The document outlines various tests and data sheets for aggregate materials, specifically coarse aggregates of 20 mm and 40 mm sizes, in accordance with IS 2386 standards. It includes procedures for Aggregate Impact Value, Flakiness Test, Elongation Test, Sieve Analysis, Slump Test, and Compressive Strength, detailing measurements and calculations required for each test. The document is structured to capture specific details such as sample weights, test results, and remarks from engineers involved in the testing process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
194 views

71 Venkat QC Tables Bridge

The document outlines various tests and data sheets for aggregate materials, specifically coarse aggregates of 20 mm and 40 mm sizes, in accordance with IS 2386 standards. It includes procedures for Aggregate Impact Value, Flakiness Test, Elongation Test, Sieve Analysis, Slump Test, and Compressive Strength, detailing measurements and calculations required for each test. The document is structured to capture specific details such as sample weights, test results, and remarks from engineers involved in the testing process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

Aggregate Impact Value [ IS : 2386 (Part-4)]

Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______
______ ______ ______ _
Sample Sample Sample Sample Sample
S.No DESCRIPTION Notation - Units
1 2 3
1 Item of Work COARSE AGGREGATE (20 mm size Graded metal)
2 Date
3 Location
4 Weight of Empty Measuring cup W1 gm
5 Wt. of Empty measuring cup + Wt. of Aggregate
(passing 12.5 mm & retaining on 10 mm sieve ) W2 gm
6 Wt. of Aggregate
(passing 12.5 mm & retaining on 10 mm sieve ) (W2-W1)=W3 gm
7 Wt. of Impacted Aggregate W4 gm
8 (Wt.
retained on 2.36
of Fines mm )2.36 mm sieve )
(passing (W3-W4)=W5 gm
9 A. I. V. 100*W5/W3 %
10 Remarks

11 Asst. Executive Engineer /

12 Dy. Executive Engineer/


Flakiness Test of Aggregate ( IS : 2386 Part - 1 )
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____
_____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _
COARSE AGGREGATE (20 mm size Graded metal)
Road Section at KM :: Date ::
Sample No:: Weight :: gm
Size of Aggregate Wt. of the
Thickness
fraction of at Wt. of aggregate in
Passing Through Retained on gauge
Sno least each fraction passing Remarks
IS Sieve IS Sieve size
200 pieces thickness gauge (gm)
( mm) ( mm) ( mm )
(gm )
1 2 3 4 5 6 7
1 63 50 100 33.9 100 100
2 50 40 100 27 100 100
3 40 31.5 100 19.5 100 100
4 31.5 25 100 16.95 100 100
5 25 20 100 13.5 100 100
6 20 16 100 10.8 100 100
7 16 12.5 100 8.55 100 100
8 12.5 10 100 6.75 100 100
9 10 6.3 100 4.89 100 100
999 999 999 999 999 999 999
Total ( gm ) W= 1000 w= 1000
F.L=(100*w/W)= pc

Elangation Test of Aggregate ( IS : 2386 Part - 1 )


COARSE AGGREGATE (20 mm size Graded metal)
Road Section at KM :: Date ::
Sample No:: Weight :: gm
Size of Aggregate Wt. of the
Thickness
fraction of at Wt. of aggregate in
Passing Through Retained on gauge
Sno least each fraction passing Remarks
IS Sieve IS Sieve size
200 pieces thickness gauge (gm)
( mm) ( mm) ( mm )
(gm )
1 2 3 4 5 6 7
1 50 40 100 81 100 100
2 40 25 100 58.5 100 100
3 25 20 100 40.5 100 100
4 20 16 100 32.4 100 100
5 16 12.5 100 25.6 100 100
6 12.5 10 100 20.2 100 100
7 10 6.3 100 14.7 100 100
999 999 999 999 999 999 999
Total ( gm ) W= 1000 w= 1000
E.I. = (100*w/W) = pc

F.I + E.I= pc

AEE/ DEE/
Data Sheet for Sieve Analysis of Aggregate ( IS : 2386 Part - 1 )
COARSE AGGREGATE (20 mm size Graded metal)
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____
______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _

Road Section at KM :: Date ::


Sample No:: Weight of Sample :: gm
Cumulative Cumulative
I.S. Sieve Weight of Per cent of per cent of per cent of Permissible Limits
SNo designation sample weight weight weight As Per MoRT&H Remarks
retained retained retained passing Specification
(gm) (%) (%) (%) TABLE 1000-1
1 2 3 4 5 6 7 8
1 40 mm 100
2 20 mm 100 100 100 100 95 - 100 100
3 10 mm 100 100 100 100 25 - 55 100
4 4.75 mm 100 100 100 100 0 - 10 100
5 In Pan 100 100 100 100 200 200 100
999 999 999 999 999 999 999 999 999 999
Total = gm Over Size= % Under Size= %

AEE/ DEE/

Road Section at KM :: Date ::


Sample No:: Weight of Sample :: gm
1 2 3 4 5 6 7 8
1 40 mm 100
2 20 mm 100 100 100 100 95 - 100 100
3 10 mm 100 100 100 100 25 - 55 100
4 4.75 mm 100 100 100 100 0 - 10 100
5 In Pan 100 100 100 100 200 200 100
999 999 999 999 999 999 999 999 999 999
Total = gm Over Size= % Under Size= %

AEE/ DEE/
Aggregate Impact Value [ IS : 2386 (Part-4)]
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______
______ ______ ______ _
Sample Sample Sample Sample Sample
S.No DESCRIPTION Notation - Units
1 2 3
1 Item of Work COARSE AGGREGATE (40 mm size Graded metal)
2 Date
3 Location
4 Weight of Empty Measuring cup W1 gm
5 Wt. of Empty measuring cup + Wt. of Aggregate
(passing 12.5 mm & retaining on 10 mm sieve ) W2 gm
6 Wt. of Aggregate
(passing 12.5 mm & retaining on 10 mm sieve ) (W2-W1)=W3 gm
7 Wt. of Impacted Aggregate W4 gm
8 (Wt.
retained on 2.36
of Fines mm )2.36 mm sieve )
(passing (W3-W4)=W5 gm
9 A. I. V. 100*W5/W3 %
10 Remarks

11 Asst. Executive Engineer /

12 Dy. Executive Engineer/


Flakiness Test of Aggregate ( IS : 2386 Part - 1 )
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____
_____ ______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _
COARSE AGGREGATE (40 mm size Graded metal)
Road Section at KM :: Date ::
Sample No:: Weight :: gm
Size of Aggregate Wt. of the
Thickness
fraction of at Wt. of aggregate in
Passing Through Retained on gauge
Sno least each fraction passing Remarks
IS Sieve IS Sieve size
200 pieces thickness gauge (gm)
( mm) ( mm) ( mm )
(gm )
1 2 3 4 5 6 7
1 25 20 100 13.5 100 100
2 20 16 100 10.8 100 100
3 16 12.5 100 8.55 100 100
4 12.5 10 100 6.75 100 100
5 10 6.3 100 4.89 100 100
999 999 999 999 999 999 999
Total ( gm ) W= 1000 w= 1000
F.L=(100*w/W)= pc

Elangation Test of Aggregate ( IS : 2386 Part - 1 )


COARSE AGGREGATE (40 mm size Graded metal)
Road Section at KM :: Date ::
Sample No:: Weight :: gm
Size of Aggregate Wt. of the
Thickness
fraction of at Wt. of aggregate in
Passing Through Retained on gauge
Sno least each fraction passing Remarks
IS Sieve IS Sieve size
200 pieces thickness gauge (gm)
( mm) ( mm) ( mm )
(gm )
1 2 3 4 5 6 7
1 25 20 100 40.5 100 100
2 20 16 100 32.4 100 100
3 16 12.5 100 25.6 100 100
4 12.5 10 100 20.2 100 100
5 10 6.3 100 14.7 100 100
999 999 999 999 999 999 999
Total ( gm ) W= 1000 w= 1000
E.I. = (100*w/W) = pc

F.I + E.I= pc

AEE/ DEE/
Data Sheet for Sieve Analysis of Aggregate ( IS : 2386 Part - 1 )
COARSE AGGREGATE (40 mm size Graded metal)
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____
______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _

Road Section at KM :: Date ::


Sample No:: Weight of Sample :: gm
Cumulative Cumulative
I.S. Sieve Weight of Per cent of per cent of per cent of Permissible Limits
SNo designation sample weight weight weight As Per MoRT&H Remarks
retained retained retained passing Specification
(gm) (%) (%) (%) TABLE 1000-1
1 2 3 4 5 6 7 8
1 63 mm 100
2 40 mm 100 100 100 100 95 - 100 100
3 20 mm 100 100 100 100 30 - 70 100
4 10 mm 100 100 100 100 10 - 35 100
5 4.75 mm 100 100 100 100 0-5 100
6 In Pan 100 100 100 100 200 200 100
999 999 999 999 999 999 999 999 999 999
Total = gm Over Size= % Under Size= %

AEE/ DEE/

Road Section at KM :: Date ::


Sample No:: Weight of Sample :: gm
1 2 3 4 5 6 7 8
1 63 mm 100
2 40 mm 100 100 100 100 95 - 100 100
3 20 mm 100 100 100 100 30 - 70 100
4 10 mm 100 100 100 100 10 - 35 100
5 4.75 mm 100 100 100 100 0-5 100
6 In Pan 100 100 100 100 200 200 100
999 999 999 999 999 999 999 999 999 999
Total = gm Over Size= % Under Size= %

AEE/ DEE/
SLUMP TEST ( IS:1199)
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____
_____ ______ ______ ______ ______ ______ ______ _

S.No DESCRIPTION Notation - Units Sample Sample Sample Sample Sample


1 2 3 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :PCC Grade M15 (40 mm size Graded metal)

2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks

9 Asst. Executive Engineer


10 Dy. Executive Engineer
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______
_____ _____ _____ ______ ______ ______ ______ ______ ______ _
S.No DESCRIPTION Units Sample Sample Sample Sample Sample Sample
1 2 3 4 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :PCC Grade M15 (40 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2

8 28 days Compressive strength


Test Date
Compressive strength of Cube 4 N/mm2
Compressive strength of Cube 5 N/mm2
Compressive strength of Cube 6 N/mm2
Average N/mm2
9 Remarks
10 Asst. Executive Engineer /
11 Dy. Executive Engineer /
SLUMP TEST ( IS:1199)
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____
_____ ______ ______ ______ ______ ______ ______ _

S.No DESCRIPTION Notation - Units Sample Sample Sample Sample Sample


1 2 3 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :PCC Grade M20 (40 mm size Graded metal)

2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks

9 Asst. Executive Engineer


10 Dy. Executive Engineer
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______
_____ _____ _____ ______ ______ ______ ______ ______ ______ _
S.No DESCRIPTION Units Sample Sample Sample Sample Sample Sample
1 2 3 4 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :PCC Grade M20 (40 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2

8 28 days Compressive strength


Test Date
Compressive strength of Cube 4 N/mm2
Compressive strength of Cube 5 N/mm2
Compressive strength of Cube 6 N/mm2
Average N/mm2
9 Remarks
10 Asst. Executive Engineer /
11 Dy. Executive Engineer /
Data Sheet for Sieve Analysis of Fine Aggregates ( IS : 2386 Part - 1 )

Name of Work ::

Item of Work :: FINE AGGREGATE / SAND

Road Section at KM :: Date ::


Sample No:: Weight of Sample ::

Cumulative GRADING ZONES AS PER TABLE


Weight of Per cent of 1000-2 of MoRT&H.
per cent of Percentage
I.S. Sieve sample weight
SNo weight passing Remarks
designation retained retained Grading Grading Grading
retained (%)
(gm) (%) Zone I Zone II Zone III
(%)
1 2 3 4 5 6 7 8 9 10
1 10.00 mm 100 100 100
2 4.75 mm 90 - 100 90 - 100 90 - 100
3 2.36 mm 60 - 95 75 - 100 85 - 100
4 1.18 mm 30 - 70 55 - 90 75 - 100
5 600 micron 15 - 34 35 - 59 60 - 79
6 300 micron 5 - 20 8 - 30 12 - 40
7 150 micron 0 - 10 0 - 10 0 - 10
Total of Col.(4)::
Fineness Modulus :: Falling Zone ::________ Remarks ::

AEE/ Dy.EE/

Road Section at KM :: Date ::


Sample No:: Weight of Sample ::

1 2 3 4 5 6 7 8 9 10
1 10.00 mm 100 100 100
2 4.75 mm 90 - 100 90 - 100 90 - 100
3 2.36 mm 60 - 95 75 - 100 85 - 100
4 1.18 mm 30 - 70 55 - 90 75 - 100
5 600 micron 15 - 34 35 - 59 60 - 79
6 300 micron 5 - 20 8 - 30 12 - 40
7 150 micron 0 - 10 0 - 10 0 - 10
Total of Col.(4)::
Fineness Modulus :: Falling Zone ::________ Remarks ::

AEE/ Dy.EE/
SAND BULK AGE & DELETERIOUS SUBSTANCES
Name of Work ::

S.No DESCRIPTION Notation - Units Sample Sample Sample Sample Sample Sample

1 2 3 4 4 4 4 4 4

1 Item of Work FINE AGGREGATE / SAND


2 Date
3 Location
4 Initial Volume of Sand V1 ml
5 Final Volume of Sand in water V2 ml
6 Bulking of Sand (V1-V2)=V3 ml
7 Bulkage (%) 100*V3/V2 %
8 Volume of Deleterious Materials V4 ml
9 Percentage of Deleterious Materials 100*V4/V2 %
10 Remarks

11 Asst. Executive Engineer


12 Dy. Executive Engineer
SLUMP TEST ( IS:1199)
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____
_____ ______ ______ ______ ______ ______ ______ _

S.No DESCRIPTION Notation - Units Sample Sample Sample Sample Sample


1 2 3 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :RCC Grade M20 (20 mm size Graded metal)

2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks

9 Asst. Executive Engineer


10 Dy. Executive Engineer
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______
_____ _____ _____ ______ ______ ______ ______ ______ ______ _
S.No DESCRIPTION Units Sample Sample Sample Sample Sample Sample
1 2 3 4 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :RCC Grade M20 (20 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2

8 28 days Compressive strength


Test Date
Compressive strength of Cube 4 N/mm2
Compressive strength of Cube 5 N/mm2
Compressive strength of Cube 6 N/mm2
Average N/mm2
9 Remarks
10 Asst. Executive Engineer /
11 Dy. Executive Engineer /
SLUMP TEST ( IS:1199)
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____
_____ ______ ______ ______ ______ ______ ______ _

S.No DESCRIPTION Notation - Units Sample Sample Sample Sample Sample


1 2 3 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :RCC Grade M25 (20 mm size Graded metal)

2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks

9 Asst. Executive Engineer


10 Dy. Executive Engineer
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______
_____ _____ _____ ______ ______ ______ ______ ______ ______ _
S.No DESCRIPTION Units Sample Sample Sample Sample Sample Sample
1 2 3 4 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :RCC Grade M25 (20 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2

8 28 days Compressive strength


Test Date
Compressive strength of Cube 4 N/mm2
Compressive strength of Cube 5 N/mm2
Compressive strength of Cube 6 N/mm2
Average N/mm2
9 Remarks
10 Asst. Executive Engineer /
11 Dy. Executive Engineer /
SLUMP TEST ( IS:1199)
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____
_____ ______ ______ ______ ______ ______ ______ _

S.No DESCRIPTION Notation - Units Sample Sample Sample Sample Sample


1 2 3 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :RCC Grade M30 (20 mm size Graded metal)

2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks

9 Asst. Executive Engineer


10 Dy. Executive Engineer
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______
_____ _____ _____ ______ ______ ______ ______ ______ ______ _
S.No DESCRIPTION Units Sample Sample Sample Sample Sample Sample
1 2 3 4 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :RCC Grade M30 (20 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2

8 28 days Compressive strength


Test Date
Compressive strength of Cube 4 N/mm2
Compressive strength of Cube 5 N/mm2
Compressive strength of Cube 6 N/mm2
Average N/mm2
9 Remarks
10 Asst. Executive Engineer /
11 Dy. Executive Engineer /
SLUMP TEST ( IS:1199)
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____
_____ ______ ______ ______ ______ ______ ______ _

S.No DESCRIPTION Notation - Units Sample Sample Sample Sample Sample


1 2 3 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :RCC/PSC Grade M35 (20 mm size Graded metal)

2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks

9 Asst. Executive Engineer


10 Dy. Executive Engineer
COMPRESSIVE STRENGTH
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______
_____ _____ _____ ______ ______ ______ ______ ______ ______ _
S.No DESCRIPTION Units Sample Sample Sample Sample Sample Sample
1 2 3 4 4 4 4 4 4

1 Item of Work CEMENT CONCRETE :RCC/PSC Grade M35 (20 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2

8 28 days Compressive strength


Test Date
Compressive strength of Cube 4 N/mm2
Compressive strength of Cube 5 N/mm2
Compressive strength of Cube 6 N/mm2
Average N/mm2
9 Remarks
10 Asst. Executive Engineer /
11 Dy. Executive Engineer /