1st Slab Beam SCH
1st Slab Beam SCH
+1 12 Curt +4 16
B5 9" 15" 2 12 2 8 - - 8 @ 8" c\c 8 @ 8" c\c B25 9" 18" 2 16 2 12 1 12 2 16 8 @ 4" c\c 8 @ 8" c\c
+1 12 Curt +2 16 Curt
B6 9" 18" 2 12 2 8 - - 8 @ 8" c\c 8 @ 8" c\c B26 9" 18" 2 12 2 12 2 16 1 12 8 @ 4" c\c 8 @ 8" c\c
+1 16 Curt +1 12 Curt
B8 9" 18" 2 16 2 8 2 16 - 8 @ 4" c\c 8 @ 8" c\c B27,B30,B31 6" 15" 2 12 2 8 - - 8 @ 8" c\c 8 @ 8" c\c
+1 16 Curt
B9 9" 15" 2 12 2 8 - 3 16 8 @ 4" c\c 8 @ 8" c\c B28 9" 18" 2 16 2 8 1 12 4 16 8 @ 4" c\c 8 @ 8" c\c
+1 16 Curt +2 16 Curt
B10 9" 1" 2 12 2 8 3 16 1 12 8 @ 8" c\c 8 @ 8" c\c B29 9" 18" 2 12 2 8 4 16 1 12 8 @ 4" c\c 8 @ 8" c\c
+1 12 Curt +1 16 Curt
B11 9" 15" 2 12 2 8 - - 8 @ 4" c\c 8 @ 4" c\c B32 9" 18" 2 16 2 8 - - 8 @ 4" c\c 8 @ 8" c\c
+2 16 +1 16 Curt
B12 9" 18" 2 12 2 8 2 16 4 16 8 @ 4" c\c 8 @ 8" c\c B33 9" 18" 2 16 2 8 - - 8 @ 4" c\c 8 @ 8" c\c
+1 16 Curt +2 16 Curt
B13 9" 21" 4 16 2 16 4 16 4 16 8 @ 4" c\c 8 @ 8" c\c B34 9" 18" 2 16 2 12 2 16 2 16 8 @ 4" c\c 8 @ 8" c\c
+2 16 Curt +2 16 Curt
B14 9" 12" 2 12 2 8 - 4 16 8 @ 4" c\c 8 @ 4" c\c B35,B36 9" 15" 2 12 2 8 1 12 1 12 8 @ 4" c\c 8 @ 8" c\c
+1 12 Curt
B15 9" 18" 2 16 2 12 - - 8 @ 4" c\c 8 @ 8" c\c B37 9" 18" 2 16 2 8 1 12 1 16 8 @ 4" c\c 8 @ 8" c\c
+2 16 Curt +2 16 Curt
B16 9" 18" 2 12 2 8 - - 8 @ 4" c\c 8 @ 8" c\c B38 9" 18" 2 16 2 12 1 12 4 16 8 @ 4" c\c 8 @ 8" c\c
+1 16 Curt +2 16 Curt
B18 9" 15" 2 12 2 8 - 1 16 8 @ 8" c\c 8 @ 8" c\c B39 9" 18" 3 16 2 12 4 16 - 8 @ 4" c\c 8 @ 8" c\c
+2 16 Curt
NOTE:-1) SECONDARY BEAMS ARE DESIGNED AS SIMPLY SUPPORTED AT DISCONTINUOUS ENDS THEREFORE EXTRA NOTE:-1) SECONDARY BEAMS ARE DESIGNED AS SIMPLY SUPPORTED AT DISCONTINUOUS ENDS THEREFORE EXTRA
TOP BARS AT DISCONTINUOUS END SHOULD BE NEGLECTED DURING LAYING THE REINFORCEMENT OF BEAMS TOP BARS AT DISCONTINUOUS END SHOULD BE NEGLECTED DURING LAYING THE REINFORCEMENT OF BEAMS
2) MAX. NO. OF BARS IN BEAM SHALL BE 3 IN ONE LAYER ONLY. 2) MAX. NO. OF BARS IN BEAM SHALL BE 3 IN ONE LAYER ONLY.
SCHEDULE OF SLABS AT 1ST SLAB LEVEL
MAIN SPAN STEEL
0.10 L1 ALT. BENT
0.30 L1 0.30 L2
0.15 L1
OTHER SPAN OR DISTR. STEEL
0.25 L1 0.25 L2 SLAB NOS. THICK. MAIN SPAN STEEL OTHER SPAN STEEL REMARKS
1ST SLAB LEVEL RCC STRCUTURE PLAN
L1
L2 WITH SHEDULE
S1 ONE WAY SLAB
4.5" 10 @ 8" c\c Alt Bent 8 @ 8" c\c Distr. PROPOSED CONSTRUCTION OF G+2 RESIDENTIAL
10 @ 16" Top Ext. @ Sup.
BUILDING FOR MR. KHONDE SHAB (AMJAD PATHAN)
Stirrups near support
S2 TWO EAY SLAB
L1 Stirrups in rest of beam
EXTRA TOP @ LEFT FOR B2
4.5" 10 @ 8" c\c Alt Bent 10 @ 8" c\c Alt Bent STRUCTURAL DESIGN BY
10 @ 16" Top Ext. @ Sup. 10 @ 16" Top Ext. @ Sup.
JVStructural
4 TOP ANCHOR BAR
L1 L2 L2
Ld EXTRA TOP @ RIGHT FOR B1 4 4 4
S3
4.5" 10 @ 8" c\c
Steel @ Top
8 @ 8" c\c Distr.
Steel @ Top
CANTILEVER SLAB
Engineers &
Consultants
L2
5
L2
L1 L1 5 S4 ONE WAY SLAB
5 BOT. CURTAIL BAR BOT. STR BAR
5 L2
4.5" 10 @ 4" c\c Alt Bent 8 @ 8" c\c Distr. OFFICE :-Plot 311/P,Opp Patel Junior College,
L1 10 @ 8" Top Ext. @ Sup. Hussain Nagar, Beed By Pass Aurangabad .
B1 B2
S5 STAIR CASE Mobile : 9423028563, 9673071706,9141685474
7" 12 @ 4" c\c 8 @ 8" c\c Email : [email protected]
TYPICAL DETAILS OF BAR BENDING FOR SLABS & BEAMS PRODUCED BY AN AUTODESK STUDENT VERSION EMPANELLMENT ON PWD REGION AURANGABAD AS A STRUCTURAL
DESIGNERS VIDE C.E. LTR NO. CEA/D-7/4625 OF DT.31-08-2019