The document lists major existing and completed projects, detailing their names, owners, contractors, and completion years. Notable projects include the Jafurah Unconventional Gas Plant and NEOM Spine Infrastructure, both completed in 2023. The document provides a comprehensive overview of various infrastructure and utility projects across Saudi Arabia, with completion years ranging from 2017 to 2023.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

MECSS Previous project list

The document lists major existing and completed projects, detailing their names, owners, contractors, and completion years. Notable projects include the Jafurah Unconventional Gas Plant and NEOM Spine Infrastructure, both completed in 2023. The document provides a comprehensive overview of various infrastructure and utility projects across Saudi Arabia, with completion years ranging from 2017 to 2023.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 25

MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

Jafurah Unconventional Gas Plant - Gas Processing


1 Saudi Aramco Samsung Engineering Co.,Ltd. 2023
Package - (Package 2)

SHA (Samsung C&T Corporation,


NEOM Spine Infrastructure – Running
2 NEOM Hyundai Eng'g & Const. Co. Ltd.& 2023
Tunnels(Mountain Section Lots 4 and 5)
Saudi Archirodon) Joint Venture.

3 APOC PDH/UTOS PROJECT Advanced Polyolefins Industry Company Samsung Engineering Co.,Ltd. 2022

Red Sea Pubic Utility Assets And Infrastructure PPP Shandong Tiejun Electric Power
4 The Red Sea Development Company 2022
Project Engineering Co.,Ltd Branch

Marjan Increment Program - Onshore water


5 injection (Package 7) Saudi Aramco Nesma & Partners Contracting CO. 2022

Marjan Increment Program – Industrial Support Al-Rashid Trading & Contracting


6 Saudi Aramco 2022
Facility RTCC

7 Moyeath Copper & Zinc Processing Plant SENET Co. AMAK 2022

9 Tanajib 380kV Substation Saudi Electricity Company - SEC Linxon Saudi Arabia Co. Ltd 2022

Page 1 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

Arabian Castles for General


10 King Fahad Air Base, Taif Royal Saudi Air Force 2022
Contracting LLC (ACGC)

Arabian Castles for General


11 King Faisal Air Academy, Al Majma’ah Royal Saudi Air Force 2022
Contracting LLC (ACGC)

GPIL EXPANSION PROJECT BOPP LINE-4 & NEW CPP


12 Gulf Packing Industries Ltd Saudi TKT 2022
LIN

Shandong Tiejun Electric Power


13 JUBAIL - 3A INDEPENDENT WATER PROJECT Jazlah Water Desalination Company 2021
Engineering Co.,Ltd Branch

Saline Water Conversion Corporation -


14 JUBAIL – RIYADH WATER TRANSMISSION SYSTEM Limak Construction 2021
SWCC

15 NEW SUDAIR PV 380KV BSP (SS 9036) Saudi Electricity Company - SEC Tareg Al-Jaafari Contracting 2021

Saline Water Conversion Corporation - Al-Rashid Trading & Contracting


16 SHUQAIQ WATER TRANSMISSION SYSTEM - PHASE 3 2021
SWCC RTCC

17 YANBU 4 - 380KV BSP Saudi Electricity Company - SEC COGELEX, GENERAL ELECTRIC 2021

Page 2 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

ONE PDM ABSF 221/231 AND ITS ASSOCIATED


18 Saudi Aramco Saipem S.p.A 2021
FACILITIES FOR LTA 65

REPLACEMENT OF TWO (2) TRUNKLINES CONNECTED


19 TO ZG-2 Saudi Aramco Saipem S.p.A 2021
FOR LTA 63

Saline Water Conversion Corporation -


20 SWCC - Jubail SWRO Desalination Plant Phase 2 Metito Overseas Limited 2021
SWCC

21 ARAMCO INNOVATION CENTER Saudi Aramco Al-Bawani 2021

NATIONAL CONTRACTING
22 Replace HIC Affected Vessels, North Ghawar Saudi Aramco 2021
CO.(NCC)

Hyundai Engineering &


23 FAIS-SHOAIBA 380KV BSP Saudi Electricity Company - SEC 2021
Construction

Hyundai Engineering &


24 EXPANSION OF 380KV NAJRAN UNIVERSITY Saudi Electricity Company - SEC 2021
Construction
SUBSTATION

25 Jubail Petrochemical Complex Sadara Chemical Company LINDE Arabian Contracting Co. Ltd. 2021

Page 3 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

CIVIL & ELECTRICAL PROJECTS


GCC Electrical Testing Laboratory (GCC
26 GCC LAB - DAMMAM 3RD INDUSTRIAL CONTRACTING COMPANY 2021
LAB)
(CEPCO)

Sabic Ibn Al-Baytar Industrial Gas Production Plant Sinopec Engineering Group Saudi
27 SABIC 2020
at Jubail Co. Ltd.

Arabian Castles for General


28 NSF C&R - KAAB Dhahran Royal Saudi Air Force 2020
Contracting LLC (ACGC)

Saline Water Conversion Corporation - SEPCO III ELECTRIC POWER


29 SWCC - Jubail SWRO Desalination Plant Phase 2 2020
SWCC CONSTRUCTION

SEPCO III ELECTRIC POWER


30 380kV Layla Substation Saudi Electricity Company - SEC 2020
CONSTRUCTION

31 SWEC - Shuqaiq Desalination Plant Phase 3 (IWP) Saline Water Conversion Corporation Acciona Agua S.A 2020

United Nations Office for Project Services


32 United Nations Development Programme -Yemen Tagadod for Solar Energy 2020
(UNOPS)

33 RABIGH3-PUMP STATION 380/110kV BSP Project Saudi Electricity Company - SEC COGELEX, GENERAL ELECTRIC 2020

Page 4 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

Al Dur Phase ll Independent Water and Power EWA - Electricty and Water Authority in SEPCOIII Bahrain Construction
34 2019
Project Bahrain Company S.P.C

35 Sakaka Solar Power Plant 300 MW Acwa Power Mahindra Susten 2019

36 ALBA PS5 ALBA - Bahrain GAMA POWER SYSTEMS 2019

Schlumberger - Dammam Land Rigs Production Gulf Builder For Trading &
37 Schlumberger 2019
Center: Phase 2 Contracting Co.

SWCC - Shoaiba Desalination Plant Expansion: Zamil Air Conditioning &


38 Saline Water Conversion Corporation 2019
Phase 4 Refrigeration Services Co. Ltd.

EWA - Electricty and Water Authority in


39 East Sitra & BMP Substation ABB Switzerland Ltd. 2019
Bahrain

KING ABDULLAH UNIVERSITY OF SCIENCE


40 HARBOR RECTIFICATION PROJECT S.A. BAYTUR Construction Co. 2019
AND TECHNOLOGY - KAUST

Group Five Pipe Saudi - Dammam 2nd Industrial


41 Group Five Pipe Saudi Schuler Pressen GmbH 2019
City: New Group Five Factory

Page 5 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

National Direction Contracting


42 Saad Allessa Metal Industries Factory Saad Ali Al Essa Group 2019
Company

43 132 Kv Makkah Housing 2 S/S Saudi Electricity Company - SEC Al GIHAZ Contracting Company 2019

44 Heredah 132/33Kv SUBSTATION Saudi Electricity Company - SEC COGELEX Saudi Arabia ( GE) 2019

45 Jizan 132/33Kv SUBSTATION Saudi Electricity Company - SEC COGELEX Saudi Arabia ( GE) 2019

Waad Al‐Shamal Integrated Solar


46 Saudi Electricity Company - SEC ABENGOA 2018
Combined Cycle Power Plant

47 PP13 Combined Cycle Power Plant Saudi Electricity Company - SEC GAMA POWER SYSTEMS 2018

48 Saudi Aramco - Jizan Refinery Project Saudi Aramco Hyundai Arabia Company LLC 2018

EWA - Electricty and Water Authority in


49 Sahel Al Zallaq BSP Substation ABB Switzerland Ltd. 2018
Bahrain

Page 6 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

EWA - Electricty and Water Authority in


50 AL Hamala 220/66/11 kV BSP ABB Switzerland Ltd. 2018
Bahrain

EWA - Electricty and Water Authority in


51 ASKAAR 220/66/11 kV BSP ABB Switzerland Ltd. 2018
Bahrain

EWA - Electricty and Water Authority in


52 AL Matar - Airport 220/66/11kV BSP ABB Switzerland Ltd. 2018
Bahrain

EWA - Electricty and Water Authority in


53 SAFRA 220/66kV BSP ABB Switzerland Ltd. 2018
Bahrain

54 Saudi Aramco / SEC - Fadhili IPP Saudi Aramco / SEC JV SPX DRY COOLING BELGIUM 2018

Alfanar Labor Compoud Rooftop Solar Power Alfanar Energy and Alfanar Electrical
55 Al-Fanar Construction 2018
Project, Riyadh Syatem

KACST King Abdulaziz City for Science & KINETICS GERMANY GMBH – Saudi
56 KACST INVAP/ABV Rock Project 2018
Technology Arabia Branch

Power and Water Utility Company for Jubail


57 GTG 1 to 8 Rehabilitation Project - Yanbu GE Power Services 2018
and Yanbu (Marafiq )

Page 7 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

ALYAMAMA TRADING AND CONTRACTING


58 ALFA WOOD Factory in 3rd indstrial city in Dammam DTC Contracting Co. 2018
COMPANY

59 East Qurayyat 132/13.8kV substation Saudi Electricity Company - SEC Al-Osais Contracting Company 2018

60 Al Aflaj 132/13.8kV Substation Saudi Electricity Company - SEC Al-Osais Contracting Company 2018

61 Dirriyah 132/13.8kV substation Saudi Electricity Company - SEC Al-Osais Contracting Company 2018

62 Al Thagher -2 110/13.8KV S/S Saudi Electricity Company - SEC Al GIHAZ Contracting Company 2018

63 Madina Housing 110/13.8KV S/S Saudi Electricity Company - SEC Al GIHAZ Contracting Company 2018

64 132 Kv Sakaka S/s Saudi Electricity Company - SEC Al GIHAZ Contracting Company 2018

65 Hail2 Conversion to Combined Cycle Power Plant Saudi Electricity Company - SEC Al TOUKHI COMPANY 2017

Page 8 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

66 Hail2 Conversion to Combined Cycle Power Plant Saudi Electricity Company - SEC AMEC FOSTER WHEELER 2017

NATIONAL CONTRACTING
67 Qassim Conversion to Combined Cycle Power Plant Saudi Electricity Company - SEC 2017
CO.(NCC)

COCKERILL MAINTENANCE &


68 Qassim Conversion to Combined Cycle Power Plant Saudi Electricity Company - SEC 2017
INGENIERIE GROUP (CMI)

69 Riyadh Metro Substations 9053 S/S & 9054 S/S Saudi Electricity Company - SEC Al TOUKHI COMPANY 2017

SEPCO III ELECTRIC POWER


70 380kV Al-Zulfi Substation (9064) Saudi Electricity Company - SEC 2017
CONSTRUCTION

61 Upgradation of Qurayat City 33/ 13.8 kV Substation Saudi Electricity Company - SEC Naizak Global Engineering System 2017

62 New Fadhili 380kV Gas Plant Substation Saudi Electricity Company - SEC ABB Contracting 2017

63 Al Kharj 132/13.8KV S/S 8717 Saudi Electricity Company - SEC Haif Company 2017

Page 9 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

64 Izdihar 132/13.8 Kv Substation (8210) Saudi Electricity Company - SEC Larsen & Toubro Saudi Arabia LLC, 2017

65 FAL 132/13.8 Kv Substation (8308) Saudi Electricity Company - SEC Larsen & Toubro Saudi Arabia LLC, 2017

66 HEET 132/13.8 Kv Substation (8719) Saudi Electricity Company - SEC Larsen & Toubro Saudi Arabia LLC, 2017

67 South Hail 132/13.8 Kv Substation (8910) Saudi Electricity Company - SEC Larsen & Toubro Saudi Arabia LLC, 2017

68 Ghazalh 132/33 Kv Substation (8936) Saudi Electricity Company - SEC Larsen & Toubro Saudi Arabia LLC, 2017

69 AZIM 132/33 Kv Substation (8938) Saudi Electricity Company - SEC Larsen & Toubro Saudi Arabia LLC, 2017

70 RAFHA 132/13.8 Kv Substation Saudi Electricity Company - SEC Larsen & Toubro Saudi Arabia LLC, 2017

71 AL JOUF 132/33 Kv Substation Saudi Electricity Company - SEC Larsen & Toubro Saudi Arabia LLC, 2017

Page 10 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

72 AL OULA Substation Saudi Electricity Company - SEC Tareg Al-Jaafari Contracting 2017

73 DIE-4C Substation Saudi Electricity Company - SEC Tareg Al-Jaafari Contracting 2017

74 Al-Fursan Substation Saudi Electricity Company - SEC Tareg Al-Jaafari Contracting 2017

75 East Dammam-2 Substation Saudi Electricity Company - SEC Tareg Al-Jaafari Contracting 2017

76 Aziziyah-3 Substation Saudi Electricity Company - SEC Tareg Al-Jaafari Contracting 2017

77 South East Dammam Substation Saudi Electricity Company - SEC Tareg Al-Jaafari Contracting 2017

78 Halfmoon substation Saudi Electricity Company - SEC Tareg Al-Jaafari Contracting 2017

79 Dhahiyah Substation Saudi Electricity Company - SEC Tareg Al-Jaafari Contracting 2017

Page 11 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

80 Saihat -3 Substation Saudi Electricity Company - SEC Tareg Al-Jaafari Contracting 2017

81 Meena-2 Substation Saudi Electricity Company - SEC Tareg Al-Jaafari Contracting 2017

82 Taimah Substation Saudi Electricity Company - SEC Delta Contracting 2017

83 Rawabi Package Saudi Electricity Company - SEC Alstom Grid 2017

Saudi Services For Electro


84 BADER 132/13.8 kV Substation (8131) Saudi Electricity Company - SEC 2016
Mechanic Works (SSEM)

85 BANAGAS Plant Project Bahrain National Gas Company YOKOGAWA 2016

Dammam Housing Substation Package (5


86 Saudi Electricity Company - SEC Al-Fanar Construction 2016
Substations)

87 Bawat Substation Saudi Electricity Company - SEC Delta Contracting 2016

Page 12 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

88 Khatam Substation Saudi Electricity Company - SEC Delta Contracting 2016

89 380 KV Al‐Khaldiyah Saudi Electricity Company - SEC AL Toukhi 2015

ARABIAN BEMCO CONTRACTING


90 PP10 COMBINED CYCLE POWER PLANT Saudi Electricity Company - SEC 2013
CO.

Power & Water Utility Company for Jubail & HANWHA ENGINEERING &
91 Yanbu 2 Power & Desalination Plant 2013
Yanbu - Marafiq CONSTRUCTION

Saudi Services For Electro


92 SSIED, Wasaliyah & Al muna Substations Saudi Electricity Company - SEC 2013
Mechanic Works (SSEM)

ARABIAN BEMCO CONTRACTING


93 POWER PLANT 10 CONVERSION OF SCGT TO CC Saudi Electricity Company - SEC 2013
COMPANY

SWCC PROJ ‐ HOFUF WATER TRANSMISSION Saline Water Conversion Corporation -


94 KSB FLUID SYSTEMS GmbH 2012
PROJECT SWCC

95 ARAMCO / JGC‐ SAFANIA ARAMCO SESCO ‐ ALKHOBAR 2012

Page 13 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

96 AR‐RAZI PLANT V METHANOL PROJECT / JUBAIL Ar Razi Saudi Methanol Company SENDAN / JUBAIL 2012

AL‐TOUKHI COMPANY FOR


AL‐DHAHIYAH 380/115KV BULK SUPPLY POINT
97 Saudi Electricity Company - SEC INDUSTRY, TRADING AND 2012
CONTRACT No.30631007/00
CONTRACTING

CONSTRUCTION OF COMBINED CYCLE POWER ARABIAN BEMCO CONTRACTING


98 Saudi Electricity Company - SEC 2012
PLANT CO.

CONSTRUCTION OF JEDDAH NORTH WEST


99 Saudi Electricity Company - SEC AL OSAIS INEBENSA COMPANY LTD 2012
380/110/13,8 kV BSP

100 MAADEN ROLLING MILLS Saudi Arabian Mining Company - Maaden SAMSUNG 2012

101 PRAXAIS OXEGEN PLANT AT HIDD DISTRICT Praxair Bahrain BSC CEGELEC (BAHRAIN) 2012

COCKERILL MAINTENANCE &


102 QURAYYAH POWER PLANT EXPANSION PROJECT Saudi Electricity Company - SEC 2012
INGENIERIE GROUP

GCCIA‐EXT PROJ‐AL
103 FADHILI/GHUNAN/SALWA/JASRAH‐ GCC Interconnection Authority ABB CONTRACTING CO.LTD 2012
BAHRAIN/AL‐ZOUR‐KUWAIT

Page 14 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

TABOUKH POWER PLANT EXT VIII PROJECT AL WADJH NATIONAL CONTRACTING


104 Saudi Electricity Company - SEC 2012
POWER PLANT EXT I CO.(NCC)

Power & Water Utility Company for Jubail &


105 YANBU‐2 (KC KORTELL PROJECT)MARAFIQ DONG SUNG AL‐SAUDIA CO.LTD 2012
Yanbu - Marafiq

106 UNICOIL PROJECT JUBAIL Universal Metal Coating Company Limited DANIELI ‐ JUBAIL 2011

GOCI PROJECT, GHAURNATTA SITE SSEM / POWER ZONE ‐


107 GCC Interconnection Authority 2011
132/13 KV S/S No. 8129 RIYADH

108 QURAYYAH POWER PLANT EXPANSION Saudi Electricity Company - SEC BEMCO INTERNATIONAL 2011

CONSTRUCTION OF COMBINED CYCLE POWER ARABIAN BEMCO CONTRACTING


109 Saudi Electricity Company - SEC 2011
PLANT‐QURAYYAH CO.

AL FANAR CONSTRUCTION
110 HAIL POWER PLANT EXTENSION‐III Saudi Electricity Company - SEC 2011
COMPANY

CONSTRUCTION OF QURAYYAH COMBINED CYCLE ARABIAN BEMCO CONTRACTING


111 Saudi Electricity Company - SEC 2011
POWER PLANT EXTENSION 1‐ BLK 6 CO., LTD.

Page 15 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

112 380kV SUB STATION 9027‐ RIYADH Saudi Electricity Company - SEC AL‐OSAIS INABENSA CO., LTD. 2011

113 MAADEN ALUMINUM SMELTER PROJECT Saudi Arabian Mining Company - Maaden PSA 2000 SAUDI ARABIA LTD 2011

ZAMIL GLASS LAMINATION BLDG. ‐ ARABIAN GULF CONSTRUCTION


114 Zamil Gorup 2010
DAMMAM COMPANY DAMMAM

33KV SUBSTATION S/S 7195, 7196,


115 Saudi Electricity Company - SEC ABB CONTRACTING ‐ RIYADH 2010
7601, 7841, 7844

DRAGADOZ GULF CONSTRUCTION


116 MAADEN DAP PROJECT , Ras Az Zawr Saudi Arabian Mining Company - Maaden 2010
CO.

MAADEN PHOSPHATE PROJECT , Ras TEKFEN CONSTRUCTION AND


117 Saudi Arabian Mining Company - Maaden 2010
Az Zawr Phosphoric Acid Plant INSTALLATION CO.INCORPORATED

SEC‐CRB JOB 8057,


118 Saudi Electricity Company - SEC Schneider Electric 2009
2549, 2612 AND 2613

REPLACEMENT OF WATER TREATMENT FACILITIES, FAISAL AL‐QATANI (FMQ) ‐


119 National Water Company 2009
ABQAIQ PLANT ALKHOBAR

Page 16 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

FAISAL AL‐QATANI (FMQ) ‐


120 FADHILI OIL WELLSITE (FP‐01) 2009
ALKHOBAR

121 AL FARAS PROJECT AL‐TOUKHI RIYADH 2009

122 MAADEN PHOSPATE PLANT PROJECT Saudi Arabian Mining Company - Maaden SMATCO ‐ JUBAIL 2009

STC GTP LOA3 SANGCOM PROJECT ‐ NOUR COMMUNICATION / B.C.


123 Saudi Telecom Company - STC 2008
DAMMAM ESTABLISHMENT

124 JUBAIL380/230kV S/S AND REMOTE S/S IN JUBAIL 2 Saudi Electricity Company - SEC AREVA / COGELEX 2008

125 QATAR PETROCHEMICAL PROJECT RAS GAS COMPANY LIMITED ABB SWITZERLAND, COMPANY LTD. 2008

126 SUBSTATION 8828 132/13.8kV Saudi Electricity Company - SEC AL‐OSAIS CONT. CO. 2008

CONSTRUCTION OF NEW SUBSTATION No. 8711 AMD


127 Saudi Electricity Company - SEC AL‐FANAR CO. 2008
8712

Page 17 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

128 RGX PROJ ‐ QATAR RAS GAS COMPANY LIMITED IMCO ‐ ALKHOBAR 2007

129 RAS LAFFAN RAS GAS COMPANY LIMITED AL SUWAIDI TRDG & DEV'T 2007

130 RGX PROJ ‐ QATAR RAS GAS COMPANY LIMITED AL SUWAIDI TRDG & DEV'T 2007

131 QATAR PROJECT AL‐SUWAIDI TRADING & CONT. 2007

HADEED STEEL OXIDE CONVEYOR AND UPGRADING AL‐SUWAIDI INDUSTRIAL SERVICES


132 HADEED STEEL 2007
OF PORT FACILITIES (S.I.S.) ‐ JUBAIL

GCCI INTERCONNECTION PROJECT


ABB SWITZERLAND, LTD. SNC‐
133 PHASE 1 QATAR 400KV DOHA SOUTH SUPER GCC Interconnection Authority 2007
LAVALIN INT'L.
SUBSTATION

GCCI INTERCONNECTION PROJECT PHASE 1, ABB SWITZERLAND, LTD. SNC‐


134 GCC Interconnection Authority 2007
KUWAIT 400/275KV AL ZOUR SUBSTATION (KUWAIT) LAVALIN INT'L.

GCCI INTERCONNECTION PROJECT PHASE 1


ABB SWITZERLAND, LTD. SNC‐
135 BAHRAIN 400KV AL JASRA SUPER SUBSTATION GCC Interconnection Authority 2007
LAVALIN INT'L.
(BAHRAIN

Page 18 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

GCCI INTERCONNECTION PROJECT PHASE 1 SALWA ABB CONTRACTING CO.


136 GCC Interconnection Authority 2007
AND GHUNAN (SAUDI ARABIA) LTD . / SNC‐LAVALIN INTERNATIONAL

SHARQ PROJECT (EASTERN PETROCHEMICAL SHAW STONE AND WEBSTER ARABIA


137 Eastern Petrochemical Company (Sharq) 2007
CO.,LTD) COMPANY LTD.

138 RABIGH COVERSION INDUSTRIAL PARK Petro Rabigh S.S. AL‐HARETH 2007

139 11752 BAHRAIN II PROJECT/ FESTUS COETZEE PSSS‐P2 ABB SCHWEIZ AG, 2007

MAADEN PHOSPHATE PROJECT , Ras


140 Saudi Arabian Mining Company - Maaden ADWAN MARKETING CO. 2007
Az Zawr Phosphoric Acid Plant

141 GCC Grid: Phase I: Substation Package GCC Interconnection Authority ABB Contracting 2006

142 S/S 9015 RIYADH Saudi Electricity Company - SEC S.S.T. ‐ RIYADH 2006

AL‐KHONAIMI PETROLEUM SERVICES Project ‐


143 AL‐KHONAIMI PETROLEUM SERVICES ABU ZAYED AL‐AMRI TRDG 2006
JUBAIL

Page 19 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

144 IRAQ PROJECT QUDAS POWER PLANT BAYJI, IRAQ SESCO‐ ALKHOBAR 2006

145 AL‐KHARJ WATER TREATMENT PLANT NWC - National Water Company VA TECH WABAG KSA 2006

146 YAMAMA CEMENT FACTORY PROJECT RIYADH YAMAMA CEMENT FACTORY BIN QURAYA EST 2006

PRINCE MOHAMMAD BIN FAHAD UNIVERSITY ‐ AA TURKI CORP (ATCO) ‐


147 PRINCE MOHAMMAD BIN FAHAD UNIVERSITY 2006
AL‐KHOBAR DAMMAM

ARABIAN GULF CONSTRUCTION


148 SHARQ 3RD EXPANSION PROJECT Eastern Petrochemical Company (Sharq) 2006
COMPANY DAMMAM

HADEED‐JUBAIL/ ABU DHABI PORT SHIPLOADER AND SAUDI VOEST ‐ ALPINE JUBAIL
149 Abu Dhabi Ports 2006
STACKER UPGRADING PROJ. / ABU DHABI

SHARQ ‐ 3RD EXPANSION PROJECT‐ AL‐RUSHAID CONSTRUCTION CO.,


150 Eastern Petrochemical Company (Sharq) 2006
JUBAIL LTD. / EEI

NEW KHURAIS 380/115kV BSP / SEC‐


151 Saudi Electricity Company - SEC MEEDCO ‐ DAMMAM 2006
EOA CONTRACT No. 30533172 / 00

Page 20 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

SHARQ ‐ 3RD EXPANSION / U & O EPC PROJECT‐ AQESA ‐ BILFAL ‐ FOSTER WHEELER ‐
152 Eastern Petrochemical Company (Sharq) 2006
JUBAIL JUBAIL

153 STC / ERICSSON GSM PROJECT Saudi Telecom Company - STC AQESA ‐ RIYADH 2005

154 KING SAUD UNIVERSITY PROJECT King Saud Universtiy EL‐MEXAL ARABIA 2005

Abu Dhabi Electricity and Water Authority


155 Umm al Nar Independent Water and Power Plant TOSHIBA CORPORATION 2003
(ADWEA)

STC GPT‐LOA3 SANGCOM PROJ.


156 Saudi Telecom Company - STC ELMEXAL BUILDING SYSTEM 2003
DAMMAM

MOHAMAD AL‐MOJIL GROUP


157 JUPC KO35 PROJ. ‐ JUBAIL Jubail United Petrochemical Company 2003
(MMG)

158 CPS 6 & 7 WATER PUMPING STATION BASRA, IRAQ SESCO ‐ KUWAIT 2003

SHARQ ‐ 3RD EXPANSION PROJECT‐ MOHAMMAD AL‐MOJIL GROUP


159 Eastern Petrochemical Company (Sharq) 2003
JUBAIL (MMG)

Page 21 of 22
MAJOR EXISTING AND COMPLETED PROJECT

Serial No. Project Name Owner Contractor Completion Year

160 TPF PROJECT / SABIC SABIC LENARCO / AYTB 2002

Arab Paper Manufacturing Company ABB CONTRACTING ‐


161 WARAQ PAPER MILLS PROJECT / ARAB PAPER MFTG
(WARAQ) DAMMAM

NATIONAL STEEL CORP.‐ 2ND


162 DIRECT REDUCTION IRON EXPANSION PROJECT
INDUSTRIAL CITY ‐ DAMMAM

Page 22 of 22