SCHEDULE OF SLAB
SCHEDULE OF SLAB
SLAB SLAB ALONG SHORT SPAN ALONG LONG SPAN OVER LONG SUPPORT OVER SHORT SUPPORT REMARKS
MARKED THICKNESS DISTRIBUTION
FULL LENGTH CURTAILED FULL LENGTH CURTAILED CONTINUOUS END CONTINUOUS END
SUPPORT SUPPORT SUPPORT SUPPORT
S1, S2, S3, S11 300 #10mm @ 145 C/C --- #10mm @ 145 C/C --- #10mm @ 145 C/C #10mm @ 145 C/C --- #10mm @ 145 C/C #10mm @ 145 C/C ---
S12, S13, S14
S4 300 #10mm @ 145 C/C --- #10mm @ 145 C/C --- #10mm @ 145 C/C #10mm @ 145 C/C #10mm @ 145 C/C #10mm @ 145 C/C #10mm @ 145 C/C ---
S5, S6, S7, S8 300 #10mm @ 290 C/C #10mm @ 290 C/C #10mm @ 145 C/C --- #10mm @ 145 C/C --- --- #10mm @ 145 C/C #10mm @ 145 C/C ---
S9, S10
1 SCHEDULE OF SLAB
S 3 SCALE 1:1OO
Dwight chloe doria PROJECT TITLE: SHEET CONTENT/S: REVISION/S: APPROVED BY:
CIVIL ENGINEER
PROPOSED 3 STOREY COMMERCIAL
BUILDING
schedule of sLAB S
PTR NO.:
TIN:
DATE:
OWNER
3