirements throughout the system lifecycle.
Transformation: A formal process used when moving from lifecycle concepts to the needs that
communicate what the stakeholders need from the SOI and then when moving to the design
input requirements that communicate what the SOI must do to meet those needs.
Qualification Criteria: A set of criteria defined in a regulation or standard that must be
achieved that provides evidence that the system is in compliance. Qualification criteria often
include safety margins for system performance in case normal operating performance values are
exceeded due to a failure or unexpected changes in the operating environment.
User: Stakeholders that will directly interact with, and operate, the product or system being
developed.
User Requirements: User-owned system requirements transformed from the user needs. User
requirements are a subset of stakeholder requirements. See also customer requirements and
stakeholder requirements.
Validation (generic): confirmation and provision of objective evidence that an engineering
element will result, or has resulted in, a system that meets its intended purpose in its operational
environment when operated by its intended users.
Verification (generic): Confirmation and provision of objective evidence that an engineering
element:
a) has been produced by an acceptable transformation,
b) meets its requirements, and
c) meets the rules and characteristics defined for the organization’s best practices and
guidelines.
Work Breakdown Structure: A hierarchical view of the tasks and activities to be performed
by a project within a given budget and schedule.
Zero-Based Approach: All requirements are thoroughly evaluated by the project for not only
feasibility, but also for applicability and value in regard to meeting the agreed to MGOs,
measures, drivers and constraints, risk mitigation, and lifecycle concepts and thereby “earn” their
way into the set of design input requirements.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 445

APPENDIX D: COMMENT FORM

Name of submitter (first name and last name):

Date Submitted:

Contact information (email address):

Type of submission (individual/group):

Group name and number of contributors


(if applicable)

Comment Commenter Category Section Specific Issue, comment and Proposed Importance
sequence name (TH, TL, number reference rationale Changed/New Text Rating
number E, G) (e.g.,
paragraph, (Rationale must (R =
line, Figure make comment Required,
no., Table clearly evident and -- MANDATORY
no.) supportable) ENTRY I = Important,

(Must be substantial to T = Think


increase the odds of About for
acceptance) future
version)

Submit comments to Working Group chair. Current WG chair will be listed at:
http://www.incose.org/techcomm.html

If this fails, comments may be sent to [email protected] (the INCOSE main office), which can
relay to the appropriate WG, if so, requested in the comment cover page.

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022


Needs and Requirements, Manual 446

(BACK COVER)

INCOSE Publications Office


7670 Opportunity Road, Suite 220
San Diego, CA 92111-2222 USA

Copyright © 2022 International Council on Systems Engineering

INCOSE-TP-2021-002-01 | VERS/REV: 1.1 | May 2022