QPR_Dec_2024_CT
QPR_Dec_2024_CT
A. Identification Particulars
1 Name of Project Construction of new road from Chowkihola to Tarapung via
Borpung (Chowkihola-Arlongwoti road with one major bridge over
river Kaliyani) Assam under NESIDS (Length L = 50.523 Km)
2 Location State : Assam
Dist. : Karbianglong
3 Approved Cost (Rs. In Crores) : 202.90
4 Date of Approval of Project/Scheme : 30/07/2024
5 Tender Cost (Rs. In Lakhs) : 19651.00
6 Date of award of Contract (First WO) : 25/09/2024
(Copy of work order to be attached (only
once for the quarter in which it was issued.
Need not be submitted if submitted in
earlier quarter)
7 Whether Contract awarded on Turnkey basis : EPC
8 Whether awarded work is being executed Yes
based on PERT/CPM :
9 Original date of Completion of project/scheme : 14/03/2027 (as per Original WO)
10 Executing Agency (State Govt./PSU/Other agency (Specify) : Public Works Roads Department, Govt. of Assam
B. Overall Progress
Physical Progress (%)
Total Expenditre
Beginning of
Items During Quarter End of Quarter incurred
Quarter (End of
(Oct-Dec'24) (Cumulative) (Rs. In Crores)
Sept' 24)
1 i) Clearing & Grubbing 0.00% 67.09% 67.09%
2 ii) Cutting & Felling Tress 0.00% 34.48% 34.48%
3 iii) Dismantling of Structures 0.00% 68.59% 68.59%
4 i) E/W in Formation Cutting 0.00% 58.88% 58.88%
5 ii) Filling 0.00% 30.62% 30.62%
6 iii) Subgrade in Shoulder 0.00% 20.61% 20.61%
7 i) Granular Sub-base in Hard Shoulders 0.00% 0.00% 0.00%
8 ii) CTSB 0.00% 19.76% 19.76%
9 iii) WMM 0.00% 14.15% 14.15%
10 ii) Tack Coat 0.00% 0.00% 0.00%
11 vi) BC-40 mm 0.00% 0.00% 0.00%
12 i) RCC Box Culvert 0.00% 30.82% 30.82%
13 i)MNB at 8+958 0.00% 0.00% 0.00%
14 ii)MNB at 15+807 0.00% 0.00% 0.00%
15 iii) MNB at 21+064 0.00% 0.00% 0.00%
16 iv) MNB at 27+733 0.00% 0.00% 0.00%
17 v) MNB at 29+726 0.00% 0.00% 0.00%
Physical Progress (%)
Total Expenditre
Beginning of
Items During Quarter End of Quarter incurred
Quarter (End of
(Oct-Dec'24) (Cumulative) (Rs. In Crores)
Sept' 24)
18 vi) MNB at 34+021 0.00% 0.00% 0.00%
19 vii) MNB at 46+345 0.00% 0.00% 0.00%
20 i) MJB at 3+500 0.00% 0.00% 0.00%
21 i)RCC Rectangular Covered drain (built up 0.00% 0.00% 0.00%
22 area) (1m x 1m) Drain (0.5m x 0.45m)
ii)CC Trapezoidal 0.00% 30.00% 30.00%
23 9) Traffic Signs, Markings and Road 0.00% 0.00% 0.00%
24 Appurtenances
i) Breast Wall 0.00% 0.00% 0.00%
25 ii) Retaining Wall 0.00% 0.00% 0.00%
Ocerall Physical Progress 0.00% 18.08% 18.08%
Total Expendature
C. No. of Photographs attached
(minimum 2 photographs of 4 x 6 size of major component
executed/ under execution, from different angle, properly pasted
on A4 size paper should be submitted. On each A4 size paper only 2
Enclosed
photographs may be pasted. Photographs should be dated and
signed by Nodal Officer. In case of Road projects photographs at a
distance of every 1 km may of road completed may be submitted.