Road Inspection Report

The report details a preliminary inspection of a 2 km road starting at Vattakkaavu Junction, noting issues such as potholes, lack of cautionary and speed limiting boards, and boulders left on the shoulder after excavation. Although drainage dips are in good condition, the road shows significant damage at several chainages. The average carriageway width is 3.75 meters, and the road ends at Vellanaadi Hospital junction.

Uploaded by

ARIF AHAMED
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
138 views

Road Inspection Report

The report details a preliminary inspection of a 2 km road starting at Vattakkaavu Junction, noting issues such as potholes, lack of cautionary and speed limiting boards, and boulders left on the shoulder after excavation. Although drainage dips are in good condition, the road shows significant damage at several chainages. The average carriageway width is 3.75 meters, and the road ends at Vellanaadi Hospital junction.

Uploaded by

ARIF AHAMED
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Sub: Report regarding issuing Fitness certificate for road for bus service

Site inspected. From preliminary inspection, the following details were observed.

• The said road starts at Vattakkaavu Junction.


• At the starting, the road has intermediate patchworks done. Between chainages 0+100 & 0+200,
potholes are seen.
• At 0+300, a by road is starting at RHS.
• The road passes through rubber plantation.
• To facilitate cross drainage of storm water runoff from adjacent land, a BT dip is provided at
0+400 & interlock dips are provided at 0+900, 1+300, 1+350, 1+600, 1+720, 1+800 & 1+900 .
They are all in good and working condition.
• No cautionary boards are seen at curves,by roads & dips.
• No mandatory speed limiting boards are provided along the road
• Road is damaged and potholes are seen at chainages 0+700, 1+400, 1+700. From Chainage
0+980, on the LHS, shoulder has been excavated for laying pipes of Jal Jeevan Mission and
refilled.
• After the excavation, boulders of considerable size has been left on the LHS shoulder which
poses risk to the traffic on the road.
• The road ends at Vellanaadi Hospital junction and has a total length of 2 kms.
• The average carriageway width is 3.75 metres.
Starting of road at Vattakkavu Junction

Potholes at intermediate locations


Interlock dip at Ch 1+900

Boulders left on LHS shoulder after water authority pipe laying


Potholes

Ending of road at Vellanaadi Hospital Junction joining with PWD road