0% found this document useful (0 votes)
28 views1 page

Downstream Chiro Side Section 2-2 Details

The document provides detailed construction specifications for a cantilever wall, including materials such as selected granular backfill, concrete, and bituminous paper. It includes various structural details, dimensions, and reinforcement bar placements necessary for the construction process. The drawing is prepared by Acute Engineering for the Oda Bultum University project, with specific notes on the contractor and revisions.

Uploaded by

Ashebir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views1 page

Downstream Chiro Side Section 2-2 Details

The document provides detailed construction specifications for a cantilever wall, including materials such as selected granular backfill, concrete, and bituminous paper. It includes various structural details, dimensions, and reinforcement bar placements necessary for the construction process. The drawing is prepared by Acute Engineering for the Oda Bultum University project, with specific notes on the contractor and revisions.

Uploaded by

Ashebir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Side Fill

H:V (1:10)
200
Section 2-2 Detail
S6
Vertical Wall

Selected Granular Backfill


28 50 Cover
A layer of Bituminous Paper

S3 & S4 (Placed Alternatively) C-25 Concrete 1 Vertical Wall

S7 & S7-1 (Overlapped) 28

5000 Granular Material Fill


50 Cover with Reducing Grain Size C-25 Concrete
See Detail 'A'
25mm Chamfer
30mm Rubber Expandite
S5
As Joint Material F1 T2
Construction Joint Ø100mm Weep Holes
50 Cover c/c 2.5m.
S1 10
Porous Concrete Lining
S2 1

Expansion Joint Detail 100 300

200 300

F4 & F4-1 (Overlapped) 75 Cover F2 & F3 (Placed Alternatively)


1550 350 800 50mm Thick Lean Concrete

2700 1.00

50mm
1m Thick Selected Granular
Replacement Fill
100 100
1850
11900 3300
125
100
Ø10 c/c 270, L=12000 Ø10 c/c 270, L=3400 200
80 100 100 100
100
300
300
Bar F4 Bar F4-1 100
Ø16 c/c 130, L=2330
100
S6 = Ø10 c/c 180, L=1025
100
Bar F1

4675
100
100
100
4675
1430
Detail 'A'
100
100 2600
100
Ø12 c/c 280, L=2900
840 480
Bar F2 100 100 100
100
3300 11900
100 100 100
150
100 100
400
Ø10 c/c 270, L=830 Ø10 c/c 270, L=4875 S3 = Ø20 c/c 360, L=4775 Ø20 c/c 360, L=1630 Ø10 c/c 270, L=3400 Ø10 c/c 270, L=12000
Ø20 c/c 180, L=1440
1400

Bar S1 Bar S2 Bar S5 Ø12 c/c 280, L=1700 Bar S3 & S6 Bar S4 Bar S7-1 Bar S7
Bar F3

CONSULTANT: CONTRACTOR: PROJECT TITLE: DRAWING TITLE: RC Protection Cantilever Wall Rebar Details (Downstream Chiro Side) DRAWING NUMBER:
CLIENT:
CONTRACTOR CONSULTANT Client Revisions:-

ACUTE Engineering Oda Bultum University Main Prepared by Checked Reviwed Approved SCALE: NTS
Oda Bultum University TNT Construction Access Road & Structures
Consultancy & Trading
Date: Aug.24,2024________ Sign:__________ Date: ________ Sign:__________ Date:__________ Sign:__________ Date:__________ Sign:__________

You might also like