1930 - Kaankshi Shah - 607 - ARD - Final FOLIO - 250109 - 102529

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views23 pages

1930 - Kaankshi Shah - 607 - ARD - Final FOLIO - 250109 - 102529

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 23

GENERAL NOTES

1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE


SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
E D C B A E D C B A PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
O O
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.
3.410 10.000 10.000 10.000 10.000 10.000 (0,0) 7.1 (0,0)
6
6.9 03

4.209
8 68
8.9 5. 261

89
95 7.
SPECIFIC NOTES

4.933
58
10.

6
5. 50

6.
18

33
5 .7 5

4.9
55

99
8

6.
6.
6

4
1. ALL THE GRID POINTS SHALL BE MARKED ON SITE BY FIXING
ANCHOR BOLTS OF 16MM Ø AND 450MM DEPTH.

10.000
42 2 42 42

51
4 2. THE ANCHOR BOLTS SHALL BE FIXED 250MM ABOVE GROUND
.1 .1 .1 .1

.1
14 14 14 14

14
AND 300MM UNDERGROUND AS THE GRID POINTS.
3. ALL THE GRID POINTS SHALL BE MARKED ON SITE WITH LINE
6 DORI IN CONJUNCTION TO ANCHOR BOLTS AND SHALL BE ON
81

1.688

3
7. TRUE ANGLE.

4.72
Ø
4. THE CONTRACTOR SHALL SHOW THE GRID TO THE

6.
05 69

10
.1 3.0 31 ARCHITECT BEFORE MARKING OUT OF COORDINATE POINTS.

5
Ø6 2.9
5. ALL THE WALL POINTS SHALL BE MARKED ON THE WALL WITH
1E 1D 1C 1B 1A 1E 1D 1C 1B 1A 7.463 PERMANENT OIL PAINT.
(50,10) (40,10) (30,10) (20,10) 6.3 (10,10)
1 (50,10) (40,10) (30,10) (20,10) (10,10)
1 6. THE SITE SHALL BE SURVEYED WITH DUMPY LEVEL AND

3.281
11.2 9 23 3 7
85 3 5.3 10.0 THEODOLITE.

4.8
76

7.
3.053

87
1
AREA STATEMENT

10.000
BUILT STRUCTURE - MUSEUM BUILT STRUCTURE - MUSEUM

4
10.99

3.2
17
1.899
00
A STRUCTURE - MUSEUM

0
8.

62
4.7
6.2 0 12.09 3.9
00 27 5 5
28
3 4. 7.04 84 1 MUSEUM - CLOSED EXHIBITION SPACE 600 SQ. M
2.
2 AUDITORIUM 120 SQ. M

13.5
2E 2D 2C 2B 2A 2E 2D 2C 2B 2A
10.489 2 2

50
(50,20) (40,20) (30,20) (20,20) (10,20) (50,20) (40,20) (30,20) (20,20) (10,20)

4.
6
2.710 .12

30
150
8

1.917
B STRUCTURE - ADMIN

9
10.
10.250

8. 165
14

88
9.

4
3
.31

8.33
1 RESTAURANT 100 SQ. M

10.000
450
2 KITCHEN WITH STORAGE 35 SQ. M

10.
3 ADMIN AND TICKETING SPACE 45 SQ. M

0 4 SOUVENIR STORE 115 SQ. M


69 5.
0. 3.

0
9.4 25 01

3.67
77 6
15 66 4
6.7 5.7
4.150 5.8 TOTAL BUILT UP AREA 1050 SQ. M
25 3.479 6.552
3E 3D 3C 3B 3A 3E 3.52 3D 3C 3B 3A
3 0 6.625 3
1.576

(50,30) (40,30) (30,30) (20,30) (10,30) (50,30) (40,30) (30,30) (20,30) 7.4 7 (10,30)
5.7

4
01 24 51
7.0
PARKING SCHEDULE

8
4.

4.06
Ø4
6

3.5
4.
25

11

.9

1
80
DETAILED STRUCTURE - MUSEUM DETAILED STRUCTURE - MUSEUM
SR. NO. FUNCTION AREA PARKING NUMBER
00

10.000
9.0

4 0 1 MUSEUM 600 SQ. M 40

6.987
05

7.4
6.290
.
12

90
2 AUDITORIUM 120 SQ. M 8

5
1.87
5 3 RESTAURANT & KITCHEN 135 SQ. M 6
3
50 5.2
04
27.45M A

27.45M A
4.1 8.049
4 SOUVENIR STORE 115 SQ. M 3
3.811 54
2.1 5
3.4

ADMIN & TICKETING 45 SQ. M 1


4E 4D 4C 4B 4A 4E 4D 4C 4B 4A
4 7 4
50

(50,40) (40,40) (30,40) (20,40) (10,40) (50,40) (40,40) (30,40) (20,40) (10,40) 5.83
9.3

8 6
7.5
50

5.112
TOTAL 58
3.00

5 INCLUSIVE OF 10% EXCESS 6


PATHWAYS
0

0
200 .90 64 ≈ 65

3
3 TOTAL PARKING TO BE PROVIDED

10.000
4
12.

.95
10
4

9.8
94
TOTAL PARKING FOR 4 WHEELER (2.50x5.50M EACH) 69
FOB FOB

5
80

229

6.15
CC

CC

5.103
13.
6.5

6.
4.318

TOTAL PARKING FOR BUSES (3.75x6.50M EACH) 3

15
30 40
9.1 5

4.8
05
1.7 3.035
5.419
ESS ROA

ESS ROA
P69 P69
5E 5D 5C P67 5B 5A 5E 5.900 5D 6.000 5C P67 5B 5A
(50,50) (40,50) P46
P47
P48
(30,50)
P68

(20,50) (10,50)
5 (50,50) (40,50) P46
P47
P48
(30,50)
P68

(20,50)
5 5.1
09 (10,50) 4.1
3 0 5
.6
15
P27 P27
P26 P26
P25 P66 P25 P66
P65 P65
P64 P64
P45 P45
P44 P44

10
P43 P43

5
.22

9.03
10.000

6
P23
P24
P23
P24 5.000
P22 P63 P22 P63
P62 P62

9.0
P61 P61
P42 P42
P41 P41

77
P40 P40

17
2.6

7.9
P19
P20
P21
P60
TRENCH P19
P20
P21
P60
99
P59 P59
D

D
P58 P58
P39 P39
P38 P38
P37 P37

P18 P18
P16
P17
P57 P16
P17
P57 8.515
6E 6D 6C P56
6B 6A 6E 6D 6C P56
6B 6A
(50,60) (40,60) P34
P35
P36
(30,60)
P55

(20,60) (10,60)
6 (50,60) (40,60) P34
P35
P36
(30,60)
P55

(20,60) (10,60)
6
6.3 9 0
62 07 20
P14
P15
P14
P15 6. 5.
P54 P54

1
P13 P13
P53 P53

6.63
P52 P52
P33 P33

10
P32 P32
P31 P31

.2

56
51

9.94
10.000

9.959
9.6
P12 P12
P11 P11
P10 P51 P10 P51

5
P50 P50
P49 P49
P30 P30
P29 P29
P28 P28

7.3
98
P09 P09
P08 P08
P07 P07 BUILT STRUCTURE -

4.3
MUSEUM
2.955

52
7
7.27 3.9
96 7.503 3.62 6.582 04
P06 P06
2.7 4
P05 P05
P04 P04
7E 7D 7C 7B 7A 7E 7D 7C 7B 7A
(50,70) (40,70) (30,70) (20,70) (10,70)
3.713
5.63
3 7 (50,70) (40,70) (30,70) 9.95 (20,70) 8.460 (10,70)
7 STRUCTURE UNDER

2.
DETAILED STRUCTURE -
3 5 CONSIDERATION

63
MUSEUM

7
5.230
P03
.02 P03 9.3

03
10
P02 P02
53

27.45M AC
P01 P01

5.7
9.
4

90
0
FOB
5
10.000

CESS RO
6.250

WATCHMAN WATCHMAN
0

AD
2.738
CABIN CABIN .77
11 9.4
5.538

54
41

13.100 11. 17
PEDESTRIA WIDE

PEDESTRIA WIDE

5.9
4 080
1.9

72 10.2
3M

3M
3.9 7.1 08
N ENTRY/E

N ENTRY/E
77
15.650

3
5 8B 5.565
8E 8D 8C 8A 8E 8D 8C 8B 8A
XIT

XIT
(50,80) (40,80) (30,80) (20,80) (10,80)
8 (50,80) (40,80) (30,80) (20,80) (10,80)
8 BUILT STRUCTURE -
ADMIN
VEHICUL

VEHICUL
9.450

BUILT STRUCTURE - ADMIN BUILT STRUCTURE - ADMIN FOB

7.123
6M WIDE

6M WIDE
AR ENTR

AR ENTR
10.000
Y/EXIT

Y/EXIT

10.
KEY PLAN

9.267
66

646
5 5

.3
SCALE = 1:1000

12
3 3

4 4

1.028
P0A P0B P0C P0A P0B P0C

46
FOB FOB

1.651
16.750

3.5
3.

7
8.02
3
39

2.680
9E 9D 9C 9B 9A 9E 9D 9C 3.981 9B 9A
(50,90) (40,90) (30,90) (20,90) (10,90)
9 (50,90) (40,90) (30,90) (20,90) (10,90)
9 DATE- 26.04.2022 DWG NO.- 01
3.709

5 5.5
4.8
3
32 5.8
10 6.2
6 1 09 N
5.4
STATUS-

WORKING DRAWING

2.107
DRAWING NAME- SCALE-

NAME - SETTING OUT PLAN 1:200


PROJECT NAME-

WAR MUSEUM
ROLL NO.-

SETTING OUT - GRID AND SETTING OUT - TRENCH NAME - KAANKSHI PRUTHVI SHAH 5511

STRUCTURE AND PATHWAYS 3rd YEAR B. ARCH


SIGN-

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
E D C B A PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF

2.965
THE ARCHITECT/CONSULTANT BEFORE.

2.413

2.664
2.660
1.887

2.443

2.925
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
O
2.567 2.044 THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.
T78
2.288 07 (0,0)

3.287
3.410 10.000 10.000 10.000 10.000 10.000

3.350

3.400
T84 T69

3.675
2.5

3.713
T82
16

3.828

3.917
2.1
T88 T86
2.1 T80

06
T75
3.247

3
22
2.104 0 T76
3.03 3.233 3.36

2.
T87 T74 T65
BUILT STRUCTURE - MUSEUM 1
TREE SCHEDULE
T67
T77 T73
3.474 T72

3.389
T85
T79 1.7
1.8 83

2.
T83 T68

22
T89
2.120 2.101 2.267

22
94 T66

10.000
T81 T71 T70
2.0

2.4
27

5
3.134

3.30
1.975 2.5 08
82 2.2
9 76
1.

2.476
2.013 T64 SYMBOL COMMON NAME SCIENTIFIC NAME NUMBER

14.348
T90
1.950
HEXAGONAL ANTI SKID

1.8
CONCRETE PAVER BLOCK T2,T12-15,T19,

1.988
BUFFALO GRASS

49
T63
COCONUT TREE COCOS NUCIFERA T27,T30,T35,T36,

2.176
T91
T40,T52,T54,T65,

1.676

20.676
T92
T88,T102,T104

2.454
T62
1E 1D 1C 1B 1A
(50,10) (40,10) (30,10) UP
(20,10) (10,10)
1 YELLOW FLAME/ PELTOPHORUM T3,T6,T11,T16,
2.159 2.097
T93 COPPER POD TREE PTEROCARPUM T21,T24,T26,T37,
UP T41,T44,T46,T49,

1.959
2.5
T61
T63,T67,T68,T72,

27.314
64
2.744 T76,T79,T83,T89,
150MM THK. PCC T92,T107,T109

54

10.000
T94
RECTANGULAR CONCRETE TRENCH STORM WATER HEXAGONAL CONCRETE BUILT STRUCTURE - MUSEUM T60

2.1
BEDDING

RAM
BLOCKS 230MM THK RUBBLE DRAIN BLOCKS TREE JASMINE/ MILLINGTONIA T5,T10,T18,T23,
COMPACTED EARTH

3
1.94
P 1:1
PACKING INDIAN CORK TREE HORTENSIS T28,T31,T33,T39,
T95 T59
T43,T48,T51,T56,

1.9 2.462
UP

0
2.332 2.274 T57,T59,T61,T66,

46

2.462
T70,T74,T77,T81,
T96
12.758 T85,T87,T90,T94,
T58
T96,T98,T100,

2.306
T105,T111

2.306
2E 2D 2C 2B 2A
(50,20)
T97
(40,20) (30,20) (20,20) (10,20)
2 SAPODILLA/ MANILKARA T7,T9,T17,T20,
T57
CHIKOO TREE T22,T25,T29,T34,
1.966 ZAPOTA

1.530
1.906 T45,T58,T62,T64,

3.347
T98 T73,T80,T91,T93,
2.064 T97,T110

2.224
CUSTARD APPLE/ ANNONA T4,T8,T32,T38,

2.696

10.000
T99
T56

SITAPHAL TREE RETICULATA T42,T47,T50,T53,


2.151 T55,T60,T64,T71,
T35 T75,T78,T82,T84,
T100
T86,T95,T99,
T55
T101,T103,T106,
6.
SECTION THROUGH THE TRENCH 51

2.419
0 94 T108
9.559 6.3

2.273
T101
1.815
SAPTAPARNI/ ALSTONIA
SCALE = 1:50

2.427
T54 T1
DEVIL'S TREE SCHOLARIS
1.902
3E 3D 3C 3B 3A T34
T102
3

2.389
(50,30) (40,30) (30,30) (20,30) (10,30)

2.346
6
T53

30
14.220

2.
DETAILED STRUCTURE - MUSEUM SCAPE SCHEDULE

5
2.26
T33 2.385

2.52
T103
6 4
15.107
2.1

1
T32

10.000
T52

3.0
T104 SYMBOL SPECIFICATION

4
2.3
00

3.21
81
T31
2.144

25
6.314

1.
T51
3.429

3.0

8 68
2.996 T105 M30 GRADE, RECTANGULAR ANTI SKID CONCRETE

59
T30 PAVER BLOCK (200x100x60MM), ARRANGED

1.8
T50

27.45M A
23.754 DIAGONALLY TO EACH OTHER WITH SAND FILLED
JOINTS BETWEEN THEM ON 80MM THK. BEDDING

7
T106 T29

25
4E 4D 4C 4B 58 2.9 4A 3.723
4

2.
2.885 2.6 48 T49 AGGREGATE COURSE
(50,40) (40,40) (30,40) (20,40) (10,40)

2.
24
T28

3.166
2
9
3.18
T107 +1.0 M
PLINTH LEVEL 22.309 M30 GRADE, HEXAGONAL ANTI SKID CONCRETE

7
T27
PAVER BLOCK (60MM THK.), ARRANGED

3.12
2.27
COMPOUND WALL 3. T48
46 4.271 DIAGONALLY TO EACH OTHER WITH SAND FILLED
0 1.750

9
T47
UP

10.000
T108
T26
JOINTS BETWEEN THEM ON 80MM THK. BEDDING

37
AGGREGATE COURSE

4
MARINE/BEACH SAND

0
2.
8.608

2.39
2.081 +0.0 M
GROUND LEVEL T46 3.248
FOB 1.9 STENOTAPHRUM SECUNDATUM (BUFFALO GRASS),

CC
T109
T25 2. 40
23 T45 WARM SEASON LAWN GRASS
9

1.940
T110
T24
2.

3.0

8
23

2.93
MARINE SAND/ BEACH SAND, FOREGROUND FOR

ESS ROA
6

12

5
P69
5E 3.542 5D 5C P67 5B 5A TRENCH

2.19
5
T111 P68 T44
P48
(50,50) (40,50) P46
P47 (30,50) (20,50) T23
(10,50) 2.655

3.352
150MM THK. PCC P27 2.484
HEXAGONAL CONCRETE BEDDING STORM WATER P25
P26
P66
230MM THK RUBBLE DRAIN P64
P65 T22 2.1
COMPACTED EARTH BLOCKS COMPACTED EARTH P44
P45 13

2.1
PACKING P43

36
T21

10.000
33
2.4
P24
P23
P22 P63
P62
P61 T42
P42
P41 2.2
P40
T20 3 8

47
1.7
P21 T41
P20 T19
P19 P60
P59

D
P58

3.230
P39
2.274

3.14
P38
P37
2.567
P18
P17
P16 P57 1
6E 6D 6C P56
6B 6A .13
(50,60) (40,60) P34
P35
P36
(30,60)
P55

(20,60)
T18
2
(10,60)
T40
6

3.028
T17
P15
P13
P14
P53
P54 2.776
P52

67
P33

2.2
P32 T39

2.
8.0
P31

1
06
T16

01
SECTION THROUGH THE PATHWAY

10.000
47
P12

3.0
P11
P10 P51 T38
P50

SCALE = 1:50
P49

1
P30

28
P29
P28 T15

2.
T14 T37 3.061
P09
P08
P07 BUILT STRUCTURE -

4.2

3.0
MUSEUM
T13 5.0 1.780

25

36
02
9.672 UGT
P05
P06 2.4x4.8M T36
P04
7E 7D 7C 4.5 7B 7A
9 7

2.208
(50,70) (40,70)
9
(30,70) 7 5.85 (20,70) (10,70) STRUCTURE UNDER
DETAILED STRUCTURE -
MUSEUM CONSIDERATION
P03 5.578
P02

27.45M AC
P01
RECTANGULAR ANTI SKID UP
CONCRETE PAVER BLOCK
FOB
UP

10.000

CESS RO
WATCHMAN

AD
CABIN +1.0 M
PLINTH LEVEL

PEDESTRIA WIDE
T01
BUILT STRUCTURE - MUSEUM

RAMP 1:10
21.364

3M
8.542

N ENTRY/E

2.
54
COMPOUND WALL

9
8E 8D 8C 8B 8A

XIT
(50,80) (40,80) (30,80) (20,80) (10,80)
8 BUILT STRUCTURE -
ADMIN

VEHICUL
BUILT STRUCTURE - ADMIN FOB

RAMP 1:10
UP

6M WIDE
AR ENTR
+0.0 M
GROUND LEVEL

10.000
Y/EXIT
KEY PLAN
SCALE = 1:1000

UP 5.578
P0A P0B P0C

150MM THK. PCC FOB


150MM THK. KERB STORM WATER RECTANGULAR CONCRETE

2.370
BEDDING
DRAIN BLOCKS 230MM THK RUBBLE 2.60
FOOTPATH

2.633

6.095

1.957
2.200

1.934
6

1.934

1.619
9E 9D 9C 9B
2.522 9A
OUTSIDE ROAD PACKING 2.63 9

1.417

1.298
2.346 5
(50,90) (40,90) (30,90) (20,90) 1.927 (10,90) DATE- 26.04.2022 DWG NO.- 02

1.418

3.709
3.1 3.140 T12
71 3.535
T02 T05 T06
T09
T10 T11
STATUS-
N
T03 T04 T08
T07
2.101
WORKING DRAWING
DRAWING NAME- SCALE-

NAME - SITE DEVELOPMENT PLAN 1:200


PROJECT NAME-

WAR MUSEUM
ROLL NO.-

SECTION THROUGH THE PARKING NAME - KAANKSHI PRUTHVI SHAH 5511

SCALE = 1:50 3rd YEAR B. ARCH


SIGN-

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
E D C B A E D C B A PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
O O
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.
3.410 10.000 10.000 10.000 10.000 10.000 (0,0) 3.410 10.000 10.000 10.000 10.000 10.000 (0,0)

SPECIFIC NOTES
1. EARTHWORK IN EXCAVATION TO BE DUMPED AT THE
EMBANKMENT SITE OR SPOIL HEAP WITHIN THE PLOT.

10.000

10.000
2. THE LEAD IS TO BE MEASURED FROM THE CENTRE OF
GRAVITY OF EXCAVATION TO THE CENTRE OF GRAVITY OF
SPOIL HEAP.
3. THE LEAD SHALL NOT BE MORE THAN 50M.
4. THE LIFT IS TO BE MEASURED FROM NATURAL GROUND
LEVEL.
5. THE LIFT SHALL BE IN LAYERS OF NOT MORE THAN 1.5M EACH.
6. THE EXCAVATION OF ORDINARY ROCK SHALL NOT REQUIRE
1E 1D 1C 1B 1A 1E 1D 1C 1B 1A BLASTING.
(50,10) (40,10) (30,10) (20,10) (10,10)
1 (50,10) (40,10) (30,10) (20,10) (10,10)
1 7. INCASE OF HARD ROCK IF CONTROLLED BLASTING IS
REQUIRED IS TO BE CARRIED OUT WITH APPROVAL OF
PLINTH LINE OF ENGINEER ONLY.
8. THE EXCAVATION OF FOUNDATIONS SHALL BE COVER
MUSEUM DRESSING TO NEAT DIMENSIONS AND PLUMBING SIDES.
9. THE BENCHING OF ROCK SHALL BE UPTO AN AVERAGE OF

10.000

10.000
10CM DEPTH.
10. THE WATERING AND RAMMING OF EARTH SHALL BE IN 15CM
LAYERS.
11. OPENING AND CLOSING OF TIMBERING IN TRENCHES, SHAFTS,
WELLS, CESSPITS, MANHOLES AND UNDERGROUND TANK
SHALL NOT BE MORE THAN 1.5M.
12. REMOVAL OF EXCAVATED EARTH/ DEBRIS FROM THE SITE OF
WORKS, INCLUDES HANDLING, RE-HANDLING, LOADING,
2E 2D 2C 2B 2A 2E 2D 2C 2B 2A UNLOADING, LEADING ETC ALL LABOUR AND MATERIAL AS A
(50,20) (40,20) (30,20) (20,20) (10,20)
2 (50,20) (40,20) (30,20) (20,20) (10,20)
2 COMPLETE JOB TO BE DUMPED OUTSIDE AS PER DIRECTION
OF ENGINEER IN CHARGE.
13. FOR ADDITIONAL HEIGHT IN CENTERING AND SHUTTERING
ADEQUATE BRACING AND PROPPING SHALL BE PROVIDED AT
ALL LEVELS.
14. SUPPLYING AND APPLYING SHUTTERING OIL FOR MOULD

10.000

10.000
RELEASING SHALL BE APPLIED EITHER BY BRUSH OR WITH
SPRAY MACHINE TO THE ENTIRE SATISFACTION OF ENGINEER
IN CHARGE.

MUSEUM MUSEUM
(DEVELOPMENT PHASE 1) (DEVELOPMENT PHASE 1) 4.500
3E 3D 3C 3B 3A 3E 3D 3C 3B 3A
(50,30) (40,30) (30,30) (20,30) (10,30)
3 (50,30) (40,30) (30,30) (20,30) (10,30)
3

1.400
BATH & WC

73

73
7.1

7.1

3.000
6.500 6.500

10.000

10.000

1.200
ALCOVE

WC WC BATH WC WC BATH 2.200

5.

5.
84

84
1

1
27.45M A

27.45M A
PASSAGE PASSAGE
TYPICAL PLAN OF LABOUR CAMP
4E 4D 4C 4B 4A 4E 4D 4C 4B 4A
UNIT
(50,40) (40,40) (30,40) (20,40) (10,40)
4 (50,40) (40,40) (30,40) (20,40) (10,40)
4 SCALE = 1:100

TRENCH TRENCH
(DEVELOPMENT PHASE 2) (DEVELOPMENT PHASE 2)

10.000

10.000
LABOUR LABOUR
CAMP CAMP

FOB FOB
CC

CC
15.000 15.000
ESS ROA

ESS ROA
5E 5D 5C 5B 5A 5E 5D 5C 5B 5A
(50,50)
12.158
(40,50) (30,50) (20,50) (10,50)
5 (50,50)
12.158
(40,50) (30,50) (20,50) (10,50)
5
VERANDAH

VERANDAH
33.000

33.000
TEMPORARY
10.000

10.000
TEMPORARY COMPOUND
40 40
.9 COMPOUND WALL .9
13 13 WALL
11.000

11.000
SITE SITE
STORAGE STORAGE
D

D
LABOUR LABOUR
CAMP CAMP
6E 6D 6C 6B 6A 6E 6D 6C 6B 6A
(50,60) (40,60) (30,60) (20,60) (10,60)
6 (50,60) (40,60) (30,60) (20,60) (10,60)
6
10.000

10.000
PASSAGE PASSAGE
MACHINE WIDE

MACHINE
6M

6M WIDE
RY ENTR

RY ENTR
WC WC BATH WC WC BATH BUILT STRUCTURE -
MUSEUM
Y/EXIT

Y/EXIT
7E 7D 7C 7B 7A 7E 7D 7C 7B 7A
(50,70) (40,70) (30,70) (20,70) (10,70)
7 (50,70) (40,70) (30,70) (20,70) (10,70)
7 DETAILED STRUCTURE -
STRUCTURE UNDER
MUSEUM CONSIDERATION

27.45M AC
MAN ENTR

MAN ENTR
FOB
10.000

10.000

CESS RO
3M WIDE

3M WIDE
Y/EXIT

Y/EXIT

AD
PLINTH LINE
OF ADMIN

8E 8D 8C 8B 8A 8E 8D 8C 8B 8A
8 8
MACHINE

MACHINE WIDE
(50,80) (40,80) (30,80) (20,80) (10,80) (50,80) (40,80) (30,80) (20,80) (10,80) BUILT STRUCTURE -
ADMIN
6M WIDE

6M
RY ENTR

RY ENTR
ADMIN ADMIN FOB
Y/EXIT

Y/EXIT
(DEVELOPMENT PHASE 2) (DEVELOPMENT PHASE 2)
10.000

10.000
KEY PLAN
2.500 6.000 2.500 6.000 SCALE = 1:1000
2.500

2.500
WATCHMAN WATCHMAN
CABIN CABIN
FOB FOB
4.500

4.500
SITE SITE
OFFICE OFFICE

9E 9D 9C 9B 9A 9E 9D 9C 9B 9A
(50,90) (40,90) (30,90) (20,90) (10,90)
9 (50,90) (40,90) (30,90) (20,90) (10,90)
9 DATE- 26.04.2022 DWG NO.- 03
4.422

4.477
4.422
4.477

3.709

3.709
52
5.3
52
5.3 N
5.7 06 5.7 06 STATUS-

WORKING DRAWING
DRAWING NAME- SCALE-

NAME - INFRASTRUCTURE DEVELOPMENT 1:200


PROJECT NAME-

WAR MUSEUM
ROLL NO.-

INFRASTRUCTURE INFRASTRUCTURE NAME - KAANKSHI PRUTHVI SHAH 5511

DEVELOPMENT PHASE 1 DEVELOPMENT PHASE 2 3rd YEAR B. ARCH


SIGN-

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
FOB 4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
X 1 2 3 4 5 6 7 8 9 10 PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

COLUMN SCHEDULE

SR. NO. SPECIFICATION SIZES SHAPE

1 C1 - C19 600x450 MM RECTANGULAR


2 SW1,SW2 1600x230 MM RECTANGULAR
3 SW3,SW4 1800x230 MM RECTANGULAR
C06
0.45 x 0.6 M 4 LEGEND:
9.394 35
+14.912 M 0.
L C06 L
C1 - COLUMN INDICATION WITH NUMBER
SW1 - SHEAR WALL INDICATION WITH NUMBER

5.094
2.755

3.450

2.250

C11 C14
0.45 x 0.6 M 0.45 x 0.6 M

0.600
0.450
+12.156 M
K C11,C14 K

4.200
5.844

3.000

3.293
C16
RCC COLUMN
9.297 0.45 x 0.6 M 450x600 mm
0.755

PCC 1:2:4
+11.401 M
J C15 J 150MM THK.

11
.4
3 9
2.545

EXCAVATION LINE EXCAVATION LINE


2.281

AT RUBBLE LEVEL AT GROUND LEVEL

TYPICAL PLAN AT FOUNDATION LEVEL


C03 C05 C10
0.45 x 0.6 M 0.45 x 0.6 M 0.45 x 0.6 M SW4 SCALE = 1:100
+9.120 M
I C03,C05,C10, I
SW4
C17
0.45 x 0.6 M
0.843

+8.277 M RCC COLUMN


H H

0.300
C17

0.300
SW1 SW2
RCC PLINTH BEAM
0.987

DPC
0
+7.290 M 0.39
G G

0.150
2.030
SW3

0.900
0.230
SW3
RUBBLE PACKING PCC 1:2:4
230MM THK. 150MM THK.

6.178
SCHEMATIC SECTION OF A TYPICAL FOUNDATION
14.912

2.617

SCALE = 1:100

C02 C09
0.45 x 0.6 M 0.45 x 0.6 M 6.104
+4.673 M
F

5.09
F C02,C09 3.653
13.989

3.801

4
C18
0.771

0.45 x 0.6 M

1.888
+3.901 M 3.260
E C18 E
2.060

4.660
6.304

3.460

3.760
2.260
1.800
1.588

C16
0.45 x 0.6 M
+2.313 M
D C16 D 1.600

3.560

4.460
1.594

C13 EXCAVATION LINE EXCAVATION LINE AT


0.45 x 0.6 M AT RUBBLE LEVEL GROUND LEVEL
+0.719 M
C C13 C01 C04 C08
C PCC 1:2:4
150 THK.
RCC SHEAR
WALL

0.45 x 0.6 M 0.45 x 0.6 M 0.45 x 0.6 M


0.492
0.227

+0.225 M
B C01,C04,C08 B TYPICAL PLAN AT FOUNDATION LEVEL FOR
LIFT PIT
75
12.1 SCALE = 1:100
FOB 0.0 M FOB
Y FOB Y
2.772

1.600
PLINTH LINE RCC SHEAR WALL

0.300
0.500

0.150
SCREED

0.230
C07 C12
0.45 x 0.6 M 0.45 x 0.6 M
-2.772 M
A C7, C12 11.776 A PCC 1:2:4
RUBBLE PACKING
230MM THK. 150MM THK.
TRAPEZOIDAL FOOTING EXCAVATION LINE AT RUBBLE LEVEL

4.165
SCHEMATIC SECTION OF A TYPICAL FOUNDATION
FOR LEFT PIT
PCC BED 150MM THK. EXCAVATION LINE AT GROUND LEVEL SCALE = 1:100
2.997

5.932 2.990 3.100 4.211 2.030 2.443 1.218 1.811 3.585


DATE- 26.04.2022 DWG NO.- 04
0.300
STATUS-
N
27.619
WORKING DRAWING
DRAWING NAME- SCALE-

10.307 NAME - FOUNDATION LEVEL PLAN 1:50


PROJECT NAME-

WAR MUSEUM
C07,C08,C09,

C12,C13,C14,
C01,C02,C03

+12.322 M

+16.533 M

+18.563 M

+22.223 M

+24.034 M
+21.006 M

+27.619 M
ROLL NO.-
+6.232 M

+9.222 M
C04,C05

C10,C11

NAME - KAANKSHI PRUTHVI SHAH 5511


0.0 M

+0.3 M

SW1

SW2
C06

C16

C17
C15

C18
SIGN-

FOB
3rd YEAR B. ARCH
X 1 2 3 4 5 6 7 8 9 10
ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
FOB 4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
X 1 2 3 4 5 6 7 8 9 10 PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

COLUMN SCHEDULE

SR. NO. SPECIFICATION SIZES SHAPE

C1 - C19 600x450 MM RECTANGULAR


SW1,SW2 1600x230 MM RECTANGULAR
1
SW3,SW4 1800x230 MM RECTANGULAR
2
C06 PB40
3
0.45 x 0.6 M PB39
+14.912 M PB5
L C06 L PLINTH BEAM SCHEDULE

SR. NO. SPECIFICATION SIZES SHAPE


PB36
PB20
PB1,PB2,PB5,PB6,PB8,PB13, 230x600 MM RECTANGULAR
PB12 PB18,PB20,PB22-PB24,PB26,
PB16 1 PB27,PB30,PB32,PB33,PB36
2.755

PB3,PB4,PB7,PB9-PB12, 150x600 MM RECTANGULAR


PB14-PB17,PB19,PB21,PB25,
2 PB28,PB29,PB31,PB34,
C11 C14 PB35,PB37-PB40
0.45 x 0.6 M 0.45 x 0.6 M PB38 PB21
+12.156 M
K C11,C14
PB37
PB30 K LEGEND:
PB6 C16
0.45 x 0.6 M C1 - COLUMN INDICATION WITH NUMBER
0.755

+11.401 M SW1 - SHEAR WALL INDICATION WITH NUMBER


J C15 J PB1 - PLINTH BEAM INDICATION WITH NUMBER

0.230
PB11 PB15
RCC PLINTH BEAM
2.281

PB30
PB19 LATERAL REINFORCEMENT

0.600
12MMØ - 120MM C/C
C03 PB32 PB32 C05 PB33 PB33 C10
0.45 x 0.6 M 0.45 x 0.6 M 0.45 x 0.6 M PB34 SW4 PB35
+9.120 M
I C03,C05,C10, I STIRRUP
10MMØ - 150MM C/C
SW4
C17
0.45 x 0.6 M
0.843

+8.277 M PB19 REINFORCEMENT OF TYPICAL A PLINTH BEAM


H C17 H SCALE = 1:20
SW1 SW2
0.987

RCC COLUMN
+7.290 M
G SW3 G

PB2 PB3 PB4 PB7 PB10 PB14 PB17


SW3 PB29

0.300
0.300
RCC PLINTH BEAM
14.912

2.617

PB18 DPC

C02 C09
0.45 x 0.6 M PB31 PB31 PB31 PB31 0.45 x 0.6 M PB32 SECTION OF TYPICAL A PLINTH BEAM
+4.673 M
F C02,C09 F SCALE = 1:50

PB17 C18
GRADING OF SOIL DIRECTION OF FLOW
0.771

PB28 0.45 x 0.6 M


SLOPE = 1:80 OF WATER
+3.901 M
E C18 E 0.100 0.230
1.600

0.150
0.900
0.150

0.230
STORM WATER
1.200 DRAIN
PB27
1.588

PB17
C16
0.45 x 0.6 M RETAINING RUBBLE PACKING PCC 1:2:4
PB14 WALL 230 mm THK. 150 mm THK.
+2.313 M
D C16 PB1 PB3 PB4 PB7 PB9 D
TYPICAL CROSS SECTION OF THE TRENCH
SCALE = 1:100
PB26
1.594

C13
PB25 0.45 x 0.6 M
+0.719 M
C C13 C01 C04 C08
C BUILT STRUCTURE -
MUSEUM
0.45 x 0.6 M PB23 PB23 0.45 x 0.6 M PB24 PB24 0.45 x 0.6 M
0.492
0.227

+0.225 M
B C01,C04,C08 B
STRUCTURE UNDER
DETAILED STRUCTURE -
CONSIDERATION
FOB 0.0 M FOB MUSEUM

Y FOB Y

27.45M AC
FOB

CESS RO
PB13
PB8
2.772

AD
PLINTH LINE

PLINTH BEAM
C07 C12
0.45 x 0.6 M PB22 0.45 x 0.6 M
-2.772 M
A C7, C12 A BUILT STRUCTURE -
ADMIN

TRAPEZOIDAL FOOTING EXCAVATION LINE AT RUBBLE LEVEL FOB

KEY PLAN
PCC BED 150MM THK. SCALE = 1:1000

5.932 2.990 3.100 4.211 2.030 2.443 1.218 1.811 3.585


DATE- 26.04.2022 DWG NO.- 05
0.300
STATUS-
N
27.619
WORKING DRAWING
DRAWING NAME- SCALE-

NAME - PLINTH LEVEL PLAN 1:50


PROJECT NAME-

WAR MUSEUM
C07,C08,C09,

C12,C13,C14,
C01,C02,C03

+12.322 M

+16.533 M

+18.563 M

+22.223 M

+24.034 M
+21.006 M

+27.619 M
ROLL NO.-
+6.232 M

+9.222 M
C04,C05

C10,C11

NAME - KAANKSHI PRUTHVI SHAH 5511


0.0 M

+0.3 M

SW1

SW2
C06

C16

C17
C15

C18
SIGN-

FOB
3rd YEAR B. ARCH
X 1 2 3 4 5 6 7 8 9 10
ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
FOB 4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
X 1 2 3 4 5 6 7 8 9 10 PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
B THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

DOOR SCHEDULE

SYMBOL NO.s SPECIFICATIONS SIZE REMARKS

35MM DOUBLE LEAF DOOR, 10MM


D1 1 TOUGHENED GLASS PANEL, 50MM 2400 x 3000 ENTRANCE
ALUMINIUM FRAME FINISHED IN
MIRROR POLISH STAINLESS STEEL,
19MM GASKET

C06 35MM TEAK WOOD DOUBLE LEAF


FLUSH DOOR, FINISHED WITH
0.45 x 0.6 M VENEER AND MELAMINE POLISH ENTRANCE TO
+14.912 M D2 2 2400 x 3000
L C06 VOID
W1 L FROM OUTSIDE AND ACOUSTICAL
TREATMENT, 15MM LIPPING PATTI,
AUDITORIUM

12MM Ø NEOPRENE GASKET


4.385 x 3.960 EQ
18MM TEAK WOOD SINGLE LEAF
FLUSH DOOR, FINISHED WITH
VENEER AND MELAMINE POLISH 1000 x 2100 SPACES IN
D3 4

EQ
W1 AUDITORIUM

1.800
1.800
W1 FROM OUTSIDE AND ACOUSTICAL
F1 C1 TREATMENT, 15MM LIPPING PATTI,

3.960
S1 EQ 12MM Ø NEOPRENE GASKET

UPVC SINGLE LEAF FLUSH DOOR,


W1 D4 4 20MM ANODIZED ALUMINIUM 1000 x 2100
ENTRANCE TO
2.755

TOILETS, SHAFTS
W1 FRAME, 25MM UPVC BEADING ON
SIDES

4.385 EQ

EQ
12MM HPL SINGLE LEAF DOOR
D5 4 660 x 2100 TOILET STALLS
WITH STAINLESS STEEL FITTINGS

0.836

0.836
C11 C14
W1
0.45 x 0.6 M 0.45 x 0.6 M W1
K +12.156 M CANOPY ABOVE W1
EQ F1
W1
C1 K WINDOW SCHEDULE
C11,C14

5.725
2.100 x 2.100
2.900 S1
EQ

EQ
+0.0 M SYMBOL NO.s SPECIFICATIONS SIZE REMARKS

4.
W1
0.755

W1 3.920

35
UP GROUND LEVEL W1
+11.401 M F1

0
C1
J C15 S1 EQ J
FIXED SHUTTER, 6MM GLAZED
1.500 W1
EQ
TOUGHENED GLASS, 40 MM STONE
W1 22 600 x 3500 ALL SPACES
FRAMES, UPVC WINDOW &
500x1200MM UPVC PANELED
W1
EQ

1
0.300

C16 VERTICAL OPENING

EQ
0.45 x 0.6 M

2.525
40MM STONE FRAMES, GLASS
EQ

2
W2 4 LOUVERED ANODIZED ALUMINIUM 300 x 600 TOILET
EQ PANELED WINDOW WITH
EQ
2.281

1.800

3
250x250MM EXHAUST FAN
W1 AS PER LIFT VENDOR W1
+1.0 M
EQ

4 SPECIFICATIONS FIXED SHUTTER, 6MM GLAZED


F. F. L -
W3 0 TOUGHENED GLASS, 40 MM STONE 2400 x 3600
FRAMES, UPVC WINDOW
EQ

5
C03 C05 C10
0.45 x 0.6 M
9.000
0.45 x 0.6 M 0.45 x 0.6 M SW4 EQ FIXED SHUTTER, 6MM GLAZED
6 TOUGHENED GLASS, 40 MM STONE
+9.120 M
I C03,C05,C10, 3.250
EQ 1.000 EQ W1 I W4 0
FRAMES, UPVC WINDOW &
500x1200MM UPVC PANELED
600 x 2500 -

SW4 VERTICAL OPENING


0.470 C17
0.320 0.45 x 0.6 M EQ
4 3 2 1
LIFT SHAFT
0.843

D3 1 2 3 4
1.000

+8.277 M
EQ EQ EQ
1.800 x 1.680
H C17
UP
EQ EQ EQ
D4 H WALL FINISH SCHEDULE

1.680
SW1 SW2

0.900 D4 SYMBOL SPECIFICATIONS REMARKS


DN
0.987

BISON BOARD
2.550

PARTITION WALL UP
+7.290 M D2 1.800 1

G SW3 12.300 0.360


0.765
1.
6 00 2
G W1 12MM PLASTER 1:1.5:2, 2 COATS OF WHITE WASH, 1 COAT

EQ
OF 5MM P.O.P PUTTY, 2 COATS OF PRIMER, 2 COATS OF ALL SPACES
3
A' VELVET TOUCH EMULSION PAINT

EQ
+1.0 M +0.4 M +1.0 M 1.350 4
STAGE F.F.L F.F.L 12MM PLASTER 1:2:4, 12 MM OF WATERPROOFING AGENT

EQ
W2
SW3

1.100
5 MIXED WITH PLASTER, 2 COATS OF WHITE WASH, 7MM TOILET
D4

EQ
D3 DADO OF CERAMIC TILES OF 300x300MM

0.
6

30

EQ

5.
0
7

36
A

EQ
14.912

0
1.480
FLOOR FINISH SCHEDULE

EQ
2.617

8
2.000 29

EQ
GREEN ROOM 9

EQ

EQ
28
1.500 x 1.480 1.800

2.
10
1.500

70

EQ
W1
PROJECTION

EQ
AUDITORIUM SYMBOL SPECIFICATIONS REMARKS

0
27
F1 C1

2.700
C02 ROOM C09 D4
12.300 x 8.900 S1

EQ
26
0.45 x 0.6 M 3.260 x 2.000 0.45 x 0.6 M
+4.673 M
F F 20MM 1:2:4 SCREEDING, 25MM WHITE CERAMIC TILES OF

EQ

2.
25

40
C02,C09 F1 600x600MM, GRADE - 2 POLISHING, 1MM CEMENT GROUT ALL SPACES
9.350

8.900

3.260
1.050

0
3.200

EQ
2.500
24
UP C18
0
3.540 2.70 12MM PLASTER 1:2:4, 25MM 1:2:4 SCREEDING, 150MM
0.771

0.45 x 0.6 M

EQ
23 F2 WIDE HARDWOOD FLOORING WITH TONGUE AND GROOVE AUDITORIUM
+3.901 M 1.760 WOMEN'S TOILET
E 7.620 SQ.M
+2.5 M
E JOINT AND ACOUSTICAL TREATMENT

EQ
C18 22 MID LANDING
1.500

20MM 1:2:4 SCREEDING, 3MM WATERPROOFING AGENT


EQ
SCREEDING, 200MM BBC LAID TO SLOPE, 8MM ANTI-SKID TOILET

EQ
F3

GREEN ROOM 1.870 21 EQ

0 CERAMIC TILES OF 300x300MM


BISON BOARD MEN'S TOILET 2.30
EQ
W1
F2 C2
D3 EQ

1.500 x 1.480 PARTITION WALL 10.650 SQ.M W2 EQ


0
0.45
S2 F3 C2 EQ

1.480 EQ 11
1.588

S3 UP
W1 W2
D5
EQ

C16 14
13
12

EQ W1 CEILING SCHEDULE
F1 C1 F3 C2 +4.0 M 15

D3 S1 S3 MID LANDING 0.45 x 0.6 M 17


16

+2.313 M D5 20 18 EQ W1
D C16
19
D SYMBOL SPECIFICATIONS REMARKS

1.20
D5 EQ W1

0
D5 W1 10MM 1:1.5:2 PLASTER, 2 COATS OF WHITE WASH, 1 COAT
OF 5MM P.O.P PUTTY, 2 COATS OF PRIMER, 2 COATS OF ALL SPACES
2.550

C1
0 0
1.95
DN WHITE VELVET TOUCH ACRYLIC PAINT WITH 300MM

1.20
D2 0.28 GYPSUM BOARD FALSE CEILING
1.594

00
11.8

0
0 W1
0.900 0.72 10MM 1:1.5:2 PLASTER WITH 600x600MM ACOUSTICAL TILE
0.860 2.250 ACOUSTICAL PANEL C13
0 FALSE CEILING FIXING WITH 24x32MM G.I SECTIONS AUDITORIUM
1.95 5 C2

+0.719 M
0.45 x 0.6 M 0.63 W2
C C13
UP
C
1.100

1.000

C01 C04 C08 10MM 1:1.5:2 PLASTER, 2 COATS OF WHITE WASH


W2
C3 TOILET
0.45 x 0.6 M EQ EQ EQ
0.45 x 0.6 M 0.45 x 0.6 M
0
0.492

0.64
0.227

+0.225 M
B C01,C04,C08
4 3 2 1
W2 B
W2
5
3.820 0.42 SKIRTING SCHEDULE
FOB 0.0 M DUCT ABOVE FOB
Y FOB 12.200
1 2 3 4 5 6

0.750 x 4.325 Y
0.300
EQ EQ EQ EQ EQ
SYMBOL SPECIFICATIONS REMARKS

RCC JALI
ALUMINIUM COMPOSITE 20MM THK. 1:2:4 PLASTER, 100MM WIDE WHITE MARBLE
3.500

PANEL DRY WALL CLADDING D1


SKIRTING ALL SPACES
2.772

UP S1
3.000

3.000

+0.0 M +1.0 M
GROUND LEVEL F. F. L
20MM THK. 1:2:4 PLASTER, 100MM WIDE HARDWOOD
SKIRTING WITH TONGUE AND GROOVE JOINT AUDITORIUM
S2

CANOPY ABOVE 20MM THK. 1:2:4 PLASTER, 100MM WIDE CERAMIC TILE
C07 C12
3.300 x 3.000 SKIRTING TOILET
0.45 x 0.6 M 0.45 x 0.6 M S3
-2.772 M
A C7, C12
W1
EQ
W1
EQ
W1
A
1.500 1.300
4.810

5.932 2.990 3.100 4.211 2.030 2.443 1.218 1.811 3.585


DATE- 26.04.2022 DWG NO.- 06
0.300
STATUS-
N
27.619
WORKING DRAWING

B'
DRAWING NAME- SCALE-

NAME - GROUND FLOOR PLAN 1:50


PROJECT NAME-

WAR MUSEUM
C07,C08,C09,

C12,C13,C14,
C01,C02,C03

+12.322 M

+16.533 M

+18.563 M

+22.223 M

+24.034 M
+21.006 M

+27.619 M
ROLL NO.-
+6.232 M

+9.222 M
C04,C05

C10,C11

NAME - KAANKSHI PRUTHVI SHAH 5511


0.0 M

+0.3 M

SW1

SW2
C06

C16

C17
C15

C18
SIGN-

FOB
3rd YEAR B. ARCH
X 1 2 3 4 5 6 7 8 9 10
ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
FOB 4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
X 1 2 3 4 5 6 7 8 9 10 PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
B THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

DOOR SCHEDULE

SYMBOL NO.s SPECIFICATIONS SIZE REMARKS

35MM DOUBLE LEAF DOOR, 10MM


D1 0 TOUGHENED GLASS PANEL, 50MM 2400 x 3000 -
ALUMINIUM FRAME FINISHED IN
MIRROR POLISH STAINLESS STEEL,
19MM GASKET

C06 35MM TEAK WOOD DOUBLE LEAF


FLUSH DOOR, FINISHED WITH
0.45 x 0.6 M VENEER AND MELAMINE POLISH ENTRANCE TO
+14.912 M D2 2 2400 x 3000
L C06 VOID
W1 L FROM OUTSIDE AND ACOUSTICAL
TREATMENT, 15MM LIPPING PATTI,
EXHIBITION
SPACE
12MM Ø NEOPRENE GASKET
4.385 x 3.960 EQ
18MM TEAK WOOD SINGLE LEAF
FLUSH DOOR, FINISHED WITH
W1 -
D3 0 VENEER AND MELAMINE POLISH 1000 x 2100

EQ
F1 C1 W1

2.400

2.400
FROM OUTSIDE AND ACOUSTICAL
W3 S1 W3 TREATMENT, 15MM LIPPING PATTI,

3.960
EQ 12MM Ø NEOPRENE GASKET

UPVC SINGLE LEAF FLUSH DOOR,


W1 D4 5 20MM ANODIZED ALUMINIUM 1000 x 2100
ENTRANCE TO
2.755

TOILETS, SHAFTS,
W1 FRAME, 25MM UPVC BEADING ON
STORE ROOM
SIDES

4.385 EQ

EQ
12MM HPL SINGLE LEAF DOOR
D5 4 660 x 2100 TOILET STALLS
WITH STAINLESS STEEL FITTINGS

0.510

0.510
C11 C14
W1
0.45 x 0.6 M 0.45 x 0.6 M W1
K +12.156 M W1
EQ W1
K WINDOW SCHEDULE
C11,C14 W3

5.725
CANOPY 2.900 F1 C1

EQ
S1

EQ
W1
SYMBOL NO.s SPECIFICATIONS SIZE REMARKS

4.
W1
0.755

3.920

35
W1
+11.401 M

0
J C15
0.675 2.400
EQ J
FIXED SHUTTER, 6MM GLAZED
2.100 W1
EQ
TOUGHENED GLASS, 40 MM STONE
W1 28 600 x 3500 ALL SPACES
FRAMES, UPVC WINDOW &
500x1200MM UPVC PANELED
W1
C16 VERTICAL OPENING

EQ
0.45 x 0.6 M

2.525
40MM STONE FRAMES, GLASS
2.100

W2 4 LOUVERED ANODIZED ALUMINIUM 300 x 600 TOILET


EQ PANELED WINDOW WITH
2.281

AS PER LIFT VENDOR 250x250MM EXHAUST FAN


W1 SPECIFICATIONS W1
FIXED SHUTTER, 6MM GLAZED
W3 3 TOUGHENED GLASS, 40 MM STONE 2400 x 3600 VOID
FRAMES, UPVC WINDOW
C03 C05 C10
0.45 x 0.6 M
9.000
0.45 x 0.6 M 0.45 x 0.6 M SW4 EQ FIXED SHUTTER, 6MM GLAZED
+9.120 M TOUGHENED GLASS, 40 MM STONE

I C03,C05,C10, 3.250
EQ 1.000 EQ W1 I W4 0
FRAMES, UPVC WINDOW &
500x1200MM UPVC PANELED
600 x 2500 -

SW4 VERTICAL OPENING


0.470 C17
0.320
EQ EQ EQ EQ 3.675
LIFT SHAFT 0.45 x 0.6 M EQ
0.843

W1 W1 W1 W1 W1 W1 +5.5 M
+8.277 M 0.380 1.800 x 1.680 FIRST FLOOR LEVEL
H C17
D4 H WALL FINISH SCHEDULE

1.680
SW1 SW2

D4 SYMBOL SPECIFICATIONS REMARKS


0.987

BISON BOARD
PARTITION WALL UP
+7.290 M D2 1.800 1

G SW3 12.300 0.360


0.765
1.
600 2
G W1 12MM PLASTER 1:1.5:2, 2 COATS OF WHITE WASH, 1 COAT

EQ
OF 5MM P.O.P PUTTY, 2 COATS OF PRIMER, 2 COATS OF ALL SPACES
3
A' VELVET TOUCH EMULSION PAINT

EQ
1.350 4
12MM PLASTER 1:2:4, 12 MM OF WATERPROOFING AGENT

EQ
W2
SW3 MIXED WITH PLASTER, 2 COATS OF WHITE WASH, 7MM TOILET

1.100
5
D4

EQ
DADO OF CERAMIC TILES OF 300x300MM
DN

0.
6

30

EQ

5.
0
7

36
A

EQ
14.912

0
FLOOR FINISH SCHEDULE

EQ
2.617

8
29

EQ
9

EQ

EQ
28

1.800

2.
10

70

EQ
EQ
W1 SYMBOL SPECIFICATIONS REMARKS

0
27

2.700
C02 C09 D4 F1 C1

EQ
S1
0.45 x 0.6 M EXHIBITION SPACE 0.45 x 0.6 M
26

+4.673 M 0
0.05 F
F 12.300 x 8.900 20MM 1:2:4 SCREEDING, 25MM WHITE CERAMIC TILES OF

EQ

2.
25

40
C02,C09 F1 600x600MM, GRADE - 2 POLISHING, 1MM CEMENT GROUT ALL SPACES
9.350

8.900

0
EQ
24
UP C18
0
2.70 12MM PLASTER 1:2:4, 25MM 1:2:4 SCREEDING, 150MM
0.771

0.45 x 0.6 M

EQ
W1 3.531 23 F2 WIDE HARDWOOD FLOORING WITH TONGUE AND GROOVE -
+3.901 M D4 1.760 WOMEN'S TOILET .148
E F1 C2
7.620 SQ.M
0 +7.0 M
E JOINT AND ACOUSTICAL TREATMENT

EQ
C18 S1 22 MID LANDING
20MM 1:2:4 SCREEDING, 3MM WATERPROOFING AGENT
EQ
SCREEDING, 200MM BBC LAID TO SLOPE, 8MM ANTI-SKID TOILET

EQ
F3
1.870 21 EQ

0 CERAMIC TILES OF 300x300MM


MEN'S TOILET 2.30
EQ
EQ
EQ
W2
10.650 SQ.M EQ
0
F3 C2 0.45
EQ

DN EQ 11
1.588

S3
W2
D5
EQ

C16 14
13
12

EQ W1 CEILING SCHEDULE
F3 C2 +8.5 M 15

S3 MID LANDING 0.45 x 0.6 M 16

+2.313 M STORE ROOM D5 EQ W1


D C16 23.180 SQ.M D SYMBOL SPECIFICATIONS REMARKS

1.20
D5 EQ W1

0
0
W1
D5 0.45 W1 10MM 1:1.5:2 PLASTER, 2 COATS OF WHITE WASH, 1 COAT
C1 OF 5MM P.O.P PUTTY, 2 COATS OF PRIMER, 2 COATS OF ALL SPACES
F1 C1 0
1.95
WHITE VELVET TOUCH ACRYLIC PAINT WITH 300MM

1.20
0
S1 0.28 GYPSUM BOARD FALSE CEILING
1.594

00
11.8

0
W1

0.750
10MM 1:1.5:2 PLASTER WITH 600x600MM ACOUSTICAL TILE
C13 EXHIBITION
0 FALSE CEILING FIXING WITH 24x32MM G.I SECTIONS
1.95 5 C2

+0.719 M
0.45 x 0.6 M 0.63 W2
SPACE

C C
7.400

C13 C01 C04 C08 10MM 1:1.5:2 PLASTER, 2 COATS OF WHITE WASH
W2
C3 TOILET
0.45 x 0.6 M 0.45 x 0.6 M 0.45 x 0.6 M
0
0.492

0.64
0.227

+0.225 M
B C01,C04,C08
W2 B
W2
5
3.820 0.42
5
SKIRTING SCHEDULE
FOB 0.0 M 4.32 FOB
Y FOB 12.200 VOID Y
DUCT 0.450 x 4.325
0.750 x 4.325
SYMBOL SPECIFICATIONS REMARKS

ALUMINIUM COMPOSITE RCC JALI 20MM THK. 1:2:4 PLASTER, 100MM WIDE WHITE MARBLE
3.500

PANEL DRY WALL CLADDING SKIRTING ALL SPACES


2.772

S1
3.000
3.000

20MM THK. 1:2:4 PLASTER, 100MM WIDE HARDWOOD


SKIRTING WITH TONGUE AND GROOVE JOINT -
S2

CANOPY 20MM THK. 1:2:4 PLASTER, 100MM WIDE CERAMIC TILE


C07 C12 SKIRTING TOILET
0.45 x 0.6 M 0.45 x 0.6 M S3
-2.772 M
A C7, C12
W1
EQ
W1
EQ
W1
A
3.300

4.810

5.932 2.990 3.100 4.211 2.030 2.443 1.218 1.811 3.585


DATE- 26.04.2022 DWG NO.- 07
0.300
STATUS-
N
27.619
WORKING DRAWING

B'
DRAWING NAME- SCALE-

NAME - FIRST FLOOR PLAN 1:50


PROJECT NAME-

WAR MUSEUM
C07,C08,C09,

C12,C13,C14,
C01,C02,C03

+12.322 M

+16.533 M

+18.563 M

+22.223 M

+24.034 M
+21.006 M

+27.619 M
ROLL NO.-
+6.232 M

+9.222 M
C04,C05

C10,C11

NAME - KAANKSHI PRUTHVI SHAH 5511


0.0 M

+0.3 M

SW1

SW2
C06

C16

C17
C15

C18
SIGN-

FOB
3rd YEAR B. ARCH
X 1 2 3 4 5 6 7 8 9 10
ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
FOB 4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
X 1 2 3 4 5 6 7 8 9 10 PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
B THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

DOOR SCHEDULE

SYMBOL NO.s SPECIFICATIONS SIZE REMARKS

35MM DOUBLE LEAF DOOR, 10MM


D1 0 TOUGHENED GLASS PANEL, 50MM 2400 x 3000 -
ALUMINIUM FRAME FINISHED IN
Y MIRROR POLISH STAINLESS STEEL,
VALLE 19MM GASKET

35MM TEAK WOOD DOUBLE LEAF


FLUSH DOOR, FINISHED WITH
VENEER AND MELAMINE POLISH -
+14.912 M D2 0 2400 x 3000
L C06 L FROM OUTSIDE AND ACOUSTICAL
TREATMENT, 15MM LIPPING PATTI,
12MM Ø NEOPRENE GASKET

18MM TEAK WOOD SINGLE LEAF


FLUSH DOOR, FINISHED WITH
VENEER AND MELAMINE POLISH 1000 x 2100 -
D3 0
FROM OUTSIDE AND ACOUSTICAL
TREATMENT, 15MM LIPPING PATTI,
12MM Ø NEOPRENE GASKET

VA
LL
UPVC SINGLE LEAF FLUSH DOOR,

EY
ENTRANCE TO
D4 2 20MM ANODIZED ALUMINIUM 1000 x 2100
2.755

LMR, OVERHEAD
FRAME, 25MM UPVC BEADING ON
ROOM
SIDES

12MM HPL SINGLE LEAF DOOR


D5 0 660 x 2100 -
Y WITH STAINLESS STEEL FITTINGS

LLE
VA

K +12.156 M
K WINDOW SCHEDULE

5.525
C11,C14 CANOPY

EY
CHAJJA ABOVE

VALL
1.200 x 0.600
SYMBOL NO.s SPECIFICATIONS SIZE REMARKS
0.755

+11.401 M
J C15 J
FIXED SHUTTER, 6MM GLAZED
2.100 0
TOUGHENED GLASS, 40 MM STONE
600 x 3500 -
W1 FRAMES, UPVC WINDOW &
500x1200MM UPVC PANELED
VERTICAL OPENING

40MM STONE FRAMES, GLASS


2.100

W2 0 LOUVERED ANODIZED ALUMINIUM 300 x 600


-
PANELED WINDOW WITH
2.281

AS PER LIFT VENDOR 250x250MM EXHAUST FAN


SPECIFICATIONS D4 FIXED SHUTTER, 6MM GLAZED
LIFT MACHINE ROOM W3 0 TOUGHENED GLASS, 40 MM STONE 2400 x 3600 -
LIFT MACHINE FRAMES, UPVC WINDOW

VALLEY
9.000 3.300 x 3.000 3.300
SW4 ROOM FIXED SHUTTER, 6MM GLAZED
+9.120 M 3.300 x 3.000 TOUGHENED GLASS, 40 MM STONE

I C03,C05,C10, EQ 1.000 EQ I W4 5
FRAMES, UPVC WINDOW &
500x1200MM UPVC PANELED
600 x 2500 OVERHEAD
ROOM
SW4 W1 VERTICAL OPENING
C17

3.000
F1 C1
6.302 LIFT SHAFT BELOW 0.45 x 0.6 M
0.843

S1
+8.277 M 1.800 x 1.680
H C17 H WALL FINISH SCHEDULE

1.680
SW1 SW2 LIFT MOTOR

SYMBOL SPECIFICATIONS REMARKS


0.987

+7.290 M 1.800
G SW3 4.300 G 12MM PLASTER 1:1.5:2, 2 COATS OF WHITE WASH, 1 COAT

1.000
W1 OVERHEAD
OF 5MM P.O.P PUTTY, 2 COATS OF PRIMER, 2 COATS OF
27

26
A' VELVET TOUCH EMULSION PAINT
ROOM, LMR

D4 12MM PLASTER 1:2:4, 12 MM OF WATERPROOFING AGENT

EQ
W2
SW3 UP MIXED WITH PLASTER, 2 COATS OF WHITE WASH, 7MM -
1.600
25

EQ
DADO OF CERAMIC TILES OF 300x300MM
DN 24

EQ

5.
23

36
A

EQ
14.912

0
0.
CHAJJA ABOVE
FLOOR FINISH SCHEDULE

EQ
2.617

22

30
1

EQ
1.200 x 0.600

0
OVERHEAD ROOM 21

EQ

EQ
2
30.150 SQ.M

2.
20

70

EQ
EQ
SYMBOL SPECIFICATIONS REMARKS

0
3

2.700
W1

5.31
EQ
4
EY

F1 C1
+4.673 M
VA

5
F F 20MM 1:2:4 SCREEDING, 25MM WHITE CERAMIC TILES OF
LL

S1

EQ

2.
5 OVERHEAD

40
C02,C09 600x600MM, GRADE - 2 POLISHING, 1MM CEMENT GROUT
LL

VA

F1

VA
9.565

8.885

ROOM, LMR

5.450

0
E

6.200

EQ
LL
Y

6
UP C18

EY
0
+10.0 M 2.70 12MM PLASTER 1:2:4, 25MM 1:2:4 SCREEDING, 150MM
0.771

0.45 x 0.6 M

EQ
TERRACE LEVEL 7 F2 WIDE HARDWOOD FLOORING WITH TONGUE AND GROOVE -
+3.901 M
E +7.0 M
E JOINT AND ACOUSTICAL TREATMENT

EQ
C18 8 MID LANDING
20MM 1:2:4 SCREEDING, 3MM WATERPROOFING AGENT
EQ
SCREEDING, 200MM BBC LAID TO SLOPE, 8MM ANTI-SKID -

EQ
F3
9 EQ

0 CERAMIC TILES OF 300x300MM


2.30
EQ
EQ

VAL
EQ
10 EQ
M.S LADDER 0
0.45
EQ

LEY
DN EQ 19
1.588

C16
EQ

16
17
18

EQ W4 CEILING SCHEDULE
15
+8.5 M
MID LANDING 0.45 x 0.6 M 13
14

+2.313 M 12 EQ W4
D C16
11
D SYMBOL SPECIFICATIONS REMARKS
EQ W4

0
0.45 W4 10MM 1:1.5:2 PLASTER, 2 COATS OF WHITE WASH, 1 COAT
OVERHEAD
C1 OF 5MM P.O.P PUTTY, 2 COATS OF PRIMER, 2 COATS OF
ROOM, LMR
0 WHITE VELVET TOUCH ACRYLIC PAINT WITH 300MM
0.28 GYPSUM BOARD FALSE CEILING
1.594

00
W4 11.8

0.750
10MM 1:1.5:2 PLASTER WITH 600x600MM ACOUSTICAL TILE
C2 FALSE CEILING FIXING WITH 24x32MM G.I SECTIONS -
+0.719 M
C C13 C 10MM 1:1.5:2 PLASTER, 2 COATS OF WHITE WASH
C3 -
0.492
0.227

+0.225 M
B C01,C04,C08 5.893 B
4.000
5
SKIRTING SCHEDULE
FOB 0.0 M 4.32 FOB
Y FOB VOID Y
12.200 0.450 x 4.325
DUCT
0.750 x 4.325
SYMBOL SPECIFICATIONS REMARKS

RCC JALI 20MM THK. 1:2:4 PLASTER, 100MM WIDE WHITE MARBLE
OVERHEAD
SKIRTING
ROOM, LMR
2.772

2.200

S1
3.000

3.000

20MM THK. 1:2:4 PLASTER, 100MM WIDE HARDWOOD


SKIRTING WITH TONGUE AND GROOVE JOINT -
S2

20MM THK. 1:2:4 PLASTER, 100MM WIDE CERAMIC TILE


SKIRTING -
S3
-2.772 M CANOPY
A C7, C12
4.400 A
3.300

5.100

5.932 2.990 3.100 4.211 2.030 2.443 1.218 1.811 3.585


DATE- 26.04.2022 DWG NO.- 08
0.300
STATUS-
N
27.619
WORKING DRAWING

B'
DRAWING NAME- SCALE-

NAME - TERRACE PLAN 1:50


PROJECT NAME-

WAR MUSEUM
C07,C08,C09,

C12,C13,C14,
C01,C02,C03

+12.322 M

+16.533 M

+18.563 M

+22.223 M

+24.034 M
+21.006 M

+27.619 M
ROLL NO.-
+6.232 M

+9.222 M
C04,C05

C10,C11

NAME - KAANKSHI PRUTHVI SHAH 5511


0.0 M

+0.3 M

SW1

SW2
C06

C16

C17
C15

C18
SIGN-

FOB
3rd YEAR B. ARCH
X 1 2 3 4 5 6 7 8 9 10
ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
FOB 4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
X 1 2 3 4 5 6 7 8 9 10 PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
B THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

SPECIFIC NOTES
1. PROVIDING AND LAYING OF WATER PROOF TREATMENT ON
ROOF SLAB BY APPLYING AFTER PREPARATION, CEMENT
SLURRY MIXED WITH TAPECRETE ACRYLIC BASED POLYMER
WATERPROOFING COMPOUND IN A RATIO OF 2:1 (2 CEMENT :1
WATERPROOFING COMPOUND), FOLLOWED BY LAYING OF
FIBRE GLASS CLOTH; SECOND COAT OF CEMENT SLURRY
MIXED WITH ACRYLIC BASED POLYMER WATER PROOFING
COMPOUND AND A FINAL COAT OF WATER PROOFING
COMPOUND BRUSH TOPING HAVING WATER PROOFING
Y
VALLE COMPOUND, CEMENT AND SAND IN THE RATIO 1:2:2 BY
WEIGHT
2. PROVIDING AND LAYING CORNER FILLET 25MM x 25MM SIZE AT
JUNCTION OF WALLS, SLAB AND PIPE JOINTS SEALING BY
+14.912 M CEMENT AND SAND MORTAR 1:3 MIXED WITH TAPECRETE
L C06 L ACRYLIC BASED POLYMER WATER PROOFING COMPOUND.
3. GRADING OF ROOF WITH CEMENT CONCRETE 1:2:4 (1 CEMENT,
2 COARSE SAND AND 4 GRADED STONE AGGREGATE OF 20MM
NOMINAL SIZE) TO A SLOPE OF 1:80.
4. FIXING PVC PIPES OF 100MMØ PIPE AS RAINWATER
DOWNTAKE PIPE, 150MMØ SOIL PIPE AND 100MMØ WASTE AND
VENT PIPES.

VA
5. PROVIDE BRACKETS COMPRISING OF ALUMINIUM PAINTED

LL
EY
STANDARD STEEL CLIPS AND MS STRAP.
2.755

0
Y 00
LE 6. WATER SUPPLY CALCULATIONS
VAL

+12.156 M
K K A STRUCTURE - MUSEUM

5.525
C11,C14

5.725
CANOPY

EY
VALL
CHAJJA
0.755

WATER REQUIRED
+11.401 M SR. NO. SPACES FOOT FALL
J C15 J PER PERSON PER
DAY

2.100
1.200

0.600
1 EXHIBITION SPACES 150 45 LITRES

2 AUDITORIUM 50 25 LITRES
2.100
2.281

TOTAL WATER REQUIREMENT = 150 x 45 LITRES


FOR MUSEUM PER DAY
3.300 = 6750 LITRES PER DAY

VALLEY
9.000
LIFT MACHINE ROOM
TOTAL WATER REQUIREMENT = 50 x 25 LITRES
+9.120 M 3.300 x 3.000
I C03,C05,C10, EY
I FOR AUDITORIUM PER DAY
= 1250 LITRES PER DAY
SW4 A LL

3.000
V
6.302
0.843

TOTAL WATER REQUIREMENT = 6750 + 1250


+8.277 M PER DAY FOR STRUCTURE A
H C17 H = 8000 LITRES PER DAY

CONSIDERATIONS:
+10.0 M +13.00 M
0.987

TERRACE LEVEL LIFT MACHINE ROOM 1. HEIGHT OF THE TANK IS 1.5M WITH 0.3M FOR SERVICEABILITY
LEVEL
1.699 2. TOTAL VOLUME (CAPACITY) OF THE TANK = 8 CU.M = 8000 LITRES
+7.290 M
G SW3 G 3. AREA COVERED BY THE TANK = 5.35 SQ.M

2.320 A'

0.150
OVERHEAD TANK

0.100
5.35 SQ.M

1.200

2.75
FLOOR SLOPED TO 1:80
NOMINALLY REINFORCED

5.
0
CONCRETE COPING

30
+14.80 M

0
OHT LEVEL
14.912

CHAJJA
2.617

BULL NOSE THROATING & WATTA


5MM DRIP GROOVE
M.S LADDER 65 FINISHED IN CEMENT PLASTER
0.600 2.7
PIPE WITH GRATING
TO ARREST DUST
RAINWATER DOWNTAKE PIPE
LAID TO SLOPE

0.075
EY

+4.673 M

VALLE
VA

MS STRAP CLAMPED TO
F F
LL

2.
C02,C09 WALL
LL

VA

67
VA
9.565

8.885

5.400

Y
E

5
LL

E
Y

LL
EY
BBC LAID TO SLOPE IN CEMENT SAND

VA
0.771

MORTAR WITH WATER PROOFING


+3.901 M +13.00 M COMPOUND
E C18
ELEVATED TERRACE
LEVEL
E
TYPICAL SECTION OF PARAPET WALL AND
COPING

VAL
M.S LADDER SCALE = 1:50

LEY
1.588

3
+2.313 M 2.87
D C16 D
0
7.40
1.594

0.750
BUILT STRUCTURE -
MUSEUM

+0.719 M
C C13 C
0.492
0.227

+0.225 M STRUCTURE UNDER


B C01,C04,C08 5.893 B DETAILED STRUCTURE -
MUSEUM CONSIDERATION

27.45M AC
4.000
5
FOB 0.0 M 4.32 FOB FOB
FOB VOID

CESS RO
Y Y
12.200 0.450 x 4.325
DUCT
0.750 x 4.325

AD
2.772

2.150
3.000

3.000

BUILT STRUCTURE -
ADMIN

FOB

-2.772 M CANOPY
A C7, C12
4.400 A
3.300 KEY PLAN
SCALE = 1:1000
5.100

5.932 2.990 3.100 4.211 2.030 2.443 1.218 1.811 3.585


DATE- 26.04.2022 DWG NO.- 09
0.300
STATUS-
N
27.619
WORKING DRAWING

B'
DRAWING NAME- SCALE-

NAME - ROOF PLAN 1:50


PROJECT NAME-

WAR MUSEUM
C07,C08,C09,

C12,C13,C14,
C01,C02,C03

+12.322 M

+16.533 M

+18.563 M

+22.223 M

+24.034 M
+21.006 M

+27.619 M
ROLL NO.-
+6.232 M

+9.222 M
C04,C05

C10,C11

NAME - KAANKSHI PRUTHVI SHAH 5511


0.0 M

+0.3 M

SW1

SW2
C06

C16

C17
C15

C18
SIGN-

FOB
3rd YEAR B. ARCH
X 1 2 3 4 5 6 7 8 9 10
ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
8 4 2 1 TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

DOOR SCHEDULE

SYMBOL NO.s SPECIFICATIONS SIZE REMARKS

35MM DOUBLE LEAF DOOR, 10MM


D1 0 TOUGHENED GLASS PANEL, 50MM 2400 x 3000 -
ALUMINIUM FRAME FINISHED IN
MIRROR POLISH STAINLESS STEEL,
19MM GASKET

35MM TEAK WOOD DOUBLE LEAF


FLUSH DOOR, FINISHED WITH
VENEER AND MELAMINE POLISH -
D2 0 FROM OUTSIDE AND ACOUSTICAL 2400 x 3000
TREATMENT, 15MM LIPPING PATTI,
12MM Ø NEOPRENE GASKET

OHT LEVEL 18MM TEAK WOOD SINGLE LEAF


FLUSH DOOR, FINISHED WITH
+14.80M D3 1 VENEER AND MELAMINE POLISH 1000 x 2100 SPACES IN
FROM OUTSIDE AND ACOUSTICAL AUDITORIUM
TREATMENT, 15MM LIPPING PATTI,
12MM Ø NEOPRENE GASKET

UPVC SINGLE LEAF FLUSH DOOR,


ENTRANCE TO
D4 3 20MM ANODIZED ALUMINIUM 1000 x 2100
TOILETS, SHAFTS,

1.800
FRAME, 25MM UPVC BEADING ON
OVERHEAD TANK SIDES
STORE ROOM

12MM HPL SINGLE LEAF DOOR


D5 2 660 x 2100 TOILET STALLS
WITH STAINLESS STEEL FITTINGS
OVERHEAD ROOM LEVEL
+13.00M
WINDOW SCHEDULE

SYMBOL NO.s SPECIFICATIONS SIZE REMARKS

W1 FIXED SHUTTER, 6MM GLAZED


F1 C1 TOUGHENED GLASS, 40 MM STONE
W1 7 600 x 3500 ALL SPACES

3.000
S1 FRAMES, UPVC WINDOW &
500x1200MM UPVC PANELED
VERTICAL OPENING
D4 40MM STONE FRAMES, GLASS
OVERHEAD ROOM W2 0 LOUVERED ANODIZED ALUMINIUM 300 x 600 -
PANELED WINDOW WITH
W1 W1 250x250MM EXHAUST FAN

FIXED SHUTTER, 6MM GLAZED


W3 0 TOUGHENED GLASS, 40 MM STONE 2400 x 3600 -
TERRACE LEVEL FRAMES, UPVC WINDOW
+10.00M FIXED SHUTTER, 6MM GLAZED
TOUGHENED GLASS, 40 MM STONE
W4 2 600 x 2500 OVERHEAD
FRAMES, UPVC WINDOW &
ROOM
500x1200MM UPVC PANELED
VERTICAL OPENING

WALL FINISH SCHEDULE

SYMBOL SPECIFICATIONS REMARKS


TOILET EXHIBITION SPACE EXHIBITION SPACE
12MM PLASTER 1:1.5:2, 2 COATS OF WHITE WASH, 1 COAT
EXHIBITION SPACE

4.500
W1
OF 5MM P.O.P PUTTY, 2 COATS OF PRIMER, 2 COATS OF ALL SPACES
VELVET TOUCH EMULSION PAINT

W2 W1 12MM PLASTER 1:2:4, 12 MM OF WATERPROOFING AGENT


W2
F2 C2 F1 C1 MIXED WITH PLASTER, 2 COATS OF WHITE WASH, 7MM TOILET
W1 DADO OF CERAMIC TILES OF 300x300MM
S3 S1
F1 C1
S1 W1
F1 C2
S1
FLOOR FINISH SCHEDULE
W1 W1

D4 D5 D4 SYMBOL SPECIFICATIONS REMARKS


FIRST FLOOR LEVEL
+5.50M
20MM 1:2:4 SCREEDING, 25MM WHITE CERAMIC TILES OF
F1 600x600MM, GRADE - 2 POLISHING, 1MM CEMENT GROUT ALL SPACES

12MM PLASTER 1:2:4, 25MM 1:2:4 SCREEDING, 150MM


F2 WIDE HARDWOOD FLOORING WITH TONGUE AND GROOVE AUDITORIUM
JOINT AND ACOUSTICAL TREATMENT

20MM 1:2:4 SCREEDING, 3MM WATERPROOFING AGENT


F3 SCREEDING, 200MM BBC LAID TO SLOPE, 8MM ANTI-SKID TOILET
CERAMIC TILES OF 300x300MM

CEILING SCHEDULE

4.500
EXHIBITION SPACE TOILET EXHIBITION SPACE AUDITORIUM
SYMBOL SPECIFICATIONS REMARKS

W1 W1 10MM 1:1.5:2 PLASTER, 2 COATS OF WHITE WASH, 1 COAT


W2 C1 OF 5MM P.O.P PUTTY, 2 COATS OF PRIMER, 2 COATS OF ALL SPACES
F1 C1 F2 C2 F1 C1
WHITE VELVET TOUCH ACRYLIC PAINT WITH 300MM
S1 S3 S1 GYPSUM BOARD FALSE CEILING

W1 10MM 1:1.5:2 PLASTER WITH 600x600MM ACOUSTICAL TILE


W1 W1 W1 W1 W1 F2 C2 C2 FALSE CEILING FIXING WITH 24x32MM G.I SECTIONS AUDITORIUM
S2
D4 D5 D3
10MM 1:1.5:2 PLASTER, 2 COATS OF WHITE WASH
FINISHED FLOOR LEVEL
0.515

C3 TOILET
+1.00M

1.000
SKIRTING SCHEDULE
FINISHED GROUND LEVEL
+0.0M
SYMBOL SPECIFICATIONS REMARKS

BISON BOARD DRY WALL ACOUSTICAL PANEL 20MM THK. 1:2:4 PLASTER, 100MM WIDE WHITE MARBLE
PARTITION SKIRTING ALL SPACES
S1

20MM THK. 1:2:4 PLASTER, 100MM WIDE HARDWOOD


SKIRTING WITH TONGUE AND GROOVE JOINT AUDITORIUM
S2

20MM THK. 1:2:4 PLASTER, 100MM WIDE CERAMIC TILE


SKIRTING TOILET
S3

DATE- 26.03.2022 DWG NO.- 10


STATUS-
N
WORKING DRAWING
DRAWING NAME- SCALE-

NAME - SECTION AA' 1:200


8 4 2 1 PROJECT NAME-

WAR MUSEUM
ROLL NO.-

NAME - KAANKSHI PRUTHVI SHAH 5511


SIGN-

3rd YEAR B. ARCH

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
C G I K L TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

DOOR SCHEDULE

SYMBOL NO.s SPECIFICATIONS SIZE REMARKS

35MM DOUBLE LEAF DOOR, 10MM


D1 0 TOUGHENED GLASS PANEL, 50MM 2400 x 3000 -
ALUMINIUM FRAME FINISHED IN
MIRROR POLISH STAINLESS STEEL,
19MM GASKET

35MM TEAK WOOD DOUBLE LEAF


FLUSH DOOR, FINISHED WITH
VENEER AND MELAMINE POLISH -
D2 0 FROM OUTSIDE AND ACOUSTICAL 2400 x 3000
TREATMENT, 15MM LIPPING PATTI,
12MM Ø NEOPRENE GASKET

18MM TEAK WOOD SINGLE LEAF


FLUSH DOOR, FINISHED WITH
OHT LEVEL D3 0 VENEER AND MELAMINE POLISH 1000 x 2100 -
FROM OUTSIDE AND ACOUSTICAL
+14.80M TREATMENT, 15MM LIPPING PATTI,
12MM Ø NEOPRENE GASKET

UPVC SINGLE LEAF FLUSH DOOR,


D4 0 20MM ANODIZED ALUMINIUM 1000 x 2100 -
FRAME, 25MM UPVC BEADING ON
SIDES

1.800
12MM HPL SINGLE LEAF DOOR
D5 2 660 x 2100 TOILET STALLS
WITH STAINLESS STEEL FITTINGS

OVERHEAD ROOM LEVEL


LIFT MACHINE +13.00M WINDOW SCHEDULE
ROOM
SYMBOL NO.s SPECIFICATIONS SIZE REMARKS

FIXED SHUTTER, 6MM GLAZED


TOUGHENED GLASS, 40 MM STONE
W1 13 600 x 3500 ALL SPACES
FRAMES, UPVC WINDOW &
500x1200MM UPVC PANELED
VERTICAL OPENING

3.000
40MM STONE FRAMES, GLASS
W2 2 LOUVERED ANODIZED ALUMINIUM 300 x 600 TOILET
PANELED WINDOW WITH
250x250MM EXHAUST FAN

FIXED SHUTTER, 6MM GLAZED


W3 1 TOUGHENED GLASS, 40 MM STONE 2400 x 3600 VOID
FRAMES, UPVC WINDOW
TERRACE LEVEL FIXED SHUTTER, 6MM GLAZED
+10.00M W4 0
TOUGHENED GLASS, 40 MM STONE
600 x 2500 -
FRAMES, UPVC WINDOW &
500x1200MM UPVC PANELED
VERTICAL OPENING

WALL FINISH SCHEDULE

SYMBOL SPECIFICATIONS REMARKS

12MM PLASTER 1:1.5:2, 2 COATS OF WHITE WASH, 1 COAT


MEN'S TOILET W1
OF 5MM P.O.P PUTTY, 2 COATS OF PRIMER, 2 COATS OF ALL SPACES
EXHIBITION SPACE EXHIBITION SPACE VELVET TOUCH EMULSION PAINT

4.500
W2
12MM PLASTER 1:2:4, 12 MM OF WATERPROOFING AGENT
F2 C2 W2
MIXED WITH PLASTER, 2 COATS OF WHITE WASH, 7MM TOILET
S3
DADO OF CERAMIC TILES OF 300x300MM
W1 W1
W2 F1 C1 F1 C1
S1 S1

FLOOR FINISH SCHEDULE


2.100

W1 W1 W3 W1 W1 W1 W1
SYMBOL SPECIFICATIONS REMARKS
D5
FIRST FLOOR LEVEL 20MM 1:2:4 SCREEDING, 25MM WHITE CERAMIC TILES OF
+5.50M F1 600x600MM, GRADE - 2 POLISHING, 1MM CEMENT GROUT ALL SPACES

VOID 12MM PLASTER 1:2:4, 25MM 1:2:4 SCREEDING, 150MM


F2 WIDE HARDWOOD FLOORING WITH TONGUE AND GROOVE AUDITORIUM
JOINT AND ACOUSTICAL TREATMENT

20MM 1:2:4 SCREEDING, 3MM WATERPROOFING AGENT


W1 F3 SCREEDING, 200MM BBC LAID TO SLOPE, 8MM ANTI-SKID TOILET
CERAMIC TILES OF 300x300MM
F1 C1
S1

LIFT SHAFT EXHIBITION SPACE EXHIBITION SPACE CEILING SCHEDULE


MEN'S TOILET

4.500
W1 W1
SYMBOL SPECIFICATIONS REMARKS
W2
F1 C1 F1 C1
F2 C2
S1 S1
S3
10MM 1:1.5:2 PLASTER, 2 COATS OF WHITE WASH, 1 COAT
W2 C1 OF 5MM P.O.P PUTTY, 2 COATS OF PRIMER, 2 COATS OF ALL SPACES
WHITE VELVET TOUCH ACRYLIC PAINT WITH 300MM
GYPSUM BOARD FALSE CEILING
2.100

10MM 1:1.5:2 PLASTER WITH 600x600MM ACOUSTICAL TILE


C2 FALSE CEILING FIXING WITH 24x32MM G.I SECTIONS AUDITORIUM

W1 W1 W1 W1 W1 W1 W1
10MM 1:1.5:2 PLASTER, 2 COATS OF WHITE WASH
D5 C3 TOILET
FINISHED FLOOR LEVEL
0.515

+1.00M

SKIRTING SCHEDULE

1.000
FINISHED GROUND LEVEL
+0.0M SYMBOL SPECIFICATIONS REMARKS

20MM THK. 1:2:4 PLASTER, 100MM WIDE WHITE MARBLE


SKIRTING ALL SPACES
S1

20MM THK. 1:2:4 PLASTER, 100MM WIDE HARDWOOD


SKIRTING WITH TONGUE AND GROOVE JOINT AUDITORIUM
S2

20MM THK. 1:2:4 PLASTER, 100MM WIDE CERAMIC TILE


SKIRTING TOILET
S3

DATE- 26.04.2022 DWG NO.- 11


STATUS-
N
WORKING DRAWING
DRAWING NAME- SCALE-

NAME - SECTION BB' 1:200


C G I K L PROJECT NAME-

WAR MUSEUM
ROLL NO.-

NAME - KAANKSHI PRUTHVI SHAH 5511


SIGN-

3rd YEAR B. ARCH

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
1 2 4 5 8 10 CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

SPECIFIC NOTES
1. ALL THE MEMBERS INSTALLED ON THE FACADE SHALL BE
STRAIGHT, TRUE AND PLUMB PERPENDICULAR.
2. ALUMINIUM COMPOSITE CLADDING - PROVIDING AND FIXING
ALUMINIUM COMPOSITE HAVING TOTAL THICKNESS OF 5MM
(WITH 0.5MM FOIL SKIN ON BOTH SIDES) ALONG WITH PVdF
COATING ON TOP AND POLYMER/EPOXY COATING ON BACK
AND FIXED WITH STAINLESS STEEL FASTENING SYSTEM
(FASTENERS) ON FACADE, SILLS, JAMBS, LINTELS, ETC.
3. THE FASTENERS TO BE FIXED BY MAKING 25MM GROOVES
AND APPLYING NON-STAINING AND NON-STREAKING SEALANT
ALONG ALL EXPOSED SURFACES.
5. ALL JOINTS, CORNERS AND CONNECTIONS SHALL BE TIGHT
AND CLEAN.
6. PROVIDING A PRECAST REINFORCED CEMENT CONCRETE JALI
50MM THK. AND FINISHING SMOOTH WITH 6MM THK. CEMENT
PLASTER 1:3 (1 CEMENT: 3 FINE SAND) ON EXPOSED
SURFACES.
7. THE DECKING FRAME OF THE CANOPY IS TO BE FASTENED ON
THE TOP OF THE MAIN FRAME AFTER THE MAIN FRAME HAS
BEEN MOUNTED TO THE WALL.
OHT LEVEL
8. CANOPY SHALL BE INSTALLED WITH POSITIVE AND NEGATIVE
+14.80M SLOPE OF 1:80 TO ALLOW WATER DRAINAGE FROM THE TOP
OF THE CANOPY AND ELIMINATE PONDING
9. ALL EXPOSED FASTENERS ARE TO BE PAINTED TO MATCH THE
LVL -8.00M CANOPY COLOUR.
10. CANOPY SHALL BE FIXED TO THE WALL WITH ALUMINIUM WALL
BRACKET AND BOLT ASSEMBLY; THE JUNCTION SHALL BE

1.800
SEALED WITH A NON - STAINING SEALANT.
11. ALL FASTENERS SHALL BE STAINLESS STEEL WITH
NEOPRENE WASHERS AND 5MM ALUMINIUM RIVETS.
OVERHEAD ROOM LEVEL 12. ALL SURFACES ARE TO BE CLEANED AFTER INSTALLATION IS
+13.00M COMPLETE.
13. SURPLUS MATERIAL AND DEBRIS SHALL BE REMOVED FROM
THE JOBSITE AFTER INSTALLATION IS COMPLETE.
14. POWDER COATED MILD STEEL LADDER TO BE INSTALLED ON
TERRACE.
15. EXTERNAL WALLS SHALL BE FINISHED IN 2 COATS WITH 18MM
THK. SANDFACED PLATER AND WATERPROOFING COMPOUND
AND EXTERNAL OFF WHITE ACRYLIC PAINT.

3.000
TERRACE LEVEL
+10.00M

4.500
FIRST FLOOR LEVEL
+5.50M
LVL -3.00M LVL +0.0M LVL -2.60M LVL -3.40M

4.500
4.450

BUILT STRUCTURE -
MUSEUM

STRUCTURE UNDER
DETAILED STRUCTURE -
MUSEUM CONSIDERATION

FINISHED FLOOR LEVEL

27.45M AC
+1.00M
FOB

CESS RO
1.000

AD
FINISHED GROUND LEVEL
+0.0M

BUILT STRUCTURE -
ADMIN

FOB

KEY PLAN
SCALE = 1:1000

DATE- 26.04.2022 DWG NO.- 12


STATUS-
N
WORKING DRAWING
DRAWING NAME- SCALE-

NAME - NORTH ELEVATION 1:200


1 2 4 5 8 10 PROJECT NAME-

WAR MUSEUM
ROLL NO.-

NAME - KAANKSHI PRUTHVI SHAH 5511


SIGN-

3rd YEAR B. ARCH

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
L I F B A PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

SPECIFIC NOTES
1. ALL THE MEMBERS INSTALLED ON THE FACADE SHALL BE
STRAIGHT, TRUE AND PLUMB PERPENDICULAR.
2. ALUMINIUM COMPOSITE CLADDING - PROVIDING AND FIXING
ALUMINIUM COMPOSITE HAVING TOTAL THICKNESS OF 5MM
(WITH 0.5MM FOIL SKIN ON BOTH SIDES) ALONG WITH PVdF
COATING ON TOP AND POLYMER/EPOXY COATING ON BACK
AND FIXED WITH STAINLESS STEEL FASTENING SYSTEM
(FASTENERS) ON FACADE, SILLS, JAMBS, LINTELS, ETC.
3. THE FASTENERS TO BE FIXED BY MAKING 25MM GROOVES
AND APPLYING NON-STAINING AND NON-STREAKING SEALANT
ALONG ALL EXPOSED SURFACES.
5. ALL JOINTS, CORNERS AND CONNECTIONS SHALL BE TIGHT
AND CLEAN.
6. PROVIDING A PRECAST REINFORCED CEMENT CONCRETE JALI
50MM THK. AND FINISHING SMOOTH WITH 6MM THK. CEMENT
PLASTER 1:3 (1 CEMENT: 3 FINE SAND) ON EXPOSED
SURFACES.
7. THE DECKING FRAME OF THE CANOPY IS TO BE FASTENED ON
THE TOP OF THE MAIN FRAME AFTER THE MAIN FRAME HAS
BEEN MOUNTED TO THE WALL.
OHT LEVEL 8. CANOPY SHALL BE INSTALLED WITH POSITIVE AND NEGATIVE
+14.80M SLOPE OF 1:80 TO ALLOW WATER DRAINAGE FROM THE TOP
OF THE CANOPY AND ELIMINATE PONDING
9. ALL EXPOSED FASTENERS ARE TO BE PAINTED TO MATCH THE
CANOPY COLOUR.
LVL -21.75M 10. CANOPY SHALL BE FIXED TO THE WALL WITH ALUMINIUM WALL
BRACKET AND BOLT ASSEMBLY; THE JUNCTION SHALL BE
SEALED WITH A NON - STAINING SEALANT.

1.800
11. ALL FASTENERS SHALL BE STAINLESS STEEL WITH
NEOPRENE WASHERS AND 5MM ALUMINIUM RIVETS.
12. ALL SURFACES ARE TO BE CLEANED AFTER INSTALLATION IS
OVERHEAD ROOM LEVEL COMPLETE.
+13.00M 13. SURPLUS MATERIAL AND DEBRIS SHALL BE REMOVED FROM
THE JOBSITE AFTER INSTALLATION IS COMPLETE.
14. POWDER COATED MILD STEEL LADDER TO BE INSTALLED ON
TERRACE.
LVL -16.20M LVL -19.20M 15. EXTERNAL WALLS SHALL BE FINISHED IN 2 COATS WITH 18MM
THK. SANDFACED PLASTER AND WATERPROOFING
COMPOUND AND EXTERNAL OFF WHITE ACRYLIC PAINT.
16. THE NODES AND RODS OF THE SPACE FRAME STRUCTURE
SHALL BE CLEAN WITHOUT WELDING SCARS, MUD, SAND OR
DIRT.

3.000
17. THE SPACE TRUSSES ERECTION SHALL BE MADE ON GROUND
LVL -16.20M OR ON SCAFFOLDINGS.

TERRACE LEVEL
+10.00M

4.500
FIRST FLOOR LEVEL
+5.50M

LVL -4.85M LVL -9.00M LVL +0.0M LVL -12.20M

4.500
4.450

4.450
BUILT STRUCTURE -
MUSEUM

STRUCTURE UNDER
DETAILED STRUCTURE -
MUSEUM CONSIDERATION

27.45M AC
FINISHED FLOOR LEVEL
+1.00M FOB

CESS RO
1.000

AD
FINISHED GROUND LEVEL
+0.0M

BUILT STRUCTURE -
ADMIN

FOB

KEY PLAN
SCALE = 1:1000

DATE- 26.04.2022 DWG NO.- 13


L I F B A STATUS-
N
WORKING DRAWING
DRAWING NAME- SCALE-

NAME - WEST ELEVATION 1:200


PROJECT NAME-

WAR MUSEUM
ROLL NO.-

NAME - KAANKSHI PRUTHVI SHAH 5511


SIGN-

3rd YEAR B. ARCH

ACADEMY OF ARCHITECTURE
GENERAL NOTES
SLAB GRID BEAM PRIMARY BEAM
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.

0.150
CANOPY ABOVE 2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
2.100 x 2.100 DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.

0.500
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
UP PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR

0.300
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR

0.300
TO WORK COMMENCEMENT.

EQ

1
ACOUSTICAL 6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
TILE THE ARCHITECT/CONSULTANT BEFORE.

EQ

2
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF

1.500
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

EQ

3
SPECIFIC NOTES

EQ

4
C03 C05 F C10
0.45 x 0.6 M 0.45 x 0.6 M 0.45 x 0.6 M

EQ

5
1. EACH PANEL IS A SIZE OF 600x2400x150MM WHITE LACQUER IN
COLOUR.
6
2. THE PANELS SHALL BE INSTALLED ON A FIRM, WELL LEVELED
4 2 1
MAIN BENT UP R/F SURFACE, DIRECTLY NOT SUPPORTED ON FLOORS
3
1 2 3 4 SECTION AA' SLAB
3. THE PANELS SHALL BE PROTECTED AT THE BASE BY SKIRTING

1.070
D3 EQ EQ EQ DISTRIBUTION R/F
SCALE = 1:50 BOARDS.

0.150
EQ EQ EQ
UP 4. THE PANELS SHALL BE MOUNTED ON THE WALL WITH A Z - U
CONNECTION ON A RAIL SYSTEM.
5. THE RAILS SHALL BE FIXED WITH U CONNECTION 1000MM C/C
0.675 DN STIRRUP ON THE WALL.

0.500
2.550

0.300
6. 6MM EXPANSION JOINTS SHALL BE PROVIDED BETWEEN THE
D2 MAIN TOP R/F SLAB PERIMETER OF THE PANELS, WALLS AND OTHER FITTINGS.
12.300 DISTRIBUTION R/F
7. EACH PANEL OF BISON BOARD OF SIZE 600x1200x6MM.

0.150
8. BISON BOARD PANELS SHALL BE FIXED ON A GRID ON
+1.0 M +0.4 M +1.0 M ALUMINIUM TEE SECTIONS OF 30x35x1.2MM @ 600MM C/C.
STAGE LEVEL FINISHED FLOOR FINISHED FLOOR
LEVEL LEVEL
9. THE BOARD MUST BE SUPPORTED ON ALL FOUR EDGES AND
D3 GRID BEAM AT INTERMEDIATE POSITIONS AT CENTERS WITH FULLY
THREADED SELF TAPPING SCREWS OF Ø 8MM.

0.300
1.000 10. BOARDS SHALL BE PROVIDED WITH 3MM EXPANSION JOINTS
G SEALED WITH COVER STRIPS OF PVC FIXED WITH SYNTHETIC
1.480
2.000 REINFORCEMENT AT END SECTION ADHESIVE.
B
GREEN ROOM SCALE = 1:25 11. THE PANEL SHALL BE FINISHED WITH 2 COATS OF PRIMER AND
1.500 x 1.480 STIRRUPS EMULSION PAINT.
1.500

STAGE AUDITORIUM PROJECTION GRID BEAMS 12. ACOUSTICAL TILES SHALL BE FIXED IN TRUE HORIZONTAL
ROOM LEVEL OF 600x600MM FALSE CEILING SYSTEM OF MS STRAP
C02 8.900 x 3.200 12.300 x 8.900 C09
HANGERS SPACED 1200MM C/C.
0.45 x 0.6 M 3.260 x 2.000 0.45 x 0.6 M
13. THE MS STRAP SHALL BE FIXED TO THE CEILING BY 25x60MM
A
REINFORCEMENT FOR THE SLAB ANGLE CLEAT AND 8MMØ FIXING SCREWS.
8.900

3.260
1.050
3.200 SCALE = 1:25 14. AFTER COMPLETION OF PANELS, REMOVE DUST AND OTHER
2.500 FOREIGN MATERIALS.

150MM THK. RCC


SLAB
1.500

BOLT FIXING FOR LEVEL 15x45MM M. S CHANNEL 25MM WIDE M. S STRAP 25x60MM ANGLE DOOR SCHEDULE
GREEN ROOM BISON BOARD W1
ADJUSTMENT @1200 C/C HANGERS @1200 C/C CLEAT
PARTITION WALL F2 C1 D3
1.500 x 1.480 S2
32MM THK. BOARDING WITH WAX
1.480 POLISH FINISH 25MM THK. RESILIENT LAYER OF SYMBOL NO.s SPECIFICATIONS SIZE REMARKS
FIBERGLASS
1.000
35MM TEAK WOOD DOUBLE LEAF
D3 75x50MM T. W. BATTENS @ FLUSH DOOR, FINISHED WITH
C 600MM C/C VENEER AND MELAMINE POLISH ENTRANCE TO
D2 2 FROM OUTSIDE AND ACOUSTICAL 2400 x 3000
AUDITORIUM
TREATMENT, 15MM LIPPING PATTI,
E 12MM Ø NEOPRENE GASKET
2.550

18MM TEAK WOOD SINGLE LEAF


DN D2 FLUSH DOOR, FINISHED WITH
SPACES IN
D3 4 VENEER AND MELAMINE POLISH 1000 x 2100
FROM OUTSIDE AND ACOUSTICAL AUDITORIUM
0.675 TREATMENT, 15MM LIPPING PATTI,
0.860 2.250 ACOUSTICAL PANEL 12MM Ø NEOPRENE GASKET
150MM THK. PCC
UP 1:2:4
1.070
1.100

C01 C04 C08


0.45 x 0.6 M EQ EQ EQ
0.45 x 0.6 M 0.45 x 0.6 M
4 3 2 1
WALL FINISH SCHEDULE

STAGE FLOORING ACOUSTICAL END CHANNEL SYMBOL SPECIFICATIONS REMARKS


C 25x75MM STEEL SECTIONS 18MM THK. BACKING
SCALE = 1:10 @450 C/C SCREWED TO CEILING TILES
SECTIONS 150MM THK. 12MM PLASTER 1:1.5:2, 2 COATS OF WHITE WASH, 1 COAT
W1
MASONRY WALL OF 5MM P.O.P PUTTY, 2 COATS OF PRIMER, 2 COATS OF ALL SPACES
PLAN OF AUDITORIUM VELVET TOUCH EMULSION PAINT

SCALE = 1:50 ACOUSTICALLY TREATED CEILING


D
SCALE = 1:10
FLOOR FINISH SCHEDULE
110x70MM ALUMINIUM
FRAME @600MM C/C
SYMBOL SPECIFICATIONS REMARKS
450x450MM
ALUMINIUM FRAME
12MM PLASTER 1:2:4, 25MM 1:2:4 SCREEDING, 150MM
12.622 F2 WIDE HARDWOOD FLOORING WITH TONGUE AND GROOVE AUDITORIUM
JOINT AND ACOUSTICAL TREATMENT
6MM THK. ACOUSTICAL
FOAM BOARD
CEILING SCHEDULE
BOLTED ANCHOR
BOLTS 110x70MM ALUMINIUM
6MM THK. BISON FRAME @600MM C/C SYMBOL SPECIFICATIONS REMARKS
BOARD
EQ

10MM 1:1.5:2 PLASTER WITH 600x600MM ACOUSTICAL TILE


6MM THK. ACOUSTICAL 15x25MM STEEL FRAME C2 FALSE CEILING FIXING WITH 24x32MM G.I SECTIONS AUDITORIUM
D 12MM THK. STONE SKIRTING SECTIONS
FOAM BOARD
FIXED WITH SILICON
6MM GROOVE

6MM THK. BISON SKIRTING SCHEDULE


BOARD

150MM THK. PCC


SYMBOL SPECIFICATIONS REMARKS
1:2:4
PLAN OF BISON BOARD PARTITION
E 20MM THK. 1:2:4 PLASTER, 100MM WIDE HARDWOOD
SCALE = 1:10 SKIRTING WITH TONGUE AND GROOVE JOINT AUDITORIUM
S2
EQ

SECTION OF BISON BOARD PARTITION 120x60MM STEEL PLATE WITH


E
SCALE = 1:10 ANCHOR BOLTS @500 C/C
450x450MM 150MM THK. BUILT STRUCTURE -
9.345

ALUMINIUM FRAME MASONRY WALL MUSEUM

A 120x60MM STEEL PLATE WITH STRUCTURE UNDER


CONSIDERATION
ANCHOR BOLTS @500 C/C DETAILED STRUCTURE -
MUSEUM
EQ

27.45M AC
ACOUSTICAL
B TILE
FOB

CESS RO
0.200

AD
GRID BEAM

A A'

30x60MM T.W FIXING 15x25MM STEEL FRAME 1200x2400MM BUILT STRUCTURE -


ADMIN
EQ

FRAME SECTIONS ACOUSTICAL PANEL


FOB

PRIMARY BEAM
1200x2400MM 150MM THK.
PLAN OF ACOUSTICAL PANEL ACOUSTICAL PANEL MASONRY WALL
F KEY PLAN
SCALE = 1:10
SCALE = 1:1000

DATE- 26.04.2022 DWG NO.- 14


0.200 25MM THK. HARDWOOD STRIP FLOORING STATUS-
N
EQ EQ EQ EQ EQ EQ WITH TONGUE AND GROOVE JOINTS
WORKING DRAWING
DRAWING NAME- SCALE-

NAME - DETAILS OF AUDITORIUM 1:50


PROJECT NAME-

REFLECTED CEILING PLAN OF AUDITORIUM DOUBLE LAYER 125MM


COMPRESSION GRADE RIGID
SCALE = 1:50 FOAM INSULATION
THK. PLYWOOD WAR MUSEUM
ROLL NO.-
150MM THK. PCC
1:2:4 NAME - KAANKSHI PRUTHVI SHAH 5511
SIGN-

3rd YEAR B. ARCH


FLOORING SECTION OF ACOUSTICAL PANEL
G F
SCALE = 1:10 SCALE = 1:10 ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
50x25MM ANGLE 20MM FASTENER WITH 12MMØ PROJECT ENGINEER ON SITE REGARDING ANY
150MM THK.
FASTENER NEOPRENE WASHER CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
MASONRY WALL
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
4MM THK. COMPOSITE 4MM THK. COMPOSITE THE ARCHITECT/CONSULTANT BEFORE.
F METAL PANEL METAL PANEL 7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.
150MM THK.
MASONRY WALL
20MM FASTENER WITH SPECIFIC NOTES
D 12MMØ NEOPRENE WASHER
G 1. ALL THE MEMBERS INSTALLED ON THE FACADE SHALL BE
H 20MM FASTENER WITH STRAIGHT, TRUE AND PLUMB PERPENDICULAR.
12MMØ NEOPRENE WASHER 150MM THK. 5MM THK. EXTRUSION 2. THE SIZE OF EACH PANEL IS 750x1500MM.
MASONRY WALL BEDDING WITH SEALANT 3. EACH PANEL TO BE MARKED ON THE REVERSE SIDE FOR
EASY IDENTIFICATION OF PANEL SIZE AND LOCATION.
4. PANELS SHALL BE STORED ON SITE IN VERTICAL POSITION,
B FACE TO FACE OR BACK TO BACK RESPECTIVELY, WITH
4MMØ COUNTER SUNK ADEQUATE PROTECTION TO PREVENT SCRATCHES OR DENTS.
I RIVET 5. ANY COMPONENT PARTS WHICH ARE OBSERVED TO BE
J DEFECTIVE IN ANY WAY, INCLUDING WARPED, BOWED,
K 5MM WEEP SLOT
5MM WEEP SLOT DENTED, ABRADED OR BROKEN MEMBERS MUST NOT BE
INSTALLED.
50x25MM ANGLE
6MM DRIP GROOVE 6. MEMBER OR PARTS WHICH HAVE BEEN DAMAGED DURING
FASTENER
INSTALLATION OR THEREAFTER BEFORE THE TIME OF FINAL
C 4MMØ COUNTER SUNK ACCEPTANCE SHALL BE REMOVED AND REPLACED.
A 12MM WEEP SLOT 1:30 SLOPE PCC 7. NO CUTTING, TRIMMING, WELDING OR BRAZING OF ANY
RIVET 4MM COMPOSITE 50x25MM ANGLE HOOK
BEDDING COMPONENT PARTS DURING ERECTION IN ANY MEMBER
METAL PANEL FASTENER 150MM THK. PCC
1:2:4 WHICH WOULD DAMAGE THE FINISH DECREASE THE
E 5MM THK. EXTRUSION STRENGTH OR RESULT IN VISUAL IMPERFECTION OR FAILURE
BEDDING WITH SEALANT 5MM THK. EXTRUSION 4MMØ COUNTER SUNK IN PERFORMANCE SHALL BE EXECUTED DURING ERECTION.
BEDDING WITH SEALANT RIVET 8. UNDER NO CIRCUMSTANCE SHOULD ANY SELF ADHESIVE
LABELS, TAPES OR MARKER PENS SHALL BE APPLIED TO THE
APPLIED FINISH OR TO THE PROTECTIVE PEEL OFF FILM.
9. ALUMINIUM COMPOSITE CLADDING - PROVIDING AND FIXING
ALUMINIUM COMPOSITE HAVING TOTAL THICKNESS OF 5MM
(WITH 0.5MM FOIL SKIN ON BOTH SIDES) ALONG WITH PVdF
COATING ON TOP AND POLYMER/EPOXY COATING ON BACK
AND FIXED WITH STAINLESS STEEL FASTENING SYSTEM
HORIZONTAL JOINT VERTICAL JOINT BASE
A SCALE = 1:5
B SCALE = 1:5
C SCALE = 1:5
(FASTENERS) ON FACADE, SILLS, JAMBS, LINTELS, ETC.
10. THE FASTENERS TO BE FIXED BY MAKING 25MM GROOVES
AND APPLYING NON-STAINING AND NON-STREAKING SEALANT
ALONG ALL EXPOSED SURFACES.
11. ALL PANEL JOINTS SHALL BE 12MM NOMINAL WIDTH AND
FULLY SEALED USING AN APPROVED MS POLYMER, SILICONE
OR POLYURETHANE SEALANT APPLIED OVER A FOAM
BACKING ROD.
12. RIVETS SHALL BE PROPERLY POSITIONED NOT LESS THAN
15MM EDGE OF THE ALUMINIUM COMPOSITE METAL PANEL
AND THE DISTANCE BETWEEN RIVETS SHALL NOT EXCEED
100MM THK. PCC 500MM.
COPING 1:2:4 13. ALL JOINTS, CORNERS AND CONNECTIONS SHALL BE TIGHT
AND CLEAN.
14. THE SYSTEM SHALL BE FIXED USING G.I BRACKETS AND
STAINLESS STEEL BOLTS.
20MM FASTENER WITH 15. THE NUTS SHALL BE COMPLETE WITH SPRING WASHER AND
1:30 SLOPE
12MMØ NEOPRENE WASHER 4MM THK. COMPOSITE 50x25MM ANGLE CAP NUTS.
METAL PANEL FASTENER 16. THE BRACKETS SUPPORT SHALL WITHSTAND WIND
PRESSURE.
17. ALL FIXTURES SHALL BE CORROSION RESISTANT FRAME OUT
OF ANODIZED ALUMINIUM MEMBER.
18. WEEP HOLES SHALL BE PROVIDED INTO ALUMINIUM
4MM THK. COMPOSITE
COMPOSITE METAL PANEL THAT ABUT EXTERNAL VERTICAL
METAL PANEL 150MM THK. MASONRY
5MM ANGLE BUILDING FACES INCLUDING GLAZING.
20MM FASTENER WITH WALL
CONNECTOR 19. UNDER NO CIRCUMSTANCES SHALL THE PEEL OFF FOIL SHALL
12MMØ NEOPRENE WASHER 150MM THK.
12MM SILICON SEALANT BE REMOVED AND LEFT TO WEATHERING.
MASONRY WALL
50x25MM ANGLE 20MM FASTENER WITH 20. BEFORE HANDING OVER OF THE COMPLETED CLADDING ALL
FASTENER 12MMØ NEOPRENE WASHER PEEL OFF FOILS SHALL BE REMOVED. PANELS WHICH WERE
20MM FASTENER WITH EXPOSED TO WEATHERING WITHOUT PEEL OFF FOIL SHALL BE
4MMØ COUNTER SUNK 12MMØ NEOPRENE WASHER 150MM THK.
12MM WEEP SLOT 150MM THK. RCC LINTEL CLEANED.
RIVET MASONRY WALL

4MMØ COUNTER SUNK


5MM THK. EXTRUSION 4MM COMPOSITE RIVET
BEDDING WITH SEALANT METAL PANEL 12MM WEEP SLOT 50x25MM ANGLE HOOK FASTENER

12MM SILICON SEALANT


4MMØ COUNTER SUNK
RIVET
50x25MM ANGLE
FASTENER
5MM THK. EXTRUSION 4MMØ COUNTER SUNK
4MM THK. COMPOSITE BEDDING WITH SEALANT RIVET 5MM THK. DRIP CHANNEL
METAL PANEL

WINDOW

5MM THK. EXTRUSION


BEDDING WITH SEALANT
50x25MM ANGLE HOOK
FASTENER

COPING OUTER CORNER INNER CORNER WINDOW LINTEL


D SCALE = 1:5
E SCALE = 1:5
F SCALE = 1:5
G SCALE = 1:5

BUILT STRUCTURE -
MUSEUM

STRUCTURE UNDER
DETAILED STRUCTURE -
MUSEUM CONSIDERATION

27.45M AC
FOB
150MM THK. 50x25MM ANGLE HOOK 150MM THK. 50x25MM ANGLE HOOK

CESS RO
MASONRY WALL FASTENER WINDOW MASONRY WALL FASTENER DOOR

4MM THK. COMPOSITE

AD
WINDOW
METAL PANEL 150MM THK. MASONRY
WALL

5MM THK. FLASH KNOT


20MM FASTENER WITH
12MMØ NEOPRENE WASHER
BUILT STRUCTURE -
150MM THK. RCC LINTEL ADMIN

FOB

4MMØ COUNTER SUNK 12MM SILICON SEALANT


RIVET
50x25MM ANGLE HOOK FASTENER
50x25MM ANGLE HOOK FASTENER
4MMØ COUNTER SUNK KEY PLAN
12MM SILICON SEALANT RIVET
SCALE = 1:1000
150MM THK. PCC SILL

12MM WEEP SLOT 12MM SILICON 12MM WEEP SLOT 12MM SILICON 20MM FASTENER WITH
4MM COMPOSITE SEALANT 4MM COMPOSITE SEALANT 12MMØ NEOPRENE WASHER
5MM THK. DRIP CHANNEL METAL PANEL 4MMØ COUNTER SUNK METAL PANEL 4MMØ COUNTER SUNK
RIVET RIVET 150MM THK. MASONRY
DOOR DATE- 26.04.2022 DWG NO.- 15
4MM THK. COMPOSITE WALL
METAL PANEL STATUS-
N
20MM FASTENER WITH 5MM THK. FLASH 20MM FASTENER WITH 5MM THK. FLASH
12MMØ NEOPRENE WASHER KNOT 12MMØ NEOPRENE WASHER KNOT WORKING DRAWING
DRAWING NAME- SCALE-

NAME - DETAILS - CLADDING 1:50


PROJECT NAME-

WAR MUSEUM
DOOR LINTEL WINDOW JAMB DOOR JAMB WINDOW SILL ROLL NO.-
H SCALE = 1:5
I SCALE = 1:5
J SCALE = 1:5
K SCALE = 1:5 NAME - KAANKSHI PRUTHVI SHAH 5511
SIGN-

3rd YEAR B. ARCH

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
NODE 4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
TUBE SUPPORTS PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
13.000 6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
1.000 1.000
SEAT FITTING THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

SPECIFIC NOTES
10MMØ ANCHOR BOLTS 1. THE NODES AND RODS OF THE SPACE FRAME STRUCTURE
SHALL BE CLEAN WITHOUT WELDING SCARS, MUD, SAND OR
SUPPORT NODES DIRT.
2. ALL FRAMING SHALL BE TRUE TO PLUMB WITH
CONFIGURATIONS.
200x200MM BASE PLATE 3. ADEQUATE TEMPORARY SUPPORTS OR BRACING SHALL BE
PROVIDED TO INSURE THE SPACE FRAME STABILITY DURING
ERECTION PROCESS.
1.000

TUBE SUPPORTS 4. THE SPACE TRUSSES ERECTION SHALL BE MADE ON GROUND


OR ON SCAFFOLDINGS.
5. ALL COMPONENTS AND NODES MUST BE WRAPPED OR
PACKED AND STORED IN CONTAINERS TO ASSURE
10MMØ ANCHOR BOLTS AVOIDANCE OF DAMAGE TO THE FINISH.
200x200MM BASE PLATE 6. IDENTIFICATION OF EACH MEMBER OF SPACE FRAME BY SIZE
AND/OR NUMBER DESIGNATED TO ALLOW EASY
SEGREGATION DURING ASSEMBLY.
7. ALL FRAME MEMBERS SHALL BE ASSEMBLED TO THEIR HOLES
1.000

300x300MM STEEL STANCHION 300x300MM STEEL STANCHION FACING DOWN.


8. FRAME SYSTEM SHALL BE FASTENED TO NODES WITHOUT
DAMAGING THE BODY THREADS.
9. THE MEMBERS SHALL BE PROTECTED AGAINST CORROSION
BY CLEANING THE MEMBERS FROM RUST AND OIL STAINS
USING SPECIAL PAINTS.
10. THE MEMBERS SHALL BE PAINTED WITH HIGH QUALITY
PLASTIC POWDER PAINT.
11. THE MEMBERS SHALL BE WELDED UNLESS OTHERWISE
SECTION OF STANCHION AND TUBE CONNECTION SECTION OF STANCHION AND TUBE CONNECTION SPECIFIED.

SCALE = 1:10 SCALE = 1:10


11.000

5MM THK. PVC SHEETS 6MM Ø G.I NUT

G.I WASHER BITUMEN WASHER


NODE CONNECTOR
TUBE MEMBERS

0.150

SCHEMATIC SECTION OF TYPICAL OVERLAP OF


BOTTOM CHORD PVC SHEETS

45°

45°
SCALE = 1:5

750x100MM TUBULAR
MEMBER 150MMØ MERO JOINT

5MM THK. PVC SHEETS

MIDDLE CHORD
PLAN OF TUBE SUPPORT
SCALE = 1:10
ZINC CAPPING

5MM THK. STEEL PLATE


GUTTER

TOP CHORD

0.300
5MM STEEL PLATE

750x100MM TUBULAR
MEMBER
SCHEMATIC SECTION OF TYPICAL RAINWATER
300x300MM STEEL STANCHION
GUTTER
SECTION OF TUBE CONNECTION SCALE = 1:10
0.300 SCALE = 1:10

PLAN OF SPACE FRAME


SCALE = 1:50
BASE PLATE

STEEL STANCHION BOTTOM CHORD MIDDLE CHORD TOP CHORD

CONNECTION WINDOW 150MMØ MERO JOINT


20MMØ BOLTS
13.000
1:75 SLOPE

500x500x10 MM STEEL STANCHION


0.950

BUILT STRUCTURE -
MUSEUM
25MM THK. GUSSETE PLATE
100x75MM GUSSETE ANGLE

STRUCTURE UNDER
DETAILED STRUCTURE -
MUSEUM CONSIDERATION

SLEEVE 50MMØ ANCHOR BOLT

27.45M AC
FOB

CESS RO
AD
PLAN OF CONNECTION OF STANCHION TO PEDESTAL
PLAN OF CONNECTOR SCALE = 1:20
SCALE = 1:5
4.500

BUILT STRUCTURE -
ADMIN

FOB

CONE

KEY PLAN
0.250

TUBULAR ELEMENT SCALE = 1:1000


50MMØ ANCHOR BOLT 300x300MM STEEL STANCHION
PIN

BASE PLATE RCC PEDESTAL


BOLT
DATE- 26.04.2022 DWG NO.- 16
STATUS-
N
BASE PLATE WORKING DRAWING
ELEVATION OF SPACE FRAME DRAWING NAME- SCALE-

SCALE = 1:50 RCC PEDESTAL NAME - DETAILS - SPACE FRAME 1:50


PROJECT NAME-

WELDED
CONNECTION WAR MUSEUM
ROLL NO.-

SECTION OF CONNECTION OF STANCHION TO PEDESTAL NAME - KAANKSHI PRUTHVI SHAH 5511


SECTION OF TUBE JUNCTION SCALE = 1:20 SIGN-

SCALE = 1:5 3rd YEAR B. ARCH

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
PRIOR TO COMMENCEMENT OF WORK ON SITE.
TREAD 5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
ANGLE CLEAT CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
6MMØ ANCHOR
TO WORK COMMENCEMENT.
BOLTS
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
1.600 1
THE ARCHITECT/CONSULTANT BEFORE.
RCC SLAB

UP
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF

EQ
2 METAL SUPPORT
PLATE THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

EQ
29 3

EQ
SPECIFIC NOTES

EQ
4

0.3
28

EQ

00

EQ
5
27 1. THE COMPONENTS SHALL BE JOINED BY WELDING AND

EQ
BOLTED UNLESS OTHERWISE SPECIFIED.

EQ
6
26 2. CUTTING, DRILLING AND PUNCHING TO BE DONE

EQ

EQ
7
ACCURATELY. BURRS AND ROUGH EDGES TO BE REMOVED.

2.700
25
3. EXPOSED CONNECTIONS SHALL BE MADE WITH HAIRLINE
EQ

2.7

EQ
8
JOINTS, FLUSH AND SMOOTH.

0
ANGLE SUPPORTS

0
24

EQ
EQ

9 4. THE COMPONENTS SHALL BE STORED ATLEAST 300MM ABOVE


GROUND AND PREVENT WATER PONDING.

EQ
23 10
EQ

5. THE SURFACES SHALL BE CLEANED OF OIL, GREASE OR


22 OTHER FOREIGN MATERIAL THEN COATED WITH PRIMER AND
EQ

0.050 FINISHED WITH OIL PAINT.


21 0.148 2.700
EQ

2.4
STRINGER BEAM 25MMØ ANCHOR BOLTS

00
UP
UP

EQ EQ EQ EQ EQ EQ C18 18MMØANCHOR BOLTS


EQ EQ EQ
+2.5 M
+4.0 M
MID LANDING
0.45 x 0.6 M
MID LANDING C16
STRINGER BEAM
0.45 x 0.6 M
20
11
2.300
14 13 12
17 16 15
19 18

W1
W1
W1
W1
W1
STRINGER BEAM CONNECTION TO TREAD STRINGER BEAM CONNECTION TO SLAB
SCALE 1:10 SCALE 1:10
PLAN OF STAIRCASE
SCALE 1:50

STRINGER BEAM
RAILING

FIXING PIN

30MM THK. FIXING


PLATE

20MMØ ANCHOR
BOLTS
250x100x50MM M.S STRINGER
BEAM 10MM GUSSET PLATE 12MM THK. FIXED GLASS
3.000

50MM THK. TIMBER BALUSTRADE


FINISHED TREAD

10MMØ ANCHOR BOLTS

20MM BASE PLATE


150MM THK. PCC BED 75MM THK. SCREEDING 7MM THK. 600x600MM
CERAMIC TILES
4.500

STRINGER BEAM CONNECTION TO FLOOR PART SECTION OF STAIRCASE


SCALE 1:10 SCALE 1:10

75MM THK. PCC BUILT STRUCTURE -


MUSEUM

BACKING

12MM THK. BACKING STRUCTURE UNDER


DETAILED STRUCTURE -
PLASTER MUSEUM CONSIDERATION

27.45M AC
7MM THK. CERAMIC FOB

CESS RO
TILES

AD
4.500

1.000
TREAD
ADHESIVE BED

BUILT STRUCTURE -
ADMIN

FOB

BALUSTRADE FIXING PIN (STANDOFF)


BRICK HEARTING

150MM THK. PCC KEY PLAN


SCALE = 1:1000
230MM THK. RUBBLE PACKING
12MM THK. FIXED GLASS BALUSTRADE

STEEL SUPPORT ASSEMBLY

DATE- 26.04.2022 DWG NO.- 17


STATUS-
N
WORKING DRAWING
BALUSTRADE CONNECTION PLINTH STEPS DRAWING NAME- SCALE-

SCALE 1:5 SCALE 1:20 NAME - DETAILS - STAIRCASE 1:50


PROJECT NAME-

WAR MUSEUM
ROLL NO.-

SECTION OF STAIRCASE NAME - KAANKSHI PRUTHVI SHAH 5511


SCALE 1:50 SIGN-

3rd YEAR B. ARCH

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
MIRROR TO WORK COMMENCEMENT.
1.350 6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

1.100
D4
SPECIFIC NOTES
PILLAR TRAP 1. PROVIDING AND LAYING OF WATER PROOF TREATMENT BY
APPLYING AFTER PREPARATION, CEMENT SLURRY MIXED
WITH TAPECRETE ACRYLIC BASED POLYMER
20MM THK. BLACK GRANITE WATERPROOFING COMPOUND IN A RATIO OF 2:1 (2 CEMENT :1
COUNTER TOP WATERPROOFING COMPOUND), AND A FINAL COAT OF WATER
DOOR PROOFING COMPOUND BRUSH TOPING HAVING WATER
PROOFING COMPOUND, CEMENT AND SAND IN THE RATIO 1:2:2
BY WEIGHT.
COUNTER BOTTOM WASH 2. GRADING OF FLOOR WITH CEMENT CONCRETE 1:2:4 (1
BASIN CEMENT, 2 COARSE SAND AND 4 GRADED STONE AGGREGATE
1.800
OF 20MM NOMINAL SIZE) TO A SLOPE OF 1:80.
ANGLE COCK 3. WASTE AND VENT PIPES SHALL BE PVC PIPES OF 150MM Ø
D4 AND 100MM Ø RESPECTIVELY.

BOTTLE TRAP

0.900
7MM THK. CERAMIC TILES
DOOR SCHEDULE
CEMENT GROUT
SYMBOL NO.s SPECIFICATIONS SIZE REMARKS
75MM THK. SCREEDING 150MM THK. MASONRY WALL

UPVC SINGLE LEAF FLUSH DOOR,


7MM THK. ANTI-SKID D4 2 20MM ANODIZED ALUMINIUM 1000 x 2100
ENTRANCE TO
TOILETS
CERAMIC TILES FRAME, 25MM UPVC BEADING ON
CEMENT SCREEDING SIDES

1.760 D5 4
12MM HPL SINGLE LEAF DOOR
660 x 2100 TOILET STALLS
WITH STAINLESS STEEL FITTINGS
12MM THK. BACKING
PLASTER 150MM THK. PCC BED
WOMEN'S TOILET
7.620 SQ.M WINDOW SCHEDULE
1.870
150MM THK. PCC BED
SYMBOL NO.s SPECIFICATIONS SIZE REMARKS
W2
F3 C2
S3
230MM THK. RUBBLE PACKING 40MM STONE FRAMES, GLASS
MEN'S TOILET SECTION OF TILE DROP W2 4 LOUVERED ANODIZED ALUMINIUM
PANELED WINDOW WITH
300 x 600 TOILET

10.650 SQ.M SCALE = 1:5 250x250MM EXHAUST FAN

W2
F3 C2 D5
S3 WALL FINISH SCHEDULE
D5
SECTION OF WASH BASIN SYMBOL SPECIFICATIONS REMARKS
SCALE = 1:10
12MM PLASTER 1:2:4, 12 MM OF WATERPROOFING AGENT
2.40

D5 230MM THK. MASONRY WALL W2


MIXED WITH PLASTER, 2 COATS OF WHITE WASH, 7MM TOILET
DADO OF CERAMIC TILES OF 300x300MM
0

D5
FLOOR FINISH SCHEDULE
1 .950 25MM THK. HPL PARTITION
2.40

SYMBOL SPECIFICATIONS REMARKS


0

0.750

20MM 1:2:4 SCREEDING, 3MM WATERPROOFING AGENT


F3 SCREEDING, 200MM BBC LAID TO SLOPE, 8MM ANTI-SKID TOILET
0 CERAMIC TILES OF 300x300MM
1.95 5
0.63 W2 12MM THK. MORTAR AND 150MM THK. MASONRY WALL
WATERPROOFING
150MM THK. RCC LINTEL
W2
150MM THK. RCC LINTEL
CEILING SCHEDULE
12MM THK. INTERNAL PLASTER

SYMBOL SPECIFICATIONS REMARKS


0
0.64 W2

10MM 1:1.5:2 PLASTER, 2 COATS OF WHITE WASH


5
0.42 W2
INSIDE OUTSIDE C3 TOILET

DOOR GLASS LOUVERS MOUNTED ON POWDER


COATED ALUMINIUM FRAME

5
SKIRTING SCHEDULE
4.32 GLASS LOUVERS MOUNTED ON
VOID POWDER COATED ALUMINIUM FRAME
0.450 x 4.325 SYMBOL SPECIFICATIONS REMARKS
DUCT
0.750 x 4.325 20MM THK. 1:2:4 PLASTER, 100MM WIDE CERAMIC TILE
SKIRTING TOILET
150MM THK. RCC SILL ALUMINIUM BOX SECTION S3

FRAME
RCC JALI
7MM THK. DADO OF 300x300MM 150MM THK. RCC SILL
7MM THK. ANTI-SKID CERAMIC TILES
CERAMIC TILES FLUSH TANK

CEMENT SCREEDING BUILT STRUCTURE -


0.450

MUSEUM

PVC SOIL PIPE

SECTION OF LOUVERED WINDOW


STRUCTURE UNDER
NAHNI TRAP SCALE = 1:10 DETAILED STRUCTURE -
MUSEUM CONSIDERATION

27.45M AC
FOB

CESS RO
20MM THK. STONE

AD
25MM THK. HPL PARTITION
FRAME

150MM THK. GLASS LOUVERED ALUMINIUM


MASONRY WALL FRAMED WINDOW
PLINTH BEAM

INSPECTION CHAMBER BUILT STRUCTURE -


ADMIN

150MM THK. PCC BED 230MM THK. RUBBLE


DOOR KNOB SELF CLOSING 75MM THK. BRICK BAT COBA PACKING FOB

CONCEALED LATCH HINGE

KEY PLAN
DOOR
SCALE = 1:1000

12MM INTERNAL 12MM MORTAR AND


PLASTER WATERPROOFING
DATE- 26.04.2022 DWG NO.- 18
7MM THK. DADO OF CERAMIC STATUS-
N
TILES OF 300x300MM
WORKING DRAWING
END WALL SECTION OF TOILET DRAWING NAME- SCALE-

SCALE = 1:20 NAME - DETAILS - TOILET 1:50


PLAN OF LOUVERED WINDOW PROJECT NAME-

PARTITION WALL FIXING SCALE = 1:10


SCALE = 1:5 WAR MUSEUM
ROLL NO.-

NAME - KAANKSHI PRUTHVI SHAH 5511


SIGN-

3rd YEAR B. ARCH

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
E D C B A PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
O
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.
3.410 10.000 T84 T82 10.000 T78
10.000 10.000 T69 10.000 (0,0)
T88 T86 T80

T76
T75
SPECIFIC NOTES
T87 T74 T65
T67
T77 T73
T85
T79
T72 1. CONSTRUCTING A R.C.C UNDERGROUND WATER TANK, R.C.C
T83 T68
T89 T66 TOP SLAB WITH 1:2:4, INSIDE PLASTERING 6MM THK. WITH

10.000
T81 T71 T70
CEMENT MORTAR 1:3 FINISHED WITH FLOATING COAT OF NEAT
T64
CEMENT AND MAKING CHANNELS IN CEMENT CONCRETE 1:2:4.
2. INSTALLING 100MM Ø WATER SUPPLY AND VENT PVC PIPES .

14.348
T90
3. THE TANK SHALL BE GRADED WITH POSITIVE AND NEGATIVE
SLOPE OF 1:80 WITH CEMENT CONCRETE TO ALLOW WATER
T63 TO FLOW.
T91
4. PROVIDING AND LAYING CORNER FILLET 25MM x 25MM SIZE AT
JUNCTION OF WALLS, SLAB AND PIPE JOINTS SEALING BY

20.676
T92
1E 1D 1C 1B 1A
T62 CEMENT AND SAND MORTAR 1:3 MIXED WITH TAPECRETE
(50,10) (40,10) (30,10) UP
(20,10) (10,10)
1 GOOSE NECK
ACRYLIC BASED POLYMER WATER PROOFING COMPOUND.
5. THE OUTLET PIPE SHALL BE 3 - 5CM ABOVE THE FLOOR OF
T93
UP STOP COCK WATER METER STOP COCK THE TANK AND ALWAYS PROVIDED WITH A SHUT VALVE.
T61
6. THE TANK SHALL BE PROVIDED A SCOUR OR DRAIN PIPE FOR

27.314
CLEANING.
7. THE MANHOLE/COVER SHALL BE TIGHT FITTING TYPE TO

10.000
T94
BUILT STRUCTURE - MUSEUM T60
PREVENT ENTRY OF DUST ETC.

RAM
UNDERGROUND WATER TANK

P 1:1
T95 T59 2.4 x 4.8 x 1.8 M
UP

0
T96
12.758
T58 MUNICIPAL MAIN COMPOUND WALL
WATER SUPPLY CALCULATIONS
SUPPLY
2E 2D 2C 2B 2A
(50,20)
T97
(40,20) (30,20) (20,20) (10,20) T57
2 A STRUCTURE - MUSEUM

PLAN OF WATER SUPPLY FROM MAINS TO UNDERGROUND TANK


T98
SCALE = 1:50 SR. NO. SPACES FOOT FALL
WATER REQUIRED TOTAL
PER PERSON PER (IN LITRES)
DAY

10.000
T99
T56

T35
1 MUSEUM 150 45 LITRES 6750
T100 COMPOUND WALL
T55 2 AUDITORIUM 50 25 LITRES 1250

1 ADMIN & TICKETING 50 45 LITRES 2250


T101
9.559 DETAILED STRUCTURE - MUSEUM
2 RESTAURANT 100 70 LITRES 7000
T54

3E 3D 3C 3B 3A T34
(50,30)
T102

(40,30) (30,30)
OHT
5.35(20,30)
SQ.M (10,30)
3 VENT PIPE TOTAL 17250 LITRES PER DAY
T53
14.220
CONSIDERATIONS:
T33
T103
15.107 OUTLET PIPE 1. HEIGHT OF THE TANK IS 1.5M WITH 0.3M FOR SERVICEABILITY
T32

10.000
TOILET
T52
2. TOTAL VOLUME (CAPACITY) OF THE TANK = 17.250 CU.M = 17250 LITRES
T104 BLOCK
SIZE OF THE TANK:
T31

6.314 VOLUME = LENGTH x BREADTH x HEIGHT


T51
G. L HEIGHT = 1.5 M
T105
T30
T50
CONSIDER L = 2B
27.45M A

23.754
T106 T29 17.250 = 2B x B x 1.5
4E 4D 4C 4B 4A B = 2.4 M
(50,40) (40,40) (30,40) (20,40) (10,40)
T49 4
T28 L = 2B = 4.8 M
T107
22.309
T27 SIZE OF THE TANK = 4.8 x 2.4 x 1.8M
T48 GOOSE NECK WATER METER
UP T47 STOP COCK

10.000
T108
T26 STOP COCK
LEGEND:
8.608
T46
FOB UNDERGROUND WATER TANK
WATER SUPPLY PIPES 100MM Ø
CC

T109
T25
T45 MUNICIPAL MAIN 2.4 x 4.8 x 1.8 M
T110
SUPPLY
T24
UNDER GROUND WATER TANK
SECTION OF WATER SUPPLY FROM MAINS TO UNDERGROUND TANK
ESS ROA

P69
5E 5D 5C P67 5B 5A
5
T111 P68 T44

(50,50) (40,50) P46


P47
P48
(30,50) (20,50) T23
(10,50) SCALE = 1:50
P27
OVERHEAD WATER TANK
P26
P25 P66
P65 T22
P64
P45
P44
P43
T21
10.000

P24
P23
P22 P63
P61
P62
T42 OVERFLOW PIPE
P42
P41
P40
T20 COVER
P21 T41
P20 T19
P19 P60
P59
D

P58
P39
P38
P37
INLET PIPE
P18
P17
P16 P57
6E 6D 6C P56
6B 6A
(50,60) (40,60) P34
P35
P36
(30,60)
P55

(20,60)
T18
(10,60)
T40
6 INLET PIPE
T17
P15
P14
P13 P54
P53
P52
P33
P32 T39
P31
T16
COVER
10.000

P12
P11
P10
P49
P50
P51 T38
OUTLET PIPE
P30
P29
P28 T15

T14 T37
SUMP
P09
P07
P08
SUBMISIBLE PUMP
T13

SUBMISIBLE PUMP
BUILT STRUCTURE -
UGT MUSEUM

P05
P06 2.4x4.8M T36
P04
7E 7D 7C 4.5 7B 7A STOP COCK
(50,70) (40,70)
9
(30,70) 7 5.85
9
(20,70) (10,70)
7
OUTLET PIPE
P03 STRUCTURE UNDER
P02 CONSIDERATION
P01
UP STOP COCK DETAILED STRUCTURE -
MUSEUM

27.45M AC
UP
10.000

WATCHMAN FOB

CESS RO
CABIN PLAN OF UNDERGROUND TANK SECTION OF UNDERGROUND TANK
SCALE = 1:50 SCALE = 1:50
PEDESTRIA WIDE

T01

AD
RAMP 1:10

21.364
3M
N ENTRY/E

MUNICIPAL
WATER SUPPLY
8E 8D 8C 8B 8A
XIT

(50,80) (40,80) (30,80) (20,80) (10,80)


8 INLET PIPE OUTLET PIPE
OHT
VEHICUL

2.5x3 M
BUILT STRUCTURE - ADMIN INLET PIPE
RAMP 1:10

BUILT STRUCTURE -
ADMIN
UP
6M WIDE

COVER
AR ENTR

FOB
10.000
Y/EXIT

INLET PIPE
TOILET
BLOCK
KEY PLAN
OUTLET PIPE
5.578 LADDER SCALE = 1:1000
UP
P0A P0B P0C

FOB
6.095

9E 9D 9C 9B 9A
(50,90) (40,90) (30,90) (20,90) (10,90)
9 DATE- 26.04.2022 DWG NO.- 19
3.709

T12

T02 T05 T06


T09
T10 T11
STATUS-
N
T03 T04 T08
T07
DOMESTIC TANK FLUSHING TANK
WORKING DRAWING
DRAWING NAME- SCALE-

NAME - SERVICES - WATER SUPPLY 1:200


PROJECT NAME-

WASH OUT
OUTLET PIPE VALVE WAR MUSEUM
ROLL NO.-

NAME - KAANKSHI PRUTHVI SHAH 5511


PLAN OF OVERHEAD TANK SECTION OF OVERHEAD TANK SIGN-

SCALE = 1:50 SCALE = 1:50 3rd YEAR B. ARCH

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
E D C B A PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
O
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.
3.410 10.000 T84 T82 10.000 T78
10.000 10.000 T69 10.000 (0,0)
T88 T86 T80

T76
T75
CONCRETE PAVING SPECIFIC NOTES
T87 T74 T65
T77 T73
T67 PCC BEDDING
T85
T79
T72 1. CONSTRUCTING A BRICK MASONRY MANHOLE IN CEMENT
T68
T89 T83
T66 GRATED COVER DRAINAGE PIPE MORTAR 1:4, R.C.C TOP SLAB WITH 1:2:4, INSIDE PLASTERING

10.000
T81 T71 T70
12MM THK. WITH CEMENT MORTAR 1:3 FINISHED WITH
T64
FLOATING COAT OF NEAT CEMENT AND MAKING CHANNELS IN
CEMENT CONCRETE 1:2:4.

14.348
T90
2. INSTALLING 150MMØ SOIL PIPE AND 100MMØ VENT PVC PIPES
IN A DOUBLE STACK SYSTEM.
T63 3. PROVIDING AND FIXING SQUARE MOUTH GULLY TRAP WITH
T91
GRATING BRICK MASONRY CHAMBER WITH WATER TIGHT
50MMØ OUTLET COVER WITH FRAME 300MMx300MM.

20.676
T92
1E 1D 1C 1B 1A
T62 4. THE MANHOLE/COVER SHALL BE TIGHT FITTING TYPE TO
(50,10) (40,10) (30,10) UP
(20,10) (10,10)
1 25MM WATER SEAL PREVENT ENTRY OF DUST ETC.
5. THE DRAINAGE SYSTEM SHALL MAINTAIN A SLOPE MINIMUM
T93
UP OF 1:80 AND MAXIMUM OF 1:60.
T61

27.314

10.000
T94
BUILT STRUCTURE - MUSEUM T60
NAHNI TRAP INVERT LEVEL CALCULATIONS

RAM
SCALE = 1:5

P 1:1
T95
UP
T59
PIPE ENCASEMENT

0
SCALE = 1:10 SR. NO. INSPECTION CHAMBER NO. INVERT LEVEL
T96
12.758
T58

1 IC 01 450 MM
2E 2D 2C 2B 2A
(50,20)
T97
(40,20) (30,20) (20,20) (10,20) T57
2 2 IC 02 469 MM
INLET 3 IC 03 507 MM
30MMØ INLET
T98 4 IC 04 544 MM
5 IC 05 582 MM
30MMØ OUTLET

10.000
T99
T56
6 IC 06 619 MM
15MM WATER SEAL
T35
7 IC 07 657 MM
T100

T55
8 IC 08 694 MM
CLEAN OUT PLUG 9 IC 09 732 MM
T101
9.559 DETAILED STRUCTURE - MUSEUM INTLET
10 IC 10 769 MM
T54

11 IC 11 807 MM
3E 3D 3C 3B 3A T34
(50,30)
T102

(40,30) (30,30) (20,30) (10,30)


3 BOTTLE TRAP 12 IC 12 844 MM
T53
14.220 65MM WATER SEAL SCALE = 1:5 13 IC 13 882 MM
T103
T33 14 IC 14 919 MM
15.107
T32
15 IC 15 957 MM

10.000
T52
TOILET
T104 BLOCK 16 IC 16 994 MM
LID
T31 17 IC 17 1032 MM
6.314 T51
18 IC 18 1069 MM
T105

IC 01
T30
T50
P - TRAP INLET TO IC 19 IC 19 1032 MM
27.45M A

LVL = -0.450M

T29
23.754 SCALE = 1:5 20 IC 20 994 MM
T106 IC 02
LVL = -0.469M
4E 4D 4C 4B 4A 21 957 MM
(50,40) (40,40) (30,40) (20,40) (10,40)
T49 4 RODDING ARM IC 21
T28 22 IC 22 919 MM
T107
22.309 23 882 MM
IC 03
T27 IC 23
LVL = -0.507M T48
24 IC 24 844 MM
UP T47 OUTLET TO MUNICIPAL SEWER

10.000
T108
T26
25 IC 25 807 MM
8.608 26 IC 26 769 MM
IC 04 T46
FOB LVL = -0.544M 27 IC 27 732 MM
CC

T109
T25 100MM WATER SEAL
IC 05 T45
LVL = -0.582M
IC 06
LVL = -0.619M
LEGEND:
IC 07
T110
IC 08 LVL = -0.657M T24
IC 09 LVL = -0.694M DRAINAGE PIPES 150MM Ø
ESS ROA

LVL = -0.732M
P69
5E 5D 5C P67 5B 5A
5
T111 P68 T44
P48
(50,50) (40,50) P46
P47 (30,50) (20,50) (10,50) COVER
T23
100MMØ INLET INSPECTION CHAMBER
P27 IC 10
P26
P25 LVL = -0.769M

P45
P64
P65
P66
T22 INTERCEPTING TRAP
P44
P43
T21
SCALE = 1:10
GULLY TRAP
10.000

P24
P23
P22 P63
P62
P61 T42
IC 11 P42
P41
LVL = -0.807M P40
T20
MASONRY
P20
P21
T19
T41 DROP CHAMBER
P19 P60
P59
D

P58
P39
P38
P37

IC 12
P18 LVL = -0.844M
P16
P17
P57 100MMØ OUTLET PIPE
6E 6D 6C P56
6B 6A
(50,60) (40,60) P34
P35
P36
(30,60)
P55

(20,60)
T18
(10,60)
T40
6
T17
P15
P14
P13 P54
IC 13 P52
P53 PCC 100MMØ INLET PIPE
LVL = -0.882M P33
P32 T39
P31
T16
10.000

P12
P11
P10 P51 T38
P50
P49
P30
P29
P28 T15
IC 14
T14 T37

P07
P08
P09
LVL = -0.919M
GULLY TRAP
T13
SCALE = 1:10
BUILT STRUCTURE -
UGT MUSEUM

P05
P06 2.4x4.8M T36
P04 IC 15
7E 7D 7C 7B 7A
(50,70) (40,70)
LVL = -0.957M

(30,70) (20,70) (10,70)


7
P03 STRUCTURE UNDER
P02 CONSIDERATION
P01 DETAILED STRUCTURE -
UP MUSEUM

IC 16

27.45M AC
LVL = -0.994M
UP 150MM MASONRY
10.000

IC COVER WALL
WATCHMAN FOB

CESS RO
CABIN
PEDESTRIA WIDE

IC 17 T01

AD
LVL = -1.032M
RAMP 1:10

21.364
3M

PCC
N ENTRY/E

8E 8D 8C 8B 8A
XIT

(50,80) (40,80) IC 18
LVL = -1.069M (30,80) (20,80) (10,80)
8
DC 01
BENCHING
VEHICUL

LVL = -1.107M

BUILT STRUCTURE - ADMIN


RAMP 1:10

MAN HOLE BUILT STRUCTURE -


ADMIN
UP
6M WIDE
AR ENTR

IC 21 MASONRY WALL FOB


10.000
Y/EXIT

LVL = -0.957M
IC 20
LVL = -0.994M
IC 19
LVL = -1.032M
TOILET
BLOCK
MUNICIPAL
SEWER LINE IC 22 100MMØ INLET PIPE KEY PLAN
LVL = -0.919M

5.578
SCALE = 1:1000
UP
P0A P0B P0C

FOB IC 27
LVL = -0.732M
IC 23 IC 24 IC 25 IC 26
LVL = -0.882M LVL = -0.844M LVL = -0.807M LVL = -0.769M
6.095

9E 9D 9C 9B 9A
(50,90) (40,90) (30,90) (20,90) (10,90)
9 DATE- 26.04.2022 DWG NO.- 20
3.709

T12

T02 T05 T06


T09
T10 T11
STATUS-
N
T03 T04 T08
T07
SECTION OF INSPECTION CHAMBER WORKING DRAWING
SCALE = 1:10 DRAWING NAME- SCALE-

NAME - SERVICES - DRAINAGE 1:200

PLAN OF INSPECTION CHAMBER PROJECT NAME-

SCALE = 1:10 WAR MUSEUM


ROLL NO.-

NAME - KAANKSHI PRUTHVI SHAH 5511


SIGN-

3rd YEAR B. ARCH

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
E D C B A E D C B A PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
O O
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.
3.410 10.000 T84 T82 10.000 T78
10.000 10.000 T69 10.000 (0,0) 3.410 10.000 T84 T82 10.000 T78
10.000 10.000 T69 10.000 (0,0)
T88 T86 T80 T88 T86 T80
T75 T75
LEGEND:
T76 T76
T87 T74 T65 T87 T74 T65
T67 T67
T77 T73 T77 T73
T85 T72 T85 T72
T89 T83
T79 T68
T89 T83
T79 T68 STORM WATER DRAIN PIPES 100MM Ø
T66 T66

10.000

10.000
T81 T71 T70 T81 T71 T70

STORM WATER DRAIN


T64 T64

14.348

14.348
T90 T90

LEGEND:
T63 T63
T91 T91

MAIN SUPPLY FROM FEEDER PILLAR TO STEP DOWN

20.676

20.676
T92
T62
T92
T62
TRANSFORMER
1E 1D 1C 1B 1A 1E 1D 1C 1B 1A
(50,10) (40,10) (30,10) UP
(20,10) (10,10)
1 (50,10) (40,10) (30,10) UP
(20,10) (10,10)
1 TRANSFORMER TO METER ROOM

T93 T93 PHASE TO PUMP ROOM


UP UP
T61 T61

27.314

27.314
PHASE TO ADMIN

10.000

10.000
T94 T94
PHASE TO MUSEUM
BUILT STRUCTURE - MUSEUM T60
BUILT STRUCTURE - MUSEUM T60

RAM

RAM
P 1:1

P 1:1
PHASE TO WATCHMAN'S CABIN
T95 T59 T95 T59
UP UP

0
PHASE TO COMPOUND LIGHTING
T96 T96
12.758 12.758
T58 T58 PHASE TO SITE LIGHTING

2E 2D 2C 2B 2A 2E 2D 2C 2B 2A 30W COMPOUND WALL MOUNTED LAMPS


(50,20)
T97
(40,20) (30,20) (20,20) (10,20) T57
2 (50,20)
T97
(40,20) (30,20) (20,20) (10,20) T57
2
25W LED BOLLARD LIGHTS ALONG PATHWAYS
T98 T98
METER ELECTRIC METER

10.000

10.000
T99 T99
T56 T56
MDB MAIN DISTRIBUTION BOARD

T35 T35 STEP DOWN TRANSFORMER (1.5x3.6M)


T100 T100

T55 T55

T101
9.559 T101
9.559

T54 T54

3E 3D 3C 3B 3A T34 3E 3D 3C 3B 3A T34
(50,30)
T102

(40,30) (30,30) (20,30) (10,30)


3 (50,30)
T102

(40,30) (30,30) (20,30) (10,30)


3
T53 T53
14.220 14.220

T103
DETAILED STRUCTURE - MUSEUM T33
T103
DETAILED STRUCTURE - MUSEUM T33

15.107 15.107
T32 T32

10.000

10.000
T52 M T52
DB

T104 T104

T31 T31

6.314 T51 6.314 T51

T105 T105
T30 T30
T50 T50
27.45M A

27.45M A
23.754 23.754
T106 T29 T106 T29

4E 4D 4C 4B 4A 4E 4D 4C 4B 4A
(50,40) (40,40) (30,40) (20,40) (10,40)
T49 4 (50,40) (40,40) (30,40) (20,40) (10,40)
T49 4
T28 T28

T107 T107
22.309 22.309
T27 T27
T48 T48

T47 T47
UP UP

10.000

10.000
T26 T26
T108 T108

8.608 8.608
T46 T46
FOB FOB
CC

CC
T109 T109
T25 T25
T45 T45

T110 T110
T24 T24
ESS ROA

ESS ROA
P69 P69
5E 5D 5C P67 5B 5A 5E 5D 5C P67 5B 5A
5 5
T111 P68 T44 T111 P68 T44
P48 P48
(50,50) (40,50) P46
P47 (30,50) (20,50) T23
(10,50) (50,50) (40,50) P46
P47 (30,50) (20,50) T23
(10,50)
P27 P27
P26 P26
P25 P66 P25 P66
P65 T22 P65 T22
P64 P64
P45 P45
P44 P44
P43 P43
T21 T21
10.000

10.000
P24 P24
P23 P23
P22 P63 P22 P63
P62 P62
P61 T42 P61 T42
P42 P42
P41 P41
P40 P40
T20 T20

P21 T41 P21 T41


P20 T19 P20 T19
P19 P60 P19 P60
P59 P59
D

D
P58 P58
P39 P39
P38 P38
P37 P37

P18 P18
P17 P17
P16 P57 P16 P57
6E 6D 6C P56
6B 6A 6E 6D 6C P56
6B 6A
(50,60) (40,60) P34
P35
P36
(30,60)
P55

(20,60)
T18
(10,60)
T40
6 (50,60) (40,60) P34
P35
P36
(30,60)
P55

(20,60)
T18
(10,60)
T40
6
T17 T17
P15 P15
P14 P14
P13 P54 P13 P54
P53 P53
P52 P52
P33 P33
P32 T39 P32 T39
P31 P31
T16 T16
10.000

10.000
P12 P12
P11 P11
P10 P51 T38 P10 P51 T38
P50 P50
P49 P49
P30 P30
P29 P29
P28 T15 P28 T15

T14 T37 T14 T37


P09 P09
P08 P08
P07 P07
T13 T13

BUILT STRUCTURE -
UGT UGT MUSEUM

P05
P06 2.4x4.8M T36 P05
P06 2.4x4.8M T36
P04 P04
7E 7D 7C 7B 7A 7E 7D 7C 7B 7A
(50,70) (40,70) (30,70) (20,70) (10,70)
7 (50,70) (40,70) (30,70) (20,70) (10,70)
7
P03 P03 STRUCTURE UNDER
P02 P02 CONSIDERATION
P01 P01 DETAILED STRUCTURE -
UP UP MUSEUM

27.45M AC
UP UP
10.000

10.000
MDB

WATCHMAN WATCHMAN FOB

CESS RO
CABIN CABIN
PEDESTRIA WIDE

PEDESTRIA WIDE
T01 T01

AD
RAMP 1:10

RAMP 1:10
21.364 21.364
3M

3M
N ENTRY/E

N ENTRY/E
8E 8D 8C 8B 8A 8E 8D 8C 8B 8A
XIT

XIT
(50,80) (40,80) (30,80) (20,80) (10,80)
8 (50,80) (40,80) (30,80) (20,80) (10,80)
8
VEHICUL

VEHICUL
BUILT STRUCTURE - ADMIN BUILT STRUCTURE - ADMIN
RAMP 1:10

RAMP 1:10
BUILT STRUCTURE -

MDB
ADMIN
UP UP
6M WIDE

6M WIDE
AR ENTR

AR ENTR
METER FOB
10.000

10.000
ROOM
Y/EXIT

Y/EXIT
MDB METER
STORM WATER
LINE
PUMP ROOM KEY PLAN
5.578 5.578
SCALE = 1:1000
FEEDER

UP UP
P0A P0B P0C P0A P0B P0C

FOB FOB
PILLAR

STEP DOWN
TRANSFORMER
6.095

6.095
9E 9D 9C 9B 9A 9E 9D 9C 9B 9A
(50,90) (40,90) (30,90) (20,90) (10,90)
9 (50,90) (40,90) (30,90) (20,90) (10,90)
9 DATE- 26.04.2022 DWG NO.- 21
3.709

3.709
T12 T12

T02 T05 T06


T09
T10 T11 T02 T05 T06
T09
T10 T11
STATUS-
N
T03 T04 T08 T03 T04 T08
T07 T07

WORKING DRAWING
DRAWING NAME- SCALE-

NAME - SERVICES 1:200


PROJECT NAME-

WAR MUSEUM
ROLL NO.-

STORM WATER DRAINAGE SITE ELECTRICAL PLAN NAME - KAANKSHI PRUTHVI SHAH 5511

PLAN 3rd YEAR B. ARCH


SIGN-

ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
FOB 4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
X 1 2 3 4 5 6 7 8 9 10 PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
B THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

LEGEND:

MDB MAIN DISTRIBUTION BOARD

SDB SUB DISTRIBUTION BOARD

15W CIRCULAR LED CEILING MOUNTED LIGHTS

25W SQUARE LED CEILING MOUNTED LIGHTS

S
SWITCH BOARD WITH SOCKET

ELECTRICAL LINE FROM MDB TO SDB

C06 ELECTRICAL LINE FROM SDB TO SWITCH BOARD


0.45 x 0.6 M
+14.912 M ELECTRICAL LINE FROM SWITCH
MDB TO SDB
BOARD TO
L C06 VOID
W1 L APPLIANCE

4.385 x 3.960 EQ

EQ
W1

1.800
1.800
W1
F1 C1

3.960
S1 EQ

W1
2.755

W1

4.385 EQ

EQ

0.836

0.836
C11 C14
W1
0.45 x 0.6 M 0.45 x 0.6 M W1
+12.156 M CANOPY ABOVE W1 W1
K C11,C14 EQ F1 C1 K

5.725
2.100 x 2.100
2.900 S1
EQ

EQ
+0.0 M

4.
W1
0.755

W1 3.920

35
UP GROUND LEVEL W1
+11.401 M F1

0
C1
J C15 S1 EQ J
1.500 W1
EQ

S
W1
EQ

1
0.300

C16

EQ
0.45 x 0.6 M

2.525
EQ

EQ
EQ
2.281

1.800

W1 AS PER LIFT VENDOR W1


+1.0 M
EQ

4 SPECIFICATIONS F. F. L
EQ

5
C03 C05 C10
0.45 x 0.6 M
9.000
0.45 x 0.6 M 0.45 x 0.6 M SW4 EQ
6
+9.120 M
I C03,C05,C10,
S

3.250 S
EQ 1.000 EQ W1 I
SW4 S

0.470 C17
0.320 0.45 x 0.6 M EQ
4 3 2 1
LIFT SHAFT
0.843

D3 1 2 3 4
1.000

+8.277 M
EQ EQ EQ
1.800 x 1.680
H C17
UP
EQ EQ EQ
D4 H

1.680
SW1 SW2

SDB
0.900 D4
DN
0.987

BISON BOARD
2.550

PARTITION WALL UP
+7.290 M D2 1.800 1

G SW3 12.300 0.360


0.765
1.
6 00 2
G

EQ
S
3
A'

EQ
+1.0 M +0.4 M +1.0 M 1.350 4
STAGE F.F.L F.F.L

EQ
SW3

1.100
5
D4

EQ
D3

0.
6

30

EQ

5.
0
7

36
A

EQ
14.912

0
S

1.480

EQ
2.617

8
2.000 29

EQ
S
GREEN ROOM 9

EQ
S

EQ
28
1.500 x 1.480 1.800

2.
10
1.500

70

EQ
W1
PROJECTION

EQ
AUDITORIUM

0
27
F1 C1

2.700
C02 ROOM C09 D4
12.300 x 8.900 S1

EQ
26
0.45 x 0.6 M 3.260 x 2.000 0.45 x 0.6 M
+4.673 M
F F

EQ

2.
25

40
C02,C09
9.350

8.900

3.260
1.050

0
3.200

EQ
2.500
24
UP C18
0
3.540 2.70
0.771

0.45 x 0.6 M

EQ
23
+3.901 M 1.760 WOMEN'S TOILET
E 7.620 SQ.M
+2.5 M
E

EQ
C18 22 MID LANDING
1.500

EQ

EQ
GREEN ROOM 1.870 21 EQ

0
BISON BOARD MEN'S TOILET 2.30
EQ
W1
S

F2 C2
D3 EQ

1.500 x 1.480 PARTITION WALL 10.650 SQ.M W2 EQ


0
0.45
S2 F3 C2 EQ

1.480 EQ 11
1.588

S S3 UP EQ 12
S
W2 13
W1 W1
D5 C16 14 EQ
F1 C1 F3 C2 +4.0 M 15

D3 S1 S3 MID LANDING 0.45 x 0.6 M 17


16

+2.313 M D5 20 18 EQ W1
D C16
MDB 19
D

1.20
D5 EQ W1

0
D5 W1
2.550

0 0
DN 1.95

1.20
D2 0.28
1.594

00
11.8

0
0 W1
0.900 0.72
0.860 2.250 ACOUSTICAL PANEL C13
0 5
0.45 x 0.6 M 1.95 0.63 W2
+0.719 M BUILT STRUCTURE -

C C13
UP
C MUSEUM
1.100

1.000

C01 C04 C08 W2


0.45 x 0.6 M EQ EQ EQ
0.45 x 0.6 M 0.45 x 0.6 M
0
0.492

0.64
0.227

+0.225 M
B C01,C04,C08
S
4 3 2 1
W2 B STRUCTURE UNDER
CONSIDERATION
W2 DETAILED STRUCTURE -
MUSEUM
5
3.820 0.42
FOB 0.0 M FOB

27.45M AC
DUCT ABOVE
Y FOB 12.200
1 2 3 4 5 6

0.750 x 4.325 Y
0.300
FOB

CESS RO
EQ EQ EQ EQ EQ

RCC JALI
ALUMINIUM COMPOSITE

AD
3.500

PANEL DRY WALL CLADDING D1


2.772

UP
3.000

3.000

+0.0 M +1.0 M
GROUND LEVEL F. F. L

CANOPY ABOVE
C07 C12
3.300 x 3.000
0.45 x 0.6 M 0.45 x 0.6 M BUILT STRUCTURE -
ADMIN
-2.772 M
A C7, C12
W1
EQ
W1
EQ
W1
A FOB

1.500 1.300
4.810 KEY PLAN
SCALE = 1:1000

5.932 2.990 3.100 4.211 2.030 2.443 1.218 1.811 3.585


DATE- 26.04.2022 DWG NO.- 22
0.300
STATUS-
N
27.619
WORKING DRAWING

B'
DRAWING NAME- SCALE-

NAME - GROUND FLOOR ELECTRICAL 1:200


PROJECT NAME-

WAR MUSEUM
C07,C08,C09,

C12,C13,C14,
C01,C02,C03

+12.322 M

+16.533 M

+18.563 M

+22.223 M

+24.034 M
+21.006 M

+27.619 M
ROLL NO.-
+6.232 M

+9.222 M
C04,C05

C10,C11

NAME - KAANKSHI PRUTHVI SHAH 5511


0.0 M

+0.3 M

SW1

SW2
C06

C16

C17
C15

C18
SIGN-

FOB
3rd YEAR B. ARCH
X 1 2 3 4 5 6 7 8 9 10
ACADEMY OF ARCHITECTURE
GENERAL NOTES
1. ALL DIMENSIONS ARE IN 'METERS UNLESS OTHERWISE
SPECIFIED.
2. THE DRAWING IS NOT TO BE SCALED. THE WRITTEN
DIMENSIONS ARE STRICTLY TO BE FOLLOWED.
3. ALL LEVELS ARE UNFINISHED LEVELS UNLESS SPECIFIED.
FOB 4. THE CONTRACTOR SHALL VERIFY ALL ON SITE DIMENSIONS
X 1 2 3 4 5 6 7 8 9 10 PRIOR TO COMMENCEMENT OF WORK ON SITE.
5. THE CONTRACTOR SHALL INFORM THE ARCHITECT AND/OR
PROJECT ENGINEER ON SITE REGARDING ANY
CONDITIONS/MODIFICATIONS REQUIRED TO BE DONE PRIOR
TO WORK COMMENCEMENT.
6. ANY DISCREPANCY IS TO BE BROUGHT TO THE NOTICE OF
B THE ARCHITECT/CONSULTANT BEFORE.
7. ALL WORK IS TO BE COMPLETED TO THE SATISFACTION OF
THE SITE ENGINEER/PROJECT MANAGER AND ARCHITECTS.

LEGEND:

MDB MAIN DISTRIBUTION BOARD

SDB SUB DISTRIBUTION BOARD

15W CIRCULAR LED CEILING MOUNTED LIGHTS

25W SQUARE LED CEILING MOUNTED LIGHTS

S
SWITCH BOARD WITH SOCKET

ELECTRICAL LINE FROM MDB TO SDB

C06 ELECTRICAL LINE FROM SDB TO SWITCH BOARD


0.45 x 0.6 M
+14.912 M ELECTRICAL LINE FROM SWITCH
MDB TO SDB
BOARD TO
L C06 VOID
W1 L APPLIANCE

4.385 x 3.960 EQ

W1

EQ
F1 C1 W1

2.400

2.400
W3 S1 W3

3.960
EQ

W1
2.755

W1

4.385 EQ

EQ

0.510

0.510
C11 C14
W1
0.45 x 0.6 M 0.45 x 0.6 M W1
+12.156 M W1
K C11,C14 W3 EQ W1
K

5.725
CANOPY 2.900 F1 C1

EQ
S1

EQ
W1

4.
W1
0.755

3.920

35
W1
+11.401 M

0
J C15
0.675 2.400
EQ J
2.100 W1
EQ

S
W1
C16

EQ
0.45 x 0.6 M

2.525
2.100

EQ
2.281

AS PER LIFT VENDOR


W1 SPECIFICATIONS W1

C03 C05 C10


0.45 x 0.6 M
9.000
0.45 x 0.6 M 0.45 x 0.6 M SW4 EQ
+9.120 M
I C03,C05,C10,
S

3.250
S
EQ 1.000 EQ W1 I
SW4 S

0.470 C17
0.320
EQ EQ EQ EQ 3.675
LIFT SHAFT 0.45 x 0.6 M EQ
0.843

W1 W1 W1 W1 W1 W1 +5.5 M
+8.277 M 0.380 1.800 x 1.680 FIRST FLOOR LEVEL
H C17
D4 H

1.680
SW1 SW2

SDB
D4
0.987

BISON BOARD
PARTITION WALL UP
+7.290 M D2 1.800 1

G SW3 12.300 0.360


0.765
1.
600 2
G

EQ
S
3
A'

EQ
1.350 4

EQ
SW3

1.100
5
D4

EQ
DN

0.
6

30

EQ

5.
0
7

36
A

EQ
14.912

0
EQ
2.617

8
29

EQ
S
9

EQ
S

EQ
28

1.800

2.
10

70

EQ
EQ
W1

0
27

2.700
C02 C09 D4 F1 C1

EQ
S1
0.45 x 0.6 M EXHIBITION SPACE 0.45 x 0.6 M
26

+4.673 M 0
0.05 F
F 12.300 x 8.900

EQ

2.
25

40
C02,C09
9.350

8.900

0
EQ
24
UP C18
0
2.70
0.771

0.45 x 0.6 M

EQ
W1 3.531 WOMEN'S TOILET 23
+3.901 M D4 1.760 0.14
8
E F1 C2
7.620 SQ.M
+7.0 M
E

EQ
C18 S1 22 MID LANDING

EQ

EQ
1.870 21 EQ

0
MEN'S TOILET 2.30
EQ
S

EQ
EQ
W2
10.650 SQ.M EQ
0
F3 C2 0.45
EQ

DN
S

EQ 11
1.588

S3 EQ 12
W2 13
D5 C16 14 EQ W1
F3 C2 +8.5 M 15

S3 MID LANDING 0.45 x 0.6 M 16

+2.313 M STORE ROOM D5 EQ W1


D C16 23.180 SQ.M D

1.20
D5 EQ W1

0
0
W1
D5 0.45 W1
F1 C1 0
1.95

1.20
0
S1 0.28
1.594

00
11.8

0
W1

0.750
C13
0 5
0.45 x 0.6 M 1.95 0.63 W2
+0.719 M BUILT STRUCTURE -

C C
7.400

MUSEUM

C13 C01 C04 C08 W2


0.45 x 0.6 M 0.45 x 0.6 M 0.45 x 0.6 M
0
0.492

0.64
0.227

+0.225 M
B C01,C04,C08
S
W2 B STRUCTURE UNDER
CONSIDERATION
W2 DETAILED STRUCTURE -
MUSEUM
5
3.820 0.42
5
FOB 0.0 M 4.32 FOB

27.45M AC
Y FOB 12.200 VOID Y
DUCT 0.450 x 4.325
FOB

CESS RO
0.750 x 4.325

ALUMINIUM COMPOSITE RCC JALI

AD
3.500

PANEL DRY WALL CLADDING


2.772

3.000
3.000

CANOPY C07 C12


0.45 x 0.6 M 0.45 x 0.6 M BUILT STRUCTURE -
ADMIN
-2.772 M
A C7, C12
W1
EQ
W1
EQ
W1
A FOB

3.300

4.810 KEY PLAN


SCALE = 1:1000

5.932 2.990 3.100 4.211 2.030 2.443 1.218 1.811 3.585


DATE- 26.04.2022 DWG NO.- 23
0.300
STATUS-
N
27.619
WORKING DRAWING

B'
DRAWING NAME- SCALE-

NAME - FIRST FLOOR ELECTRICAL 1:200


PROJECT NAME-

WAR MUSEUM
C07,C08,C09,

C12,C13,C14,
C01,C02,C03

+12.322 M

+16.533 M

+18.563 M

+22.223 M

+24.034 M
+21.006 M

+27.619 M
ROLL NO.-
+6.232 M

+9.222 M
C04,C05

C10,C11

NAME - KAANKSHI PRUTHVI SHAH 5511


0.0 M

+0.3 M

SW1

SW2
C06

C16

C17
C15

C18
SIGN-

FOB
3rd YEAR B. ARCH
X 1 2 3 4 5 6 7 8 9 10
ACADEMY OF ARCHITECTURE

You might also like