The document outlines a detailed estimate for various construction and renovation tasks in a bathroom, including flooring, wall tiling, furniture installation, shower construction, false ceiling work, and electrical installations. Each section lists the materials required, their quantities, rates, and total amounts, culminating in an overall total cost of 332,520. The estimate also includes labor charges and a profit margin for each category of work.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
4 views2 pages
MASTERBATHROOM EST FF2 - Sheet1
The document outlines a detailed estimate for various construction and renovation tasks in a bathroom, including flooring, wall tiling, furniture installation, shower construction, false ceiling work, and electrical installations. Each section lists the materials required, their quantities, rates, and total amounts, culminating in an overall total cost of 332,520. The estimate also includes labor charges and a profit margin for each category of work.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2
S.
NO DESCRIPTION QUANTITY/REQIURED RATE TOTAL AMOUNT
MASTER BATHROOM FLOORING PROVIDING 50KG BAG CEMENT FROM ACC 1 CEMENT FOR LEVELING AND LAYING TILE 12 BAGS 375/BAG 4500 PROVIDING 40KG BAG SAND FOR MIXING IN 2 CEMENT FOR LAVELING 36 BAGS 90/BAG 3240 PLACING 3'x3' CERAMIC TILE FROM RAK 3 CERAMIC TO LAY ON FLOOR 32 TILES 650/TILE 20800 GIVING 40 KG BAG TILE PLASTER FROM ACC 4 EXTRA STRONG FOR APPLYING ON TILES 14 BAG 380/BAG 5320 LABOUR CHARGE FOR LEVELING AND LAYING 5 TILES 5 PROPLE 1500/PERSON 7500 TRANSPORTATION CHARGE FOR TILES AND 6 CEMENT TO SITE 9KM 1200/KM 10800 7 PROFIT 10% 5216 TOTAL 52160 WALL PROVIDING WALL CERAMIC TILES 2'x2' FROM 1 RAK CERAMICS FOR LAYING ON WALL 195 TILES 550/TILE 107250 PROVIDING 2'x2' MOSAIC TILE FROM KAJARIA 2 FOR WALL INBETWEEN CERAMIC TILES 37 TILES 360/TILE 13320 GIVING 20KG BAG TILE PLASTER FROM ACC 3 EXTRA STRONG FOR APPLYING ON TILES 54 BAG 350/BAG 18900 LABOUR CHARGE FOR STICKING TILES ON WALL 4 AND APPLYING TILE PLASTER 5 PEOPLE 1200/PERSON 6000 TRANSPORTATION CHARGE FOR CERAMIC TILES 5 AND MOSAIC TILE 6 PEOPLE 1200/PERSON 7200 6 PROFIT 10% 15267 TOTAL 152670 FURNITURE PROVIDING AND FIXING WC FROM PARRYWARE 1 IN BATHROOM 1 PIECE 7150/PIECE 7150 PROVIDING AND FIXING WASHBASIN FROM 2 JAQUAR FOR BATHROOM 1 PIECE 2200/PIECE 2200 LABOUR CHARGE FOR FIXING WC AND 3 WASHBASIN 3 PEOPLE 1500/PERSON 4500 TRANSPORTATION CHARGE FOR WC AND 4 WASHBASIN TO SITE 7KM 1000/PERSON 7000 5 PROFIT 10% 2085 TOTAL 20850 SHOWER PROVIDING 18MM 8'x4' PLYWOOD FROM 1 GREEN PLY FOR SHOWER FLOOR AERA 8 PLANKS 1760/PLANK 14080 PROVIDING AND FIXING NATURAL VENEER ROLL 2 8'x4' FOR PLYWOOD 8 ROLL 250/SQFT 2000 3 GIVING ADHESIVE FEVICOL FOR PLYWOOD 2KG 700/KG 1400 4 PROVIDING 4" NAILS FOR JOINING PLYWOODS 1 KG 208/KG 208 LABOUR CHARGE FOR PLYWOODS AND JOING 5 THEM FOR SHOWER FLOOR 3 PEOPLE 1500/PERSON 4500 TRANSPORTATION CHARGE FOR PLYWOOD AND 6 OTHER MATERIALS 7KM 1000/PERSON 7000 7 PROFIT 10% 2918.8 29188 FALSE CEILING PROVIDING 18MM 8'x4' PLYWOOD FROM GREEN PLY FOR FALSE CEILING ABOVE SHOWER 1 AREA 3 PLANKS 1760/PLANK 5280 GIVING ADHESIVE FEVICOL FOR FIXING 2 PLYWOOD 2KG 700/KG 1400 3 PROVIDING 4" NAILS FOR JOINING PLYWOODS 1 KG 208/KG 208 PROVIDING 4"SCREW FOR JOINING GYPSUM 4 AND PLYWOOD 2KG 190/KG 380 PROVIDING 12.5MM GYPSUM BOARD FROM 5 PABCO GYPSUM FOR FALSE CEILING 9 BOARDS 390/BOARD 3510 GIVING AND FIXING GYPSUM BY FALSE CEILING 6 CHANNELS FROM GI FALSE CEILING 6400 PROVIDING PUTTY 10KG BAGS FROM BIRLA FOR 7 APPLYING IN GYPSUM BOARD 3 BAGS 200/BAG 900 APPLYING PRIEMER FROM ZINSSER ON GYPSUM 8 BOARD 4L 148/L 592 PROVIDING WHITE PAINT FROM BERGER FOR 9 APPLYING ON GYPSUM BOARD 4L 471/L 1884 LABOUR CHARGE FOR GYPSUM , PLYWOOD AND 10 FIXING 3 PEOPLE 1100/PERSON 3300 TRANSPORTATION CHARGE FOR GYPSUM 11 BOARD AND PLYWOOD AND OTHER MATERIALS 7KM 1500/PERSON 10500 12 PROFIT 10% 3435.4 TOTAL 34354 ELECTRICAL PROVIDING 1SQMM ELECTRICAL WIRE 90M 1 FROM HAVELLS FOR WIRING 1 BOX 1199/BOX 1199 PROVIDING 12 W 4" DIA RECESSED LIGHT FROM 2 PHILIPS FOR LIGHTING 7 PIECE 1280/PIECE 8960 PLACING 5A 5PIN SOCKET FROM C&K PRODUCTS 3 FOR SWITCH BOARDS 2 PIECE 12/PIECE 24 4 PROVIDING SWTICHBOARD 8M FROM HABVELLS 1PIECE 249/PIECE 249 LABOUR CHARGE FOR WIRING AND FIXING ALL 5 ELECTRIALS 4 PEOPLE 1000/PERSON 4000 TRANSPORTATION CHARGE FOR ALL ELECTRICAL 6 MATERIALS 5KM 1000/KM 5000 7 PROFIT 10% 1943.2 TOTAL 19432 TOTAL AMOUNT 332520