02.Structure
02.Structure
51
2"
°
135
C-1 C-1
10
'-1
"
02
1
F-1 F-1 135
°
A A A
9'-3"
A
10'
-3 2
1"
0"
19'-3"
'-1
30
B B
B
B
21
10'-421"
'-4
"
10'
A
11'
B
-9 2
A
1"
20'-10"
"
11
B B
8"
4"
3'-821"
C-2
2'-5"
135
B
°
F-1
5'-9"
13'-621"
B 23'-6"
15'-1121"
15'-1121"
4'-421"
C
B
1"
B
'-1
B
4'-421"
24
12'-521"
C
A C
°
90°
135
135
°
4'-7"
° C-2 C-2
135
18'-9"
18'-9"
F-1 F-1
A A
A
01
"
2
-1
B
1'
4'-7" 9'-921"
8'-9"
° 135
135 °
C A A A
C-2 C-2
F-1 F-1
25'-021" 12' 31'-121" 12' 11'-6" 13'-621"
TITLE.
SATLUJ PARK
C-3 C-3 C-3 C-3
LIBRARY EXCAVATION PLAN
F-1 F-1 F-1 F-1
17'-5" 17'-4" 17'-5" SHEET SIZE : SCALE :
A2
03
03-08-2023
04-12-2023
DETAIL DESIGN
DETAIL DESIGN
(REVISION-I)
FIDA
ENGR.
SAEED
ENGR.
SAEED
ENGR.
FARHAN
ENGR.
FARHAN
1. USE CONCRETE HAVING MINIMUM CYLINDER STRENGTH OF 3,000 PSI FOR STRUCTURAL MEMBERS AS 28 DAYS STRENGTH. SCALE:-1/6" = 1'-0" 04
2. USE DEFORMED STEEL HAVING MINIMUM YIELD STRENGTH OF 60,000 PSI AS PER ASTM 615 05
06
3. CONCRETE COVER
07
I. FOUNDATION
DRAWING Nº:
BOTTOM = 1-1/2" SHEET REV
TOP = 3" BHN-SP-S-01 00
SIDES = 3"
II. COLUMN = 1-1/2"
PROJECT:
III. PLINTH BEAM = 3"
4. BRICK MASNORY IN SUB STRUCTURE WILL BE 1:6 CEMENT SAND MORTAR AND SUPER STRUCTURE WILL BE 1:5. RE-DEVELOPMENT OF PARKS
5. HORIZONTAL D.P.C. WILL BE 1½" TH. P.C.C (1:2:4) WITH 1 COAT OF HOT BITUMEN 10/20@20 LBS/100SFT ON ONE LAYER OF POLYTHENE BAHAWALNAGAR PUNJAB PAKISTAN
SHEET, 500 GAUGE.
6. VERTICAL D.P.C. WILL BE 3/4" THICK VERTICAL D.P.C. 1:3 CEMENT SAND MORTAR WITH HOT BITUMEN 1 COAT 10/20 @ 20 Lbs/100 Sft & ONE CLIENT:
LAYER OF POLYTHENE SHEET, GAUGE 500.
7. THE CONNECTION OF COLUMN & MASONRY SHALL BE BY G.I. SHEET 4" WIDE, GAUGE 22 EXTENDING 5 FEET FROM FACE OF COLUMN, IN
TWO LAYERS, 6 SHEETS ON EACH COLUMN (PER STOREY), 3 ON EITHER SIDE
8. IN 4-1/2" THICK WALLS, A REINFORCEMENT OF 1" WIDE 18 GAUGE HOOP IRON SHALL BE PLACED IN COURSES NOT MORE THAN 12" APART
AND CONTINUED FOR 9" INTO THE MAIN WALL ON WHICH THE PARTITION WALL ABUTS. IF THE PARTITION WALL EXCEEDS 20' IN
BHN-SP-S-01
LENGTH OR 15' HEIGHT, THE HOOP IRON SHALL BE INTRODUCED AT COURSES NOT MORE THAN 6" APART.
CONSULTANT:
LENGTH
LAP
F.F.L F.F.L F.F.L
F.F.L
6"
1'-6"
1'-6"
1'-6"
AS PER COLUMN
ELEVATION
1'-6"
P.L P.L P.L P.L
AS PER SITE
AS PER SITE
AS PER SITE
AS PER SITE
R.L
VARIES
R.L R.L R.L
N.S.L
VARIES
VARIES
VARIES
N.S.L N.S.L N.S.L 4-#4
9" 9" 9" 9"
3'
6"
0"
9"
1'-121" 1'-121"
2'-6"
2'-6"
2'-6"
9"
4"
1'-6" 1'-6" P.C.C. 1:4:8
3" 3" 3"
3"
5'x5'
2'-3" 2'-3" 1'-6"
4" 3"
P.C.C. 1:4:8
SECTION 1-1
4"
4"
2'-6"
1 1
S-02 S-02
#4@6"
5'
10-#6
#4@6"
2'-6"
9" 1'-
6"
2'-6" 2'-6"
8-#6 5'
TITLE.
FOOTING F-1 SATLUJ PARK
1'
-3
"
A2
8-#6 #3@8" c/c
1'-2"
1' ISSUE
N°
DATE DESCRIPTION DRAWN DESIGNED APPROVED
ENGR. ENGR.
01 10-04-2023 PRELIMINARY DESIGN FIDA
SAEED FARHAN
F.F.L 02 03-08-2023 DETAIL DESIGN FIDA
ENGR.
SAEED
ENGR.
FARHAN
DETAIL DESIGN ENGR. ENGR.
03 04-12-2023
#3@8" c/c (REVISION-I) SAEED FARHAN
6"
9"
04
05
9" 06
Ø1'-10"
1'-6"
6"
07
DRAWING Nº:
:4
1:2
COLUMN C1 . C. SHEET REV
COLUMN C2 COLUMN C3 R.C
6"
BHN-SP-S-02 00
SCALE:- 1" = 1'-0" P.L. .1 :4:8
SCALE:- 1" = 1'-0" SCALE:- 1" = 1'-0"
P.C.C
4"
PROJECT:
3'
3"
RE-DEVELOPMENT OF PARKS
BAHAWALNAGAR PUNJAB PAKISTAN
#3@8"c/c
B/W
CLIENT:
6"
P.C.C .1:4:8
1'-6"
BHN-SP-S-02
CONSULTANT:
1'-6"
#3@10"
1'-9"
#3@10"
2'-6"
2'-6"
#3@10" #3@10" #3@10"
2'
6' #3
@
#3@8" 10
"
3'
-3
"
B-10
B-10
6' #3@7"
7" THICK SLAB
2'
2'-6"
#3@8"
#3@6"
#4@8"
#4@9"
#4@8"
#3@8"
#3@6"
#3@8" #3@7" #3@9" #3@7" #3
#4
@
9"
@7
2'-6"
"
2'-9" 2'-9" 3'-9" 3'-9" 3'-9" 3'-3"
B-9
7"
@
#3
#3@9"
5'
PAD
#3@9"
#3
BEAM
@
4'
10
"
"
10
2'-9"
#3@6" #3@8" #3@6"
2'-6"
#3@10"
@
8"
#3
2'
2'
"
@
-6
#4
8"
3'
@
#4
#4@9"
2'-9"
2'
2'
#4@9"
B-5
#4
7"
@
@
#3@7"
#4
8"
#4@9"
#4@8"
4'
B-5
2'-6"
#3@8"
#4@8"
#3@8"
#3@8"
3'-6"
5'
#3@8" #4@5" STAIR 5'
#4
6'
#3@8"
B-6
#3@6"
#3@10"
B-7 B-7
2'
#3@8"
6'
4' 2'-6"
#3@8"
#3@6"
6'
5'
#4@9"
#3@8" 3'-6"
#3@8"
#3@10" 3'-6"
PC-1 2'-6" 2'-6" PC-1
B-
#3
2'
@
4
8"
6'
#3@6"
4'
B-8
#3@7"
B-1 B-1 B-1
"
3'
10
7"
#3
#3
#3@7"
#3
#3@6"
#3@5"
@
10
#3@6"
"
"
B-2A
5'
-3
2'
4' 4'
3'
-3
-9
5'
"
"
#3@8"
#3@6"
"
-6
2'
#3@9"
B-3
#4@8"
#3@6"
X
4'
4'
4'
4'
#3@6" #3@6"
#3@6" TITLE.
SATLUJ PARK
B-2A
LIBRARY FIRST FLOOR SLAB
REINFORCEMENT PLAN
SHEET SIZE : SCALE :
3-#4 3-#4 A2
(T&B) X B-2 B-2 B-2 (T&B) ISSUE
N°
DATE DESCRIPTION DRAWN DESIGNED APPROVED
ENGR. ENGR.
01 10-04-2023 PRELIMINARY DESIGN FIDA
SAEED FARHAN
NOTE: 02
03
03-08-2023
04-12-2023
DETAIL DESIGN
DETAIL DESIGN
(REVISION-I)
FIDA
FIDA
ENGR.
SAEED
ENGR.
ENGR.
FARHAN
ENGR.
SAEED FARHAN
ENGR. ENGR.
1. THICKNESS OF ALL SLABS IS 6" UNLESS OTHERWISE NOTED. FIRST FLOOR SLAB REINFORCEMENT PLAN 04
05
15-01-2025 REVISION-II ALI
HASNAIN FARHAN
07
DRAWING Nº:
SHEET REV
BHN-SP-S-03 00
PROJECT:
RE-DEVELOPMENT OF PARKS
BAHAWALNAGAR PUNJAB PAKISTAN
CLIENT:
BHN-SP-S-03
CONSULTANT:
SLAB
SLAB
SLAB
SLAB
AS PER ARCHI. DRAWING
AS PER ARCHI. DRAWING
#4@8"(B/W) #4@8"(B/W)
#3@8"(B/W)
#3@8"(B/W)
#3@8"(B/W)
#3@8"(B/W)
2-#6+1-#8 2-#6+1-#8
2-#4 2-#4
4-#6 3-#4
2-#6 2-#8
2-#4
1'-6"
1'-6"
1'-9"
1'-9"
#3@4" L/3 FROM
#3@5" L/3 FROM #3@5" L/3 FROM #3@6" L/3 FROM SUPPORT & #3@7"
10"
2-#4 2-#4 SUPPORT & #3@8" SUPPORT & #3@8" #3@6" SUPPORT & #3@8" AT MID SPAN
AT MID SPAN AT MID SPAN AT MID SPAN
2-#4 2-#4
BEAM B-2 BEAM B-2A BEAM B-3 BEAM B-4 BEAM B-5
SCALE:- 3/4" = 1'-0" SCALE:- 3/4" = 1'-0" SCALE:- 3/4" = 1'-0" SCALE:- 3/4" = 1'-0" SCALE:- 3/4" = 1'-0"
3-#4
2-#4 2-#4
SLAB
SLAB
2-#4
1'-3"
1'-3"
3'-6"
LINTEL LEVEL SUPPORT & #3@8"
LINTEL LEVEL
AT MID SPAN
2-#6+1-#8 2-#6+1-#8
1' 1' 2-#4
1'-9"
1'-9"
1'-9"
1'-9"
(AT MID SECTION) (AT END SECTION #3@5" L/3 FROM
SUPPORT & #3@8" 2-#3@6" L/3 FROM
CONTINUOUS) #3@5" L/3 FROM #3@5" L/3 FROM 2-#6 SUPPORT & #3@8"
AT MID SPAN
SUPPORT & #3@7" SUPPORT & #3@7" AT MID SPAN
BEAM B-1 AT MID SPAN AT MID SPAN
SCALE:- 3/4" = 1'-0"
3-#6 4-#6 5-#6 2-#6+1-#8 2-#8+2-#6
9" 1' 1'-3" 9" 1'-3"
BEAM B-6 BEAM B-7 BEAM B-8 BEAM B-9 BEAM B-10
SCALE:- 3/4" = 1'-0" SCALE:- 3/4" = 1'-0" SCALE:- 3/4" = 1'-0" SCALE:- 3/4" = 1'-0" SCALE:- 3/4" = 1'-0"
2-#4
#3@8"c/c
9"
2-#4
9"
TITLE.
SATLUJ PARK
LIBRARY FIRST FLOOR SLAB
BEAMS SECTIONAL DETAILS
PAD BEAM SECTION
SHEET SIZE : SCALE :
SCALE:- 1" = 1'-0"
A2
03
03-08-2023
04-12-2023
DETAIL DESIGN
DETAIL DESIGN
(REVISION-I)
FIDA
FIDA
ENGR.
SAEED
ENGR.
SAEED
ENGR.
FARHAN
ENGR.
FARHAN
ENGR. ENGR.
04 15-01-2025 REVISION-II ALI
HASNAIN FARHAN
SPAN W D MK-1 MK-2 MK-3 05
06
3'-9" WIDTH OF MK1 07
UP TO 3'-0" 6" 2-#4 2-#4 3#8" c/c DRAWING Nº:
8-#3 WALL
SHEET REV
WIDTH OF BHN-SP-S-03a 00
3'-6" TO 5'-0" 9" 2-#4 2-#6 3#7" c/c MK3
SLAB WALL
STEEL
1'-121"
1' PROJECT:
4-#4 WIDTH OF
5'-6" TO 7'-0" 12" 2-#4 2-#6 3#6" c/c RE-DEVELOPMENT OF PARKS
WALL
MK2 BAHAWALNAGAR PUNJAB PAKISTAN
#3@6" c/c
WIDTH OF 2-#6 +
7'-6" TO 9'-0" 12" 2-#4 3#6" c/c
1'
#3@9"
2'-6"
#3@9"
3'-9"
3'-9"
#3@9"
X
9" 3'-
3'- 9"
#3@7"
#3@7"
#3@6" #3@8" #3@7"
#3@6"
"
@9
5'-6" 5'-6"
#3
#3
@9
#4@9"
"
B-1
B-1
#3@9"
3'-9"
3'-9"
#3@9"
2'-6"
#3@9"
2'-6"
#3@10"
#3@8"
#3@8"
2' 3'-9" 3'-9" 3'-9" 3'-9" 1'-6"
B-2
B-2
#3@7"
#3@7"
#3@9"
#3@9"
#3@9"
2'-6"
B-3
TITLE.
SATLUJ PARK
LIBRARY ROOF SLAB
REINFORCEMENT PLAN &
BEAMS SECTIONAL DETAILS
ROOF SLAB REINFORCEMENT PLAN 4"
SHEET SIZE :
A2
SCALE :
AS PER ARCHI.
02 03-08-2023 DETAIL DESIGN FIDA
SAEED FARHAN
NOTE:
DETAIL DESIGN ENGR. ENGR.
DRAWING
03 04-12-2023 (REVISION-I) SAEED FARHAN
ENGR. ENGR.
#3@12"
04 15-01-2025 REVISION-II ALI
HASNAIN FARHAN
05
1'-421" 07
2. DISTRIBUTION TOP BARS #3@12"c/c. DRAWING Nº:
3-#3 SHEET REV
2-#6 BHN-SP-S-05 00
2-#4 3-#4
SLAB PROJECT:
STEEL
1'-121"
RE-DEVELOPMENT OF PARKS
2-#4
BAHAWALNAGAR PUNJAB PAKISTAN
2'
2-#4 2-#4
1'-6"
1'-6"
9"
R.C.C LINTEL BAND R.C.C LINTEL BAND SCALE:- 3/4" = 1'-0" SCALE:- 3/4" = 1'-0" SCALE:- 3/4" = 1'-0" SCALE:- 3/4" = 1'-0" ASIAN CONSULTING ENGINEERS PVT.(LTD)
SCALE:- 1" = 1'-0" SCALE:- 1" = 1'-0" C-3 JHELUM BLOCK, GREEN FORT-II, LAHORE, PAKISTAN
TELEPHONE: +92 42 35450914-5
FAx: +92 42 35450916 WEB: www.asiancon.com