The document provides elevation details for a flood control structure in Barangay Maligaya, Boac, Marinduque, including various flood levels and areas for cut and fill. It outlines the project name, location, and personnel involved in drafting and reviewing the plans. Key elevations mentioned include the design flood level at 20.97 m and the ordinary water level at 18.50 m.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Plans 4

The document provides elevation details for a flood control structure in Barangay Maligaya, Boac, Marinduque, including various flood levels and areas for cut and fill. It outlines the project name, location, and personnel involved in drafting and reviewing the plans. Key elevations mentioned include the design flood level at 20.97 m and the ordinary water level at 18.50 m.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ELEVATION: 20.

00 M

ELEVATION: 15.00 M

ELEVATION: 10.00 M

TOP OF HEADWALL : ELEV. 22.57

TOP OF FREEBOARD : ELEV. 21.97

1
1.5
DESIGN FLOOD LEVEL : ELEV. 20.97
LANDSIDE CLOSURE MAXIMUM FLOOD EXPERIENCE : ELEV. 20.73

ELEVATION: 20.00 M 1
1

RIVERSIDE
GEOTUBE ORDINARY WATER LEVEL : 18.50
TOP OF PILE CAP / FOOTING : ELEV. 17.97

0+095.00
RE =18.09
ELEVATION: 15.00 M ITEM 1704 (1) a : AREA OF CUT = 4.71 m2 LEFT SIDE FACING DOWNSTREAM
ITEM 1704 (1) b : AREA OF FILL = 4.18 m2
ITEM 900(1) c : AREA OF CLASS "A" = 0.86 m2
ITEM 1712(1) : AREA OF SLOPE PROTECTION = 3.38 m2
ITEM 804(7) : GRAVEL FILL = 2.54 m2

QUANTITY @ END PROTECTION


LENGTH OF BEAM = 7.41 m
AREA OF CLOSURE = 14.69 m2

ELEVATION: 10.00 M

CROSS SECTION
SCALE VERT = 1 :100m
HOR = 1 :100m

PROJECT NAME AND LOCATION : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


RAYMOND N. ORILLA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF
ENGINEER I
REGION IV - B , MIMAROPA FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, DD 16
MARINDUQUE DISTRICT ENGINEERING OFFICE CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CROSS SECTION PREPARED :
JERSON O. MONTERA FERNAN S. DIAZ RYAN N. DELA CRUZ RICHARD EMMANUEL P. RAGRAGIO
BOAC , MARINDUQUE MALIGAYA, BOAC, MARINDUQUE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 10 10 16
JOHN MARK M. CACHOMBO
DATE : DATE : DATE : DATE :