TIME_AND_WORK_7
TIME_AND_WORK_7
1. If 15 men take 60 days to complete a job, find 11. Three men can complete a job in 3 days,
the time taken by 45 men to complete it. working 3 hours a day. In how many days can
9 men complete it working 1 hour a day?
2. 18 men take 20 days to complete a job working (A) 6 (B) 1.5 (C) 3 (D) 9
12 hours a day. Find the number of days those
15 men will take to complete it if they work 9 12. 40 men who can complete a job in 96 days
hours a day. started a job. After 24 days, 20 men joined.
After 32 more days, N men left. The remaining
3. 20 men take 10 days to complete a job working men completed the remaining work in 20 more
12 hours a day. Find the number of men days. Find the value of N.
required to complete a job, twice as large, in
30 days working 8 hours a day. 13. A group of men are building a wall. After half
the wall has been built, double the number of
4. If ten men can do a job in ten days, what men join the original group. The wall gets
fraction of the job can be done by one man in completed 6 days earlier than scheduled.
one day? What is the total number of days the initial
(A) 1/10 (B) 1/100 (C) 1/20 (D) ½ group of men would have taken to complete
the wall?
5. A man can eat an apple in one day. How many (A) 18 (B) 16 (C) 14 (D) 12
apples can six men eat in six days?
14. A contractor was assigned a task to be
6. If a man cuts the grass of a lawn in T minutes, completed in 120 days. He initially hired 48
what part of the lawn can he cut in 30 men to complete the task. But after 60 days,
minutes? only two–fifths of the task was completed.
(A) 30/T (B) T-30 (C) T/30 (D) 30-T How many more men should he hire after 60
days in order to complete the task on time?
7. X men can complete a work in 120 days. If
there were 10 men more, the work would be 15. A and B can complete a job in 10 days and 15
completed in 20 days less. Find the value of X. days respectively. Find the time taken to
complete it, if both A and B work together.
8. Ten men can do a piece of work in 15 days.
How many men are needed to complete a 16. A and B together can complete a job in 8 days.
work which is five times as large as the first A alone can complete it in 24 days. Find the
one, in 10 days? time taken by B to complete it.
9. Nine men can complete a job in 15 days. If a 17. Ajay and Bala working together can complete
man works thrice as fast as a woman, find the a job in 16 days. Ajay alone can complete it in
number of days taken by 15 women to 18 days. Both work together for 4 days and
complete the job. then Bala leaves. Find the time taken by Ajay
(A) 20 (B) 24 (C) 27 (D) 36 to complete the remaining work.
10. A man can complete a job in four days working 18. A and B together can complete a job in 12 days.
ten hours a day. In how many days can he B and C together can complete it in 20 days. A
complete it if he works eight hours a day? and C together can complete it in 10 days. Find
the times taken by each of
A, B and C to complete it.