This document outlines specifications for construction materials and workmanship, emphasizing adherence to relevant Australian standards. It details requirements for structural steel, concrete, footings, reinforcement, and engaged piers, including material properties, installation methods, and quality control measures. The document serves as a guideline for contractors to ensure compliance with engineering standards before and during construction.

Uploaded by

tunglam96bk
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

s1

This document outlines specifications for construction materials and workmanship, emphasizing adherence to relevant Australian standards. It details requirements for structural steel, concrete, footings, reinforcement, and engaged piers, including material properties, installation methods, and quality control measures. The document serves as a guideline for contractors to ensure compliance with engineering standards before and during construction.

Uploaded by

tunglam96bk
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8

GENERAL STRUCTURAL STEEL CONCRETE FOOTING


S1. All materials and workmanship shall be in C1. Concrete will be used in the slab, piers, footing and
A G1. These specifications are designed to be read in BASE PLATE: BOLT m10 m12 plate thickness A
accordance with AS4100 and AS1554 and relevant retaining walls.
conjunction with the accompanying final design drawings. 24mm, m24 4.6 HD bolt
codes. C2. Concrete shall have a slump of 80mm and maximum
G2. Specifications are to be followed exactly as written aggregate size of 20mm and have strength as shown HD bolt 8.8 High Tensile AS 1110.1
unless changes have been approved. S2. Steel component must follow the minimum below and has a compressive strength of 32 MPa. This F1. All materials and workmanship shall be in
requirements in table below was taken for all elements of the structure
G3. Any changes to the final design must be approved accordance with AS3600 and relevant codes.
and verified by the engineer with written approval before C3. All concrete must be mechanically vibrated within F2. Holding Down (HD) bolt shall be of grade
commencement. the formwork to achieve maximum compaction without 4.6 mild steel in accordance with AS1110.1 and
G4. All materials used in construction are to adhere to all causing segregation AS1252.
current relevant standards as outline in the specifications. C4. The size of concrete in drawing does not include F3. Formwork shall be designed, constructed
B G5. All materials and installations will strictly adhere to thickness of finishes. and stripped in accordance with AS3610. B
S3. Sheeting used in accordance with AS/NZS 2728 &
manufacturer recommendations. F4. Maximum lift of pour for concrete shall be
AS 1397. Fasteners must be placed more than 25mm GROUNDWORKS 2000mm
G6. Unless explicitly stated, all lengths are defined in from the end of sheet. GW1. All work regarding the soil, such as the retaining
millimetres. F5. All reinforcement shall be in correct position
S4. Must allow roof sheets to overlap into gutters by assumes that the soil is in drained conditions.
G7. Contractors to execute all necessary tests and checks 50mm GW2. Ensure an appropriate drainage solution in the as shown in drawing before pouring concrete.
prior to construction commencement at their expense. construction and service phases F6. Minimum cover to reinforcement including
S5. More detail on how to install sheeting can be found
G8. No holes or abscesses are to be made not indicated GW3. The soil is taken as highly reactive fitments must be followed as shown in drawings
in TRIMDEK manual.
in the drawings unless otherwise stated. GW4. Ensure the structural fill has a nominal particle of no
S6. All purlins and girts bolts are tighten using 55Nm F7. Maximum tolerant for fixing reinforcement
more than 40mm.
torque position is ±5mm for member with thickness
GW5. Layers should be compacted no less than 200mm.
C REINFORCEMENT S7. Purlin and girts bolts are used in accordance with GW6. Dryness and moisture soil levels should be tested in
less than 600mm and ±10mm for member with
C
thickness larger than 600mm
R1. All workmanship and material shall be in accordance table below, provided by LYSAGHT accordance to AS1289.
GW7. The fill material shall be compaction tested for every F8. Curing in accordance with AS3600. Curing
with AS3600 and other current relevant codes including
100 square metres per layer of fill. must be covered with polythene sheet for at
amendments.
least 7 days
R2. Reinforcement type and grade are outlined below, all
in accordance with AS/NZS 4671
ENGAGED PIER
EP1. Engaged Piers must adhere to AS3600
and current relevant codes.
D EP2. All reinforcements must be checked by D
engineer before construction
R3. Bar notation explanation: Number of bar - Bar size
(mm), spacing(mm). For example, 20-N20 200 means 20 S8. Bolt designation EP3. Pier is only suporting tension and
hot rolled deform bars with 20mm diameter at 200mm compression.
Structural bolt of grade 4.6 to AS 1111 snug tightened
spacing. EP4. Starter bars needed to be place at the
High strength structural bolt of grade 8.8 to AS1252
bottom of the wall stem to prepared for the
snug tightened
engaged pier construction
R4. Reinforcement to be lapped only as specified on the
S9. All bolts, nuts and washer shall be galvanised,
drawings. Otherwise, the minimum as follows
unless otherwise noted.
AS3600:2009 (Cl 13.1.2.2 and Cl 13.1.2.3)
S10. All plate and gussets shall be as shown in
E drawings E
S11. All welds to be 6mm or 12mm Continuous fillet
weld (CFW) as per drawings. Electrodes to be E48XX,
all welds are G.P category.
S12. Welding must be carried out by an experienced
operator in accordance with AS1554 and inspected and
certified by a qualified professional as outlined in Drawing Title:
Drawn by Oliver Tan 27/10
R5. Minimum distance to the face of concrete is shown in AS2214.
drawings
S13. Steelwork, excluding concrete-encased sections, Check by Ngoc Thanh Vu 27/10
Design Specifcations
F should be cleaned using power tools, with all weld slag F
Note: Scale : 1:1
removed, and coated with an approved metallic primer Revision R-01
at least 40 hours prior to dispatch.
Drawing No. : S-01
1 2 3 4 5 6 7 8