work Schedule

The document outlines the construction schedule for the Gaba Sanbata Crop Market Center, detailing tasks from site work to finishing, spanning from March to August 2025. Key phases include excavation, concrete work, masonry, roofing, and electrical installation. The project is structured with specific tasks, start and finish dates, and includes milestones for progress tracking.

Uploaded by

kfentayehu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views8 pages

work Schedule

The document outlines the construction schedule for the Gaba Sanbata Crop Market Center, detailing tasks from site work to finishing, spanning from March to August 2025. Key phases include excavation, concrete work, masonry, roofing, and electrical installation. The project is structured with specific tasks, start and finish dates, and includes milestones for progress tracking.

Uploaded by

kfentayehu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

CONSTRUCTION OF GABA SANBATA CROP MARKET CENTER GABA SANBATA CROP MARKET CENTER

Text1 Task Name Start Finish 2025


February March April May June July August September
Project Construction of Gaba Sanbata Crop Market Mon 3/3/25 Sat 8/30/25
Center Gaba Sanbata Crop Market Center
Site Work Mon 3/3/25 Wed
4/30/25
1.10 Excavate the top soil from the Mon 3/3/25 Mon
site to an average depth of 20cm. 3/31/25 Excavate the top soil from the site to an average depth of 20cm.
1.20 Bulk excavate in ordinary soil to Mon 3/3/25 Mon
reduce level to a depth not 3/31/25 Bulk excavate in ordinary soil to reduce level to a depth not exceeding 150cm
1.30 Cart away Mon 3/3/25 Mon
3/31/25 Cart away
1.40 Select material supply ,fill and Tue 4/1/25 Wed
compact 4/30/25 Select material supply ,fill and compact
1.60 Basaltic Stone pitch 1:3 ratio Tue 4/1/25 Wed
4/30/25 Basaltic Stone pitch 1:3 ratio
1.70 Half ditch dia.30cm Tue 4/1/25 Wed
4/30/25 Half ditch dia.30cm
1.80 Back filling with dry select Tue 4/1/25 Wed
material 4/30/25 Back filling with dry select material
(Retail Market Center 10m span) Mon 3/3/25 Sat 8/30/25
for single shed
A-SUB-STRUCTURES Mon 3/3/25 Mon 7/7/25

1.00 EXCAVATION AND EARTH Mon 3/3/25 Sat 5/31/25


WORK
1.10 Trench Excavation for Mon 3/3/25 Mon
masonry wall depth not 3/31/25 Trench Excavation for masonry wall depth not exceeding 500mm
1.20 Isolating footing Excavation Mon 3/3/25 Mon
for masonry wall depth not 3/31/25 Isolating footing Excavation for masonry wall depth not exceeding 1500mm
1.30 Cart away Mon 3/3/25 Mon
3/31/25 Cart away
1.40 Select material supply ,fill Thu 5/1/25 Sat 5/31/25
and compact Select material supply ,fill and compact
1.50 250mm thick hardcore Tue 4/1/25 Wed
4/30/25 250mm thick hardcore
1.60 Back filling with dry select Thu 5/1/25 Sat 5/31/25
material Back filling with dry select material
2.00 CONCRETE WORK Mon 3/3/25 Mon 7/7/25

2.10 50mm Lean concrete Mon 3/3/25 Wed


4/30/25
a) Under footing pad Mon 3/3/25 Wed
4/30/25 Under footing pad
b) Under grade beam Mon 3/3/25 Wed
4/30/25 Under grade beam
c) Under ground floor slab Mon 3/3/25 Wed
4/30/25 Under ground floor slab
2.20 C-25 Reinforced concrete Fri 3/28/25 Tue 5/6/25

a) footing pad Fri 3/28/25 Mon


4/28/25 footing pad
b) Foundation column Tue 4/1/25 Wed
4/30/25 Foundation column
c) Grade beam Mon 4/7/25 Tue 5/6/25
Grade beam
d) 10cm thick ground floor Mon 4/7/25 Tue 5/6/25
slab 10cm thick ground floor slab
2.30 Form work Fri 3/28/25 Tue 5/6/25

a) footing pad Fri 3/28/25 Mon


4/28/25 footing pad

Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: Construction of Gaba S
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Sat 12/28/24
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress

Page 1
CONSTRUCTION OF GABA SANBATA CROP MARKET CENTER GABA SANBATA CROP MARKET CENTER
Text1 Task Name Start Finish 2025
February March April May June July August September
b) Foundation column Tue 4/1/25 Wed
4/30/25 Foundation column
c) Grade beam Mon 4/7/25 Tue 5/6/25
Grade beam
2.40 Chip wood between slab Mon 4/7/25 Tue 5/6/25
panel and grade beam Chip wood between slab panel and grade beam
2.50 Reinforcement bar Tue 4/1/25 Wed
4/30/25
a) Ø8 deformed bar Tue 4/1/25 Wed
4/30/25 Ø8 deformed bar
b) Ø14 deformed bar Tue 4/1/25 Wed
4/30/25 Ø14 deformed bar
c) Ø16 deformed bar Tue 4/1/25 Wed
4/30/25 Ø16 deformed bar
2.60 Class B 20cm thick HCB Fri 4/25/25 Thu 6/26/25
Class B 20cm thick HCB
2.70 3 coats of Plastering of block Tue 5/6/25 Mon 7/7/25
wall 3 coats of Plastering of block wall
3.00 MASONRY WORK Mon 3/3/25 Mon 6/2/25

3.10 Stone masonry 1:3 ratio Mon 3/3/25 Wed


4/30/25
a) under grade beam Mon 3/3/25 Wed
4/30/25 under grade beam
b) Under Steps Mon 3/3/25 Wed
4/30/25 Under Steps
c) Under Ramps Mon 3/3/25 Wed
4/30/25 Under Ramps
3.20 Retaining wall Mon 3/3/25 Mon 6/2/25
Retaining wall
B. SUPER-STRUCTURE Wed 5/7/25 Sat 8/30/25

1.00 CONCRETE WORKS Wed 5/7/25 Fri 8/8/25

1.10 C-25 Reinforced concrete Wed 5/7/25 Fri 8/8/25

a) In Elevation of columns Wed 5/7/25 Fri 7/4/25


In Elevation of columns
b) Intermediate beams Thu 5/22/25 Mon
7/21/25 Intermediate beams
c) In roof beams Wed Fri 8/8/25
6/11/25 In roof beams
1.20 Form work Wed 5/7/25 Mon
7/21/25
a) To Elevation of columns Wed 5/7/25 Fri 7/4/25
To Elevation of columns
b) To beams Thu 5/22/25 Mon
7/21/25 To beams
1.30 Reinforcement bar Wed 5/7/25 Fri 7/4/25

a) Ø8 deformed bar Wed 5/7/25 Fri 7/4/25


Ø8 deformed bar
b) Ø16 deformed bar Wed 5/7/25 Fri 7/4/25
Ø16 deformed bar
1.40 Form work for intermediate Thu 5/22/25 Mon
beams 7/21/25 Form work for intermediate beams
1.50 Reinforcement bar for Thu 5/22/25 Mon
intermediate beams 7/21/25
a) Ø8 deformed bar Thu 5/22/25 Mon
7/21/25 Ø8 deformed bar

Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: Construction of Gaba S
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Sat 12/28/24
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress

Page 2
CONSTRUCTION OF GABA SANBATA CROP MARKET CENTER GABA SANBATA CROP MARKET CENTER
Text1 Task Name Start Finish 2025
February March April May June July August September
b) Ø14 deformed bar Thu 5/22/25 Mon
7/21/25 Ø14 deformed bar
2.10 ROOF WORK Tue 7/1/25 Thu 7/31/25

2.1.2 EGA 500 Roof Cover Tue 7/1/25 Thu 7/31/25


EGA 500 Roof Cover
2.1.3 Flashing Tue 7/1/25 Thu 7/31/25
RAL3011(330*.40mm) sheet Flashing RAL3011(330*.40mm) sheet
2.1.4 Gutter RAL3011(670*.40mm) Tue 7/1/25 Thu 7/31/25
sheet Gutter RAL3011(670*.40mm) sheet
2.1.5 25*2.5cm Wooden Fascia Tue 7/1/25 Thu 7/31/25
25*2.5cm Wooden Fascia
2.20 STRUCTURAL STEEL Tue 7/1/25 Thu 7/31/25
WORKS
2.2.2 Raffer C-Profile Tue 7/1/25 Thu 7/31/25
:240*80*12*2mm Raffer C-Profile :240*80*12*2mm
2.2.3 Purlin C-Profile Tue 7/1/25 Thu 7/31/25
:80*50*10*2mm Purlin C-Profile :80*50*10*2mm
2.2.4 U-Profile Tue 7/1/25 Thu 7/31/25
380*90*380*250*5mm U-Profile 380*90*380*250*5mm
2.2.5 L-Profile 520*90*3mm Tue 7/1/25 Thu 7/31/25
L-Profile 520*90*3mm
2.2.6 Flat Sheet 520*3mm Tue 7/1/25 Thu 7/31/25
Flat Sheet 520*3mm
2.2.7 Steel Plate 300*300*8mm Tue 7/1/25 Thu 7/31/25
Steel Plate 300*300*8mm
2.2.8 Double Steel Plate Tue 7/1/25 Thu 7/31/25
300*70*8mm Double Steel Plate 300*70*8mm
2.2.9 Double Steel Plate Tue 7/1/25 Thu 7/31/25
300*100*8mm Double Steel Plate 300*100*8mm
2.2.10 Bolt L-500 diameter 24 Tue 7/1/25 Thu 7/31/25
Bolt L-500 diameter 24
3.00 FINISHING Fri 8/1/25 Sat 8/30/25

3.20 3 coats of Plastering on RC Fri 8/1/25 Sat 8/30/25


3 coats of Plastering on RC
3.30 Plastic Paint (2 coats )on Fri 8/1/25 Sat 8/30/25
Concrete Plastic Paint (2 coats )on Concrete
3.40 Cement Screed 20mm Fri 8/1/25 Sat 8/30/25
Cement Screed 20mm
4.00 ELECTRICAL Fri 8/1/25 Sat 8/30/25
INSTALLATION
4.20 Distribution board 2pcs ACB Fri 8/1/25 Sat 8/30/25
25A/1-Phase Distribution board 2pcs ACB 25A/1-Pha
4.30 Light point Fri 8/1/25 Sat 8/30/25
Light point
4.40 Two way switches Fri 8/1/25 Sat 8/30/25
Two way switches
4.50 Socket outlet Fri 8/1/25 Sat 8/30/25
Socket outlet
4.60 Power Cable Fri 8/1/25 Sat 8/30/25
Power Cable
GUARD HOUSE Mon 6/2/25 Mon
6/30/25
A.SUB-STRUCTURE

1.00 EARTH WORK Mon 6/2/25 Mon


6/30/25
1.10 Clearing and grubbing 200mm Mon 6/2/25 Mon
6/30/25 Clearing and grubbing 200mm

Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: Construction of Gaba S
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Sat 12/28/24
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress

Page 3
CONSTRUCTION OF GABA SANBATA CROP MARKET CENTER GABA SANBATA CROP MARKET CENTER
Text1 Task Name Start Finish 2025
February March April May June July August September
1.20 Bulk excavate in ordinary soil Mon 6/2/25 Mon
to reduce level to a depth not 6/30/25 Bulk excavate in ordinary soil to reduce level to a depth not exceeding 1.50m
1.30 Trench Excavation depth not Mon 6/2/25 Mon
exceeding 500mm 6/30/25 Trench Excavation depth not exceeding 500mm
1.40 Cart away Mon 6/2/25 Mon
6/30/25 Cart away
1.50 Select material supply ,fill and Mon 6/2/25 Mon
compact 6/30/25 Select material supply ,fill and compact
1.60 250mm thick hardcore Mon 6/2/25 Mon
6/30/25 250mm thick hardcore
1.70 Back filling with dry select Mon 6/2/25 Mon
material 6/30/25 Back filling with dry select material
B.SUPER-STRUCTURE Mon 6/2/25 Mon
6/30/25
2.00 Concrete Work Mon 6/2/25 Mon
6/30/25
2.10 50mm Lean concrete Mon 6/2/25 Mon
6/30/25 50mm Lean concrete
2.20 C-25 Reinforced concrete Mon 6/2/25 Mon
6/30/25
a) Beams Mon 6/2/25 Mon
6/30/25 Beams
b) Columns Mon 6/2/25 Mon
6/30/25 Columns
c) Slabs Mon 6/2/25 Mon
6/30/25 Slabs
2.30 Form work Mon 6/2/25 Mon
6/30/25
a) Beams Mon 6/2/25 Mon
6/30/25 Beams
b) Columns Mon 6/2/25 Mon
6/30/25 Columns
c) Slabs Mon 6/2/25 Mon
6/30/25 Slabs
2.40 Reinforcement bar Mon 6/2/25 Mon
6/30/25
a) Ø8 deformed bar Mon 6/2/25 Mon
6/30/25 Ø8 deformed bar
b) Ø10 deformed bar Mon 6/2/25 Mon
6/30/25 Ø10 deformed bar
c) Ø12 deformed bar Mon 6/2/25 Mon
6/30/25 Ø12 deformed bar
3.00 Block and Masonry work Mon 6/2/25 Mon
6/30/25
3.10 Class B 20cm thick HCB Mon 6/2/25 Mon
6/30/25 Class B 20cm thick HCB
3.20 50cm Masonry foundation Mon 6/2/25 Mon
6/30/25 50cm Masonry foundation
3.30 Retaining wallmasonry Mon 6/2/25 Mon
6/30/25 Retaining wallmasonry
4.00 ROOFING Mon 6/2/25 Mon
6/30/25
4.10 RHS Truss Mon 6/2/25 Mon
6/30/25
a) RHS 40*40*3 Bottom Mon 6/2/25 Mon
member 6/30/25 RHS 40*40*3 Bottom member
b) RHS 40*40*3 Top member Mon 6/2/25 Mon
6/30/25 RHS 40*40*3 Top member
c) RHS 30*30*3 Vertical and Mon 6/2/25 Mon
Diagonal 6/30/25 RHS 30*30*3 Vertical and Diagonal

Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: Construction of Gaba S
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Sat 12/28/24
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress

Page 4
CONSTRUCTION OF GABA SANBATA CROP MARKET CENTER GABA SANBATA CROP MARKET CENTER
Text1 Task Name Start Finish 2025
February March April May June July August September
4.20 RHS Purlin 40*40*3 Bottom Mon 6/2/25 Mon
member 6/30/25 RHS Purlin 40*40*3 Bottom member
4.30 CIS 28G Mon 6/2/25 Mon
6/30/25 CIS 28G
4.40 25*250mm facia board Mon 6/2/25 Mon
6/30/25 25*250mm facia board
4.50 Gutter Mon 6/2/25 Mon
6/30/25 Gutter
4.60 UPVC down pipe Mon 6/2/25 Mon
6/30/25 UPVC down pipe
5.00 WINDOWS AND DOORS Mon 6/2/25 Mon
6/30/25
5.10 1000*2500mm Door Mon 6/2/25 Mon
6/30/25 1000*2500mm Door
5.20 1500*1500mm Window Mon 6/2/25 Mon
6/30/25 1500*1500mm Window
6.00 FINISHING Mon 6/2/25 Mon
6/30/25
6.10 3 coats of Plastering of block Mon 6/2/25 Mon
wall 6/30/25 3 coats of Plastering of block wall
6.20 Plastic Paint (2 coats )on Mon 6/2/25 Mon
block wall 6/30/25 Plastic Paint (2 coats )on block wall
6.30 Cement Screed 20mm Mon 6/2/25 Mon
6/30/25 Cement Screed 20mm
7.00 ELECTRICAL Mon 6/2/25 Mon
INSTALLATION 6/30/25
7.10 Distribution board 2pcs ACB Mon 6/2/25 Mon
25A/1-Phase 6/30/25 Distribution board 2pcs ACB 25A/1-Phase
7.20 Light point Mon 6/2/25 Mon
6/30/25 Light point
7.30 Two way switches Mon 6/2/25 Mon
6/30/25 Two way switches
7.40 Socket outlet Mon 6/2/25 Mon
6/30/25 Socket outlet
7.50 Power Cable Mon 6/2/25 Mon
6/30/25 Power Cable
DRY LATRINE Mon 6/2/25 Mon
6/30/25
A.SUB-STRUCTURE Mon 6/2/25 Mon
6/30/25
1.00 EXCAVATION AND EARTH Mon 6/2/25 Mon
WORK 6/30/25
1.10 Clearing and grubbing Mon 6/2/25 Mon
200mm 6/30/25 Clearing and grubbing 200mm
1.20 Bulk excavate in ordinary Mon 6/2/25 Mon
soil to reduce level to a depth 6/30/25 Bulk excavate in ordinary soil to reduce level to a depth not exceeding 1.0m
1.30 Pit excavation in ordinary Mon 6/2/25 Mon
soil to reduce level to a depth 6/30/25 Pit excavation in ordinary soil to reduce level to a depth not exceeding 2.0m
1.40 Pit excavation in weathered Mon 6/2/25 Mon
rock l to reduce level to a 6/30/25 Pit excavation in weathered rock l to reduce level to a depth not exceeding 4.5m
1.50 Trench Excavation depth not Mon 6/2/25 Mon
exceeding 1000mm 6/30/25 Trench Excavation depth not exceeding 1000mm
1.60 Select material supply ,fill Mon 6/2/25 Mon
and compact 6/30/25 Select material supply ,fill and compact
1.70 Cart away Mon 6/2/25 Mon
6/30/25 Cart away
1.80 250mm thick hardcore Mon 6/2/25 Mon
6/30/25 250mm thick hardcore
2.00 Concrete Work Mon 6/2/25 Mon
6/30/25

Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: Construction of Gaba S
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Sat 12/28/24
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress

Page 5
CONSTRUCTION OF GABA SANBATA CROP MARKET CENTER GABA SANBATA CROP MARKET CENTER
Text1 Task Name Start Finish 2025
February March April May June July August September
2.10 50mm Lean concrete Mon 6/2/25 Mon
6/30/25 50mm Lean concrete
2.20 C-25 Reinforced concrete Mon 6/2/25 Mon
6/30/25
a) Grade Beams Mon 6/2/25 Mon
6/30/25 Grade Beams
b) Entrance steps Mon 6/2/25 Mon
6/30/25 Entrance steps
c) 10mm suspended floor slab Mon 6/2/25 Mon
6/30/25 10mm suspended floor slab
d) Entrance ramp Mon 6/2/25 Mon
6/30/25 Entrance ramp
2.30 Joint Filler Mon 6/2/25 Mon
6/30/25 Joint Filler
2.40 Form work Mon 6/2/25 Mon
6/30/25
a) Grade Beams Mon 6/2/25 Mon
6/30/25 Grade Beams
b) Entrance steps Mon 6/2/25 Mon
6/30/25 Entrance steps
c) Entrance ramp Mon 6/2/25 Mon
6/30/25 Entrance ramp
2.50 Reinforcement bar Mon 6/2/25 Mon
6/30/25
a) Ø8 deformed bar Mon 6/2/25 Mon
6/30/25 Ø8 deformed bar
b) Ø10 deformed bar Mon 6/2/25 Mon
6/30/25 Ø10 deformed bar
c) Ø12 deformed bar Mon 6/2/25 Mon
6/30/25 Ø12 deformed bar
d) Ø14 deformed bar Mon 6/2/25 Mon
6/30/25 Ø14 deformed bar
3.00 Masonry work Mon 6/2/25 Mon
6/30/25
3.10 Masonry foundation below Mon 6/2/25 Mon
ground level 6/30/25 Masonry foundation below ground level
3.20 50cm Masonry above ground Mon 6/2/25 Mon
level 6/30/25 50cm Masonry above ground level
3.30 Retaining wallmasonry Mon 6/2/25 Mon
6/30/25 Retaining wallmasonry
B.SUPER-STRUCTURE Mon 6/2/25 Mon
6/30/25
1.00 Concrete Work Mon 6/2/25 Mon
6/30/25
1.10 C-25 Reinforced concrete Mon 6/2/25 Mon
6/30/25
a) In Elevation of columns Mon 6/2/25 Mon
6/30/25 In Elevation of columns
b) In top tie beam Mon 6/2/25 Mon
6/30/25 In top tie beam
c) In Lintel Mon 6/2/25 Mon
6/30/25 In Lintel
1.20 Form work Mon 6/2/25 Mon
6/30/25
a) In Elevation of columns Mon 6/2/25 Mon
6/30/25 In Elevation of columns
b) In top tie beam Mon 6/2/25 Mon
6/30/25 In top tie beam
c) In Lintel Mon 6/2/25 Mon
6/30/25 In Lintel

Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: Construction of Gaba S
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Sat 12/28/24
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress

Page 6
CONSTRUCTION OF GABA SANBATA CROP MARKET CENTER GABA SANBATA CROP MARKET CENTER
Text1 Task Name Start Finish 2025
February March April May June July August September
1.30 Reinforcement bar Mon 6/2/25 Mon
6/30/25
a) Ø8 deformed bar Mon 6/2/25 Mon
6/30/25 Ø8 deformed bar
c) Ø12 deformed bar Mon 6/2/25 Mon
6/30/25 Ø12 deformed bar
2.00 Block work Mon 6/2/25 Mon
6/30/25
2.10 Class B 20cm thick HCB Mon 6/2/25 Mon
6/30/25 Class B 20cm thick HCB
2.20 Class B 15cm thick HCB Mon 6/2/25 Mon
6/30/25 Class B 15cm thick HCB
3.00 ROOF WATER PROOFING Mon 6/2/25 Mon
6/30/25
3.10 CIS 28G Mon 6/2/25 Mon
6/30/25 CIS 28G
3.20 Gutter Mon 6/2/25 Mon
6/30/25 Gutter
3.30 UPVC down pipe Mon 6/2/25 Mon
6/30/25 UPVC down pipe
3.40 Flat Sheet copping Mon 6/2/25 Mon
6/30/25 Flat Sheet copping
4.00 METAL WORK Mon 6/2/25 Mon
6/30/25
4.10 Windows Mon 6/2/25 Mon
6/30/25
a) 60*110cm Mon 6/2/25 Mon
6/30/25 60*110cm
b) 60*60cm Mon 6/2/25 Mon
6/30/25 60*60cm
5.30 Steel mesh wire Mon 6/2/25 Mon
6/30/25 Steel mesh wire
4.20 Doors Mon 6/2/25 Mon
6/30/25
a) 80*210cm Mon 6/2/25 Mon
6/30/25 80*210cm
b) 70*210cm Mon 6/2/25 Mon
6/30/25 70*210cm
5.00 CARPENTRY AND JOINERY Mon 6/2/25 Mon
6/30/25
5.10 Dia.10-12cm upper and lower Mon 6/2/25 Mon
wooden rafter 6/30/25 Dia.10-12cm upper and lower wooden rafter
5.20 Dia.8-10cm vertical and Mon 6/2/25 Mon
diagonal wooden truss 6/30/25 Dia.8-10cm vertical and diagonal wooden truss
5.30 5*7cm Zigba purlin Mon 6/2/25 Mon
6/30/25 5*7cm Zigba purlin
5.40 20*2cm Wooden Fascia Mon 6/2/25 Mon
6/30/25 20*2cm Wooden Fascia
5.50 9mm thick white pvc ceiling Mon 6/2/25 Mon
6/30/25 9mm thick white pvc ceiling
6.00 FINISHING Mon 6/2/25 Mon
6/30/25
6.10 3 coats of Plastering of Mon 6/2/25 Mon
internal wall 6/30/25 3 coats of Plastering of internal wall
6.20 Ceramic wall tile Mon 6/2/25 Mon
6/30/25 Ceramic wall tile
6.30 2 coats of Plastering of Mon 6/2/25 Mon
external wall 6/30/25 2 coats of Plastering of external wall
6.40 Ceramic Floor tile Mon 6/2/25 Mon
6/30/25 Ceramic Floor tile

Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: Construction of Gaba S
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Sat 12/28/24
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress

Page 7
CONSTRUCTION OF GABA SANBATA CROP MARKET CENTER GABA SANBATA CROP MARKET CENTER
Text1 Task Name Start Finish 2025
February March April May June July August September
6.50 Terazzo window sill Mon 6/2/25 Mon
6/30/25 Terazzo window sill
6.60 Stone pavement Mon 6/2/25 Mon
6/30/25 Stone pavement
6.70 Half dia.30cm concrete pipe Mon 6/2/25 Mon
6/30/25 Half dia.30cm concrete pipe
7.00 GLAZING Mon 6/2/25 Mon
6/30/25
7.10 4mm thick clear glass Mon 6/2/25 Mon
6/30/25 4mm thick clear glass
8.00 PAINTING Mon 6/2/25 Mon
6/30/25
8.10 3 coats of plastic emulsion Mon 6/2/25 Mon
paint 6/30/25
a) Internal walls Mon 6/2/25 Mon
6/30/25 Internal walls
b) External wall Mon 6/2/25 Mon
6/30/25 External wall
ESMP Mon 6/2/25 Mon
6/30/25
A.SUB-STRUCTURE Mon 6/2/25 Mon
6/30/25
1.00 EARTH WORK Mon 6/2/25 Mon
6/30/25
1.10 Clearing and grubbing Mon 6/2/25 Mon
200mm 6/30/25 Clearing and grubbing 200mm
1.20 Bulk excavate in ordinary Mon 6/2/25 Mon
soil to reduce level to a depth 6/30/25 Bulk excavate in ordinary soil to reduce level to a depth not exceeding 1.0m
1.30 Trench Excavation depth not Mon 6/2/25 Mon
exceeding 1000mm 6/30/25 Trench Excavation depth not exceeding 1000mm
1.40 Back filling with dry select Mon 6/2/25 Mon
material 6/30/25 Back filling with dry select material
B.SUPER-STRUCTURE Mon 6/2/25 Mon
6/30/25
1.50 Select material supply ,fill and Mon 6/2/25 Mon
compact 6/30/25 Select material supply ,fill and compact
1.60 Construction of ESM0 Mon 6/2/25 Mon
6/30/25 Construction of ESM0
1.70 250mm thick hardcore Mon 6/2/25 Mon
6/30/25 250mm thick hardcore
1.80 Retaining wall masonry Mon 6/2/25 Mon
6/30/25 Retaining wall masonry
1.90 Tapella Mon 6/2/25 Mon
6/30/25 Tapella

Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: Construction of Gaba S
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Sat 12/28/24
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress

Page 8