0% found this document useful (0 votes)
64 views2 pages

RFI-Dated-13 01 25

Uploaded by

Bikram Pandit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views2 pages

RFI-Dated-13 01 25

Uploaded by

Bikram Pandit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Construction of New 4-lane Bridge (Parallel to the Existing MG Setu) with the approaches from km 0/000 to km 14/500 across

river Ganga on NH-19 at Patna in the state of Bihar on EPC mode

RFI 13-01-2025

S.No Description of work Structure RFI No. Date Time SPS Engineer Side

1 Drain Wall reinforcement cheking and Concrete pouring at ch:-9+920 to 9+935 Lhs. (MCW) Drain SPS/NMGS/RFI/27433 13-01-2025 8:30 AM Chunchun Hajipur

2 Retaining Wall First lift Shuttering, reinforcement checking and concrete pouring at Ch:-9+160 to 9+165 Lhs. Retaining Wall SPS/NMGS/RFI/27434 13-01-2025 10:00 AM Chunchun Hajipur

3 Retaining Wall Raft Shuttering, reinforcement checking and concrete pouring at Ch:9+065 to 9+085 LHS. Retaining Wall SPS/NMGS/RFI/27435 13-01-2025 4:00:A M Chunchun Hajipur

4 P-31- upper Pylon 8th lift LHS survey and concrete checking Upper Pylon SPS/NMGS/RFI/27436 13-01-2025 9:00 AM S.D. Manjhi Hajipur

5 P-30- upper Pylon 5th lift LHS survey and concrete checking Upper Pylon SPS/NMGS/RFI/27437 13-01-2025 9:00 AM S.D. Manjhi Hajipur

6 P-15 upper Pylon 1st lift LHS survey and concrete checking Upper Pylon SPS/NMGS/RFI/27438 13-01-2025 10:00 AM S.D. Manjhi Hajipur

7 Closure of NCR -51 " Removal of two different sources of Aggregate at Hot Mix Plant" NCR Closure SPS/NMGS/RFI/27439 13-01-2025 11:30 AM Pratyus Kumar Hajipur

8 Closure of NCR -53 " Curing of Pylon at P-26 and P-27" NCR Closure SPS/NMGS/RFI/27440 13-01-2025 10:00 AM Pratyus Kumar Hajipur

9 Checking of survey, shutter, formwork, reinforcement & concrete of pier starter of AP2R/01 VUP SPS/NMGS/RFI/27441 13-01-2025 11:00 AM Devendar Singh Hajipur

10 Checking reinforcement , shuttering and concreting of pre-cast girder for VUP at chainage 11+976 VUP SPS/NMGS/RFI/27442 13-01-2025 11:20 AM Devendar Singh Hajipur

11 Checking of reinforcement shutter & concrete of Dirt wall /return wall (P/S) at MNB 2+478 Dirt wall SPS/NMGS/RFI/27443 13-01-2025 11:40 AM Devendar Singh Patna

12 FDD checking of Embankment 28th layer (Selected Earth)RHS MCW(9+600) to (9+700)(W=53 MTR) FDD Embankment SPS/NMGS/RFI/27444 13-01-2025 11:50 AM Shane Ahmad Hajipur

13 FDD checking of Embankment 21th layer(Soil Sandwich),RHS, MCW (9+920) to (10+060) (w-30 MTR) zone-1 FDD Embankment SPS/NMGS/RFI/27445 13-01-2025 3:30 PM Shane Ahmad Hajipur

14 FDD checking of Embankment 21th layer(Soil Sandwich),RHS, MCW (9+920) to (10+060) (w-30 MTR) zone-2 FDD Embankment SPS/NMGS/RFI/27446 13-01-2025 2:50 PM Shane Ahmad Hajipur

15 Fdd checking for R.E fill (Sand dust) 16th layer 11+710-11+850 LHS MCW 9mtr FDD RE Fill SPS/NMGS/RFI/27447 13-01-2025 9:00 AM Shane Ahmad Hajipur

16 Fdd checking for R E fill (Sans dust) 14th layer 11+850-11+950 LHS MCW 9mtr FDD RE Fill SPS/NMGS/RFI/27448 13-01-2025 9:15 AM Shane Ahmad Hajipur

17 Fdd and level checking for R.E fill Embankment Top (Sand dust) 12+250-12+280 RHS MCW 9mtr FDD RE Fill SPS/NMGS/RFI/27449 13-01-2025 9:30 AM Shane Ahmad Hajipur

18 Fdd and level checking for R.E fill Embankment Top (Sand dust) 12+710-12+770 RHS MCW 9mtr FDD RE Fill SPS/NMGS/RFI/27450 13-01-2025 10:00 AM Shane Ahmad Hajipur

19 Reinforcement checking shuttering and concreting of Friction slab crash barrier 6Nos at Old P-1 Friction Slab SPS/NMGS/RFI/27451 13-01-2025 10:15 AM Ashok Singh Hajipur

20 Reinforcement checking shuttering and concreting of Friction slab crash barrier 8Nos at 9+570 RHS MCW Friction Slab SPS/NMGS/RFI/27452 13-01-2025 10:30 AM Ashok Singh Hajipur

21 Checking and laying of R.E panel erection 3rd layer 13+940-13+970 LHS MCW RE Panel Erection SPS/NMGS/RFI/27453 13-01-2025 11:00 AM Ashok Singh Hajipur

22 Final checking of R E wall 14+010-14+070 LHS MCW RE Wall SPS/NMGS/RFI/27454 13-01-2025 11:30 AM Ashok Singh Hajipur

23 Fdd and level checking of GSB Top of Retained zone 14+080-14+280 LHS MCW 8mtr FDD GSB SPS/NMGS/RFI/27455 13-01-2025 12:00 PM Ashok Singh Hajipur

24 Fdd checking for R E fill (Sand dust) 12th layer 14+020-14+050 LHS MCW 9mtr FDD RE Fill SPS/NMGS/RFI/27456 13-01-2025 12:45 PM Ashok Singh Hajipur

25 Reinforcement checking shuttering and concreting of 12+904 LHS MCW LVUP wall 1st lift Patna side LVUP SPS/NMGS/RFI/27457 13-01-2025 2:00 PM Devendar Singh Hajipur

26 Drain Slab reinforcement checking, shuttering and concreting (3+000) to (3+010) RHS SR (in between existing and proposed bridges) Drain SPS/NMGS/RFI/27458 13-01-2025 2:30 PM Neetesh Patna

27 Fdd checking for Retained Earth fill (P.A) 6th layer 13+200-13+360 RHS MCW 7mtr FDD Retained Earthfill SPS/NMGS/RFI/27459 13-01-2025 9:00 AM Ashok Singh Hajipur

28 Fdd checking for Retained Earth fill (P.A) 6th layer 13+200-13+360 LHS MCW 7mtr FDD Retained Earthfill SPS/NMGS/RFI/27460 13-01-2025 10:00 AM Ashok Singh Hajipur
S.No Description of work Structure RFI No. Date Time SPS Engineer Side

29 Fdd checking for Retained Earth fill (P.A) 3rd layer 13+080-13+200 LHS MCW 7mtr FDD Retained Earthfill SPS/NMGS/RFI/27461 13-01-2025 11:00 AM Ashok Singh Hajipur

30 P24-B35-R Stressing of segment at finishing yard in Bay-1 Segment Stressing SPS/NMGS/RFI/27462 13-01-2025 10:00 AM KP Gupta Hajipur

31 P27-C1-A LHS,RHS & P27 C1-B LHS,RHS Stay Pipe welding & lifting Stay Pipe SPS/NMGS/RFI/27463 13-01-2025 10:00 AM Vijay Sindher Hajipur

32 P27-C1-A LHS,RHS & P27 C1-B LHS,RHS Stay Strand Installation & Stressing Stay Strand Stressing SPS/NMGS/RFI/27464 13-01-2025 2:00 PM Vijay Sindher Hajipur

33 P23-B6-R 6th pair Segment Erectionat P23 Segment Erection SPS/NMGS/RFI/27465 13-01-2025 2:00 PM Vijay Sindher Hajipur

34 P23-B6-F 6th pair Segment Erectionat P23 Segment Erection SPS/NMGS/RFI/27466 13-01-2025 2:00 PM Vijay Sindher Hajipur

35 P24-B36-R Stressing of segment at finishing yard in Bay-1 Segment Stressing SPS/NMGS/RFI/27467 13-01-2025 2:00 PM KP Gupta Hajipur

36 Longitudnal T19 stressing at pier 24 Longitudinal Stressing SPS/NMGS/RFI/27468 13-01-2025 2:00 PM Vijay Sindher Hajipur

37 P31-B15-R 15th pair Segment Erection at P31 Segment Erection SPS/NMGS/RFI/27469 13-01-2025 4:00 PM Vijay Sindher Hajipur

38 P31-A15-F 15th pair Segment Erection at P31 Segment Erection SPS/NMGS/RFI/27470 13-01-2025 4:00 PM Vijay Sindher Hajipur

39 P23-B26-F Reinforcement Checking Profile checking Concreting of segment in Bay 2 Cell 5 Segment Casting SPS/NMGS/RFI/27471 13-01-2025 4:00 PM KP Gupta Hajipur

40 P15-B2-F Reinforcement Checking Profile checking Concreting of segment in Bay 2 Cell 1 Segment Casting SPS/NMGS/RFI/27472 13-01-2025 6:00 PM KP Gupta Hajipur

41 P15-B8-R Reinforcement Checking Profile checking Concreting of segment in Bay 1 Cell 2 Segment Casting SPS/NMGS/RFI/27473 13-01-2025 7:00 PM KP Gupta Hajipur

42 Longitudnal T7 stressing at pier 23 Longitudinal Stressing SPS/NMGS/RFI/27474 13-01-2025 9:00 PM Vijay Sindher Hajipur