777
777
Contractor ; T. Ravi
Note;
1.The report shall not be reproduced, except in full,without the written approval of the laboratory
2. The result indicate above are based on the tests carried out on the samples received in the laboratory
3..Any query regarding the report must be reported within 1 days from the date testing
Building Material Testing | Bridge Load Testing | Structural Strengthening Solutions | Quality Control | Assurance |Audit
Proof Checking (Structural Designs & Drawings) | Soil Stabilization and Shoring Services | Non – Destructive Testing
#174, Sri Ranga Complex
Amrutha Nagar Main Road
New Bank Colony, Konanakunte
Bangalore – 560062.
Mobile : +91 97429 59595.
Tele/Fax: 080- 2632 2565
E – mail: [email protected]
URL: www.civilexperts.in
Date; 06/02/2023
Contractor ; T. Ravi
Note;
1.The report shall not be reproduced, except in full,without the written approval of the laboratory
2. The result indicate above are based on the tests carried out on the samples received in the laboratory
3..Any query regarding the report must be reported within 1 days from the date testing
Building Material Testing | Bridge Load Testing | Structural Strengthening Solutions | Quality Control | Assurance |Audit
Proof Checking (Structural Designs & Drawings) | Soil Stabilization and Shoring Services | Non – Destructive Testing
#174, Sri Ranga Complex
Amrutha Nagar Main Road
New Bank Colony, Konanakunte
Bangalore – 560062.
Mobile : +91 97429 59595.
Tele/Fax: 080- 2632 2565
E – mail: [email protected]
URL: www.civilexperts.in
Contractor ; T. Ravi
Note;
1.The report shall not be reproduced, except in full,without the written approval of the laboratory
2. The result indicate above are based on the tests carried out on the samples received in the laboratory
3..Any query regarding the report must be reported within 1 days from the date testing
Building Material Testing | Bridge Load Testing | Structural Strengthening Solutions | Quality Control | Assurance |Audit
Proof Checking (Structural Designs & Drawings) | Soil Stabilization and Shoring Services | Non – Destructive Testing
#174, Sri Ranga Complex
Amrutha Nagar Main Road
New Bank Colony, Konanakunte
Bangalore – 560062.
Mobile : +91 97429 59595.
Tele/Fax: 080- 2632 2565
E – mail: [email protected]
URL: www.civilexperts.in
Date; 20/02/2023
Contractor ; T. Ravi
Note;
1.The report shall not be reproduced, except in full,without the written approval of the laboratory
2. The result indicate above are based on the tests carried out on the samples received in the laboratory
3..Any query regarding the report must be reported within 1 days from the date testing
Building Material Testing | Bridge Load Testing | Structural Strengthening Solutions | Quality Control | Assurance |Audit
Proof Checking (Structural Designs & Drawings) | Soil Stabilization and Shoring Services | Non – Destructive Testing
#174, Sri Ranga Complex
Amrutha Nagar Main Road
New Bank Colony, Konanakunte
Bangalore – 560062.
Mobile : +91 97429 59595.
Tele/Fax: 080- 2632 2565
E – mail: [email protected]
URL: www.civilexperts.in
Contractor ; T. Ravi
Note;
1.The report shall not be reproduced, except in full,without the written approval of the laboratory
2. The result indicate above are based on the tests carried out on the samples received in the laboratory
3..Any query regarding the report must be reported within 1 days from the date testing
Building Material Testing | Bridge Load Testing | Structural Strengthening Solutions | Quality Control | Assurance |Audit
Proof Checking (Structural Designs & Drawings) | Soil Stabilization and Shoring Services | Non – Destructive Testing
#174, Sri Ranga Complex
Amrutha Nagar Main Road
New Bank Colony, Konanakunte
Bangalore – 560062.
Mobile : +91 97429 59595.
Tele/Fax: 080- 2632 2565
E – mail: [email protected]
URL: www.civilexperts.in
Contractor ; T. Ravi
Note;
1.The report shall not be reproduced, except in full,without the written approval of the laboratory
2. The result indicate above are based on the tests carried out on the samples received in the laboratory
3..Any query regarding the report must be reported within 1 days from the date testing
Building Material Testing | Bridge Load Testing | Structural Strengthening Solutions | Quality Control | Assurance |Audit
Proof Checking (Structural Designs & Drawings) | Soil Stabilization and Shoring Services | Non – Destructive Testing