Method statement For Tower cranes and SPB Lifting & Jumping.
Implementing a clear tower crane and SPB lifting plan ensures safety and efficiency.
The plan includes:
1. Planning Phase
Method statement For Tower cranes and SPB Lifting & Jumping 1
CHAITANYA INFRA PRIVATE LIMITED
2. Preparation Phase
• We already Ensured a level and stable ground for the tower crane.
3. Lifting Execution
• Erection:
• We already done the erection of tower crane in the lift cut out area.
• We Sequentially add mast sections using the tower crane’s climbing frame as mentioned in the
drawing which we submitted.
• Safety Checks:
Method statement For Tower cranes and SPB Lifting & Jumping 2
CHAITANYA INFRA PRIVATE LIMITED
• Lifting Process:
• We Secure the SPB with slings or lifting beams at designed points as per the submitted drawing.
• P & M in charge can Guide the SPB into position using personnel on the ground.
• Ensure a minimum staggered height of 6.0 meters between the crane and the SPB during operations.
. Jumping Sequence:
• Perform SPB jumping every two floors, alternating with girder changes.
• One additional girder will be kept rotating for continued support and operation
5. Post-Lifting Activities:
5.1. Inspections
• Inspect the installed tower crane and SPB for stability and alignment.
Method statement For Tower cranes and SPB Lifting & Jumping 3
CHAITANYA INFRA PRIVATE LIMITED
5.3. Documentation
• Inspection reports.
6. Safety Considerations
• Will Ensure all personnel wear appropriate personal protective equipment (PPE).
Thank You.