The document outlines a community study activity plan for nursing students at the Institute of Health Sciences in Gaborone, scheduled from January to March 2025. It details the weekly activities, including data collection, analysis, project planning, implementation, and submission of drafts. The plan emphasizes community engagement and collaboration with stakeholders throughout the process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views4 pages

Nur 364 Activity Plan 2025

The document outlines a community study activity plan for nursing students at the Institute of Health Sciences in Gaborone, scheduled from January to March 2025. It details the weekly activities, including data collection, analysis, project planning, implementation, and submission of drafts. The plan emphasizes community engagement and collaboration with stakeholders throughout the process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

INSTITUTE OF HEALTH SCIENCES-GABORONE

COMMUNITY STUDY ACTIVITY PLAN – NUR 364

Name of the community....................................

WK Activity Comments Lecturer Students Date


Signature
Orientation and collection of tools
08-09/01/25 development of data collection tools
(family, key informants, windshield)
WEEK 1 Introduction and familiarization to
clinic and community
13-17/01/25 Arrival and settling at places of
assignment, getting to know staff and
community, identify sources of
information, get consent and start
collecting data.(At least 40 families
and all relevant stake holders)

Data collection
(Data collection methods used
to generate specific data and
their appropriateness, data collection
tools availability)
WEEK 2 Data collection
Identification of health
20-24-/01/25 Needs and resources, list of identified
real and perceived needs and
resources. Presentation of findings in
graphs/ pie charts
WEEK 3 Data analysis

27-31/01/25  data analysis based on


Sbrana Group 1 community’s perception and
collected data
 identify four (4) priority
problems and manage one (1)
problem of highest priority
Planning
 come up with project plan and
implementation

PHC principles guiding selection of


interventions, setting goals and
objectives of the project, identifying
stakeholders

WEEK 4 Project Implementation


Mobilising the community,
03-07/02/25 collaboration with appropriate stake
Sbrana Group holders, implementing the project with
2 participation of the
Community.

WEEK 4 Project Implementation


10-14/02/25 Mobilising the community,
collaboration with appropriate stake
holders, implementing the project with
participation of the community
SUBMISSION OF 1ST DRAFT-
CHAPTERS 1-4 FOR GUIDANCE
G1
WEEK 5
SUBMISSION OF 1ST DRAFT-
17-21/02/25 CHAPTERS 1-4 FOR GUIDANCE
G2

Project implementation continues.


SUBMISSION OF 2nd DRAFT-
CHAPTERS 5-8 FOR GUIDANCE
G1

WEEK 6 Final Draft for Group 2-Soft copy??

24-28/02/25 Project implementation continues


 Handing over plans underway
 Submit hand over programs
with proposed dates
 Confirm attendance of relevant
stakeholders
 Venue ready
 Write down PHC principle
relevant to project
 Prepare the final write up of all
chapters for final submission
(inclusive of all
communication tools used
during data collection i.e.
letters, teaching plans etc.)
WEEK 7 Handing over
03-07/03/25 Venue preparation, program available,
invitation of relevant stakeholders
Evaluation
Process and outcome

08/03/25 Back to Station Back to Station

13/03/2025 SUBMIT FINAL SCRIPT BY


1630HRS

GOOD LUCK!!!!!!!!!!!!!!!!!!!!!!!!!!!