BBS STP
BBS STP
Sr.
Particular Nos.
no. L
STP BLOCK
Raft
Bottom(Short Bar)
Bottom(Long Bar)
Chairs
Wall
1 Outer wall of equalization tank at grid A1 to B1(section B-B) upto 6.85 level 1 2.46
2 Outer wall of equalization tank at grid A1 to A3(section D-D) upto 6.85 level 1 3.80
4 Outer Stairs wall at grid C1 to D1(section C-C) upto 6.85 level 1 5.81
flushing water & irrigation water tank intternal wall at grid D4 to D3(section A-A) upto 6.85
6 2 5.45
level
Vertical bars
horizontal internal bars upto 2.4 from raft top
Extra Vertical upto 2.4 internal bars
horizontal internal bars upto 2.4 to 6.85
flushing water & irrigation water tank intternal wall at grid D5 to C5 &(section C-C) upto
7 1 4.07
6.85 level
flushing water & irrigation water tank intternal wall at grid D4 to C4 &(section C-C) upto
8 1 4.07
6.85 level
Vertical bars
horizontal bars upto 6.85 level
Bottom bars
binders
main bars
binders
Mbr,aeration 01,02 & anoxic tanks vertical direction walls at grid B4 to C4 &(section A-A)
11 4 4.85
upto 4.10 level
Vertical bars
horizontal bars upto 1.5 from top of raft
horizontal bars upto 1.5 to 4.10
Mbr,aeration 01,02 & anoxic tanks horizontal direction walls at grid B,C4 (section C-C) upto
12 1 8.32
4.10 level
Vertical bars
horizontal bars upto 4.10
Mbr,aeration 01,02 & anoxic tanks horizontal direction walls at grid B,C5 (section C-C) upto
13 1 9.26
4.10 level
Stp equalization tanks vertical direction walls between grid A5-3 & B5-3 (section A-A) upto
14 1 8.86
4.10 level
Vertical bars
horizontal bars upto 1.5 from top of raft
horizontal bars upto 1.5 to 4.10
15 Stp equalization tanks vertical direction walls at grid A5-3 (section A-A) upto 4.85 level 1 9.32
16 Stp equalization tanks horizontal direction walls at grid AB3 (section B-B) upto 4.10 level 1 2.20
Vertical bars
horizontal bars upto 1.85 from top of raft
horizontal bars upto 1.85 to 4.10
17 Stp equalization tanks horizontal direction walls at grid AB5 (section B-B) upto 4.85 level 1 2.24
18 Inner wall of equalization tank at grid betwwen A & B on 1,2,3 (section D-D) upto 2.85 level 1 4.30
Vertical bars
horizontal bars upto 2.85
Etp chlorine contact,etp tube settler pump sunction,etp flocculation ,etp coagulation tank s
19 1 2.33
vertical direction walls at grid C1,2 or stair wall (section D-D) upto 2.85
Vertical bars
horizontal bars upto 2.85
Etp chlorine contact,etp tube settler pump sunction,etp flocculation ,etp coagulation tank s
20 3 1.50
vertical direction walls at grid BC1,2 (section D-D) upto 2.85
Vertical bars
horizontal bars upto 2.85
21 Etp tube settler pump sunction tank chajja at level 2.05 1 1.50
Bottom bars
binders
Etp chlorine contact,etp tube settler pump sunction,etp flocculation ,etp coagulation tank s
22 horizontal direction walls at grid BC1 (section C-C) upto 2.85 (consider section of stair 1 11.94
wall outer at grid 01)
23 Etp tube settler pump sunction tank middle wall at bottom level 0.85 & top level 2.85 1 1.50
Bottom bars
binders
RA-01
12 17 0.15 8.33
10 39 0.20 2.9
12 21 0.13 8.33
10 39 0.20 2.9
12 26 0.15 8.33
10 39 0.20 4.0
12 31 0.13 8.33
10 39 0.20 4.0
12 53 0.15 8.33
10 39 0.20 8.0
12 63 0.13 8.33
10 39 0.20 8.0
12 40 0.15 8.33
10 39 0.20 6.0
12 47 0.13 8.33
10 39 0.20 6.0
0.30 7.55 0.30
12 37 0.15 8.33
10 39 0.20 5.7
12 31 0.18 8.33 0.60
12 28 0.09 5.7
12 31 0.18 2.97
12 33 0.13 5.7
12 62 0.18 8.33
12 56 0.09 5.7
12 62 0.18 2.97
12 66 0.13 5.7
12 56 0.15 8.33
10 26 0.20 4.3
12 68 0.13 8.33 0.60
12 35 0.13 4.3
10 29 0.20 4.3
12 68 0.13 8.33
12 40 0.13 4.3
10 18 0.20 1.27
8 10 0.20 3.45 0.40
12 80 0.13 5.58
12 26 0.13 5.1
10 52 0.13 5.1
12 63 0.15 5.58
10 25 0.20 9.5
12 75 0.13 0.18
12 21 0.13 9.5
12 18 0.13 9.5
12 63 0.15 6.33
10 29 0.20 9.5
12 76 0.13 6.33
10 29 0.20 9.5
12 24 0.20 5.58
12 20 0.20 2.4
10 30 0.20 2.4
12 16 0.15 5.58
10 25 0.20 2.4
12 19 0.13 5.58
10 25 0.20 2.4
10 46 0.20 4.33
10 38 0.20 4.5
12 26 0.20 4.03
10 38 0.20 2.2
0.20 3.55 0.10
10 18 0.20 4.03
10 38 0.20 1.4
0.80 0.15
10 9 0.20 1.30 0.50
10 9 0.20 1.65 0.50
12 81 0.15 4.33
10 19 0.20 12.1
12 96 0.13 4.33
10 19 0.20 12.1
3.75 7.50
₹ 1,740,212
23761
297500