We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2
Doc No. Rev.
ERECTION CHECK LIST 00
POWER TRANFORMERS ECQP xxx 00
CUSTOMER CUSTOMER PROJECT PROJECT PLANT Plant
PLANT UNIT XXNN EQUIPMENT CODE NN DESCRIPTION DOCUMENTS REF. XXXX-XXNN Ste REPORT DATE TEST RESULT SCOPE OF INSPECTION AND TEST REMARKS p Y No. PAS FAIL NA 1 INPUT DOCUMENTS 2 TRANSFORMER FOUNDATION 3 TRANSFORMER INSTALLATION 4 TRANSFORMER BASEMENT 5 INSTALLATION ENVIRONMENT 6 LABELING OF EQUIPMENT 7 EQUIPMENT EARTHING 8 CLEANING 9 BUS DUCT INSTALLATION 10 BUS DUCT GROUNDING 11 BUS DUCT Hi.PO TEST 12 ISOLATOR SWITCH INSTALLATION 13 ISOLATOR SWITCH Hi.PO TEST 14 AUX CABLES ENTRY AND CLAMPING 15 CABLE LABELING 16 CABIN EARTHING 17 CABIN SAFETY TOOLS 18 MV/LV CABLES TYPE 19 ROOM/AREA READY FOR COMMISSIONING 20 CLEANELINESS OF AREA-ROOM 21 ROOM-AREA SAFE ACCESS 22 MV CABLES ENTRY AND CLAMPING 23 MV CABLES SHIELD 24 MODIFIED DOCUMENTS REMARKS
Witnessed/Reviewed by " " Witnessed/Reviewed by "Customer" Witnessed/Reviewed by " "
Name Surname Name Surname Name Surname Name
Signature Date Doc No. Rev. COMMISSIONING CHECK LIST 00 POWER TRANFORMERS ECQP xxx 00
CUSTOMER CUSTOMER PROJECT PROJECT PLANT Plant
PLANT UNIT XXNN EQUIPMENT CODE NN DESCRIPTION DOCUMENTS REF. XXXX-XXNN Ste REPORT DATE TEST RESULT SCOPE OF INSPECTION AND TEST REMARKS p Y No. PAS FAIL NA 1 INPUT DOCUMENTS 2 TRANSFORMER INSTALLATION 3 SAFETY 4 AUXILIARY CABLES 5 POWER CABLES 6 INSULATION RESISTANCE TEST 7 POWER RATIO TEST 8 CURRENT RATIO TEST 9 WINDING RESISTANCE MEASURE 10 FUNCTIONAL TEST 11 SURGE ARRESTER 12 COOLING SYSTEM 13 AS BUILT DOCUMENTS
REMARKS
Witnessed/Reviewed by " " Witnessed/Reviewed by "Customer" Witnessed/Reviewed by " "