HIRADC Presentation1
HIRADC Presentation1
IDENTIFICATION
RISK ASSESSMENT
DETERMINING
CONTROLS
An ongoing process to
– Assessment of risks
RESPONSIBILITIES
❑ Unit In charges to carry out HIRADC on yearly basis and
send to HSE
• Elimination
• Substitution
• Enclosure / isolation
Engineering Controls
Hierarchy for Determining Hazard Control Measures(Contd…)
Administrative Controls
• Training requirements
• In emergency situations.
CONTROL MEASURES IN PLACE (Contd…)
❑ Base
❑ Residual
RESIDUAL RISK LEVEL ESTIMATION
Use severity and probability scales
(including human factor)
RR = S + P(L+HF)
RISK ASSESSMENT METHODOLOGY
S-Score Severity Score - Definitions
0 No injury, illness, no legal requirement
incident
RISK ASSESSMENT METHODOLOGY