By default, all charts and dashboards are public. What should be done to make
charts and dashboards private?
Please choose the correct answer.
Response:
Set restrictions for charts in the Permission filter application.
From <https://www.erpprep.com/node/21892/myresults/4748158>
Which of the following fields can be overwritten in the New Planning view by
fixed default value settings?
There are 3 correct answers to this question.
Response:
Default Display Time
Planning Unit
Language
Unit of Measure to ID
Currency to ID
From <https://www.erpprep.com/node/21892/myresults/4748158>
Question:
Which of the following settings are relevant for planning notes?
There are 2 correct answers to this question.
Response:
It is possible to edit or delete planning notes that were created by other
users without administrator permissions
The number of the Period ID attribute planning note combinations in the
database is unlimited.
It is possible to show planning notes from all planning levels
From <https://www.erpprep.com/node/21892/myresults/4748158>
Question:
What option is available for the key figure that is enabled for fixing?
Score 0 of 1
Question:
You want to setup Demand Sensing to analyze demand changes in execution or
close to execution windows. Which of the following conditions must you consider
during the setup?
There are 2 correct answers to this question.
Response:
The result generates sensed demand data at the monthly time granularity
for the time horizon defined in the forecast model
At setup test the system to run the Demand Sensing (full) algorithm
weekly and the Demand Sensing (update) on a daily basis.
It is mandatory to load historical lag-based snapshot data
From <https://www.erpprep.com/node/21892/myresults/4748158>
Question:
You create an S&OP operator for heuristics on an SAP IBP project. What must
you enable for the S&OP operator which is specifically relevant for sub
networks?
Please choose the correct answer.
Response:
Compute Expected Supply parameter
From <https://www.erpprep.com/node/21892/myresults/4748158>
Question:
Which of the following conditions are relevant for subtotals in the planning view?
There are 2 correct answers to this question.
Response:
Only attribute-based totals can be added to the planning view.
The total value can be added before or after the selected attribute.
The values of the attribute-based total at the highest attribute level in the
planning level can be changed.
The total number of attributes that can use subtotals in the planning view
From <https://www.erpprep.com/node/21892/myresults/4748158>
Question:
How is minimum resource utilization considered by the optimizer?
There are 2 correct answers to this question.
Response:
Minimum resource utilization may not be achieved in full for restricted
storage capacity.
For all buckets and all quantities that represent the minimum utilization.
Achieved in short term and then tail off in future buckets, due to discounts.
From <https://www.erpprep.com/node/21892/myresults/4748158>
Which of the following settings can you use in your supply planning background
job triggered from Excel?
There are 2 correct answers to this question.
Response:
Type of algorithm used
Planning unit
UOM to ID
Target Currency
From <https://www.erpprep.com/node/21892/myresults/4748158>
You define a fixing for key figure, which of the following functions are available
for this key figure?
There are 3 correct answers to this question.
Response:
Fixing is possible for system editable key figures
Fixing is possible for a certain period including all child values in the
hierarchy
Fixing is possible for a certain quantity of a key figure value
From <https://www.erpprep.com/node/21892/myresults/4748158>
Question:
Which of the following functional areas are included in the out-of-the-box SAP
Integrated Business Planning application for sales and operations?
There are 3 correct answers to this question.
Response:
Demand Driven Materials Requirement planning
Executive review
Score 0 of 1
Question:
Which maintenance, Repair and overhaul (MRO) parts planning processes are
included in SAP IBP for supply chain?
There are 3 correct answers to this question.
Response:
Supply planning
Inventory optimization
Demand planning
From <https://www.erpprep.com/node/21892/myresults/4748158>
Pre-Processing
Accuracy Measurements
From <https://www.erpprep.com/node/21892/myresults/4746391>
You are working with Inventory Optimization Process and you want to use a
What If analysis. What parameters are assessed by this analysis?
There are 2 correct answers to this question.
Response:
Number of planning combinations
Capacity consumption
Service levels
Changed variability
From <https://www.erpprep.com/node/21892/myresults/4746391>
Which of the following are inputs to Demand Sensing with Gradient Boosting
(Full) algorithm?
There are 2 correct answers to this question.
Response:
Forecast Error CV Calculated by Manage Forecast Error Calculations app
Recommended Safety Stocks from Multistage Inventory Optimization
From <https://www.erpprep.com/node/21892/myresults/4746391>
Which of the following configuration options are part of the New Key Figure
creation process?
There are 3 correct answers to this question.
Response:
Enable fixing for the key figure.
Enable planning notes for the key figure.
From <https://www.erpprep.com/node/21892/myresults/4746391>
Which of the following key functions are supported by SAP IBP for sales and
Allocation planning
From <https://www.erpprep.com/node/21892/myresults/4746391>
To verify that SUM() calculation is used for a key figure only if the
Aggregation Mode of the key figure is set to Sum or Custom
From <https://www.erpprep.com/node/21892/myresults/4746391>
You run a what-if analysis and use the Scenario planning function. Which actions
can you perform?
There are 3 correct answers to this question.
Response:
Change scenario-specific master data.
Share data with other users.
From <https://www.erpprep.com/node/21892/myresults/4746391>
Which parts of the S&OP high-level process would the Inventory planning and
optimization process fit into?
There are 2 correct answers to this question.
Response:
Demand Review, by using the output of demand planning as input into
calculations
Supply Review, by providing an input to supply network planning
From <https://www.erpprep.com/node/21892/myresults/4746391>
You need to create various planning operators. Which operators must you assign
to your planning area to view them in Microsoft Excel?
There are 2 correct answers to this question.
Response:
Copy Operator
Disaggregation Operator
Statistical Forecasting
From <https://www.erpprep.com/node/21892/myresults/4746391>
From <https://www.erpprep.com/node/21892/myresults/4746391>
Which input parameters can you use to limit the scope of your supply planning
run?
There are 3 correct answers to this question.
Response:
Product locations
Permission filter
Subnetwork
Time periods
Versions
From <https://www.erpprep.com/node/21892/myresults/4746391>
You define a fixing for key figure, which of the following functions are available
for this key figure?
Fixing is possible for a certain period including all child values in the
hierarchy
Fixing is possible for ranges of up to 50 cells
From <https://www.erpprep.com/node/21892/myresults/4746330>
Increase the use of incremental lot size beyond the frozen horizon.
Eliminate the usage of telescope time buckets
Split into multiple planning areas to support weekly vs. daily planning
needs.
From <https://www.erpprep.com/node/21892/myresults/4746330>
What are the outputs of the Calculate Target Inventory Components Operator?
There are 3 correct answers to this question.
Response:
Recommended Safety Stock
Reorder Point
Component Usage
Target Pipeline Stock
From <https://www.erpprep.com/node/21892/myresults/4746330>
Which of the following functional areas are included in the out-of-the-box SAP
Integrated Business Planning application for sales and operations?
There are 3 correct answers to this question.
Response:
Executive review
From <https://www.erpprep.com/node/21892/myresults/4746330>
What are the ways to achieve period shift in SAP IBP calculations?
There are 2 correct answers to this question.
Response:
Use a local member.
From <https://www.erpprep.com/node/21892/myresults/4746330>
Which of the following fields can be overwritten in the New Planning view by
fixed default value settings?
There are 3 correct answers to this question.
Response:
Language
Currency to ID
Planning Unit
Unit of Measure to ID
From <https://www.erpprep.com/node/21892/myresults/4746330>
You created a key figure and want to add calculations. Which of the following
rules do you consider?
There are 2 correct answers to this question.
Response:
Aggregation calculations using SUM or MAX functions must be based on a
higher aggregation level.
All key figure calculations have calculation inputs, which can be marked as
stored or non-stored.
The calculation chain for a key figure must always result in a calculated key
figure.
Key figures can be calculated across different planning levels.
From <https://www.erpprep.com/node/21892/myresults/4746330>
Time profiles are made out of levels, which are in turn made out of periods. What
are the ways SAP IBP identifies profiles and periods?
Please choose the correct answer.
Response:
Periods are identified by an alphanumeric prefix and profiles by an integer.
Periods are identified by a start and end date and profiles by an integer.
From <https://www.erpprep.com/node/21892/myresults/4746330>
By default, all charts and dashboards are public. What should be done to make
charts and dashboards private?
Please choose the correct answer.
Response:
Set restrictions for charts in the Permission filter application.
From <https://www.erpprep.com/node/21892/myresults/4748158>
Which of the following fields can be overwritten in the New Planning view by
fixed default value settings?
There are 3 correct answers to this question.
Planning Unit
Language
Unit of Measure to ID
Currency to ID
From <https://www.erpprep.com/node/21892/myresults/4748158>
From <https://www.erpprep.com/node/21892/myresults/4748158>
What option is available for the key figure that is enabled for fixing?
Please choose the correct answer.
Response:
Fixing is possible for key figures with negative values
You can change fixed key figure only with administrative rights
Fixing is possible for a certain period, including all child values in the
hierarchy
Fixing is possible for a part key figure value on a certain planning level
From <https://www.erpprep.com/node/21892/myresults/4748158>
From <https://www.erpprep.com/node/21892/myresults/4748158>
You create an S&OP operator for heuristics on an SAP IBP project. What must
you enable for the S&OP operator which is specifically relevant for sub
networks?
Please choose the correct answer.
Response:
Compute Expected Supply parameter
From <https://www.erpprep.com/node/21892/myresults/4748158>
Which of the following conditions are relevant for subtotals in the planning view?
There are 2 correct answers to this question.
Response:
Only attribute-based totals can be added to the planning view.
The total value can be added before or after the selected attribute.
The values of the attribute-based total at the highest attribute level in the
planning level can be changed.
The total number of attributes that can use subtotals in the planning view
can be restricted.
From <https://www.erpprep.com/node/21892/myresults/4748158>
Achieved in short term and then tail off in future buckets, due to discounts.
From <https://www.erpprep.com/node/21892/myresults/4748158>
From <https://www.erpprep.com/node/21892/myresults/4748158>
Which of the following settings can you use in your supply planning background
job triggered from Excel?
There are 2 correct answers to this question.
Response:
Type of algorithm used
Planning unit
UOM to ID
Target Currency
From <https://www.erpprep.com/node/21892/myresults/4748158>
You define a fixing for key figure, which of the following functions are available
for this key figure?
There are 3 correct answers to this question.
Response:
Fixing is possible for system editable key figures
Fixing is possible for a certain period including all child values in the
hierarchy
Fixing is possible for a certain quantity of a key figure value
From <https://www.erpprep.com/node/21892/myresults/4748158>
Which of the following functional areas are included in the out-of-the-box SAP
Integrated Business Planning application for sales and operations?
There are 3 correct answers to this question.
Response:
Demand Driven Materials Requirement planning
Executive review
From <https://www.erpprep.com/node/21892/myresults/4748158>
Which maintenance, Repair and overhaul (MRO) parts planning processes are
included in SAP IBP for supply chain?
There are 3 correct answers to this question.
Response:
Supply planning
Inventory optimization
Demand planning
From <https://www.erpprep.com/node/21892/myresults/4748158>