Quotation
Quotation
DATE 1/20/2025
888 Quotation # 100
City, State ZIP Code Customer ID ABA
Phone: Enter Phone number here Fax: Enter Fax number here
SALESPERSON P.O. NUMBER SHIP DATE SHIP VIA F.O.B. POINT TERMS
Due on receipt
SUBTOTAL $ 1,496.00
OTHER $ -
TOTAL $ 1,624.66
If you have any questions concerning this quotation, contact name, phone number, e-mail.
A. General Requirements
Subtotal A ₱15,000.00
B. Earthworks
Subtotal B ₱0.00
Subtotal C ₱0.00
D. Drainage Works
Installation of Weep Holes (PVC Pipes, Ø100
1 l.m. 0
mm)
2 Installation of Drainage Canal l.m. 0
3 cu.m. 0
Subtotal D ₱0.00
E. Miscellaneous Works
Subtotal D ₱0.00
F. Materials
F. Materials