Test Plan for Employee Information System

The Test Plan for the Employee Information System outlines the testing strategy, objectives, scope, and schedule to ensure the system meets defined requirements. It includes details on the modules to be tested, testing levels and types, resources, and risk management. The plan aims to validate functionality, performance, and compatibility before deployment.

Uploaded by

sr0935364
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

Test Plan for Employee Information System

The Test Plan for the Employee Information System outlines the testing strategy, objectives, scope, and schedule to ensure the system meets defined requirements. It includes details on the modules to be tested, testing levels and types, resources, and risk management. The plan aims to validate functionality, performance, and compatibility before deployment.

Uploaded by

sr0935364
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Test Plan for Employee Information System

Version: 1.0
Date: August 22, 2024
Prepared by: [Your Name]
Approved by: [Approver's Name]

1. Introduction

1.1 Purpose

The purpose of this Test Plan is to define the testing strategy for the Employee
Information System (EIS). It describes the objectives, scope, resources, schedule, and
testing activities to ensure that the system meets the defined requirements and
functions as expected.

1.2 Objectives

• Validate the functionality of all modules in the EIS.

• Ensure the system meets the performance criteria.

• Identify and resolve any defects before deployment.

• Verify that the system is compatible with different browsers and devices.

• Confirm that the system integrates seamlessly with existing applications.

1.3 Scope

The scope of testing includes the following modules of the EIS:

• Employee Management

• Payroll Management

• Leave Management

• Performance Evaluation

• Reporting and Analytics

• User Authentication and Access Control

1.4 References

• SRS Document: Employee Information System SRS v1.0

• System Design Document: Employee Information System Design v1.0


2. Test Items

2.1 Modules to be Tested

• Employee Management: Adding, updating, and deleting employee records.

• Payroll Management: Processing payroll, generating payslips, and calculating


deductions.

• Leave Management: Applying for leave, approving/rejecting leave, and leave


balance calculations.

• Performance Evaluation: Recording performance evaluations, generating


reports, and notifications.

• Reporting and Analytics: Generating standard and custom reports.

• User Authentication: Login, logout, password management, and role-based


access control.

2.2 Features Not to be Tested

• External third-party payroll integration (to be handled in a separate testing


phase).

• Legacy data migration (handled by a different team).

3. Approach

3.1 Testing Levels

• Unit Testing: Conducted by developers during code implementation to verify


individual components.

• Integration Testing: Testing the interaction between integrated modules (e.g.,


Employee Management with Payroll).

• System Testing: End-to-end testing of the entire system in an environment that


mimics production.

• User Acceptance Testing (UAT): Conducted by end-users to validate the system


against business requirements.

3.2 Testing Types

• Functional Testing: Verify that each function of the EIS operates according to
the SRS.
• Performance Testing: Evaluate the system’s response time, throughput, and
resource usage under expected load.

• Security Testing: Assess the security of user authentication, data access


controls, and protection against vulnerabilities.

• Compatibility Testing: Ensure the system works across different browsers


(Chrome, Firefox, Edge) and devices (desktop, tablet, mobile).

• Regression Testing: Re-test after bug fixes or changes to ensure existing


functionality is unaffected.

3.3 Test Environment

• Hardware: Servers with 32GB RAM, 4TB storage.

• Software: Microsoft SQL Server 2019, ASP.NET Core 5.0, Angular 12.

• Browsers: Chrome, Firefox, Microsoft Edge.

• Devices: Windows PCs, Mac, Android, and iOS devices.

4. Test Deliverables

4.1 Documents

• Test Plan

• Test Cases Document

• Test Summary Report

• Bug/Defect Report

4.2 Testing Artifacts

• Test Scripts

• Test Data

• Automated Test Results (if applicable)

4.3 Metrics

• Number of test cases executed

• Number of defects found and resolved

• Test coverage percentage

• Performance benchmarks (e.g., response times)


5. Resources

5.1 Roles and Responsibilities

• Test Manager: Oversees the testing process and ensures that the testing
objectives are met.

• Test Engineers: Design and execute test cases, report defects, and validate
fixes.

• Developers: Fix identified defects and assist with unit testing.

• UAT Team: End-users who will validate the system during UAT.

5.2 Tools

• Test Management Tool: Jira or TestRail for tracking test cases and defects.

• Automation Tool: Selenium for automated testing.

• Performance Testing Tool: JMeter for load testing.

6. Schedule

Activity Start Date End Date

Test Plan Preparation August 15, 2024 August 22, 2024

Test Case Design August 23, 2024 August 30, 2024

Unit Testing September 1, 2024 September 10, 2024

Integration Testing September 11, 2024 September 20, 2024

System Testing September 21, 2024 October 5, 2024

UAT October 6, 2024 October 15, 2024

Final Testing and Bug Fixes October 16, 2024 October 20, 2024

Test Summary Report Preparation October 21, 2024 October 25, 2024

7. Risk and Contingency

7.1 Risks
• Delays in test environment setup.

• Unavailability of key resources (developers, test engineers).

• High number of defects identified during testing.

7.2 Contingency Plans

• Set up a backup test environment to mitigate delays.

• Cross-train team members to cover for unavailable resources.

• Prioritize critical defects and deploy hotfixes if necessary.

8. Approval

Prepared by: [Your Name]


Date: [Date]

Approved by: [Approver's Name]


Date: [Date]

This Test Plan document outlines the overall approach and schedule for testing the
Employee Information System, ensuring that it meets all functional, performance, and
security requirements before deployment.