BLASTING WORK

Uploaded by

crispy anoop
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SW/HSE/F334

CHECKLIST FOR BLASTING


Project
Date &
Time
Location
Status
Sr. No. Check Points Remarks
Yes No
Permit / approval to be taken from customer / local bodies etc. before
1
planning blasting.
Whether method statement of blasting procedures is prepared and duly
2
approved by all stakeholder
Whether workers and staff assisting blasting work are medically fit (records
3
available)
Whether risk assessment (RA) been prepared and reviewed by a concerned
4
person and all stakeholders
Whether relevant checklist of equipments,third party, competency, permit-to-
5 work (PTW) for blasting work and associated hazardous work is avilable and
maintained

Whether blasting record incorporating number of holes made/type of


6 explosive used / firing pattern & sequence with date and time of blast are
available and maintained

7 Whether blasting work and explosives handled by licensed blaster

Whether intensity (pressure profile) of the charge calculated created by


8
detonation in a borehole before main blasting
Whether secured place with security is available for temporary storage of
9 nitroglycerin based explosive, dry blasting agents etc. or placement of surplus
detonators and primers into secure explosives vehicle.
Whether all protruding or penetrating materials (nails, screws, rivets etc.)
10
collected from blasting location prior to blasting
Whether standard warning signal through high pitch horns for all clear signal
11
before and after firing is maintained
Whether road marshal and trained personal deployed to control moving traffic
12
and by passers before initiating blasting activity
Whether controlled blasting safety measures adopted to prevent flyrock
13
landing beyond the property (if applicable)
Whether blasting shelter is built to prevent blasters and helpers often suffer
14
injuries from flyrock that may be projected from a blast
Whether caution board or safety signage is provided and diplayed along with
15
barricading edge (< 5 meter)

Note : No work carried out with short contingency deviation, It must cascaded to senior management, so if it is minor deviation than need to be
approval from Regional EHS Manager / RM, or if it is major deviation than need to be approved by corporate HSE head

Comments (if any)

Signature of Site safety incharge Signature of Site Engineer/Incharge