1. FOUNDATIONS
3495 4085 4495 5190 5190 325 4095
25mm EXPANSION JOINT
TO BE FILLED WITH FOAM
2290 2595 5290 6635 750 5590
2H16 23 They shall generally be taken 1500mm
min. below existing ground level after
C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 removal of organic layer and all
A 400x200mm RC GROUND BEAM 400x200mm RC GROUND BEAM A excavations to be confirmed by the
Engineer before concrete blinding is
400
F1 F1 F1 F1 F1 F1 F1 F1 F1 laid.
5690
150mm thick concrete slab concrete slab concrete slab concrete slab concrete slab concrete slab concrete slab concrete slab
2H16 24 concrete.
6685
concrete slab reinforced with reinforced with reinforced with reinforced with reinforced with reinforced with reinforced with reinforced with
reinforced with BRC meshref. BRC meshref. BRC meshref. BRC meshref. BRC meshref. BRC meshref. BRC meshref. BRC meshref. 2. CONCRETE MIXES
BRC meshref. A142(above) A142(above) A142(above) A142(above) A142(above) A142(above) A142(above) A142(above) Reinforced concrete to have a min.
A142(above) works cube strength of 25N/mm² at
400x230mm RC GROUND BEAM A2 SECTION THROUGH 400x200mm 28 days with 20mm max.aggregate size
1000
C1 C1 C1 C1 C1 C1 C1 C1 C1
B 400x200mm RC GROUND BEAM 400x200mm RC GROUND BEAM 400x200mm RC GROUND BEAM 400x200mm RC GROUND BEAM B GROUND BEAM 3. REINFORCEMENT
1275
3790
STAIRCASE 01
reinforced with reinforced with reinforced with
400x200mm RC GROUND BEAM
BRC meshref. BRC meshref. 400x200mm RC GROUND BEAM 400x200mm RC GROUND BEAM C BS4483
A142(above) A142(above)
22925
22925
F2 F2 150mm thick concrete F2 F2
2495
4. MINIMUM COVER TO ALL STEEL IN
400x200mm RC GROUND BEAM
2700
2500
1645
reinforced with reinforced with T = Top
2095
F2 F2 F2 F2 F2 reinforced with
F3
150mm thick BRC meshref. BRC meshref. BRC meshref. C1
SPACING takes B = Bottom
concrete slab A142(above) A142(above) E1
F
C3 C3 C3 C3
reinforced with
A142(above) precedence. 6. Minimum Laps are
H8 - 400mm H16 - 800mm
2445
BRC meshref. F2
2095
F2 F2 F2 F2
2. All SERVICE HOLES H10 - 500mm H20 - 1000mm
A142(above)
H12 - 600mm H25 - 1250mm
C2 C2 C2 C2 C2 C1 C1
400x200mm RC GROUND BEAM
C1
400x200mm RC GROUND BEAM
C1 C1 C1
F1
through structural slabs
G 400x200mm RC GROUND BEAM 400x200mm RC GROUND BEAM
All dimensions to be confirmed on site.
150mm thick and columns shall be in
F2 F2 F2 F2 F2 F2 F2 F2 F2
concrete slab accordance with the This drawing must be read in conjunction
3165
3065
3495 4085 2100 2395 3295 1895 5190 325 4095 2290 1745 2555 3580 1455 3975 1210 2945 3395 1155
51175
25mm expansion joint to be filled with foam 1000 gauge micro-slip membrane (DPM) on
50mm thick Sand blinding
3500
200mm thick compacted hardcore No. Date: Descriptions:
1740 1735
CLIENT:
Murram compacted in layer not
exceeding 200mm each
28H16 31 125 B2 & T2
PROJECT TITLE:
PROPOSED EMERGENCY WARD, MCH AND
150mm THICK SOLID SLAB REINFORCED
ON TOP WITH MESH, BRC REF No. A142 PEDIATRIC WARD TO BE BUILT ON PLOT...,
400x230mm GROUND BEAM
1000 GAUGE DPM BLOCK..., AT ISHAKA ADVENTIST
HOSPITAL, ISHAKA MUNICIPALITY,
50mm SAND BLINDING BUSHENYI DISTRICT.
200mm Hardcore
02 02 02 02 02 02 ARCHITECT: CIVIL/STRUCTURAL
3500
ENGINEER
max. depth = 2000mm
400
02 02
R8 32 150
R8 32 150
1 02 02 02 02 02 02
1 8H20
DPC
150mm conc. slab reinforced
on top with mesh Ref. No.
A142 on 1000 gauge polythene
sheeting
200mm thick wall
DRAWING DESCRIPTION:
200mm thick hardcore
700
Murram compacted in
FOUNDATION LAYOUT
layers not exceeding
200mm thick to approval &
2/28H16 30 125 (bothways) Murram compacted in DETAILS
layers not exceeding
50
230
230
TYPICAL SECTION 1-1 OF 3500x3500x700mm 1000 gauge SCALE AS INDICATED
1000 gauge
1750 1750 FOOTING, TYPE F3 [5.No] 600 polythene sheeting 600 polythene sheeting DATE MAY 2024
DWG No.
SCALE 1:25 TYPICAL SECTIONS THROUGH M.C STRIP FOUNDATION
TYPICAL PLAN OF 3500x3500x700mm DESIGNED BY: ISSUED TYPE:
SCALE 1:25
COLUMN BASES, TYPE F3 [5.No] APPROVAL SUBMISSION
DRAWINGS
K.L
SCALE 1:25 PAPER: SHEET No. REV
A1 01/12 00
NOTES
1. FOUNDATIONS
They shall generally be taken 1500mm
min. below existing ground level after
removal of organic layer and all
excavations to be confirmed by the
Engineer before concrete blinding is
laid.
Weak pockets of bearing strata to be
dug out and filled with 1:4:8 mass
concrete.
2. CONCRETE MIXES
Reinforced concrete to have a min.
works cube strength of 25N/mm² at
28 days with 20mm max.aggregate size
3000
1500 1500 3. REINFORCEMENT
(a) High yield bars (>500N/mm²) to be
square twisted cold formed bars to
BS4461and are marked "H" on these
dwgs
20H16 31 150 B2
(b) Mild steel bars (250N/mm²) marked "R"
1300
on these dwgs to be round bars to
BS4483
1 1
02 02 02
(b) Beams = 30mm
20H12 31 100 B2
3000
400
02
02 02 02
02
1 02
02 02 02
02
1 (c) Columns =
(d) Ground slab=
5. ABBREVIATIONS
30mm
30mm
02 02 02
M.C = Mass Concrete
R.C = Reinforced Concrete
20H16 30 150 B1
1300
20H12 30 100 B1 T = Top
B = Bottom
6. Minimum Laps are
H8 - 400mm H16 - 800mm
H10 - 500mm H20 - 1000mm
H12 - 600mm H25 - 1250mm
TYPICAL PLAN OF 2000x2000x700mm 1300 400 1300 All dimensions to be confirmed on site.
COLUMN BASES, TYPE F2 [28.No] This drawing must be read in conjunction
SCALE 1:25 with the relevant architectural drawings.
TYPICAL PLAN OF 3000x3000x700mm
COLUMN BASES, TYPE F1 [22.No]
400 REVISIONS
SCALE 1:25
R8 32 150
R8 32 150
700
50mm concrete
blinding 1300 1300
2000
PROJECT TITLE:
TYPICAL SECTION 1-1 OF 2000x2000x700mm
700
PROPOSED EMERGENCY WARD, MCH AND
FOOTING, TYPE F2 [28.No] 2/20H16 30 150 (bothways)
PEDIATRIC WARD TO BE BUILT ON PLOT...,
BLOCK..., AT ISHAKA ADVENTIST
SCALE 1:25 HOSPITAL, ISHAKA MUNICIPALITY,
50
50mm concrete
blinding BUSHENYI DISTRICT.
3000
ARCHITECT: CIVIL/STRUCTURAL
ENGINEER
TYPICAL SECTION 1-1 OF 3000x3000x700mm
FOOTING, TYPE F1 [22.No]
SCALE 1:25
DRAWING DESCRIPTION:
FOUNDATION DETAILS
APPROVED BY:
SCALE AS INDICATED
A1 02/12 00
FIRST FLOOR LEVEL
FIFTH F.L
FIFTH F.L
250
250
D
D
18R8 04 200
4H20 02 + 740
4H20 02 +
3500
4H16-03 R8 02 200
250
4H16-03
3500
3500
300 300
02 03 02
.
02 03 02
.
5b
5b
300
300
03 03
03 03
02 03 02
75mm kicker
75mm kicker
150
FOURTH F.L FOURTH F.L
FOURTH F.L
250
250
250
FIFTH F.L
D
D
250
4H20 02 +
4H16-03
3500
4H16-03 4H16-03
300
3500
3500
3500
02 03 02
24R8-5b 150
5b 24R8-5b 150 24R8-5b 150
300
03 03
02 03 02
02 03 02 02 03 02
02 03 02
75mm kicker
5b 5b
5b
300
300
300
03 03 03 03
03 03
.
.
02 03 02 02 03 02
02 03 02
FOURTH F.L
250
75mm kicker
75mm kicker
75mm kicker
D(DEPTH OF BEAM)
THIRD F.L THIRD F.L
THIRD F.L
250
250
250
D
D
3500
3500
400
400
02 02 02 02
02 02
.
.
.
02 02 02
02 02 02 02 02 02 3. REINFORCEMENT
(a) High yield bars (>500N/mm²) are
square twisted cold formed bars to
BS4461and are marked "H" on these
1000mm min. lap
dwgs
75mm kicker
75mm kicker
75mm kicker
250
250
D
D
5. ABBREVIATIONS
D(DEPTH OF BEAM) M.C = Mass Concrete
R.C = Reinforced Concrete
T = Top
8H16 03 B = Bottom
6. Minimum Laps are
08H20 02 08H20 02 08H20 02 H8 - 400mm H16 - 800mm
3500
3500
18R8-5b 200
3500
3500
400
5b 400 400 This drawing must be read in conjunction
300
03 03 02 02 02 02 02 02
02 02 02
5b 5b
with the relevant architectural drawings.
5b
400
800mm min. lap
400
03 03 03
400
02 02 02 02
02 02
75mm kicker
.
.
02 02 02 02 02 02
02 02 02
CLIENT:
FIFTH F.L
1000mm min. lap
250
75mm kicker
75mm kicker
250
250
4H20 02 +
D
ARCHITECT: CIVIL/STRUCTURAL
18R8-5b 200 ENGINEER
08H20 02 08H20 02
.
08H20 02
300
02 03 02
5b 24R8-5b 150 24R8-5b 150
300
24R8-5b 150 03 03
3500
3500
3500
02 03 02
.
.
02 02 02 02 02 02
02 02 02
75mm kicker
5b 5b
5b
400
400
DRAWING DESCRIPTION:
400
02 02 02 02
02 02
02 02 02 02 02 02
02 02 02 COLUMN C1, C2, C3, & C4 ELEVATION
FOURTH F.L DETAILS
1000mm min. lap
250
75mm kicker
75mm kicker
75mm kicker
K.L
APPROVED BY:
GROUND FL
GROUND FL D(DEPTH OF BEAM) GROUND FL
AS INDICATED
SCALE
TYPICAL R.C COLUMN ELEVATION, TYPE C1 TYPICAL R.C COLUMN ELEVATION, TYPE C1 TYPICAL R.C COLUMN ELEVATION, TYPE C2 TYPICAL R.C COLUMN ELEVATION, TYPE C3 SUBMISSION DRAWINGS
30H16-20 2/Rib B1
30H12-08 2/Rib B1
38H12-01 200 B2 Weak pockets of bearing strata to be
600x300mm RC BEAM 25
5690
58H12-05 2/Rib B1
30H16-18 2/Rib B1
30H16-14 2/Rib B1
600
2H12 03 dug out and filled with 1:4:8 mass
[30]
6685
58H12-04 2/Rib T1
58H12-06 2/Rib T1
58H12-07 2/Rib T1
30H16-15 2/Rib T1
30H16-17 2/Rib T1
30H16-19 2/Rib T1
600x300mm RC BEAM 24
600x300mm RC BEAM 23
concrete.
[30]
[30]
[30]
[30]
500x300mm RC BEAM 15 A2 works cube strength of 25N/mm² at
1000
28 days with 20mm max.aggregate size
B 600x300mm RC BEAM 03 600x300mm RC BEAM 04 600x300mm RC BEAM 04 B TYPICAL SECTION THROUGH
600x300mm RC BEAM 18
1275
3. REINFORCEMENT
600x300mm RC BEAM 27
600x300mm RC BEAM 27
600x300mm RC BEAM 26
(Scale 1:10)
16H12-09 2/Rib B1
B2 450x200mm RC BEAM 14 12H12-27 2/Rib B1 (a) High yield bars (>500N/mm²) to be
600x300mm RC BEAM 20
3790
square twisted cold formed bars to
600x300mm RC BEAM 21
[18] 34H12-26 2/Rib B1 [16]
STAIRCASE 01
[28]
[28]
[28]
[10] 84H12-32 2/Rib T1 [34] [28] [12] dwgs
600x300mm RC BEAM 18
58H12-03 2/Rib B1
500x300mm RC BEAM 06 600x300mm RC BEAM 04 600x300mm RC BEAM 04 C on these dwgs to be round bars to
300
12H12-40 200 B2
BS4483
22925
22925
500x300mm RC BEAM 24a
500x300mm RC BEAM 23
21H12-39 200 B1
2495
600x300mm RC BEAM 11
[16] 58H12-31 2/Rib B1 [42]
3H20 01
600x300mm RC BEAM 31
4. MINIMUM COVER TO ALL STEEL IN
3H16 02
22H12-10 2/Rib B1
28H12-11 2/Rib B1
C2 (a) Foundations = 50mm
D 600x300mm RC BEAM 07 600x300mm RC BEAM 10 600x300mm RC BEAM 08
(b) Beams = 30mm
R8 @200
11H12-36 200 B2
450x200mm RC BEAM 28
2500
18H12-28 2/Rib B1
[18] 60H12-25 2/Rib B1 [42]
(d) Ground slab= 30mm
600
STAIRCASE 02
2H12 03
3940
28H12-21 2/Rib B1
16H12-35 200 B1
5. ABBREVIATIONS
31H12-23 200 B2
E 450x200mm RC BEAM 09 450x200mm RC BEAM 09
28H12-22 2/Rib T1
18H12-30 2/Rib T1
3H20 04 M.C = Mass Concrete
600x300mm RC BEAM 29
600x300mm RC BEAM 32
600x300mm RC BEAM 32
600x300mm RC BEAM 18
2095
405
E1 T = Top
F B = Bottom
19H12-24 200 B1 TYPICAL SECTION THROUGH
18H12-12 2/Rib B1 18H12-29 2/Rib B1 6. Minimum Laps are
2445
600x300mm RC BEAM 19
2095
15H12-38 200 B2
AM
450x20 0mm RC BE
All dimensions to be confirmed on site.
3165
3065
39H12-37 200 B1
600
600
500
800 PEDIATRIC WARD TO BE BUILT ON PLOT...,
26H8-22-200 26H8-22-200 26H8-22-200 BLOCK..., AT ISHAKA ADVENTIST
HOSPITAL, ISHAKA MUNICIPALITY,
BUSHENYI DISTRICT.
5190 3H16-02 5190 3H16-02 5190 ARCHITECT: CIVIL/STRUCTURAL
TYPICAL ELEVATION THROUGH 600x300mm RC BEAM 01 (SCALE 1:25) [CONT'D] TYPICAL ELEVATION THROUGH 500x300mm RC BEAM 06. [1st FLOOR] (SCALE 1:25) ENGINEER
6 7 11
3H16-15 2H12-06 3H20-12 3H20-09 3H20-13 3H20-10 2H12-07
2100 2100 2600 1250 2600 2400
600
600
75
SCALE AS INDICATED
250
175
DATE MAY 2024
600 DWG No.
600
2H12 03
laid.
[22]
Weak pockets of bearing strata to be
600x300mm RC BEAM 26
600x300mm RC BEAM 26
600x300mm RC BEAM 26
dug out and filled with 1:4:8 mass
30H16-16A 2/Rib B1
28H16-20A 2/Rib B1
30H12-08A 2/Rib B1
38H12-01A 200 B2
5240
600x300mm RC BEAM 25
58H12-05A 2/Rib B1
30H16-18A 2/Rib B1
concrete.
30H16-14A 2/Rib B1
600x300mm RC BEAM 25
3H20 05
600x300mm RC BEAM 18
[30]
6685
58H12-04A 2/Rib T1
58H12-06A 2/Rib T1
58H12-07A 2/Rib T1
30H16-15A 2/Rib T1
30H16-17A 2/Rib T1
30H16-19A 2/Rib T1
600x300mm RC BEAM 24
600x300mm RC BEAM 23
600x300mm RC BEAM 19
2. CONCRETE MIXES
TYPICAL SECTION THROUGH Reinforced concrete to have a min.
16H12-02A 200 B1 600x300mm RC BEAM 20 works cube strength of 25N/mm² at
A1
[30]
[30]
[30]
[30]
450x200mm RC BEAM 15a
(Scale 1:10) 28 days with 20mm max.aggregate size
1450
[06]
B 600x300mm RC BEAM 03 600x300mm RC BEAM 04 600x300mm RC BEAM 04 B 3. REINFORCEMENT
1275
16H12-11A 2/Rib B1
600x300mm RC BEAM 27
600x300mm RC BEAM 27
600x300mm RC BEAM 27
square twisted cold formed bars to
B2 450x200mm RC BEAM 14
[28]
600x300mm RC BEAM 20
600x300mm RC BEAM 20
BS4461and are marked "H" on these
3790
600x300mm RC BEAM 20
STAIRCASE 01
300 dwgs
28H12-09A 2/Rib B1
[28] (b) Mild steel bars (250N/mm²) marked "R"
[28]
[28]
[28]
94H12-32A 2/Rib T1 [28] [34] [32]
3H25 01
58H12-03 2/Rib B1
20770
3H16 02
5210
12H12-12A 200 B2
R8 @200
12H12-36A 2/Rib B1
600x300mm RC BEAM 23
600x300mm RC BEAM 24
[14] [32] 46H12-31A 2/Rib B1 21H12-30A 200 B1
2495
4. MINIMUM COVER TO ALL STEEL IN
10H12-32A 2/Rib B1
600x300mm RC BEAM 31
(a) Foundations = 50mm
600
2H12 03
36H12-28A 2/Rib B1
(b) Beams = 30mm
C2
D 600x300mm RC BEAM 05 600x300mm RC BEAM 08 (c) Columns = 30mm
(d) Ground slab= 30mm
09H12-36A 200 B2
450x200mm RC BEAM 28
2700
16H12-34A 2/Rib B1
2500
16H12-35A 2/Rib B1
5. ABBREVIATIONS
600x300mm RC BEAM 27
16H12-35A 200 B1
M.C = Mass Concrete
31H12-23A 200 B2
E 450x200mm RC BEAM 09 450x200mm RC BEAM 09 600x300mm RC BEAM 17 E TYPICAL SECTION THROUGH
R.C = Reinforced Concrete
28H12-22A 2/Rib T1
600x300mm RC BEAM 29
600x300mm RC BEAM 32
600x300mm RC BEAM 20b
1645
600x300mm RC BEAM 18
T = Top
2095
(Scale 1:10)
12H12-21A 2/Rib B1
B = Bottom
E1
6. Minimum Laps are
F 36H12-29A 2/Rib B1
[varies in length]
23H12-24A 200 B1 H8 - 400mm H16 - 800mm
2445
H10 - 500mm H20 - 1000mm
2095
300
H12 - 600mm H25 - 1250mm
G 600x300mm RC BEAM 17 600x300mm RC BEAM 12 F1 3H20 01
450x200mm RC BEAM 09
3H20 02 All dimensions to be confirmed on site.
1015
450x200m
910
m RC BEAM
m RC BEAM
450x200m
450x200mm RC BEAM
This drawing must be read in conjunction
25mm EXPANSION JOINT
R8 @200 with the relevant architectural drawings.
TO BE FILLED WITH FOAM
600
2H12 03
3495 4085 2100 2395 3295 1895 5190 325 4095 2290 1745 2555 3580 4765 1870 2945 3395 1155
51175 REVISIONS
1 2 3 3c 4 4a 5 66 7 7a 9 11 11b 11d 14 14a 15a
3H20 05
SECOND FLOOR STRUCTURAL LAYOUT TYPICAL SECTION THROUGH
SCALE 1:100 600x300mm RC BEAM 29
(Scale 1:10)
1 2 3c 4a 5
2H12-03 3H20-08 3H16-05 3H16-06 3H20-09 2H12-04 3H16-07
1100 2000 1000 2000 1900 1900
600
600
20H8-22-200 22H8-22-200 800 26H8-22-200 175mm maxpans, 75mm concrete toppings, PEDIATRIC WARD TO BE BUILT ON PLOT...,
150mm wide ribs, spaced at 450mm centres & BLOCK..., AT ISHAKA ADVENTIST
reinforced at the top with BRC mesh ref. No. HOSPITAL, ISHAKA MUNICIPALITY,
3H16-01 3H16-02 A142 BUSHENYI DISTRICT.
4085 4495 5190
ARCHITECT: CIVIL/STRUCTURAL
st nd rd th
TYPICAL ELEVATION THROUGH 600x300mm RC BEAM 03. [1 , 2 , 3 , & 5 FLOOR] (SCALE 1:25) ENGINEER
6 7a 6 7a
3H25-03 2H16-04 3H25-05 3H20-03 2H16-04 3H20-05
600
600
DWG No.
600
2H12 03
laid.
2800
30H16-14B 2/Rib B1
600x300mm RC BEAM 26
600x300mm RC BEAM 26
dug out and filled with 1:4:8 mass
30H16-15B 2/Rib B1
34H12-01B 2/Rib B1
600x300mm RC BEAM 25
10H12-07B 2/Rib B1
30H16-17B 2/Rib B1
a 600x300mm RC BEAM 13 34H16-29B 2/Rib B1 concrete.
600x300mm RC BEAM 25
3H20 05
600x300mm RC BEAM 18
38H12-03B 2/Rib T1
6685
30H16-16B 2/Rib T1
600x300mm RC BEAM 24
1400
600x300mm RC BEAM 23
600x300mm RC BEAM 19
34H12-10B 2/Rib T1
2. CONCRETE MIXES
b 600x300mm RC BEAM 16
TYPICAL SECTION THROUGH Reinforced concrete to have a min.
600x300mm RC BEAM 20a works cube strength of 25N/mm² at
2490
34H16-31B 2/Rib T1
(Scale 1:10) 28 days with 20mm max.aggregate size
28H12-04B 2/Rib T1
600x300mm RC BEAM 27
600x300mm RC BEAM 27
600x300mm RC BEAM 27
square twisted cold formed bars to
28H16-16B 2/Rib T1
B2 450x200mm RC BEAM 14
600x300mm RC BEAM 20
BS4461and are marked "H" on these
3790
600x300mm RC BEAM 22
600x300mm RC BEAM 22
[32] 42H12-19B 2/Rib B1 [10] 14H12-18B 2/Rib B1
STAIRCASE 01 dwgs
28H16-13B 2/Rib B1
94H12-20B 2/Rib T1 [28] [34] [32] (b) Mild steel bars (250N/mm²) marked "R"
28H16-05B 2/Rib B1
on these dwgs to be round bars to
20765
20770
28H12-11B 2/Rib B1
5210
12H12-34B 200 B2
600x300mm RC BEAM 23
600x300mm RC BEAM 24
2495
21H12-33B 200 B1
3H20 01 4. MINIMUM COVER TO ALL STEEL IN
600x300mm RC BEAM 30
28H16-06B 2/Rib T1 26H12-30B 2/Rib B1
450x200mm RC BEAM 28
600
2700
2H12 03
2500
16H12-28B 2/Rib B1
5. ABBREVIATIONS
16H12-35B 200 B1
M.C = Mass Concrete
20H12-24B 2/Rib T1
20H12-27B 2/Rib B1
E 450x200mm RC BEAM 09 450x200mm RC BEAM 09 600x300mm RC BEAM 17 E
R.C = Reinforced Concrete
28H16-26B 2/Rib T1
600x300mm RC BEAM 29
600x300mm RC BEAM 32
600x300mm RC BEAM 32
08H16-25B 2/Rib B1
1645
3H20 05
600x300mm RC BEAM 18
T = Top
2095
B = Bottom
12H12-38B 2/Rib B1
E1
F TYPICAL SECTION THROUGH 6. Minimum Laps are
28H12-22B 2/Rib B1
[varies in length]
600x300mm RC BEAM 26 H8 - 400mm H16 - 800mm
2445
2095
1010
450x200m
910
m RC BEAM
m RC BEAM
450x200m
450x200mm RC BEAM
25mm EXPANSION JOINT This drawing must be read in conjunction
TO BE FILLED WITH FOAM with the relevant architectural drawings.
3495 4085 2100 2395 3295 1895 5190 325 4095 2290 1745 2555 3580 4765 1870 2945 3395 1155
51175
6a
1 2 3 3c 4 4a 5 66 7 7a 9 11 11b 11d 14 14a 15a REVISIONS
THIRD FLOOR STRUCTURAL LAYOUT
SCALE 1:100
1 2 3 4 5
3H16-02 3H16-04
800
3H16-01 3H16-03
3495 4085 4495 5190
No. Date: Descriptions:
TYPICAL ELEVATION THROUGH 450x200mm RC BEAM 09 [1st, 2nd, 3rd & 5th FLOOR] (SCALE 1:25)
CLIENT:
9 11 11d 14 15a
3H25-07 3H25-05 2H12-03 3H25-06 2H12-04 3H20-08 ISHAKA ADVENTIST HOSPITAL
1000 2200 1000 2200 1500
600
600
PROJECT TITLE:
16H8-22-200 33H8-22-200 1000 15H8-22-200 23H8-22-200 PROPOSED EMERGENCY WARD, MCH AND
PEDIATRIC WARD TO BE BUILT ON PLOT...,
BLOCK..., AT ISHAKA ADVENTIST
3195 3H25-01 6635 2945 3H16-02 4550 HOSPITAL, ISHAKA MUNICIPALITY,
BUSHENYI DISTRICT.
TYPICAL ELEVATION THROUGH 600x300mm RC BEAM 08. [1st & 2nd FLOOR] (SCALE 1:25)
ARCHITECT: CIVIL/STRUCTURAL
5 6 ENGINEER
Slab Notes:
1. Maxpan Slab
All Pannels to be 250mm thick slab with
26R8-22-200 175mm maxpans, 75mm concrete toppings,
150mm wide ribs, spaced at 450mm centres &
reinforced at the top with BRC mesh ref. No.
3H16-03 DRAWING DESCRIPTION:
5190 A142
THIRD FLOOR STRUCTURAL LAYOUT
TYPICAL ELEVATION THROUGH 450x200mm RC BEAM 09 [1st, 2nd, 3rd & 5th FLOOR] (SCALE 1:25) [CONT'D] AND
BEAM DETAILS
1 2 3 4 5
ENGINEER'S SEAL: DRAWN BY: CHECKED BY:
3H16-09 2H12-05 2H12-03 2H12-06 800 2H12-07 3H16-08 2H12-04
1165 1360 1360 1500 1500 1730 K.L
APPROVED BY:
A1 06/12 00
1 2 2a 4 4' 4b 5 5' 66 6a 7 10 11 11' 12 13 15 NOTES
300
50020
1. FOUNDATIONS
3495 3590 4990 800 3115 1275 1995 3195 325 4095 2290 6045 1840 1680 4955 750 5590
3H25 01
They shall generally be taken 1500mm
3H20 02
25mm EXPANSION JOINT min. below existing ground level after
TO BE FILLED WITH FOAM R8 @200 removal of organic layer and all
A 600x300mm RC BEAM 01 600x300mm RC BEAM 04 A excavations to be confirmed by the
600
2H12 03 Engineer before concrete blinding is
laid.
3195
30H12-02C 2/Rib B1
30H16-09C 2/Rib B1
600x300mm RC BEAM 20b
600x300mm RC BEAM 20
30H12-35C 200 B1
dug out and filled with 1:4:8 mass
30H16-15C 2/Rib B1
38H12-03C 2/Rib T1 30H12-07C 200 B1
30H16-17C 2/Rib B1
600x300mm RC BEAM 25
32H12-36C 200 B2
49H12-04C 200 B2
600x300mm RC BEAM 20
30H16-29C 2/Rib T1
30H16-31C 2/Rib T1
30H16-16C 2/Rib T1
4H25 05 concrete.
30H16-14C 2/Rib B1
600x300mm RC BEAM 25
600x300mm RC BEAM 18
6685
a' 600x300mm RC BEAM 14a
600x300mm RC BEAM 24
600x300mm RC BEAM 23
2. CONCRETE MIXES
TYPICAL SECTION THROUGH
Reinforced concrete to have a min.
[32]
3495
600x300mm RC BEAM 21
works cube strength of 25N/mm² at
(Scale 1:10)
30H12-05C 200 T1
28 days with 20mm max.aggregate size
B 600x300mm RC BEAM 03a 600x300mm RC BEAM 03a 600x300mm RC BEAM 04 600x300mm RC BEAM 04 B 3. REINFORCEMENT
300 (a) High yield bars (>500N/mm²) to be
600x300mm RC BEAM 27
600x300mm RC BEAM 27
square twisted cold formed bars to
3H25 01
600x300mm RC BEAM 20
56H12-10C 2/Rib B1
600x300mm RC BEAM 20
BS4461and are marked "H" on these
3790
600x300mm RC BEAM 20
STAIRCASE 01
3H20 02
[17]
dwgs
600x300mm RC BEAM 19a
28H16-13C 2/Rib B1
R8 @200
6485
20765
20770
28H16-08C 2/Rib B1
28H16-16C 2/Rib T1
28H16-06C 2/Rib T1
600x300mm RC BEAM 04 600x300mm RC BEAM 04 C BS4483
600
2H12 03
12H12-34C 200 B2
600x300mm RC BEAM 23
600x300mm RC BEAM 24
2495
21H12-33C 200 B1
36H12-20C 2/Rib B1
12H12-40C 2/Rib B1 4. MINIMUM COVER TO ALL STEEL IN
600x300mm RC BEAM 31
(a) Foundations = 50mm
(b) Beams = 30mm
D 600x300mm RC BEAM 05 600x300mm RC BEAM 08a
C2 3H25 05 (c) Columns = 30mm
(d) Ground slab= 30mm
450x200mm RC BEAM 28
2700
2500
16H12-22C 2/Rib B1
600x300mm RC BEAM 23 5. ABBREVIATIONS
12H12-28C 2/Rib B1
(Scale 1:10) M.C = Mass Concrete
28H12-23C 2/Rib B1
28H12-27C 2/Rib B1
E 450x200mm RC BEAM 09a 450x200mm RC BEAM 09a 600x300mm RC BEAM 17 E
R.C = Reinforced Concrete
28H12-24C 2/Rib T1
28H12-25C 2/Rib T1
28H12-26C 2/Rib T1
600x300mm RC BEAM 29
600x300mm RC BEAM 32
600x300mm RC BEAM 32
600x300mm RC BEAM 32
1645
600x300mm RC BEAM 18
19H12-18C 200 B2
19H12-38C 200 B2
3H16 01 H8 - 400mm H16 - 800mm
19H12-37C 200 T2
2445
36H12-01C 2/Rib B1
[varies in length]
3H12 02 H10 - 500mm H20 - 1000mm
H12 - 600mm H25 - 1250mm
G 600x300mm RC BEAM 17 600x300mm RC BEAM 12 F1 R8 @200
450x200mm RC BEAM 09
All dimensions to be confirmed on site.
1010
450x200m
910
m RC BEAM
m RC BEAM
450x200m
600
25mm EXPANSION JOINT
450x200mm RC BEAM
2H12 03 This drawing must be read in conjunction
TO BE FILLED WITH FOAM with the relevant architectural drawings.
3495 4085 2100 2395 800 2495 1895 5190 325 6385 1745 2555 3580 4765 1870 2945 3395 1155
51175
3H20 05
1 2 3 3c 4 4' 4a 5 66 6a 7 7a 9 11 11b 11d 14 14a 15a REVISIONS
TYPICAL SECTION THROUGH
FOURTH FLOOR STRUCTURAL LAYOUT 600x300mm RC BEAM 10
SCALE 1:100 (Scale 1:10)
6 7 8b 11
3H20-13 2H12-07 3H16-10 1250 3H16-16 3H20-14 3H16-11
2130 1435 1435 1195 1195 2460
600
600
250
6385 3H20-01 4305 3H16-02 3580 3H20-06
TYPICAL ELEVATION THROUGH 600x300mm RC BEAM 05. [2nd, 3rd, 4th & 5th FLOOR] (SCALE 1:25) No. Date: Descriptions:
11 13 15 CLIENT:
3H16-11 1250 2H12-08 3H16-05 3H20-15 2H12-09
2460 2460 1865 Slab Notes:
1. Maxpan Slab ISHAKA ADVENTIST HOSPITAL
All Pannels to be 250mm thick slab with
600 175mm maxpans, 75mm concrete toppings,
1250 37H8-22-200 1250 28H8-22-200
150mm wide ribs, spaced at 450mm centres & PROJECT TITLE:
reinforced at the top with BRC mesh ref. No.
PROPOSED EMERGENCY WARD, MCH AND
A142
250 250 PEDIATRIC WARD TO BE BUILT ON PLOT...,
3H20-06 7385 3H20-03 5590 3H20-04 BLOCK..., AT ISHAKA ADVENTIST
HOSPITAL, ISHAKA MUNICIPALITY,
TYPICAL ELEVATION THROUGH 600x300mm RC BEAM 05. [2nd, 3rd, 4th & 5th FLOOR] (SCALE 1:25) [CONT'D] BUSHENYI DISTRICT.
7a 11 11d 14 ARCHITECT: CIVIL/STRUCTURAL
ENGINEER
3H16-09 3H20-07 3H16-05 2H12-03 3H16-06 2H12-04
2000 2000 2200 1000 2200 1500
600
31H8-22-200 33H8-22-200 1000 15H8-22-200
DRAWING DESCRIPTION:
6135 3H20-01 6635 2945 3H16-02
FOURTH FLOOR STRUCTURAL LAYOUT
TYPICAL ELEVATION THROUGH 600x300mm RC BEAM 08a. [3rd, 4th & 5th FLOOR] (SCALE 1:25) AND
BRC Mesh Ref. A142 top BEAM DETAILS
14 15a 450
2H12-04 3H20-08 ENGINEER'S SEAL: DRAWN BY: CHECKED BY:
1500
75
K.L
Slab Notes:
1. Maxpan Slab
250
APPROVED BY:
175
A1 07/12 00
1 2 3 3' 4 4'' 5 5'' 66 6b 7 7b 11 13 15 NOTES
50020
1. FOUNDATIONS
3495 4085 3075 1420 1775 3410 1920 3270 325 4325 2060 2635 5245 7385 5590 300 They shall generally be taken 1500mm
25mm EXPANSION JOINT min. below existing ground level after
TO BE FILLED WITH FOAM 3H16 01 removal of organic layer and all
A 600x300mm RC BEAM 01 600x300mm RC BEAM 04 A 3H16 02 excavations to be confirmed by the
Engineer before concrete blinding is
R8 @200
49H12-04D 200 B2
34H12-45D 200 B1
laid.
Weak pockets of bearing strata to be
600
30H16-02D 2/Rib B1
30H16-17D 2/Rib B1
2H12 03
600x300mm RC BEAM 26
dug out and filled with 1:4:8 mass
4920
30H16-31D 2/Rib B1
30H16-09D 2/Rib B1
concrete.
30H16-19D 2/Rib T1
30H16-29D 2/Rib T1
30H16-16D 2/Rib T1
30H16-15D 2/Rib T1
32H12-42D 200 B2
[23]
32H16-16D 2/Rib B1
600x300mm RC BEAM 25
600x300mm RC BEAM 18
6685
32H12-43D 200 T2
16H12-44D 200 B1
600x300mm RC BEAM 24
600x300mm RC BEAM 23
600x300mm RC BEAM 18
26H12-07D 200 B1
2. CONCRETE MIXES
3H16 05 Reinforced concrete to have a min.
07H12-41D 200 B2
32H16-06D 2/Rib T1 d works cube strength of 25N/mm² at
26H12-05D 200 T1 TYPICAL SECTION THROUGH 28 days with 20mm max.aggregate size
1765
600x300mm RC BEAM 24
B 600x300mm RC BEAM 03 600x300mm RC BEAM 04 600x300mm RC BEAM 04 B (Scale 1:10) 3. REINFORCEMENT
1275
[26]
600x300mm RC BEAM 27
600x300mm RC BEAM 27
square twisted cold formed bars to
B2 450x200mm RC BEAM 14
3790
STAIRCASE 01
dwgs
28H16-08D 2/Rib B1
62H16-32D 2/Rib B1 [30] [32] 96H12-30D 2/Rib T1 [64] [32] (b) Mild steel bars (250N/mm²) marked "R"
on these dwgs to be round bars to
20765
20770
5210
12H12-34D 200 B2
600x300mm RC BEAM 23
600x300mm RC BEAM 24
4. MINIMUM COVER TO ALL STEEL IN
2495
21H12-33D 200 B1
[30] [32] 62H16-14D 2/Rib T1
3H20 01
600x300mm RC BEAM 31
12H12-40D 2/Rib B1
36H12-20D 2/Rib B1
450x200mm RC BEAM 28
600
2700
2H12 03
2500
16H12-22D 2/Rib B1
5. ABBREVIATIONS
M.C = Mass Concrete
12H12-28D 2/Rib B1
28H12-27D 2/Rib B1
E 450x200mm RC BEAM 09 450x200mm RC BEAM 09 600x300mm RC BEAM 17 E
R.C = Reinforced Concrete
28H12-24D 2/Rib T1
28H12-25D 2/Rib T1
28H12-26D 2/Rib T1
600x300mm RC BEAM 29
09H12-03D 200 B2
600x300mm RC BEAM 32
600x300mm RC BEAM 32
600x300mm RC BEAM 32
1645
3H20 05 T = Top
600x300mm RC BEAM 18
B = Bottom
19H12-23D 200 B2
19H12-18D 200 B2
19H12-38D 200 B2
19H12-37D 200 T2
600x300mm RC BEAM 25 H8 - 400mm H16 - 800mm
2445
36H12-01D 2/Rib B1
[varies in length]
(Scale 1:10) H10 - 500mm H20 - 1000mm
H12 - 600mm H25 - 1250mm
G 450x200mm RC BEAM 09
600x300mm RC BEAM 17 600x300mm RC BEAM 12 F1 All dimensions to be confirmed on site.
1010
450x200m
910
m RC BEAM
m RC BEAM
25mm EXPANSION JOINT 450x200m
16H12-03 200 B1
5210
45H12-02 200 B2
7710
9280
9280
4340
21H12-01 200 B1
D D
600
600
600
600
2H12 03 2H12 03 2H12 03 2H12 03 CLIENT:
E1
2500
2500
2 3 4 5
3H16-02 3H16-04
800
75
APPROVED BY:
1. Maxpan Slab
250
SCALE AS INDICATED
All Pannels to be 250mm thick slab with
175
175mm maxpans, 75mm concrete toppings, DATE APR. 2024
26R8-22-200
150mm wide ribs, spaced at 450mm centres & DWG No.
reinforced at the top with BRC mesh ref. No.
A142 150 300 150 300 150 DESIGNED BY: ISSUED TYPE:
APPROVAL SUBMISSION
5190 Main Bars DRAWINGS
250mm COMPOSITE SLAB K.L
PAPER: SHEET No. REV
TYPICAL ELEVATION THROUGH 450x200mm RC BEAM 09a [4th FLOOR] (SCALE 1:25) [CONT'D]
Scale 1:10
A1 08/12 00
200 1645 11TREADS @300 =3300
ROOF FL
9H12-08
9H12-09 4550
9H12-06
2275 2275
9H12-03
20
300
0m
m
Wa
2/8H12-05 T & B 05
ist
3500
1005
9H12-04
1345
7H12-06-200c/c
9H12-03
.
9H12-09 .
9H12-01-200 .
9H12-01-200
ist
Wa
05 9H12-09
300 300 300 300 300 300 300 300 300 300 300
mm
200
4325
9H12-09
9H12-06
16H12-05-200 B+ 2/8H12-05-200 T
T
9H12-03
15H12-05-200 B+ 2/8H12-05-200
. 9H12-03-200 9H12-03-200 .
20
0m
.
m
6585
Wa
2/8H12-05 T & B 05
ist
9H12-04 3500
9H12-04-200
. 9H12-04-200
.
5580
9H12-03
9H12-09
9H12-05-200
. 9H12-05-200
.
t
ais
05 9H12-09
mW
m
200
FOURTH FL
9H12-08
9H12-09
2260
9H12-06
8H12-06-200c/c
1645
.
9H12-03
20
0m
m
Wa
2/8H12-05 T & B 05
ist
3500
300
9H12-04
9H12-03
1795 430 1795 275
9H12-09 3395 1155
t
ais
05 9H12-09
mW
m
200
THIRD FL
9H12-08
TYPICAL STAIRCASE PLAN 02
9H12-09
9H12-06
9H12-03
20
0m
m
Wa
2/8H12-05 T & B 05
ist
3500
CAUTION:
9H12-04 1. In case of discrepancy
9H12-03 between the NUMBER OF
BARS and the SPACING, the
9H12-09
SPACING takes
precedence.
t
ais
05 9H12-09
mW
3500
1. FOUNDATIONS
They shall generally be taken 1200mm
9H12-04 min. below existing ground level after
9H12-03 removal of organic layer and all
excavations to be confirmed by the
Engineer before concrete blinding is
laid.
9H12-09
Weak pockets of bearing strata to be
ist
05 9H12-09 concrete.
mm
CLIENT:
200
(b) Mild steel bars (250N/mm²) marked "R" HOSPITAL, ISHAKA MUNICIPALITY,
0m
3500
5. ABBREVIATIONS
9H12-02 M.C = Mass Concrete
05 R.C = Reinforced Concrete DRAWING DESCRIPTION:
ist
9H12-01
Wa
T = Top
mm
H12 - 600mm H25 - 1250mm ENGINEER'S SEAL: DRAWN BY: CHECKED BY:
K.L
All dimensions to be confirmed on site.
630 APPROVED BY:
This drawing must be read in conjunction AS INDICATED
SCALE
with the relevant architectural drawings.
TYPICAL STAIRCASE DATE MAY 2024
DWG No.
SECTION 02
DESIGNED BY: ISSUED TYPE:
SCALE 1:25 SUBMISSION DRAWINGS
K.L
PAPER: SHEET No. REV
A1 09/12 00
200 1765 10TREADS @300 =3000
ROOF FL
7H12-08
7H12-07
7H12-06 3495
1745 1745
7H12-03
300
20
0m
m
Wa
2/7H12-05 T & B 05
ist
3500
7H12-04
1645
7H12-06-200c/c
7H12-03
1765
7H12-09 .
7H12-01-200 .
7H12-01-200
2970
t
is
Wa
05 7H12-07
mm 7H12-02-200 7H12-02-200
. .
200
FIFTH FL
300155 300 300 300 300 300 300 300 300 300 300
7H12-08
7H12-07 7H12-03-200 7H12-03-200
. .
7H12-06
5210
7H12-03
17H12-05-200 B+ 2/8H12-05-200 T
17H12-05-200 B+ 2/8H12-05-200 T
20
0m
m
3295
Wa
2/7H12-05 T & B 05
.
ist
2245
7H12-05-200
. 7H12-05-200
.
7H12-09
ist
Wa
05 7H12-07
mm
200
FOURTH FL
275
7H12-08
7H12-07
7H12-06
1495 315 1495
7H12-03
3795
20
0m
m
Wa
2/7H12-05 T & B 05
ist
3500
7H12-09
ist
Wa
05 7H12-07
mm
200
THIRD FL
7H12-08
7H12-07
7H12-06
7H12-03
20
0m
m
Wa
2/7H12-05 T & B 05
ist
3500
CAUTION:
7H12-04 1. In case of discrepancy
7H12-03 between the NUMBER OF
BARS and the SPACING, the
SPACING takes
7H12-09 precedence.
ist
Wa
SECOND FL
and columns shall be in
7H12-08 accordance with the
7H12-07 relevant services'
7H12-06 drawings.
7H12-03
20
0m
m
Wa
3500
1. FOUNDATIONS
They shall generally be taken 1200mm
7H12-04 min. below existing ground level after
7H12-03 removal of organic layer and all
excavations to be confirmed by the
Engineer before concrete blinding is
laid.
7H12-09 Weak pockets of bearing strata to be
dug out and filled with 1:4:8 mass
t
ais
05 7H12-07 concrete.
W
mm
CLIENT:
2. CONCRETE MIXES
200
BUSHENYI DISTRICT.
mm
Wa
ENGINEER
t
5. ABBREVIATIONS
7H12-02 M.C = Mass Concrete
R.C = Reinforced Concrete DRAWING DESCRIPTION:
05
ist
7H12-01 T = Top
Wa
B = Bottom
mm
STAIRCASE 01 DETAILS
6. MINIMUM LAPS
200
K.L
All dimensions to be confirmed on site.
630 APPROVED BY:
This drawing must be read in conjunction AS INDICATED
SCALE
with the relevant architectural drawings.
DATE MAY 2024
A1 10/12 00
250
ROOF FLOOR
250
ROOF FLOOR
1400
2/2H12 07 150
H12- 01 NF & FF
3500
3500
(2/15)
2/12H12 05 150 c/c
2100
2100
1000
700 1500 500
250
250
1400
2/2H12 07 150
H12- 01 NF & FF
3500
3500
(2/15)
2/12H12 05 150 c/c
2100
2100
1000
700 1500 500
250
250
1400
2/2H12 07 150
H12- 01 NF & FF
3500
3500
(2/15)
2/12H12 05 150 c/c
2100
2100
1000
1400
2/2H12 07 150
2/14H12 08 150 c/c
H12- 01 NF & FF
(2/18)
3500
3500
(2/15)
2100
1000
SECOND FLOOR
SECOND FLOOR
250
250
1400
H12- 01 NF & FF
(2/18)
3500
3500
(2/15)
2100
1000
FIRST FLOOR
FIRST FLOOR
250
250
CLIENT:
1400
PROJECT TITLE:
PROPOSED EMERGENCY WARD, MCH AND
3500
ARCHITECT: CIVIL/STRUCTURAL
2/4H16 05 150 c/c
ENGINEER
2100
2100
2/105H12 07 150
700 1500 500 U bar (BOTH L & R)
1000
150
DRAWING DESCRIPTION:
min. depth = 1500mm
K.L
APPROVED BY:
500
A1 11/12 00
NOTES
1. FOUNDATIONS
They shall generally be taken 1500mm
E F G 6 5 4 3 2 1 min. below existing ground level after
4490 5190 5190 4495 4085 3495 removal of organic layer and all
excavations to be confirmed by the
2245 2245
Engineer before concrete blinding is
400
4000 laid.
6 6 FOURTH FL Weak pockets of bearing strata to be
500 3000 500
dug out and filled with 1:4:8 mass
09H12-06 concrete.
2. CONCRETE MIXES
Reinforced concrete to have a min.
500
200 Waist
2/18H12 03 200
100H12-02 2/20H12 02 150
works cube strength of 25N/mm² at
WALL B
09H16-07 200 B2
28 days with 20mm max.aggregate size
09H16-08 200 B2
4790
5190
3. REINFORCEMENT
(a) High yield bars (>500N/mm²) to be
THIRD FL 2/27H16 22 150 (T2 & B2) square twisted cold formed bars to
BS4461and are marked "H" on these
08H12-01-200
3500
2/21H12 02 150 2/21H12 02 150 dwgs
WALL C
2/18H12 01 200
WALL A
on these dwgs to be round bars to
4100
3100
BS4483
5 5
400
200 Waist
100H12-03 (a) Foundations = 50mm
(b) Beams = 30mm
09H12-05 (c) Columns = 30mm
450x200mm RC BEAM 09
500
4790
5190
09H12-06 B = Bottom
6. Minimum Laps are
H8 - 400mm H16 - 800mm
100H12-02
200 Waist
PLAN OF FOUNDATION BASE FOR LIFT SHAFT H10 - 500mm H20 - 1000mm
(SCALE 1:25) H12 - 600mm H25 - 1250mm
All dimensions to be confirmed on site.
This drawing must be read in conjunction
FIRST FL with the relevant architectural drawings.
4 4
400
08H12-01-200
3500
REVISIONS
22850
22450
450x200mm RC BEAM 09
100H12-03
3000
WALL B
09H12-05
4095
4495
200 Waist
700
H10 03 150
H12 01 150 H12 02 150
WALL A
WALL C
H12 02 150
3100
1500
3 3
400
H10 03 150
CLIENT:
WALL B
900
TYPICAL SECTION THROUGH RAMP ISHAKA ADVENTIST HOSPITAL
SCALE 1:25
4085
3700
ARCHITECT: CIVIL/STRUCTURAL
ENGINEER
Lift Shaft
min. depth = 1500mm
H12 01 150
3495
3075
H12 02 150
08H12-01 200 B1
600x300mm RC BEAM 18
500
A1 12/12 00