Power-Transformer

Commissioning
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Power-Transformer

Commissioning
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Doc No. Rev.

ERECTION CHECK LIST 00


POWER TRANFORMERS ECQP xxx 00

CUSTOMER CUSTOMER PROJECT PROJECT PLANT Plant


PLANT UNIT XXNN EQUIPMENT CODE NN DESCRIPTION
DOCUMENTS REF. XXXX-XXNN
Ste REPORT DATE TEST RESULT
SCOPE OF INSPECTION AND TEST REMARKS
p Y No. PAS FAIL NA
1 INPUT DOCUMENTS
2 TRANSFORMER FOUNDATION
3 TRANSFORMER INSTALLATION
4 TRANSFORMER BASEMENT
5 INSTALLATION ENVIRONMENT
6 LABELING OF EQUIPMENT
7 EQUIPMENT EARTHING
8 CLEANING
9 BUS DUCT INSTALLATION
10 BUS DUCT GROUNDING
11 BUS DUCT Hi.PO TEST
12 ISOLATOR SWITCH INSTALLATION
13 ISOLATOR SWITCH Hi.PO TEST
14 AUX CABLES ENTRY AND
CLAMPING
15 CABLE LABELING
16 CABIN EARTHING
17 CABIN SAFETY TOOLS
18 MV/LV CABLES TYPE
19 ROOM/AREA READY FOR
COMMISSIONING
20 CLEANELINESS OF AREA-ROOM
21 ROOM-AREA SAFE ACCESS
22 MV CABLES ENTRY AND
CLAMPING
23 MV CABLES SHIELD
24 MODIFIED DOCUMENTS
REMARKS

Witnessed/Reviewed by " " Witnessed/Reviewed by "Customer" Witnessed/Reviewed by " "

Name Surname Name Surname Name Surname Name


Signature
Date
Doc No. Rev.
COMMISSIONING CHECK LIST 00
POWER TRANFORMERS ECQP xxx 00

CUSTOMER CUSTOMER PROJECT PROJECT PLANT Plant


PLANT UNIT XXNN EQUIPMENT CODE NN DESCRIPTION
DOCUMENTS REF. XXXX-XXNN
Ste REPORT DATE TEST RESULT
SCOPE OF INSPECTION AND TEST REMARKS
p Y No. PAS FAIL NA
1 INPUT DOCUMENTS
2 TRANSFORMER INSTALLATION
3 SAFETY
4 AUXILIARY CABLES
5 POWER CABLES
6 INSULATION RESISTANCE TEST
7 POWER RATIO TEST
8 CURRENT RATIO TEST
9 WINDING RESISTANCE MEASURE
10 FUNCTIONAL TEST
11 SURGE ARRESTER
12 COOLING SYSTEM
13 AS BUILT DOCUMENTS

REMARKS

Witnessed/Reviewed by " " Witnessed/Reviewed by "Customer" Witnessed/Reviewed by " "

Name Surname Name Surname Name Surname Name


Signature
Date