_Material master
_Material master
Material Management
Copy the standard material type (ROH) and select copy as…
Ashok BN
SAP MM Consultant
2
Material Management
We can change the material type as per the requirement and select the check box if
number range required as external, once save then our material type will create.
Ashok BN
SAP MM Consultant
3
Material Management
Click on groups, and at the top click on group and select as insert.
Ashok BN
SAP MM Consultant
4
Material Management
Double click on material type (ZASH) and select the check box for material group
(ASHR) and at the top click on element group.
In this configuration we can change the messages types like error msg to warning msg.
Ashok BN
SAP MM Consultant
5
Material Management
Ashok BN
SAP MM Consultant
6
Material Management
Click on material group and select the new entries, name the group then save it.
Creating Division:
Click on division and select new entries and fill the required division and save it.
In this node only we can create the laboratories, storage conditions, temperature
conditions.
Ashok BN
SAP MM Consultant
7
Material Management
Ashok BN
SAP MM Consultant
8
Material Management
Ashok BN
SAP MM Consultant
10
Material Management
Accounting view:
Ashok BN
SAP MM Consultant