Spec_sheet_incinerator_design
Spec_sheet_incinerator_design
Attention: Customer:
Company Name: General Location:
Phone: Site Elevation:
Fax: Required By Date:
Email: Today’s Date:
Project Reference:
EQUIPMENT REQUIREMENTS
INCINERATOR SPECIFICATIONS
Waste Gas Analysis: Please provide details on a separate sheet or complete page two.
Page 1 of 2
TOTALS:
Note:
1. We must be supplied with the flow rate and gas composition that will deliver the highest BTU value to the incinerator.
2. Include all potential waste gas sources to be sent to the incinerator.
3. Ensure the flow rate provided is the surge flow rate (if applicable) and not an averaged flow rate. Page 2 of 2