1. Fixed expenditure
Sl No. Particulars Nos
D Electrification
1 Electric connection
2 Wiring
Subtotal
G Pre-operative Expenses
1 Legal expenses, Start-up expenses, Establishment cost, consultancy fees, trials and others.
Total of fixed asset
2. Variable expenditure
A Raw material Expenditure Unit rate per kg /L/pcs(₹
1 Wheat flour(kg) 40
2 Egg(pcs) 6.33
3 Sugar(kg) 42
4 soyabean oil(L) 110
5 Baking powder(kg) 110
6 Baking soda(kg) 300
7 Milk (L) 50
Dry fruits(kg) cashew 584
8 raisin 72
9 Toppings (tutti frutti)(kg) 250
10 vanilla essence(L) 710
11 Salt(kg) 26
12 Parchment paper-A4 size(sheet) 1.94
Total raw material expenditure
Profitability table
Sl no. 1 yr
1 Yield per day (kg) 100
2 No. of working days 150
3 Total Yield per year (kg) 3750
4 Selling price/kg 250
5 Gross income/Benefit 937500
Expenditure
Particulars 1st Year
Capital Cost 5,178,190
Recurring cost 1,313,533
Total cost 6,491,723
Income/Benefit 937500
Income/Benefit (Rs. in Lakhs) 9.375
Net income -5,554,223
Net income (in lakhs) -55.5422275
Financial Analysis
Particulars 1
1 Total cost (Rs.) 6,491,723
2 Total cost (Rs. in Lakhs) 64.9172275
3 Income/Benefit (Rs.) 937500
4 Income/Benefit (Rs. in Lakhs) 9.375
5 Net Income/Benefit (Rs.) -5,554,223
6 Net Income/Benefit (Rs. in Lakhs) -55.5422275
7 Discounting factor @ 15% 0.869565217391304
8 Discounted Cost @ 15% DF 56.4497630434783
9 Discounted Benefit @ 15% DF 8.15217391304348
10 NPW (Net Present Worth) @ 15% DF 41.9774721719228
11 (Benefit Cost Ratio) BCR @ 15% DF 1.27549887400893
12 IRR (%) 54%
Debt-Equity Ratio
emaining 150 days on preliminary and preoperative activities i.e. 25% production capacity in 1st year)
Unit Basis
Sq ft Nil
Nil Nil
Sq ft 18X10
Sq ft 50X40
Sq ft 25X10
Sq ft 20X10
Sq ft 15X10
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
Nil Nil
cy fees, trials and others.
Quantity required per day (kg) No. of working days in the year
14.4 300
200 300
12 300
6 300
1.1 300
0.55 300
23 300
0.15 300
0.0625 300
4.2 300
0.015 300
0.35 300
600 300
150
56250
3,863,674
2 yr 3 yr
100 100
300 300
30000 30000
250 250
7500000 7500000
Year
2 3
3,863,674 3,863,674
38.63674 38.63674
7500000 7500000
75 75
3,636,326 3,636,326
36.36326 36.36326
0.756143667296787 0.657516232431988
29.2149262759924 25.4042837182543
56.710775047259 49.3137174323991
:1
Means of Finance
1
2
:1
Total Financial Outlay
Margin @25%
Bank loan
5
20
100
30000
250
7500000
1000 3000
Nil 8%
300 180
350 2000
400 250
250 200
250 150
250 200
2%
50,000 Nil
125,000 Nil
300,000 Nil
850 Nil
434 Nil
7,330 Nil
4,000 Nil
21,000 Nil
60,000 Nil
Annual Raw Material Expenditure (₹) No. of working days in 1st year
172800 75
379800 75
151200 75
198000 75
36300 75
49500 75
345000 75
26280 75
1350 75
315000 75
3195 75
2730 75
349200 75
2030355
r
4 5
3,863,674 3,863,674
38.63674 38.63674
7500000 7500000
75 75
3,636,326 3,636,326
36.36326 36.36326
0.571753245593033 0.49717673529829
22.0906814941342 19.2092882557689
42.8814934194775 37.2882551473717
Particulars Unit
Term Loan %
Own contribution %
Total Financial Outlay 64.92
Margin @25% 16.23
Bank loan 48.69
Total Expenditure (₹)
3000000
240000
3240000
54000
700000
100000
50000
37500
50000
991500
19830
1011330
50,000
125,000
300,000
850
8,680
7,330
4,000
21,000
60,000
576,860
55000
65000
120000
35000
40000
75000
55000
100000
5,178,190
Amount
Unit Rate (Rs. in
Lakhs)
75 48.69
25 16.23
ASSUMPTIONS FOR DPR (Detailed Project Report) PREPARATION
1. Production Capacity of baked products (muffins) is 25kg per batch.
2. Working hours/Day: 8 h (7h for production and 1h for regular maintenance and other activities)
3. Total batches per day: 5 (3 batches for 1st year, 4 batches for 2nd year and 5 batches from 3rd year on
4. No of working days in a year: 300 days(200 days for 1st year and 300 days from 2nd year onwards)
5. Raw Material stock is for 21 days and finished goods Closing Stock for 10 days.
6. Interest on working Capital Loan and Term loan are taken at 10%.
7. Salary and wages rates are taken as per the Current Market Scenario.
8. Daily Power Consumption is considered at 40 KWH (24 KWH for 1st year, 32KWH for 2nd year and 40K
9. Means of finance (Self contribution: 25%, Bank loan: 75%)
Total area=3000ft2
Project duration=5yr
nce and other activities)
and 5 batches from 3rd year onwards)
ys from 2nd year onwards)
, 32KWH for 2nd year and 40KWH from 3rd year onwards)
1. Fixed expenditure
Sl No. Particulars
A Land & Site Development
1 Land purchasing
2 Registration charges
Sub Total
B Building Structure
1 Raw material storage unit
2 Main production area
3 Quality control lab
4 Refrigeration and storage unit
5 Office/ staff room/ Restroom
7 Boundary wall
Subtotal
6 Architect Plan Fees
Subtotal
C Plant & Machinery
1 Planetary mixer(20L)
2 Baking oven
3 Packaging machine
4 seiving machine
5 muffin batter dispositor machine
6 Weighing machine
7 Muffin moulds
8 color label printing machine
9 computer
10 Water pump
11 Water storage tank (1000 lit)
12 RO water plant (500 lit/hr)
Sub Total
D Electrification
1 Electric connection
2 Wiring
Subtotal
G Pre-operative Expenses (legal expenses, start-up expenses, Consultancy fees, trials, others)
Total of fixed asset
2. Variable expenditure
A Raw material Expenditure
1 Wheat flour(kg)
2 Egg(pcs)
3 Sugar(kg)
4 Soyabean oil(L)
5 Baking powder(kg)
6 Milk (L)
7 Dry fruits(kg) cashew
8 Raisin
9 Toppings (cherry)(kg)
10 Vanilla Essence(L)
11 Salt(kg)
12 Parchment paper cup (pcs)
Total raw material expenditure
with @3% incremental cost
B Labour/staffs Expenditure
1 Manager
2 Accountant
3 Skilled operator
4 Unskilled operator
5 Storekeeper
6 Security staff
7 Helper
Annual Total labour Expenditure
with @3% incremental cost
land tax
Tax amount
Other charges
D Transport Expenditure at 0.5% revenue/year
1 Packaging Expenditure (Rs) at 1% revenue/year
2 Advertisement Expenditure at 1% revenue/year
3 Insurance amount at 0.5% revenue/year
5 Total Expenditure (₹)
with @3% incremental cost
Particulars
Capital Cost
sq ft
1 Sq ft
1 Sq ft
1 Sq ft
1 Sq ft
1 Sq ft
1
2 Nil
2 Nil
1 Nil
1
1
1 Nil
22 Nil
1 Nil
1
2 Nil
1 Nil
1 Nil
Unit rate per kg. (₹) Quantity required per batch (kg) 1st year expenditure
25 8.334 125008.06
4 35 83225.81
40 4.166 99987.10
75 2.083 93737.90
50 0.191 5733.87
42 8.334 210016.80
448 1.081 290477.42
135 0.665 53825.81
126 3.870 292572.00
162 0.005 470.32
7.5 0.450 2025.00
0.1 625.000 37500.00
28.856 18.76 1294580.09
1294580
No. of staff Labour Expenditure per month (₹) 1st year Labour expenditure (₹)
1 13500 94500
1 11500 80500
2 9500 66500
2 7500 52500
1 6500 45500
1 6500 45500
1 6000 42000
427000
427000
3708319 0 0
nil 0 0
2nd year Labour expenditure (₹) 3rd year Labour expenditure (₹) 4th year Labour expenditure (₹)
162000 162000 162000
138000 138000 138000
114000 114000 114000
90000 90000 90000
78000 78000 78000
78000 78000 78000
72000 72000 72000
732000 732000 732000
753960 776579 799876
0 0
4723565 4884202
4723565 4884202
Total Expendit ure (₹)
0
95,000
95000
150000
540000
144000
150000
78400
151800
1214200
24284
1238484
110000
570000
360000
58000
500000
6990
17160
327105
28500
7080
10000
90000
2084835
50000
60000
110000
40000
40000
60000
80000
3708319
No. of production days in year
5th year expenditure 1st year 2nd year 3rd year 4th year 5th year
5thyr
1126
Quantity required per day
1st year (3 batches per day) 2nd year (4 batches per day)
25.00 33.34
104.03 138.71
12.50 16.66
6.25 8.33
0.57 0.76
25.00 33.34
3.24 4.32
1.99 2.66
11.61 15.48
0.01 0.02
1.35 1.80
1875.00 2500.00
Quantity required per day
3rd year (5 batches per day) 4th year (5 batches per day )
41.67 41.67
173.39 173.39
20.83 20.83
10.42 10.42
0.96 0.96
41.67 41.67
5.40 5.40
3.32 3.32
19.35 19.35
0.02 0.02
2.25 2.25
3125.00 3125.00
5th year (5 batches per day)
41.67
173.39
20.83
10.42
0.96
41.67
5.40
3.32
19.35
0.02
2.25
3125.00
Profitability table
Sl no. 1 yr 2 yr 3 yr 4 yr
1 No of batch per year 3 4 5 5
2 Targeted Yield per batch (kg) 25 25 25 25
3 Targeted Yield per day (kg) 75 100 125 125
4 No. of working days 200 300 300 300
5 Total Yield per year (kg) 10500 22500 30000 31875
6 Selling price/kg 236 239 242 245
7 Gross income/Benefit 2478000 5377500 7260000 7809375
8 Gross income/Benefit (in lakh) 24.78 53.78 72.60 78.09
5 yr
5
25
125
300
33750
248
8370000
83.70
Financial Analysis Year
Particulars 1 2 3
Capital Cost 3708319
Recurring cost 1843920 3685840 4568501
1 Total cost (Rs.) 5552239 3685840 4568501
3 Income/Benefit (Rs.) 2478000 5377500 7260000
5 Net Income/Benefit (Rs.) -3074239 1691660 2691499
7 Discounting factor @ 15% 0.8696 0.7561 0.6575
8 Discounted Cost @ 15% DF 4828034 2787024 3003863
9 Discounted Benefit @ 15% DF 2154783 4066163 4773568
10 NPW (Net Present Worth) @ 15% DF 3872971
11 (Benefit Cost Ratio) BCR @ 15% DF 1.25
12 IRR (%) 67%
Year
4 5 Total
3708319
4723565 4884202 19706028
4723565 4884202 23414347
7809375 8370000 31294875
3085810 3485798 7880528
0.5718 0.4972
2700714 2428312 15747947
4465036 4161369 19620918
Debt-Equity Ratio
Sl.no. Description
1 Debt 41.64
2 Equity 13.88
3 Debt-Equity Ratio 3 :1
net surpluss repayment of principal repayment of interest total outgo net amount in hand
16.92 4.50 4.16 8.66 8.25
26.91 9.50 3.71 13.21 13.70
30.86 13.50 2.76 16.26 14.59
34.86 14.14 1.41 15.56 19.30
13.1367699614436
Unit Rate Amount Amount (Rs. in lakhs)
75 4164179 41.64
25 1388060 13.88
100 5552239