0% found this document useful (0 votes)
75 views

BCA Project Phase 2 (1)

The document outlines the guidelines for the Project Report and Viva-Voce process for the Bachelor of Computer Applications (BCA) program at Manipal University Jaipur. It details the requirements for project work, including the need for a live project related to the student's specialization, and specifies the components expected in the project report. Additionally, it describes the evaluation pattern, which includes internal assessments and term-end examinations, along with the requirements for the project presentation.

Uploaded by

sanaabubakar777
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views

BCA Project Phase 2 (1)

The document outlines the guidelines for the Project Report and Viva-Voce process for the Bachelor of Computer Applications (BCA) program at Manipal University Jaipur. It details the requirements for project work, including the need for a live project related to the student's specialization, and specifies the components expected in the project report. Additionally, it describes the evaluation pattern, which includes internal assessments and term-end examinations, along with the requirements for the project presentation.

Uploaded by

sanaabubakar777
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Project Report

Guidelines
Bachelor of Computer Applications (BCA)
Program

Centre for Distance & Online Education


Manipal University Jaipur
Dehmi Kalan, Rajasthan – 303 007.
Contents

Contents
2.1 Phase 2: Project Work.................................................................................................................2
2.1.1 Components of Project Report............................................................................................3
2.2 Project Evaluation.......................................................................................................................4
2.4 Project Viva Voce / Presentation................................................................................................5

2.1 Phase 2: Project Work

Project Report and Viva-Voce process


As project work is an important part of the - BCA course curriculum, it has been
marked 24 credits. The following guidelines need to be followed for BCA
projects.
1. The project must be a live project either done at the place of work
or some other organization.
2. The project must be related to the specialization pursued.
3. The title selected should be coherent with the stream of study or
specialization.
4. The learner and the guide have the freedom to identify an
appropriate topic.
5. The project title should be specific and focused towards the
objectives of the project.
6. Project work should be undertaken on the same topic that has
been approved by PSC.

2.1.1 Components of Project Report


These guidelines will provide the information for developing a project report.
The components of the Project Report expected from the learners may include
the following:
 Table of Contents
 Introduction/Objectives
 System Analysis
 Identification Of Need
 Preliminary Investigation
 Feasibility Study
 Project Planning
 Project Scheduling (PERT Chart & Gantt Chart)
 Software Requirement Specifications (SRS)
 Software Engineering Paradigm applied.
 Data Models (like DFD)/Control Flow Diagrams/State
Diagrams/Sequence Diagrams/ Entity Relationship Models,
Class Diagrams/CRC Models/ Collaboration Diagrams/Use-
case Diagrams/Activity Diagrams depending upon your
project requirements.
 System Design
 Modularisation Details
 Data Integrity and Constraints
 Database Design, Procedural Design/Object Oriented Design
 User Interface Design
 Test Cases (Unit Test Cases and System Test Cases)
 Coding
 SQL commands for
 Database Creation (along with constraints)
 Data Insertion in Tables, and
 Access Rights for different users
 Standardization of the coding
 Code Efficiency
 Error Handling
 Parameters Calling/Passing
 Validation Checks
 Testing
 Testing Techniques and Testing Strategies used.
 Testing Plan Used
 Test reports for Unit Test Cases & System Test Cases
 Debugging and Code Improvement
 System Security Measures
 Database/Data Security implementation
 Creation of User Profiles
 Managing the User Rights
 Cost Estimation and its Model
 Future Scope
 Bibliography
 Appendices (if any)
 Data Dictionary

2.2 Project Evaluation


Evaluation Pattern for the project is based on the following categories:
 Synopsis (30% - Internal Assessment (IA)),
 Project report and viva voce (70% - Term-End-Examination (TEE)).
Project Steering Committee (PSC) will evaluate the submitted synopsis and the
marks will be awarded as per the distribution given below:

Section File/Document Marks


Section – A (Internal Project Synopsis (under Sem 3 tab), post 30
Assessment) guide approval
Section – A (Term End) Project Report 50
Section – B (Term End) Answer for Viva Questions 20
TOTAL 100

2.4 Project Viva Voce / Presentation


The presentation along with a 3 -5-minute video showing the project execution
should be uploaded on LMS within the timeline stipulated by the University.
Viva will be conducted as per the schedule given by the Office of Learner
Evaluation. The project work is completed with the viva voce / presentation.

You might also like