We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
CONCRETE CUTTING CHECKLIST
PROJECT NAME: GE, CHAKAN, PUNE
SL NO CHECK POINTS YES NO
FLOOR SAW 1 Shaft nut secure 2 Belt tensioned and undamaged 3 Adequate water and waterways clear 4 Flaps in place 5 Guards in place HAND HELD SAW 6 Belts tensioned and undamaged 7 Flange locking nut secure 8 Water supply adequate 9 Guards in place WALL SAW 10 Tracks securely fastened 11 Blade secured 12 Job wedged/securely supported WIRE SAW 13 Pulleys secure 14 Hydraulic pressure correct DRILLS 15 Electric switch, plug and lead safe 16 Water collar operable 17 Carriage clamp and shims operable BLADE AND BITS 18 No undercutting evident 19 Blades free of cracks & deterioration 20 Blade is right size and type for the machine 21 All segments secure ELECTRICAL LEADS 22 Plugs in good condition 23 Outer casing intact Correctly tagged 24 GFCIs fitted INSPECTED BY: DATE: