71 Venkat QC Tables Bridge
71 Venkat QC Tables Bridge
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______
______ ______ ______ _
Sample Sample Sample Sample Sample
S.No DESCRIPTION Notation - Units
1 2 3
1 Item of Work COARSE AGGREGATE (20 mm size Graded metal)
2 Date
3 Location
4 Weight of Empty Measuring cup W1 gm
5 Wt. of Empty measuring cup + Wt. of Aggregate
(passing 12.5 mm & retaining on 10 mm sieve ) W2 gm
6 Wt. of Aggregate
(passing 12.5 mm & retaining on 10 mm sieve ) (W2-W1)=W3 gm
7 Wt. of Impacted Aggregate W4 gm
8 (Wt.
retained on 2.36
of Fines mm )2.36 mm sieve )
(passing (W3-W4)=W5 gm
9 A. I. V. 100*W5/W3 %
10 Remarks
F.I + E.I= pc
AEE/ DEE/
Data Sheet for Sieve Analysis of Aggregate ( IS : 2386 Part - 1 )
COARSE AGGREGATE (20 mm size Graded metal)
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____
______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _
AEE/ DEE/
AEE/ DEE/
Aggregate Impact Value [ IS : 2386 (Part-4)]
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____ _____ ______ ______ ______
______ ______ ______ _
Sample Sample Sample Sample Sample
S.No DESCRIPTION Notation - Units
1 2 3
1 Item of Work COARSE AGGREGATE (40 mm size Graded metal)
2 Date
3 Location
4 Weight of Empty Measuring cup W1 gm
5 Wt. of Empty measuring cup + Wt. of Aggregate
(passing 12.5 mm & retaining on 10 mm sieve ) W2 gm
6 Wt. of Aggregate
(passing 12.5 mm & retaining on 10 mm sieve ) (W2-W1)=W3 gm
7 Wt. of Impacted Aggregate W4 gm
8 (Wt.
retained on 2.36
of Fines mm )2.36 mm sieve )
(passing (W3-W4)=W5 gm
9 A. I. V. 100*W5/W3 %
10 Remarks
F.I + E.I= pc
AEE/ DEE/
Data Sheet for Sieve Analysis of Aggregate ( IS : 2386 Part - 1 )
COARSE AGGREGATE (40 mm size Graded metal)
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____
______ _____ _____ _____ ______ ______ ______ ______ ______ ______ _
AEE/ DEE/
AEE/ DEE/
SLUMP TEST ( IS:1199)
Name of Work :: ______ ______ ______ ______ ______ ______ ______ _____ _____ _____ _____ _____ ______ _____ _____
_____ ______ ______ ______ ______ ______ ______ _
1 Item of Work CEMENT CONCRETE :PCC Grade M15 (40 mm size Graded metal)
2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks
1 Item of Work CEMENT CONCRETE :PCC Grade M15 (40 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2
1 Item of Work CEMENT CONCRETE :PCC Grade M20 (40 mm size Graded metal)
2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks
1 Item of Work CEMENT CONCRETE :PCC Grade M20 (40 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2
Name of Work ::
AEE/ Dy.EE/
1 2 3 4 5 6 7 8 9 10
1 10.00 mm 100 100 100
2 4.75 mm 90 - 100 90 - 100 90 - 100
3 2.36 mm 60 - 95 75 - 100 85 - 100
4 1.18 mm 30 - 70 55 - 90 75 - 100
5 600 micron 15 - 34 35 - 59 60 - 79
6 300 micron 5 - 20 8 - 30 12 - 40
7 150 micron 0 - 10 0 - 10 0 - 10
Total of Col.(4)::
Fineness Modulus :: Falling Zone ::________ Remarks ::
AEE/ Dy.EE/
SAND BULK AGE & DELETERIOUS SUBSTANCES
Name of Work ::
S.No DESCRIPTION Notation - Units Sample Sample Sample Sample Sample Sample
1 2 3 4 4 4 4 4 4
1 Item of Work CEMENT CONCRETE :RCC Grade M20 (20 mm size Graded metal)
2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks
1 Item of Work CEMENT CONCRETE :RCC Grade M20 (20 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2
1 Item of Work CEMENT CONCRETE :RCC Grade M25 (20 mm size Graded metal)
2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks
1 Item of Work CEMENT CONCRETE :RCC Grade M25 (20 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2
1 Item of Work CEMENT CONCRETE :RCC Grade M30 (20 mm size Graded metal)
2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks
1 Item of Work CEMENT CONCRETE :RCC Grade M30 (20 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2
1 Item of Work CEMENT CONCRETE :RCC/PSC Grade M35 (20 mm size Graded metal)
2 Grade of Concrete
3 Date
4 Location
5 Initial Height of Slump cone ( Concrete mould ) h1 mm
6 Height of Concrete after subsidence h2 mm
7 SLUMP = Reduction if Heigh of Concrete (h2-h1)=S mm
8 Remarks
1 Item of Work CEMENT CONCRETE :RCC/PSC Grade M35 (20 mm size Graded metal)
2 Grade of Concrete ::
3 Date
4 Location
5 Date of Casting
6 Number of Cubes cast no
7 7 days Compressive strength
Test Date
Compressive strength of Cube 1 N/mm2
Compressive strength of Cube 2 N/mm2
Compressive strength of Cube 3 N/mm2
Average N/mm2