0% found this document useful (0 votes)
116 views

Preservation-Inspection-Check-List

Uploaded by

onome ohwerhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views

Preservation-Inspection-Check-List

Uploaded by

onome ohwerhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

ORCSU Team Starting Strong

Campaign 2024

Preservation Compliance Audits check list

PROJECT No. : Inspected by : Peter Ohwerhi

Title : ETP Inspection Date : 2/12/2024

Supplier Name : Nil Inspection Level (IL) : High

Names Participants- Peter Ohwerhi( TPC/4C8), Oruese Obue


Construction Engineer (EVOMEC) and Paul Dennis (
TPC/4C10)

0
Inspection Result
No Description
C NC NA Comment
1 The equipment shall be in a temperature control area as per specification and preserve properly.

2 All opening part and equipment shall be protected properly.

Check instrument cabinet, marshalling, control panel and juction box are closed , fitted tighthly and
3
completely covered with Tarpaulin to avoid rain , dirt’s and water ingress.

4 Preservative product shall be applied before packing. `

Preservation requirement summary of material and equipment as per approved preservation procedure :
Storage condition : – Outdoors with cover sheet
– Outdoors without cover sheet
– Indoor with air conditioning
– Indoor without air conditioning
Packing style : – Closed box
– Crate box
– Bare
Preservative product : – N2
5 – Dry air
ORCSU Team Starting Strong
Campaign 2024

Preservation Compliance Audits check list


5
– VpCI
– Rust presventive oil
– Space heater
– None
Special requirement : – Moisture proof pack
(If any) – Vacuum pack
– Sealed container
– Periodical rotation of shaft /
impeller
In case extend storage, all packing shall be stored in proper place, protected and the condition validity of
6
preservative product shall be monitored.

7 Daily preservation inspection is done on a weekly basis.

8 Veitfy and confrim that handover Spare parts are kept in a good temperture control room.
9 The equipment is well preserved, and it is covered with Tarpaulin to avoid rain , dirt’s and water ingress.

Note:
1. Any activity during walkthrough shall be completed with picture as evidence for reporting.
oors
with
cover
sheet

- ORCSU Team Starting Strong


Outd
oors Campaign 2024
witho
ut
cover
sheet
PHOTO INSPECTION REPORT

PO No. : Inspected by :
-
Indoo
PO Title
r with : Inspection Date :
air
Supplier Name
condit : Inspection Level (IL) :
ioning
Preservation Procedure :
Doc. No. / Rev. No.
0
-
Indoo
r
witho
ut air
condit
ioning

Packi
ng
style :

-
Close
Photo-1 Photo-2
d box
Subject : Subject :

-
Crate
box

-
Bare

Prese
rvativ
e
Photo-3 Photo-4
produ
Subject : Subject :
ct : -
N2

-
Dry
air

-
Dessi
cant
Photo-5 Photo-6
Subject : Subject :

-
VpCI

-
Rust
presv
entive
oil

Photo-7 - Photo-8
Subject
Spac: Subject :
e
heate
r

-
None

Speci
al
requir
emen
t: -
Moist
ure

You might also like