signedpdfnew BCWO
signedpdfnew BCWO
To
Shri Basavaraj Tippanna Gangai And Shri Vagish Tippanna Gangai,
Betadur Road, Kundagol, Taluk: Kundagol & District: Dharwad
Validity : 12/01/2030
Page-1 e_outwardno76923 SENIOR ENVIRONMENTAL OFFICER PCB ID-254822 INW ID-287750 Printed through XGN
--16/01/2025
(This document contains 9 pages including annexure & excluding additional conditions)
Combined Consent Order No: CTE-347055 PCB ID: 254822 GSC No : PB0XG0000277750 Date: 16/01/2025
To,
The Occupier,
Shri Basavaraj Tippanna Gangai And Shri Vagish Tippanna Gangai
Betadur Road, Kundagol,
Taluk: Kundagol & District:
Dharwad
Sir,
Sub: Consent to Establish new activity under Water (Prevention & Control of Pollution) Act, 1974 & Air
(Prevention & Control of Pollution) Act, 1981
Ref: 1. CFE application submitted by the industry/organization on 10/01/2025 at regional Office
With reference to the above, it is to be informed that, the Board hereby accords Consent for Establishment for new
Activity under Water (Prevention & Control of Pollution) Act, 1974 & Air (Prevention & Control of Pollution) Act, 1981
at the location indicated below subject to the following terms & conditions.
Location:
Name of the Industry: Shri Basavaraj Tippanna Gangai And Shri Vagish Tippanna Gangai
Address: Survey No.342/2, Betadur Road, Kundagol, Taluk: Kundagol & District: Dharwad
Industrial Area: Not In I.A, Kundagol,
Taluk: Kundgol, District: Dharwad
1. This consent for establishment is valid up to 12/01/2030 from the date of issue.
2. The applicant shall not undertake expansion/diversification without the prior consent of the Board.
3. The applicant shall obtain necessary license/clearance from other relevant statutory agencies as required under
the law.
Page-2 e_outwardno76923 SENIOR ENVIRONMENTAL OFFICER PCB ID-254822 INW ID-287750 Printed through XGN
--16/01/2025
(This document contains 9 pages including annexure & excluding additional conditions)
I. WATER CONSUMPTION:
1. The source of water shall be from and total water consumption shall be as below.
1. The industry shall treat the domestic wastewater from the factory in septic tank with soak pit. No overflow
from the soak pit is allowed. The septic tank and soak pit shall be designed as per IS 2470 Part – I and Part – II.
2. The industry shall treat the domestic wastewater in the Sewage Treatment Plant (STP) as per the proposal
submitted. It shall meet the standards specified in Annexure-I & shall be used on land for gardening/
greenbelt within the factory premises.
3. Domestic Sewage shall be discharged to Underground drainage System/ Sewers owned by Local body.
4. The trade effluent shall be treated in the Effluent treatment Plant (ETP) to the stipulated standards and the
treated trade effluent shall be discharged to the Underground drainage System (UGD) owned by Local body.
Page-3 e_outwardno76923 SENIOR ENVIRONMENTAL OFFICER PCB ID-254822 INW ID-287750 Printed through XGN
--16/01/2025
(This document contains 9 pages including annexure & excluding additional conditions)
1. The Source of emission, Stack height & Air Pollution Control (APC) measures shall be as specified in
ANNEXURE-II.
2. The occupier shall provide port holes for sampling of emission, access platforms for carrying out stack
sampling, electrical points and all other necessary arrangements including ladder as indicated in Annexure-II.
3. The Occupier shall upgrade/modify/replace the control equipment with prior permission of the Board.
The applicant shall ensure that the ambient noise levels within its premises during construction and during
operational period shall not exceed w.r.t Area/Zone as per Noise Pollution (Regulation and Control)
Rules, 2000 as mentioned below:-
a) In Industrial Area 75 dB(A) Leq during day time and 70 dB(A) Leq during night time.
b) In Commercial Area 65 dB(A) Leq during day time and 55 dB(A) Leq during night time.
c) In Residential Area 55 dB(A) Leq during day time and 45 dB(A) Leq during night time.
d) In Silence Zone 50 dB(A) Leq during day time and 40 dB(A) Leq during night time.
Note: - * Day time shall mean 6 am to 10 pm and Night time shall mean 10 pm to 6 am.
* dB(A) Leq denotes the time weighted average of the level of sound in decibels on scale A which is
relatable to human hearing.
* “A”, in dB(A) Leq, denotes the frequency weighting in the measurement of noise and corresponds to
frequency response characteristics of the human ear.
1. The industry shall collect, treat and dispose off all solid waste generated from the process other than wastes
covered under the Hazardous Wastes (Management& Transboundry Movement) Rules 2016, in such manner so as
not to cause environmental pollution.
2. The details of solid waste generated from the proposed plant and mode of disposal shall be as below.
Page-4 e_outwardno76923 SENIOR ENVIRONMENTAL OFFICER PCB ID-254822 INW ID-287750 Printed through XGN
--16/01/2025
(This document contains 9 pages including annexure & excluding additional conditions)
VI. HAZARDOUS AND OTHER WASTES (MANAGEMENT & TRANSBOUNDRY MOVEMENT) RULES 2016:
1. The industry shall apply and obtain authorization under Hazardous Wastes (Management & Transboundry
Movement) Rules 2016, and comply with the conditions of the authorization. The applicant shall apply for
authorization along with the consent for operation (CFO) application under the Rules in Form-I to obtain
authorization and comply with conditions.
VII. GENERAL:
1. The applicant shall obtain prior permission from the competent authority for drawing of water from
Surface/Ground water source and submit a copy of the same to the Board.
2. The industry shall transport and store the raw materials in a manner so as not to cause any damage to
environment, life and property. The applicant shall be solely responsible for any damages to environment.
3. The industry shall not commission the proposed plant for trial or regular production unless necessary Water &
air pollution control equipments are installed as specified in the Consent Order.
4. The industry shall ensure that the treatment plant and control equipments are completed and commissioned
simultaneously along with construction of the factory and erection of machineries.
5. The industry shall not change or alter (a) raw materials or manufacturing process, (b) change the products or
product mix (c) the quality, quantity or rate of discharge/emissions and (d) install/replace/alter the water or air
pollution control equipments without the prior approval of the Board.
6. The industry shall immediately report to the Board of any accident or unforeseen act or event resulting in
release of discharge of effluents or emissions or solid wastes etc. in excess of the standards stipulated.
And the industry shall immediately take appropriate corrective and preventive actions under intimation
to the Board.
7. The Board reserves the right to review, impose additional condition or conditions, revoke, change or alter the
terms and conditions.
8. This CFE does not give any right to the Party/Project Authority/Industry to forego any other legal
requirement, that is necessary for setting/operation of the plant.
9. The industry shall furnish pointwise compliance to the conditions given under this consent for establishment
along with the application for Consent to operate.
10. The applicant is liable to reinstate or restore, damaged or destroyed elements of environment at his cost,
failing which, the applicant/occupier as the case may be shall be liable to pay the entire cost of remediation
or restoration and pay in advance an amount equal to the cost estimated by Competent Agency or Committee.
11. The Project authorities shall apply and obtain prior consent of the Board for any new air pollution sources in
future
Page-5 e_outwardno76923 SENIOR ENVIRONMENTAL OFFICER PCB ID-254822 INW ID-287750 Printed through XGN
--16/01/2025
(This document contains 9 pages including annexure & excluding additional conditions)
Please note that this is only consent for establishment issued to you to proceed with the formalities for
establishment of the industry and does not give any right to proceed with trial/regular production. For
this purpose, separate consents of the Board for discharge of liquid effluent and the emissions to the air shall
have to be obtained by remitting prescribed consent fee. The application for consent has to be made 120 days
in advance of commissioning for trial production of the plant.
Note:
The following Conditions mentioned above are not applicable.
COPY TO:
1. The Environmental Officer, KSPCB, Regional Office, Dharwad for information and to inspect the
industry during your next visit to the area.
2. Master copy (Dispatch).
3. Office copy.
Note: All efforts should be made to remove colour and unpleasant odour as far as practicable.
ANNEXURE- II
Page-6 e_outwardno76923 SENIOR ENVIRONMENTAL OFFICER PCB ID-254822 INW ID-287750 Printed through XGN
--16/01/2025
(This document contains 9 pages including annexure & excluding additional conditions)
Additional Conditions:
1. The applicant shall utilize the treated domestic effluent for gardening and green development.
2. The solid waste generated shall be disposed scientifically.
3. To provide roof top rain water harvesting system and to develop green belt around the premises.
4. Not to use any banned plastic items as per GOK notification dated: 11.03.2016 & shall comply with provisions of Plastic Waste
Management Rules 2016 & its subsequent amendments.
5. The applicant shall obtain NOC from ground water authority for extraction of ground water within 3 months as per NGT order
dated:19.12.2018 (OA No.670/2018).
Page-7 e_outwardno76923 SENIOR ENVIRONMENTAL OFFICER PCB ID-254822 INW ID-287750 Printed through XGN
--16/01/2025
(This document contains 9 pages including annexure & excluding additional conditions)
Page-8 e_outwardno76923 SENIOR ENVIRONMENTAL OFFICER PCB ID-254822 INW ID-287750 Printed through XGN
--16/01/2025
(This document contains 9 pages including annexure & excluding additional conditions)
Chi Chimney KVA Minimum Constituents to be Tolerance limits Air pollution Date of which air
m.N attached to Rating/ chimney controlled in the mg/NM3 Control pollution control
o. Capacity height to be emission equipment to equipments shall
provided be be provided to
above installed,in achieve the
ground addition to stipulated
level chimney tolerance limits
(in Mtr) height as per and chimney
col.(4) heights
conforming to
stipulated
heights.
Portholes shall be provided for all chimneys, stacks and other sources of emission. These shall serve as the
sampling points. The sampling point should be located at a distance equal to atleast eight times the stack or duct
diameters downstream and two diameters upstream from source of low disturbance such as a
Bend, Expansion, Construction Valve, Fitting or Visible Flame for rectangular stacks, the equivalent diameter can be
calculated from the following equation.
2 (Length x Width)
Equivalent Diameter = -----------------------
(Length + Width)
2. The diameter of the sampling port should not be less than 3”. Arrangements should be made so that the porthole is
closed firmly during the period when it is not used for sampling.
3. An easily accessible platform to accommodate 3 to 4 persons to conveniently monitor the stack emission from the
portholes shall be provided. Arrangements for an Electric Outlet Point off 230 V 15 A with suitable switch control
and 3 Pin Point shall be provided at the Porthole location.
Page-9 e_outwardno76923 SENIOR ENVIRONMENTAL OFFICER PCB ID-254822 INW ID-287750 Printed through XGN
--16/01/2025