2 Load Under Head Wall Final 1000
2 Load Under Head Wall Final 1000
Load Dispersion each wheel = ( 250 + 2 H Tan 45+1.2 ) x ( 500 + 2 H Tan 45+1.8 )
13.43 x 14.28
= 152.630 m2
5.950
4.950
0.4 0.04 Th CC Lining
C.B.L. 21.840
Ph2
0.4
0.3 0.3
Ph1
6.7
Loads on RCC box per mt.
Wt. of top member = 6.7 * 0.4 * 2.5 = 6.7 t/m
Wt. of bottom member = 6.7 * 0.4 * 2.5 = 6.7 t/m
Wt. of vertical walls(END) = 2 1.24 * 0.4 * 2.5 = 2.48 t/m
Wt. of vertical walls(middle) = 1 1.24 * 0.4 * 2.5 = 1.240 t/m
Wt. of water in box = 2x 1.2 * 2.75 * 1= 6.6 t/m
net upward soil reaction B = 105.531 - 6.7 - 0.528 - 2.628 = 14.280 t/sqmt
6.7
load on top of slab A = 84.279 + 0.751 + 6.700 = 13.691 t/sqmt
due to earth bank 6.7
Wt. of head wall = = 6.7 x 12.5 = 83.75
13.691 t/sqmt
1.640
3.150
14.280 t/sqmt
net upward soil reaction = 112.131 - 2.628 - 6.700 - 0.528 = 15.265 t/sqmt
6.7
load on top of slab = 13.691 t/sqmt i.e due to due to earth bank
1.640
3.150
8.299 t/sqmt
8.299 t/sqmt
15.265 t/sqmt
DESIGN OF BOX (CANAL)
Width of Box = 2.75 mts.
Height of Box = 1.2 mts.
Total Width of Box = 6.7 mts.
Height of Box including wc = 1.24 mts.
Thickness of wc in box = 0.04 mts.
No. of Vents = 2
Thickness cc lining = 0.04 mts.
Thickness of sealing coat in canal = 0 mts.
Thickness of Hor. Member(top) = 0.4 mts.
Thickness of Ver. Member( end) = 0.4 mts.
Thickness of Ver. Member( middle= 0.4 mts.
F S L of canal = 26.79 M
Sill level of box = 14.916 M
Live Load Surcharge = 0 t/m2
Avg. Ground Level/TBL = 27.79 M
Stress under headwall = 12.50 t/m2
Height of earth over box = 0.000 mts.
Top level of box = 21.800 M
Density of RCC = 2.5
Density of earth = 2.1
Density of concrete = 2.4
Density of water = 1
Levelling course thickness = 0.15 m
left offset of levelling course = 0.3 m
right offset of levelling course = 0.3 m
Coeft. = 0.361
CBL = 21.84 m
TBL 27.790
1.000 FSL 26.790
0.3 0.3
Ph1
1.64
1.685 t/sqmt
CASE 2 (BOX FULL CANAL EMPTY)
Total wt. of box = 60.645 - 33.165 = 27.480 t/sqmt
net upward soil reaction = 27.480 - 2.628 - 6.700 - 0.264 = 2.670 t/sqmt
6.700
load on top of slab = 6.700 + 0.000 + 0.643 + 0.000 = 1.096 t/sqmt
6.700
Earth pressure at top = 0.361 x 2.1 x 0.24 = 0.182 t/sqmt
Earth pressure at bottom = 0.361 x 2.1 x 1.88 = 1.425 t/sqmt
1. 100% hydrostatic pressure(Drain)
P1 = 0 * 1 = 0 t/sqmt
P2 = 1.64 * 1 = 1.64 t/sqmt
Net Horizontal pressure at top = 0.182 - 0.000 = 0.182 t/sqmt
Net Horizontal pressure at bottom = 1.425 - 1.640 = -0.215 t/sqmt
1.096 t/sqmt
1.64
2.670 t/sqmt
CASE 3 (BOX EMPTY CANALFULL)
Total wt. of box = 60.645 - 6.600 = 54.045 t/sqmt
net upward soil reaction = 54.045 - 2.628 - 6.700 - 0.264 = 6.635 t/sqmt
6.700
load on top of slab = 6.700 + 0.000 + 0.643 + 0.000 + 33.165 = 6.046 t/sqmt
6.700
side thrust( Earth pressure + 100% hydrostatic pressure)
1. 100% hydrostatic pressure
P1 = 5.190 * 1 = 5.19 t/sqmt
P2 = 6.83 * 1 = 6.83 t/sqmt
earth pr. At top = 0.361 * (2.1-1.0) * 0.24 = 0.095 t/sqmt
earth pr. At bottom = 0.361 * (2.1-1.0) * 1.880 = 0.747 t/sqmt
Net Horizontal pressure at top = 5.19 + 0.095 = 5.285 t/sqmt
Net Horizontal pressure at bottom = 6.83 + 0.747 = 7.577 t/sqmt
6.046 t/sqmt
1.64
7.577 t/sqmt
7.577 t/sqmt
6.635 t/sqmt
CASE 4 (BOX FULL CANALFULL)
Total wt. of box = 60.645 = 60.645 t
net upward soil reaction = 60.645 - 2.628 - 6.700 - 0.264 = 7.620 t/sqmt
6.700
load on top of slab = 6.700 + 0.000 + 0.643 + 0.000 + 33.165 = 6.046 t
6.700
side thrust( Earth pressure + 100% hydrostatic pressure)
1. 100% hydrostatic pressure(Canal)
P1 = 5.190 * 1 = 5.19 t/sqmt
P2 = 6.83 * 1 = 6.83 t/sqmt
earth pr. At top = 0.361 * (2.1-1.0) * 0.24 = 0.095 t/sqmt
earth pr. At bottom = 0.361 * (2.1-1.0) * 1.880 = 0.747 t/sqmt
1. 100% hydrostatic pressure(Drain)
P1 = 0 * 1 = 0 t/sqmt
P2 = 1.64 * 1 = 1.64 t/sqmt
Net Horizontal pressure at top = 5.19 + 0.095 - 0 = 5.285 t/sqmt
Net Horizontal pressure at bottom = 6.83 + 0.747 - 1.64 = 5.937 t/sqmt
6.046 t/sqmt
1.64
7.620 t/sqmt
HEAD WALL (U/S & D/S)
`
DATA : 2.0
1
HEAD WALL TOP LEVEL :+ 489.324
TOP OF FOUDATION :+ 487.134 W4
489.324
8.552
4.270 8.931
5.950
4.950
0.4 0.04 Th CC Lining
C.B.L. 21.840
Ph2
0.4
0.25 0.25
Ph1
6.7
Loads on RCC box per mt.
net upward soil reaction B = 76.218 - 6.700 - 0.528 - 2.592 = 9.910 t/sqmt
6.7
load on top of slab A = 55.002 + 0.751 + 6.700 = 9.321 t/sqmt
6.7
water pressure C = 0
water load D = 0
9.321 t/sqmt
1.640
3.150
9.910 t/sqmt
net upward soil reaction = 82.818 - 2.592 - 6.700 - 0.528 = 10.895 t/sqmt
6.7
load on top of slab = 55.002 + 0.751 + 6.700 = 9.321 t/sqmt
6.7
9.321 t/sqmt
1.640
3.150
8.299 t/sqmt
8.299 t/sqmt
10.895 t/sqmt
STRAIGHT WING WALL
DATA :
STRESS IN CONCRETE :
9.294 7.470
2.873
Lever arm =M/V = 2.873 / 9.294 = 0.309 m
Eccentricity = 0.309 - 1.600 /2 = 0.491 m
B/6 = 1.60 / 6 = 0.267 m< 0.491 m
STRESS ON SOIL :
13.829 18.033
5.608 11.346
max min
on concrete 16.500 -4.890 t/sq.mt.
on soil 11.240 0.290 t/sq.mt.