Net Metering Connection Order -ANNEXURE IX

This document is a net metering connection order for the installation of a Solar Rooftop PV system by Dakshin Haryana Bijli Vitran Nigam Limited. It includes sections for the consumer's details, commissioning instructions, and a report on the installation and testing of the solar system and meters. The document also outlines specific technical details and requirements for the meters involved in the net metering arrangement.

Uploaded by

ashsingh.chattha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

Net Metering Connection Order -ANNEXURE IX

This document is a net metering connection order for the installation of a Solar Rooftop PV system by Dakshin Haryana Bijli Vitran Nigam Limited. It includes sections for the consumer's details, commissioning instructions, and a report on the installation and testing of the solar system and meters. The document also outlines specific technical details and requirements for the meters involved in the net metering arrangement.

Uploaded by

ashsingh.chattha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ANNEXURE-IX

DAKSHIN HARYANA BIJLI VITRAN NIGAM LIMITED

NET METERING CONNECTION ORDER/SUNDRY JOB ORDER

S. No.
Consumer’s Name :-
Address:-

To ---------------------------

JUNIOR ENGINEER / LINE SUPERINTENDENT

Please commission Solar Rooftop PV system and net metering connection as per
sanctioned estimate No._____________________ and install solar meter at panel and bidirectional meter(s)
with grid. Subsequently turn on the supply and report the requisite details given as under:

Date-------------------------- Sub Divisional Officer


------------------------------------------------------------------------------------------------------------------------------------------
REPORT

The required Rooftop Solar PV System under Net Metering Arrangement with meter (s) has been installed &
tested and found OK.

PARTICULARS

Size of Service____________________________________________________length of service at (in feet)

Connected to ______________________________________________________________________Phase

Insulation test (between phase)______________________________________________________(to earth)

Net Meter Value Solar Meter Old Meter


Value
Particular Import Export
Meter Type Meter Type Meter Type
Meter Make Meter Make Meter Make
Meter Serial No. Meter Serial No. Meter Serial No.
Meter Badge Meter Badge Meter Badge
Number Number Number
Meter Installation Meter Installation Meter Removal
date date date
Stock Location Stock Location Stock Location
Initial Read Reading Reading
MF MF MF
kWHE kVAS kWh
kVHE kVHS kVA
kWE kWHS kVAh (if
available)
kVAE KWS
kWHI
kVHI
kWI
kVAI
Meter Status