0% found this document useful (0 votes)
19 views

Plans 2

The document outlines regulations for the installation of standard billboards for DPWH projects, specifying a size of 1200mm x 2400mm and prohibiting political billboards within certain distances of project sites. It also states that DPWH contractors cannot display politicians' names on their equipment or billboards. Additionally, it includes details about project signage, funding sources, and construction specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

Plans 2

The document outlines regulations for the installation of standard billboards for DPWH projects, specifying a size of 1200mm x 2400mm and prohibiting political billboards within certain distances of project sites. It also states that DPWH contractors cannot display politicians' names on their equipment or billboards. Additionally, it includes details about project signage, funding sources, and construction specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

NOTES :

1. THE INSTALLATION OF THE REQUIRED STANDARD BILLBOARD SIZE ( 1200MM X 2400MM / 4 FT. X 8FT. ) FOR ALL PROJECTS SHALL
BE STRICTLY ENFORCED.

2. NO POLITICAL BILLBOARDS SHALL BE ALLOWED TOBE INSTALLED 100 METERS BEFORE AND 100 METERS AFTER ALL DPWH
PROJECTS AND IN BETWEEN THE PROJECT LIMITS OR WITHIN THE ROAD RIGHT OF WAY.

3. DPWH CONTRACTORS SHALL NOT BE ALLOWED TO PLACE NAMES OF POLITICIANS ON THEIR EQUIPMENT OR CARRY POLITICAL
BILLBOARD ON THEIR EQUIPMENT.

0.70m

1.00m
THIS IS WHERE YOUR TAXES GO
DANGER NAME OF PROJECT:
LOCATION:

CAUTION
0.20m

NAME OF CONTRACTOR:
DATE STARTED:
CONTRACT COMPLETION DATE:
CONTRACT COST:

1.10m
IMPLEMENTNG OFFICE:

0.85m
SOURCES OF FUND:
Department of Public Works and Highways
Text 2920 0r call (02) 165-02 for any concern on this project
www.dpwh.gov.ph

AREA UNDER
CONSTRUCTION
03 DETAIL OF DPWH STANDARD BILLBOARD

04 16 SCALE 1 : 15m

02 DETAIL OF CONSTRUCTION SIGNAGES

04 16 SCALE 1 : 10m

DISPLAY AREA

DISPLAY AREA
1.20m

50 X 50 HORIZONTAL

1.20m
COCOLUMBER
( 1200mm x 2400mm x 12mm MARINE PLYWOOD / TARPAULIN )
50 X 50 HORIZONTAL
COCOLUMBER

50 X 75 VERTICAL
COCOLUMBER
50 X 75 VERTICAL
COCOLUMBER 50 X 50 WOODEN
STAKE
50 X 50 WOODEN

D
R
STAKE

A
1.00m

50 X 50 WOODEN

1.00m

O
LB
STAKE 50 X 50 WOODEN 50 X 50 WOODEN

IL
STAKE STAKE

45°
NAT. GRND.

B
NAT. GRND. EDGE OF ROAD

0.50m
0.50m

TRAFFIC DIRECTION

FRONT ELEVATION TYPICAL FRAME ELEVATION ORIENTATION

01 DETAIL OF FRAMING FOR DPWH STANDARD BILLBOARD

04 16 SCALE 1 : 25m

PROJECT NAME AND LOCATION : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


RAYMOND N. ORILLA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF
ENGINEER I
REGION IV - B , MIMAROPA FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, G 04
MARINDUQUE DISTRICT ENGINEERING OFFICE CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DETAIL OF FRAMING FOR DPWH STANDARD BILLBOARD PREPARED :
JERSON O. MONTERA FERNAN S. DIAZ RYAN N. DELA CRUZ RICHARD EMMANUEL P. RAGRAGIO
BOAC , MARINDUQUE MALIGAYA, BOAC, MARINDUQUE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 04 06 16
JOHN MARK M. CACHOMBO
DATE : DATE : DATE : DATE :
ENGINEER II
2440

204 250
21 459 571 459
286 190

114
81 3232 48 47 47 37
Republic of the Philippines

2121 30 31 30
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MARINDUQUE
DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE IV-B
Boac, Marinduque

38 38
Project: Cost:
25

1220
Location Fund Source/s:
DIS
38 38 40 38 149

25 25 25 Implementing Agency/ies:
Development Partner/s: P LA
Contractor/ Supllier:
Brief Description of Project:
YA
RE
77
2440

Project Details:
38

2440
15

Project Date Project Status

A
73

Target Percentage Cost


Date
202

Duration Started Date of of As of incurred


(Date) Completed Remarks
Completion Completion to Date
69
69
69
69

92

1220
40 38

For particulars or complaints about this project, please contact the Regional Office or
25

Cluster which has audit jurisdiction on this project:


77
38 39

COA Regional Office Office No./Cluster:


25

Address:
25

Contact No.: or Text COA Citizen's Desk at 0915-5391957


41
263

1220 1220

2440

NOTES :
1. LAYOUT OF PROJECT BILLBOARD IS BASED ON COA CIRCULAR 2013-004,
ERIES OF 2013
FOR SOURCE OF FUND, STATE IF DPWH REGULAR BUDGET, PRIORITY DEVELOPMENT
ASSISTANCE FUND, DEPED/DA/DAR BUDGET, CALAMITY FUND, MVUC FUND, ETC.

2. ALL DIMENSION ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.

1 DPWH STANDARD PROJECT BILLBOARD 2 ISOMETRIC VIEW OF BILLBOARD


05 16 SCALE : NTS
05 16 SCALE : NTS

1220
DISPLAY AREA

2440

2440
50x75 VERTICAL
COCO LUMBER

(TARPAULIN 2440 x 2440 x 12


MARINE PLYWOOD)
50x75 HORIZONTAL 50x75 HORIZONTAL
COCO LUMBER COCO LUMBER
1220

50x75 HORIZONTAL
45° COCO LUMBER

50x75 VERTICAL 50x75 VERTICAL


50x75 VERTICAL COCO LUMBER COCO LUMBER

1000

1000
COCO LUMBER
50x50 WOODEN 50x50 WOODEN
STAKES STAKES
1000

EDGE OF ROAD
50x50 WOODEN GROUND LEVEL GROUND LEVEL
STAKES
TRAFFIC DIRECTION GROUND LEVEL

500

500
500

2440 2440

3 ORIENTATION 4 TYPICAL FRAME ELEVATION 5 FRONT ELEVATION (OPTION 1) 6 BACK ELEVATION


05 16 SCALE : NTS 05 16 SCALE : NTS 05 16 SCALE : NTS 05 16 SCALE : NTS

PROJECT NAME AND LOCATION : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


RAYMOND N. ORILLA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF
ENGINEER I
REGION IV - B , MIMAROPA FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, G 05
MARINDUQUE DISTRICT ENGINEERING OFFICE CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DETAIL OF FRAMING FOR COA STANDARD BILLBOARD PREPARED :
JERSON O. MONTERA FERNAN S. DIAZ RYAN N. DELA CRUZ RICHARD EMMANUEL P. RAGRAGIO
BOAC , MARINDUQUE MALIGAYA, BOAC, MARINDUQUE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 05 06 16
JOHN MARK M. CACHOMBO
DATE : DATE : DATE : DATE :
ENGINEER II
SAMPLING SAMPLER SPT. DEPTH
SCALE
DEPTH TYPE NO. N
(M)
(M) VALUE 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180
ELEV. 11

0.33m
1.00
0.50 - 1.00 SPT1 17
ELEV. 10

2.00
1.50 - 2.00 SPT2 6
ELEV. 9

3.00
2.50 - 3.00 SPT3 55
ELEV. 8

4.00

ELEV. 7 BORING LOG - BH1 BORING LOG - BH2


4.00 - 4.50 SPT4 82
5.00

ELEV. 6

6.00
5.50 - 6.00 SPT5 112
ELEV. 5

7.00

ELEV. 4
7.00 - 7.50 SPT6 100
8.00

ELEV. 3

9.00
8.50 -9.00 SPT7 102
ELEV. 2

10.00

10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 ELEV. 1
BORE HOLE LOCATION
AND COORDINATES
BOREHOLE DATA

PROJECT NAME AND LOCATION : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS RAYMOND N. ORILLA
FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF
ENGINEER I
REGION IV - B , MIMAROPA FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, G 06
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BOREHOLE DATA, BORING LOG, & BOREHOLE LOCATION & PREPARED :
JERSON O. MONTERA FERNAN S. DIAZ RYAN N. DELA CRUZ RICHARD EMMANUEL P. RAGRAGIO
BOAC , MARINDUQUE MALIGAYA, BOAC, MARINDUQUE COORDINATES 06 06 16
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
JOHN MARK M. CACHOMBO
DATE : DATE : DATE : DATE :
ENGINEER II
50mm PVC DRAIN OR WEEPHOLES
SPACED AT 2.0M ON CENTER
STAGGERED EACHWAY

GENERAL NOTES: TOP OF STRUCTURE

DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS,BRIDGE AND AIRPORT VOLUME II MONOLITHIC

0.50m
REVISION 2013 EDITION,DPWH STANDARD SPECIFICATIONS FOR PUBLIC WORKS POURING
STRUCTURES (BUILDINGS, PORTS AND HARBORS, FLOOD CONTROL AND DRAINAGE 8 - 16mm Ø RSB w/
12mm Ø LAT. TIE @
0.30m 0.25m ON CENTER
STRUCTURES, AND WATER SUPPLY SYSTEMS) VOLUME III REVISION 2019 EDITION :

10 000
16mmØ X 500mm DOWEL BARS
1. ALL DIMENSIONS, DISTANCES ARE IN METERS UNLESS OTHERWISE SPECIFIED. FULLY WELDED TO STEEL SHEET PILE
2. LOCATION AND DIRECTION OF BENCHMARK INDICATED ON THE PLANS SHALL BE

0.60m
10 000
(100mm MIN. LENGTH OF WELD)
THE LOWEST WEEP HOLES SHALL BE INSTALLED
FOLLOWED. JUST ABOVE THE ORDINARY WATER LEVEL.

0.40m
CLASS "A"

3. FIGURES SHALL GOVERN SCALE DIMENSIONS IN CASE OF DISCREPANCIES. 20 000 TOP OF FOOTING
(FOOTING)

4. THE DISTRICT OFFICE SHALL INFORMED ACCORDINGLY IF THERE ARE SIGNIFICANT


CHANGES IN THE PRESENT COARSE AND CONFIGURATION OF THE PROPOSE
CONSTRUCTION SITE WHICH WOULD REQUIRED REVISION OF PLANS.
5. PRE-CONSTRUCTION SURVEY SHALL BE CONDUCTED BY THE CONTRACTOR WITH ELEVATION PLAN SHOWING WEEPHOLES 0.60m
THE SUPERVISION OF THE PROJECT ENGINEER,PRIOR TO THE START THE 12.00m SHEET PILE
SECTION MODULUS = 1252 cm3/m

PROJECT. 12.mm Ø VERT.


RSB @ 0.25m O.C.
Z - TYPE
(SEE DETAIL)

0m
1c
6. ALL CONCRETE MIX SHALL SHALL BE CLASS "B" WITH ALLOWABLE STRESS OF

0.3
12.mm Ø HOR. RSB
@ 0.25m O.C.

08 16
17.24MPa EXCEPT FOR THE PILE CAP/FOOTING (AS SHOWN) WHICH SHALL BE CLASS "A" 1
1
0.05m DIA. PVC PIPE
WEEPHOLES SPACED
@ 2.00m HOR. 1.00m

WITH ALLOWABLE STRESS OF 20.70MPa

5m
VERT. STAGGERED
w/ FILTER CLOTH (2%

0.2
GRADE SLOPE)
0.30m thk. CONC.
SLOPE PROTECTION

7. CONCRETE PROTECTION FOR REINFORCING BARS SHALL NOT BE LESS THAN 75mm 0.3
MEASURE FROM THE OUTER SURFACE OF THE REINFORCEMENT. 0m
DETAIL OF FOOTING (CLASS "A")
GRADED GRAVEL WITH
THE LARGEST ONES
ADJACENT TO THE HOLE
WITH FILTER BAG
(AS SHOWN )

8. ALL REINFORCING BARS SHALL BE STRUCTURAL GRADE DEFORMED BARS: fy = 275.80


MPa
1a @ RIVERSIDE
9. UNLESS OTHERWISE SHOWN, ALL BARS SPACING SHALL REFER TO CENTER OF BARS.
10. REPRESENTATIVE SAMPLE OF ALL MATERIALS SHALL PASS THE TEST REQUIRED AND 1b DETAIL OF WEEP HOLES SCALE 1 : 20m
AND/OR
CONFORM WITH GOVERNMENT SPECIFICATIONS PRIOR TO ITS ACQUISITION
INCORPORATED IN THE WORK. 07 16 SCALE 1 : 40m
07 16
11. A PARTITION WORK SHALL BE INSTALLED IN ORDER TO PREVENT THE DAMAGE OF WEEP HOLES
1.00m 0.30m
THE REVETMENT FROM SPREADING. THE LENGTH OF ONE SEGMENT OF (SEE DETAIL)
TOP OF HEADWALL
REVETMENT ALONG THE LONGITUDINAL DIRECTION SHOULD NOT BE MORE THAN 50m IN 1b

HEADWALL
ELEVATION = RANGE FROM 22.57m - 22.57m

0.60m
07 16
ORDER TO PREVENT DAMAGE ON THE ADJOINING SECTION OF THE REVETMENT ONCE
SIDEWALK TOP OF FREE BOARD
IT COLLAPSES. STRUCTURE OF THE PARTITION WORKS SHALL BE THE SAME AS

m
ELEVATION = RANGE FROM 21.97m - 21.97m

.10
12mm Ø VERT. RSB @ 0.25m O.C.

FREEBOARD
THE END PROTECTION WORK.

-5

1.00m
12mm Ø HOR. RSB @ 0.25m O.C.

7m
12. FINAL CLEANING OF PROJECT SITE INCLUDING REMOVAL OF TEMPORARY WORKS DESIGN FLOOD ELEVATION

2.6
ELEV. RANGE FROM 20.97m - 20.97m
PARTICULARLY ON RIVER BED WHICH WILL BE AN OBSTRUCTION STREAM

M
MAXIMUM EXPERIENCED FLOOD LEVEL
LAND SIDE

O
FR
ELEVATION = RANGE FROM 20.73m - 20.73m
FLOW,SHALL BE MADE BY CONTRACTORS UPON COMPLETION OF THE PROJECTS

ES
AND/OR PRIOR TO THE APPROVAL OF ITS COMPLETION. 1

I
AR

VERTICAL HEIGHT = 4.00m


EMBANKMENT FROM STRUCTURE 1.5 0.30m thk. CLASS "B" CONC.

=V
NOTES ON REBAR HOOKS EXCAVATION/ BORROW AT 95% COMPACTION
EMBANKMENT

HT
IG
1. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS OTHERWISE PERMITTED BY THE STRUCTURAL ENGINEER.

HE

SL
2. AS SHOWN IN THE DESIGN DRAWINGS OR PERMITTED BY THE STRUCTURAL ENGINEER. RIVER SIDE

T
AN

AN
1

SL
1

T
GEOTUBE

H
180 DEG. HOOKS 90 DEG. HOOKS

EI
G
H
T
=
02a

5.
09 16 NATURAL GROUND LINE

6 5m
E XCAVATION
1.00m

MAIN BAR END HOOKS EXCAVATE 1


(ALL GRADES) 135 DEG. HOOKS 2 ORDINARY WATER LEVEL

0.30m
0.30m
LE TOP OF PILE CAP/FOOTING ELEVATION = RANGE FROM 18.53m - 18.49m
Item 1704 (4):
Item 1704 (4): ELEVATION = RANGE FROM 17.97m - 17.97m
0.50m 0.10m thk Gravel fill

0.60m
0.20m thk. Gravel fill
60 75 125 150 LEFT SIDE FACING DOWNSTREAM
8 - 16mm Ø RSB w/ 12mm Ø LATERAL TIES BOTTOM OF PILE CAP/FOOTING
75 100 150 200 Item 715 (8) : Geotextile Bag (FILLED HEIGHT=2m)
STATION LIMIT : STA. 0 + 000.00 - STA. 0 + 095.00 SPACED @ 0.25m O.C. ELEVATION = RANGE FROM 17.37m - 17.37m
95 125 175 250 0.60m

115
150
150
200
200
230
300
450
TYPICAL DRAWING OF CONCRETE CLASS "A" CONCRETE
EXISTING RIVER BED
ELEVATION = RANGE FROM 16.75 - 15.80

240
300
300
335
350
450
550
600 01 REVETMENT WITH STEEL SHEET PILES FOOTING (SEE DETAIL)
1a
07 16
12.00m STEEL SHEET PILES
SECTION MODULUS = 1252 cm3/m
Z - TYPE
(SEE DETAIL)

07 16 SCALE 1 : 50m 1c
08 16

PROJECT NAME AND LOCATION : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


RAYMOND N. ORILLA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF
ENGINEER I
REGION IV - B , MIMAROPA FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, DD 07
MARINDUQUE DISTRICT ENGINEERING OFFICE CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TYPICAL DRAWINGS OF CONCRETE REVETMET PREPARED :
JERSON O. MONTERA FERNAN S. DIAZ RYAN N. DELA CRUZ RICHARD EMMANUEL P. RAGRAGIO
BOAC , MARINDUQUE MALIGAYA, BOAC, MARINDUQUE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 01 10 16
JOHN MARK M. CACHOMBO
DATE : DATE : DATE : DATE :
ENGINEER II
SPECIFICATION: 116mmØ X 500mm DOWEL BARS
FULLY WELDED TO STEEL SHEET PILE 12.00m Z - TYPE STEEL SHEET PILES
(100mm MIN. LENGTH OF WELD) ( MHZ12-1 - 72.80 Kg/m ; 770mm x 343.50mm x 8.60 / 8.50mm THK )
STEEL SHEET PILE
DPWH STANDARD SPECIFICATIONS FOR PUBLIC WORKS STRUCTURES (BUILDINGS,
L = 0.30 m 16mmØ X 500mm DOWEL BARS
PORTS AND HARBORS, FLOOD CONTROL AND DRAINAGE STRUCTURES, AND WATER
SUPPLY SYSTEMS) VOLUME III REVISION 2019 EDITION : FULLY WELDED TO STEEL SHEET PILE
(100mm MIN. LENGTH OF WELD)
1. ALIGNMENT AND GRADE ARE SUBJECT TO ADJUSTMENT TO SUIT EXISTING FIELD
CONDITION.
2. DISTANCE AND ELEVATIONS ARE IN METERS UNLESS OTHERWISE SPECIFIED.
3. ALL WORKS SHALL COMPLY WITH THE DPWH STANDARD SPECIFICATIONS FOR
PUBLIC WORKS STRUCTURES (BUILDINGS, PORTS AND HARBORS, FLOOD CONTROL
AND DRAINAGE STRUCTURES, AND WATER SUPPLY SYSTEMS) VOLUME III REVISION
2019 EDITION & SPECIAL PROVISIONS & SPECIFICATIONS PERTAINING TO THIS
PROJECT.
4. ALL CONCRETE TO BE USED SHALL BE CLASS "B" WITH ALLOWABLE STRESS OF 17.24
MPa EXCEPT FOR THE PILE CAP/FOOTING (AS SHOWN) WHICH SHALL BE CLASS "A"
WITH ALLOWABLE STRESS OF 20.70 MPa.
5. ALL REINFORCEMENT TO BE USED SHALL BE GRADE 40 STEEL.
6. ALL SHEET PILES TO BE USED SHOULD BE Z - TYPE : HOT-ROLLED STEEL
SHEET PILES WITH MINIMUM THICKNESS OF 8.60/8.50 mm, EFFECTIVE WIDTH OF 770 L = 12.00 m
mm, EFFECTIVE HEIGHT OF 343.50 mm, UNIT WEIGHT OF 72.80 kg/m AND MINIMUM
YIELD STRENGTH OF 345 MPA.
7. THE MATERIALS FOR THE EMBANKMENT SHALL NOT CONTAIN ANY STUMP, BRUSH,
WEED, ROOT, TURF, CLOD AND OTHER ORGANIC MATTER, CLAY OF OTHER
MATERIALS SHALL BE BROKEN AND BEATEN AND NO ACCUMULATIONS AT THE FOOT
OF SIDE SLOPES OF EMBANKMENT WILL BE PERMITTED.

CONSTRUCTION REQUIREMENT
SHEET PILE SHALL BE DRIVEN TO ELEVATION SHOWN ON THE PLANS OR AS DIRECTED
BY THE ENGINEER. WHERE IMPRACTICAL TO DRIVE TO PLAN ELEVATION DUE TO
SUBSURFACE CONDITIONS, THE DRIVING OF PILES MAY BE STOPPED AT A HIGHER
ELEVATION WITH THE WRITTEN PERMISSION, THE ENGINEER SHALL ASCERTAIN THAT
1c-2 ISOMETRIC VIEW
THE CONTRACTOR HAS ADEQUATE EQUIPMENT FOR THE REQUIRED DRIVING AND THAT
PILES CAN BE DRIVEN TO THE PLAN ELEVATION WITH THE PROPER USE OF THIS 08 16 SCALE NTS
EQUIPMENT.

THE TOP OF THE PILING SHALL BE DRIVEN OR CUT-OFF TO A STRAIGHT LINE AT THE
ELEVATION INDICATED ON THE PLANS.

THE REQUIREMENTS GOVERNING THE INSTALLATION OF SHEET PILING SHALL CONFORM STEEL SHEET PILES SCHEDULE
IN GENERAL TO THOSE GOVERNING BEARING PILES AS SET FORTH UNDER ITEM 400 OF STATION LENGTH SECTION MODULUS REMARKS
DPWH STANDARD SPECIFICATION, PILING.
1c-1 DETAIL OF Z-TYPE : MHZ12-1 STEEL SHEET PILES FROM TO OF SSP OF SSP

METHOD OF MEASUREMENT STA.0+000.00 STA.0+095.00 12.00 m 1,252.00 cm3/m LEFT SIDE


08 16 SCALE 1 : 30m

SHEET PILING WILL BE MEASURED BY THE LINEAR METER OF SHEET PILING AS SHOWN
ON THE PLANS OR AS DIRECTED IN WRITING BY THE ENGINEER, COMPLETE IN PLACE
AND ACCEPTED. HOWEVER, MEASUREMENT OF PILING WHICH HAS BEEN DELIVERED TO Z-TYPE STEEL SHEET PILE
PLAN LENGTH AND CANNOT BE DRIVEN ACCORDING TO PLAN OR DIRECTED ELEVATION 16mmØ X 500mm DOWEL BARS Z-TYPE STEEL SHEET PILE
BECAUSE OF SUBSURFACE CONDITION SHALL BE MEASURED AS IF DRIVEN TO THAT FULLY WELDED TO STEEL SHEET PILE
SPOT DETAIL
ELEVATIONS. (100mm MIN. LENGTH OF WELD)
SHEET PILE DIMENSION AND SECTIONAL PROPERTIES 8.60 mm
TYPE OF WIDTH HEIGHT THICKNESS SECTION AREA WEIGHT WEIGHT MOMENT OF INERTIA SECTION MODULUS
SHEET PILE w h Tf /Tw 8.50 mm
(mm) (mm) (mm) (cm2) (kg/m) (kg/m2) (cm4/m) (cm3/m) h = 343.50 mm
SPOT DETAIL
Z - TYPE
770.00 343.50 8.60 / 8.50 120.80 72.80 94.50 21,496.00 1,252.00
(MHZ12-1)
w = 770.00 mm
Tf

h Tw 1c CROSS SECTION OF Z-TYPE : MHZ12-1 STEEL SHEET PILES


08 16 SCALE 1 : 50m
w w
PROJECT NAME AND LOCATION : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


RAYMOND N. ORILLA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF
ENGINEER I
REGION IV - B , MIMAROPA FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, DD 08
MARINDUQUE DISTRICT ENGINEERING OFFICE CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SPECIFICATION AND CROSS SECTION OF STEEL SHEET PILE (Z-TYPE) PREPARED :
JERSON O. MONTERA FERNAN S. DIAZ RYAN N. DELA CRUZ RICHARD EMMANUEL P. RAGRAGIO
BOAC , MARINDUQUE MALIGAYA, BOAC, MARINDUQUE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 02 10 16
JOHN MARK M. CACHOMBO
DATE : DATE : DATE : DATE :
ENGINEER II
0.20m thk. CLASS "B" CONC.
1.00m 0.30m
with 12mm Ø RSB SPACED
@ 0.25m BOTH WAYS

HEADWALL
0.60m
(DOUBLE LAYER)
SIDEWALK

1
1.5

1
1

NATURAL GROUND LINE NATURAL GROUND LINE

12mm Ø LATERAL TIES


EXCAVATE
8 - 16mm Ø RSB
SPACED @ 0.25m O.C. 1
2

8 - 16mm Ø RSB w/ 12mm Ø LATERAL TIES

0.60m
SPACED @ 0.25m O.C.

1.00m
8 - 16mm Ø RSB w/ 12mm Ø LATERAL TIES
SPACED @ 0.25m O.C.
0.60m
CLASS "A" CONCRETE 1a
FOOTING (SEE DETAIL) 07 13
0.50m
9.00m STEEL SHEET PILES
SECTION MODULUS = 1252 cm3/m
9.00m STEEL SHEET PILES Z - TYPE
LEFT SIDE FACING DOWNSTREAM SECTION MODULUS = 1252 cm3/m
1c
(SEE DETAIL) 08 16
0.30m Z - TYPE 1c
1.00m (SEE DETAIL) 08 16
END PROTECTION
HEADWALL

0.20m thk. CLASS "B" CONC. STA. 0 + 000.00


0.60m

with 12mm Ø RSB SPACED STA. 0 + 095.00,


SIDEWALK
@ 0.25m BOTH WAYS
(DOUBLE LAYER) 02 TYPICAL DRAWING OF END PROTECTION
SCALE 1 : 50m
LAND SIDE
09 16
1
1.5

1.0
0m
1
1
RIVER SIDE
CLASS "A" CONCRETE
02a
FOOTING @ BUTTRESS
8 - 16mm Ø RSB w/ 12mm Ø LATERAL TIES
09 16 EMBANKMENT
(SEE DETAIL) SPACED @ 0.25m O.C.
NATURAL GROUND LINE

1.00m
8 - 16mm Ø RSB w/ 12mm Ø LATERAL TIES
EXCAVATE
NATURAL GROUND LINE
SPACED @ 0.25m O.C. 1 CLASS "A" CONCRETE FOOTING
2
1.00m

0.60m

0.50m
8 - 16mm Ø RSB w/ 12mm Ø LATERAL TIES
0.50m SPACED @ 0.25m O.C.
0.60m
CLASS "A" CONCRETE 1a
FOOTING (SEE DETAIL) 07 13
DETAIL OF CLASS "A" CONCRETE FOOTING
9.00m STEEL SHEET PILES
SECTION MODULUS = 1252 cm3/m
Z - TYPE
02a @ BUTTRESS & @ EVERY 50 METER SPAN
1c

09 16
(SEE DETAIL) 08 16 SCALE 1 : 25m
SEGMENT END / INTERMEDIATE PROTECTION
STA. 0 + 026.00, STA. 0 + 052.00, STA. 0 + 078.00,

02 TYPICAL DRAWING OF SEGMENT END / INTERMEDIATE PROTECTION


SCALE 1 : 50m
09 16
PROJECT NAME AND LOCATION : SHEET CONTENT : DRAFTED : REVIEWED : SUBMITTED : RECOMMENDED : APPROVED : SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


RAYMOND N. ORILLA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF
ENGINEER I
REGION IV - B , MIMAROPA FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, DD 09
MARINDUQUE DISTRICT ENGINEERING OFFICE CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TYPICAL DRAWINGS OF INTERMEDIATE AND END PROTECTION PREPARED :
TYPICAL DRAWINGS OF CONCRETE REVETMENT WITH STAIRS JERSON O. MONTERA FERNAN S. DIAZ RYAN N. DELA CRUZ RICHARD EMMANUEL P. RAGRAGIO
BOAC , MARINDUQUE MALIGAYA, BOAC, MARINDUQUE ENGINEER II CHIEF, PLANNING AND DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 03 10 16
JOHN MARK M. CACHOMBO
DATE : DATE : DATE : DATE :
ENGINEER II