10. QAP, FAT & ITP Documents
10. QAP, FAT & ITP Documents
XXXXX-A-32, Rev-0
QAP, FAT & ITP Documents
Date 07.08.2023
TABLE OF CONTENT
This Document is property of Emerson, it is supplied in confidence and may not be copied or used without
consent of Emerson
Doc No. XXXXX-A-31, Rev-0
Emerson Automation Solutions Intelligent Platforms Pvt. Ltd.
Velankani Tech Park, Ground Floor, Building No.8,
QUALITY ASSURANCE PLAN for Hardware 07-Aug-23
Date
No.43, Electronics City, Bangalore-560100, Karnataka, India and software Page No Refer Below
Page 1 of 4
Doc No. XXXXX-A-31, Rev-0
Emerson Automation Solutions Intelligent Platforms Pvt. Ltd.
Velankani Tech Park, Ground Floor, Building No.8,
QUALITY ASSURANCE PLAN for Hardware 07-Aug-23
Date
No.43, Electronics City, Bangalore-560100, Karnataka, India and software Page No Refer Below
Page 2 of 4
Doc No. XXXXX-A-31, Rev-0
Emerson Automation Solutions Intelligent Platforms Pvt. Ltd.
Velankani Tech Park, Ground Floor, Building No.8,
QUALITY ASSURANCE PLAN for Hardware 07-Aug-23
Date
No.43, Electronics City, Bangalore-560100, Karnataka, India and software Page No Refer Below
Page 3 of 4
Doc No. XXXXX-A-31, Rev-0
Emerson Automation Solutions Intelligent Platforms Pvt. Ltd.
Velankani Tech Park, Ground Floor, Building No.8,
QUALITY ASSURANCE PLAN for Hardware 07-Aug-23
Date
No.43, Electronics City, Bangalore-560100, Karnataka, India and software Page No Refer Below
Page 4 of 4
Emerson Doc. No. XXXXX-A-06 REV-00
PLC FAT PROCEDURE
Client Doc. No. ---
Reference Documents:
Rev. Category of
S.NO Document Description Doc No.
No Approval
1 PLC SYSTEM CONFIGURATION DRAWING
2 PLC GA & POWER DISTRIBUTION DRAWING
3 PLC I/O MODULE WIRING DRAWING
4 PLC BILL OF MATERIALS
5 PLC DATA SHEET
6 QUALITY PLAN
Revision History:
Revision Revision Date Author Change Description
0 07.08.2023 Revanna Initial submission
Contents
1. Introduction ......................................................................................................................... 4
2. Nominated Persons ............................................................................................................ 6
3. Review of Tools .................................................................................................................. 7
4. Bill of Materials Check ........................................................................................................ 7
5. Cabinet / Console Visual Check ......................................................................................... 8
6. Panel Power Distribution Check ......................................................................................... 8
7. Panel Earthing Check ......................................................................................................... 9
8. I/O Operation Check ......................................................................................................... 10
9. Redundancy Check........................................................................................................... 11
10. HMI Graphics & Software Functionality Check ................................................................. 14
11. Third Party Connectivity Check ........................................................................................ 15
12. Power Fail and Restart Check .......................................................................................... 16
13. PLC System Boot up procedure check ............................................................................. 17
1. Introduction
Purpose
The purpose of this document is to set forth the objectives, methodology, and documentation verification and test
activities necessary to complete the Factory Acceptance Test for SCADA system for Project.
Objectives
The objectives of the Factory Acceptance Test are to establish that the control system can be expected to be
commissioned at site within a reasonable time and that it will perform as defined in the contract specification and
approved documents. The Complete system will be tested during the FAT. Internal FAT will be conducted as per
approved FAT Procedure.
Abbreviations
General abbreviations and technical words used for protocol development and execution and data sheet collection
include the following:
Term Definition
AC Alternating Current
AI Analog Input
AO Analog Output
BOM Bill of Materials
CPU Central Processing Unit
DC Direct Current
DI Discrete Input
DO Discrete Output
EWS Engineering Workstation
OWS Operator Workstation
FAT Factory Acceptance Test
FB Function Block
Hz Hertz (Frequency)
I/O Inputs / Outputs
LAN Local Area Network
mA milli-amperes
N/A Not Applicable
N/AV Not Available
N/S Not Specified
OI Operator Interface
P & ID Piping and Instrumentation Diagram
PID Proportional, Integral, Derivative Control Algorithm
PRN Printer
PSU Power Supply Unit
PV Process Value
RAM Random Access Memory
SAT Site Acceptance Test
SFC Sequential Function Chart
SP Set point
TP Twisted Pair
UPS Uninterruptible Power Supply
V Volts
VAC Voltage – Alternating Current
VDC Voltage – Direct Current
2. Nominated Persons
3. Review of Tools
Purpose:
To verify that the measuring equipment used for testing or inspection are calibrated:
Multimeter, Analog Input Simulator
Procedures:
Check that all the tools used for testing and intended to be used for inspection have a valid calibration report.
Acceptance Criteria:
The calibration certificate of each tool is present, and the calibration due date is later than the first day of inspection.
Observation:
Acceptance Criteria Met: ❑ Yes ❑ No
Purpose:
The purpose of this verification is to ensure that the all the item quantity and makes listed in the bill of materials are as
per the BOM document.
Procedure:
Verify that each item listed in the provided “Bill of Material” are available.
Acceptance Criteria:
All items included in the “Bill of Material” document must be available.
Observation:
Acceptance Criteria Met: ❑ Yes ❑ No
Purpose:
The purpose of this verification is to ensure that the appearance of the cabinets/consoles are as per approved GA/IGA
Diagrams and specifications.
Procedure:
i. Verify Cabinet/Console dimensions.
ii. Verify appearance of Cabinets/Consoles per approved GA/IGA.
iii. Verify installed items as per GA/IGA.
iv. Verify the wire size and colours as per the drawings.
Acceptance Criteria:
i. All the panel/console dimensions are as per the drawings.
ii. All items installed as per the drawings.
iii. All the wire colour and size are as per the drawing.
Observation:
Acceptance Criteria Met: ❑ Yes ❑ No
Purpose:
i. The purpose of this test is to verify the Power distribution are as per approved drawing.
ii. To verify the AC/DC voltages are distributed correctly as per requirement.
Procedure:
i. Check the voltage level of the incoming TB/MCB’s.
ii. Check the voltages of 24VDC bulk power supply output.
iii. Check the Voltage level at each MCB output as per the power distribution drawing.
Acceptance Criteria:
i. Wiring is done as per approved Power distribution & wiring drawing.
ii. The measured Voltage ranges are as per the power distribution drawing.
Observation:
Acceptance Criteria Met: ❑ Yes ❑ No
Purpose:
To ensure that each equipment connected to the corresponding earth bars as per the panel power distribution drawings.
Procedure:
i. Visually check the cable connection between the earth bar and equipment’s.
ii. Check the continuity between the equipment earth terminal and earth bar.
Acceptance Criteria:
The Multimeter shows continuity between equipment earth point and earth bus bar.
Observation:
Acceptance Criteria Met: ❑ Yes ❑ No
Purpose:
To ensure that all the IO’s are configured as per the configuration drawing and functioning.
Procedure:
Digital Inputs:
i. Short the Field terminal end using short link.
ii. Observe LED indication on corresponding Digital Input modules.
iii. Observe corresponding input status change in the Workstation for the assigned address.
Digital Outputs:
i. Force the Output memory I/O address in Workstation.
ii. Observe LED Indication in the corresponding Digital output module.
iii. Wet contacts: Check the voltage level at Field terminals across Power and return using Multi meter and read
the value as per approved Wiring drawing.
iv. Pot Free contacts: Check the continuity at Field terminals across Power and return using Multi meter and
observe the buzzer sound.
Analog Inputs:
i. For 4-20 mA inputs, connect “Current source” to the Field terminals as per the wiring drawing.
ii. Change the values between 4-20mA and read the corresponding values in the Workstation.
iii. The values should be within the tolerance level specified in the document.
Analog Outputs (Current / Voltage):
i. Enter the Analogue counts for the assigned I/O address in Workstation.
ii. Connect the “Current source” at the Field terminals as per wiring drawing and read the corresponding value.
iii. The values should be within the tolerance level specified in the document.
Acceptance Criteria:
Digital Input
Module wiring is as per the wiring drawing, LED’s are functioning, IO addresses are configured as per the IO list.
Digital Output
Module wiring is as per the wiring drawing, LED’s are functioning, IO addresses are configured as per the IO list.
Analog Input
Module wiring is as per the wiring drawing, IO addresses are configured as per the IO list and measured values are
within the accuracy limits.
Analog Output
Module wiring is as per the wiring drawing, IO addresses are configured as per the IO list and measured values are
within the accuracy limits.
Observation:
Acceptance Criteria Met: ❑ Yes ❑ No
9. Redundancy Check
Purpose:
To Ensure the redundancy levels are functioning as per the configuration drawing.
Procedure:
Check the procedures as per the below tables:
Comments/Observations:
Comments/Observations:
Purpose:
The purpose of this verification is to ensure that the HMI Graphics & Software is developed as per Customer inputs and
requirements (P&ID, Control Philosophy etc.)
Observation:
Acceptance Criteria Met: ❑ Yes ❑ No
Purpose:
To Check Modbus RTU/Modbus TCP/IP functionality for third party data exchanges.
Procedure:
i. Modbus Simulator / Modbus Slave Setup Software will be installed on a PC and configure the simulator as
slave/ master device based on the configuration requirement. Connect Communication cable between PC &
Modbus Device. Configure few MODBUS I/O Register in slave/Master Simulator and verify the same in PLC.
ii. Connect the Communication cable between PC and PLC System.
iii. Interface parameters like Baud Rate, Parity and Data Bits, Time out, IP address, Slave ID are configured in
the Modbus Simulator.
iv. Same Parameters will be configured in the PLC System.
v. Configure the available Modbus RTU master/slave and/or Modbus TCP/IP Server/client as per the system
configuration.
vi. Establish the communication with the Modbus simulator.
vii. Simulate the Modbus read/write data exchanges between the controller and Modbus simulator.
viii. The Data received from the serial device can be viewed in the PLC Programmer.
Acceptance Criteria:
The data exchange between PLC and Third-party device is achieved.
Observation:
Acceptance Criteria Met: ❑ Yes ❑ No
Switch OFF mains AC supply from Main The cabinet & console power is Pass
Incoming supply from the MCB. in OFF state. Fail
5 Burn-in test
Inspected by Approved by
Visual Check
Panel Paint shade : External
Panel Paint shade : Internal
Mouning plate colour
Paint Thickness
Panel Name plate
PLC Modules
Panel Legend
Component Tags
Service Tags
Cable Troughs
Bulk Power supplies
Terminal Blocks
Interrogation/Earth Bus bars
Fans
Breakers
Ethernet Switches
Converters
Relays / Relay boards
Barriers / Repeaters
Wire Sizes
Wire Colours
Terminal Fuses
Mechanical Completion
Mounting of Components as per GA drawing
Labeling of the Equipments
Checking of H/Ws used
Inspected by Approved by
Pre-requisite
All connections have to be properly terminated to its designated Terminals Power supply connections to the various
devices are at correct potential. The Power Distribution scheme in line with the Power Distribution Diagram the test
configuration as shown in the PLC configuration diagram & the same will be prepared for FAT.
Procedure
Measure the Input voltage to the device. Record its Readings.
Switch ON the device. Measure the Output voltage of the device. Record its readings.
Results
Record the results of the readings done & Sign off this sheet after the tests are completed
Inspected by Approved by
Inspected by Approved by
FORMAT No.: QA/FORM/IR-IO R1 DT. 20-MAy-2019
IR No. XXXXX/IR-01
INSPECTION REPORT
Project No. XXXXX
INPUT / OUTPUT TEST
Page No. 5
Module No. Result Module No. Result Module No. Result Module No. Result
Inspected by Approved by
Procedure:
Configuration: The connected configuration is checked up with respect to the system configuration drg.
Communication: The communication between various devices checked for proper functioning of read/write
commands. Communication between Third party devices shall be carried with Soft simulator.
Bulk Power Supplies Redundancy: Redundancy is checked by switching off one of the Power Supplies at a time
and checking for the System status for drop-out.
PLC System Redundancy: Redundancy is checked by switching off one of the PLC System at a time and checking
for the System status for drop-out of Outputs.
Bus / LAN Redundancy: Redundancy is checked by disconnecting one of the LAN Cables and checking for loss of
Outputs.
Logic & SCADA: HMI Screens & Software functionality check shall be carried out with respect to the BLD/Control
write, I/O list and P&ID provided by Client
Redundancy check
Bulk Power Supplies redundancy
CPU redundancy
Communication Redundancy
Bus/LAN Redundancy
Programming Logic
Application Logic
HMI / Scada
HMI/SCADA Screens
Operator Interface / Screens Dynamics
Taging philosophy
Screen Layout
Navigation
Alarm Logging & Printout
Report Generation
Trending
Inspected by Approved by
Pre-requisite:
This test is conducted after completion of the Input/Output Tests
Procedure
The System and all other equipments are kept under continuously energised condition for a period of 48 Hours.
Acceptance
The System is observed for any abnormal heating of failure of the various components. The system is accepted if
the temperature raise inside the panel is not above 10degC
Panel Serial Burn-in Start Temp. (Deg C) Burn-in End Temp. (Deg C)
Result
No. Date & Time Ambient Inside Date & Time Ambient Inside
Inspected by Approved by