Company Name: ANA Designs Pvt. Ltd. Company Address: 1A New india Chambers, MIDC central Rd, Andheri east. Mumbai
Engineer Name: Velu M Contact No: 9137177375
Description of work
Hazardous Work Activity:
(Please tick relevant work activity) Х Energised electrical installation / services. Х Structural alterations / repairs with a potential for structural collapse.
√ Coring / Chasing / Cutting (no electrical power in the area) Х Works involving asbestos. Х Demolition of a load-bearing element of a structure.
Х Roof Access √ Working at heights (risk of falling more than 2 metres). Х Works in or near a 1.5+ metre shaft / trench (excavation).
Х Shop Front Works (including glazing) Х Works near to or use of moving mobile plant. Х Works in areas exposed to extreme temperature.
Х Fire Services Х Works in or near a confined space. Х Works in or near water or other liquids with a risk of drowning.
Х Works in contaminated or flammable atmospheres / areas. Х Works involving traffic corridors or other non-pedestrian traffic. Х Use of explosives.
Х Mechanical Work (all works related to air conditioning and lift services; pumps, pipes and ductwork related to other services structural work) Х Other
Tick the Personal protective equipment (PPE) requirements. Emergency arrangement details
Other Job
Specific PPE
Head Foot Hi-vis vest Hand Eye Hearing Fall arrest Fire/evacuation First Aid Pollution/spill
Hazardous materials: Are hazardous materials to be used? Yes No Is MSDS Available
Person responsible for ensuring compliance with SWMS: Date of SWMS review:
Person responsible for reviewing the SWMS control measures: Date SWMS received by reviewer:
Material Loading / Unloading Stuck by Suspended load 1) Material loading and unloading area should be free
Fall of man /material from height. from obstacles.
Material Damage, 2) Use of PPEs like safety belt is must.
Use Lifting Equipment. 3) Use proper means of communication.
Uneven Ground. 4) Onsite Emergency Plan to be considered.
5) Good working platform to be provided.
6) Do the Third party inspection for lifting tools tackles,
chain, D- cycle, pulley etc
Likely Moderate High Likely Insignificant Low
7) Lifting Equipment inspection should be done.
8) Entry to unauthorized persons close to hoist should
be restricted.
9) All moving parts should be guarded.
10) Display warning signs.
11)Drivers Documents to be submitted
Material Shifting Lifting of Excessive Weight Manually 1) Tool box talk to be given.
Slips trips fall. 2) Proper supervision.
Muscle strains, 3)Follow proper material handling technique’s
4)Avoid obstruction (Cables, materials, waste etc.) in
walkways
5) Proper PPEs to be used.
6) Ensure good housekeeping
7)trained and experienced workforce to be deployed.
Likely Moderate High 8)shifting of material does not use a scaffold for shifting likely Minor Moderate
the materials.
9)Adequate illumination must be added.
10)All Materials are to be stacked not more than 1.5m
in a designated area and to be barricaded & isolated the
flammable material.
Unlikely