1.0 SITE CLEARANCE 1.1 Clear the site off all shrubs, undergrowth and small SM trees including grubbing up their roots and dispose as directed 2.0 EARTH WORKS 2.1 Excavate over site average 150 mm deep to remove to SM remove vegetable soil, load, wheel and deposit 100 metres away and later spread and level on site where directed. 2.2 Excavate for foundation trench starting from stripped CM level not exceeding 1500 mm from ground level. deep 2.3 Allow for maintaining and supporting sides of ITEM excavation for maintaining excavation for keeping the same free from fallen materials 3.0 KEEP THE EXCAVATION FREE OF WATER Allow for keeping excavation free of water and mud by ITEM pumping bailing or other approved means. 4.0 FILLING AND DISPOSAL 4.1 50 mm fine material for blinding (murram / quarry dust SM to surface of hardcore well rolled and levelled. 4.2 Load, wheel and deposit surplus excavated material CM where directed by architect 4.3 300 mm thick approved hardcore filling spread, leveled, CM well rammed and consolidated in 150 mm thick layers to receive concrete surface bed. 5.0 ANTI TERMITE TREATMENT Chemical ant termite treatment executed complete by SM an approved specialist under ten years guarantee t0 surface blinded hardcore 6.0 DUMP PROOF MEMBRANE 1000-gauge polythene D.P.M. underlay sheeting to SM bottom slab with end side laps 150 mm. 7.0 CONCRETE WORKS 7.1 50 mm thick plain concrete mix 1:4:8 blinding to SM foundation strip 7.2 250 mm thick reinforced concrete mix 1:2:4 foundation CM strip 8.0 WALLING Masonry walls bedded and joined in cement and sand (1:4) mortar in: 8.1 400 mm thick brick wall reinforced with 32 x 2 mm loop CM iron every alternate course. 8.2 300 mm thick brick wall reinforced with 32 x 2 mm loop CM iron every alternate course. TOTAL