100% found this document useful (1 vote)
197 views104 pages

Ammonia Pid Rev 6

The document outlines technical specifications and notes for the fuel gas knockout drum and related systems in a natural gas processing facility. Key instructions include limiting ramp down of output, minimizing distances between equipment, and ensuring automatic ramp-up conditions are met. It also emphasizes the confidentiality of the technical information contained within.

Uploaded by

Sachin Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
197 views104 pages

Ammonia Pid Rev 6

The document outlines technical specifications and notes for the fuel gas knockout drum and related systems in a natural gas processing facility. Key instructions include limiting ramp down of output, minimizing distances between equipment, and ensuring automatic ramp-up conditions are met. It also emphasizes the confidentiality of the technical information contained within.

Uploaded by

Sachin Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 104

1 2 3 4 5 6 7 8 9 10 11 12

100 V 203 FUEL GAS K.O. DRUM 1 NOTES:


1) RAMP DOWN OF OUTPUT TO BE LIMITED TO 10% / minute.
IS 2) D E L E T E D.
9
3) TWO NRV'S OF DIFFERENT TYPE SHALL BE CONSIDERED.
A 4) MINIMIZE OVERALL DISTANCE BETWEEN FUEL GAS K. O. DRUM
100 V 203 AND FUEL GAS EXPANDER 100 TX 201 A/B.
FZAL FI FN 5) DELETED.
FZT 1002 1002 1002 NG
AL 6) RAMP-UP SET POINT OF PIC-1006 IN CASE OF TRIP OF EXCESS
10"x6" 6"-FG-100-0105-D1A 1002 A LHV
SYNGAS. AUTOMATIC RAMP-UP SHALL ONLY BE POSSIBLE WHEN
MEDIAN
DUTY CONTROLLER FIC-2044 IS IN AUTOMATIC MODE.
FZT FZY FY FY 7) DELETED.
1002 B 1002 1002 1 1002 2 8) REFER P&ID NO: A747-79-41-100-1191 FOR ANALYSER DETAILS.
TI 2oo3 9) VALVE WITH 1" INBUILT BYPASS.
1002 FZT
1002 C

FT FI
B 1001 1001 3/4" PV

D1A
PG 6"x4" 1006
1005
18"-FL-100-0102-A1A
18"-FL-100-0101-A1A

4"

FC
4"

D28A
51.5 kg/cm^2g 51.5 kg/cm^2g GENERAL NOTES:
4"x6"
PSV PSV 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
PT
1004 1 1004 2 3/4" 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
1003 A
4"M6" DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
18"x6" 18"x6"
4"M6" REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
FB LO FB LO PT PY
8"x4"

8"x4"

3/4" 3/4" 1003 B 1003


51.5 kg/cm^2g
D1A A1A A1A D1A MEDIAN

6"-FG-100-0102-D28A
PT IS
3/4" 3/4"
9 PSV
C
FB LO

1"D2"
FB LC

1003 C
NOTE 1 1008
IS IS
PIC 11 6
AP 1003 FB LO
TYPE 4A 1 1/2"x1" 3/4"
1002 AL 10"x6" AH
8"-NG-100-0125-D1A UZY UZV PIC I

A1A
D28A
3/4"
AT AI 1002 1002 1006 108
FB LO
8"-NG-100-0115-D1A 1001 1001

1 1/2"-FG-100-0109-D28A
I

FC
8"
NOTE-8 SP GRAVITY 111
MIN.
START-UP LINE UZLO UZLC I PG
1002 1002 106 1007
LOCK UP
PZV IS FUNCTION
1003 S
20 FY NOTE 4
PY
D
FC

10"
PUZY 3001 2 1006
1003 37.0 kg/cm^2g
PZLC

NOTE 3
1003 PSV

D28A
1 1/2"F2"
100 V 203

10"-FG-100-0125-D28A-IE
1010
10"
4"x2"

8"-PG-100-0105-B28A-IE
B1

B28A
PT PT PT IS IS
FB LO
3"x1.5" 1006 A 1006 B 1006 C I 10 1
3/4" A1A B28A
11
3"-PG-100-0106-B28A-IE
10"
SAFE LOCATION 3/4" A1 M1 20"
10"-NG-100-0104-D1A

FB LO LZAH LZAHH LZAL IS


3" 3" 3" 3" 1002 1002 1002 15
3/4"-NI-100-0102-A1A L7 L3 THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
I
A1A

INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND


111 L5 L1
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
3" 3" 3" 3"
3/4"

PERMISSION OF HALDOR TOPSOE.


D1A

I
109
LG LZT LZT LZT LZY LY
MINIMIZE I FV 1001 1002 C 1002 A 1002 B 1002 1002
106 3001 M DPT DPT
3/4" DPT 2oo3

MEDIAN
FC
8"

UZY
FN FY FIC AH
1003 I LIC
3001 3001 1 3001
D1A

EXCESS 3/4" IS UZLO 115 1002


SYNGAS S 3" AL
L6
3" D1 L4 L2
IN VIEW

LHV 15 1003 L8 3" CLOSE


3/4"

MIN. FOR PIPING


3"
A1A

UZV UZLC 3" 3" 3"

3"x2"
1003 1003 3"
F
2"-PC-100-0105-D9A 3"
FZT FC
NOTE-9 2"
3001 A
3/4" ON-OFF

PG FY FZT 2"x1"
1002 3001 1 3001 B
2"
FC

1"
D9A

1" LO
1"x2" LV
FZT
FF 1002
A1A

PI PT 3001 C
1001 1001
3/4" 20" PIPE
TO FLARE HEADER

AL 2M HEIGHT
G
2"-PC-100-0106-A1A

LAH
LIC LT LG
8"-PG-100-2504-B28A-IE

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

10"-FG-100-0108-D28A
10"-NG-100-0102-D1A
10"-NG-100-0103-D1A

18"-FL-100-0101-A1A

2"-NG-100-0105-D1A

1003 1003 1004

2"-FL-100-0111-A1A
4"-FL-100-0103-A1A

2"-FL-100-0110-A1A
2"-NI-100-0101-A1A
TO FLARE HEADER

ON / OFF
UNIT
NG FOR PRESSURIZATION OF 100C 302

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
OSBL

REV. DESCRIPTION DATE DRAWN CHECK APPR.


LV
163

572

366

366

641
100

1003 Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


100-1184

308-1114

Revival of Ramagundam Fertilizer Complex Project


10"-FG-308-1401-D1A B/L

H 2"-PC-100-0108-A1A 2"x1" 1"x2" 2"-PC-100-0107-A1A 2200 MTPD Ammonia Plant


NATURAL GAS FROM

SHEET SIZE UNIT


100-1185

100-1185

100-1185
P25

TO FLARE HEADER

TO FLARE HEADER
100-1185
EXCESS SYN. GAS

FC 100
FROM 100 E 312
P09C

P09C
P09A
FROM HEADER
P65

P23
NATURAL GAS

1"
TO FY-2044 1

TO FY-2044 1
NAME
TO 100 K 411

TO 100 E 215
Natural gas distribution
P01
NITROGEN

FUEL GAS
1" Piping and instrument diagram
SIGNAL

SIGNAL
DOCUMENT ID
486

OWS IN VIEW S-03470 P42101 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 R 201 HYDROGENATOR 100 R 202 A/B SULFUR ABSORBER NOTES:

1) TO BE LOCATED ON INLET FLANGE.

2) TO BE PROVIDED WITH INSTRUMENT AIR BUFFER TANK SO THAT


THE VALVES ARE OPERABLE DURING EMERGENCY EVEN AFTER
A FAILURE OF INSTRUMENT AIR SUPPLY.

3) VALVE SHOULD BE LOCATED IN FIRE SAFE LOCATION.


4) VALVE WITH 1" INBUILT BYPASS.

12"-NG-100-0304-D1A-IH
P03 164 GENERAL NOTES:
NATURAL GAS 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
LOCATE NEAR TOP OF 100-R-202A/B FROM 100 E 204 1
AAH 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
AE AT AI DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
2057 2057 2057 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
HC DETECTOR
B 10"-NG-100-0202-D1A-IH

LC
TO FLARE HEADER
4"-FL-100-0201-A1A

LO
NOTE-4 100-1185

TO FLARE HEADER
12"-FL-100-0202-A1A
3/4" 100-1185
PG
D1A-IH A1A
2001 FF
NOTE 1

2"
FF AH
TI TI
LOCATE NEAR TOP OF 100-R-201 2005 2007
AAH 2"x4"
AE AT AI

2"
2"

2056 2056 2056 2"-NG-100-0203-D1A-IH


C
HC DETECTOR

D1A-IH A1A

A1A
LO
100 R 202 B

D1A-IH
12" 12" 12"
A1 A1
100 R 202 A A1
24" 24" 24"
100 R 201 FSO
M1 M1 M1 2002
IS
20

UZY UZV PV
2001 S 2001 2005

NOTE 2,3
FF 8"x12"
TI

FC
FO
T1 8"
2" 2001
D 3" 10"x8"
UZLO UZLC
2001 2001
12"-NG-100-0201-D1A-IH

12"-NG-100-0204-D1A-IH
3"-NG-100-0207-D1A-IH

TYPE 7A TYPE 7A
FF AH
TI AP AP

10"-NG-100-0206-D1A-IH
T2 O1 O1 THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
2" 2002 2002 2" 2004 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
2"
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
PERMISSION OF HALDOR TOPSOE.

TYPE 7A TYPE 7A PIC


TYPE 7A
MIN. FOR PIPING

MIN. FOR PIPING

MIN. FOR PIPING


H1 2005
H1 H1
PG AP PG AP PG AP
FF FF FF
B1 PP 2002 2001 B1 2003 2003 B1 2004 2005
TI TI TI
12" 12" 2003 12" 12" 2004 12" 12" 2006
3/4"
12"-NG-100-0215-D1A-IH

LO
MINIMIZE

MINIMIZE

MINIMIZE
PZT

MEDIAN
2006 A

F
SAFE LOCATION SAFE LOCATION
PZT PZY PY
SAFE LOCATION
2006 B 2006 2006
3/4"-NI-100-0204-A1A 3/4"-NI-100-0205-A1A 3/4"-NI-100-0206-A1A 2oo3

PZT

MEDIAN
2006 C
3/4" 3/4" 3/4"

D1A
D1A A1A D1A A1A A1A D1A
D1A

A1A D1A

12"x10"
A1A
A1A

2"-NI-100-0202-A1A

10"-NG-100-0205-D1A-IH
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

6"-NG-100-0209-D1A-IH
2"-NI-100-0201-A1A
2"-NI-100-0203-A1A

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.

NATURAL GAS TO 100 HE 201


622

622

622

257

371

261

622

573
NATURAL GAS TO 100 E 201
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant
100-1184

100-1184

100-1184

SIGNAL TO 100 K 411


SIGNAL TO FZY-2027

SIGNAL TO FZY-2057

SIGNAL TO FIC-2030
SHEET SIZE UNIT
100

P11B

P11B

P11B

P11B
FROM HEADER

FROM HEADER

FROM HEADER

P06

P06

P65
P06

P06
NAME
Desulphurization
P02
NITROGEN

NITROGEN

NITROGEN

FIC-2057

FIC-2030

FIC-2058
Piping and instrument diagram
DOCUMENT ID

S-03470 P42102 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 204 1 FEED GAS PREHEATER No. 1 100 E 204 2 FEED GAS PREHEATER No. 2 NOTES:

1) DELAYED FIELD WELDS TO BE CONSIDERED AT THE INLET OF


100 E 204 1/2 UNTIL COMPLETION OF BLOWING.

2) MINIMUM SET POINT CORRESPONDING TO 25% OF NORMAL FLOW.


A
3) CAPACITY (CV) OF BYPASS VALVE MUST NOT EXCEED CAPACITY OF
12"-NG-100-0304-D1A-IH CONTROL VALVE FV-2005.
P02 164
NATURAL GAS 4) VALVE WITH ADJUSTABLE MECHANICAL TRAVEL STOP (LOCKABLE)
TO 100 R 201
FOR SETTING THE MINIMUM VALVE OPENING.
AH
TIC 5) DELETED.
2011
AL 6) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
SCOPE OF REFORMER CONTRACTOR.

B GENERAL NOTES:
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

NOTE 3 1" 1"-HG-100-0302-D5A-IH


RTP
01
C FV EIL HPIP
3"-HG-100-0301A-D1A-IH
2005

FC MINIMIZE
3"-HG-100-0301-D5A-IH D5A D1A
3"x1 1/2" 1 1/2" 3"
1 1/2"x3"
3"
3/4"

3/4"
TI
RTP 2012
TI TV
02
2014 I 2011
EIL HPIP
101
6"
AH FO

6"-NG-100-0302A-D1A
FI FT FT FIC FFY FFI IH

10"-NG-100-0303-D1A-IH
2008 2008 2005 2005 2007 2007

6"-NG-100-0302-D1A
D AL AL AL
NOTE 2 SP H2 / HC
PV
RATIO 10"-NG-100-6501A-D1A

RTP EIL
TI RTP
59
PG FN FY 2010 58
EIL HPIP
AH
HPIP
2011 2005 2005 NOTE 4 TI
H2 / HC H2
2013
PV MIN.
STOP
12"-NG-100-0304A-D1A-IH

THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL


INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E 10" REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
10" 10" 12" PERMISSION OF HALDOR TOPSOE.
NOTE 1

100 E 205 100 E 204-2 100 E 204-1

CONT. REFER P04

CONT. REFER P05


FI FT
2006 2006

REFORMER CONTRACTOR SCOPE (NOTE-6)

REFORMER

REFORMER

REFORMER

REFORMER

REFORMER

REFORMER

REFORMER
EIL/OTHER'S SCOPE

PACKAGE

PACKAGE

PACKAGE

PACKAGE

PACKAGE

PACKAGE

PACKAGE
G

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
3"-HG-100-5501-D5A-IH

10"-NG-100-6501-D1A

2"-SL-100-0804-A2A-IH

2"-WCR-100-8218-A3A
2"-WCS-100-8218-A3A
2"-SW-100-8715-A3A

2"-IA-100-8430-A23K
2"-AP-100-8409-A1A

2"-NI-100-8414-A1A
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant

FROM CW HEADER
SHEET SIZE UNIT
P55

P55

P55

P65

P65

100

TO CW HEADER
FROM HEADER

FROM HEADER

FROM HEADER

FROM HEADER

FROM HEADER
FROM 100 K 411
FROM HEADER

100-1187

100-1184

100-1184

100-1184

100-1182

100-1182
RECYCLE GAS

NATURAL GAS
FROM PI-2191

FROM PI-2191

FROM PI-4104

P-08B NAME
Natural gas preheat
Piping and instrument diagram
P03
DOCUMENT ID
247

373

S-03470 P42103 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 202-1 PROCESS AIR PREHEATER No. 1 100 E 202-2 PROCESS AIR PREHEATER No. 2 NOTES:

1) CONTROLLER IS SWITCHED TO AUTOMATIC MODE WITH


STEAM SUPER HEATER P07
PREDETERMINED SET POINT.
AH
TI 2) DELAYED FIELD WELDS TO BE CONSIDERED AT THE INLET
A OF 100 E 202 1/2 UNTIL COMPLETION OF BLOWING.
2019
16"
16"-PA-100-0409-E26K-IH
267 P11A 3) DRAIN VALVE TO BE ACCESSIBLE.
PROCESS AIR
4) TRIPLE ECCENTRIC DISC TYPE.
(100 E 202 1) TO 100 R 203
16"
5) DELETED.

NOTE 2 6) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
AH TI SCOPE OF REFORMER CONTRACTOR.
TI 3"-SM-100-0401A-D2A-IH 2018
2017 12"-SM-100-0402A-D2A-IH
10"-PA-100-0406A-D2A-IH MINIMIZE
16" 16"-PA-100-0407-D2A-IH NOTE 3
GENERAL NOTES:
RTP HPIP HPIP

3/4"
RTP

3/4"

MINIMIZE
16"-PA-100-0405A-D1A-IH 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
B STEAM SUPER HEATER P05 03 EIL 05
EIL
HIC 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
2001 DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
HPIP EIL MIN.
STOP REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
16"

D2A

10"
FO
D1A
HV HPIP RTP
RTP 10"-PA-100-0406-D1A-IH
60
2001
EIL 04
16" 16"
NOTE 2

12"-SM-100-0402-D2A-IH
100 E 202-2
CONT. REFER P03

CONT. REFER P03


REFORMER CONTRACTOR SCOPE

C
100 E 204 -2

100 E 204 -1

MINIMIZE
NOTE 6

PG
2014

16"-PA-100-0405-D1A-IH

LO
FV
2016
8"x12"

3/4"
IS
EIL / OTHERS SCOPE

UZY

FO
2 8"
2007 8"
D NOTE 3 12"x8" AH
8"-PA-100-0404-D1A-IH
IS FIC I
SAFE S
3A 3/4" 2016 103
LOCATION AL
FSO UZLO UZV NOTE 1
2017 2007 2007
3"-SM-100-0401-D2A-IH
2"-PA-100-0410-A1A

3/4"
FZLC FZLC FO LO
FUZY 2011 2019 FUZY 3"
6"x8" FZV 3/4"
2011 2011 2019
16"
FC
FC

6"
IS IS
8"x6"
IS 2 FZV 2 FFI
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
2 2019 2014
3/4" 3/4" AL
FI INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E UZY UZV 2015 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
PERMISSION OF HALDOR TOPSOE.
A1A
1"x2"

2006 S 2006 FIC FT AD


AH
2011 2011
FO

I FIC FFY
D1A-IH

1"
8"-PA-100-0402-D1A-IH 102 2019 2014 FZAL FZT FT
2"x1"

AL
UZLO TOTAL GAS/AIR 2015 2015 2016
2006 I
102 AD
IS
LO

AH
2 FIC IS
2"-PA-100-0401-D1A-IH UZV UZY 2013 1
PV AL
2005 2005 IS
3
MEDIAN

16" FC
F I
NOTE 4 102
UZLC
2005 FY FZAL FFZI
TI FZT 2019 2019 2012
2020 2019 A

2oo3 2"
FZT FZY FFZY FFZAL FFY

LO
2019 B 2019 2012 PRIMARY 2012 2018 2"
REFORMER ADD
GAS/AIR
FZT
2019 C IS
2
G

FF
PG PT PI
4001 4002 4002

12"-SM-100-6001-D2A-IH
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
16"-PA-100-6201-D1A-IH

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
TO TURBINE GOVENOR SYSTEM

REV. DESCRIPTION DATE DRAWN CHECK APPR.


616
SIGNAL FROM PROCESS AIR

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant
P62B

P11B
SHEET SIZE UNIT
P06

P06

P60
100
FROM 100 K 421

FROM FZY-2027

P62C

FROM FIC-2027

FROM FIC-2057

FROM HEADER
PROCESS AIR

NAME
Process air preheat

MP STEAM
Piping and instrument diagram
P04
SIGNAL

SIGNAL

SIGNAL
DOCUMENT ID
528

268

269

374

520
S-03470 P42104 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 203 1/2 STEAM SUPERHEATER 100-X-101 NOTES:


HP STEAM SILENCER
1) PV-7008, DOWNSTREAM PIPING AND SILENCER TO BE DESIGNED BY
VENDOR OF SILENCER. VENT TO BE LOCATED AS CLOSE TO
TURBINE INLET AS POSSIBLE.
IS
300#
A 1 SAFE LOCATION 2) IS-7 SENDS PULSE TO HIC-7001 TO CHANGE OUTPUT FROM ZERO
133.0 kg/cm^2g 100-X-101 TO 100%. THEREBY QUENCH CONTROL FROM FY-7005 1 IS
PSV 24"-SH-100-0509-A1D-IH SILENCER ENABLED.
3"L(2)6"
7009 IS-7 ALSO SET FIC-7004 TO REMOTE SET POINT.
6"x24"
TZAH NOTE 5 3) SPRAY NOZZLES AND TIs TO BE INSTALLED ACCORDING TO
7007 6"x3"
VENDOR INSTRUCTIONS

26"-SH-100-0510-B21D-IP
G22G A1D 2"-WY-100-0501-A1D-IP 4) DELAYED FIELD WELDS TO BE CONSIDERED AT THE INLET
OF E 203 1/2 UNTIL COMPLETION OF BLOWING.

6"-SH-100-0503-G22G-IH
SS
AH 5) TO BE PROVIDED WITH WEEP HOLE DIA.1/2".
TIC MEDIAN TY TZY PV
CONT. REFER P04 NOTE 5 6) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE

10"x26"
RTP 7007 7007 7007 7008

B21D
A/B/C SCOPE OF REFORMER CONTRACTOR.
57 2oo3
B 10" 7) VALVE WITH 1" INBUILT BYPASS.

FL/DC
G22G
HPIP EIL
100 E 203 1 AH
20"-SH-100-0502A-G22G-IH 20"-SH-100-0502-G22G-IH
14"x10" PIC

20"
NOTE 1 7008
GENERAL NOTES:
100 E 203-1 AH
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
TIC THS
NOTE-7
7006 7006 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
18" AL DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
18"-SH-100-0501-G22G-IH
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
ST-003 14"-SH-100-0504-G22G-IH
10"
NOTE 4 3/4"

SS
C TI
7008 TV
18" 7006 1
TZ
18" 7006
PT
BW STR-001
1"x2" 2"-BF-100-0504-F2A-IH 2"x1" 7008
100 E 203-2 TAL TY
NOTE 3
FC 1"x2"

3/4"

3/4"
(ROW 1-12) 7009 7009 2 1"
G22G F2A

2"-BF-100-0503-F2A-IH
PG
18"
7007
TV
18"-SH-100-0506-G22G-IH NOTE 3 18"-SH-100-0507-G22G-IH 7006 2
(ROW 13-28)
18" BW

G22G
D 100 E 203-2 2"x1"
STR-002
18" 18" FZ 2"-BF-100-0502-F2A-IH
AH 3"
TI 7004 PT
FC 1"x2"

3/4"

3/4"
NOTE 2

F2A
7005 1" 7006
CONT. REFER P03

IN VIEW
I I
3"-BF-100-0507A-F2A-IH 101 107 1"

PIC
20"x18" 7006
AL

FL/DC
2"
3/4" FIC SP TY TI 18"
18"x20"
7004 7009 1 7009 PV
FV MIN. CALC. THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
7006

IN VIEW
PV ALLOWED INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
7004
FC

E TEMPERATURE REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN


3/4"
PERMISSION OF HALDOR TOPSOE.
FZLC 1" 1"
7004 PG
7005
STR-003

3"-BF-100-0507-F2A-IH
2"-BF-100-0501-F2A-IH

TI 4"x3"
7004 4"x3"

FT
F 7004
IS 3/4"
HIC FY
1
7001 7005 2 LOW
UZV
UZY S SELECTOR
7001
7001
FO

3"

UZLO UZLC I ESTABLISH


7001 7001 NOTE 2 107
QUENCH
PV PV
FY
7005 1
MAX. QUENCH
PV

HIC
EIL HPIP

G
7002
RTP
DISPLACEMENT REFORMER CONTRACTOR SCOPE (NOTE 6)
06
EIL SCOPE

20"-SH-100-0505-G22G-IH
18"-SH-100-1110-F2D-IH

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
3"-BF-100-5831-F2A-IH

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.

375
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant
HP QUENCH WATER
P11C

P11C
P58B

SHEET SIZE UNIT


100
FROM 100 E 209

FROM HEADER

P60
FROM FI-2065

NAME

TO HEADER
HP steam superheat
P05
HP STEAM

HP STEAM
Piping and instrument diagram
SIGNAL

DOCUMENT ID
264

606

263

S-03470 P42105 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

NOTES:
SAFE LOCATION
IS
1) INSTRUMENT AIR FOR THE TWO PARALLEL CONTROL VALVES
1
SHALL BE TAKEN FROM INDIVIDUAL AIR MANIFOLDS.
FROM PIC-2005 UZY UZV
2) DISTANCE FROM 100 C 601 TO MIX POINT SHALL BE MINIMIZED.

A1A
P02 2013 S 2013
A 1"x2"
FO 1"

D1A
2"x1"
IS 3) CAPACITY OF HV-2008 SHALL BE LIMITED TO HALF THE CAPACITY
IS UZLO UZLC 1 OF TRIP VALUE OF FZAL-2033.
AH
1 2013 2013 UZV UZY UZY PI
4) ANY DIAGNOSTIC ALARM FROM PRESSURE TRANSMITTERS
2015 2015 2014 2027
FUZY SHALL DISABLE THE PRESSURE COMPENSATION.
1"x2"
S 2027 IS
1" FO S FF 5) THE BLIND SHOULD BE QUICK SWING TYPE.
1 PT
2"x1"
TI FZLC UZLC UZLO UZLC MINIMIZE 2027
6) FIC-2117 SHALL TAKE OVER EQUIVALENT SP FROM FIC-2035 IN CASE
2032 2027 2"-NG-100-0604-D1A-IH 2015 2015 2014 OF LOW FLOW OF RECYCLE HYDROGEN FROM LOOP. ON
12"-NG-100-0603-D1A-IH 12"x20" 20"-PG-100-0601-D1A-IH ACTUATION OF FALL-2035 AND I-101, FIC-2117 SHALL TAKE OVER
256 P07 EQUIVALENT SP FROM FIC-2035 AND WILL CONTINUE TO RAMP
10"x8" FC

1 1/2"
FC 8"x12" NOTE-7 FOR REMAINING TIME CYCLE (TOTAL TIME CYCLE IN 10 MINS.)

3/4"

3/4"
NATURAL GAS/STEAM
B 8" 12"
MINIMIZE TO 100 E 201
UZV WHEN FIC-2117 IS NOT IN USE IF IN FMO MODE, IF HS IS ACTIVATED
IT IS RELEASED FOR USE.

6"-NG-100-0601-D1A-IH

6"-NG-100-0602-D1A-IH
FZV 2014
2027
20"x24" 7) THE DISTANCE BETWEEN THE UZV-2014 AND FZV-2027/2030 TO BE
NOTE 1 KEPT MINIMUM. POSITIVE ISOLATION TO BE ENSURED DURING
MINIMIZE
SAFE LOCATION NORMAL OPERATIONS.
8) POSITIVE ISOLATION TO BE ENSURED DURING NORMAL
FZT FZT FZT 12"-SM-100-0616-A1A-IP

MINIMIZE
FZV MINIMIZE OPERATIONS.
2027 A 2027 B 2027 C 2030 HV
NOTE 1 6"x12"
2008
4" A1A-IP 18"x20"
6"x4" FC 4"x6"

D2A D1A
IN VIEW D2A-IH

NOTE 5
LC NOTE 3

D1A

D1A

D1A
FZY FY 6"

3/4"

3/4"
2027 2027 FZLC
GENERAL NOTES:
2oo3 2030

D5A
C

B1A
A1A
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
MEDIAN

NOTE 8 NOTE 8 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,


6"-SM-100-0613-D2A-IH MIN.
FZAL FZAL FT FUZY PG FF DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
2027 1 2027 2030 2030 2025 TI REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
1 1/2"
2034 3/4" 3/4"
IS
FIC 1 18"-SM-100-0612-D2A-IH NOTE 2

IS IS 2030

MINIMIZE
D2A

D2A
2 1

TO SAFE LOCATION

D22A

D1A
MINIMIZE
I
101
4"-SM-100-0615-A1A-IP

LO
D MINIMIZE
AD

2"x4"
AH
12"-SM-100-0611-D2A-IH 2" 2"
FIC I
2027 101 LC NOTE 6

1 1/2"
AL A1A-IP D22A-IH
I HS
3/4" 3/4" 101 2038
FZLC FZLC I I
FN I FUZY 2033 2031 101 101
12"x18" 12"x8" I
2028 101 2033 12" 8" RAMPING 3/4"

12"x8" FO
12"x18" FC
101
FZV FV DOWN
CARBON NO. IS UY UV I FV
2033 2031
1 FIC FY 2038 S 2038 101 2035
AD NOTE 1 1.1/2"x3"
FFY FIC 2031 2031
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL

FO

FC
3/4" AL >10% 2" 1.1/2"
2028 2033 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
3/4" 3"x1.1/2"
E AL NOTE 1
STEAM/CARBON PG UZLO FALL FIC REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
3/4"
PERMISSION OF HALDOR TOPSOE.
6001 2038 2035 2035

FFI FT
2028 2031 FT
AL
12"-SM-100-0610-D2A-IH 2035
TI
2033
MEDIAN

FY
FFZI FZN 2033 FZT
2029 2029 2033 A
AL
F CARBON NO. 2oo3

FFZY FZY FZT FT


2029 2033 2033 B 2117
STEAM/CARBON

FZT PG
FFZAL FZAL 2033 C FALL FIC 3/4" 2026
2029 2033 2117 2117

LO
PZY PZT
PG NOTE 6
2029 2029
NOTE 4 2028
IS IS I
1 1 101 I
101
PI 2"
G
2029
2" 10"-SM-100-5101-D22A-IH
10"-NG-100-0205-D1A-IH

10"-SM-100-0614-D2A-IH

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

24"-NI-100-5210-B1A-IH
3"-HG-100-5511-D5A-IP
18"-SM-100-6002-D2A-IH

2"-ML-100-6950-D1A

4"-NI-100-0601-A1A
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
268

269

389

258

631

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)

FROM START-UP CIRCUIT


100-1184
Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant SHEET SIZE UNIT
P02

P02

P60

P51

P69

P55

P55

P55

P52
FROM 100 R 202 B

100
FROM 100 C 601

FROM 100 P 295


FROM PZY-2006

FIC-2083

FIC-2083
P11B

FROM HEADER

FROM HEADER

FROM HEADER
P-51

P-57
P04

P04

P51

P69

RECYCLE GAS
NATURAL GAS

TO FFZY-2012

FROM PI-2191
FROM TI-2190
TO FFY- 2060

TO 100 C 601

NAME
TO FFY-2018

Feed/steam mixing
METHANOL
TO FV-2117

NITROGEN
MP STEAM

MP STEAM

MP STEAM

NITROGEN
Piping and instrument diagram
P06
SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

DOCUMENT ID
257

261

376

259

646

260

255
S-03470 P42106 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 205 COMBUSTION AIR PREHEATER 100 E 201 PROCESS FEED PREHEATER NOTES:

254 P08A 1) DELAYED FIELD WELDS TO BE CONSIDERED AT THE INLET OF


IS SIGNAL E 201 UNTIL COMPLETION OF BLOWING.
1 PZAH IS TO FLUE GAS DAMPER
BURNER BURNER 2031 1 2) ALARM WHEN DAMPER IS NOT FULLY CLOSED.
A TIGHTNESS TEST TIGHTNESS TEST AH
PAHH PIC MEDIAN PY PZY PZAL IS 3) TO BE USED IN CASE OF LTM SYSTEM.
2031 2031 2031 2031 2031 1
AL AH 4) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
HZY HIC 2oo3 AI SCOPE OF REFORMER CONTRACTOR.
2011 2011 AP 2011
TYPE 9 AL 5) REFER P&ID NO. A747-79-41-100-1193 FOR ANALYSER DETAILS.
PZT PZT PZT 2012 O2/COMBUSTIBLE
HZLC HZLO HZLO HZLC 2031 A 2031 B 2031 C AT
NOTE 2 NOTE 2 I
2011 1 2011 1 2011 2 2011 2 2011
AC AC 209 4" NOTE 5

NOTE 3

FL/DO

FL/DO
HZV HZV FLUE GAS FROM GENERAL NOTES:
2011 1 2011 2
PRIMARY REFORMER P10 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
B
FF 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
TI TI DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
2036 2038 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
20"-PG-100-0601-D1A-IH 20"-PG-100-0601A-D1A-IH
NOTE 1 AH
TI
256 P06 100 E 201 2037
NATURAL GAS/STEAM 20" AL
FROM 100 R 202 B EIL HPIP

20"
RTP TI
56 2039

C (100 E 202 1)

TI
2040

(100 E 203 1)

TI
2042
D

EIL SCOPE REFORMER CONTRACTOR SCOPE (100 E 203 2)


NOTE 4 (ROW 1-12)

100 E 205
FLUE GAS BLOWER P08A

TI
2049
FLUE GAS TO

AH THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL


TI TI TI TI TI INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E 2046 2045 2044 2043 2041 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
AL PERMISSION OF HALDOR TOPSOE.
TI
2050
(100 E 204 2)

(100 E 202 2)

(100 E 204 1)

(100 E 203 2)
(ROW 13-28)

AH
TI
2047 20"-PG-100-0701-E21M-IH
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
DUCTING

DUCTING

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
380

253

REV. DESCRIPTION DATE DRAWN CHECK APPR.

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


NATURAL GAS/STEAM

Revival of Ramagundam Fertilizer Complex Project


P08B

H
COMBUSTION AIR

COMBUSTION AIR

2200 MTPD Ammonia Plant SHEET SIZE UNIT


FROM 100 E 215

P10

P10

100
TO 100 H 201

TO 100 H 201

NAME
Reformer convection section
Piping and instrument diagram
P07
379

DOCUMENT ID

S-03470 P42107 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 X 201 FLUE GAS STACK 100 K 201 FLUE GAS BLOWER NOTES:

1) BLOWER IS PROVIDED WITH TWO MOTORS ONE WITH VFD AND


100 MK 201 A /B MOTOR FOR 100 K 201 A /B OTHER WITH FIXED SPEED. BLOWER SHALL PRIMARILY RUN WITH
VFD MOTOR. FAILURE OF MOTOR WITH VFD SHALL CAUSE THE
OTHER MOTOR TO TAKE OVER THE FULL LOAD.
A
2) CONDITIONAL TRIP IS-201 SHALL BE INITIATED ONLY IF BOTH THE
MOTOR ARE TRIPPED. VENDOR TO DETAIL THE CONTROL LOGIC.

3) IZAL-2001 A SHALL SWITCH THE DRAFT PRESSURE CONTROL VIA


SUCTION DAMPER HV-2015 AND 100 MK 201 B TAKES OVER FULL
EIL/OTHER'S SCOPE LOAD.
REFORMER CONTRACTOR SCOPE 4) FLUE GAS BLOWER (100 K 201) AND FLUE GAS DAMPER (HV-2015)
NOTE 5 IS LOSE SUPPLY TO REFORMER CONTRACTOR.
5) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
NOTE 3 SCOPE OF REFORMER CONTRACTOR.
HS HIC I
254 P07
2014 2015 201
SIGNAL 6) REFER P&ID NO: A747-79-41-100-1193 FOR ANALYSER DETAILS.
FROM PIC-2031
B SP

I SIC IS
201 2001 201

GENERAL NOTES:
HS SY UZY 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
2016 A 2001 2018 A 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
START / STOP
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

REFORMER VENDOR
II

FAN VENDOR
2001 A
AL
C RUNNING

MEDIAN
100 MK 201 A

IS IZAL IZY YL ML
201 2001 A 2001 A
M 2001 A 2001 A
2oo3
NOTE 1, 2
NOTE 6
100 X 201
AI AT
2017 2017
CO AT AI
NOTE 6 2021 2021 PG
4" SPM
AI AT 2035
D O1
2018 2018 TYPE 6
NOX
NOTE 6 AP
AI AT 2016
2020 2020
SOX

(INST. AIR 1" FLANGED)


(POTABLE WATER 1" FLANGED)
HV FLUE GAS FROM
2015 PRIMARY REFORMER SECTION P07
100 K 201 NOTE 4
2"

FL
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E NOTE 4 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
2"
PERMISSION OF HALDOR TOPSOE.
II
2001 B 2"-SY-100-0801-A1A
AL
RUNNING
100 MK 201 B
MEDIAN

SS

IS IZAL IZY YL ML
201 2001 B 2001 B
M 2001 B 2001 B
2oo3
AUTOSTART
NOTE 1, 2

HS UZY IS
F 2016 B 2018 B 201

START/STOP
UY I
2017 201

DETAILS BY FAN VENDOR

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant SHEET SIZE UNIT
100
NAME
Flue gas blower
Piping and instrument diagram
P08A
DOCUMENT ID

S-03470 P42108-A 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 214 LPS COMBUSTION AIR PREHEATER 100 K 202 COMBUSTION AIR BLOWER 100 P 214 CONDENSATE PUMP FOR 100 E 214 NOTES:

1) AIR INTAKE DUCT TO BE LOCATED AT MIN 5 m ABOVE GRADE AND


100 V 214 CONDENSATE POT FOR 100 E 214 100 MK 202 A /B MOTOR FOR 100 K 202 100 MP 214 MOTOR FOR 100 P 214 EQUIPPED WITH BIRD SCREEN.

A 2) DELETED.

3) BY REFORMER VENDOR.

4) IZAL-2004 A SHALL SWITCH THE COMBUSTION AIR


PRESSURE CONTROL VIA SUCTION DAMPER AND 100 MK 202 B
TAKES OVER THE FULL LOAD.

5) BLOWER IS PROVIDED WITH TWO MOTORS ONE WITH VFD AND


OTHER WITH FIXED SPEED. BLOWER SHALL PRIMARILY RUN WITH
VFD MOTOR. FAILURE OF MOTOR WITH VFD SHALL CAUSE THE
OTHER MOTOR TO TAKE OVER THE FULL LOAD.

TO REFORMER PACKAGE 6) CONDITIONAL TRIP IS-201 SHALL BE INITIATED ONLY IF BOTH THE
2"-SL-100-0804-A2A-IH
P-03 MOTOR ARE TRIPPED. VENDOR TO DETAIL THE CONTROL LOGIC.
B
EIL/OTHER'S SCOPE 7) 1/2" WEEP HOLE TO BE DRILLED AT VALVE DISCHARGE LOW POINT.
REFORMER CONTRACTOR SCOPE 8) COMBUSTION AIR BLOWER (K-202) SHALL BE LOOSE SUPPLY
NOTE-11 TO REFORMER CONTRACTOR.
PIC I
9) 2 NOS. HC DETECTOR TO BE PROVIDED AT COMBUSTION AIR
2066 202
IN VIEW AL BLOWER SUCTION. TAPPING FOR THE INSTRUMENT TO BE
PROVIDED BY VENDOR WHEREAS SUPPLY OF INSTRUMENT
RTP SHALL BE BY REFORMER CONTRACTOR.
PG
55 NOTE 1 10) MINIMUM FLOW ORIFICE BY PUMP VENDOR.
7004
EIL HPIP 11) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
FAN VENDOR SCOPE.

C
SAFE LOCATION BURNER
6.0 kg/cm^2g 6"-SL-100-6115A-A2A-IH
TIGHTNESS TEST
PSV I

1 1/2"-SL-100-0801-A2A-IH
1"D2" NOTE 7 6"
2040 UY 202
2022
100 E 214 HS II IS
2"x1" 2021 B 2004 B 202 FY FIC FZAL FZT GENERAL NOTES:
AL
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.

MEDIAN
START/STOP 2036 HIGH 2036 2036 2036
2"-V-100-0801-A1A
AL
SELECTOR 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
2"-SL-100-0802-A1A-IH DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
IS UZY IZY IZAL REFORMER VENDOR FAN VENDOR
202 2021 B
M 2004 B 2004 B
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
2" 2oo3 I HIC FHS

NOTE 3
NOTE 5, 6 NOTE 4
D 100 V 214 2" 100 MK 202 B 202 2020 2036
V1 2"
NOTE 3 S1 FAN VENDOR SCOPE
PG NOTE 8,11
L3
2"x11/2" NO POCKETS 1 1/2" 2039
2" 2" PG

3"x2"
FF A3
PI PT 2" 2038 HV TI
L1 L5 2" 1.5"-SL-100-0801A-A2A-IH DUCTING
7003 7003 2" 2020 2051
AL A2
2"x11/2" DUCTING
LIC LT LT LI LALL
2001 2001 2003 2003 2003
100 K 202 FL
LG
AL MAGNETIC 2002
DPT DPT II
2" AH

MEDIAN
TI 2004 A
100 MK 202 A AE AE THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
L6 AL
I 2052 2060 2061 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
2"
H1 6" AL
E 2" 809 IS UZY IZY IZAL REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
L2
3" 3"-SC-100-0802-A1A-IH 202 2021 A
M 2004 A 2004 A
PERMISSION OF HALDOR TOPSOE.
L4 A1 2oo3
2" 2" NOTE 5, 6 AT AT
B1 2060 2061
HC DETECTOR HC DETECTOR
MIN. 2.8M

3" TG HS SY
1 1/2"-SC-100-0806-A1A-IH

2053 2021 A 2005 IS


202
START/STOP
AI AI
3"-SC-100-0803-A1A-IH

NOTE 6
2060 2061
SIC AAH AAH
2005

DETAILS BY FAN VENDOR


F

VF FO PI
DUCTING

NOTE 10 2040 2037


AL
FF
PG PT
STR 004 RTP
2042 2037 LV
08
2001
3/4"-SC-100-0809-A1A-IP HPIP EIL
2"-SC-100-1579-A1A-IH
PG IP IH 2"-SC-100-0805-A1A-IH
504 P57
2041 3/4" FC

3/4"
2"x1" STEAM CONDENSATE
3/4" 2" TO 100 V 701
G 2"-SC-100-0805A-A1A-IH
3"x2"
100 P 214
3/4"-SC-100-0808-A1A-IH
3/4"
3/4"

IH 2"
IP
100 MP 214 RTP Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
6"-SL-100-6115-A2A-IH

IP IH 26
YL ML HPIP EIL
M 2002 A 2002 A 2"-WCR-100-8218-A3A
TO CW RETURN HEADER
P&ID 2010-FD-4006 100-1182
3/4"-SC-100-0810-A1A-IP
FROM EMERGENCY CW HEADER
2"-WCS-100-8218-A3A 1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
I UY P&ID 2010-FD-4006 100-1182
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
809 2002 A HPIP EIL REV. DESCRIPTION DATE DRAWN CHECK APPR.
379

HS Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


2002
RTP Revival of Ramagundam Fertilizer Complex Project
H 25 2200 MTPD Ammonia Plant SHEET SIZE UNIT
P10

P61

COMBUSTION AIR

100
FROM HEADER

P07
FROM PY-2066

NAME
TO 100 E 205

Combustion air blower and preheater


P08B
LP STEAM

Piping and instrument diagram


SGNAL

DOCUMENT ID
390

576

S-03470 P42108-B 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 215 FUEL GAS PREHEATER NO. 1 100 E 216 FUEL GAS PREHEATER NO. 2 100 V 215 STEAM CONDENSATE POT FOR FUEL EXPANDER 100 P 215 A/B CONDENSATE PUMP FOR 100 E 215/100 E 216 100 V 204 FUEL GAS K.O. DRUM 2 NOTES:

100 MP 215 A /B MOTOR FOR 100 P 215 A /B FUEL GAS


1) MINIMIZE THE DISTANCE TO EXPANDER 100 TX 201 A/B.

10"-FG-100-0905-D5A-IH BYPASS TO 100 E 217


FF 2) DELETED.
AH 370 P09B
PT PI 3) 10 mm DIA WEEP HOLE TO BE DRILLED AT VALVE
A FF
TI 2056 2056 DISCHARGE LOW POINT.
AL
2057 FUEL GAS 4) MINIMUM FLOW DEVICE BY PUMP VENDOR.
AL TO 100 TX 201 A
10"-FG-100-0901-D5A-IH
367 P09B
FF
TI
2058 FUEL GAS
AL TO 100 TX 201 B
16"-FG-100-0903-A5A-IH
368 P09B
GENERAL NOTES:
14"-FL-100-0917-A1A TO FLARE HEADER 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
100-1185
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
14.0 kg/cm^2g DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
PSV
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
B 100 E 215 2051 1
4"P6"
10" 4" 10" 10" FF 14"-FL-100-0916-A1A
A1 B2 A1 B2 6"x14"
A2 PI

14"-FL-100-0917-A1A
4" 14"x10"
16"x10" 2055
PG PG FB LO
2049 2050
100 E 216 14.0 kg/cm^2g
3/4" 6"x4"
16"x10" 14"x10"
A3 A1A A5A 3/4"

FB LO
B1 A2 B1 B3 FF PT PSV
4"P6"
IN VIEW

IN VIEW

3" 10" 3" 10" 10" TI 2055 2051 2


2060 6"x14"
14"-FG-100-0936-A5A
FB LO
6"x4"

6"-FG-100-0904-A5A-IH
3/4"
3/4"

FB LC
FF 100 V 204
A1A A5A
Up

TI 14"
SAFE LOCATION
C 2059 6.0 kg/cm^2g B1

Up
6"-FG-100-0907-A5A-IH
PSV
3"L4" 8"-SL-100-0902-A1A
2043

1 1/2"-SL-100-0901-A2A-IH
4"x8" 14" 14"-FG-100-0902-A5A-IH
3"-SC-100-0901-A1A-IH

3"-SC-100-0902-A1A-IH
24" M1 A1 P09B 369
NOTE 3 MINIMIZE
6"x3" FUEL GAS
2"-SL-100-0906-A1A 2" 2" 2" FROM 100 TX 201 A
L7 L3

6"-SL-100-0905-A1A-IH
L5 L1
2" 2" 2" 2"
2"
IH
LZAL IS
LG LZT 2007 16
2008 2007 C
LZT LZT LZY LZAH IS
D M DPT
2007 A 2007 B 2007 2007 10
DPT DPT 2oo3

IS
6" LY
16
1.5" 100 V 215 L6 2" L2 2"
2007
S1 2" 2" L8 D1 L4 2"
A3 UZY

MEDIAN
2" 2"
2033
2" UZLO
2" AH
LIC I 2033
A1 L1
3" 2007 116
L5 AL UZLC
UZV
L3 2" 2033 THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
1 1/2"-SC-100-0908-A1A-IH 2033
2" INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
1 1/2" A2 2"-PC-100-0907-A1A
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
PERMISSION OF HALDOR TOPSOE.
IN VIEW 2",FC
AH
LALL LI LT LG LT LIC
2005 2005 2005 2004 2006 2006
AL
DPT DPT DPT
3/4"
LV
2" 2007
I 2"x1"
2" L6
I 810 PI 1"
1"

LO
810 L4 L2 FC
2048
6" H1 2" AL 2"x1"
ON/OFF
2" B1 VF FF
PG FO PT LV 3/4"
MIN. 2.8M

2037 2006
2"-SY-100-0901-A1A-IP

F 2045 2048

2"-SC-100-0906-A1A-IH NOTE-4
LO 2"
PG 2"-SC-100-0911-A1A-IH 2"
IH 3/4"

2"-PC-100-0908-A1A
IP 2044 FC

3/4"

3/4"
3/4"-WY-100-0901-A1A-IP

IP IH 2"x1"

1 1/2"-SC-100-0909-A1A-IH

2"-SC-100-0910-A1A-IH
100 P 215 A 2"
3/4"

OWS
3/4" 100 MP 215 A
IH 3/4"-WY-100-0902-A1A-IH 20"
2"-SC-100-0907-A1A-IH

IP
YL ML PIPE
M 2003 A 2003 A
AP
2M HT.
2021
LO

AUTOSTART
G I UY TYPE-2A LAH
FO VF LIC LT LG
810 2025 A 2204 2204 2203
PG 2038
2047

ON / OFF
NOTE-4
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

2"-SC-100-0912-A1A-IH
4"-SL-100-6121-A2A-IH

4"-SL-100-6120-A2A-IH

10"-FG-100-0108-D28A

PG

2"-FL-100-0918-A1A
3/4"
2046
3/4"-WY-100-0903-A1A-IP

IP IH 2"x1" LV
2204
100 P 215 B 2"-PC-100-0910-A1A 1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
3/4"

2" 2"x1" 1"x2" 2" 0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS

3/4" 100 MP 215 B FC


REV. DESCRIPTION DATE DRAWN CHECK APPR.

381

100
IH 3/4"-WY-100-0904-A1A-IH 2"-PC-100-0909-A1A Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
1"
IP Revival of Ramagundam Fertilizer Complex Project
YL ML
H M

STEAM CONDENSATE
2200 MTPD Ammonia Plant
2003 B 2003 B 1" SHEET SIZE UNIT
P61

P61

P01

OWS 100

1185
FROM HEADER

FROM HEADER

P57
AUTOSTART IN VIEW

TO 100 V 701
I UY NAME
Fuel gas preheat
P09A
LP STEAM

LP STEAM

FUEL GAS

810 2025 B Piping and instrument diagram


DOCUMENT ID
364

365

366

S-03470 P42109-A 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 TX 201 A/B FUEL GAS EXPANDER 100 E 217 FUEL GAS PREHEATER NO. 3
NOTES:

1) FV-2044 1/2/3 OPERATES IN SPLIT RANGE AS SHOWN:

0-50%
VALVE OPENING, %
P09C 512
A UZY SIGNAL FROM FY-2044 2
100
2061

IS UZLO 1 2 3
10 2061

UZV UZLC FO
2061 2061 2120
A5A A1A
TO FLARE HEADER
3"-FG-100-0961-A5A-IH 4"-FL-100-0983-A1A OUTPUT, %
100-1185 0 50 100
LO FO 3"x4" LO
3/4" 3"
16"-FG-100-0903-A5A-IH 2) IRRESPECTIVE OF LAST POSITION, ON ACTIVATION OF
368 P09A VF IS-10,SELECTOR SWITCH HS-2044 SHALL BE DIVERTED
PT PI TO FLARE HEADER
FUEL GAS PDI UZY 2"-FL-100-0982-A1A TO FHIC-2044 3 AND CONTROLLER SHALL BE SWITCHED
FROM 100 E 216 2064 2064 100-1185
2471 2024
IS
TO AUTOMATIC MODE.
B NOTE 1
PI PI IS 10 PDT PDI 3) MIN. 2-3% OPENING TO BE MAINTAINED IN DCS
FHIC 10 VF VF
2063 2063 VF VF 2473 2473 TO FLARE HEADER ( CORRESPONDING TO 5% FUEL FLOW)
2044 1 NOTE-6 PDI UZLO 16"-FL-100-0981-A1A
UZV VF

16"x12"
VF UZY 100-1185 4) DISTANCE BETWEEN 100-PSV-2052 1/2 AND 100-E-217 SHALL BE
2471 2024
FV VF 2474 2474 NOTE-6
VF MINIMISED.
PT 2044 1 PDT UZV UZLC VF
PDI FF 5) TEMPERATURE INDICATOR TO BE PROVIDED ON PIPE INNER
2063 2471 2024 2024 FC LOCATE NEAR LOCATE NEAR TI TYPE-7A AP CIRCUMFERENTIAL AFTER FIRST BEND.
12" 2473 100-TX-201A/B 100-TX-201A/B 2055 2045
367 P09A UZLO UZLC 6) REFER VENDOR P&ID NO. A747-79-41-100-P76 FOR DETAILS.
AE AE
10",FC VF FC,10" VF 2474 2474 20"-FG-100-0910-A1A-IH
FUEL GAS VF 2062 2063 384 P09C
FROM 100 E 215 FV NOTE-6 6.0 kg/cm^2g MINIMUM
VF 3/4" FUEL GAS
10"-FG-100-0901-D5A-IH 2045 NOTE-5
PSV TO 100 H 201
4"x3" 4"x3" 8"T10"

10"x16"
10"-FG-100-0937-D5A-IH AT AT 16"-FL-100-0980-A1A 2052 1
3" 2062 2063
C

14"-FG-100-0917-A1A-IH

14"-FG-100-0916-A1A-IH
NOTE-6 300#
H2 DETECTOR H2 DETECTOR
FB LO FF
AAH AAH 3/4" 14"x8"
TI MIN. MIN.
1"-FG-100-0921-D5A-IH TO SEAL GAS AI AI
2062 2063 3/4" 2062 GENERAL NOTES:
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.

16"-FL-100-0981-A1A

FB LO
GENERATOR 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
6.0 kg/cm^2g 6" 14" 14"
2"-NI-100-8418-A1A DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
100-1184 B1 B3 B2
PSV
2"x1" LOCATE NEAR LOCATE NEAR 8"T10" REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
FUEL GAS EXPANDER FUEL GAS EXPANDER 2052 2 100 E 217
10"x16"
2"x1" 100 TX 201 A 100 TX 201 B AE AE 300#
2"-IA-100-8417-A23K
100-1184 FOR DETAILS REFER VENDOR P&ID 2060 2061 FB LO A1 A2 A3
VENDOR OTHER 14"x8"

14"-FG-100-0918-A1A-IP
NO: A747-79-41-100-P76 A~L 3/4" 6" 14" 14"
3/4"

FB LC
D AT AT
2060 2061 MIN. MIN.
HC DETECTOR HC DETECTOR 14"-FG-100-0919-A1A-IH
14"-FG-100-0911-A1A-IP 14"-FG-100-0909-A1A-IP NOTE-4
AAH AAH
AI AI

20"-FG-100-0908-A1A-IP
2060 2061
3/4"-FG-100-0963-A5A-IH

VF : VENDOR FURNISHED
SEAL GAS DRAIN

PI
FF
2065 TI
2"-FG-100-0962-A1A-IP

2061 THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL


3/4" INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
VF
E PT REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
FROM EMERGENCY CW HEADER
3"-WCS-100-8213-A3A 2065 PERMISSION OF HALDOR TOPSOE.
100-1182
MINIMUM
TO CW RETURN HEADER VF 20"-FG-100-0912-A1A-IP
3"-WCR-100-8213-A3A
100-1182
LO VF
3/4"

20"-FG-100-0906-A1A-IH
14"-FG-100-0902-A5A-IH
P09A 369
FUEL GAS
TO 100 V 204

TO FLARE HEADER
2"-FL-100-0984-A1A
100-1185

F 12"-FG-100-0914-A1A-IH
50-100%
HS IS
2043 10
A1A

A1A

NOTE 2
FHIC
D5A
D5A

2044 2
3/4" NOTE 1 3/4" FHIC 50-100%
2044 3
12"x4" 8"x20"
NOTE-6 FC 4" FC 8" NOTE 1,3
6"x4" VF 10"x8" NOTE-6
FV FV
3/4" 2044 2 3/4" 2044 3 3/4" 3/4"
G VF

6"-FG-100-0915-D5A-IH
FI

6"-PC-100-5103-A23K-IH

6"-PC-100-0905-A23K-IP
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

2039

3"-FG-100-0957-A1A

3"-FG-100-0955-A1A
10"-FG-100-0905-D5A-IH
370 P09A T
FUEL GAS 1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
BYPASS 0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.

649

339

388
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant

FROM 100 E 601 1/2/3


SHEET SIZE UNIT

P51
100

P09C

P26

P51
CONDENSATE

CONDENSATE
NAME

TO 100 H 201

TO 100 H 501

TO 100 E 602
Fuel gas expander
P09B

FUEL GAS

FUEL GAS
Piping and instrument diagram
DOCUMENT ID
387

S-03470 P42109-B 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 X 220 STATIC MIXER SAFE LOCATION


IS
COMMON
LOCAL RESET NOTES:
8 HS IS
1) DUTY CONTROL OF REFORMER FIRING RATE WITH
UZY 2031 8 IS
UZV COMPENSATION FOR VARIATION IN FLASH GAS, OFF-GAS AND
2030 2030 9 EXCESS SYNGAS FLOW RATE.
1"x2"
IS
A

FO
IH 1" 2) THE TEST IS TO BE PART OF THE ESD SYSTEM. REFER TO
8
2"x1" DOCUMENT DESCRIBING BURNER TIGHTNESS TEST SYSTEM.
UZY UZLC UZLO IS PZAL PI PZAL IS IS
UZV

2"x1"
2034 2030 2030 8 2057 2063 2063 8 9
2034
AL 3) FUEL GAS DOUBLE BLOCK AND BLEED VALVES SHOULD BE
LOCATED AS NEAR TO THE PRIMARY REFORMER AS POSSIBLE.

FO
1"
2oo3
2"x1"
UZLO UZLC PY PZY PY PZY PZAH 4) THE DISTANCE FROM THE MIXING POINT TO 100 H 201 SHOULD BE
2034 2034 2057 2057 2063 2063 2063 MIN. 30 x OD.

2"-FG-100-0934-A1A-IH
UZY UZY
2029 2031 2oo3

MEDIAN
IS UZLO UZLO IS
S GENERAL NOTES:
8 2029 2031 8 PZT PZT PZT PG PZT PZT PZT
FF FF 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
TI UZV UZLC UZLC UZV 2057 A 2057 B 2057 C 2058 2063 A 2063 B 2063 C TI
B 2064
24"-FG-100-0938-A1A-IH 100 X 220 2029 2029 2031 2031 2065
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
I 24"-FG-100-0935-A1A-IH DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
AL
558 10"-FG-100-0932-A1A NOTE 3 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
109 P10
IS MINIMIZE 24"
NOTE 4 24" FUEL GAS
9 FC PSV FC TO 100 H 201
6.0 kg/cm^2g 3"L4" A23K A1A
UZY UZV 2062 1
8"-FL-100-0941-A1A TO FLARE HEADER
2028 S 2028
3/4" B23K
4"x8"
100-1185
8"-FG-100-0923-A23K-IE A23K FB LO
10"
FC

6"x3" 3/4" 3/4"


6.0 kg/cm^2g

8"-FL-100-0940-A1A
24"x20" 3/4" TO FLARE HEADER

FB LO
UZLO UZLC PSV
A1A A23K 3"L4" 100-1185
2028 2028 UZY 2062 2
3/4" UZLO UZLC 3/4"
2032 4"x8" FB LO
FV B23K 4.5 kg/cm^2g
2032 2032
UZV A23K
C 5001
10"x8" 3/4" PSV
2032 6"x3" 3/4" 1.5H3

FC
8" 2061
3"-FL-100-0942-A1A
FC

8" 3/4"

FB LC
3/4"

3"-FG-100-0929-A1A
8"x10" A23K A1A FB LO
FV 6"-FG-100-0933-A23K-IH 2"x1 1/2"
3/4" 8"x6"
3002
IS IS
3/4"

FC
311 9 6" 6"-FG-100-0975-A23K-IH
START / STOP
28"x10" 6"x8"
I HS LO FSO
28"-FG-100-0931-A1A FB 2048
108 2029
2" 3/4" 2"-FG-100-0945-A1A
UZY
NOTE 2 1001 SAFE LOCATION
8"x24"
2"
2200 mm

24"-FG-100-0922-A23K-IH AH
PIC PV
D FF AH
2057 BURNER

FO 1 1/2"-FG-100-0990-A1A
LG LT LI TIGHTNESS TEST PG
2009 2010 2" AL
2010 2" UZLO 2059
M AL FF AH
GWR M 1001 2
LG LT LI 2"x3"
2"

2" 2011 2012 2012


AL LOCAL HS UZLC

2200 mm
RESET 2"
DPT 2030 1001 2
IN-VIEW

2"x3"
2" 2" IS IS PCV

IN-VIEW
1.1/2"
1 8 2060
1 1/2"
LC

HV UZV 3/4" 3.0 kg/cm^2g

1 1/2"
LC

1 1/2"-FG-100-0928-A1A
PG FO 2028 1001 2
5002 2046
FO THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
1 1/2"-FG-100-930-A1A HV 2047 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E TYPE 4A 2027
NO POCKETS 1.5"x1" UZLO UZLC REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
1 1/2"x1" 1001 3 1001 3 PERMISSION OF HALDOR TOPSOE.
AP 1" 1"
A23K
5001

FC
A19A 3"
1 1/2"x2" 1"x2"

UZV
2"-MD-100-0901-A19A 1001 3
I I NOTE 1
109 558 PV
AMMONIA FIC FY
WASH PIT 2044 2044 2
DUTY HIGH UZLO UZLC
PG CONTROLLER SELECTOR
1001 1 1001 1
FY FIC FY FY FY FN 3001

FC
5001 1 5001 5001 2 2044 1 3002 1 3002 I 3"
LOW MULTIPLIER ADDER
SELECTOR MULTIPLIER FLASH GAS TYPE 4A 108
F
LHV UZV
AP 1001 1
FN 3001
FT
300# 5001
5001 TO FLARE HEADER
OFF-GAS 8"-FL-100-0943-A1A
100-1185
LHV
FY FIC FT A1A
300#
3002 2 3002 3002 A23K-IE
AL
LOW
SELECTOR
NO POCKETS

PV
4"x8"

TI 3/4"
3030 2
3001
FC

4"
TI I
G 3/4"
5001 311
20"-FG-100-0910-A1A-IH

8"-FG-100-1901-A23K-IE

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
10"-FG-100-3603-A1A

3"-FG-100-0957-A1A
4"-FG-100-0920-A23K-IE

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
512

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


FUEL GAS FROM 100 E 217

SIGNAL FROM PIC-3030 1

Revival of Ramagundam Fertilizer Complex Project


H 2200 MTPD Ammonia Plant

FROM 100 TX 201 A/B


P09B

P09B
SOLUTION TO T-302

SHEET SIZE UNIT


P36

P36

P36

P01

P01

P19

P19

P19

P19

TO FHIC-2044 1/2/3

100
FROM PIC-3030 2
FROM PIC-3030-1

FROM 100 V 302

P53A

P09B
FROM PIC-5096

FROM PIC-5096

FROM FY-3001

FROM FY-1002

NAME
FROM PGRU

FLASH GAS

Fuel control
P09C
OFF GAS

Piping and instrument diagram


SIGNAL

SIGNAL

SIGNAL

SIGNAL

SIGNAL

DOCUMENT ID
155

158

572

641

384

204

204

385

511

649
NG
S-03470 P42109-C 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 H 201 NOTES:


PRIMARY REFORMER
1) ONE TI PLACED ON EACH HOT COLLECTOR
TOTAL NUMBER OF HOT COLLECTORS: 5

2) HIGH PRESSURE IN REFORMER FURNACE BOX ACTIVATES


A HAZARD FLASHERS ALONG WITH HOOTERS. THREE FLASHERS
NOTE 5 ARE LOCATED AT THE END OF THE REFORMER ON EACH FLOOR.
14"-PG-100-1001-E21M-IH 14"-PG-100-1002-E21M-IH
PI
2102 3) HEADER END CAPS TO BE WELDED AFTER COMPLETION
AH AH OF BLOWING.
2" 2" PDI PDI
PG PT 2103 2104
4) PORTABLE INFRARED PYROMETER FOR TUBE WALL TEMPERATURE
PRIMARY 2101 2102 MEASUREMENT.
SS
REFORMER 100 H 201 SS
3/4" Up 3/4" 3/4" Up
PDT PDT
CONVECTION P11A 113 5) SYMMETRICAL PIPING.
2103 2104
NOTE 7 NOTE 7 CONNECTION
PG SECTION P07 AH

3/4"
TI FROM OUTLET 100 R 203
6) VALVE TO BE LOCATED AT ACCESSIBLE LOCATION.
2076
NOTE 2 NOTE 3 NOTE 3
3/4" 7) DRAIN LINE ARE LOCATED AT DISTRIBUTOR FRONT END DRAIN
2" 2" LINE TO BE ROUTED TO GROUND LEVEL & CONNECTED TO SS.
B FUEL I XAL PG PG
NOTE 6

Up
GAS AH AH NOTE 6
209 2004 2099 TI TI 2100
8) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
AIR 2067 2068 SCOPE OF REFORMER CONTRACTOR.
NOTE 4
9) FOR BURNER DISTRIBUTION OF FUEL GAS HEADER
XAL 2004A/BIC (HOOTER) REF.DWG. NO.2010-FD-4008.
TI
XAL 2004DIE/F (FLASHER)
PG BURNER ROW 2069 10) SUPPLY & INSTALLATION OF GAS DETECTORS 100-AT-2051,
1 SAFE LOCATION SAFE LOCATION SAFE LOCATION SAFE LOCATION 2052, 2053, 2054, 2055 BY EIL/CLIENT.
6
NOTE 6 NOTE 6
GENERAL NOTES:
NOTE 6 NOTE 6

2"

2"

2"
2"
PG PG PG PG
LOCATE NEAR LOCATE NEAR LOCATE NEAR 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
2086 2090 2094 2098 100-H-201 100-H-201 100-H-201
PG PG PG PG 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
PG 2070 2074 2078 2082
AE AE AE DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
C
2051 2052 2053 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
6"
6" 6" 6" NOTE-10 NOTE-10 NOTE-10
3/4"
BURNER ROW 6
FUEL AT AT AT
GAS 2051 2052 2053
PG PG PG PG
WALL-C HC DETECTOR HC DETECTOR HC DETECTOR
AIR 2085 2089 2093 2097

PG PG PG PG AAH AAH AAH


WALL-A AI AI AI
2069 2073 2077 2081 2051 2052 2053
PG
8" 8" 8" 8"
BURNER ROW
2-3 BURNER ROW 4 & 5 WALL-D
4-5
PG WALL-B PG PG PG LOCATE NEAR LOCATE NEAR
D 100-H-201 100-H-201
2084 2088 2092 2096
AE AE
PG PG PG PG
2054 2055
2068 2072 2076 2080
NOTE-10 NOTE-10
NUMBER OF BURNER PER ROWS PER FURNACE WALL: 15 8" 8" 8" 8"
TOTAL NUMBER OF BURNERS: 6 x 15 x 4 = 360 AT AT
BURNER ROW 2 & 3 2054 2055
HC DETECTOR HC DETECTOR
PG PG PG PG
2083 2087 2091 2095 AAH AAH
AI AI
PG PG PG PG 2054 2055
2067 2071 2075 2079
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
4" 4" 4" 4" INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
BURNER ROW 1 PERMISSION OF HALDOR TOPSOE.

3/4"
REFORMER CONTRACTOR SCOPE
EIL SCOPE (NOTE 8)
12"

12"

12"
12"
16"x12" 16"x12"
3/4"

3/4"
SAFE LOCATION
RTP TYPE 7A
09 TZAH IS
F AP 2075 1
EIL HPIP 2"
24"-FG-100-0935-A1A-IH 24"x16" 2019
24"-FG-100-9301-A1A-IH
109 P09C
NOTE 08 2oo3

MIN. 4 m ALLOY 602CA


FUEL GAS AH
FROM HEADER TI TZY MEDIAN TI

6"
2070 2075 2075

TI TI A/B/C
2071 2074 6" 6" 6" 6"
NOTE 5
TI TI
112 P11A
2072 2073
REFORMED GAS
NOTE 1 TO 100 R 203
PZAL IS
PZT 2066 1
G
2066 C

3/4"
2oo3
PZT PZY PY
20"-PG-100-0701-E21M-IH

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2066 B 2066 2066

Up
MEDIAN
DUCTING

PZT
2066 A
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
390

128
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
Revival of Ramagundam Fertilizer Complex Project
NATURAL GAS/STEAM

H 2200 MTPD Ammonia Plant


SHEET SIZE UNIT
P07

P07
COMBUSTION AIR

100
FROM 100 E 201

FROM 100 E 205

P11C
P08B

CONNECTION
NAME
TO PIC-2066

Primary reformer
P10
TO AI-2022
Piping and instrument diagram
SIGNAL

DOCUMENT ID
253

380

S-03470 P42110 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 R 203 SECONDARY REFORMER NOTES:

1) MINIMUM LENGTH OF 4000 mm OF 30 mm TUBE IN ALLOY 602CA.

2) CHECK VALVE TO BE CLOSE TO 100 R 203.

A 3) VALVE TO BE LOCATED AT ACCESSIBLE LOCATION.


4) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
SCOPE OF REFORMER CONTRACTOR.

Up
P10 113
CONNECTION
TO PDT-2104
EIL SCOPE
GENERAL NOTES:
REFORMER CONTRACTOR SCOPE (NOTE 4) 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
NOTE 2 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
B 16" 100 R 203
U1 A2
2"-SW-100-1101A-A3A-IH 3"

112 P10 A1
REFORMED GAS
FROM 100 H 201

HPIP
RTP
54

EIL Up
117 P11B
C CONNECTION
3/4"

NOTE 3 TO PDT-2111
Up

3/4"
AH
TI
2080 IS IS
AL
2 2

MEDIAN
AP
D TYPE 7A
U2 U3 2024
3"
TZY TZAH TZAL
3"-SW-100-1101B-A3A 2080 2080 2080

NOTE 1
B1 2oo3
A/B/C

SS 6" 6" 6"


6"
P1 T1 T2 T3

24" M1 116 P11B THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL


REFORMED GAS
INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E TO 100 HE 201 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
PERMISSION OF HALDOR TOPSOE.

D1
MIN. FOR PIPING

2"

G
16"-PA-100-0409-E26K-IH

2"-SW-100-1101-A3A

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS

655
REV. DESCRIPTION DATE DRAWN CHECK APPR.

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
1187
P07

H
FROM 100 E 202 1

2200 MTPD Ammonia Plant


SERVICE WATER

SHEET SIZE UNIT


P11C
SAMPLE INLET
PROCESS AIR

100
TO AT-2022

NAME
Secondary reformer
Piping and instrument diagram
P11A
267

100

DOCUMENT ID

S-03470 P42111-A 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 HE 201 HEAT EXCHANGE REFORMER NOTES:


129 P11C
PROCESS GAS 1) MINIMIZE DISTANCE FROM NON-RETURN VALVES TO ADDITION
IS SAFE LOCATION TO 100 E 208 POINT.
1
REFORMER CONTRACTOR SCOPE (NOTE-14) 2) SUBSEQUENT TO IS-1 CONTROLLER IS SWITCHED TO PRE-
UZY UZV 2"-V-100-1102-A1A-IP DETERMINED SET POINT. IT WILL REMAIN CONSTANT FOR
A LOCATE NEAR FEED/
STEAM MIX POINT 2037 S 2037 EIL SCOPE 5 MINUTES AFTER THAT IT WILL RAMP DOWN TO 0% IN NEXT
1"x2" A1A 5 MINUTES.
AE
D1A-IH

FO
2059 1"
2"x1" 3) TO BE USED DURING OPERATION WITH ONLY STEAM FLOW.
UZLO UZLC
4) FT-2052 TO BE VISIBLE FROM HAND VALVE HV-2036.

2"-NG-100-1115-D1A-IH
2037 2037
AT
2059 5) STEAM PIPING UP TO DISMANTLED NOZZLES U1, U2, U3
HC DETECTOR IS
MUST BE INCLUDED IN IN PIPE BLOWING.
1 IS I
AAH 6) MIN. LENGTH OF 4000 mm OF 30 mm TUBE IN ALLOY 602CA.
AH AI
PI IS UZY UZV 1 101
2059
2113 1 2039 2039 FUZY 7) ANY DIAGNOSTIC ALARM FROM PRESSURE TRANSMITTERS
1"x2" P02 SHALL DISABLE THE PRESSURE COMPENSATION.
UZY 2057
AD

FO
B FF 1" FROM PIC-2005
FF PT 2036 AH FIC 8) CAPACITY OF HV-2034 SHALL BE LIMITED TO HALF THE CAPACITY
AH 2"x1"
TI 2113 TO BE MINIMIZED UZLC UZLO UZLC FZLC 2057 TI OF TRIP VALUE OF FZAL-2054.
AL
2083 2036 2039 2039 2057 2084
12"-PG-100-1116-D1D-IH 6"x12"
9) FIC-2062 SHALL TAKE A PREDETERMINED SETPOINT ON
ACTIVATION OF I-101. CONTROLLER OUTPUT WILL RAMP DOWN
HPIP EIL

6" TO 0% IN 10 MINUTES.
RTP

1 1/2"
FC 6"-NG-100-1112-D1A-IH 3"x6" 3" 6"x3"

3/4"

3/4"
53

Up FC

4"-NG-100-1110-D1A-IH
UZV D1D D1A FZV 10) SUBSEQUENT TO IS-1, CONTROLLER IS SWITCHED TO PRE-
MINIMIZE
2036 MINIMUM 2057 DETERMINED SET POINT AFTER A DELAY OF 5 MINUTES THE

TO BE MINIMIZED
AH CONTROLLER IS SWITCHED TO MANUAL WITH 0% OUTPUT.

4"-NG-100-1111-D1A-IH
PDI PDT NOTE 1
HOWEVER IN CASE THE TRIP IS-1, IS ACTIVATED DUE TO LOW
NOTE 1 FZV
2112 2112 STEAM/CARBON RATIO, THE CONTROLLER SHALL SWITCH TO
2058 MANUAL IMMEDIATELY WITH 0% OUTPUT. NO DELAY FOR CLOSURE

MEDIAN
MINIMIZE FC OF VALVE IS ACCEPTED IN SUCH SCENARIO.

3/4"

3/4"
Up Up 4"x2" 2" 2"x4"
PDT FZT FZT FZT
117 P11A 11) SUBSEQUENT TO IS-1 THE VALVE FZV-2054 SHALL CLOSE AFTER
C 2111 2057 C 2057 B 2057 A A DELAY OF 3 MINUTES.
MINIMIZE

MINIMIZE
FROM EXIT SECONDARY
REFORMER NOTE 1 FZLC
12"-PG-100-1116A-D1D-IH AH SAFE LOCATION NOTE 10 12) SUBSEQUENT TO IS-1 THE SET POINT IS CONSTANT FOR 10
Up

PDI 2058 MINUTES AFTER THAT THE CONTROLLER IS SWITCHED TO MANUAL


2111 4"-SM-100-1126-D2A-IH WITH 0% OUTPUT.
FY FZY
NOTE-15 NOTE 8 S 13) SUBSEQUENT TO IS-1 THE CONTROLLER IS SWITCHED TO A

D1D
12" HV FUZY FT 2057 2057
2oo3 PREDETERMINED SET POINT, AFTER 10 MINUTES THE
2034 6"-SM-100-1125-A1A-IP NOTE 9 2058 2058 CONTROLLER IS SWITCHED TO MANUAL WITH 0% OUTPUT.
D1D

D1D

D1D
A2 MINIMIZE
3/4"

NOTE-7
100 HE 201 4" 3" IS

D2A
4"x3" HS IS
1 14) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
2037 1
B1A

A1A
3"x6" PG FIC I

D5A
UY

1 1/2"
LC IN VIEW SCOPE OF REFORMER CONTRACTOR.
2116 2040 2058 101
D2A-IH A1A 15) THE BLIND SHOULD BE QUICK SWING TYPE. MOC OF BLIND SHALL
3/4" 3/4" 3/4" I BE SS316.
FZAL
NOTE 6

10"-SM-100-1123-D2A-IH 101 16) SUPPLY & INSTALLATION OF GAS DETECTOR 100-AT-2058 BY EIL.
2057
3"-HG-100-1121-D5A-IP
UV UZLO

3/4"
D
6" 2040 2040
P1 2"-ML-100-1101-D2A

FO
6"-SM-100-1122-D2A-IH 2"
GENERAL NOTES:
NOTE 13 I 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
B1
FV I I 101 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
2053 101 101 NOTE 11 DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
1.1/2"x3" 3/4" REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
> 10% 3/4"
FZLC CARBON NO.
FC

1.1/2" 2054
3" 3" 4"x3" NOTE 3 FY FZLC FUZY FN
U1 U2 4"-SM-100-1124A-D2A-IH 3"x1.1/2" 6"x10"
FIC FALL 2055 2055 2054 2061

FC
3"x6" FZV
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
NOTE 5 4"x3" 3/4" 2053 2053 6" IS INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND

FO
AL 2054
E 4"x3" 1 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
3" FV 10"x6"
U3 AD PERMISSION OF HALDOR TOPSOE.
3" I FIC 6"x3" 2055 FIC FFY
101 2055 3/4" 2054 2061
AL 3/4" AL RATIO
FT NOTE 2
2053
I

MEDIAN
NOTE 12 FT 101 FFI
LOCATE NEAR HPIP RTP
100-HE-201 I 2055 2061
10
LO

AL
AE EIL 101 6"-SM-100-1121-D2A-IH
FY STEAM/CARBON CARBON NO.
2058 2054
FZT FZAL IS FZN FFZY
ST 002 PG 2054 A 2054 1 2056 2056
NOTE 16 A1 3/4"
2114 FIC NOTE-2,10
AT
4"-SM-100-1124-D2A-IH

F 2058 2059 FZT FZY


SS AL
HC DETECTOR 2054 B 2054

AAH FZLC 2oo3 FV FFZAL FFZI


AI

D2A
2059 FZT 2062 2056 2056
2058 1"x2" STEAM/CARBON
4"-SM-100-1120-D2A-IH 2054 C

FO
1"

D1A
4"x2" 2" 2"x4"
3/4"

FO 2"x1"
HV TI IS
2036 FV 2085 1
2059 AL
2"
116 P11A M2 24" FF 10" 3/4"
FI PZT PZY
PROCESS GAS
2052 A 2115 2115
MEDIAN

FROM 100 R 203 FIC FT


NOTE 4 FF FZT FZT FZT NOTE 7 2062 2062 FFY
G
FI FT 2059 A 2059 B 2059 C 2060
DIV
2052 B 2052 PI
AL
2115 I
AH Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
3"-HG-100-5520-D5A-IP
10"-NI-100-5211-B1A-IH

6"-NG-100-0209-D1A-IH
FY FZY 101 FFI
10"-SM-100-6003-D2A-IH

2"-ML-100-6918-D1A
3"-NI-100-1105-A1A

2059 2059 2060


2oo3 NOTE 9 AL
FROM TI-2190

2"
FROM PI-2191

GAS RATIO
HTER/PRIMARY
2" REFORMER
IS FZAL 1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
1 2059
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.

374
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
NITROGEN FROM HEADER
100-1184

Revival of Ramagundam Fertilizer Complex Project

SIGNAL FROM PZY-2006


SIGNAL FROM PIC-2005
H 2200 MTPD Ammonia Plant

FROM 100 P 295 A/B


SHEET SIZE UNIT
P52

P52

P52

P55

P55

P55

P60

P69

P06

P02

P02

P02

FROM 100 R 202 B


100
FROM 100 E 222

FROM HEADER

FROM HEADER

FROM FIC-2027
P04

NATURAL GAS
FROM PI-2196
FROM TI-2177

RECYCLE H2

NAME

TO FFY-2018
METHANOL Heat exchange reformer
NITROGEN

MP STEAM

Piping and instrument diagram


P11B

SIGNAL

SIGNAL
DOCUMENT ID
115

118

521

664

389

622

622

371
S-03470 P42111-B 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 208 WASTE HEAT BOILER NO. 1 100 E 209 STEAM SUPERHEATER NOTES:

1) TO BE PROVIDED WITH MECHANICAL STOP FOR MAX. OPENING.


EIL/OTHER'S SCOPE 2) INTERMITTENT BLOW DOWN PIPING IS CRITICAL PIPING AND
REFORMER CONTRACTOR SCOPE (NOTE 5) Down RISERS TO 100 V 201 SUPPORTS TO BE DESIGNED FOR ACCELERATING LIQUID.
A
124 P12
3) LOCAL VENT TO BE USED FOR OXYDATION OF SECONDARY
RTP
20C REFORMER CATALYST.
TO FLARE HEADER
20"-FL-100-1122A-A1A 20"-FL-100-1122-A1A
100-1185 4) TV-2091 1 / TV-2091 2 OPERATES IN SPLIT RANGE AS SHOWN:
RTP
20B 20"-FL-100-1123-A1A TO FLARE HEADER
20"-FL-100-1123A-A1A VALVE OPENING, %
100-1185

TO FLARE HEADER 100


20"-FL-100-1124A-A1A 20"-FL-100-1124-A1A
100-1185
RTP
20A

40.0 kg/cm^2g 40.0 kg/cm^2g 42.0 kg/cm^2g HPIP EIL 1 2


42.0 kg/cm^2g

FB LO

FB LO

FB LO
B PSV PSV PSV
6"Q8" 6"Q8" 6"Q8" RTP
2120 1 2120 2 2120 3 PSV 20"-FL-100-1127-A1A OUTPUT, %
6"Q8" 20 0 25 100
2120 4
HPIP EIL TO FLARE HEADER 5) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
SCOPE OF REFORMER CONTRACTOR.
14"x6" 3/4" 14"x6" 3/4" 14"x6" 3/4" 100-1185
14"x6" FB LO
3/4" 6) DELETED.
3/4" D25D A1A 3/4" D25D A1A 3/4" D25D A1A
D25D A1A
3/4"

14"-PG-100-1122-D25D-IH
7) SUPPLY & INSTALLATION OF GAS DETECTORS 100-AT-2064,

14"-PG-100-1117-D25D-IH

14"-PG-100-1118-D25D-IH

14"-PG-100-1121-D25D-IH
20"-FL-100-1127A-A1A BY EIL.

FB LO

FB LO

FB LO
FB LC
8) FOR RISER & DOWNCOMERS PIPING REFER HPIP
DOC. NO. 2010-FD-4010.

GENERAL NOTES:
SM2
C IS 2" 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
SV
2 LOCATE NEAR
100-E-208 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
16"-SH-100-1201-F2A-IH DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
AE 18"

SB2

SA2
P12 125 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
2064 16"
AH HP STEAM FROM 100 V 201
TI TZAH
NOTE-7 100 E 209
2089 2089 SAFE LOCATION
AT
NO POCKETS

MEDIAN 2064
2oo3 TI CO DETECTOR ADD INSPECTION POINT 20"-V-100-1101-A1A
RISERS

TZY NOTE 3
2048

24"-PG-100-1103-D25D-IH
AAH A1A
2089 AI
A/B/C D25D-IH
100 E 208 2064 20" TO FLARE HEADER
20"-FL-100-1128-A1A
100-1185
FF

3/4"
D 6" 6" 6" 6" 6" 20" 20" 18" 6" 24"
AH HV D25D-IH A1A
NOTE 8 TI
S1A

H1A S1B H1B TW H2A S1C S1D S1E H2B 2041


M2 2092 12"x20"
NOTE 8 NOTE 8 NOTE 8
6" 20" 18" 6" RTP

FC
11 12"

2" Q HPIP EIL 14"x12"


HIC
SB1 32"-PG-100-1101A-D25D-IH
129 P11B T1 NOTE 4 SA1 B1 2041
3/4" 3/4"
PROCESS GAS TV 32" 1 1/2"
FROM 100 HE 201 2"SQ SM1
NOTE 8 2091 1 AH
D3B S2A S2B C1 D6 D4 TIC LOW POINT 14"-PG-100-1102-D25D-IH
TV 2091
M1 2" 22" 22" 3" 2" 2" D3A S2C C2 S2D S2E D5 D1 D2 AL
2091 2
2" 20" 3" 20" 18" 2" 2" 2"SD THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
2" NOTE 4
NOTE 8 NOTE 8 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND

RANGE
PG

SPLIT
E 2126 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
NOTE 1 PERMISSION OF HALDOR TOPSOE.
25-100%
THIC
IN VIEW
2091 2

2"
DOWNCOMERS

THIC TY 0-25% PG
2091 1 2091 2125
LOW
SELECTOR
3"-SM-100-1303A-F2A-IH

SAFE LOCATION TYPE 7A


AH
TIC AP
2090 2023
MINIMIZE
2"-BB-100-1102A-F22A-IH

REFORMED GAS
A1A

TO 100 R 204
F 32"-PG-100-1101-D25D-IH
122 P13
PT PI AI AT
F2A

2124 2124 2022 2022


3" CH4

ST 004
3/4" Down
P12 126
SS DOWNCOMERS
FROM 100 V 201
D2A F2A

H HV
2040 FT FI
127 P12
2065 2065
SIGNAL
TO LY-2018 2, FY-2068
G
HPIP HPIP
RTP RTP
19 12
EIL EIL
18"-SH-100-1110-F2D-IH

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

NOTE 2

3"-SM-100-1303-D2A-IH 3"-BB-100-1102-F22A-IH
Up

Up

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
391

264

263

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


FROM COLD COLLECTOR

Revival of Ramagundam Fertilizer Complex Project


H
P13

2200 MTPD Ammonia Plant


BLOWDOWN DRUM
TO INTERMITTENT

P11A

SHEET SIZE UNIT


P10
HEATING STEAM

100
FROM HV-2435

P56

FROM 100 R 203


P05

P05
TO 100 E 203 2

CONNECTION

CONNECTION
TO FY-7005 1

NAME
Waste heat boiler and superheater
P11C
HP STEAM

Piping and instrument diagram


SIGNAL
123

DOCUMENT ID
128

655

S-03470 P42111-C 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 V 201 STEAM DRUM NOTES:


SAFE SAFE SAFE
LOCATION LOCATION LOCATION 1) HYDRASTEP WITH LOCAL INDICATOR AT GROUND LEVEL AND
RISERS
P13 299
SIGNAL TO DCS.

24"-SL-100-1202-A1A-IP

24"-SL-100-1203-A1A-IP
24"-SL-100-1201-A1A-IP
NO POCKETS
143.0 kg/cm^2g 143.0 kg/cm^2g RISERS
EIL SCOPE FROM 100 E 210
2) LHS SWITCH FROM 3-ELEMENT CONTROL TO NORMAL LEVEL
A 4"P(2)8" 4"P(2)8" CONTROL AND LIC-2018 IS SIMULTANEOUSLY CHANGED TO
REFORMER CONTRACTOR SCOPE (NOTE 5) P-CONTROLLER.
139.0 kg/cm^2g
TI 300# PSV 300# PSV 300# RISERS
2096 PSV 2133 2 2133 3 NO POCKETS 3) 1/2" WEEP HOLE TO BE DRILLED AT VALVE DISCHARGE LOW POINT.

NOTE 3
4"P(2)8"
16"-SH-100-1201-F2A-IH 2133 1
RISERS 4) BICOLOR LEVEL GUAGE.
P11C 125
NOTE 3 NOTE 3 NO POCKETS
HP STEAM 5) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
TO 100 E 209 SCOPE OF REFORMER CONTRACTOR.
AH F2A A1A F2A A1A F2A A1A
PI PY PZY 6) REFER P&ID NO: A747-79-41-100-1193 FOR ANALYSER DETAILS.
2132 SAFE 2132 2132
LOCATION 7) FOR RISER & DOWNCOMERS PIPING REFER HPIP

4"-SH-100-1205-A1A-IP
2oo3
DOC. NO. 2010-FD-4010.

1"
MEDIAN

8"-SH-100-1202-F2A-IH

8"-SH-100-1203-F2A-IH

8"-SH-100-1204-F2A-IH
2"
PG
B PZT PZT PZT

3"-BB-100-1201A-F22A-IH
VISIBLE 2131
TYPE 6 2132 A 2132 B 2132 C

2"x4"
A1A-IP
AP
F2A-IH 2" 2" 2"

2"
2"
127 P11C 2029 100 V 201

2"
SIGNAL

2"
FROM FI-2065 16" 2" 2" 2"
GENERAL NOTES:

RC 1 10"

RS 12 10"
RS 11 12"

RS 21 10"
P4 V1 B1 S1 S2 S3

RR 2 18"
RR 3 18"

RR 4 18"
RR 5 16"
RC 2 8"
RC 3 8"
RC 4 8"

RS 22 8"
RS 23 8"

PR 1 20"
P1 P2 P3
4" 4" 4" 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
LY RTP
L3 NOTE 7 52 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
2018 2 2" 2" 2" HPIP EIL DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
LG L5 L7 L9 L11 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
BI-COLOUR 2" 2" 2" 2" 2" 2" 2" 2" D1
2017 3"
600x500 NOTE 4 NOTE 4 NOTE 1
LZT LZT LZT LT
24" M1 L1 L4 M2 24"
2018 A DPT 2018 B DPT 2018 C DPT 2020
C 2" 2" 2" 2" 2" 2" 600x500
LG
2016 MAGNETIC
AH
LIC LY NOTE 7
L2 L6 L8 L10 L12

DS 11 16"

DS 12 16"

DS 21 14"
DS 22 12"
DS 23 12"
2018 2018 1

DR 1 22"
DR 2 22"
DR 3 20"
DR 4 20"
DR 5 18"

DC 1 12"
DC 2 10"
DC 3 10"
DC 4 10"
DENSITY 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2"
AL
COMP.
A1 D2
10"-BF-100-1203A-F2A-IH 10"

2"
AH
LI
HPIP RTP

2"
10"-BF-100-1203-F2A-IH 2020
EIL 51 AL
LI
2020 1

F2A
TYPE 2A
D

F1K
AP
2030 MEDIAN LY LZY LZY
2018 2018 1 2018 2 DENSITY
2oo3 COMP.

TYPE 2A

AP LZAH LZAL
6"-BF-100-1202-F2A-IH 2028 2018 2018

PV FF
3/4" 3/4" LIC AI AT
AH
FDI FY LHS 2019 2027 2027 IS IS
NOTE 2 THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
2068 2068 2018 CONDUCTIVITY 1 A 1
8"x10" INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
AL 6"x4" (NOTE 6)
E PV REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
FL/DC

8" FC 4" PERMISSION OF HALDOR TOPSOE.

3"-BB-100-1201-F22A-IH
10"x8" 4"x6"
LV LV
2018 2019
3/4" 3/4"
FIC
2076 6"-BF-100-1201-F2A-IH
SP

3"x1"

1"
PDT PDIC
2130 2130 1"x3"
HV
AL
F 2044
DOWNCOMERS DOWNCOMERS
P11C 126 298 P13
2"

2"

DOWNCOMERS DOWNCOMERS
TO 100 E 208 TO 100 E 210
2"

2"

LOW LOW
RISERS POINT POINT
124 P11C
NO POCKETS
RISERS
FROM 100 E 208
2"

2"
2"

2"

G
LOW LOW
POINT POINT
DOWNCOMERS

DOWNCOMERS

3"-BB-100-1202-F22A-IH
10"-BF-100-1404-F2A-IH

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

NO POCKETS

NO POCKETS
2"-PH-100-5902-F1K

RISERS

RISERS
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
407

418

132

291

394
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)

CONTINUOUS BLOW DOWN


Revival of Ramagundam Fertilizer Complex Project
SIGNAL TO BF TURBINE

SIGNAL TO BF TURBINE
FOR SPEED CONTROL

FOR SPEED CONTROL

H 2200 MTPD Ammonia Plant


100 E 502 / 100 E 212/
100 E 500 / 100 E 501

FROM DOSING UNIT


P15C

P59B

P27B

P27A
SHEET SIZE UNIT
P14

100

FROM 100 E 501

FROM 100 E 500


BOILER WATER

BOILER WATER
P58A

P58A

P27A

P27B

P56
FROM FT-2076

NAME
TO 100 E 500

TO 100 E 501
PHOSPHATE

Steam drum
P12

HP STEAM

HP STEAM
100 E 213

Piping and instrument diagram


SIGNAL

DOCUMENT ID
288

287

393

289

134
S-03470 P42112 1
BF

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 R 204 HT CO-CONVERTER 100 E 211 METHANATOR TRIM HEATER 100 E 210 WASTE HEAT BOILER NO. 2 NOTES:

1) VALVE BELONGS TO SECTION 3.


TO FLARE HEADER
4"-FL-100-1301-A1A
100-1185 2) TO BE INSTALLED ACCORDING TO VENDOR INSTRUCTIONS.

A 3) INTERMITTENT BLOW DOWN PIPING IS CRITICAL PIPING.


P12 299 TO BE DESIGNED FOR ACCELERATING LIQUID
HP STEAM
& PROPERLY SUPPORTED.
RTP FF
TO 100 V 201 TI
50 4) 1/2" WEEP HOLE TO BE DRILLED AT VALVE DISCHARGE LOW POINT.
2107 AL
EIL HPIP HPIP EIL
32"-PG-100-1304-D25D-IH
298 P12 296 P14
5) VALVE WITH ADJUSTABLE MECHANICAL TRAVEL STOP
32"-PG-100-1304A-D25D-IH MIN. STOP
(LOCKABLE) FOR SETTING THE MINIMUM VALVE OPENING.
BOILER WATER SHIFTED GAS
(NOTE 7) RTP TOP
FROM 100 V 201 REFORMER CONTRACTOR SCOPE 49 NOTE 5 TO 100 E 212
FF 100 E 210
AH EIL SCOPE
NOTE 8 32"
TI 32" TI
T2

S1 D 10"
2099 T1

S1 C 8"
S1 A 8"
S1 B 8"
600ID 2100
AL
M1 M2 TI
B

S2 D 12"

S2 C 10"
2101

S2 A 10"
S2 B 10"
1 1/2"

600ID
D25D-IH A1A D2 D1 U B D3 TI
PP
LOW POINT 2" 2102
3/4" NOTE 8 2"
DRAIN 2" 2"

2"

2"
2" 2"x4"
RTP
13
2"-SM-100-1302-F22A-IH
2"-PG-100-1301-D25D-IH
HPIP EIL
TW1
2" 32" 2"

2"-SM-100-1302A-F22A-IH
24" A1

2"-BB-100-1302A-F22A-IH
TW1 TW2
M1

MINIMIZE
100 R 204 ST-005 TW2
C LOCATE NEAR
100-E-211 3/4"
T
LOCATE NEAR
FF 100-R-204
TI AE
SS 3/4"

32"-PG-100-1302-D25D-IH
FF AE 3051
2100 TI
2065
2103
TI

F22A
FF
TI AT HV 2103
FF
2101 TI AT 3051 2047
FF TI
2104 2065 H2 DETECTOR

D2A
PDT PDI 2104
FF CO DETECTOR
TI 2143 2143 AAH TI
FF AI
2102 TI AAH EIL 2105
AI 3051
RTP

2"-SM-100-1301-D2A-IH
2105 2065 14 BOTTOM
D HPIP
SAFE LOCATION 6) LINE SIZING TO BE CONFIRMED ON QUENCH STATION TZ-2110 AND
AH
TDI PSV-2141 DATA FINALIZED BY RESPECTIVE VENDORS.
40.0 kg/cm^2g
2109
7) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
4L6 PSV 16"-SL-100-1301-A1A SCOPE OF REFORMER CONTRACTOR.
2141
6"x16" 8) FOR RISER & DOWNCOMERS PIPING REFER HPIP
FF
DOC. NO. 2010-FD-4010.
TDY TI PG NOTE 4,6
MIN. FOR PIPING

8"x4"
H1 TYPE 5 2109 2108 2140 D2A A1A GENERAL NOTES:

NOTE 6
B1 PG AP FF 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
AH
32" 2139 2134 TI 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
12"
AH 12"x10"
2106 TIC
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,

8"-SM-100-1305-D2A-IH
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
2110
E AL
1 1/2"

NOTE 2
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
MINIMIZE

8"-PG-100-1305-D25D-IH

INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND


LOW POINT REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
DRAIN 2"-SM-100-1352-D2A-IH PERMISSION OF HALDOR TOPSOE.
1" 1"x2" TZ-2110
NOTE 1&5 TV
SAFE LOCATION
3048 2 2"-BF-100-1301-D1A-IH

MIN. STOP
8"x4" NOTE 4
3/4"-NI-100-1302-A1A

8" TV 2"x1" TZ D2A A1A

FC
2110 2110
D25D
A1A

6"x8"
3/4"
IN VIEW
12"-PG-100-1314-D25D-IH

6"
MIN. MIN. 8"x6"
HV
D25D

FI
F 3/4" 2146
7002
12"-PG-100-1313-D25D-IH
A1A

12" 12" 8"


B2 B3 A1
100 E 211
FT
7002

A2 A3 B1
12" 12" 8"
12"-PG-100-1312-D25D-IH

12"-PG-100-1311-D25D-IH

MIN. MIN.

G
8"-PG-100-1306-D25D-IH

3/4"
1 1/2"

NOTE 3
TG
16"-PG-100-1310-D25D-IH
32"-PG-100-1101-D25D-IH

16"-PG-100-2406-D25D-IH

10"-SM-100-1304-D2A-IH
3"-BB-100-1302-F22A-IH

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

3"-SM-100-1309-D2A-IH

3"-SM-100-1350-D2A-IH

3"-SM-100-1303-D2A-IH
8"-SM-100-6004-D2A-IH
3002 LOW POINT

2"-BF-100-5836-D1A-IH
DRAIN
2"-NI-100-1301-A1A

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
335

395

309

660

661

123
INTERMITTENT BLOWDOWN

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


100-1184

Revival of Ramagundam Fertilizer Complex Project


H 2200 MTPD Ammonia Plant
MP QUENCH WATER
P11C

P58B

SHEET SIZE UNIT


P24

P24

P60
FROM THIC-3048 2

100

HEATING STEAM

HEATING STEAM

HEATING STEAM

HEATING STEAM
REFORMED GAS
FROM 100 E 209

FROM 100 E 311

P11C
P27A

P27B
FROM HEADER
FROM HEADER

PROCESS GAS

PROCESS GAS
P24

P56

P18
TO 100 R 301

NAME
TO 100 V 702

TO 100 E 302

TO 100 E 500

TO 100 E 501

TO 100 E 208
HT shift conversion
P13
MP STEAM
NITROGEN

Piping and instrument diagram


SIGNAL

DOCUMENT ID
122

334

336

612

396

S-03470 P42113 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 212 1 /2/3 BFW PREHEATER NO. 1 NOTES:

1) HV-2050 1/2 OPERATES IN SPLIT RANGE AS SHOWN:

VALVE OPENING, %
A
100
32"-PG-100-1304-D25D-IH 16"-PG-100-1402-D25D-IH 1
296 P13 75
SHIFTED GAS FF
FROM 100 E 210 TI
2117 2

OUTPUT, %

28"-PG-100-1408-A1A-IH
FF 0 50 100
TI AH
2116 MIN.
MIN. 2) 25% MINIMUM OPENING OF HV-2050 2 TO BE IMPLEMENTED IN
CONTROL SYSTEM
28"-PG-100-1405-D25D-IH
B 3) VALVE WITH ADJUSTABLE MECHANICAL TRAVEL STOP
(LOCKABLE) FOR SETTING THE MINIMUM VALVE OPENING.
100 E 212 1
8" 28" 28" 4) PROVIDED WITH MECHANICAL MINIMUM STOP. OPENING
B1 A2 A3 SHALL BE MINIMUM ABOUT 50 TO 80%.

A1 B2 B3
8" 28" 28"

100 E 212 2 GENERAL NOTES:


8" 28" 28"
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
C B1 A2 A3
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
TV DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
2119 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
A1 B2 B3

FL/DO
16"
8" 28" 28"
AH
8"-BF-100-1403-F2A-IH

TIC
2119
100 E 212 3 AL
8" 28" 28"
B1 A2 A3

A1 B2 B3
D
8" 28" 28"
28"-PG-100-1407-B5A-IH 28"-PG-100-1406-B5A-IH LOW POINT DRAINVALVES IN PROCESS LINES IN SHIFT SECTION
SHALL BE MADE FROM STAINLESS STEEL.

NOTE 3
MIN.
FF

MIN.
TI MIN 10 x OD MIN 10 x OD
4"-BF-100-1412-F2A-IH 2118
AL
28"-PG-100-1401-B5A-IH 28"-PG-100-1403-D25D-IH 28"-PG-100-1404-B5A-IH
4"
171 P15A
PG

1 1/2"
8"-BF-100-1505-F2A-IH

MIN. STOP SHIFTED GAS


2146 B5A D25D D25D B5A TO 100 R 205
NOTE 3 THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
LOW POINT INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
FF DRAIN
E PI PT REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
PERMISSION OF HALDOR TOPSOE.
2145 2145

TG
2115 NOTE 1
50-100%
I HIC
HIC 107 2050
2049
FL/DO

8" NOTE 2
HV
2049 HV
0-50%

2050 2
4"-BF-100-1410-F2A-IH 4"-BF-100-1411-F2A-IH
F
4"
HV FC
2050 1
FL/DO

NOTE 4 8"

8"x10"

FF
TI
G
2114
10"-BF-100-1404-F2A-IH

10"-BF-100-1504-F2A-IH

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
8"-BF-100-1402-F2A-IH
8"-BF-100-2701-F2A-IH

6"-BF-100-1506-F2A-IH

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
287

169

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
H
FROM 100 P 701 A/B/C

2200 MTPD Ammonia Plant


P15C

P15C
P27B

SHEET SIZE UNIT


100
FROM 100 E 213
FROM 100 E 502

P27B
P12

NAME
TO 100 V 201

TO 100 E 502

BFW preheat
Piping and instrument diagram
P14
DOCUMENT ID
BFW
252

172
170

S-03470 P42114 1
BF

BF

BF
BF

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 R 205 LT SHIFT CONVERTER GUARD NOTES:


1) VALVES ARE CONNECTED TO EMERGENCY POWER SUPPLY.
2) TRIPLE ECCENTRIC BUTTERFLY VALVE.
3) TO BE PROVIDED WITH INSTRUMENT AIR BUFFER TANK SO THAT
THE VALVES ARE OPERABLE DURING EMERGENCY EVEN AFTER
A FAILURE OF INSTRUMENT AIR SUPPLY.
4) VALVE SHOULD BE LOCATED IN FIRE SAFE LOCATION.
5) VALVE WITH 1" INBUILT BYPASS.
6) CONTROL VALVE WITH EXPANDER & REDUCER BY VENDOR.

TOP

TI
FF
TI 2124
AH
2123 TI
2125

2"
2"x4" TI
4"-FL-100-1502-A1A
B 100-1185
2126
TO FLARE HEADER 2"-PG-100-1501-B5A-IH 14"-FL-100-1501-A1A
A1A B5A-IH 100-1185
TI
TO FLARE HEADER 2127

LOW POINT TI
DRAIN LOCATE NEAR 2" 28" 2" 2128
1 1/2" 100 R 205 100 R 205
AE A1
TW1 TW2
2066 24"
M1

A1A
TW1

B25D-IH
LO
AT

A1A
NOTE 2

3/4"
2066 FF
TI

Down
HO DETECTOR

B25D-IH
FF
C MINIMIZE 2124 TI FSO
AAH TW2
MINIMIZE

B1A B5A PG AI 2129 2072 IS


FF FF

MINIMIZE
2149 2066 25
TI PDT PDI
FF
2125 TI 2150 2150 UZV UZY
HZV 2130 2042 S 2042 TI
FF 16"x14" 4"
2053 TI 2129

Down

FO
NOTE 1 FF 16" NOTE 3,4
2126 TI NOTE-6 TI

LC

FL
28" 14"x16"
2131 UZLC UZLO 2130
HV
FF
HZLC HZLO IS TI 2057 2042 2042 TI
FF 3/4"
2053 2053 206 2127 4"-PG-100-1504-B25D-IH 2131
3/4" 3/4" TI
2132 TI
FF
TI 2132
D NOTE-5 FF
2128 TI TI
2133 2133
3"

BOTTOM

14"-PG-100-1502-B25D-IH
MIN. FOR PIPING
H1 LOW POINT DRAINVALVES IN PROCESS LINES IN SHIFT SECTION
SHALL BE MADE FROM STAINLESS STEEL.
B1 TYPE 5

12" 28" AP
FF GENERAL NOTES:
2036 TI HZV 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
2134 2058 28" 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
FL NOTE 1 28"-PG-100-1503-B25D-IH DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
162 P15B REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

3/4"
SHIFTED GAS

MINIMIZE

MINIMIZE
E 2" TO 100 R 206
SAFE LOCATION THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
HZLC
INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
3/4"-NI-100-1501-A1A 2058 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN

24"-PG-100-1507-B25D-IH
HZLO
PERMISSION OF HALDOR TOPSOE.
A1A

3/4"
B25D 2058
3/4"
3/4"-NI-100-1541-B25D

B25D

B25D
IS
206

A1A

B1A

MINIMIZE
F
10"-NI-100-1502-B1A-IP

IS IS
IS HZLO 205 206
205 2054
NOTE 1
HZLC HZV
2054 2054
28"-PG-100-1404-B5A-IH
171 P14
24"
SHIFTED GAS 28"x24"
10"-NI-100-5206-B1A-IH

24"-NI-100-1503-B5A-IP

FROM 100 E 212 FL


G B5A B25D

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

10"-NI-100-1540-B1A-IH
2"-NI-100-1509-A1A

3/4"

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


B5A
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
B1A
24"-NI-100-1523-B1A-IP

REV. DESCRIPTION DATE DRAWN CHECK APPR.

668
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
-

100-1184

Revival of Ramagundam Fertilizer Complex Project


H 2200 MTPD Ammonia Plant SHEET SIZE UNIT
FROM S.U. CIRCUIT
P52

100
P15B

TO S/U CIRCUIT

TO S/U CIRCUIT
P52
FROM HEADER

NAME
LT shift conversion I
NITROGEN

NITROGEN

NITROGEN

P15A
NITROGEN

Piping and instrument diagram


DOCUMENT ID
236

S-03470 P42115-A 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 R 206 LT SHIFT CONVERTER NOTES:


1) VALVES ARE CONNECTED TO EMERGENCY POWER SUPPLY.
2) TO BE PROVIDE WITH INSTRUMENTA AIR BUFFER TANK SO THAT THE
VALVES ARE OPERABLE DURING EMERGENCY EVEN AFTER FAILURE
OF INSTRUMENT AIR SUPPLY.
A 3) VALVE SHOULD BE LOCATED IN FIRE SAFE LOCATION.
HZLO IS
2063 208
4) TRIPLE ECCENTRIC BUTTERFLY VALVE.
5) VALVE WITH 1" INBUILT BYPASS.
HZLC PG
2063 2154
6) CONTROL VALVE WITH EXPANDER & REDUCER BY VENDOR.
HZV
2063
TOP
28"-PG-100-1503-B25D-IH NOTE-5 28"
162 P15A
TI

1 1/2"
FL

3/4"
SHIFTED GAS 2139
FROM 100 R 205 NOTE 1
LOW POINT TI
DRAIN 2140

TI
3" LC

3/4"
B FF 2141
TI
2138 TI

2"
FLARE HEADER 4"x2" 2142
4"-FL-100-1503-A1A
100-1185
TI
2"-PG-100-1515-B25D-IH
2143
A1A B25D-IH
14"-FL-100-1504-A1A FLARE HEADER
100-1185

TW1
2" 28" 2"
A1
100 R 206
TW1 TW2
LOCATE NEAR 24"
100 R 206

A1A
M1
C TW2
NOTE 4 AE

B25D-IH
1502

LO
A1A
FF
TI

Down
3/4" FF
AT 2139 TI

B25D-IH
TI FSO
1502 2144
B25D

2144 2073 IS
CO DETECTOR FF FF
26 TI
TI PDT PDI
FF
B1A

AAH 2145
2140 TI 2155 2155 UZV UZY
AI
2145 2043 S 2043 TI
1502 16"x14"
FF 2146
MINIMIZE TI 4"

Down
16"

FO
FF NOTE-6 NOTE 2, 3
2141 TI
TI
14"x16" 2147
2146 HV UZLC UZLO
D FF
2061 2043 2043 TI
TI 3/4"
FF 2148
2142 TI 4"-PG-100-1517-B25D-IH
2147 BOTTOM
FF
TI LOW POINT DRAINVALVES IN PROCESS LINES IN SHIFT SECTION
FF SHALL BE MADE FROM STAINLESS STEEL.
2143 TI
2148
MIN. FOR PIPING

14"-PG-100-1516-B25D-IH
GENERAL NOTES:
20"-NI-100-1504-B1A-IP

H1 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.


B1 TYPE 5 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
12" 28" AP
FF REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
E 2038 TI
NOTE 1 THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
2149
FL 28" 28"-PG-100-1518-B25D-IH INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
408 P15C REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
PERMISSION OF HALDOR TOPSOE.

3/4"
SHIFTED GAS

MINIMIZE

MINIMIZE
1 1/2"
SAFE HZV HZLC TO 100 E 213

3/4"-NI-100-1543-A1A
LOCATION NOTE-5 LOW POINT
2062 2062
DRAIN
IS IS HZLO IS
A1A
208 207 2062 208

3/4"
B25D-IH

3/4"-NI-100-1542-B25D-IH 3/4"
HZV HZLC HZLO IS
F 2064 2064 2064 207
24"-PG-100-1519-B25D-IH
B25D-IH

FL, 24"

B25D
NOTE 1

MINIMIZE
A1A

B1A

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
20"-NI-100-5208-B1A-IH

24"-NI-100-1523-B1A-IP

24"-NI-100-1527-B1A-IP
2"-NI-100-1515-A1A-

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
411

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant
1184

15A

SHEET SIZE UNIT


P52

FROM S.U CIRCUIT

100
TO S.U. CIRCUIT
P52
FROM HEADER

NAME
LT shift conversion II
NITROGEN

P15B
NITROGEN

NITROGEN

Piping and instrument diagram


DOCUMENT ID
669

100

S-03470 P42115-B 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 213 BFW PREHEATER NO. 2 NOTES:

1) IS-1 TRIP SWITCHES THE CONTROLLER


TO REMOTE SET POINT EQUAL TO THE MEASURED PRESSURE
AT THE TIME OF TRIP. SUBSEQUENTLY THE SET POINT SHALL BE
I
RAMPED DOWN 2 bar PER MINUTE.
A NOTE 1
101
2) PV-2159 1/2 OPERATES IN SPLIT RANGE AS SHOWN:

NOTE 2
VALVE OPENING, %
AH
PIC SPLIT RANGE 0-50% PHIC
AH 2159 2159 1 100
AI
2040
CO
1 2

50-100%
NOTE 7 PG PT
FF
AT 2158 2159 TI PV
2040 2157 2159 1
28"-PG-100-1518-B25D-IH 24"-PG-100-1506-B25D-IH 24"x16" 16"-PG-100-1505-B25D-IH TO FLARE HEADER
12"x26" 26"x36"
408 P15B 100-1185 OUTPUT, %
12" 36"-FL-100-1505-A1A 0 50 100
SHIFTED GAS 16"x12" B25D A1A
B FROM 100 R 206
24"x16" FC
3) VALVE WITH ADJUSTABLE MECHANICAL TRAVEL STOP

26"-FL-100-1506-A1A
NOTE 2 (LOCKABLE) FOR SETTING THE MINIMUM VALVE OPENING.

PHIC 4) TO BE PROVIDED WITH INSTRUMENT AIR BUFFER TANK SO THAT


2159 2 THE VALVES ARE OPERABLE DURING EMERGENCY EVEN AFTER
FAILURE OF INSTRUMENT AIR SUPPLY.

20"-PG-100-1522-B25D-IH

20"-PG-100-1521-B25D-IH
FF
AH
TI PV 5) VALVE SHOULD BE LOCATED IN FIRE SAFE LOCATION.
2154 2159 2
MIN. MIN.
16"-PG-100-1508-B25D-IH 12"x26" 26" 6) 5-10% MINIMUM OPENING OF HV-2066 TO BE IMPLEMENTED IN
CONTROL SYSTEM.
12"
16"x12" B25D A1A
FC 7) REFER P&ID NO: A747-79-41-100-1193 FOR ANALYSER DETAILS.
C 8) TWO PHASE FLOW, ANCHOR SECURELY.
100 E 213 20" 20"
8" 600# 600#
300#
190.0 kg/cm^2g B1 A2 A3

PSV UZY
1 1/2"F3"
2160 1 2045 GENERAL NOTES:
8"-BF-100-1511-A1A 8"x3" IS UZLC
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
A1 B2 B3
8" 20" 20" 1 2045 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
4"x1 1/2" DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
A1A F2A UZV UZLO FSO REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

NOTE-8
300#

NOTE-8
20"-PG-100-1520-D25K-IH

20"-PG-100-1523-D25K-IH
190.0 kg/cm^2g 2045 2045 2077

FB LO
3/4"
4"-PG-100-1509-B25D-IH 4"x6" LO
PSV
1 1/2"F3"
2160 2 MIN. MIN.
8"-BF-100-1512-A1A 4"
B25D A1A
8"x3" FO
D NOTE 4, 5
LOW POINT DRAINVALVES IN PROCESS LINES IN SHIFT SECTION

4"-BF-100-1503-F2A-IH
4"x1 1/2" SHALL BE MADE FROM STAINLESS STEEL.
A1A F2A
FB LC

SS 4"-BF-100-1510-F2A-IH

FF FF
TI TI THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
2155 2056 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E NOTE 3 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
MIN. STOP PERMISSION OF HALDOR TOPSOE.
8"-BF-100-1502-F2A-IH

HIC
2065

HV
2065
6"-BF-100-1501-F2A-IH 12"x8"

6"
MIN. 10 x OD

FC

F I HIC
FF
TI 107 2066
2153 NOTE 6
AL
HV
2066
6"-BF-100-1545-F2A-IH

6"
FC

FT
2076

G
28"-PG-100-1510-D25K-IH
12"-BF-100-5822-F2A-IH
10"-BF-100-1504-F2A-IH

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
6"-BF-100-1506-F2A-IH

NOTE-8

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
172

252

288

308

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant
FROM HP BF PUMPS
P58A

SHEET SIZE UNIT


100
P14

P14

P12

P18
SHIFTED GAS
TO 100 E 212

NAME
TO 100 E 502

TO 100 E 302
TO FIC-2076

BFW preheat down stream LT shift


Piping and instrument diagram
P15C
SIGNAL

DOCUMENT ID
412
BF

S-03470 P42115-C 1
BF

BF

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

TG
100 E 305 DMW PREHEATER NO. 2 100 E 308 PROCESS GAS COOLER 100 P 305 A/B PROCESS CONDENSATE PUMP NO. 1 100 V 304 PROCESS GAS SEPARATOR NOTES:
2166

10"-DW-100-1610-B1K-IH
100 MP 305 A/B MOTOR FOR 100 P 305 A /B
1) 1/2" WEEP HOLE TO BE DRILLED AT VALVE DISCHARGE LOW POINT.

2) DELETED.

3/4"
SAFE LOCATION
6"-PG-100-1607-A1A
A 3) VALVE WITH ADJUSTABLE MECHANICAL TRAVEL STOP (LOCKABLE)
16.0 kg/cm^2g
FOR SETTING THE MINIMUM VALVE OPENING.
PSV
2"J3"
2163 NOTE 1 4) DETAILED ENGINEER SHALL PROVIDE DEAERATOR VENT
TO SAFE LOCATION. COMBUSTIBLE GASES FROM TUBE LEAKAGE
IN 100 E 305/100 E 308 WILL BE CARRIED WITH THE
3/4"
DEMIN. WATER / COOLING WATER.
3"-DW-100-1602-B1K-IH
5) LV-2025 OPERATES IN SPLIT RANGE AS SHOWN.

FB L0
100-1185
B1K A1A
10"x8"
100 E 305
24" 3" 10" VALVE OPENING, %
A1 S1 B2
100

4"-FL-100-1601-A1A
B 40.0 kg/cm^2g
FF 1 2
A2 B1 TI PSV
1"D2"
10" 24" 2163 2169
3/4" 2"x4"
TV
2164 FB LO OUTPUT, %
16"-PG-100-1606-D25K-IH 2"x1" 0 50 100
8.5 kg/cm^2g

6"-WCR-100-1610-A3A
SAFE LOCATION
NOTE 3 A1A B28A 3/4"
PSV NOTE 9 FC 6) DELETED.

3/4"
3"L4"
2164 16"
7) SUCTION LINE UPTO ISOLATION VALVE SHALL BE DESIGNED FOR

2"-PG-100-1610-B28A-IP
PI

FB L0
DISCHARGE SIDE DESIGN CONDITIONS.

24"-PG-100-1605-D25K-IH
NOTE-1, 4 2170
8) MIN. FLOW DEVICE BY PUMP VENDOR.

NOTE 9
3/4" FF 9) TWO PHASE FLOW, ANCHOR SECURELY.
C FF PT PG
AH 2170 2171
TI

FB L0
2165
SS AL
GENERAL NOTES:
MIN. MIN.
NOTE 9 NOTE 9 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
4"-WCR-100-1603-A3A 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
16"-PG-100-1611-D25K-IH DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
4" 16" 100 E 308 100 V 304
12" 16" 16"-PG-100-1614-D25K-IH 24"
B1 S1 A2 A3 B1

TG
2162 B3
D B2 A1
16" 16" 12"
16"-PG-100-1613-D25K-IH

16"-PG-100-1612-D25K-IH
TIC
2164
NOTE 9 MIN.
NOTE 9 24"-PG-100-1601-D25K-IH 24"
MIN.
A1 M1 24"

NOTE 3,9
TV MIN. 10 x OD
2161 3" 3" 3"
L1 L5 L3
6"-DW-100-1604-A1K-IH 3"
3" 3"
3"
FO DPT
3/4"

6" 0-50%
LHIC LZT LG LZT LZT THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
B1K A1K 2025 1 2025A M 2023 2025B 2025C
INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E
MIN. 10 x OD

3"-PC-100-1601-D23K-IH DPT DPT REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN


10"-WCS-100-1607-A3A A3 PERMISSION OF HALDOR TOPSOE.
BACK FLUSH 3" 3"

AP 3"
10"
L4
3047 3" 3"
I 3"
L2 L6
TIC AH TYPE-11 318
3" 3"
3"
6"-PC-100-1608-D23K-IH

2161 LUY SS 2"x3"


A2
6"-DW-100-1605-B1K-IH 2025 1 S
LO

D23K
PG
10"X8" B2
LV 2165

DO NOT POCKET
3700 mm
2025 1 2"x3" D23K-IH A1A 8"

B9A
EIL PG
3/4" 4"x6" VENDOR 3/4"-SY-100-1601-A1A
FV 2166

F 2081 3/4"
3"x4"
3/4"

3/4"

4"x6" 4" 6"x4" VF NOTE-7


FC NOTE-8 4"x8" 8"-PC-100-1602-D23K-IH
FC

6"
100 P 305 A NOTE-7

2"-PC-100-2510-B9A
3/4"
3/4" AH
8"-PC-100-1611-D23K-IH 6"-PC-100-1603-D23K-IH LI
4"
100 MP 305 A 2025
A1 K

FIC
3

3/4" AL
D2
A
2"

6"-PC-100-1607-D23K-IH

2081 LHIC
3"-PC-100-1606-D23K-IH

M 2025 2 3/4"
FT OWS LZAL LZY
3/4"-SY-100-1602-A1A 6" FC
2081 2025 2025
2oo3

8"-PC-100-1605-D23K-IH
ML YL UY I
NOTE 4

LV 3/4"
2005 A 2005 A 2048 A 318
2"

2025 2

D23K
AUTOSTART
IS LY
G 6" FC
PG 315 2025
LO

A23K
6"-PC-100-1604-A23K-IP
2167 UZY S UZV
2"x3" D23K-IH A1A
EIL PG 2047 2047 I
24"-PG-100-1801-D25K-IH

24"-PG-100-1602-B28A-IH
10"-DW-100-2002-A1K-IH

3/4"-SY-100-1603-A1A
6"-PC-100-1610-D23K-IH

VENDOR 315
6"-DW-100-1603-B1K-IH

12"-WCR-100-1602-A3A

4"x6" Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
8"-DW-100-1601-B1K-IH

12"-WCS-100-1601-A3A

2168 IS
3/4" 315 NOTE-5
3"x4"
NOTE 9

VF
NOTE-7 AH
NOTE-8 4"x8" 50-100% LIC

100 P 305 B NOTE-7 2025


3/4" AL
3/4"

8"-PC-100-1612-D23K-IH 0-50%
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
100 MP 305 B 0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
A1 K
3
D2
A

REV. DESCRIPTION DATE DRAWN CHECK APPR.


424

100

301

548

328
UNSTRIPPED CONDENSATE
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
M
PROCESS CONDENSATE

PROCESS CONDENSATE
Revival of Ramagundam Fertilizer Complex Project
H OWS 2200 MTPD Ammonia Plant

TO OFF SPEC. TANK.


100-1182

100-1182
P20A

FROM 100 P 311 A/B


SHEET SIZE UNIT
P18

P25
3/4"-SY-100-1604-A1A
100
COOLING WATER

COOLING WATER
TO DEAERATOR

FROM 100 E 302

FROM 100 E 304


1186

PROCESS GAS
P57

P51

P67

P23
SHIFTED GAS
FEED WATER

ML YL UY I

TO 100 C 302
NAME
TO 100 E 601

Condensate separation
P16
TO HRSG

2005 B 2005 B 2048 B 318 Piping and instrument diagram


RETURN

SUPPLY

DOCUMENT ID
310

317

300
AUTOSTART
DW

S-03470 P42116 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 V 303 CO2 PRODUCT SEPARATOR 100 P 304 A/B OH CONDENSATE PUMP 100 E 306 CO2 PRODUCT COOLER NOTES:

1) LOCATION AT GROUND LEVEL.


100 MP 304 A/B MOTOR FOR 100 P 304 A /B
2) 1/2" WEEP HOLE TO BE DRILLED AT VALVE DISCHARGE LOW POINT.
HIGH VENT
+ 51500 MM ABOVE GRADE (MIN.)
A (VENT DISCHARGE POINT) 3) DELETED.
4) PIPING TO BE DESIGNED FOR HALF VACUUM.

5) PV-3008 1/2/3 OPERATES IN SPLIT RANGE AS SHOWN:


24"-CD-100-1731-A23K 24"x12"
NOTE 4 VALVE OPENING, %
36"-CD-100-1702-A72K-IP

FB LO

FB LO

FB LO

FB LO

FB LO
3.7 kg/cm^2g 3.7 kg/cm^2g 3.7 kg/cm^2g 3.5 kg/cm^2g 3.5 kg/cm^2g P17B 302
12"-CD-100-1719-A23K

12"-CD-100-1718-A23K

12"-CD-100-1717-A23K

12"-CD-100-1716-A23K

12"-CD-100-1715-A23K
CO2 GAS 100
FF
PSV PSV PSV PSV PSV TI FROM 100 V 301
6"R8" 6"R8" 6"R8" 6"R8" 6"R8"
3010 5 3010 4 3010 3 3010 2 3010 1 8.5 kg/cm^2g
NOTE 2

NOTE 2

NOTE 2

NOTE 2

NOTE 2
3004 PG
(1) (2) (3) (4)
8"x12" 8"x12" 8"x12" 8"x12" 8"x12" 3007
PSV
3/4"D1"
3006
8"x6" 8"x6" 8"x6" 8"x6" 8"x6"
3/4" 3/4" 3/4" 3/4" 3/4" MIN. MIN.
B 3/4" 3/4" 3/4" 3/4" 3/4" OUTPUT, %
A23K A72K A23K A72K A23K A72K A23K A72K A23K A72K TG
0 50 75 100
3/4"

18"-CD-100-1723-A72K-IP

18"-CD-100-1724-A72K-IP

18"-CD-100-1725-A72K-IP

18"-CD-100-1726-A72K-IP
3005
FB LO

FB LO

FB LO

FB LO
FB LC
1"-WCR-100-1701-A3A
FB,LO
6) DELETED.

3/4"-WCR-100-1703-A3A
24"-CD-100-1731-A23K

7) MIN. FLOW DEVICE BY PUMP VENDOR.


8"-CD-100-1714-A72K

8"-CD-100-1707-A72K

8"-CD-100-1706-A72K

8"-CD-100-1720-A72K

8"-CD-100-1705-A72K
16"x18" SS 8) TWO PHASE FLOW, ANCHOR SECURELY.

18" 18" 18" 18" 16"


100 E 306
A2 A3 A4 A5 B1

GENERAL NOTES:
MIN. 14"-CD-100-1704-A72K
AP 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
TYPE 3 B2 B3 B4 B5 A1 3045 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
C AP 18" 18" 18" 18" 16" DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
TYPE-11

18"-CD-100-1727-A72K-IP

18"-CD-100-1728-A72K-IP

18"-CD-100-1729-A72K-IP

18"-CD-100-1730-A72K-IP
3003 TI REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
18"x16"
3003
36"-CD-100-1708-A72K

PG
3009 36"
100 V 303
B1
AH MIN. MIN.
NOTE 5 PIC PT PIPING DESIGN SHALL ADRESS PIPING CONNECTED TO
3008 3008 EQUIPMENT DESIGNED FOR VACUUM CONDITIONS.
AL

10"-WCS-100-1705-A3A
BACK FLUSH

10"
NOTE 4,8 36"-CD-100-1703-A72K

2"
36"

2"
D A1
50-100%

25-50%

0-25%
L3 L5 L1
10"-CD-100-1711-A72K

3" 3" 3" 3" 3" 3" SS

PHIC AH
AH
3008 2 PV LI LT LG LT LIC
3001 3003 3002 304 P17B
24" 3008 2 3001 3002
DPT M DPT AL SIGNAL
10"-CD-100-1712-A23K TO LV-3002
LALL
NOTE 2 3001
FC,10"
I THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
16"x24" A23K A72K L4 L6 L2
16"-CD-100-1710-A72K

310 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND


3" 3" 3" 3" 3" 3"
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
24" M1 3"
PERMISSION OF HALDOR TOPSOE.
PHIC I
A2
3008 3 310
MIN. 6500 mm

PV 3"x1 1/2"
B2
3008 3

LO

LO
16"-CD-100-1713-A23K 3"
VF VF
2"-SY-100-1701-A23K
NOTE 2 16" FC FO FO
3"-PC-100-1701-A23K

3004 3005
A23K A72K

1 1/2"-PC-100-1703-A23K
NOTE 7 NOTE 7
A23K 3/4"-MD-100-1714-A23K
A1A
PG
3002
OWS

3/4"
F PG
TYPE 1A 3003 2"-PC-100-1705-A23K
PHIC 303 P17B
3008 1 AP 2"x1"
OH CONDENSATE

2"-PC-100-1706-A23K
3002 3"x2" TO 100 V 301
3/4"
FC

36" 3/4"-MD-100-1712-A23K
NOTE 1
3/4"

3/4"-SY-100-1705-A23K
IN VIEW
PV 100 P 304 A
3008 1
I UY YL ML
310 3001 A
M 3001 A 3001 A FG

1 1/2"-PC-100-1704-A23K

3/4"

3/4"
AUTOSTART 3003

2"-PC-100-1707-A23K
3/4" 100 MP 304 A A23K
A23K
A19A
3/4"-MD-100-1708-A23K A1A
G
36"-CD-100-1709-A72K

PG
3"-PC-100-1702-A23K

3/4"x2"
3004
3/4"
PG OWS

18"-WCR-100-1702-A3A
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

18"-WCS-100-1701-A3A

2"-MD-100-1710-A23K
3005

2"-MD-100-1713-A19A

2"-PC-100-1708-A23K
2"x1"
A23K
A19A

3"x2"

3/4"-SY-100-1707-A23K
3/4"
3/4"

3/4"-MD-100-1709-A23K 3/4" 1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
3/4"x2"
3/4"-SY-100-1706-A23K

100 P 304 B A23K 0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
2"-MD-100-1711-A19A

A19A REV. DESCRIPTION DATE DRAWN CHECK APPR.


I UY YL ML

305
M Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
3/4"

310 3001 B 3001 B 3001 B


100-1182
Revival of Ramagundam Fertilizer Complex Project

TO SOLUTION DRAIN
A23K
H AUTOSTART A23K A1A 2200 MTPD Ammonia Plant
100 MP 304 B
200-1128

100-1182
SHEET SIZE UNIT
A1A
100
COOLING WATER

COOLING WATER

TO 100 P 303 A/B

P53A
P53A

P53A
CO2 PRODUCT

P22
CONDENSATE

100-T-302
NAME
CO2 product separation
Piping and instrument diagram
P17A

RETURN
SUPPLY

OWS DOCUMENT ID

OWS S-03470 P42117-A 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 V 301 LP FLASH DRUM NOTES:

1) TO BE LOCATED AT GROUND LEVEL.

2) PIPE ENLARGEMENT LOCATED 10-15 m BELOW V 301


-0.1 kg/cm^2g INLET NOZZLE.
A -0.1 kg/cm^2g
VRV 10"x10" VRV 3) INLET PIPING TO BE SYMMETRICAL. BRANCH TO BE Y-SPLIT.
10"x10" 3018 2 3018 1 NO HIGH POINTS IN LINE TO STRIPPER.

12"x10" 12"x10" 4) PIPING TO BE DESIGNED FOR HALF VACUUM.

5) PT MEASURING RANGE TO COVER NEGATIVE PRESSURE.

FB,LO

FB,LC
6) DELETED.

MINIMIZE

MINIMIZE
12"-CD-100-1701-A72K-IP

12"-CD-100-1732-A72K-IP
7) DELETED.
36"-CD-100-1702-A72K-IP
P17A 302 8) DELETED.
CO2 GAS NOTE 4
B TO 100 E 306 9) PIPING LAYOUT AND SUPPORT TO CONSIDER FLASHING AND TWO
PHASE FLOW.

304 P17A
36"
SIGNAL
FROM LIC-3002 B2

LV
100 V 301
3002
M1 24"
2"-PC-100-1705-A23K 2"-PC-100-1720-A23K
FG
303 P17A A5
2" 3010 2"
3/4"

3/4"
OH CONDENSATE FC
FROM 100 P 304 A/B
NOTE 1 NOTE 3
C
A2 A1
2" 32" 32" 32"-MD-100-1706-A21K-IH
32"-MD-100-1707-A21K-IH NOTE 9
NOTE 9 24" M2 NOTE 5
P1 FF GENERAL NOTES:
2" PT PI 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.

Up
3019 3019
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
FF AH
PDT PDI
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
3020 3020

Up
D P2
2" NO POCKETS 26"-CD-100-1801-A23K-IH
A3 P18 311
26"
CO2/H2O PIPING DESIGN SHALL ADRESS PIPING CONNECTED TO
FROM 100 C 301 EQUIPMENT DESIGNED FOR VACUUM CONDITIONS.
A4
20"
A6
2"
L7
2" 2" 2" 2"
L1
L3 L5
2" 2" 2" 2"

2"-MD-100-1702-A19A-IH
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
LZT LZT LZT LG INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E 3005 A 3005 B 3005 C 3006 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
M PERMISSION OF HALDOR TOPSOE.

36"-MD-100-1705-A21K-IH

NOTE 9
2" 2"
L4 L6
2" 2"

LC
2"
L2
2" 2"
L8
2" 2"
24" M3
B1 40"

FF
TI
LZY D1 3009

F 3005 6"
2oo3 (100 V 302, P19A)
AP
AH TYPE 2A
LI MEDIAN 3006

Up
3005
AL
6"

IS LZAH 30"x36" NOTE 2


5 B 3005

IS LZAL
4 3005

G
20"-MD-100-1703-A19A-IH

40"-MD-100-1704-A19A-IH

20"-MD-100-2131-A19A-IH

30"-MD-100-1904-A21K-IH
8"-MD-100-2201-A19A-IH
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
6"-MD-100-1701-A19A

2"-AF-100-2006-A21K
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
210

211

212

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
H

FROM 100 P 301 A/B/C

ANTIFOAM SOLUTION
SEMILEAN SOLUTION

SEMILEAN SOLUTION

SEMILEAN SOLUTION

SEMILEAN SOLUTION
2200 MTPD Ammonia Plant

P20A
FROM 100 P 303 A/B

SHEET SIZE UNIT


P22

P21

P19
TO 100 P 301 A/B/C

100
SOLUTION DRAIN

TO 100 P 303 A/B

RICH SOLUTION
FROM 100 V 302

FROM 100 X 301


P19

P22

P21

NAME
TO 100 T 302

MDEA flash
Piping and instrument diagram
P17B
DOCUMENT ID
213

214

215

318
S-03470 P42117-B 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 301 1/2 SOLUTION HEAT EXCHANGER 100 C 301 CO2 STRIPPER 100 E 302 STRIPPER REBOILER NOTES:

FF 1) LY-3010 2 IS A THREE ELEMENT FEED FORWARD ALGORITHM.


TI
3016
AL
26"-CD-100-1801-A23K-IH 2) PIPE TO BE VERTICAL TO MAX. HEIGHT. FIRST ELBOW TO BE IN SS.
A P17B 311
CO2/H2O NO POCKETS 3) SEMILEAN SOLUTION NOZZLE OUTLET TO BE HIGH POINT DUE
TO 100 V 301 26" TO POSSIBLE FLASHING.
100 C 301
B1
4) PIPING LAYOUT AND SUPPORT TO CONSIDER FLASHING
AND TWO-PHASE FLOW. REDUCER LOCATION TO BE IN
P1
2" WITH MIN. 5 x OD PIPE BETWEEN BENDS.
NOTE 5
18"
A1 A2 5) INLET PIPING TO BE SYMMETRICAL. NO HIGH POINTS IN
18" PG
24" M1 2" T2
3023
6) PT MEASURING RANGE TO COVER NEGATIVE PRESSURE.
FF NOTE 6
TI
FF 7) PIPE TO BE VERTICAL TO MAX. HEIGHT.
B 3018 PT PI
FF 8) TWO PHASE FLOW, ANCHOR SECURELY.
TI 3024 3024

24"-MD-100-1802-A21K-IH
3017

Up
TYPE 6
AP
T1 P3
SAFE 3010 2" 2" FF
LOCATION AH
PDT PDI GENERAL NOTES:
O1 M2 24"
3025 3025 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
3"
AP 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,

3/4"-NI-100-1802-A1A
3011 DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,

3/4"
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

Up
TYPE 2A

Up
C PG
2" P2
2" 3026 PIPING DESIGN SHALL ADRESS PIPING CONNECTED TO
U1
MINIMIZE EQUIPMENT DESIGNED FOR VACUUM CONDITIONS.

M3 24" A19A A23K


28"-CD-100-1803-A19A-IH NOTE-2
A23K
A19A
A19A A23K
28" 28"-CD-100-1802-A19A-IH NOTE-2
A4
A23K
A3 A19A

MIN. 750 mm. MAX. 1000 mm.


28"

NOTE 2,7
FF

NOTE 2,7
B2 28" AH
TI
L7 2" 2"

Up
2169
100 E 302

Up
D 2" 2" AL
L1
28" 28"
L5 L3
B3 B4
2" 2" 2" 2"

L1
4" 2" 2"
A6
MIN. LG
3011 28"
LG LZT
M
3009 3010 C A1

D25K
M L2
LZT LZT 2" 2" MIN.
24" M4 3010 B 3010 A STOP

14"-PG-100-1802-D25K-IH
A7 2" 2"

D2A
8" B2 D1 A2 B1 THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
L4
28" 2" 28" 24" INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
L6 L2
E SAFE REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
2" 2"
MIN.

2" 2"
FF
28"-MD-100-1811-A19A-IH
LOCATION PERMISSION OF HALDOR TOPSOE.
TI 28"

MIN.
L8 A5
3013 NOTE-8

3/4"-SM-100-1801-D2A-IH
2" 2"
B3 14"-PG-100-1803-D25K-IH
28"-MD-100-1814-A19A-IH

MIN. FOR PIPING


FF 14"
TI 20" FC
3014
NOTE 4 20"-MD-100-1810-A19A-IH LZY LZAH IS TV 3/4"
18"x24"
3010 3010 5 3019
MIN.

2oo3
18" 20" LZAL IS
B1 A2 3010 4
100 E 301 2
LY
NOTE 3

2"
F 3010 1

A1 B2 TIC

MEDIAN
18" 20" 3019
NOTE 1
AH
LY LIC
3010 2 18" 20" 3010
AL
B1 A2 2"-MD-100-1812-A19A
SP 100 E 301 1
NOTE 3
FT FIC
Down

TYPE 2A 3013 3013 A1 B2


AP 18" 20"
3008 FV
G
3013 LOW POINT
IH 2" DRAIN 6"
IH
IP IP
1 1/2"-MD-100-2011-A19A-IP
14"x12"

12"x18"

12"
2"-MD-100-1815-A19A-IP

LOW POINT
6"-MD-100-1813-A19A-IP
3/4"
3/4"
14"-MD-100-2202-A21K-IH

24"-PG-100-1801-D25K-IH

28"-PG-100-1510-D25K-IH

10"-SM-100-1304-D2A-IH
300# FF DRAIN FC TYPE 2A Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
8"-MD-100-2026-A19A

3"-MD-100-5344-A19A

4"-MD-100-5307-A19A
2"-NI-100-1801-A1A

2"

TI

NOTE-8

NOTE-8
IH AP
3012 IP 3009
12" 18"-MD-100-1801-A21K-IH
FF
2"-SY-100-1803-A1A

TI
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
2"-SY-100-1802-A1A A1A A19A

2"
A21K 2" 3015 2" 0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
A19A A21K A19A REV. DESCRIPTION DATE DRAWN CHECK APPR.
2"-SY-100-1801-A1A

20"-MD-100-1809-A19A-IH
2"-MD-100-1816-A19A-IP

A1A A1A
319

314

310
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
FROM 100 E 304 / 100 E 303
100-1184

Revival of Ramagundam Fertilizer Complex Project


H
SEMILEAN SOLUTION

2200 MTPD Ammonia Plant

P15C
P20B

P20B

P20A

P53B

P53A
FROM 100 P 302 A/B

FROM 100 P 303 A/B

SHEET SIZE UNIT


P22

P13
100

HEATING STEAM
LEAN SOLUTION

LEAN SOLUTION

LEAN SOLUTION
FROM 100-P-309

FROM 100 A 301

FROM 100 E 213


P53A

P53A
P20A

P53A
FROM FIC-3021

FROM HEADER
FROM HEADER

P16
SHIFTED GAS

SHIFTED GAS
NAME
TO 100 E 304

TO 100 E 305
TO 100 T 302

OWS OWS OWS MDEA stripping


HIGH VENT
NITROGEN

P18
SOLUTION

SOLUTION

Piping and instrument diagram


SIGNAL

DOCUMENT ID
312

313

306

323

307

308

309
S-03470 P42118 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 V 302 HP FLASH DRUM NOTES:

16"-FL-100-1901-A1A- TO FLARE HEADER

16"-FL-100-1902-A1A- TO FLARE HEADER

16"-FL-100-1903-A1A- TO FLARE HEADER

16"-FL-100-1904-A1A- TO FLARE HEADER

16"-FL-100-1905-A1A- TO FLARE HEADER

16"-FL-100-1906-A1A- TO FLARE HEADER

16"-FL-100-1907-A1A- TO FLARE HEADER

16"-FL-100-1908-A1A- TO FLARE HEADER

16"-FL-100-1909-A1A- TO FLARE HEADER

16"-FL-100-1910-A1A- TO FLARE HEADER


100-1185

100-1185

100-1185

100-1185

100-1185

100-1185

100-1185

100-1185

100-1185

100-1185
1) PIPING LAYOUT AND SUPPORT TO CONSIDER FLASHING AND
9.0 kg/cm^2g 9.0 kg/cm^2g 9.5 kg/cm^2g 9.5 kg/cm^2g 9.0 kg/cm^2g 9.0 kg/cm^2g
9.5 kg/cm^2g
9.5 kg/cm^2g SHOULD BE USED WITH MIN. 5 x OD PIPE BETWEEN BENDS.
6"R10" 6"R10" 6"R10" 6"R10" 6"R10" 6"R10"
9.0 kg/cm^2g 9.0 kg/cm^2g 6"R10" PSV
A 6"R10" 2) LEVEL CONTROL VALVES SHALL BE LOCATED AT GROUND LEVEL.
3033 10

FB,LO
PSV PSV PSV PSV PSV PSV PSV PSV PSV 10"x16"

FB,LO

FB,LO

FB,LO

FB,LO

FB,LO

FB,LO

FB,LO

FB,LO

FB,LO
6"R10" 6"R10"
3033 1 3033 2 3033 3 3033 4 3033 5 3033 6 3033 7 3033 8 3033 9 300# 3) INLET PIPE FOR NOZZLE TO BE DESIGNED FOR HALF VACUUM.
10"x16" 10"x16" 10"x16" 10"x16" 10"x16" 10"x16" 10"x16" 10"x16" 10"x16"
3/4"

10"x6"
300# 300# 300# 300# 300# 300# 300# 300# 300# 3/4" 4) A1 FLANGE SHALL BE 150#.
3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4" 3/4"
10"x6"

10"x6"

10"x6"

10"x6"

10"x6"

10"x6"

10"x6"

10"x6"
3/4"

10"x6"
3/4" 3/4" 3/4" 3/4" 3/4" 3/4" A1A A72K
3/4" 3/4" 3/4" 5) LV-3015 1/2 OPERATES IN SPLIT RANGE AS SHOWN:
A1A A72K A1A A72K A1A A72K A1A A72K A1A A72K A1A A72K A1A A72K A1A A72K A1A A72K
FB,LO

FB,LO

FB,LO

FB,LO

FB,LO

FB,LO

FB,LO
FB,LC

FB,LO

FB,LO
VALVE OPENING, %
(V 301, P17B)
100

10"-HG-100-1907-A72K-IH

10"-HG-100-1906-A72K-IH

10"-HG-100-1905-A72K-IH

10"-HG-100-1904-A72K-IH

10"-HG-100-1925-A72K-IH

10"-HG-100-1903-A72K-IH
10"-HG-100-1928-A72K-IH

10"-HG-100-1927-A72K-IH

10"-HG-100-1926-A72K-IH

10"-HG-100-1901-A72K-IH
8" 1 2
B B2

100 V 302
I
NOTE 3 OUTPUT, %
42"-HG-100-1902-A72K-IH 42" 311 0 50 100
S1
30"
6) PIPING LAYOUT AND SUPPORT TO CONSIDER FLASHING AND TWO
MINIMIZE

A1 PHASE FLOW, ANCHOR SECURELY.


SAFE LOCATION NOTE 4 M1 36" AH
PT PIC
3030 3030 1
2"
P1
PG 2" PIC
3032 PG 3030 2
AL
3/4"-NI-100-1902-A1A

C 3031
A72K
IN VIEW

GENERAL NOTES:
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
A1A

2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,


AH DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
3/4" LIC REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
3015
AL L7
2" 2"
2" 2"
L1

SPLIT RANGE
L5 L3
2" 2" 2" 2"

50-100% LG LZT LZT LZT


D
3014 3015 C 3015 B 3015 A

0-50%
M

2" 2" 2" 2"


L6 L4
LHIC
NOTE 5 2" 2" L2
3015 1
L8 2" 2"
NOTE 2

MEDIAN
FF
LV TI
3015 1 3024
30"X20" 30"-MD-100-1903-A21K-IH B1
20"X30" LZY LY
M2 24"
FL/DO 30" 3015 3015
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL

3/4"
20" 2oo3
INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E 20" AP REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
FL/DO PERMISSION OF HALDOR TOPSOE.
3015 LZAH IS
30"X20" 20"X30" 3015 5 B
TYPE 2A
NOTE 5
LV LZAL IS
3015 2 3015 5 B

MIN. FOR PIPING


D1
6"
LHIC
3015 2

6"-MD-100-1902-A19A
NOTE 6

NOTE 1

Down
G

2"-SY-100-1901-A1A
2"
30"-MD-100-2119-B21K-IH

30"-MD-100-1904-A21K-IH

8"-FG-100-1901-A23K-IE
A19A Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
6"-MD-100-1701-A19A
2"-AF-100-2004-B21K

A1A
2"-NI-100-1901-A1A

6"-MD-100-1901-A19A
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
OWS 0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
215

237

511

204

204

385
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
100-1184

Revival of Ramagundam Fertilizer Complex Project


H

SIGNAL TO PV-3030 2
FROM 100 TP 301 A/B

2200 MTPD Ammonia Plant


P20A

P17B

SHEET SIZE UNIT


P21

SOLUTION DRAIN

100
MDEA SOLUTION
RICH SOLUTION

RICH SOLUTION
FROM 100 X 301

FROM 100 V 301

P09C

P09C

P09C

P09C
P17B

P53A
FROM HEADER

TO 100 H 201
NAME
TO 100 V 301

TO 100 T 302

TO FIC-3002
MDEA HP flash

TO FY-3002
NITROGEN

ANTIFOAM

P19

FUEL GAS
Piping and instrument diagram

SIGNAL
DOCUMENT ID
320

207

210

S-03470 P42119 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 304 DMW PREHEATER NO. 1 100 E 303 LEAN SOLUTION COOLER 100 X 301 ANTIFOAM DOSING UNIT NOTES:

1) ONE DOSING POINT AND ONE ONLY SHALL BE LINED UP


AT ALL TIMES.
2) DELETED.
A

10" 20" 100 E 304


FF
B1 A2

1 1/2"-MD-100-2010-A19A-IP
TI
3029
10"-DW-100-2028-A1K

A1 B2
10" 20"

B TG
IH 3031
20"-MD-100-2012-A19A-IP

10"
8.5 kg/cm^2g
MIN. 10 x OD

PSV

1"-WCR-100-2004-A3A
3/4"D1"
3042

FF FF 3/4"-WCR-100-2003-A3A
TI TI TV
3028 3030 3/4" 3034

FB LO
14"-MD-100-2013-A19A-IP 1 1/2"-MD-100-2015-B21K
C
P20B 316
SS TG 14"

3/4"
LEAN SOLUTION
PG 3032 FC FROM 100 P 302 A/B
3041

AP
3046 24"x20"
FF
FT FI NOTE-11 20" 20"
300#
GENERAL NOTES:
3016 3016 A2 B1 100 E 303 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,

2"
FF REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
AT AI B2 A1
3018 3018 20" 20" TYPE 1A
D
CONDUCTIVITY 20"x24" AP
FF AH
TI TIC 3019
3033 3034
20"-MD-100-2014-A19A
315 P20B

A19A
10"-WCS-100-2005-A3A MIN. STOP MIN. 10 x OD LEAN SOLUTION
BACK FLUSH TO 100 P 302 A/B
IS

A21K
10"
5 B
100 X 301 UZY UZV

2"-AF-100-2002-A21K
2"
REFER VENDOR P&ID NO. TL-WN00260224/18 3004 S 3004
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
SS INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND

FC
1 1/2"
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
PERMISSION OF HALDOR TOPSOE.
UZLC HV
3004 3001
1.5"

1.5"x2"

2"-AF-100-2001-B21K
M
BY VENDOR PSV
3043

FB LO
F 3/4"
3/4"

FB LO
2"
MINIMIZE
MINIMIZE
2"-WY-100-2001-A1A

1"x1/2" 1"

B21K
B21K

B21K
B21K
G
NOTE 1

A21K

A21K
A21K

A21K
1 1/2"-MD-100-2011-A19A-IP

OWS
20"-MD-100-1809-A19A-IH

10"-DW-100-2002-A1K-IH

24"-WCR-100-2002-A3A

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
24"-WCS-100-2001-A3A
10"-DW-100-2027-A1K

2"-AF-100-2005-A21K

2"-AF-100-2004-B21K

2"-AF-100-2003-A21K
2"-AF-100-2006-A21K
2"-DW-100-2004-A1K

1"-AP-100-8413-A1A

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
317

323

318

321

320

322
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
100-1186

100-1182

100-1184

Revival of Ramagundam Fertilizer Complex Project


H
ANTIFOAM SOLUTION

2200 MTPD Ammonia Plant


100-1182

SHEET SIZE UNIT


P18

TO 100 P 301 A/B/C


100
COOLING WATER

COOLING WATER

TO 100 P 303 A/B


LEAN SOLUTION

P20C
FROM 100 E 301

P17B
P16

P18

P22

P19

P21
TO 100 C 301

NAME
TO 100 E 305

TO 100 V 301

TO 100 V 302

Lean solution cooling


DM WATER

HIGH VENT

P20A
ANTIFOAM

ANTIFOAM

ANTIFOAM
RETURN

Piping and instrument diagram


SUPPLY

DOCUMENT ID
319

DW

S-03470 P42120-A 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 P 302 A /B LEAN SOLUTION PUMP NOTES:

100 MP 302 A /B MOTOR FOR 100 P 302 A /B 1) PUMP TO BE PROVIDED WITH UNDERLOAD TRIP FOR
PROTECTION AGAINST LOW FLOW OPERATION.
NOTE-5
2) 100 P 302 A/B SEALS TO BE FLUSHED WITH FILTRED LEAN SOLUTION
IS FZAL FZY FY (DW FOR START-UP).
A
6 3021 3021 3021 3) TRIPLE ECCENTRIC DISC TYPE.
MEDIAN
2oo3 4) MIN. FLOW DEVICE BY PUMP VENDOR.
5) REFER VENDOR P&ID NO. DL1755005_001-1005-01.
FZT FZT FZT FIC
3021 A 3021 B 3021 C 3021
AL

FV
3021
14"-MD-100-2024-D21K
B 3"-WCS-100-8214-A3A
100-1182

D21K
14"x10" 10" 10"x14" 2"
FC

IS IS LOW POINT

B21K
3"-WCR-100-8214-A3A DRAIN
304 305
100-1182
UZV UZY UZV UZY
3008 3008 3009 3009
14" 14"

FC

FC
NOTE 3 NOTE 3

VF UZLC UZLC
FO 3008 3009
3019 NOTE-4
8"-MD-100-2031-D21K
C 14"-MD-100-2025-D21K
VF
8" FO
A19A D21K 3020 NOTE-4
8"-MD-100-2027-A19A 8"-MD-100-2032-D21K

8"
IS A19A D21K IS
304 305
GENERAL NOTES:
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
PG NOTE 1 PG NOTE 1
3049 3052
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
UZY IS UZY IS DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
100 P 302 A 3006 A 304 3006 B 305 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
A
100 P 302 B A
D19 D19
K K
D 8"x14" D21 8"x14" D21

3/4" UZY 3/4" UZY


NOTE 2 M 3007 A NOTE 2
M 3007 B
" "
3/4 3/4
20"x10" 20"x10" 100 MP 302 B
100 MP 302 A
1K 1K
D2 9A D2 9A

20"-MD-100-2023-D21K
20"-MD-100-2021-D21K

YL YL
D1 D1
3004 A 3004 B
3/4"-MD-100-2037-D19A

3/4"-MD-100-2035-D19A
MIN. 3 x OD

MIN. 3 x OD
ML ML
3004 A 3004 B
AUTOSTART AUTOSTART
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
D21K

D21K
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
PERMISSION OF HALDOR TOPSOE.
D19A

D19A
PI PZAL PZT PI PZAL PZT
3/4"-MD-100-2036-D19A

3/4"-MD-100-2034-D19A
3048 3048 3048 3051 3051 3051
AL AL
PG PG
3047 3050
20"-MD-100-2020-D19A

20"-MD-100-2022-D19A

IS IS
304 305

F
2" 2"
2"-MD-100-2033-D19A

2"-MD-100-2038-D19A
D19A

D19A
A19A
A19A

MIN. 5xO.D.
20"-MD-100-2014-A19A
315 P20A
LEAN SOLUTION
FROM 100 E 303

1 1/2"-MD-100-2015-B21K
P20A 316
LEAN SOLUTION
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

14"-MD-100-2029-D21K
TO HV-3001
8"-MD-100-2026-A19A

6"-MD-100-2001-A19A

6"-MD-100-5308-A19A

4"-MD-100-2039-D21K
2"-MD-100-2030-A19A

2"-MD-100-2030A-A19A

2"-SY-100-2001A-A1A
2"-SY-100-2001-A1A

D19A 2" D19A 2"


A19A D19A A19A D19A
A1A A1A 1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.

FOR SEAL FLUID DISTRIBUTION


312

241

238

427

313
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
OWS OWS Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant SHEET SIZE UNIT
P53A

100
SOLUTION DRAIN

P-20C
LEAN SOLUTION

LEAN SOLUTION

LEAN SOLUTION

LEAN SOLUTION
FROM 100-A-302

TO 100 T 302
P53B

P53A

P53A
P18

P23

P18
TO 100-P-309
TO 100 C 301

TO 100 C 302

TO LY-3010 2
NAME
TO 100 T 302

Lean solution pumps


Piping and instrument diagram
P20B

SIGNAL
DOCUMENT ID

S-03470 P42120-B 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

NOTES:

1) DELETED.
2) DELETED.

3) DM WATER CONNECTION TO BE USED ONLY DURING START-UP.


A
4) DELETED.

2"-DW-100-2004-A1K
P20A
NOTE-3
DM WATER

100-1190

100-1190

100-1190

100-1190

100-1190

100-1190

100-1190-4

100-1190-4

100-1190-4

100-1190-4
XP-301A

XP-301B

P-302A

P-302B

P-303A

P-303B
P-301C
P-301A

P-301B

P-309
B

GENERAL NOTES:
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

40.0 kg/cm2g 40.0 kg/cm2g


C

1.5G3 1.5G3
D21K A19A A19A D21K
PSV PSV
3140-1 3140-2

FB LO FB LO
3/4" 3/4"
A1K 3/4" 3/4"

2"-MD-100-2051-D21K

2"-MD-100-2050-D21K

2"-MD-100-2049-D21K

2"-MD-100-2048-D21K

2"-MD-100-2040-D21K

2"-MD-100-2041-D21K

2"-MD-100-2042-D21K

2"-MD-100-2043-D21K

2"-MD-100-2044-D21K

2"-MD-100-2045-D21K
FB LO FB LC
D21K

PI
3137

D
3"-MD-100-2047-D21K
3/4"

3"-MD-100-2046-D21K
FF
PT
3137
PCV
3137

FO
3/4" 3/4"
2"

4" 4"

RO
E
3137

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
4"-MD-100-2039-D21K

3"-MD-100-2053-A19A

3"-MD-100-2052-A19A
FOR SEAL FLUID

REV. DESCRIPTION DATE DRAWN CHECK APPR.

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant
P-302A/B DISCHARGE
P20B

MDEA SOLUTION

SHEET SIZE UNIT


DRAIN TO T-302

100
P53A

P53A

NAME
Lean Amine distribution for Pump Seal
Piping and instrument diagram
P20C
DOCUMENT ID

S-03470 P42120-C 0

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 XP 301 A /B REVERSE PUMP 100 P 301 A /B/C SEMILEAN SOLUTION PUMP NOTES:

100 MP 301 A /B/C MOTOR FOR 100 P 301 A /B/C 1) PIPING LAYOUT AND SUPPORT TO CONSIDER FLASHING
NOTE-8 AND TWO PHASE FLOW ANCHOR SECURELY.

2) 100 P 301 A/B/C AND 100 TP 301 A/B SEALS TO BE FLUSHED WITH
A FILTERED LEAN SOLUTION (DW FOR START-UP)
2"-WCR-100-2103-A3A
FROM 100-P-301C 20"x28" 20"x28"
3) MINIMUM REQUIRED LENGTH OF STRAIGHT PIPE FROM INLET LIQUID
2"-WCS-100-2103-A3A 20"x28" CONTROL VALVE TO BE SPECIFIED BY REVERSE PUMP VENDOR.
UZLC UZLC UZLC

100-P-301C

12"-MD-100-2110-A19A-IH

12"-MD-100-2112-A19A-IH
12"-MD-100-2108-A19A-IH
TO 100-P-301C 3016 3017 3018
2"-WCR-100-8215-3-A3A 4) PUMP TO BE PROVIDED WITH UNDERLOAD TRIP FOR
FROM 100-P-301C FC 20" FC 20" FC 20" PROTECTION AGAINST LOW FLOW OPERATION.
2"-WCS-100-2103-A3A
S VF UZV S VF S 5) VALVES SHALL BE CONNECTED TO EMERGENCY
TO 100-P-301C UZV UZY UZY UZV UZY
VF POWER SUPPLY.
3016 3016 NOTE-7 3017 3017 3018 3018
FO FO NOTE-7 FO
3025 IS 3027 IS 3028 IS 6) LV-3019 1/2/3/4 OPERATES IN SPLIT RANGE AS SHOWN:
2"-WCR-100-2102-A3A
FROM 100-P-301B 12"-MD-100-2132-D21K-IH 301 12"-MD-100-2133-D21K-IH 302 303 7) MIN. FLOW DEVICE BY PUMP VENDOR.
2"-WCS-100-2102-A3A NOTE-7 8) REFER VENDOR P&ID NO. SOA1510221/SOA1510226.
100-P-301B

B TO 100-P-301B A19A D21K


PG A19A D21K FI PG A19A D21K PG
2"-WCR-100-8215-2-A3A FI
3065 3026 3068 3071 VALVE OPENING, %
FROM 100-P-301B 3024 AL
AL
2"-WCS-100-8215-2-A3A 20"-MD-100-2107-D21K-IH 20"-MD-100-2109-D21K-IH 12"-MD-100-2134-D21K-IH 20"-MD-100-2111-D21K-IH 100
TO 100-P-301B IS FZAL FZT IS FZAL FZT
301 3024 3024 302 3026 3026
(1) (2) (3) (4)
2"-WCR-100-2101-A3A
FROM 100-P-301A
2"-WCS-100-2101-A3A AH AH
100-P-301A

IS SZAH SI IS SZAH SI
TO 100-P-301A
308 3001 A 3001 A 309 3001 B 3001 B OUTPUT, %
2"-WCR-100-8215-1-A3A
AL AL 0 50 75 100
FROM 100-P-301A 100 XP 301 A UZY IS 100 XP 301 B UZY IS UZY IS
2"-WCS-100-8215-1-A3A 300# 3/4" SZT 100 P 301 A 3015 A 301 300# 3/4" SZT 100 P 301 B 3015 B 302 100 P 301 C 3015 C 303
A A A
C
TO 100-P-301A 600#
3001 A D19 600# 3001 B D19 D19
K K K
D21 100 MP 301 A D21 100 MP 301 B D21
14"x20" 14"x20" 14"x20" 100 MP 301 C
3/4" IP UZY IS 3/4" IP UZY IS 3/4" IP UZY IS
IH IH IH
M 3014 A 301
M 3014 B 302
M 3014 C 303 GENERAL NOTES:
3/4"-MD-100-2143-B21K-IP

3/4"-MD-100-2146-B21K-IP
IH IH IH NOTE 4 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.

28"x16"

28"x16"

28"x16"
" IP " IP " IP

MIN. 3 x OD
600# 3/4 600# 3/4 3/4 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
YL ML YL ML YL ML
300# 1K 300# 1K 1K DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
NOTE 1 & 3

600# 600#

NOTE 1 & 3
600# D2 9A 3007 A 3007 A 600# D2 9A 3007 B 3007 B PI D2 9A 3007 C 3007 C
300# D1 300# D1 D1 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

3/4"-MD-100-2137-D19A-IP

3/4"-MD-100-2138-D19A-IP
3070
MIN. 3 x OD
300# 300#

MIN. 3 x OD

28"-MD-100-2104-D21K-IH
AUTOSTART AUTOSTART AL AUTOSTART

3/4"-MD-100-2141-D19A-IP

3/4"-MD-100-2140-D19A-IP
3/4" 3/4" D21K
I LHIC I LHIC
D19A
308 3019 1 309 3019 2
PI PI

3/4"-MD-100-2142-D19A-IP

3/4"-MD-100-2139-D19A-IP
28"-MD-100-2105-D21K-IH
20"x12" 28"-MD-100-2106-D21K-IH 20"x12" PZAL PZT
14"x20" PG 3064 14"x20" PG 3067
AL AL 3070 3070
3058 D21K 3060 D21K
D
D19A D19A PG 2"
3069
PZAL PZT PZAL PZT

28"-MD-100-2103-D19A-IH
IS
IS 3064 3064 IS 3067 3067 IH IP
S VF VF 303
308 309
20" FC

PG PG 20"
3059 PG 2" 3061 FC PG 2"
LUZY LUZY
3/4"-MD-100-2144-B21K-IP

3/4"-MD-100-2147-B21K-IP
LZV
3019 1 LZV 3063 3019 2 3066

28"-MD-100-2102-D19A-IH
IS 3019 2 IS
3019 1
IH IP NOTE 6 IH IP
301 302
28"-MD-100-2101-D19A-IH

NOTE 6

20"-MD-100-2114-B21K-IH
20"-MD-100-2115-B21K-IH

2"-MD-100-2150-D19A-IP
2"-MD-100-2136-D19A-IP

2"-MD-100-2135-D19A-IP

D19A
2"-MD-100-2148-B21K-IP
2" 2"

A19A
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
PG INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND

D19A
D19A

E 3072 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN


PERMISSION OF HALDOR TOPSOE.
A19A

A19A
3/4" 3/4"
40"x28" 40"x28"

40"x28"

20"-MD-100-2113-B21K-IH
NOTE 1
NOTE 1 20"-MD-100-2116-B21K-IH

NOTE 5 HZV
2"-MD-100-2145-B21K-IP

HZV
NOTE 5 3003
3004 PI UZY
HS IS
FL
2"

F HS IS 3003 309 3056 3013


FL 20"
2"

3004 308 IS UZLO


20" FF
PG PT 5 B 3013
HZLC HZLO
HZLC HZLO 3003 3003 3057 3056 UZV UZLC

Down
Down
3004 3004 3013 3013

0-50%
A21K

FC
30"

28"-MD-100-2117-B21K-IH
Down
A19A

LHIC 50-75%
3019 3
NOTE 6
2" VF

SPLIT RANGE
2" LV
G
3019 3

NOTE 1 30"-MD-100-2118-B21K-IH 30"x28"

28"x20" 20" 20"x28"


3/4"

28"-MD-100-2130-D21K-IH
20"-MD-100-2131-A19A-IH

40"-MD-100-1704-A19A-IH

30"-MD-100-2119-B21K-IH

30"-MD-100-2303-B21K-IH
FC Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2"-SY-100-2101B-A1A-IP
2"-SY-100-2102-A1A
2"-SY-100-2101-A1A
4"-WCR-100-8215-A3A
4"-WCS-100-8215-A3A

2"-MD-100-2148-A19A
2"-MD-100-2120-A19A

2"-MD-100-2151-A19A
2"-AF-100-2003-A21K

2"-SY-100-2102C-A1A
2"-MD-100-2151C-A19A
2"-SY-100-2102B-A1A
2" 2" 2" 2" 2" FC 2" 2" 2" 2"
B21K-IP D19A-IP B21K-IP D19A-IP D19A-IP
B21K-IP D19A-IP B21K-IP 28"x20" 20" 20"x28" D19A-IP D19A-IP
NOTE 1

A19A A19A A19A A19A A19A


A1A A1A A1A A1A A1A
VF
LV 1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
3019 4 0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
OWS OWS OWS OWS OWS

2"-MD-100-2151B-A19A
REV. DESCRIPTION DATE DRAWN CHECK APPR.
214

207

239

330
NOTE 6 Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
Revival of Ramagundam Fertilizer Complex Project
MDEA SOLUTION DRAIN
MDEA SOLUTION DRAIN

MDEA SOLUTION DRAIN

MDEA SOLUTION DRAIN

MDEA SOLUTION DRAIN


SEMILEAN SOLUTION

H LHIC 75-100%
SEMILEAN SOLUTION

SEMILEAN SOLUTION
2200 MTPD Ammonia Plant
P17B

P20A

SHEET SIZE UNIT


1182

P23

P23
3019 4
100
FROM 100 C 302
RICH SOLUTION

RICH SOLUTION
FROM 100 V 301

FROM 100 X 301


1182

P53A
P17B

P53A

P53A

P53A

P53A

FROM LIC-3019
P19

P23
TO 100 V 301

TO 100 C 302
TO 100 T 302

NAME
TO 100 V 302

TO 100 T 302

TO 100 T 302

TO 100 T 302

TO 100 T 302
Semilean solution pumps
P21
ANTIFOAM

Piping and instrument diagram

SIGNAL
DOCUMENT ID
212

322

327

325
S-03470 P42121 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 P 303 A /B SPLIT STREAM PUMP NOTES:

100 MP 303 A /B MOTOR FOR 100 P 303 A /B 1) 100 P 303 A/B SEALS TO BE FLUSHED WITH FILTERED
LEAN SOLUTION (DW FOR START-UP).
2) MIN. FLOW DEVICE BY PUMP VENDOR.
A

GENERAL NOTES:
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
B REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

A19A

LO
A21K
I PALL
306 3079
IH IP 3/4"-MD-100-2210-A21K-IP
PI
3/4"-MD-100-2216-A21K-IH IP IH
3079 PG
AL 3/4" 3080

PG PT
5"X8"
3078 3079 100 P 303 A
NOTE 1
VF 12"X14"
C 20"-MD-100-2204-A19A-IH 20"X12" NOTE-2
IH IP
MIN. 3 x OD
3/4"
A19A A21K
3/4"-MD-100-2211-A21K-IH
IH 2"
I UY UY I
IP
306 3022 A
M 3023 A 306

20"-MD-100-2206-A19A-IH
100 MP 303 A

8"-MD-100-2208-A19A-IH
3/4"-SY-100-2203-A1A
YL ML
3010 A 3010 A 3/4"
AUTOSTART A21K-IP
A21K
A1A
A19A

OWS

A19A
3/4"-MD-100-2217-A21K-IH
LO

A21K
I PALL
307 3082

PI IP IH THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL


3082 PG INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
AL
E 3083 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
PERMISSION OF HALDOR TOPSOE.
PG PT
5"X8"
3081 3082 100 P 303 B 14"-MD-100-2203-A21K-IH
NOTE 1
12"X14"
VF
20"-MD-100-2205-A19A-IH 20"X12"
NOTE-2
IH IP
MIN. 3 x OD 3/4" 3/4"-MD-100-2213-A21K-IP
3/4"
A19A A21K
2"

IH 3/4"-MD-100-2214-A21K-IH IH IP
IP
I UY UY I
307 3022 B
M 3023 B 307

A23K A19A
100 MP 303 B
F YL ML
2"-MD-100-2209-A19A-IP

3010 B 3010 B
AUTOSTART

A21K A19A

3/4"-SY-100-2202-A1A
3/4"
A21K-IP
A1A
A21K
A19A
2"-SY-100-2201-A1A

2"
A19A-IP
G A1A OWS

3/4"-MD-100-2215-A19A-IP

3/4"-MD-100-2212-A19A-IP
Down

OWS
20"-MD-100-1703-A19A-IH

14"-MD-100-2202-A21K-IH

8"-MD-100-2201-A19A-IH
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2"-PC-100-1708-A23K

2"-AF-100-2005-A21K

2"-MD-100-2207-A19A

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


3/4"x2" 3/4"x2" 0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
240

306

213
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
Revival of Ramagundam Fertilizer Complex Project
MDEA SOLUTION DRAIN

MDEA SOLUTION DRAIN

MDEA SOLUTION DRAIN

H
SEMILEAN SOLUTION

SEMILEAN SOLUTION

SEMILEAN SOLUTION
2200 MTPD Ammonia Plant
P17A

P20A

P17B
FROM 100 P 304 A/B

SHEET SIZE UNIT


100
FROM 100 X 301

FROM 100 V 301

P53A

P53A

P53A

P17B
P18
CONDENSATE

NAME

TO 100 E 301

TO 100 V 301
TO 100 T 302

TO 100 T 302

TO 100 T 302

Split streams pumps


P22
ANTIFOAM

Piping and instrument diagram


DOCUMENT ID
305

321

211

S-03470 P42122 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 C 302 CO2 ABSORBER NOTES:

1) VALVE IS PROVIDED WITH EMERGENCY POWER SUPPLY.


I
FF
105 TI 2) FV-3032 1/2 OPERATES IN SPLIT RANGE AS SHOWN:
3040
A
20"-PG-100-2302-B5A
337 P24 VALVE OPENING, %
FT FIC WASHED GAS TO 100 V 305
6001 6001 100
20"
100 C 302
LOCATE NEAR
FV B1 CO2 ABSORBER 3/4" 1 2
6001 2" AE
P1
2"-PC-100-2301-D23K-IP 3053
A4 M1 24"
1" 2"
2"x1" 1"x2"
FC OUTPUT, %
AT TO FLARE HEADER 0 50 100
1500#
E23K D23K 3053 100-1185
A3 H2 DETECTOR
100-1185
B 14" AAH
AI 100-1185
P2 M2 24" 3053

20"-FL-100-2303-A1A
2" 37.0 kg/cm^2g 38.9 kg/cm^2g

20"-FL-100-2301-A1A

20"-FL-100-2302-A1A
PG
3086
6"Q8" 6"Q8"
FHIC

Up
AP
3032 2 TYPE 7A 37.0 kg/cm^2g
3025 PSV PSV
NOTE 2 3" PSV 3092 2 3092 3
FF 6"Q8"
AH 24" M3 O1 3092 1

FB, LO

FB, LO

FB, LO
FV PDI PDT
3032 2 3087 3087 600# D28A
AP 600# D28A 600# D28A

28"-MD-100-2310-D21K-IH
TYPE 2A B28A
3026 3/4" B28A 3/4" B28A 3/4"
3/4"
PP

10"-PG-100-1636-B28A-IP
28"x18" 18" 18"x28"
FC 1 1/2" D28A A1A 3/4" D28A A1A 3/4" D28A A1A

Up

10"-PG-100-2325-B28A-IP
C AP
FF TYPE 7A

FB, LO

FB, LO
FB, LC
TI 3027
3038 2" 3"
FC
28"x18" 18" 18"x28" P3 O2
28" A2
AP 12"x10"
LOW POINT 36" M4 TYPE 2A 12"-PG-100-2326-B28A-IP 10"-PG-100-2327-B28A-IP GENERAL NOTES:

Up
FV DRAIN 3028
3032 1 2" PG 2"-PG-100-2328-B28A-IH
12"x10" 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.

3088
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,

3"-HG-100-2301-B5A
FHIC AP
TYPE 7A
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
AH FF
3032 1 PDI PDT 2" 3029
A5
FZT FZT FZT NOTE 2 3089 3089 24"-PG-100-2301-B28A-IH
24" M5 O3
3032 A 3032 B 3032 C 3"

MIN. 3000 mm
D

B28A
0-50%

50-100%

MINIMIZE
PG AP
2"-PC-100-2302-E23K-IP

TYPE 2A
3090 1 1/2" 3030 PG

D1A
FZY FZAL PP 3091

Up
3032 3032 2" A1 24"
2oo3 P4
SPLIT RANGE

2" 2"
2" 2" IS
L7 L1
FY IS HZV 314
L5 L3 3008
3032 6 2"
2" 2" 2"
NOTE 1

IN VIEW
FL HS
MEDIAN

2"
LG LZT LZT LZT 24" 3008
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
3023 3019 C 3019 B 3019 A
FIC HZLO HZLC INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
M
E 3032 3008 3008 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
AL 2" 2" 2"
2" PERMISSION OF HALDOR TOPSOE.
L6 L4
L8 L2
2" 2" 2" 2" SAFE PG
LOCATION 2179
24" M6
IS

3/4"-NI-100-2302-A1A
5

B28A
30" B2 LZY LZAH LZAL HUZY

A1A
LOCATE NEAR
CO2 ABSORBER 3019 3019 3019 3007 HIC
FF
MIN. FOR PIPING

2oo3
AE TI D1 3/4" 3007
3054 3039 6" HZV

B28A
F LY IS IS 3007
6"-MD-100-2301-B19A

LO TO FLARE HEADER
3019 5 5 B PG 26"
AT 100-1185
3094

A1A
3054 12"x10" FC 10"x26" 26"-FL-100-2305-A1A
TYPE 2A 10" B28A-IP A1A
H2 DETECTOR
MEDIAN

3/4"
12"-PG-100-2305-B28A-IP

IN VIEW
AAH AP
AI
3022
3054

AH
LIC I PG 3/4"
B19A

2"-SY-100-2301-A1A

3019 105 B 3093


2" AL

B28A
B19A
A19A
E23K

A1A
G
LC

B5A
E23K
D1A

Down

OWS
28"-MD-100-2130-D21K-IH

30"-MD-100-2303-B21K-IH

24"-PG-100-1602-B28A-IH
D23K
2"-PC-100-5102-D23K-IP

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
14"-MD-100-2029-D21K
2"-BF-100-5862-D1A-IP

6"-MD-100-2302-A19A

2"-NG-100-0105-D1A

3"-HG-100-2302-B5A
2"-NI-100-2301-A1A

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
327

333

325

326
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)

TO H2 RECYCLE SYSTEM
STRIPPED CONDENSATE

100-1184

Revival of Ramagundam Fertilizer Complex Project


NATURAL GAS
FOR PRESSURIZATION
TO LZV/LV-3019 1/2/3/4

H
FROM 100 P 301 A/B/C
SEMILEAN SOLUTION

2200 MTPD Ammonia Plant


FROM 100 E 601 1/2/3
P58B

P20B

FROM 100 P 302 A/B

P01

SHEET SIZE UNIT


P51

P21

P16
100
MDEA SOLUTION
FROM LETDOWN

LEAN SOLUTION

RICH SOLUTION

FROM 100 V 304


P53A

FROM HEADER

PROCESS GAS
P21

P21

P55
RECYCLE GAS
TO 100 V 302

NAME
OF 100 C 302
TO 100 T 302

CO2 absorption
P23
NITROGEN

Piping and instrument diagram


MP BFW

SIGNAL

DOCUMENT ID
609

331

427

330

328

S-03470 P42123 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 V 305 PROCESS GAS K.O.DRUM 100 R 301 METHANATOR 100 E 311 1 /2 GAS-GAS EXCHANGER NOTES:
EXCESS SYNGAS
TO FUEL MIXING 1) TV-3048 1/2 OPERATES IN SPLIT RANGE AS SHOWN:
8"-PG-100-2450-B5A-IE
589 P25 VALVE OPENING, %
TO FLARE HEADER
26" 26"-FL-100-2410-A1A
A 100-1185 100

1 2

A1A
3/4"

B5A
PIC UZY UZY
3100 3026 3027 OUTPUT, %
10"x26" 0 50 100
IS IS
2" 10" S S
PT 6 6 2) TO BE LOCATED AT A SAFE DISTANCE FROM 100 R 301.
14"x10"
PV 3100 UZLC UZV UZLC UZV
3) TRIPLE ECCENTRIC DISC TYPE.
14"-PG-100-2410-B5A 3100 3026 3026 3027 3027

TYPE 4A 18" 20"-PG-100-2401-B5A 4) LG TO BE VISIBLE FROM GLOBE VALVE.


B AP 20"x18" FC FC 18"x20"

MINIMIZE
MINIMIZE SAFE LOCATION 5) VALVE WITH ADJUSTABLE MECHANICAL TRAVEL STOP
3024 2"
NOTE 3 18" 18"
(LOCKABLE) FOR SETTING THE MINIMUM VALVE OPENING.

3/4"-NI-100-2404-A1A
PG NOTE 3 PG

3/4"
3/4"
3101 3102
A1A 6) REFER P&ID: A747-79-41-100-1193 FOR ANALYSER DETAILS.
AT B5A
3023 IN VIEW 3/4"

12"-PG-100-2411-B5A
AH
AI
3023 IS
CO2
NOTE 6 30
20"-PG-100-2415-B5A

HUZY
D25D B5A
3011 S HZLO
3011 12"-PG-100-2412-D25D 12"
C 3"-PG-100-2403-D25D-IH
HIC HZLC FO
3011 3011

MIN. 10xOD
TV

2"
TO FLARE HEADER
20"-FL-100-2403-A1A 3048 1
100-1185 FF GENERAL NOTES:
LO 20"x3" FO NOTE 1 TI
3" PP AH 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
NOTE 2 3/4" TIC SPLIT RANGE 0-50% THIC 3049 20"-PG-100-2405-B28A-IP
HZV
A1A D25D 3048 3048 1 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
3011
338 P25 DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,

50-100%
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
100 R 301 PROCESS GAS

16"-PG-100-2454-B28A-IP
24"

16"-PG-100-2452-B28A-IP
TO 100 E 312
A1 24"
100 V 305
20" M1 THIC
AH
B1 TI MEDIAN 3048 2
D 100 E 311 1
3044
AL
2" LOCATE NEAR 16" 16" LOCATE NEAR
TZAH TZY
100-R-301 100-E-311-1/2
20"-PG-100-2302-B5A 20" 3044 3044 B2 B3
T1
337 P23 A1 M1 24" AH AE AE
TI MEDIAN 2oo3
WASHED GAS 3051 B1 A1 3052
2" 2" 2" 2" 3045
FROM 100 C 302 24" 20"
24"-PG-100-2402-D25D-IH

L7 L3
TZAH TZY 2" A3 A2
L5 L1 T2

2"-NI-100-2402-B5A
AT

16"-PG-100-2455-D25D-IH
2" 2" 3045 3045 AT 16" 16"
2" 2"
AH 3052
2oo3 3051
DPT DPT IS TI MEDIAN
H2 DETECTOR H2 DETECTOR
LG LZT LZT LZT 30 3046 16"-PG-100-2456-D25D-IH
3024 3025 C DPT 3025 A 3025 B AAH AAH
TZAH TZY 2" AI
M T3 AI
100 E 311 2 THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
3046 3046 3051 3052 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
AH FF
E TI 2oo3 16" 16" TI REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
MEDIAN
PERMISSION OF HALDOR TOPSOE.
IS 3047 B3 B2 3050
17 TZAH TZY 2"
T4 A1 B1
3047 3047 24" 24"
2oo3 A2 A3
16" 16"
FOR PIPING

L6 L8
D1 L4 L2
MIN.

16"-PG-100-2453-D25D-IH

16"-PG-100-2451-D25D-IH
2" 2" 2" 2" 2"
FOR PIPING
IN VIEW

MIN.

H1

2" 2" 2" 2" LZAL


IS B1
3025 FF
17 24"
12" TI
UZY UZV
LZY LZAH 3051
F 3028 3028
3025 3025
S 2oo3
24"-PG-100-2404-D25D-IH
FC, 2"

MINIMIZE
PG
UZLO
2"-PC-100-2401-B9A LY IS 3104
3028
3025 6
SAFE LOCATION
MEDIAN

3/4"-NI-100-2403-A1A
3/4"
LV

D25D
A1A
AH
NOTE 4 3025
2"X1" LIC I
B9A

FC 3025 117
1" 1" AL MIN. 10 x OD 3/4"
1"X2"
A19A

G ON-OFF
D25D

FF FF MIN. STOP
B5A

3/4"
TI TI NOTE 5
3052 2170
NOTE 2
16"-PG-100-1310-D25D-IH

16"-PG-100-2406-D25D-IH
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
A1A
A1A

PG
2"-PC-100-2402-A19A

3103

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
2"-NI-100-2401-A1A

REV. DESCRIPTION DATE DRAWN CHECK APPR.


TO MDEA PREPERATION TANK
563

336

334
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
PROCESS CONDENSATE

100-1184

100-1184

Revival of Ramagundam Fertilizer Complex Project


H 2200 MTPD Ammonia Plant SHEET SIZE UNIT
P13

100
TO 100 TV-3048 2
FROM 100 E 211
P53A

FROM HEADER

FROM HEADER
PROCESS GAS

PROCESS GAS
P13

P13
NAME

TO 100 E 211
Methanation
P24
NITROGEN

NITROGEN

Piping and instrument diagram


SIGNAL

DOCUMENT ID
335

S-03470 P42124 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 312 FINAL COOLER 100 P 311 A/B PROCESS CONDENSATE PUMP NO. 2 100 V 311 FINAL GAS SEPARATOR NOTES:
TO FLARE HEADER
100 MP 311 A/B MOTOR FOR 100 P 311 A /B 100-1185 1) 1/2" WEEP HOLE TO BE DRILLED AT VALVE DISCHARGE LOW POINT.

3"-FL-100-2502-A1A
2) DELETED.
3"-FL-100-2501-A1A
A 100-1185
TO FLARE HEADER 3) LV-3027 1/2 OPERATES IN SPLIT RANGE AS SHOWN:
SAFE LOCATION
8.5 kg/cm^2g 37.0 kg/cm^2g 37.0 kg/cm^2g 26"-FL-100-2503-A1A VALVE OPENING, %
100-1185

A1A
PSV PSV PSV
3"L4" 3109-2 1"D2" 1"D2" TO FLARE HEADER
3108 FB FB 3109-1 100
8"-PG-100-2506-A3A LO LO
NOTE 1

B5A
3"x2" 3"x2"
PV
4"x8" 3110 A B
20"-PG-100-2405-B28A-IP 3/4" 3/4" 12"x26"
3/4" 4"-WCR-100-2504-A3A 1.5"x1" 1.5"x1"

FC
12"

16"-PG-100-2507-B28A-IP FB LO
338 P24 A1A B5A
A1A B5A 3/4" 3/4"

16"-PG-100-2510-B28A-IP
PROCESS GAS 14"x12"
PIC

3"-WCR-100-2503-A3A
FROM 100 E 311 1/2 MIN. MIN. OUTPUT, %
SS

1 1/2"-PG-100-2530-B5A

1 1/2"-PG-100-2502-B5A
3110 0 50 100
B
LC LO 4) DELETED.

14"-PG-100-2503-B5A
FB FB TYPE 4A
5) MIN. FLOW DEVICE BY PUMP VENDOR.
AP PT 6) REFER P&ID: A747-79-41-100-1193 FOR ANALYSER DETAILS.
TG 12" 16" 16" 3" 3035 3110 7) TWO PHASE FLOW, ANCHOR SECURELY.
3055 B1 A2 A3 S1

100 E 312
FF GENERAL NOTES:
A1 B2 B3 TI
3056
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
12" 16" 16"

16"-PG-100-2508-B28A-IP
20"
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
16"-PG-100-2509-B28A-IP

DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,


MIN. MIN. B1 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
AP 100 V 311
C 3048

TYPE-11 NOTE-7 NOTE-7

20"-PG-100-2501-B28A 20"
A1
NOTE-7
M1 24"
2"
10"-WY-100-2501-A1A A2 A3
10" 2"
BACK FLUSH MINIMIZE MIN.
2" 2" 2" 2" AT AI
10"
LO

LO
L1 L7
A3A A1A 3036 3036
VF
10"-WCS-100-2502-A3A

L3 L5 H2
VF 2"
FO FO 2" 2" 2"
AH
1 1/2"-PC-100-2504-B9A

3035 3036 AT AI
DPT
SS NOTE-5 NOTE-5 LZT LZT LZT LG 3037 3037
D CO2+CO
3027 A 3027 B 3027 C 3026
NOTE-6
M
2"

DPT DPT
2"

2"

2" 2" 2" 2"


PG
L4 L6
3113 2"
L2 L8
B9A A9A PG 2" 2" 2"
B2
3/4"-PC-100-2511-B9A 3112

3500 mm
2"x1" 3/4" 2"
3"x2" 2"-PC-100-2503-B9A
100 P 311 A
1 1/2"-PC-100-2506-B9A

3/4"
2"-PC-100-2505-B9A

3/4"
3/4"-PC-100-2512-A9A

100 MP 311 A B9A THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL


A9A PT PIC INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E YL ML 3111 3111 REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
3013 A 3013 A
M PERMISSION OF HALDOR TOPSOE.

AUTOSTART LZAL LZAH LZY


OWS FF
3027 3027 3027 FT
2oo3
UZY IS 3037

1 1/2"-PC-100-2501-B9A
PG

2"-PC-100-2508-B9A
3030 A 316
3115
FI
B9A A9A PG
3037 PG
3/4"-PC-100-2513-B9A 3114
3116
2"x1" 3/4"
2"-PC-100-2507-B9A 3"x2" IS IS LY
100 P 311 B 316 6 3027
3/4"

F 3/4"

MEDIAN
IS
3/4"-PC-100-2514-A9A

100 MP 311 B B9A 431 SIL-2


A9A
YL ML
3013 B 3013 B
M I LIC
AH

316 3027
LV AUTOSTART
OWS AL
3027 1
1"x2"

50-100% 3/4"
3/4" UZY IS NOTE 3
3030 B 316 1.5"x1"
FC

1"
8"-PG-100-2450-B5A-IE

FC
NOTE 3

1"
2"x1" 0-50%
589 P24 IS 3/4"

1.5"x1"

NO POCKETS
LV 316
EXCESS GAS
B5A B28A
FROM 100 C 302 UV UY 3027 2
G 3/4"
3031 3031
1 1/2"
B9A
FC

FC

2"
8"-PG-100-2504-B28A-IE

1 1/2"-PC-100-2502-A9A
12"-WCR-100-2501-A3A

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
12"-WCS-100-2501-A3A

A9A

20"-PG-100-2505-B5A
UZV UZY

3"-HG-100-2501-B5A
2"-PC-100-2510-B9A

2"-PC-100-6301-B9A

2"-PC-100-2902-B9A
3032 3032

I I
316 106
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
486

300

651

532

627

248
UNSTRIPPED CONDENSATE

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


K.O. DRUM CONDENSATE

TO H2 RECYCLE SYSTEM
PROCESS CONDENSATE

PROCESS CONDENSATE
100-1182

Revival of Ramagundam Fertilizer Complex Project


H 2200 MTPD Ammonia Plant
100-1182

P29C
P63A

GAS COMPRESSOR
SHEET SIZE UNIT
FROM 100 K 431 1/2
EXCESS SYNGAS

100
COOLING WATER

COOLING WATER
TO FUEL MIXING

FROM 100 V 509

P63C
P63A

TO SYNTHESIS
FROM HEADER
P01

P16

P67

P55
RECYCLE GAS
MAKE-UP GAS
NAME
TO 100 V 304

TO 100 V 434
TO 100 T 604

Final gas separation


Piping and instrument diagram
P25
RETURN

SIGNAL
DOCUMENT ID
218

463

S-03470 P42125 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 R 501 AMMONIA CONVERTER NO. 1 100 H 501 START-UP HEATER NOTES:

1) VALVE WITH ADJUSTABLE MECHANICAL TRAVEL STOP


(LOCKABLE) FOR SETTING THE MINIMUM VALVE OPENING.
MIN. VALVE OPENING SHALL CORRESPOND TO 10% OF VALVE Cv .

A T2 T3, T4 T1
100 R 501 2) GLOBE VALVE TO BE EQUIPPED WITH GEAR.
TOP
3) TZY-5029 CALCULATES TRIP SETPOINT FOR TZAH-5029 BASED ON
TI LOCATE NEAR SIGNAL FROM PZT-5004.
START-UP HEATER
5004
AE 4) SU HEATER OUTLET LINE DESIGN TEMPERATURE:
14"-SG-100-2602-F25E-IH
TI
A4 5081
5005 14"
TI
5006 3/4" AT
FF
NOTE 6 FF AH NOTE 4 5081 EIL SCOPE
TI TI TIC
PP 5) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
5007 FF FF FF 5003 5002 TZAH IS
H2 DETECTOR
IS
REFORMER
AL AL CONTRACTOR VENDOR SCOPE.
5029 501 AAH 501
TI TI TI TI NOTE 6 AI SCOPE 6) SUPPLIED BY HTAS.
B 5008 5016 5017 5018 5081 (NOTE 5)
AH NOTE 3
TIC TI FF FF
TI TI AH
5002 5009 NOTE 6 TZY TI UZY XL
5004 5010
AL FF AH
5029 5029 TI 5001 5001
FF FF 5030 HTP
BOTTOM TI TI 002
NOTE 6 14"-SG-100-2605-F25E-IH EIL HPIP
5005 5011

MIN. DISTANCE
T1 PDI

3000 mm
FF FF 5005 GENERAL NOTES:
TI TI AL
NOTE 6 NOTE 4 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
T3 5006 5012 100 H 501
FF
IS PDZAL PDZT PDT PDI
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,

F25E
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
C FF FF 501 5005 5005 5006 5006
T4 TI TI AL REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
NOTE 6
5007 5013

FO
HTP

F25D
T2
FF FF FF
14" 001
FF
FF FF TI TI TI TV EIL HPIP FOR HEATER SECTION REFER P&ID
TI TI 5010-FD-801, 802 & 4008
NOTE 6 5019 5020 5021 5002 14"-SG-100-2607-F25D-IH
5008 5014

TOP FF FF
NOTE 2
TI TI HTP HTP
NOTE 6 04 05
5009 5015
LOCATE NEAR HPIP
TI
LOCATE NEAR 100-R-501/E-554-1/2 HTP 2"x1.1/2"
TI 100-R-501 03
5010 5003 AE EIL
AL AE
2603
TI 5074
5011
D
TI AT

14"-SG-100-2601-F25D-IH
AT
5012 FF FF FF 2603
5074
TI TI TI TI NH3 DETECTOR
H2 DETECTOR
5013 5022 5023 5024 AAH
AAH AI
TI AI
2603
5014 5074

TI
5015

BOTTOM FF FF
TI TI THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
5025 5026 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E PP REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
A1 A2
MIN. FOR PIPING

FF AH PERMISSION OF HALDOR TOPSOE.


TI
3/4"
14" 14"
5028
FF
TI 24"-SG-100-2606-G25M-IH
B1 340 P27A
5027 24"
SYNTHESIS GAS TO 100 E 500
A3
1"

14"
LOW POINT HIC
AE
DRAIN 5002
5075
PP
FF
HV
3/4"

F 5002 AT
5075
H2 DETECTOR
FO
14" AAH
AI
14"-SG-100-2604-F25D-IH

PZY PI
5075
5004 5004

HIC
PZT PG
5001
5004 5003
PP
FF FF AH
HV TIC
3/4"

5001 5031
AL
18"-SG-100-2603-F25D-IH
G
PG FO
5007 18" 18"-SG-100-2608-F25D-IH
1 1/2"

MIN. STOP
NOTE 1
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

24"-SG-100-2801-F25D

3"-SL-100-6180-A2A-IH

2"-AI-100-2601-A23K
N2

3"-FG-100-0955-A1A
2"-SA-100-2601-A1A

2"-NI-100-2601-A1A

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.

FUEL GAS FROM 100 TX 201 A/B


586
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
100-1184

Revival of Ramagundam Fertilizer Complex Project

100-1184
H 2200 MTPD Ammonia Plant
1184

P09B
SHEET SIZE UNIT

P-61
P28
100

INSTRUMENT AIR
SYNTHESIS GAS
FROM 100 E 503

P27B
FROM HEADER

FROM HEADER
SERVICE AIR

NAME
Ammonia synthesis, Part 1

TO TV-5031
NITROGEN

P26

LP STEAM
Piping and instrument diagram

SIGNAL
DOCUMENT ID
341

339
100

S-03470 P42126 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 500 LOOP WASTE HEAT BOILER NO. 1 100 R 502 AMMONIA CONVERTER NO. 2 NOTES:

1) PROVIDED WITH MECHANICAL MINIMUM STOP.

2) INTERMITTENT BLOW DOWN PIPING IS CRITICAL PIPING.


TO BE DESIGNED FOR ACCELERATING LIQUID.
A PROVIDE ADEQUATE SUPPORT FOR TWO PHASE FLOW.
24"-SG-100-2703-F25M-IH
3) DESIGN TEMPERATURE NEAR MIXING POINT UPTO 10 x OD
133 P27B
SHOULD BE SIMILAR TO HOT FLUID DESIGN TEMPERATURE.
SYNTHESIS GAS
TO 100 E 501 4) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
SCOPE OF REFORMER CONTRACTOR.
8"-SG-100-2752-F25D-IH

100 R 502
B3 B2 10"-SG-100-2705-F25D-IH
B 135 P27B
8" 8"
SYNTHESIS GAS
TO 100 E 503

FF FF FF LOCATE NEAR
EIL/OTHER'S SCOPE AH 100-R-502
TI TI TI AE
REFORMER CONTRACTOR SCOPE 5041 5042 5043 5076
(NOTE 4)
24"-SG-100-2606-G25M-IH GENERAL NOTES:
340 P26 AT 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
FF FF FF
SYNTHESIS GAS 5076
FROM 100 R 501 TI TI TI PDT PDI
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
H2 DETECTOR DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
C 5044 5045 5046 5010 5010
FF AL AAH
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
AI
100 E 500 5076
24"
B2 FF FF FF
A1
TI TI TI
5047 5048 5049

B1 A2 D1 FF
FF
24" 2" TI TI
FF 5039 5050
12"-SG-100-2701-G25M-IH

24"-SG-100-2751-G25M-IH

PP
2"-BB-100-2701-F22A-IH

FF A3 A2 10"-SG-100-2706-F25D-IH
TI
AH P27B 136
5036 TI 8" 8"
SYNTHESIS GAS
5038

MIN. FOR PIPING


FF FROM 100 E 502

3/4"
D
HIC TI
MINIMIZE

5005 B1 5040
24" A1
DOWNCOMERS

1"
NO POCKETS
24"
3"x2"

RISERS
FO

24"
NOTE 1 LOW POINT
FF HV HV DRAIN
12" 5005 5006
FL/DO
3"-SM-100-1310-F22A-IH

8"-SG-100-2753-F25D-IH
H"
NOTE 3
MIN. 10 x OD

TV TYPE 8 THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL


5037 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
AP
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
G25M

5002
AH PP PERMISSION OF HALDOR TOPSOE.
TIC
5037
F25E

AL

3/4"
24"-SG-100-2702-F25E-IH

1"
LOW POINT
AH
TI DRAIN
5151
AL
F FF

3/4"

BOTTOM TOP TOP BOTTOM


TI TI TI TI TI TI
5043 5042 5041 5044 5045 5046
F22A

NOTE 2
D2A

G
TI TI TI
5050 5039 5040
TYPE-10 AP
3"-BB-100-2702-F22A-IH

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
3"-SM-100-1309-D2A-IH

5060

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
490

134
INTERMITTENT BLOW DOWN

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
TOP BOTTOM
H TI TI TI 2200 MTPD Ammonia Plant
SHEET SIZE UNIT
P12

P13

5047 5048 5049 100


HEATING STEAM
FROM 100 V 201
BOILER WATER

P56

P12
FROM TV-2110

NAME
TO 100 V 702

TO 100 V 201

Ammonia synthesis, Part 2


P27A
HP STEAM

Piping and instrument diagram


DOCUMENT ID
132

660

S-03470 P42127-A 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 501 LOOP WASTE HEAT BOILER NO. 2 100 E 502 LOOP BFW PREHEATER NOTES:

1) INTERMITTENT BLOW DOWN PIPING IS CRITICAL PIPING AND ITS


SUPPORTS TO BE DESIGNED FOR ACCELERATING LIQUID.

2) DESIGN TEMPERATURE NEAR MIXING POINT UPTO A MIN. 10 OD


A LENGTH SHOULD BE SIMILAR TO HOT FLUID DESIGN TEMPERATURE.
10"-SG-100-2705-F25D-IH 3) MANHOLE NOZZLE ID = 500 MM.
135 P27A
4) HV-5010 SHALL BE PROVIDED WITH MECHANICAL LOCK FOR
SYNTHESIS GAS LIMITING MAXIMUM OPENING.
FROM 100 R 502
5) ALL ITEMS SHOWN INSIDE PACKAGE VENDOR B/L ARE IN THE
EIL SCOPE SCOPE OF REFORMER CONTRACTOR.
PP
REFORMER CONTRACTOR SCOPE
(NOTE 5)
VF

3/4"
24"-SG-100-2703-F25M-IH
133 P27A
SYNTHESIS GAS
B FROM 100 R 502

100 E 501 100 E 502 AH FF


24" 24" 8" TI TI
B2 A1 B2 5058 5059
A1 NOTE-3 FF
M1
TYPE 2A

B1 A2 D1 B1 A2 AP GENERAL NOTES:
24" 2" 24" 8" 5005 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,

2"-BB-100-2704-F22A-IH
FF FF AH FF
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
TI TI TI
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
5056 5057 2171

24"-SG-100-2704-F25E-IH
MINIMIZE

24"-SG-100-2707-F25D-IH
HV

3"-SM-100-1351-F22A-IH
5009

H"

FF
HIC
5010
D
FF
10"-SG-100-2706-F25D-IH
HV
P27A 136
5010 24"-SG-100-2750-F25E-IH
SYNTHESIS GAS
TO 100 R 502 24" NOTE 2 24"-SG-100-2709-F25D-IH
437 P28
FC
MAX. STOP F25D F25E F25E F25D SYNTHESIS GAS
TO 100 E 503
NOTE-4
MIN. 10 x OD MIN. 10 x OD
24"-SG-100-2708-F25D-IH
3/4"
DOWNCOMERS

FF
NO POCKETS

TV THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL


5031
RISERS

INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND


E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN

FL/DO
PERMISSION OF HALDOR TOPSOE.
F22A

12"
D2A

12"-SG-100-2720-F25E-IH

NOTE 1

TYPE 10
AP
5061

G
3"-BB-100-2705-F22A-IH

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
3"-SM-100-1350-D2A-IH

8"-BF-100-1402-F2A-IH

8"-BF-100-2701-F2A-IH
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
488

289

170
INTERMITTENT BLOW DOWN

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
H
BOILER FEED WATER

2200 MTPD Ammonia Plant


FROM 100 E 212 1/2/3

SHEET SIZE UNIT


P12

P13

P14

P26
FROM 100 TV 2110

100
HEATING STEAM
FROM 100 V 201

FROM TIC-5031
P56

P12

P14

NAME
TO 100 V 201

TO 100 V 201 Ammonia synthesis, Part 3


P27B
HP STEAM

Piping and instrument diagram


SIGNAL

DOCUMENT ID
291

661

169

586

S-03470 P42127-B 1
BF

BF

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 503 HOT HEAT EXCHANGER 100 E 504 WATER COOLER 100 E 505 1st COLD EXCHANGER NOTES:

SAFE LOCATION 1) WARNING NOTE:


8.5 kg/cm^2g
WHEN MAKING HYDROSTATIC TEST OF PIPING NOTE THAT
PSV EXCHANGERS 100 E 503 AND 100 E 505 ARE DESIGNED FOR
4"N6"
5015 DIFFERENTIAL PRESSURE ONLY.
A 10"-SG-100-2805-A3A
FF 6"x10"
2) AUTOMATIC MANIFOLD.
TI NOTE 3
8"x4"
5062 4"-WCR-100-2804-A3A 3) 1/2" WEEP HOLE TO BE DRILLED AT VALVE DISCHARGE LOW POINT.
24"-SG-100-2802-F5A- 3/4"

FB LO
4) TO BE PROVIDE WITH INSTRUMENTA AIR BUFFER TANK SO THAT THE
VALVES ARE OPERABLE DURING EMERGENCY EVEN AFTER FAILURE
OF INSTRUMENT AIR SUPPLY.

8"-WCR-100-2803-A3A
SS
AP
TYPE 8 PP 5) VALVE SHOULD BE LOCATED IN FIRE SAFE LOCATION.
5008
3/4"
6) DELETED.

24"x26"
7) REFER P&ID: A747-79-41-100-1191 FOR ANALYSER DETAILS.
24" 24" 8" 8) TWO PHASE FLOW, ANCHOR SECURELY.
B B1 A2 S1

TG
5063 100 E 504
B2 A1
PP
24" 24"

24"x26"
FF
TI
5064

3/4"
24"-SG-100-2803-F5A

NOTE-8

24" 24" 100 E 505


NOTE 1 100 E 503 AP
NOTE 1
C B1 A1
5055
16"-SG-100-2819-F5A 16"-SG-100-2816-F5A 16"-SG-100-2814-F5A
16"-SG-100-2820-F5A
TYPE-11 GENERAL NOTES:
16" 16"
A3 A2 B2 B3 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
16" 16"
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

TYPE 8
B2 B3
24"-SG-100-2910-F5A-IC
16" 16" AP
16"-SG-100-2817-F25D-IH

A2 A3 P29A 492
16"-SG-100-2818-F25D-IH 5009 16" 16"
D SYNTHESIS GAS
FROM 100 E 507
FF 16"-SG-100-2813-F5A-IC 16"-SG-100-2815-F5A-IC
A1 TI B1
24" 5065 24"

TYPE 8 PP
FF
AP
NOTE 2 TI

3/4"
5013 PP PP
FF AT AT AT IS 5066
3/4" 3/4"
AH
5010 5011 5012 50 24"-SG-100-2804-F5A-IS
TI
174 P29A
5061 HUZY
10"-WCS-100-2806-A3A NOTE-8 SYNTHESIS GAS
24"-SG-100-2709-F25D-IH BACK FLUSH 5013 S TO 100 E 506
AI AI AI HZLO THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
437 P27B
5010 5011 5012 5013 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
SYNTHESIS GAS NH3 H2 CH4 10"
E FROM 100 E 502 HIC HZLC REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
NOTE-7
PERMISSION OF HALDOR TOPSOE.
5013 5013 F5A A1A
6"-SG-100-2812-F5A LO

SS FO 6"x18"

3/4"
6"
FSO
PP
HZV NOTE 4, 5 5002
3/4"
5013

HUY
FF 5012

TI HS
S
F 7002 5012

HV

3/4"
5012
FF
2"-SG-100-2811-F5A FC
PV
2"

2"
5014
2"x1.1/2" 1.1/2" 1.1/2"x2" 1"x2"
FT FI

FC
1"
7003 7003
2"x1"
FF

3/4"
PIC

F5A
5014

G FF

D5A
PT
5014
24"-SG-100-2801-F25D-IH

26"-WCR-100-2802-A3A

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
26"-WCS-100-2801-A3A

18"-AG-100-2801-A1A
24"-SG-100-6302-F5A

24"-SG-100-2810-F5A

2"-HG-100-2801-D5A
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
341

246
537

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


100-1182

Revival of Ramagundam Fertilizer Complex Project


H

FLARE DISTRIBUTION
2200 MTPD Ammonia Plant
100-1182
P63B

P30B

SHEET SIZE UNIT


FROM 100 K 431 1/2

100
SAMPLE STREAM

COOLING WATER

COOLING WATER
SYNTHESIS GAS

SYNTHESIS GAS

SYNTHESIS GAS
TO 100 K 431 1/2

P39A
P63B
P26

P55
RECYCLE GAS

TO AMMONIA
TO 100 R 501

NAME
PURGE GAS

TO HEADER
Ammonia synthesis, Part 4
P28
RETURN

Piping and instrument diagram


SUPPLY

DOCUMENT ID
539

189

S-03470 P42128 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 507 2nd COLD EXCHANGER 100 E 506 1st AMMONIA CHILLER NOTES:

1) WHEN MAKING HYDROSTATIC TEST OF PIPING


NOTE THAT EXCHANGER 100 E 507 ARE DESIGNED FOR
16"-AG-100-2903-A4A DIFFERENTIAL PRESSURE ONLY.
P39A

A TO AMMONIA FLARE DISTRIBUTION


2) VAPOUR GATHERING DEVICE.
24"-SG-100-2804-F5A-IS 4"-AG-100-2956-A4A 3) MANHOLE NOZZLE ID = 500 mm.
174 P28 P39A
SYNTHESIS GAS TO AMMONIA 4) TWO PHASE FLOW, ANCHOR SECURELY.
FROM 100 E 505 LOCATE NEAR FLARE DISTRIBUTION
100-E-506
AE
25.0 kg/cm^2g 5083
4"M6"
PSV 3/4"

FB LO
5021
6"x16" AT
5083
8"x4" NH3 DETECTOR

4"-AG-100-2956-A4A
B1A A4A AAH
B
AI
AH 3/4"

8"-AG-100-2901-B1A-IC FB LO
PI 5083
5020

FF
PG PT A4A
5019 5020 B1A

2"
2"
2"
8" 16" 10"
GENERAL NOTES:
P1 P2 S1 V1 B2 A2
NOTE 2 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.

10"-AL-100-2901-B1A-IC
L1 L3 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
3" 3" 3" 2" 2" DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
100 E 506 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
C 24"
AH FF
A1 LIC LT LG
5002 5002 5001
AL M

NOTE 3 M1 FF
TI
L2 L4 T1
3" 3" 2" 2" 2" 5072
3"
B1 D1 B3
24" 2" 8"
PP

LC
FF
TI
3/4" 3/4"

LC
5069 B1A
A4A
24"-SG-100-2901-F5A-IC
D
PP
NOTE-4 3/4"
FF NOTE 1 24"

TI A1 4"x10"
5070 100 E 507 4" 4"
3/4"

FC
24"-SG-100-2910-F5A-IC 16"-SG-100-2921-F5A-IC FF 10"x4"
P28 492 B2 B3 LV
16" 16"
SYNTHESIS GAS 5002
TO 100 E 505 3/4"

16"-SG-100-2923-F5A-IC
16"-SG-100-2922-F5A-IC
8"-AL-100-2906-B1A-IC 8"-AL-100-2908-B1A-IC
188 P29B THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
LIQUID AMMONIA INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
A2 A3 TO 100 E 508
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
16"-SG-100-2924-F5A-IC 16" 16"
PERMISSION OF HALDOR TOPSOE.
2"-AL-100-2905-A4A
B1 P39B
24" TO AMMONIA
FLARE DISTRIBUTION

PP
FF

TI
F 5071
3/4"

NOTE-4 24"-SG-100-2902-F5A-IC
180 P29B
DETAIL A SYNTHESIS GAS
TO 100 E 508

CAP

EQUAL TEE
1000

DETAIL A
G

16"-AG-100-2907-B1A-IC
24"-SG-100-3001-F5A-IC

10"-AL-100-3120-B1A-IC

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
6"-SG-100-2905-F5A-IC

2"-AL-100-2950-B1A-IC

2"-AL-100-3401-B1A-IC

12"-SG-100-2920-F5A
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
177

493

450

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant
GASEOUS AMMONIA

P29C
P30B

SHEET SIZE UNIT


P31

P34
100
LIQUID AMMONIA

LIQUID AMMONIA

LIQUID AMMONIA
SYNTHESIS GAS
FROM 100 V 501

FROM 100 E 512

FROM 100 V 505

FROM 100 V 509


P29C
P30A

P40

MAKE-UP GAS
NAME
TO 100 E 514

TO 100 E 509

TO 100 V 508
PURGE GAS

Ammonia synthesis, Part 5


Piping and instrument diagram
P29A
DOCUMENT ID
453

175

173

451
S-03470 P42129-A 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 508 2nd AMMONIA CHILLER NOTES:

1) FLOW ORIFICE TO BE LOCATED AS LOW AS POSSIBLE


RELATIVE TO 100 E 508.

A 2) MANHOLE NOZZLE ID = 500 mm.


8"-AL-100-2908-B1A-IC
3) VAPOUR GATHERING DEVICE.
188 P29A
LIQUID AMMONIA 4) TWO PHASE FLOW, ANCHOR SECURELY.
FROM 100 E 506

12"-AG-100-2926-A4A 4"-AG-100-2957-A4A
P39A P39A
TO AMMONIA TO AMMONIA
B FLARE DISTRIBUTION FLARE DISTRIBUTION GENERAL NOTES:
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

4"-AG-100-2957-A4A
FF
3/4" LV
LOCATE NEAR
5006
100-E-508
FC AE
8" 8"
5084
8"x10"

FB LO
C 25.0 kg/cm^2g
3/4"
3/4" AT
PSV 5084
4"N6"
5024 NH3 DETECTOR

10"-AL-100-2927-B1A-IC
6"x12"
AH AAH
AI
PIC
6"x4" 5084
3/4" 5025

A4A
AL
A4A B1A

FB LO
LC PT PG

B1A
5025 5026
FF 8"-AG-100-2925-B1A-IC
LC
TI
5075 8" 2" 2" 2" 20" 10"
3/4"

24"-SG-100-2902-F5A-IC S1 V1 P1 P2 B2 A2
D 180 P29A NOTE 3
SYNTHESIS GAS L3 L1
FROM 100 E 507 2" 3"
2" 3" 3"
100 E 508 24"
AH
A1 LG LT LIC
FF
5005 5006 5006
M AL

NOTE 2 M1
TI
L4 L2 T1
2" 3" 2" 5076
2" 3" 3"
B1 FF
D1 B3
24" 2" 3"
THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND

LC
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN

3"-AL-100-2928-B1A-IC
PERMISSION OF HALDOR TOPSOE.

LC
B1A
A4A

2"-AL-100-2929-A4A
P39B
TO AMMONIA
FLARE DISTRIBUTION

F NOTE 1

FT
5005

FIC
B1A

5005
3/4"

3" 3"
B4A

FC
3"x8"
FV
G
5005
3/4"

20"-AG-100-2950-B1A-IC
24"-SG-100-2903-F5A-IC

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

6"-AG-100-3001-B1A-IC
3"-AL-100-2926-B1A-IC

8"-AL-100-2930-B4A-IC
NOTE-4

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
186

223

197

184

183
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
Revival of Ramagundam Fertilizer Complex Project
H 2200 MTPD Ammonia Plant

GASEOUS AMMONIA

GASEOUS AMMONIA
P30A
SHEET SIZE UNIT
P33

100
LIQUID AMMONIA

LIQUID AMMONIA
SYNTHESIS GAS

FROM 100 E 514


P30A

P64B

P30B

FROM LIC-5035
P32

P40
NAME
TO 100 E 514

TO 100 K 441

TO 100 V 501

TO 100 V 503

TO 100 V 507
Ammonia synthesis, Part 6
Piping and instrument diagram
P29B
SIGNAL

SIGNAL

DOCUMENT ID
178

185
S-03470 P42129-B 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 509 MAKE-UP GAS CHILLER 100 V 509 MAKE-UP GAS SEPARATOR NOTES:

1) HALF OPEN PIPE DEVICE.

25.0 kg/cm^2g 2) MANHOLE NOZZLE ID = 500 mm.


PSV
A 4"N6" 3) VAPOUR GATHERING DEVICE.
5030

6"X14"
3/4"
14"-AG-100-2955-A4A
LOCATE NEAR
P39A 100-E-509
TO AMMONIA 6"X4"
FLARE DISTRIBUTION AE
A4A B1A
5089
P39A
TO AMMONIA 3/4"
FLARE DISTRIBUTION FBLO AT

2"-AG-100-2958-A4A
5089
NH3 DETECTOR

3"-AL-100-2951-B1A-IC AAH GENERAL NOTES:


AI
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.

6"-AG-100-2952-B1A-IC
5089
B 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,

A4A
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
PG

2"
B1A
5029

LC
FF

2"
3" 6" 2" TI
3/4"
FF
A2 B2 P1 V1 S1
100 E 509 7003
AH
LV TI
NOTE 3
5010 2" 6" 5080
1"x3" L1 L3 FF
3" 3"
FC
1"

1" 12"
2"x1" AH FF
LIC LT LG A1
5010 5010 5009
C 3/4" 12"
AL M
B1
100 V 509
FF M1 NOTE 2
TI
T1 L2 L4
5079 2" 3" 3" 2"
D1 B1
2" 12"
Down 12"-SG-100-2915-F5A-IC

LC
A1
12" I I
B1A

LC 2" NOTE 1 107 508


L3
2"
2"
A4A

L1
L5 2"
2"
D AH
I LZT LG LT LIC
107 5013 5011 5012 5012
M DPT AL
DPT 2"
L6

FOR PIPING
2"
L4 B2 L2

MIN.
2"-AL-100-2953-A4A
2" 2" 2"
P39B 494
AH 2"
TO AMMONIA LZAL LI
FLARE DISTRIBUTION
5013 5013
AL

THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL


INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND

2"-PC-100-2901-F1A
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
PERMISSION OF HALDOR TOPSOE.
IS
508

3/4"

2"x1"
1"

FC
1"
F
1"x2"
LV
3/4" 5012

IS IS
7 508

UZV
UZY
5003
5003

F1A

FC
2"

B9A
UZLC
G
5003

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
3/4"
6"-AG-100-2951-B1A-IC

2"-AL-100-2950-B1A-IC

12"-SG-100-6301-F5A

12"-SG-100-2920-F5A
2"-PC-100-2902-B9A
1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
460

463

451
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
PROCESS CONDENSATE

Revival of Ramagundam Fertilizer Complex Project


H 2200 MTPD Ammonia Plant
GASEOUS AMMONIA

P29A

P63B

SHEET SIZE UNIT


100
LIQUID AMMONIA
FROM 100 E 512

FROM 100 K 431

P29A
P40

P25
MAKE-UP GAS

MAKE-UP GAS
NAME
TO 100 V 508

TO 100 V 311

TO 100 E 508
Ammonia synthesis, Part 7
Piping and instrument diagram
P29C
DOCUMENT ID
493

536

S-03470 P42129-C 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 514 PURGE GAS CHILLER 100 V 514 PURGE GAS SEPARATOR NOTES:

1) DELETED.

2) VAPOUR GATHERING DEVICE.

P39A
TO AMMONIA
FLARE DISTRIBUTION

P39A
TO AMMONIA
FLARE DISTRIBUTION

8"-AG-100-3002-A4A
B
GENERAL NOTES:
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
LOCATE NEAR DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
100-E-514 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
AE 195 P30B
5090 TO FIC-5016
FBLO

3/4" 3/4" PI
LV AT 195 P30B
5135
5016 5090 TO FIC-5016
FF 3"x1"
25.0 kg/cm^2g NH3 DETECTOR
FC
1" 1" PP
C 1"x3"
PSV AAH PT
4"L6" AI AH
5034 TI 5135
5090

4"-AG-100-3056-A4A
5085
3/4"

3/4"
6"-SG-100-3005-F5A-IS
195 P30B
3/4"
PURGE GAS
B1A
3"-AL-100-3006-B1A-IC

A4A TO 100 C 551

A4A
FBLO

4"-AG-100-3004-B1A-IC
LC

B1A

Up
PG
5033
LC

3" 6" 2" 2"


D
A2 B2 P1 V1 S1 6" 100 V 514
NOTE 2
4" PP B1
L1 L3
100 E 514
3" 2" TI

3/4"
3" 3" 2" FF
5084
AH
LIC LT LG 6"
FF A1
5016 5016 5015
AL M
L3 L1
TI 2" 2" 3" 3"
T1 L2 L4 Down
3"
5083 2" 3" 2" 6"-SG-100-3004-F5A-IC
FF 3" 3" 2"
B1 A1
D1 6" 6" THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
2" INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
LC

AH PERMISSION OF HALDOR TOPSOE.


MIN. IN VIEW LG LT LI
B1A

FF
STOP 5017 5018
LC

5018
M
A4A

B2

2" L4

MIN. 6500 mm BOTTOM (T-T)


2" L2
3" 3"

2"-AL-100-3005-F5A-IC
196 P30B
AMMONIA DRAIN
TO 100 V 501

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
6"-AG-100-3001-B1A-IC

6"-SG-100-2905-F5A-IC
3"-AL-100-2926-B1A-IC

2"-AL-100-3007-A4A

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
185

Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


Revival of Ramagundam Fertilizer Complex Project
H
FLARE DISTRIBUTION

2200 MTPD Ammonia Plant


GASEOUS AMMONIA

P29B

P29A

SHEET SIZE UNIT


100
LIQUID AMMONIA
FROM 100 E 506

FROM 100 E 507


P29B

P39B
TO AMMONIA

NAME
TO 100 V 507

PURGE GAS

Ammonia synthesis, Part 8


Piping and instrument diagram
P30A
DOCUMENT ID
186

177

S-03470 P42130-A 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 V 501 AMMONIA SEPARATOR NOTES:

1) THREE POSITION SWITCH.


EACH VALVE MAY BE USED SEPARATELY OR BOTH
SIMULTANEOUSLY.

A 2) IRRESPECTIVE OF PREVIOUS CONTROLLER MODES I-554


FORCES FHIC-5009 1 TO "MANUAL" WITH AN OUTPUT OF 0%
AND FHIC-5009 2 TO "REMOTE" RECEIVING ITS SET POINT
12"-AG-100-3025-A4A FROM FIC-5009.

3) NOZZLE ID = 500 mm.


3/4"
FV 4) TWO PHASE FLOW, ANCHOR SECURELY.

3"x12"
A4A
5009 2
3"x12"
FC
3" 3"

F5A
CLOSE
I FHIC I
NOTE 2
107 5009 2 554
3/4"

50-100%
B

FT FIC SPLIT RANGE 0-50% FHIC FY FIC FT


5009 5009 5009 1 5009 LOW 5016 5016
FROM TI-5085 SELECTOR
195 P30A

195 P30A GENERAL NOTES:


FROM PI-5135 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
FV
3"-SG-100-3010-F5A-IS 5009 1 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
FC DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
6"-SG-100-3005-F5A-IS
195 P30A REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
6"x4" 4" 4"x6"

3/4"

3/4"
PURGE GAS
FROM 100 V 514
PP
C
FF AH
TYPE 8 6"x4" 4" 4"x6"
TI
AP 5088 6"-SG-100-3011-F5A-IS 6"-SG-100-3012-F5A-IS

3/4"
5017
HV
5016

24" NOTE 3
B1
100 V 501
M1

PP
IS IS
7 507
D LOCATE NEAR
100-V-501
3/4"

AE
A1
24" 5087
LZAH LZAL
L1 L5
3" 3" 5021 5021
3" 3" 3" 3"

L3 AT
3" 3" 3" 5087
LZY LY MEDIAN NH3 DETECTOR
5021 5021 AAH
AI
2oo3
AH 5087
LZT LZT LZT LIC I THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
5021 A 5021 B 5021 C 5021 507 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E AL
REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
PERMISSION OF HALDOR TOPSOE.

UZY
2"-AL-100-3005-F5A-IC A2 5004
196 P30A L4
2" 3" 3" IS
AMMONIA DRAIN 3"
S
FROM 100 V 514 507
L2 L6
3" 3" 3" 3" UZLC UZV
3" 3"
B2 5004 5004
6"
6"-AL-100-3001-F1A-IC
NOTE 1
D1 FC LHS
6"
2" 5021

F
IS IS
507 507
IN VIEW LI
5021 LUZY LUZY

1"
5021 1 S S 5021 2

2"-AL-100-3003-F1A-IC
LZLC LZLC
5021 1 5021 2
FC FC

6" 6"

LZV LZV
G 5021 1 5021 2
6"-AL-100-3002-F1A-IC
193 P31
PROD. AMMONIA
TO 100 V 502
24"-SG-100-2903-F5A-IC

24"-SG-100-3001-F5A-IC

Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,

6"-SG-100-3015-F5A-IS

12"-AG-100-3025-A4A
2"-AL-100-3004-A4A
NOTE 4

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
189

453

192
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
Revival of Ramagundam Fertilizer Complex Project
H
FLARE DISTRIBUTION

FLARE DISTRIBUTION
2200 MTPD Ammonia Plant
P29B

SHEET SIZE UNIT


100
SAMPLE STREAM

SYNTHESIS GAS

SYNTHESIS GAS
FROM 100 E 508

P39B

P29A

P39A
P28

P35
TO AMMONIA

TO AMMONIA
TO 100 C 551
NAME
TO 100 E 507
PURGE GAS

PURGE GAS
Ammonia synthesis, Part 9
Piping and instrument diagram
P30B
DOCUMENT ID
197

S-03470 P42130-B 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 V 502 LET DOWN VESSEL 100 E 512 AMMONIA PRODUCT HEATER NOTES:

FLARE DISTRIBUTION

FLARE DISTRIBUTION

FLARE DISTRIBUTION

FLARE DISTRIBUTION
P39A

P39A

P39A

P39A
1) ORIFICE SHALL BE CHECKED FOR EXCESSIVE WEAR AT REGULAR

TO AMMONIA

TO AMMONIA

TO AMMONIA

TO AMMONIA
TURN-AROUNDS.
2) LV-5025 1/2 OPERATES IN SPILT RANGE AS SHOWN:
A P39A 3) TWO PHASE FLOW. ANCHOR SECURELY.
TO AMMONIA
FLARE DISTRIBUTION VALVE OPENING, %

B1A
TYPE 4A 1"
100

18"-AG-100-3156-A4A
18"-AG-100-3106-A4A-

18"-AG-100-3102-A4A
AP

2"
B5A
A4A
5020 1 2

2"x1"

1"x2"
3/4"

3/4"
2"
1"

A5A
A5A B5A FC

FB,LO

FB,LO

FB,LO
OUTPUT, %

2"-AG-100-3108-B5A-IC
PV 30.0 kg/cm^2g 29.0 kg/cm^2g 29.0 kg/cm^2g 0 50 100
5038
FF PSV PSV PSV
B 4"L6" 4"L6" 4"L6"
5042 3 5042 2 5042 1

4"-AG-100-3157-A4A
NOTE 1 3/4" 3/4" 3/4" 3/4" 3/4" 3/4"
PG
5037 FSO TG
AH B5A
5013 5091 A4A A4A B5A A4A B5A
6"-AL-100-3002-F1A-IC PIC

2"-AG-100-3108-B5A-IC
5038

10"-AG-100-3155-B5A-IC
10"-AG-100-3103-B5A-IC

10"-AG-100-3101-B5A-IC

A4A
LZAH IS
193 P30B AL
5025 507
PROD. AMMONIA FF
FROM 100 V 501 F1A B5A PT PG LC

B5A
5038 5039

FB,LO

FB,LO

FB,LC
6"-AL-100-3101-B5A-IC
LC
LZY LY LALL I
C 6" 2" 2" 2" 2" 5025 5025 5025 502
A1 P1 B1 S1 S2 S3 P2 V1 3" 3" 3"
2oo3 MEDIAN
L7 L1 L5
2" 3"
2" 3" 3"
100 V 502 3" 3" 3" AH
50-100%
LIC

2"-AG-100-3105-A4A
L3
5025
AL GENERAL NOTES:
LG LZT LZT LZT NOTE 2
24" M1
5024 5025 A 5025 B 5025 C
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
M 2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
LHIC I DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
L4
3" 3" 3" 5025 2 505 REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.
2" 3" 3"
2" 3"
L8 L2 L6
D1 B2 3" 3" 3" I
3" 6" 505
D
FOR PIPING

AP LUY
LC

TYPE 4A
MIN.

5021 S 5025 2
B5A

LC

FF
TI LV
A4A

5092 5025 2
FC
6"-AL-100-3102-B1A-IC 16"-AL-100-3103-B4A-IC
149 P32
6"

6"x16"
NOTE-3 LIQUID AMMONIA

3/4"

3/4"
29.0 kg/cm^2g TO 100 V 503
LOCATE NEAR
100-V-502 1"D2" 6"
PSV

6"-AL-100-3105-B1A-IC
AE 5040 1 B1A B4A THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
5085 FB,LO
2"x4" 4"-AL-100-3115-B4A-IC

NOTE-3
INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
E 148 P32
REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN

4"-AL-100-3116-B4A-IC
LO 29.0 kg/cm^2g

0-50%
3"x1" LIQUID AMMONIA PERMISSION OF HALDOR TOPSOE.
3/4"

FB,LO
AT PSV TO 100V 503
3/4" 1"D2"
5085 B1A B4A 5040 2

FB,LO
NH3 DETECTOR 2"x4" 25.0 kg/cm^2g
4"-AL-100-3155-B4A-IC
AAH

3"-AL-100-3108-B1A
I PSV

FB,LO
AI 3"x1" 1"E2"
502 3/4" 5041
5085 FI
5014 3/4" B1A B4A 2"x4"
FF
1 1/2"x1" 3/4"
LHIC 3"-AL-100-3154-B1A 3/4"
B1A B4A

FB,LO
3/4" 5025 1
FB,LC
I 1 1/2"-AL-100-3156-B1A
S
F 502
6" 6" FF AH A4A
FC
LUY TIC TG B1A

LC
LV 5025 1 5093 5094
AL
5025 1

LC
3/4"
6" 10" 2"
100 E 512
B1 A2 V1

3/4"

FO
4"
D1 B2 A1
FF
TV 4"-AL-100-3110-B1A-IC 2" 10" 6"
5093 TI

LC
5095
G FF

LC
B1A
6"-AL-100-3106-B1A-IC A4A

NOTE-3 AP
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
2"-AG-100-3107-A5A-IS

6"-AL-100-3107-B1A-IC

10"-AL-100-3304-B1A-
5022
2"-AG-100-3801-B1A-

2"-AL-100-3145-A4A-

10"-AL-100-3120-B1A-IC
2"-AG-100-3110-A4A

3"-AL-100-3150-A4A

2"-AL-100-3801-B1A

TYPE 4A
NOTE-3

1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS


0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
159

271

283

175
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
Revival of Ramagundam Fertilizer Complex Project
H
6"-AL-308-1703-B1A-IC
FLARE DISTRIBUTION

FLARE DISTRIBUTION

FLARE DISTRIBUTION
2200 MTPD Ammonia Plant
PRODUCT AMMONIA
FROM 100 P 553 A/B

SHEET SIZE UNIT


P38

P38

P33
308-1117

100
LIQUID AMMONIA

LIQUID AMMONIA

LIQUID AMMONIA
P39A

P39B

P39B
FROM 100 V 551

FROM 100 V 504


LET DOWN GAS

P29A
P36
TO AMMONIA

TO AMMONIA

TO AMMONIA
NAME
TO 100 C 552

TO 100 E 506
Ammonia let-down
INERT GAS

P31
TO UREA

Piping and instrument diagram


DOCUMENT ID
168

165

150
S-03470 P42131 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 V 503 FLASH VESSEL 100 P 501 A/B AMMONIA PRODUCT PUMP NOTES:

1) THERMAL RELIEF
4"-AL-100-3115-B4A-IC 100 MP 501 A /B MOTOR FOR 100 P 501 A /B
148 P31 2) PROVISION FOR FUTURE CONNECTION OF AMMONIA VAPOR FROM
LIQUID AMMONIA AMMONIA STORAGE , IF ANY.
FROM PSV-5040 AND PSV-5041
A 3) MIN. FLOW DEVICE BY PUMP VENDOR.
25.0 kg/cm^2g

PSV
1 1/2"F2"
5057
FB,LO 4"-AG-100-3202-A4A
P39A
TO AMMONIA
3/4" FLARE DISTRIBUTION GENERAL NOTES:

A4A
3/4"
1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.

FB,LO

2"

B4A
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
2"-AG-100-3203-B4A-IC
DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

B PT AH
PIC
5055 A
5055

3"-AG-100-3201-B4A-IC
AL
MEDIAN
PT PY
5055 B 5055
2oo3 AH

8"-AG-100-3210-B4A-IC
PIC
PT
5056
5055 C AL

16"
3" B1
S1

100 V 503
C

24" M1
4"x2" 4"-AL-100-3115-B4A-IC
A5
16"-AL-100-3103-B4A-IC 2" 2"-AL-100-3225-B4A-IC
149 P31 A1 3/4"
16" 3"-AL-100-3205-B4A-IC

FC
LIQUID AMMONIA A4 8"
FROM 100 V 502 3"
A3

FB,LO

FB,LO
6" PV
32.0 kg/cm^2g

B4A
LOCATE NEAR 32.0 kg/cm^2g 5055
A2 100-V-503
8" PSV PSV
6" AE 3/4"D1" 3/4"D1"

A4A
A6 5054 1 5054 2
MINIMUM NOTE-2 5086
2"-AL-100-3204-B4A-IC
D 6"-AL-100-3266-B4A-IC NOTE 1 NOTE 1 THERMAL RELIEF VALVE TO BE PLACED WHERE ISOLATION OF
3" 3" 2"
3" 2" LIQUID AMMONIA IS POSSIBLE.
L5 L7

3"-AL-100-3206-B4A-IC
AT 3/4" 3/4"
L3 L1 5086
3" 3"
3" 3" 3" 3"
NH3 DETECTOR 3/4" 3/4"

FB,LC
FB,LO
1 1/2"-AL-100-3203-B4A-IC
AAH

1 1/2"-AL-100-3224-B4A-IC
AI
LZT LZT LZT LG 5086 3/4"-AL-100-3255-B4A-IC
5030 C 5030 B 5030 A 5029
TYPE 4A
M
PG AP

LO
5050 5026
3" 3" 3" 3"
3" 3" PG 2"x3"
L4 L2 THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
5051 INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
L6 L8
E 2" REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN

5"x6"
3" 3" 3" 2" 4"x5"
VF NOTE-3 PERMISSION OF HALDOR TOPSOE.
8" 8"-AL-100-3202-B4A-IC

6"-AL-100-3210-B4A-IC
6"-AL-100-3207-B4A-IC
B2 5"
VENDOR
LZAL LZAH LZY 8"x6"
EIL
3/4"-AL-100-3265-B4A-IC

3/4"-AL-100-3252-B4A-IC
6000 mm (MIN.)

2"-AL-100-3260-B4A-IC
8"-AL-100-3201-B4A-IC

5030 5030 5030


2oo3
D1 100 P 501 A

B4A

3"-AL-100-3211-B4A-IC
2" YL ML UZY IS
M
3/4"

LC
2"
IS IS LY 5001 A 5001 A 5007 A 504
LC

A4A
504 503 5030 AUTOSTART
2"-AL-100-3251-B4A-IC

IC IC 100 MP 501 A FF
LC
MEDIAN

B4A IP IP FI
A4A 5018

B4A B4A B4A B4A LZLC


AH 3/4"-AL-100-3256-B4A-IC
F I LIC A4A A4A A4A A4A 5030 1
504 5030 LZLC LZV
PG

LO
AL 5030 2 5030 1

3"x2"
3/4"-AL-100-3254-A4A 5052 LUZY 3/4" LUZY
6" LZV FC
PG 5030 2 5030 1
2"x3"

2"x3" 2"
5030 2
3/4"-AL-100-3253-A4A

FC
5053 IS IS
TO AMMONIA 5"x6" NOTE-3 504 504
3/4" WASH PIT 4"x5" 5" VF
3/4"
100 P 501 B VENDOR

6"-AL-100-3215-B4A-IC
8"x6"
EIL
3/4"-AL-100-3263-B4A-IC
LHIC
100 MP 501 B
3/4"

3/4"-AL-100-3257-B4A-IC
LC
2"

B4A 5030 2
3/4"
A4A
YL ML UZY
UNIT 2"-AL-100-3264-A4A 5001 B 5001 B
M 5007 B
3"-AL-100-3212-B4A-IC

25-100%
G OSBL
AUTOSTART
IC
IC IP
IP IS

16"-AG-100-3236-B4A-IC
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
6"-AG-100-6420-B4A-IC

504
2"-AL-100-4001-B4A-IC

2"-AL-308-1704-B4A-IC

8"-AL-100-2930-B4A-IC

2"-AL-100-3901-B4A-IC
B4A B4A

8"-AG-100-3235-A4A
B4A B4A
3/4"-AL-100-3261-A4A A4A A4A
A4A A4A
0-25% LHIC
3/4"-AL-100-3258-B4A 5030 1
3/4"-AL-100-3262-A4A
AE LOCATE NEAR 1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
3/4"-AL-100-3259-A4A
5094 100-P-501A 0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
TO AMMONIA FLARE DISTRIBUTION

REV. DESCRIPTION DATE DRAWN CHECK APPR.

308
276

640

224
Ramagundam Fertilizer and Chemicals Ltd. (RFCL)
AMMONIA FROM STORAGE

TO AMMONIA AT Revival of Ramagundam Fertilizer Complex Project


2"-AL-100-3250-A4A

H
FROM 100 V 507/V 508

FLARE DISTRIBUTION

FLARE DISTRIBUTION

FLARE DISTRIBUTION
6"-AL-308-1701-B4A-IC
WASH PIT 2200 MTPD Ammonia Plant
1117

5094 P39C

PRODUCT AMMONIA
P64A

P29B

SHEET SIZE UNIT


P40

100
LIQUID AMMONIA

LIQUID AMMONIA

NH3 DETECTOR LIQUID AMMONIA

TO 100 K 441 A/B


1117
P39B

P39B

P39B

P39A
FROM 100 K 441

FROM 100 E 508

FROM 100 P 504

P64B

P64A
AMMONIA GAS

AMMONIA GAS
TO 100 TK 441
TO STORAGE
TO AMMONIA

TO AMMONIA

TO AMMONIA
NAME
AAH Ammonia flash
AI Piping and instrument diagram
P32

SIGNAL
DOCUMENT ID
5094
308
147

618

184

277

S-03470 P42132 1

(I)
JOB NUMBER DOCUMENT NUMBER REV
1 2 3 4 5 6 7 8 9 10 11 12

100 E 510 1/2 AMMONIA CONDENSER 100 V 504 AMMONIA ACCUMULATOR NOTES:

1) 100 E 510 1/2 SHALL BE LOCATED AT SAME LEVEL AND WITH


SYMMETRICAL PIPING LAYOUT.
EXCHANGERS SHALL BE SLOPED 5% TOWARDS LIQUID OUTLET.

A 2) DELETED.
14"-AG-100-3302-B1A-IP 4"-AG-100-3305-A1A
P39A 3) DELETED.
TO AMMONIA
FLARE DISTRIBUTION 4) A PROVISION OF UNLOADING AMMONIA TO AMMONIA

4"-AG-100-3305-A1A
4" ACCUMULATOR SHALL BE CONSIDERED FOR START-UP
REQUIREMENTS.
3"-AG-100-3308-B1A 4"-AG-100-3307-B1A

10"-AG-100-3319-B1A-IP

10"-AG-100-3320-B1A-IP
153 P34
INERT GAS
8.5 kg/cm^2g TO 100 E 511
PSV
3/4"D1"
5062

A1A

2"x4"
1"-WCR-100-3311-A3A

3/4"-WCR-100-3307-A3A
B LC

B1A
3/4"

3"
LC
100 E 510 1
SS
10" 10" 2" 3"
FBLO
A2 A3 V1 B2 24"
B1

GENERAL NOTES:
A1 1) ALL INSTRUMENT TAG NUMBERS TO BE PREFIXED BY 100.
B3 24"
2) FOR STANDARD SYMBOLS AND NOMENCLATURE, GENERAL NOTES,
10"
NOTE 1 DETAILS OF SAMPLE COOLERS AND SAMPLE CONNECTIONS,
REFER P&ID NO. A747-79-41-100-S01A/S01B/S02A/S02B.

Down 10"-AL-100-3321-B1A
C

20"x14" 14"-AG-100-3301-B1A-IP 4"-AG-100-3309-A1A


P39A
TO AMMONIA THERMAL RELIEF VALVE TO BE PLACED WHERE ISOLATION OF
FLARE DISTRIBUTION
4" LIQUID AMMONIA IS POSSIBLE.

3"-AG-100-3313-B1A TO FIC-5021
P34
PG
4"-AG-100-3309-A1A

4003 8.5 kg/cm^2g


10"-AG-100-3318-B1A-IP

10"-AG-100-3317-B1A-IP

PSV 10"-WCS-100-3315-A3A
D 3/4"D1"

4"-AG-100-3312-B1A
5063 BACK FLUSH
1"-WCR-100-3310-A3A
3/4"-WCR-100-3303-A3A
2"x4"
A1A

10"
3/4"
B1A

LC 25.0 kg/cm^2g

100 E 510 2 LC 1 1/2"F2"


2" 3" SS
10" 10" SS
FBLO
A2 A3 V1 B2 24" PSV
B1
5066 3/4"
4"-AG-100-3311-A1A
A1 P39A
B3 24" 2"x4" LO
TYPE-11 TYPE-11 3"x1 1/2" TO AMMONIA THIS DOCUMENT CONTAINS CONFIDENTIAL TECHNICAL
FLARE DISTRIBUTION
NOTE 1 10"
3"-AG-100-3316-A1A
INFORMATION OF HALDOR TOPSOE AND IS TO BE USED AND
AP AP
E 3/4" P39A REPRODUCED ONLY IN ACCORDANCE WITH THE WRITTEN
5056 5057 LO
AH
TO AMMONIA PERMISSION OF HALDOR TOPSOE.
PI B1A A1A FLARE DISTRIBUTION
Down 10"-AL-100-3301-B1A 5065

3"-AG-100-3310-B1A
A1A
FF B1A
PG PT LC
5064 5065
10"-WCS-100-3313-A3A LC
BACK FLUSH
TG 2" 10" 10" 4" 2" 2"
TG
10" 5100 3" 3" 3" P2 A2 A1 B1 P1 V1 100 V 504
5101 S1
L1 L3
2" 2"

SS 10" 10"
F
AH
10"-WCS-100-3314-A3A
10"-WCS-100-3312-A3A

LIC LT LG
M1 24"
5035 5035 5034
AL M

1D2 2" 2" B2


LO LO L4
2"

2"

L2
2"
2"

16.0 kg/cm^2g
3" 3" 3" T1 D1 A3
PSV
2" 3" 2" 10"
5096 TO AMMONIA FLARE
3/4" FF 2"-AL-100-3306-B1A-IC
TI DISTRIBUTION

LC
2"-AG-100-3321-A1A
5102 P39A
LO B1A 3/4"
1.5"-AL-100-3324-A4A-IC

A1A
A4A B4A-IC
4"-AL-100-3303-B1A
151 P34
G 3/4" 3/4"
LIQUID AMMONIA
LO 1.5" FO
TO 100 E 511
5051
1.5" FO 2"-AG-100-3322-A1A
LC
2"-AL-100-3323-A4A-IC

B1A 5050 P39A

2"-AL-100-3305-B4A-IC
A4A TO AMMONIA FLARE

10"-AL-100-3304-B1A
B4A B4A
20"-AG-100-6401-B1A-IP

4"-AL-100-3322-B1A
Information contained herein is confidential; it may not be used for any purpose other than for which it has been issued,
24"-WCR-100-3302-A3A

24"-WCR-100-3306-A3A
24"-WCS-100-3301-A3A

24"-WCS-100-3305-A3A

A4A A4A DISTRIBUTION


3"-AL-100-3302-A4A
1.5"-AL-100-3327-A4A-IC
1D2 UNIT
16.0 kg/cm^2g 2"-AL-100-5901-A4A-IC OSBL
PSV
5097 1 Client comments incorporated Apr 29, 2016 GOPA/SUBA SHGH ANKS
3/4" 0 First Issue Feb 19, 2016 GOPA/SUBA SHGH ANKS
REV. DESCRIPTION DATE DRAWN CHECK APPR.
178

671

150
1.5"-AL-100-3324-A4A-IC

A1A LO Ramagundam Fertilizer and Chemicals Ltd. (RFCL)


FLARE DISTRIBUTION
100-1182

100-1182

A4A Revival of Ramagundam Fertilizer Complex Project


H 1.5"
2"-AL-308-1705-B4A-IC

2200 MTPD Ammonia Plant


1117
100-1182

100-1182
P64A

3/4" SHEET SIZE UNIT


308-1117

LO 100

LIQUID AMMONIA

LIQUID AMMONIA
TO AMMONIA
COOLING WATER

COOLING WATER

COOLING WATER

COOLING WATER

LIQUID AMMONIA
FROM STORAGE
FROM 100 K 441

P59A

P39B

1.5"
TO 100-X-702
P29B

You might also like