NIGHT (012)
NIGHT (012)
:
SHIFT HANDOVER PROCEDURE FOR
MAINTENANCE Rev. No.: 0
Page 1 of 2
Prepared by: Approved by: Date:
J.Cornelius J.Cornelius 11/06/2019
1. PURPOSE
The procedure defines the steps that are necessary to ensure efficient communication are
communicated to the next shit when they come on duty and is aimed at preventing
misunderstandings when one shift takes over from a previous shift.
2. PROCESS.
2.1.3 The Production Controller must explain in detail all tasks that must be performed by
maintenance during his shift.
2.1.4 List all tasks required to be performed in detail.
Acknowledgement.
I agree that all above steps and processes was explained to me in person and that I
understand the tasks that are expected to be performed by myself during my shift.
Date:
4.2.1 The maintenance chargehand must explain in detail the current production status at end of
his shift to the Production Controller taking over the shift.
4.2.2 List the current status in detail.
Acknowledgement.
I agree that all above steps and processes was explained to me in person and that I
understand the current status of maintenance at end of night shift.
Date:
Signature (Formulator)