0% found this document useful (0 votes)
4 views2 pages

MASTERBATHROOM EST FF2 - Sheet1

The document outlines a detailed estimate for various construction and renovation tasks in a bathroom, including flooring, wall tiling, furniture installation, shower construction, false ceiling work, and electrical installations. Each section lists the materials required, their quantities, rates, and total amounts, culminating in an overall total cost of 332,520. The estimate also includes labor charges and a profit margin for each category of work.

Uploaded by

Lingesh 7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views2 pages

MASTERBATHROOM EST FF2 - Sheet1

The document outlines a detailed estimate for various construction and renovation tasks in a bathroom, including flooring, wall tiling, furniture installation, shower construction, false ceiling work, and electrical installations. Each section lists the materials required, their quantities, rates, and total amounts, culminating in an overall total cost of 332,520. The estimate also includes labor charges and a profit margin for each category of work.

Uploaded by

Lingesh 7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

S.

NO DESCRIPTION QUANTITY/REQIURED RATE TOTAL AMOUNT


MASTER BATHROOM
FLOORING
PROVIDING 50KG BAG CEMENT FROM ACC
1 CEMENT FOR LEVELING AND LAYING TILE 12 BAGS 375/BAG 4500
PROVIDING 40KG BAG SAND FOR MIXING IN
2 CEMENT FOR LAVELING 36 BAGS 90/BAG 3240
PLACING 3'x3' CERAMIC TILE FROM RAK
3 CERAMIC TO LAY ON FLOOR 32 TILES 650/TILE 20800
GIVING 40 KG BAG TILE PLASTER FROM ACC
4 EXTRA STRONG FOR APPLYING ON TILES 14 BAG 380/BAG 5320
LABOUR CHARGE FOR LEVELING AND LAYING
5 TILES 5 PROPLE 1500/PERSON 7500
TRANSPORTATION CHARGE FOR TILES AND
6 CEMENT TO SITE 9KM 1200/KM 10800
7 PROFIT 10% 5216
TOTAL 52160
WALL
PROVIDING WALL CERAMIC TILES 2'x2' FROM
1 RAK CERAMICS FOR LAYING ON WALL 195 TILES 550/TILE 107250
PROVIDING 2'x2' MOSAIC TILE FROM KAJARIA
2 FOR WALL INBETWEEN CERAMIC TILES 37 TILES 360/TILE 13320
GIVING 20KG BAG TILE PLASTER FROM ACC
3 EXTRA STRONG FOR APPLYING ON TILES 54 BAG 350/BAG 18900
LABOUR CHARGE FOR STICKING TILES ON WALL
4 AND APPLYING TILE PLASTER 5 PEOPLE 1200/PERSON 6000
TRANSPORTATION CHARGE FOR CERAMIC TILES
5 AND MOSAIC TILE 6 PEOPLE 1200/PERSON 7200
6 PROFIT 10% 15267
TOTAL 152670
FURNITURE
PROVIDING AND FIXING WC FROM PARRYWARE
1 IN BATHROOM 1 PIECE 7150/PIECE 7150
PROVIDING AND FIXING WASHBASIN FROM
2 JAQUAR FOR BATHROOM 1 PIECE 2200/PIECE 2200
LABOUR CHARGE FOR FIXING WC AND
3 WASHBASIN 3 PEOPLE 1500/PERSON 4500
TRANSPORTATION CHARGE FOR WC AND
4 WASHBASIN TO SITE 7KM 1000/PERSON 7000
5 PROFIT 10% 2085
TOTAL 20850
SHOWER
PROVIDING 18MM 8'x4' PLYWOOD FROM
1 GREEN PLY FOR SHOWER FLOOR AERA 8 PLANKS 1760/PLANK 14080
PROVIDING AND FIXING NATURAL VENEER ROLL
2 8'x4' FOR PLYWOOD 8 ROLL 250/SQFT 2000
3 GIVING ADHESIVE FEVICOL FOR PLYWOOD 2KG 700/KG 1400
4 PROVIDING 4" NAILS FOR JOINING PLYWOODS 1 KG 208/KG 208
LABOUR CHARGE FOR PLYWOODS AND JOING
5 THEM FOR SHOWER FLOOR 3 PEOPLE 1500/PERSON 4500
TRANSPORTATION CHARGE FOR PLYWOOD AND
6 OTHER MATERIALS 7KM 1000/PERSON 7000
7 PROFIT 10% 2918.8
29188
FALSE CEILING
PROVIDING 18MM 8'x4' PLYWOOD FROM
GREEN PLY FOR FALSE CEILING ABOVE SHOWER
1 AREA 3 PLANKS 1760/PLANK 5280
GIVING ADHESIVE FEVICOL FOR FIXING
2 PLYWOOD 2KG 700/KG 1400
3 PROVIDING 4" NAILS FOR JOINING PLYWOODS 1 KG 208/KG 208
PROVIDING 4"SCREW FOR JOINING GYPSUM
4 AND PLYWOOD 2KG 190/KG 380
PROVIDING 12.5MM GYPSUM BOARD FROM
5 PABCO GYPSUM FOR FALSE CEILING 9 BOARDS 390/BOARD 3510
GIVING AND FIXING GYPSUM BY FALSE CEILING
6 CHANNELS FROM GI FALSE CEILING 6400
PROVIDING PUTTY 10KG BAGS FROM BIRLA FOR
7 APPLYING IN GYPSUM BOARD 3 BAGS 200/BAG 900
APPLYING PRIEMER FROM ZINSSER ON GYPSUM
8 BOARD 4L 148/L 592
PROVIDING WHITE PAINT FROM BERGER FOR
9 APPLYING ON GYPSUM BOARD 4L 471/L 1884
LABOUR CHARGE FOR GYPSUM , PLYWOOD AND
10 FIXING 3 PEOPLE 1100/PERSON 3300
TRANSPORTATION CHARGE FOR GYPSUM
11 BOARD AND PLYWOOD AND OTHER MATERIALS 7KM 1500/PERSON 10500
12 PROFIT 10% 3435.4
TOTAL 34354
ELECTRICAL
PROVIDING 1SQMM ELECTRICAL WIRE 90M
1 FROM HAVELLS FOR WIRING 1 BOX 1199/BOX 1199
PROVIDING 12 W 4" DIA RECESSED LIGHT FROM
2 PHILIPS FOR LIGHTING 7 PIECE 1280/PIECE 8960
PLACING 5A 5PIN SOCKET FROM C&K PRODUCTS
3 FOR SWITCH BOARDS 2 PIECE 12/PIECE 24
4 PROVIDING SWTICHBOARD 8M FROM HABVELLS 1PIECE 249/PIECE 249
LABOUR CHARGE FOR WIRING AND FIXING ALL
5 ELECTRIALS 4 PEOPLE 1000/PERSON 4000
TRANSPORTATION CHARGE FOR ALL ELECTRICAL
6 MATERIALS 5KM 1000/KM 5000
7 PROFIT 10% 1943.2
TOTAL 19432
TOTAL AMOUNT 332520