0% found this document useful (0 votes)
3 views

01-DER

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

01-DER

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

EngSolutions RCB Version 8.8.4 - License No: A20124-A15833 Page No.

1
===============================================================================================
Company: ECOWALL Engineer: JUAN PABLO SANCHEZ ROJAS
Project: CASA KR 14 A bis 66 - 34, Bogotá, D.C. 12:53:08 16/01/2025
File: C:\RCB\Structures\PORTICO VINOS DOS N10-03.rcb
===============================================================================================

P-DELTA ANALYSIS - SUMMARY MAXIMUM STORY DRIFT RATIO, Δ/h

Drift-Ratio at CENTER OF MASS MAXIMUM Corner Story-Drift-Ratio


------------------------------- -------------------------------------------
Story DriftX DriftY DriftR DriftX DriftY DriftR Axis
______ _________ _________ _________ _________ _________ _________ _________

2 0.0006 0.0000 0.0006 0.0006 0.0000 0.0006 A-5


1 0.0008 0.0000 0.0008 0.0008 0.0000 0.0008 A-5
______ _________ _________ _________ _________ _________ _________ _________
Maxima 0.0008 0.0000 0.0008 0.0008 0.0000 0.0008
______ _________ _________ _________ _________ _________ _________ _________

DriftX = (Δx/h)max
DriftY = (Δy/h)max
DriftR = ([(Δx/h)² + (Δy/h)²]½)max

You might also like