The document contains a log of application lifecycle events for the iCSee application, detailing the transitions between active, inactive, and background states. Key timestamps indicate when the application launched, became active, resigned active status, and entered the background. The log spans from November 30, 2024, to December 22, 2024.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
8 views
app_debug_log 2
The document contains a log of application lifecycle events for the iCSee application, detailing the transitions between active, inactive, and background states. Key timestamps indicate when the application launched, became active, resigned active status, and entered the background. The log spans from November 30, 2024, to December 22, 2024.