Civil of Project Award Till The Date Jan25

The document lists various civil projects awarded in the fiscal year 2024-25 as of January 1, 2025, detailing project names, locations, lengths, costs, and concessionaires. Projects span multiple states including Andhra Pradesh, Assam, Bihar, Gujarat, Haryana, Punjab, and Himachal Pradesh, with various modes of execution such as EPC, PBMC, and Item Rate. The total awarded costs for these projects vary significantly, reflecting a diverse range of infrastructure improvements across the regions.

Uploaded by

upnandan19
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
75% found this document useful (4 votes)
11K views17 pages

Civil of Project Award Till The Date Jan25

The document lists various civil projects awarded in the fiscal year 2024-25 as of January 1, 2025, detailing project names, locations, lengths, costs, and concessionaires. Projects span multiple states including Andhra Pradesh, Assam, Bihar, Gujarat, Haryana, Punjab, and Himachal Pradesh, with various modes of execution such as EPC, PBMC, and Item Rate. The total awarded costs for these projects vary significantly, reflecting a diverse range of infrastructure improvements across the regions.

Uploaded by

upnandan19
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

List of Civil Project awarded till date (01/01/2025) in FY 2024-25

Total LOA Date -Civil Total Awarded


Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
Construction of 6 lane elevated corridor
including its approaches from Km. 629+880
Visakhapatna Srinivasa Edifice Andhra
1 to Km. 634+470 (Design Chainage) of NH-16 16 4.59 27-12-2024 137.89 EPC
m Private Limited. Pradesh
in Ranasthalam Town portion in the state of
Andhra Pradesh on EPC Mode under NH(O).
Strengthening and Major Maintenance of
Anandapuram-Visakhapatnam-Anakapalle
section from Km.682.980 to Km.741.256
Visakhapatna Shiva Buildtech Andhra
2 and Ranastalam Town Portion from Km. 1,616 62.276 02-07-2024 78.15 PBMC
m Pvt. Ltd. Pradesh
630-120 to Km. 634-120 of NH-16 in the
State of Andhra Pradesh on Performance
Based Maintenance Contracts (PBMC)
Half Clover Leaf Interchanges cum ROB at SRC Infra
Andhra
3 Yerramanchi and Gudipalli Villages at Km 44 4.77 27-12-2024 74.19 Anantapur EPC Developers
Pradesh
416.005 Across NH-44 Private Limited
Strengthening and Major maintenance
work of stretch two lane with paved Sri Sainath
Andhra
4 shoulder of Penchalakona to Yerpedu 565 84 02-12-2024 62.28 Tirupati PBMC Constructions
Pradesh
section of NH-565 (Total Length 84.00km) Private Limited
in the State of Andhra Pradesh on PBMC
Mode Maintenance including Incident
Routine
Management (Excluding Ambulance
Services) for Four Laning of Vijayawada – Abhipsa
Andhra
5 Machilipatnam section of NH-65 from Km. 65 64.611 29-07-2024 8.27 Vijayawada HAM Construction,
Pradesh
0.000 to Km. 64.611 & Eastern side Benz Bhubaneswar.
Circle Flyover on NH-16 in the state of
Andhra Pradesh.

Page 1
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
Short term Improvement and Routine
Maintenance of 4/6 laning of Hyderabad - Andhra
Jogendra
6 Vijayawada section of NH-65 from 65 61.5 25-08-2024 3.36 Hyderabad Item Rate Pradesh,
Chodhary
Km.160.000 to 221.500 in the State of Telangana
Telangana & Andhra Pradesh.
Strengthening and Major maintenance Shree Gautam
work of stretch of Patacharkuchi to Baihata Construction
7 NH-27 56.85 30-09-2024 76.14 Guwahati PBMC Assam
from Km. 1040.300 to Km. 1097.150 Company
(Package no. AS-06,AS-05 & AS-04 balance) Limited
of NH 31
Strengthening and Major Maintenance of Prabhu
“4L PS Divided Carriageway Road from Km. Agarwalla
8 NH-27 73.685 31-12-2024 66.30 Guwahati PBMC Assam
205.00 to Km. 278.685 of NH-37 in the state Construction Pvt
of Assam” on PBMC Mode Ltd
Routine Maintenance and Incident
Management of Muzaffarpur - Darbhanga -
9 Supaul Section of NH-27(East west Corridor) 27 145.65 07-10-2024 9.30 Darbhanga Item Rate Kairav Green Bihar
from Km.0.00 to Km.145.456 in the state of
Bihar.
Maintenance & Repair Work of "Two Laning
with Paved Shoulder of Chhapra Rewaghat-
Muzaffarpur section of NH-102 from Km
1+300 to Km 74+200 (Existing Chainage) Vinod Kumar
10 722 73.079 18-07-2024 56.38 Chhapra PBMC Bihar
and Km 1+300 to km 74+379 (Design Jain
Chainage), (Total Design length 73.079
Kms.) in the state of Bihar" on
Performance-based Maintenance Contracts
(PBMC)

Page 2
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
Providing and fixing/installation of Metal
Beam Crash Barrier at high embankment
location and also locations as per engineer Chhattisga
11 53 18 27-08-2024 4.91 Raipur EPC S B Deshmukh
decision for proejct highway of durg bypass rh
from km. 308.600 to km 323.600 of NH-53
in the State of Chhattisgarh on EPC Mode.
Short Term O&M Work of 4 laning of
Sargaon Bilaspur of NH-200 (New NH-130)
KAMDHENU Chhattisga
12 (PKG-III) from Km 91+026 to 126+525 130 35.49 14-08-2024 1.37 Bilaspur EPC
CONSTRUCTION rh
section of Raipur Bilaspur in the State of
Chhattisgarh under NHDP IV in BoQ basis.
Construction of Slip Road from Km 20.762
to Km 21.275 (LHS) and Serivce Road M/s Shree Ram
Chhattisga
13 between Km 23.180 to Km 24.854 (RHS) in 130 2.19 29-07-2024 5.47 Bilaspur Item Rate Construction
rh
Bilaspur Pathrapali section of NH-130 in the Company
State of Chhattisgarh
Balance work of Six Laning of Shamlaji-
Motachiloda from Km. 401.200 to
Km.494.410 section (Design Chainage Apex Tarmac
14 48 5.54 28-06-2024 415.00 Ahmedabad Item Rate Gujarat
Km.447.385 to Km 540.595, Length- 93.210 Pvt. Ltd.
Km) of old NH-8 (NH-48) in the state of
Gujarat on single Percentage Item Rate
Contract of Pre-Monsoon Maintenance
Execution
Activities at the risk and cost of existing
Concessionaire on the Shamlaji to Apex Tarmac
15 48 93.21 18-06-2024 0.59 Ahmedabad Item Rate Gujarat
Motachiloda from km. 401.200 to Pvt. Ltd.
494.410(Length 93.210 Km) section of NH-8
in the state of Gujarat.

Page 3
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
Adoption of Safety measures at 06 accident
prone locations in between Ch.94+500 to Shivam
16 NH-48 11.5 30-07-2024 0.77 Ahmedabad Item Rate Gujarat
Ch.106+000 on six lane murlidhar deore
AhmedabadVadodara section of NH48 in
the state
Repair of Gujarat.
work at risk and cost on Ahmedabad
– Godhra section of NH-47 from Km.04.200
17 NH-47 118.22 11-11-2024 1.11 Ahmedabad Item Rate Hitesh B Shah Gujarat
to 122.420 in the state of Gujarat on item-
rate contract
Short Term Improvement and Routine
Maintenance work from Km. 0+000
(Budhel) to Km. 0+900, Km. 0+900 to Km. Shree
18 51 11 23-09-2024 4.59 Bhavnagar Item Rate Gujarat
9+350 (Vartej Y-Jn.) & Km. 9+350 (Vartej- Y Construction
Jn.) to Km. 11+000 (Vartej) of NH-51
(Missing Link - Bhavnagar Bypass)
Repair and Re-habilitation works of Major Sanrachana
19 Bridge on Sabarmati River near Prantij at 68 0.4 05-06-2024 17.25 Palanpur Item Rate Structural Gujarat
Km 156-900 of NH-68 in the Strengthening
state of Gujarat.
Maintenance works and activities on pvt.Ltd
section from Km 0.000 to Km.123.454 of SRM Contractors
20 151 103 22-07-2024 171.23 Rajkot PBMC Gujarat
Jetpur-Somnath Section of NH-151 in the Ltd.
State of Gujarat
Strengthening work of Padhi to Dahod
Gujarat,
21 section of NH-113 under one time NH 113 85.588 21-06-2024 46.38 Godhra EPC S R Construction
Rajasthan
improvement
4 Lane LVUP at Sector-26 Panchkula
Rajinder
Junction at Km. 170+335 of Yamunanagar -
22 07 1.25 02-07-2024 13.63 Chandigarh EPC Infrastructure Haryana
Panchkula Section of Old NH-73 (New NH-
Private Limited
07) from Km. 169+700 to Km. 170+950

Page 4
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
New Construction of Damaged Major
Bridge RCC T-Beam bridge and its
approaches at Ch. 147+547 (LHS) on
AT
23 Yamuna Nagar-Saha-Barwala-Panchkula 344 0.52 04-07-2024 4.49 Chandigarh EPC Haryana
Constructions
section of NH-73 (New NH-344) from Km.
115.400 to km. 157.192 (Package-2) in the
State of Haryana on EPC Mode.
Balance Overlay work on Yamunanagar-
Rajinder
Saha-Panchkula section of (New NH 344)
24 344 16 29-07-2024 8.83 Chandigarh Item Rate Infrastructure Haryana
from km. 115.400 to km. 157.192 (Package-
Private Limited
2) in the State of Haryana.
Incident Management service on Ambala to
Kaithal section of old NH-65 (new NH-152) ABS
25 152 50.36 06-06-2024 0.77 Ambala Item Rate Haryana
from Km 00.000 to Km 50.360 (Package-1) Construction Co.
for the Period of 2 Years.
Maintenance work on UP-Haryana Border -
Yamunanagar-Saha -Panchkula Section of NKC
26 (Old NH-73) (New NH-344) from km. 71.400 344 44 16-08-2024 8.96 Chandigarh Item Rate Constructions Haryana
to km. 115.400 (Package-1) in the State of Pvt. ltd.
Haryana.
Overlay and Maintenance work on Ambala
Dhariwal
Kala Amb section of NH-72 from Km.29.000
27 72 6 16-08-2024 2.99 Chandigarh Item Rate Buildtech Haryana
to km. 34.000 and in km. 38.000 in the
Limited
State of Haryana.
Operation and Maintenance including
Routine Maintenance and Incident
Management of Six Laning of Panipat- Haryana,
28 44 176 26-06-2024 24.22 Ambala Item Rate Gaurav Singh
Mandi Gobindgarh Section of NH-1 From Punjab
Km 96.000 to Km 272.000 in the State of
Haryana and Punjab.

Page 5
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
Construction of 3 nos. of Ramp Type Foot
Over Bridges at various locations on Six
Dhingra Brothers Haryana,
29 laning of Panipat-Khanna section of NH-44 44 176 02-07-2024 4.00 Ambala Item Rate
(India) Punjab
(old NH-1) from Km.96.000 to Km. 272.000
in the State of Haryana and Punjab.
4 laning of Aligarh-Palwal Section from Km.
46.390 (Design Chainage) to Km. 69.110 Haryana,
Nirmal Build
30 (Terminating at junction EPE) (Package-II 334D 22.72 01-08-2024 677.14 Aligarh HAM Uttar
Infra Pvt. Ltd.
from Kurana- Eastern Peripheral Pradesh
Expressway) of NH-334D
Interim protection measures on NH-03
Himachal
31 between Pandoh (km 221) to Manali (km 03 84.945 30-07-2024 9.44 Mandi Item Rate AV Construction
Pradesh
309) in the state of Himachal Pradesh
Short term improvement and routine
maintenance with provision of incident
Rajinder
Management system services of Kullu- Himachal
32 03 37.345 05-07-2024 16.65 Mandi Item Rate Infrastructure
Manali section of NH-21 (New NH-03) from Pradesh
Private Limited
km. 272.000 to km. 309.345 (Design
chainage) in the state of Himachal Pradesh
Maintenance of existing stretch of NH-103
(Old NH-88) from Km. 96.500 to 131.000 of M/s Ganesh Himachal
33 103 34.5 18-07-2024 15.51 Hamirpur Item Rate
Shimla Mataur section in the state of Builders Pradesh
Himachal Pradesh
Construction of Slope Protection Work at
Various Locations on the Hillside between
Bharat
Km 106+139 to Km 129+050 of the Himachal
34 05 6.075 09-09-2024 89.00 Shimla EPC constructions
SolanKaithlighat section of NH 22 (now NH Pradesh
(India) pvt. Ltd
5) on EPC mode in the State of Himachal
Pradesh (HP)

Page 6
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
4 Lane of CG/JH Border-Gumla from km Shivalaya
35 0.000 to km 32.370 of NH-43 in the State NH-43 32.37 07-10-2024 781.00 Gumla HAM Construction Co. Jharkhand
of Jhrkhand Pvt. Ltd.
Construction of FOB's for permanent
rectification of Black Spot at
Km.37/430(Mahadevpura village) ID
KA(02)-028 and at Km.105/800 (near G.R Engineers &
36 75 0.12 31-07-2024 3.32 Hassan EPC Karnataka
Adichunchanagiri Univercity) ID KA(03)-270 Contractors
of Nelamangala to Devihalli section of NH-
75(Old NH-48) from km 28+200 to 110+000
in the state of Karnataka
Short term Maintenance of Two Laning with
Paved Shoulders of Bijapur-Gulbarga-
M/ s. Mascot
37 Homnabad section of NH-50 (Old NH-218) 50 220.01 09-07-2024 5.65 Gulbarga Item Rate Karnataka
Construction Co.
from Km.195.000 to Km.415.010 in the
State of Karnataka
Construction of 04 Culverts at Moolepadam
(Km.337+830), Seminarpadi (Km.328+690) Siddhartha
38 & 2 Nos at Air-link Castle Athani 544 0.0077 19-07-2024 6.47 Palakkad Item Rate Laxmi Engitech Kerala
(Km.324+335 & Km.324+210) on NH - 544 Pvt. Ltd.
under Item Rate Contract - 3rd Call
Balance work of widening of 4 nos existing
2 Lane major Bridge of Six-laning of
Kozhikode Bypass (Calicut Bypass) (i.e. KMC
39 Vengalam Jn. to Ramanattukara Jn.) section 66 1.895 30-05-2024 106.20 Kozhikode EPC Construction Kerala
of NH-66 from Design Chainage km Ltd.
230+400 to Design Chainage km 258.800
(total length 28.400 km) in the State of
Kerala on EPC Mode

Page 7
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
Construction of Standalone Flyover at
Rasalpur Junction on Indore-Dewas section Punia Madhya
40 NH-52 1.133 27-06-2024 31.18 Indore EPC
of NH-52 under road safety improvement in Construction Co. Pradesh
the state of Madhya Pradesh on EPC mode
Short Term improvement and Routing
Maintenance including Incident
Management Services for Vidisha-Sagar Not G.R Engineers & Madhya
41 NH-146 106.6 16-12-2024 7.16 Vidisha
section of NH-146 from Km.81+000 Applicable Contractors Pradesh
(Existing Ch.) to Km.187+600 (Existing Ch.)
in the State of Madhya Pradesh
Balance Work for Construction of Two lane
with paved shoulder from Km 80+800 to
PKT
Km 85+250 (Satna-Maihar section) of NH Madhya
42 135BG 4.45 30-12-2024 40.51 Katni EPC Construction
135BG (design length 4.450 km) under Pradesh
Private Limited
Bharatmala Pariyojana in the State of
Madhya Pradesh on EPC Mode
Six laning with both sides Service Road of
Ayodhya Bypass from Design Km 0+000 Missing Ravi Infrabuild Madhya
43 16.439 02-12-2024 836.91 Bhopal HAM
near Ashram Tiraha on NH-46 to Km Link Projects Limited Pradesh
16+439 end at Ratnagiri Tiraha on Nh-146
Design and Construction of VUP along with
its allied works for rectification of MoRTH
identified blackspot [Blackspot ID: MH (05)- Shiv Sai Maharash
44 NH 48 1 26-06-2024 33.90 Thane EPC
20)] at Ibadpada/ Sutrakar Phata Construction tra
(Ch.392.500) on Surat-Dahisar section of
NH-48 in the state of Maharashtra on EPC
Mode

Page 8
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
Design and Construction of New Service
Road from Ch. Km. 835.780 to Km. 836.600
(Linear length km 1.605) including Minor
Nikhil
Bridges And New Major Bridges on Both
Construction Maharash
45 sides Service Road on Mutha River 48 1.6 30-08-2024 52.68 Pune EPC
Group Private tra
Ch.837+063 along with its approaches for
Limited
NH-4 (Pune-Satara Section Km.725.000 to
Km. 865.000) in the State of Maharashtra
on EPC Mode
Design and Construction of Major Bridge
along with its allied works for rectification Nikhil
of blackspots at Bale Bridge (Ch. 245+700) Construction Maharash
46 65 1.04 26-07-2024 34.52 Solapur EPC
and at Old Pune Naka Bridge (Ch. 246+600) Group Private tra
on Pune - Solapur (Km. 150.050 to Km. Limited
251.325) section of NH 65 in the State of
Maharashtra of Slope Protection Works at
Construction
Amba Ghat from Km 67.000 to Km 72.000 MD-Infra India Maharash
47 166 5 02-09-2024 23.82 Kolhapur EPC
on NH-166 of Ratnagiri- Kolhapur section in Pvt. Ltd. tra
the state of Maharashtra on EPC Mode
Widening of service road near Charampa
Flyover, BUS Stand Chaka and Highway
Abhipsa
Lighting with widening of service near
48 16 1.5 04-07-2024 2.56 Chandikhole Item Rate Construction, Odisha
Bonth Chaka on both side of NH-16 in
Bhubaneswar.
Chandikhole – Bhadrak section of NH-05
(New NH-16) in the state of Odisha
Construction of 4 Nos. of FOB i.e. 1 No of
FOB at Baramunda, 1 No of FOB at Palasuni
Bhubaneshw Dhingra Brothers
49 and 2 Nos. of FOB at Manguli on 16 1 24-06-2024 7.30 EPC Odisha
ar (India)
Chandikhole-Jagatpur-Bhubanewar Section
of NH-5 (New Nh-16) in the State of Odisha
on EPC Mode

Page 9
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
Improvement of Khallikote Ghat section of
2.200 Km (i.e from Km. 307+600 to
C.P. Arora
309+800) by providing Retaining wall,
Engineers
50 widening of existing road, Drain and street 16 2.2 11-07-2024 2.62 Berhampur EPC Odisha
Contractors Pvt.
light, etc of 4/6 laning of Puintola to Tangi
Ltd.
(km 284.0-km 355.0) section of NH 5 (New
NH-16) in the state of Odisha.
Repair & Improvement at de-scoped EUP
locations from Km. 239+890 to Km. CDM
51 49 70.916 23-08-2024 0.67 Chandikhole EPC Odisha
310+806 of Baharagora – Singhara section Construction
of NH-49 in the state of Odisha.
Execution of various additional works in
Maruti
Jharpokharia – Baripada – Balasore Section
52 18 81.257 15-07-2024 10.60 Chandikhole EPC Construction Odisha
of NH – 5 (From Km. 0.000 to Km. 81.257)
Company
in the state of Odisha – 4th call
Construction of 3L Stand-along Bridge at IB Vindhya
53 NH-49 0.65 21-10-2024 33.60 Sambalpur EPC Odisha
river at Kanatora - Jharsuguda Section Construction
Construction of Vehicular Underpass at km Company
229.500 including Widening of New Service
road, Exit-Entry, Dismantling, EIMSIM Babas
54 Reconstruction of Drain and Relocating of 44 0.7 02-07-2024 18.50 Ambala EPC Infrastructure Punjab
Highway Lighting on Panipat-Jalandhar Pvt. Ltd.
section of old NH-1 (new NH 44) in the
State of Punjab on EPC Mode.
Operation & Maintenance including Routine
Maintenance and Incident Management of
Dhingra Brothers
55 Six Lane Panipat-Jalandhar Section of NH-1 44 115.1 13-08-2024 5.33 Ludhiana Item Rate Punjab
(India)
(New NH-44) from Km 272.000 to Km
387.100 in the State of Punjab

Page 10
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
Construction of Bicycle Track along 4-lane
(Partial Access Controlled) Laddowal Bypass
Kabir infra
56 from km 0.000 to km 17.041 linking NH-95 5 17.041 09-09-2024 10.45 Ludhiana Item Rate Punjab
private limited
with NH-1 via Laddowal seed farm at
Ludhiana in the State of Punjab
Milling & BC overlay of Zirakpur to Sangrur Rajinder
57 section of NH-64 (New NH-07) from Km. 7 123.9 14-08-2024 19.20 Chandigarh Item Rate Infrastructure Punjab
0.000 to Km. 123.900 in the state of Punjab. Private Limited
Replacement of Old Highway Halogen lights
with New LED Lights on NH-07 from Variant Infratech
58 7 123.9 09-09-2024 1.46 Chandigarh Item Rate Punjab
Zirakpur to Sangrur km. 0.000 to km Private Limited
123.900 in the State of Punjab.
Operation & Maintenance of 4-lane start of
Patiala bypass to Start of Sangrur Bypass KAMDHENU
59 07 60.72 09-09-2024 2.64 Chandigarh Item Rate Punjab
Section of NH-64 (New NH-07) from km. CONSTRUCTION
50.000 to km. 110.720 in the State of
Punjab maintenance and Incident
Routine
Management (Including Ambulance service
Suraj
for existing Kharar-Banur-Tepla of NH-205A)
60 205 13.7 04-07-2024 5.50 Chandigarh Item Rate Construction Punjab
of 4L of Kharar-Kurali section of New NH-
Company
205 from Km 16.200 to Km 29.900 in the
State of Punjab.
2 L PS of Tonk- Sawaimadhopur Section on KCC Infra Private
61 116 66.8 21-08-2024 41.58 Kota PBMC Rajasthan
from km. 1.300 to km. 69.750 of NH-116 Limited
Balance Works for six laning of
Sriperumbudur to karaipettai section of NH-
P&C projects Tamil
62 4 (New NH-48) from 37+000 (Existing Km NH 48 16.82 07-11-2024 341.50 Kanchipuram EPC
private Limited Nadu
37+000) to Km 71+015 (Existing Km
71+000) in Tamilnadu on EPC mode
underNHDP Phase-V

Page 11
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
Permanent Rectification of Black Spot TN-
(02)-155, TN-(02)-401, TN-(02)-594 and TN-
(02)-641 by constructing Vehicular
Underpass (VUP) at Maravapalayam Bus
Stop & Anichampalayam Privu, Light Ramalingam
Vehicular Underpass (LVUP) at Taluk Office Construction Tamil
63 44 2.42 18-12-2024 52.54 Salem EPC
Padamudipalayam and construction of Company Pvt. Nadu
additional Service Road along with 2nos of Ltd
Foot over Bridge at Thavittupalayam &
Velayuthampalayam village in the project of
Namakkal – Karur section of NH-44 in the
State of Tamil Nadu on EPC mode
Short term measures at 22 Nos. of Hot spot
locations & 4 Nos.of Black spot locations in NH44(TN Sharvaa Tamil
64 53.049 24-10-2024 2.50 Madurai Item Rate
Dindigul to Samayanallur section of NH- -05) Associates Nadu
44(TN-05)
Short term measures for 32 Nos. of Hot
Sharvaa Tamil
65 spot locations & 6 Nos.of Black spot NH44 116.5 24-10-2024 3.73 Madurai Item Rate
Associates Nadu
locations in Madurai to Kayathar Section of
NH-44
Rectification of Blackspot TN-(03)-303 by
Construction of 6Lane VUP of size 12x5.5m
at Km 203.995 on Madural Kanniyakumari Sindhu Muruga
Tamil
66 Section of NH44 (Old NH7) RE Wall 44 0.838 23-07-2024 24.20 Nagarcoil EPC Construction
Nadu
approaches 2Lane Service Road Pvt. Ltd.
Reconstruction of 2 Nos of Minor Bridges
etc. In the State of Tamil Nadu on EPC
Mode.

Page 12
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
The highway starting from its junction with
NH-716 near Puttur connecting, Narayana
Vanam, Thumburu, Koppedu, Harijan, Vada,
Ramagiri, Krishnapuram, Utthukottai in the Not Babuji Civil Tamil
67 NH-716A 32.29 06-12-2024 30.52 Chennai-II
State of Andhra Pradesh connecting Applicable Construction Nadu
Tharachi, Palavakkam, Periyapalam,
Kannigaipair, and terminating at its junction
with NH-16 near Janappachataram in the
State ofMaintenance
Major Tamil Nadu of the Existing Highway
(i) from Km. 29+300 to Km. 31+700 (ii) from
Km. 52.300 to Km 96.000 & iii) from Km. Suganya Tamil
68 NH-32 50.1 14-06-2024 43.90 Chengalpattu Item Rate
101.000 to Km. 105.000 on Tambaram to Constructions Nadu
Tindivanam section of NH-32 (Old NH- 45)
in the State of Tamil Nadu
Long term remedial measures for
Elimination of MoRT&H identified Black
EKK
Spots ID TN (02)-441, TN (03)-08, TN-028 & Tamil
69 NH-32 4.1 12-06-2024 89.26 Chengalpattu EPC Infrastructure
TN-(02)-308 at isolated locations from Nadu
Limited
Chengalpattu (Km 51+000) – Tindivanam
(Km 121+000) section of NH-45 (New NH-
32)
Construction of Foot Over Bridges with Lift
facility at 07 Nos of locations between Km EKK
Tamil
70 30+100 to Km 47+840 on Tambaram to NH-32 0.001 24-06-2024 13.59 Chengalpattu EPC Infrastructure
Nadu
Chengalpattu section of NH-32 (Old No. Limited
NH45) in state of Tamil Nadu on EPC Mode.
Periodic Renewal/Overlay in Madurai to
Tuticorin section from Km 138.800 to Km CDR & Co. Tamil
71 38 46.3 07-10-2024 122.51 Tuticorin Item Rate
266.865 of NH-38 (Old NH-45B) in the state Constructions Nadu
of Tamil Nadu on Item Rate basis

Page 13
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
Periodic Renewal Strengthening in
Thanjavur to Trichy section from Km 80.000 CDR & Co. Tamil
72 83 48.48 07-10-2024 28.13 Thanjavur Item Rate
to Km 128.480 of NH67 New NH83 in the Constructions Nadu
State of Tamil Nadu on Item Rate Basis
One Time Improvement(DBM+BC) of
abandoned NH/Bypass stretch of Existing
M/s Vignessh Tamil
73 road 2-Lane "Thirumangalam to 744 36.48 13-07-2024 25.04 Nagarcoil Item Rate
and Co Nadu
Rajapalayam" Section of NH208(Old)
NH744(New) in the State of Tamilnadu.
Annual Maintenance including Incident
Management of Thanjavur – Pudukkottai Shri Tamil
74 36 55.228 25-09-2024 2.92 Karaikudi Item Rate
Section from Km 174.000 to Km 229.228 of S.Vellaichamy Nadu
NH-36
Repair and Maintenance work in
Sri
Vikravandi-Sethiyathope section from Km Tamil
75 36 65.96 27-08-2024 7.96 Thanjavur Item Rate Venkateswara
0.00 to km 65.960 of NH-36 (Old NH-45C) in Nadu
Constructions
the State of Tamil Nadu on Item Rate Basis
Operation and Maintenance including
Incident Management for 6 months of Two
Laning with Paved Shoulders of Paramakudi Ramanathapu Tamil
76 87 39.42 04-10-2024 1.39 Item Rate Shri B. Murugan
– Ramanathapuram section from ram Nadu
Km.81/064 to Km.120/484 of NH-87 (Old
NH-49) in the State of Tamil Nadu on an
item rate basis
Operation and Maintenance including
Incident Management for one year of Four
laning of Madurai - Paramakudi section Ramanathapu G.R Engineers & Tamil
77 8,587 76.064 25-09-2024 5.97 Item Rate
from Km.5/000 to Km.81/064 of NH-85 & ram Contractors Nadu
87 (Old NH-49) in the State of Tamil Nadu
on an item rate basis

Page 14
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
“Construction of 6-Lane Underpasses (2
No’s) and allied works on Existing 4 Lane
Hyderabad to Bangalore Section of NH-44
Kanimetta (from km 125.890 to km
Mahabubnag Sree Rama
78 127.250) & Thomalapally (from km 149.110 44 3.01 26-09-2024 43.32 EPC Telangana
ar Constructions
to km 150.760) in the State of Telangana on
EPC Mode, as part of Longterm
Rectification of MoRTH Identified Black
Spot (TG-02-26 & TG-02-418).
Short term Improvement and Routine
Maintenance of 4/6 laning of Hyderabad -
Jogendra
79 Vijayawada section of NH-65 from 65 60 25-08-2024 3.37 Hyderabad Item Rate Telangana
Chodhary
Km.100.000 to 160.000 in the State of
Telangana.
Short term Improvement and Routine
Maintenance of 4/6 laning of Hyderabad - Jogendra
80 65 60 25-08-2024 3.36 Hyderabad Item Rate Telangana
Vijayawada section of NH-65 from Chodhary
Km.40.000 to 100.000 in the State of
Telangana.and Maintenance of 2/4 Lane
Operation
with paved shoulders of stretch from (i) Km
154/000 to 187/000 of Mangalwarpet to PDR Projects(P)
81 365 81.4 01-07-2024 53.36 Warangal PBMC Telangana
Mallampalli section; (ii) Km. 72/600 to Ltd.
121/000 of Tanamcherla to Jamandlapally
section of NH-365
Operation and Maintenance of 4 Lane
Varanasi Ring Road Phase I from Babtpur to Krishna
Uttar
82 Harhua section (km 0.00 to km 16.55) and 4 31 25 15-07-2024 5.89 Varanasi Item Rate Constellation
Pradesh
Lane Babatpur to Harahua section of NH-56 Pvt. Ltd.
from km 263.00 to km 271.450

Page 15
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
HILLWAYS
Construction of Ring Road around kanpur CONSTRUCTION
Uttar
83 from Ch.51.200 to Ch. 68.650 (Badarka to TBD 17.45 22-08-2024 612.50 Kanpur EPC COMPANY PVT.
Pradesh
Harbanch-Uchti Pkg-III) LTD.-M/s gour
tar Road coat
Construction of Ring Road Kanpur from Ch. private
Ajay limited
Prakash
Uttar
84 32.090 to Ch.51.200 (Transganaga to TBD 19.11 20-11-2024 321.00 Kanpur EPC Associates-S.S.
Pradesh
Sathara) (Package-II B) Builders (JV)
Construction of VUP Flyover at Medical
Tiraha to Konchhabhawar, Jhansi (Km.
105.700 to Km. 106.800) on NH-25 (New
Gawar Uttar
85 NH-27) and Inter-change at Km. 97.100 on 27 2 14-08-2024 98.99 Jhansi EPC
Construction Ltd Pradesh
NH-25 (new NH-27) for Shivpuri-Kanpur
Road (Jhansi Bypass) section in the State of
Uttar Pradesh on EPC.
4/6L of Northern Ayodhya Bypass starting
Km. 112.540 and ending Km. 139.928 north Uttar
86 bypass 35.4 23-09-2024 1199.30 Raebareli HAM Ceigall India Ltd.
of existing NH-27 (part-1) and part-2 south Pradesh
of NH-27 from km 0.000 to km 5.000.
4/6L Southern Ayodhya Bypass from Km
Uttar
87 5.000 to Km 37.172 (starting near Km. bypass 32.172 23-09-2024 1299.20 Raebareli HAM Ceigall India Ltd.
Pradesh
112.540 and ending at Km. 153.281 of NH-
27)
Repair and Maintenance of National
Highway-128A starting from its junction M/s MVD
Uttar
88 with NH-28 near Mohammadpur 128A 46.771 08-11-2024 9.19 Azamgarh Item Rate Infradevelopers
Pradesh
connecting to Badshahpur and terminating Private Limited
at its junction with NH-31.
Ghazipur-Zamaniya-Saiyadraja section of P. P Pandey Uttar
89 NH-24 56.48 23-08-2024 48.35 Varanasi EPC
NH-97 (old)/NH-24(New) Infrastructure Pradesh
Pvt. Ltd.

Page 16
List of Civil Project awarded till date (01/01/2025) in FY 2024-25
Total LOA Date -Civil Total Awarded
Sr. No. Project Name NH(New) PIU Mode Concessionaire State
Length Work Cost (Rs Cr)
S&P
Infrastructure West
90 Dhupguri-End of Falakata Bypass (Pkg IIB) 31D 29 14-11-2024 717.27 Jalpaiguri EPC
Developers Pvt. Bengal
Ltd. - Skylark
4L Bowaichandi to Guskara–Katwa Road Infra Engineering
Ashoka Buildcon West
91 section from Km 89.814 to Km 133.000 of 116A 43.186 25-11-2024 1391.00 Bardhaman HAM
Limited Bengal
NH 116A (Pkg-III)
4L Mayurakshi Bridge Approach to R&C
West
92 Moregram section from Km 180.000 to Km 116A 50.957 25-11-2024 2048.70 Krishnagar HAM Infraengineers
Bengal
230.957 of NH 116A (Pkg-V) Pvt. Limited
4L PS Kharagpur-Bardhaman-Moregram R&C
West
93 section from Km. 133.00 to Km. 180.00 for 116A 47 25-11-2024 1004.65 Krishnagar HAM Infraengineers
Bengal
Package-IV Pvt. Limited

Page 17

You might also like