0% found this document useful (0 votes)
11 views

Variation Order vs

Uploaded by

ababneh00
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Variation Order vs

Uploaded by

ababneh00
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

# Variation Order vs.

Change Order: Understanding the Differences

In construction and project management, the terms "variation order" and "change order"
are often used interchangeably, but they can have distinct meanings depending on the
context. Understanding the differences between the two is crucial for effective project
management, contract administration, and maintaining clear communication among
stakeholders.

## Change Order

### Definition
A change order is a formal document that modifies the original construction contract. It
typically involves adjustments to the project scope, cost, or timeline due to unforeseen
circumstances or new requirements.

### Common Reasons for Change Orders


- **Design Modifications**: Changes requested by the client or architect after the project
has begun.
- **Regulatory Changes**: New laws or regulations that affect the project.
- **Unforeseen Conditions**: Unexpected issues, such as discovering hazardous
materials or structural problems.

### Key Characteristics


- **Formal Process**: Change orders are usually documented and require approval from
all parties involved (e.g., the client, contractor, and architect).
- **Cost Implications**: They often include adjustments to the project budget and
schedule.
- **Contractual Basis**: Change orders are based on the original contract terms and
conditions.

## Variation Order
### Definition
A variation order specifically refers to modifications in the scope of work as outlined in the
original contract. It is often used in the context of construction contracts and can be seen
as a subset of change orders.

### Common Reasons for Variation Orders


- **Client Requests**: Changes initiated by the client for additional work or alterations.
- **Design Enhancements**: Improvements or upgrades that enhance the project's quality
or functionality.
- **Technical Adjustments**: Changes needed to accommodate technical specifications
or methods.

### Key Characteristics


- **Scope Focus**: Variation orders primarily focus on changes to the scope of work rather
than cost or schedule adjustments.
- **Flexibility**: They may be issued more informally than change orders, depending on the
contract's terms.
- **Defined Within Contracts**: Variation orders are typically defined within the original
contract and may have specific procedures for approval.

## Key Differences

| Aspect | Change Order | Variation Order |


|-------------------------|------------------------------------------------|---------------------------------------
-----|
| **Definition** | Formal document modifying contract terms | Modifications in
scope of work |
| **Scope** | May include changes in cost, schedule, or scope| Primarily focused on
changes in scope |
| **Approval Process** | Requires formal approval from all parties | May be less formal,
depending on the contract |
| **Contract Basis** | Based on original contract terms | Defined within the
original contract |
| **Common Reasons** | Design changes, regulatory changes, unforeseen issues |
Client requests, enhancements, technical adjustments |

## Conclusion

While the terms "variation order" and "change order" are sometimes used interchangeably,
understanding their distinct meanings is essential for effective project management.
Change orders encompass broader modifications to the contract, including cost and
schedule adjustments, while variation orders specifically address changes in the project's
scope. Clear communication and proper documentation of both types of orders are crucial
for maintaining project integrity and ensuring all parties are aligned throughout the
construction process.